HomeMy WebLinkAbout20181273 Ver 1_Initial Credit Release_20211123Mitigation Project Name
DMS ID
River Basin
Cataloging Unit
County
Bug Headwaters Mitigation Site
100084
Yadkin
03040101
Wilkes
USACE Action ID
DWR Permit
Date Project Instituted
Date Prepared
Stream/Wet. Service Area
Signature of Official Approving Credit Release
2018-01788
2018-1273
6/22/2018
10/28/2021
Yadkin 03040101
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the
NCIRT and posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Cool Stream Credits
Project Credits
Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
#Releases
Approved
Credits
Anticipated
Release
Year
Approved
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
2,276.860
2,276.860
0.000
2,276.860
2021
10/28/2021
3 - Year 1 Monitoring
10.00%
758.953
2022
4 - Year 2 Monitoring
10.00%
758.953
2023
5 - Year 3 Monitoring
10.00%
758.953
2024
6 - Year 4 Monitoring
5.00%
379.477
2025
7 - Year 5 Monitoring
10.00%
758.953
2026
8 - Year 6 Monitoring
5.00%
379.477
2027
9 - Year 7 Monitoring
10.00%
758.953
2028
Stream Bankfull Standard
10.00%
758.953
2025
Totals
2,276.860
Total Gross Credits
7,589.533
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
2,276.860
Total Percentage Released
30.00%
Remaining Unreleased Credits
1 5,312.673
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Cool Stream
Restoration
6,055.000
Cool Stream
Enhancement I
1,769.000
Cool Stream
Enhancement II
936.000
Page 1 of 2
Mitigation Project Name
DMS ID
River Basin
Cataloging Unit
County
Bug Headwaters Mitigation Site
100084
Yadkin
03040101
Wilkes
USACE Action ID
2018-01788
DWR Permit
2018-1273
Date Project Instituted
6/22/2018
Date Prepared
1O/28/2021
Stream/Wet. Service Area
Yadkin 03040101
Debits
Cool Stream
Restoration
Credits
Beginning Balance (mitigation credits)
7,589.533
Released Credits
2,276.860
Unrealized Credits
0.000
Converted Credits
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE Permit
DWR
DCM
Remaining Balance (Released credits)
2,276.860
Remaining Balance (Unreleased credits)
5,312.673
Total Remaining Balance (Released and Unreleased credits)
7,589.533
Page 2 of 2
l4:erfiche Upload: Email &Attachment
DWR#: 20181273 v.1
Doc Type: Mitigation Evaluation
From: Bmwnin& Kimberly DCIV USARMY CESAW (USA( [maiko:Kimberly.D.Browning@usace.army.mil]
SeM: Tuesday, Nwember 23, 20214:35 PM
TO: Wiesner, Paul <paul.wiesrier@ncdenr.gov>
CC: Reid, Matthew<matthe d,d@ncdenr.g,—;Cmmbley,TykrACIV USARMY CESAW (USA(<Tyler.A.CmmbIW2@usace.,,- ill; Leff Keaton<jkeaton@wildlandseng.com>; Shawn Wikerson<swilkerson@wildlandseng.com>;Haywood, Casey M CIV USARMY CESAW (UM)
<Casw.M.Haywood@usace.army.mib; Tugwell, Todd 1 CIV USARMY CESAW (US(<T.,d.I.Tu—II@u.t, 1-.d,iI1; Davis, Ed. B<ed..d,%ds@.tdenr.g—; Bowers, Todd <bo—.wdd@epa —; Youngman, Holland 1 <h0h.d youdg—.@f es.g—, Wilson, Travis W.
.wilson@ncwildlife.org>; Leslie, Addh-1 <andrea.leslie@d-Idlife.org>; Hannon, Beth <beth. harmon@ncdenr.gw>; Stanfill, lim <jim.rtanFll@ncdenr.gov>; Men, Melanie <mebnk.allen@ncdenr.gov>
Subj—(Ex Al Notice of Initial CreditRelease/NCDMS Bug —"M— Mitigation Site/SAW-218—./Mike, County
verky. se rag¢pyySLym,
Paul,
The 15-Day&-Built/MYO review far the Bug Headwaters Mitigation Site (SAW-2018-01—B ended Nwember 19, 2021. Per Section 332.8(0((9( ofthe 20M Mitigation Rule, this review followed the streamlined review process. All comments received from Ube NCIRT are incorporated in the
mail below. Please address IRT concerns in the MY1 Report and provide a response to this email. The IRT would like Uo visit this site in 2022 during Ube credit release site vkits. There were no objection to issuing the initial 30%credit release of 2276.860 cool SMM Please find attached
thecurrent signed ledger.
1. Groudd instability in both pond bottoms will likely be something to watch during monitoring with regard to vegetation establishment. Was the sediment from the pond removed, and were soil amendments added prior W plating?
2. What b the source dsedimentcweringthe riffleat STAM-6?
3. If the exirting wetlands were planted, please capture same of those areas with random veg plats in future monitoring years.
4. Were plantingsubstituti0ns made?lU's difficult UO UellUhe percent of each species planted from Table 6.
1. Overall, DWR was pleased with the level of detail included in Ube MEM Report. We also appreciated DMS' comments. And thank you for providing the drone video, it was very helpful for this review.
2. UT3&UT6— It could simply be a Uermir Il thin&but "stone bank fortifi Uion"raises aye lbw Flag about di pping a section ofsUream. Please provide a brief description of what was done as an d Ube stone bank fortifcaUion, as well asa bdefjuAfficatbn of need.
3. Looking at the redline drawing set rertoratbn reaches profiles, many d Ube as -built pools are shallower than the design. Are these features expectedUO deepen over time? Will changes be captured by the proj-cross-sMbns?
4. Based on observa ns from the video, if not support
channelm N beincom g imana dered W manage any vegetation growing within stream channels it should be proposed within the neM two years. In general, DWR does channel maintenance beyond to eva MY3 in order luate
the trajectoryd a credit feature's function (sream vs. wetbnd(nce
Tndd Rrwnrc
I have performed a cursory r ie—fthe Bug Headwaters mtigaton site -Bulk and MYO Reports dated October 2021.AtINN time Ida rot have anyspecific comments or coricems withthe site as presented by WlldlandsEngineering.The—p,diwlationssuch as rock All replacement
with -ill, Ube realignment d UT 3, brush toe and riffle enhancements, fence realignments, BMP enhancements, and Ube replacement of tag He, with other species in the planting plan were all noted and acceptable.
Happy Thanksgivin&
Kim
Kim Browning
Mitigation ProjM Manager, Regulatory Divis'pn U.S. Army Corps of Engineers
—Original Message —
From: Haywood, Casey M CIV USARMY CESAW (USA(<Casev.M.Havwood@usace.armv.mil>
Sent: Thursday, November04, 202112:33 PM
To: Tugwell,=atCIVUTARMY CESAW (USA(<Tndd lTnawrlllolnca mil>;Bmwnin&Kimbedy DCIV USARMY CESAW(USA(<KimbnrlvrtRrnwnina mib; Davis, Erin B<nrin davisllonr�l nv>;Bowers,Todd<bnwrrc mddlolrna an�o; Youngman, HollandI
<holland vounemanlafws.eov>; [ravis.wilsonlancwildlife.ore; andrea.leslielancwildlife.ore
CC Wiesner, Paul<oanl wircnrrloln v>;Reid, M,Bhem, brw rridloln vrlones,MScott(Scott( CIV USARMYCESAW(USA(IS— Innrclod miI>;CrumblwTNerACIVUSARMYCESAW(USA(<TNrrA ('n�mblrv�on mib; Boggs, Brandee C CIV
USARMY CHAD(USA(<Bmnrlrr. ('. mil>; Leff Keaton<krainn wildbndcrn�r�m>; Shawn Wilkerson <s�ilkrrrnn onw�ldbndrrne rnm>
Subj— Notice d As -Built & MYO Review/ NCDMS Bug Headwaters Mkigation Site/SAW-2018-01788/ Wilkes County
Good after
The bebw referenced FINAL Record Drawing (As -Built( Report review has been requerted by NCDMS. PerSMion 332.8(0((9(of the 2008 Mitigation Rule, this rwkw requires an IRT review period of 15 calendar days. Please provide anycommen[s by 5 PM on the 15-daycomment
deadline shown bebw. When providing comments please indicate if your coricems are great enough that you recommend not issuingthe credit release. Comments provided aRerthe 15-daycomment deadline (shown below( may not be considered. Please no[e:lf an IRi site visit is
requerted, comments will be due 1"d after the site vkit is conducted.
