HomeMy WebLinkAboutNC0044423_Remission Request (LV-2021-0334)_20211130 JUSTIFICATION FOR REMISSION REQUEST
Case Number: LV-2021-0334 County: Watauga
Assessed Party: Appalachian State University
Permit No.: NC0044423 Amount Assessed: $852.76
Please use this form when requesting remission of this civil penalty. You must also complete the "Request For Remission,
Waiver of Right to an Administrative Hearing, and Stipulation of Facts"form to request remission of this civil penalty.
You should attach any documents that you believe support your request and are necessary for the Director to consider in
evaluating your request for remission. Please be aware that a request for remission is limited to consideration of the five
factors listed below as they may relate to the reasonableness of the amount of the civil penalty assessed. Requesting
remission is not the proper procedure for contesting whether the violation(s)occurred or the accuracy of any of the factual
statements contained in the civil penalty assessment document. Pursuant to N.C.G.S. § 143B-282.1(c),remission of a civil
penalty may be granted only when one or more of the following five factors apply. Please check each factor that you
believe applies to your case and provide a detailed explanation, including copies of supporting documents,as to why the
factor applies(attach additional pages as needed).
(a) one or more of the civil penalty assessment factors in N.C.G.S. 143B-282.1(b)were wrongfully applied to the
detriment of the petitioner(the assessment factors are listed in the civil penalty assessment document);
(b) the violator promptly abated continuing environmental damage resulting from the violation(i.e., explain the
steps that you took to correct the violation and prevent future occurrences);
(c) the violation was inadvertent or a result of an accident(i.e., explain why the violation was unavoidable or
something you could not prevent or prepare for);
(d) the violator had not been assessed civil penalties for any previous violations;
X (e) payment of the civil penalty will prevent payment for the remaining necessary remedial actions (i.e., explain
how payment of the civil penalty will prevent you from performing the activities necessary to achieve
compliance).
EXPLANATION:
RECEIVED
NOV 30 2021
NCDEQ/DWR/NPDtS
STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY
COUNTY OF WATAUGA
IN THE MATTER OF ASSESSMENT ) WAIVER OF RIGHT TO AN
OF CIVIL PENALTIES AGAINST ) ADMINISTRATIVE HEARING AND
) STIPULATION OF FACTS
Appalachian State University )
Appalachian State WTP )
)
PERMIT NO.NC0044423 ) CASE NO. LV-2021-0334
Having been assessed civil penalties totaling$852.76 for violation(s) as set forth in the assessment document of the Division
of Water Resources dated,the undersigned, desiring to seek remission of the civil penalty, does hereby waive the right to
an administrative hearing in the above-stated matter and does stipulate that the facts are as alleged in the assessment
document. The undersigned further understands that all evidence presented in support of remission of this civil penalty must
be submitted to the Director of the Division of Water Resources within thirty(30) days of receipt of the notice of
assessment. No new evidence in support of a remission request will be allowed after(30)days from the receipt of the
notice of assessment.
This the Twtn•f � 4 -) day of i"0✓f0n`f ,20 Z I
,z)Zft)
SIGNATURE
ADDRESS
RECEIVED Zds ale vi.{r
Nov 0 2021 game A/Z z Aa7
NCDEQ/DWpJtipDES
TELEPHONE
( r2V-242 — 578Y
ATTACHMENT A
Appalachian State University
CASE NUMBER: LV-2021-0334
PERMIT: NC0044423 REGION: Winston-Salem
FACILITY: Appalachian State WTP COUNTY: Watauga
LIMIT VIOLATION(S)
SA
MPLE LOCATION: Outfall 001 -Effluent
Violation Report Unit of Limit Calculated %Over Violation Penalty
Date Month/Yr Parameter Frequency Measure Value Value Limit Type Amount
8/18/2021 8-2021 Copper,Total(as Cu) Monthly ug/I 5.20 10 92.3 Daily $0.00
Maximum
Exceeded
8/31/2021 8-2021 Copper,Total (as Cu) Monthly ug/I 4 10 150.0 Monthly $593.75
Average
Exceeded
8/18/2021 8-2021 Turbidity 2 X month ntu 10 16.3 63.0 Daily $156.25
Maximum
Exceeded
8/31/2021 8-2021 Turbidity 2 X month ntu - 10 11.1 11.0 Daily $0.00
Maximum
Exceeded
8/18/2021 8-2021 Zinc,Total (as Zn) Monthly ug/I 63 74 17.5 Daily $0.00
Maximum
Exceeded
8/31/2021 8-2021 Zinc,Total(as Zn) Monthly ug/I 63 74 17.5 Monthly $0.00
Average
Exceeded
Justification for Remission Request
Case Number: LV-2021-0334
Assessed Party: Appalachian State University
Permit No.: NC0044423
Explanation:
The Appalachian State University(ASU)water treatment plant has received a Notice Of Violation for
copper, zinc,and turbidity in the plant discharge water in August of 2021. ASU had a zoom meeting on
July 23, 2021 with several members at NCDEQ to outline the steps ASU is taking to bring the water plant
into compliance. ASU also responded in writing,via electronic mail, on November 4, 2021 providing
information on steps taken to address the violations. ASU then received an Assessment of Civil Penalty
for the violation
ASU believes that a remission of the civil penalty is warranted for the following reason.
ASU has been working with Dewberry Engineers since January 2018 to bring the plant wastewater
discharges into compliance. For proof of this work, please see the attached proposal dated 1/17/2018.
The work was started well before the NOV's in question and is still ongoing.The initial phase of the
evaluation included extensive sampling to identify the root cause of the exceedances so that a targeted
appropriate solution could be identified. It has been made clear that discharging the wastewater back
into the lake is effectively concentrating the copper and zinc levels in the vicinity of the intake structure.
As such,ASU has submitted a request to NCDEQ NPDES Wastewater Permitting to modify the existing
wastewater discharge permit. The permit modification request seeks to move the plants wastewater
discharge outfall to downstream of the plant's reservoir. In short, moving the discharge location will
keep ASU from pulling the wastewater into the plant intake.
The permit modification request also outlines two other options for removing the copper and zinc at the
water treatment plant. Both options have been evaluated by Dewberry Engineers and assigned high
level cost estimates. Based on the evaluation of treatment options, it is preferred to move the discharge
location as the means to address the issue.
The permit modification request was submitted by mail and e-mail on July 13, 2021.
ASU is currently working with DewberryEngineers to make changes to the modification request after
DEQ provided guidance in a zoom meeting on September 21, 2021. If the modification request is
approved,ASU will work with all possible haste to implement the changes outlined in the request.
The ASU water plant underwent a three day shut down this summer in order to vacuum excavate the
sludge from the bottom of the backwash basin. Once the sludge was removed, the basin was
thoroughly cleaned to help remove residual copper and zinc from the basin. Additionally in an attempt
to help mitigate the intake of wastewater directly back to the plant, ASU has started scheduling
wastewater discharges when the plant is finished operating for the day. This gives the wastewater
approximately 18 hours to disperse before the plant is restarted. The discharge scheduling changes
have been implemented this summer, before the NOV was received.
It is our opinion, that since ASU is taking valid measurable steps to bring the plant back into compliance
and has incurred costs in excess of$84,000 to evaluate the root cause of the violations and identify the
appropriate solution and will incur additional costs in excess of$65,000 to implement the solution, that
the civil penalty should be considered for remission. I greatly appreciate your time and your willingness
to work with ASU. We here at ASU are deeply committed to environmental integrity, and look forward
to implementing an effective solution to this problem.
Dewberry® Dewberry Engineers Inc. 704.509.9918
9300 Harris Corners Parkway 704.509.9937 fax
Suite 220 www.dewberry.com
Charlotte,NC 28269
January 17,201.8
Revised January 22,2018(Rev')
Revised January 29,2018(Rev2)
Revised March 5,20'8(Rev3) RECEIVED
Mr.Jeff Pierce N()V a ® 202i
Physical Plant Acting Director
Appalachian State University NCDEQIDWRINPDtS
Planning,Design and Construction
DD Dougherty Administration Building
Boone,NC 28608
Reference: Appalachian State University Water Treatment Plant Permit Evaluation
Dear Mr.Pierce:
Dewberry Engineers Inc. (Dewberry) is pleased to submit this proposal to assist the Appalachian State
University (ASU) Water Treatment Plant (WTP) evaluate alternatives to modify the facility's National
Pollutant Discharge Elimination System(NPDES)permit.This proposal is based upon our December 20,
2017 conversation.
To facilitate your review,our proposal presents the Project Understanding,Scope of Service,and Fee.
PROJECT UNDERSTANDING
Dewberry understands the ASU WTP discharges filter backwash to Norris Branch Reservoir,also known as
Appalachian State Reservoir,under the auspices of NPDES NCoo44423.The most recent permit became
effective April 1,2017.Norris Branch Reservoir is classified as a Water Supply II,Trout,and High Quality
Water and as a result is subject to stringent water quality standards.The current NPDES permit subjects
the ASU WTP to an effluent turbidity limit of io NTU (nephelometric turbidity unit) and a minimum
effluent dissolved oxygen of 6 mg/1. ASU WTP is currently not able to consistently meet the effluent
dissolved oxygen limit or the effluent turbidity limit.The NPDES permit imposes a schedule which requires
compliance with the effluent turbidity limit by July 1,2019.
These effluent limits are identical to the surface water quality in-stream standards for trout waters (i5A
NCAC.o2B.o211).In-stream water quality standards are established as criteria to achieve within the water
body.Typically,in-stream water quality standards are not applied directly as effluent NPDES permit limits,
except in instances where the receiving stream is a zero flow stream.In addition,when in-stream standards
are used to develop numerical effluent limits,a dilution factor is typically applied which takes into account
the critical low flow rate of the receiving water body.The critical low flow rates are established by the United
States Geological Survey(USGS). Moreover,it is customary for NPDES permits to contain upstream and
downstream monitoring requirements to confirm in-stream water quality standards are maintained.
The ASU WTP does not discharge into a zero flow stream. However,in developing the ASU WTP effluent
limits, no dilution credit was given for the receiving stream because it is a lake/reservoir. DEQ set the
effluent limits equal to the in-stream standards.The responsibility to establish a dilution ratio for Norris
Branch Reservoir was placed on ASU as the permittee.The ASU WTP NPDES permit includes upstream
Mr.Jeff Pierce
Project:ASU Water Treatment Plant Permit Evaluation
January 17,2018
Revised March 5,2018(Rev3)
Page 2 of 6
monitoring for turbidity and dissolved oxygen but does not include downstream monitoring for these
parameters.
Dewberry understands ASU is interested in evaluating regulatory solutions for achieving compliance with
the effluent turbidity and dissolved oxygen limits.In Dewberry's opinion,multiple options are available for
modifying the NPDES permit which would be consistent with the intent of water quality regulations,would
improve the potential for ASU to maintain compliance with the NPDES permit,and be protective of water
quality.
Based on discussion on January 22,2018,Dewberry understands ASU is interested in relocating the DO
sampling location and add a fresh-air intake sleeve (aeration device). These changes are targeted to
increasing the DO concentration in the effluent samples. Per correspondence from Mr.George Smith,the
aeration device will require modification of the existing permit,but the revised sampling location will not.
The extent of infrastructure permit modification will be placed on the DEQ meeting agenda. Dewberry
will present the proposed infrastructure permit modifications at the meeting with DEQ.
Based on discussion on January 29, 2018,Dewberry understands ASU would like the current scope to
include completion of the permit modification application based on the assumption that Option 1 is agreed
upon with DEQ as the appropriate path forward. The scope below has been revised to include the
previously Future Task 4.
SCOPE OF SERVICE
Task 1t—Information and Regulatory Review(Work Previously Completed)
Dewberry has previously completed the following activities in preparation for assisting ASU WTP with this
permit evaluation.
• Participate in conference calls with ASU
• Review ASU WTP NPDES permit fact sheet,current NPDES permit,and historical NPDES permits
• Review ASU WTP effluent data
• Review water quality regulations
• Review receiving water stream classification and impairment status
• Assist ASU with writing the response to Notice of Violation &Intent to Assess Civil Penalty
(Tracking Number:NOV-2018-LV-oo34)fir September 13,2017.
Task 2—Kickoff Meeting and WTP Site Visit
As an initial activity,two Dewberry engineers will participate in a site visit and project kickoff meeting at
the ASU WTP. The project kickoff meeting will include representatives from Dewberry and ASU but will
not include DEQ.The objective of this meeting will be to review information previously provided by ASU
and request additional information if needed,develop the project plan,tour the WTP,observe the discharge
outfall and sampling locations, discuss project schedule, and establish lines of communication with the
University and DEQ. The proposed infrastructure modifications will be reviewed. During the meeting,
Dewberry will present the path forward options,presented in more detail in Task 3 scope below,and will
discuss the advantages/disadvantages of each option with ASU.
