HomeMy WebLinkAboutNCC204031_NOT Closeout Documents_20211129North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
Chemours Seep C Wastewater
County: Bladen Project: Treatment Plant River basin: Cape Fear
Person financially responsible: The Chemours Company - Tom Ei, Director of Project #: BLADE-2021-003
Corporate Remediation Group NPDES COC: NCC204031 / NCC210298
Address: 22828 NC Highway 87 W, Fayetteville, NC 28306
1. Project Location: NC 87 W, Hollow Township
Pictures: No
2. Weather and soil conditions: light rain, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Scott Miller, Jake Fancher, Ethan Moran
Inspection report: Sent Report Date given/sent: September 10, 2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under the
SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The
NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this
correspondence must be uploaded as part of completing the NOT process.
Reported by: Mike Lawyer Others present:
Date of inspection: September 09, 2021 Time arriving on site: 9:15 AM Time leaving site: 9:17 AM
cc: