Loading...
HomeMy WebLinkAboutSW6211001_Supplement-EZ Form_20211129SUIPP MEE-FZ COVFR PAGE FORNAS LOADED rRCJECT INFORMATION 1 � Project Name 2 Project Area ac __ 3 Coastal Wetland Area (ac) ... 4 Surtace Water Area (so) 5 Is this project High or Low Density? 6 Does this project use an off -site SCM? Road Apartrr 20.17 0 0 - High No COMPLIANCE WITH 02H .1003(4) _ 7 Width of vegetated setbacks provided (feet) n/a 8 Will the vegetated setback remain vegetated? _ N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: infiltration System Bioretention Cell --— 2 Wet Pond Stormwater Wetland ` 15 Permeable Pavement 16 - Sand Filter 17 Rainwater Harvesting (RWH) _ 18 Green Roof 19 Level Spreader -Filter Strip LS-FS 20 IDisconnected Impervious Surface (DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Sity Cell — 25 Ba filter 26 Filterra FORMS LOADE DESIGNER CERTIFICATION 27 Name and Title C. Scott Brown, PE - Vice President 28 ,Organization: _ _ 41D Site Solutions, Inc. 29 Street address: 409 Chicago Drive - Suite 112 30 City,State Zip:.Fayetteville, North Carolina 28306 31 Phone numbers : _ 910-426-6777 32 Email: sbrown@4dsitesolutions.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. H CARO4�'�,, FES 'pa;�'j� SEAL 027452 = SONG 051�. Signature of esigner P_Zq'Z! Date 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so, number of low density drainage areas _0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 iTVPe of SCM _ Wet Pond _ 878,537 300,353 300,353 Wet Pond 238655 238655 5 Total drainage area (so ft) 6 Onsite drainage area (sq ft 7 Offsite drainage area ft 8 Total BUA inro ect ft 348854 sf 188578 sf 160276 sf 9ft ew BUA on subdivided lots (subject to rpermitting) 10 New BUA not on subdivided lots (subject to rmittin sf 351226 sf 188578 sf 160276 sf 11 Offsite BUA ft 12 Breakdown of new BUA not on subdivided lots: - Parking_( ft -Sidewalk ft 35543 sf 22749 sf 12794 sf - Roof ft 642136 sf 59267 sf 49769 sf - Roadway s ft 157607 sf 81453 sf 73782 sf - Future ft - Other, please specify in the comment box belowLsgft) 49040 sf 25109 sf 23931 sf New infiltrating permeable pavement on 13 subdivided lots ft New infiltrating permeable pavement not on 14 subdivided lots ft Existing BUA that will remain (not subject to 15 perm ittin ft 16 Existin BUA that is already permitted ft 17 Existiqq_BUA that will be removed ft 18 Percent BUA 40% 63% 67% 19 Design storm (inches 20 Design volume of SCM (cu ft)_ 21 Calculation method for design volume ADDITIONAL_ INFORMATION Please use this space to provide any additional information about the 22 1drainage areas): 1.0 in 1.0 in 28103 cf 23193 cf Simple Simple "Other' impervious areas listed are to account for the water surface of the ponds, providing more accurate routing results. WET POND i— 1 Drainage area number 2 Minimum required treatment volume (cu ft) 1 15404 cf 13030 cf GENERAL MDC FROM 02H .1050 Is the SCM sized to treat the SW from all surfaces at build -out? Yes $ Yes — - - — 4 Is the SCMM located away from contaminated soils - Yes Yes 5 What are the side slopes of the SCM H:V ? 3:1 3:1 6 i Does the SCM have retaining walls, gabion walls or other engineered No No side slopes? 7 Are the inlets, outlets, and receiving stream protected from erosion Yes Yes 10- ear storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes Yes desi n volume? 9 What is the method for clewatering the SCM for maintenance? Pump referred Pump referred 10 1 If applicable, will the SCM be cleaned out after constriction? Yes Yes 11 Does the maintenance access comply with General MDC 8 ? Yes Yes 12 Does the drainage easement comply with General MDC 9 ? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with NIA NIA General MDC 10 ? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15' Is there an O&M Plan that complies with General MDC (12)? Yes Yes 16 Does the SCM follow the device specific MDC? _ Yes Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes WCT onkin Mnr FRnM n7H 1nSz 18 Sizing method used SA/DA SA/DA 19 Hasa stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment 247.00 246.00 removal) (fmsl 21 1 Elevation of the main pool bottom (top of sediment removal) (fmsl) 248.00 247.00 221 Elevation of the bottom of the vegetated shelf (fmsl) 23. Elevation of the permanent pool fmsl — - 24 Elevation of_ a top of the vegetated shelf (fmsl) 25, Elevation of the temporaryool (fmsl) _ 26Surface area of the main permanent pool (square feet) 27 Volume of the main permanent pool (cubic feet) 28 Avera a depth of the main pool (feed _ _ _ _ 29 Avera a depth equation used 30 _ If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. she (feet 251.50 251.00 252.00 251.50 252.50 252.00 253.84 T 253.26 8482 25722 of 3 ft Equation 3 _458.0 ft_ 10365 32946 of 3 !IF Equation 2 __ 3.0 ft 32 Volume of the forebay (cubic feed 33 Is this 15--20% of the volume in the main_ pool? _ 34 Clean -out depth for foreba inches) 35 Design volume of SCM (cu ft) 5426 of 5070 of Yes Yes 48 In 54 in 28103 of 23193 cf 36 Is the outlet an orifice or a weir? 37 If orifice, orifice diameter (inches) 38 If weir, weir heightfinchesL 39 If weir, weir length inches _ 40 Drawdown time for the temporary pool (days) Orifice Orifice 1.75 in 1.75 in 2.7 2.3 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting 42 Are berms or baffles provided to improve the flowpath? 43 Depth of forebay at entrance inches) _ _ _ _..._ 44 Depth of forebay_ate_(inches) 45 Does water flow out of the forebay in a non -erosive manner? 46 Width of the vegetated shelf (feet) 47' Slope of vegetated shelf H:V Yes Yes No No 60 in 66 in 54 in 60 in Yes Yes 1 6 ft 6 ft 6:1 6:1 48 Does the orifice drawdown from below the top surface of the ermanentpool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MD)�9 is met. No No 51 Is a trash rack or other device provided to protect the outlet system? 52 Are the dam and embankment planted in non -clumping turf grass? 53 Species of turf that will be used on the dam and embankment 54 Has a planting plan been provided for the vegetated_ shelf? ADDITIONAL INFORMATION Please use this space to provide any additional information about the 55lwet pond(s) Yes Yes Yes Yes I Centipede Centipede Yes Yes Wet Pond 2 11:12 AM 11/29/2021