Dewberry'
r•r
•
Mr.Jeff Pierce
Project:ASU Water Treatment Plant Permit Evaluation
January 17,2018
Revised March 5,2018(Rev3)
Page 3 of 6
Dewberry will draft meeting minutes to document the kick off meeting.Dewberry will submit a draft of the
meeting minutes to ASU for review and comment. Dewberry will incorporate mutually agreed upon
revisions prior to a final submittal.
Task 3—Meeting with DEQ
Dewberry will coordinate a meeting with the NC DEQ Winston-Salem Regional Office NPDES permitting
personnel. Due to potential schedule constraints with DEQ personnel, Dewberry suggests setting this
meeting date as an initial project activity to ensure this meeting does not become a schedule limiting
activity.Dewberry will contact the Winston-Salem Regional Office to schedule the meeting.
The objective of the meeting will be to propose permit modification strategies to DEQ.Dewberry will use
information previously reviewed in Task 1 and Task 2 to develop a presentation for the meeting. The
presentation will serve as the meeting agenda and Dewberry will review the presentation with ASU prior to
the meeting.We assumed two Dewberry engineers will attend the meeting with ASU representatives and
the meeting will take place at the Winston-Salem Regional Office after completion of Task 2.
Dewberry anticipates proposing two potential permitting strategies at the meeting. The first proposed
strategy"Option 1"will be to modify the permit to monitor turbidity and dissolved oxygen upstream and
downstream of the discharge and remove the numerical effluent limits. If the downstream sampling
indicates the in-stream standards are met, an effluent limit is deemed unnecessary to comply with water
quality regulations;therefore,we would request to remove the numerical effluent limit.The intent of adding
the upstream sampling is to confirm that the receiving water body is not exceeding the in-stream water
quality standard before the ASU WTP discharge.This first strategy"Option 1"is the preferred path forward.
Dewberry considers this consistent with the intent of the water quality regulations.
If the first proposed strategy is not accepted by DEQ,a second potential path forward"Option 2"would be
to perform a study to establish the dilution factor provided by Norris Branch Reservoir. DEQ may require
ASU to establish the dilution factor in order to modify the ASU NPDES permit. A mixing zone study is
currently listed in Special Condition A(3) of the ASU WTP NPDES permit as an acceptable study for
inclusion in the required Corrective Action Plan(CAP). It is anticipated that DEQ would accept a mixing
zone study as a path forward;however,this is not deemed the preferred alternative because it will require
significantly more effort compared to the first proposed strategy("Option 1").It should also be noted that
if a dilution factor is established and used to increase the effluent turbidity limit,it does not guarantee the
increased limit will be high enough to resolve the potential compliance concerns.It is also worth noting that
a dilution factor could be used to increase other effluent limits within the NPDES permit,specifically copper
and zinc.
Concurrently with "Option 1",Dewberry anticipates proposing permit modifications for infrastructure
changes. These changes include relocating the DO sampling location and add a fresh-air intake sleeve
(aeration device). These changes are targeted to increasing the DO concentration in the effluent samples.
The goal of the meeting with DEQ is to select a path forward that is acceptable to ASU and DEQ.Dewberry
will draft meeting minutes to document the discussion.After ASU reviews the draft meeting minutes and
provides comments,if necessary,Dewberry will update and distribute the meeting minutes to all attendees.
Dewberry
Mr.Jeff Pierce
Project:ASU Water Treatment Plant Permit Evaluation
January 17,2018
Revised March 5, 2018(Rev3)
Page 4 of 6
Task 4—Permit Modification Application
The preferred permitting strategy,identified as "Option 1", is to modify the ASU WTP NPDES permit to
include upstream and downstream in-stream monitoring for turbidity and dissolved oxygen and
eliminate the numerical effluent limits for those parameters.If DEQ finds this strategy acceptable, the
next step would be to submit an application to modify the NPDES permit. Modifying the sampling
locations and effluent limits is deemed a major permit modification.A major permit modification may
require submittal of complete application forms and appropriate supplemental documentation.
Dewberry will complete the DEQ Form C-WTP and develop a cover letter for the permit modification.
Dewberry assumes no other supplemental documentation or sampling is required by DEQ to support the
permit modification.Dewberry will submit a draft of the permit application and cover letter to ASU to
review and comment.Dewberry will host a teleconference to review the draft application with ASU and
will make mutually agreed upon revisions.Dewberry assumes ASU will be responsible for submitting the
application and any application fees.
If DEQ is amenable to the proposed infrastructure improvements strategy, a permit modification with
supporting documentation and an Authorization to Construct will be required. The scope and fee to
support ASU with the Authorization to Construct and plant modification construction documents for
infrastructure improvements are not included in this proposal. Therefore, if this is the selected path
forward,Dewberry can submit a separate fee proposal detailing the required scope.
Future Task 5—Water Quality Modeling and Permit Modification
If"Option 1" cannot be agreed to by DEQ, ASU may be required to establish a dilution ratio for Norris
Branch Reservoir "Option 2"before allowing modification of effluent permit limits. For discharges into
streams or rivers,numerical effluent NPDES limits are often established by allowing credit for the dilution
of the discharge into the receiving water body.The dilution credit is most often calculated at the receiving
water's low flow condition,or 7Qio.The 7Qio is defined as the minimum average flow for a period of seven
consecutive days that has an average recurrence of once in ten years. This permitting strategy does not
appear to have been applied by DEQ to Norris Branch Reservoir which is permitted as a lake discharge.
Hydraulic modeling of Norris Branch Reservoir could be performed to quantify the dilution provided by the
reservoir.The Reasonable Potential Analysis performed by DEQ to establish the effluent permit limits could
be reevaluated to apply the dilution ratio determined by the study which would result in higher effluent
permit limits. Once the hydraulic modeling is performed, a permit modification application can be
completed as described in Future Task 3.It is not guaranteed that the higher effluent limits would resolve
the compliance concerns. The scope and fee to support ASU with water quality modeling and permit
modification is not included in this proposal.Therefore,if this is the selected path forward,Dewberry can
submit a separate fee proposal detailing the required scope.
FEES
We propose to perform Tasks 1, 2, 3, and 4 as described in the Scope of Services for a lump sum fee of
$19,500.After Task 3 is complete,if Option 2 is selected and Future Task 5 is required,a fee estimate for
future work can be provided.
Dewberry
Mr.Jeff Pierce
Project:ASU Water Treatment Plant Permit Evaluation
January 17,2018
Revised March 5,2018(Rev3)
Page 5 of 6
The following assumptions were made in preparing this fee estimate:
• Dewberry has allocated for one meeting at the ASU WTP and one meeting with DEQ at the Winston-
Salem Regional Office.
• Dewberry has not included allocation for sample collection or analysis if additional sampling is
required.
• Dewberry excludes writing responses for additional Notice Of Violations beyond the one included
in the Task i Scope of Work.
• Dewberry excludes preparing an Authorization to Construct and design documentation if
installation of additional equipment is required.
• Dewberry assumes ASU is responsible for permit application fees.
SCHEDULE
A preliminary project schedule is presented below. Please note that this schedule is subject to DEQ
availability and responsiveness.
• Kickoff Meeting at ASU WTP—Within 3 weeks of receiving Notice to Proceed
• Submit Draft Agenda for DEQ Meeting to ASU—2 weeks after Kickoff Meeting
• Meeting with DEQ—Within 4 weeks of Kickoff Meeting(subject to DEQ availability)
• Submit Draft Meeting Minutes to ASU—i week after DEQ Meeting
• Submit Draft Form C-WTP and Cover Letter to ASU—3 weeks after DEQ Meeting
ADDITIONAL SERVICES
This proposal is based upon our current understanding of local, state and federal requirements and
regulations and our understanding of the project as described herein. Any modifications to these
requirements and regulations, or other requirements not provided for herein, which require additional
services will be discussed with Appalachian State University and an additional services proposal will be
generated by Dewberry.
AUTHORIZATION
If you have any questions, please do not hesitate to contact us.We look forward to serving Appalachian
State University on this project. If you find our proposal acceptable, please execute a purchase order to
allow us to begin work.
Sincerely,
Dewberry Engineers Inc.
Oriv4 op. '7714
Anthony"Tony"Miller,P.E.
Project Manager
cc: Leigh-Ann Dudley,PE,Dewberry
Katie Jones,PE,Dewberry
=r Dewberry'
Mr.Jeff Pierce
Project:ASU Water Treatment Plant Permit Evaluation
January 17,2018
Revised March 5, 2018(Rev3)
Page 6 of 6
The foregoing proposal of Dewberry Engineers Inc.is accepted:
Print(Type)Individual,Firm,or Corporate Name
Signature of Authorized Representative Date
Print(Type)Name of Authorized Representative and Title
IP Dewberry'