At the conclusion of this comment period, a copyof all comments will be provided W NCDMS and the NCIRT aI,ngwith Dbtdd Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
15-Day Comment Start Date: November 04, 2021
15-Day Comment Deadline: November 19, 2021
45-Day DE Decision: December 19, 2021
Project information and bcatbn d Ube FINAL As -Built Baseline Monitoring Report (MYO(:
Bug Headwaters Mitigation Site
DMS P,.*d # 100084
RFP#16-00 —Issued 12/)/201)
Inrtkution Date: 6/22/2018 Full Delivery
SAW -20 -788
MU M181273
Yadkin River Basin
Catalo®ng Unit 0-0101
Wilkes County, North Carolina
Mitigation Plan Projel Credits:
), 589.533 SMUs (cool(
As-Built-MYO Proj-Credits:
7,58S.533 SMUs (cool(
Mitigation Pbn Lengths/ Acreages:
8,760 ff.
As-Built-MYO Lengths/ Acreages:
8,—ft.
Please Note:
There wasa 68-foot reduction ins[ream length from Mitigation Plan Footaget,As-Built Footage throughout the SRe. UT3 hasa 28-foot reduction in stream length, however, this of due, thealignment change. Theoriginally p,po alignment was 810 feet, while the realigned
submitted t, the IRT was 811 feet. The As -Built Plansshow that A- werec,n—m as designed with-1,min,rdeviatpns. The reduction in sream footage is relatedWthe typical difference between Overall design Mg. —length and the surveyed sream lengths.
ProjM adju—ts are detailed in S di,n 2.1 As -built/ Record Drawings. 2021 is Monitoring Year 1 for this proj—
FD Provider: Wildlends Engineering Inc Contact Leff Keaton,-kratnn onwilAland�rn� rim <maihn�ikratnn anwilAland�rn� r�mI, (919( 851-9986-103
NCDEQ- DMS PM: Matthew Reid, matthrwrrid onn maihn�matthrw rrid unnrdrnrenv�,(828(-231-7912
FINAL ACBuilt Baseline Monitoring Reportand Record Drawings can be accessed dir ly,. the DIMS Sh,,Pd¢ site here:
Adr,nevideo Nth,,k,isavailablehere:httm//vrnmrnP/ ra a<Blockedhttp,l/youtu.be/_p0MV27—
IRT-DMS Share—t Page (Updated(:
<Blockedhttplj/nccOnrectsharep,intc,m/sites/IRT-DMS/SRePages/H,me.aspx>
Bug—dwaters 100084 MYD 2021.pdf
<Blockedhttps://ncconn.—harepoi ,../sites/IRT-DMS/ASBuik%20Report%20%20Drawing/Forms/Nlltems.aspxi
id=%2Fsites%2FIRT%2DDMS%2FASBuik%20Report%20%20Drawing%2FBug%20Headwaters%20%28MMM%29%2FBWHeadwaters%5F1000M0 FMY 5F2021%2Epdf&pave -%2Fsites%2FIRT%2DDMS%2FASBuilt%20Report%20%20Drawing%2FBug%20Headwaters%20%28100080%29>
Bug—dwaters_108080_AB_2021.pdf
<BlockedhttpsJ/ncconn.—harepoirk.com/sites/IRT-DMS/ASBuik%20Report%20%20Drawing/Forms/Nlltems.aspxi
id=%2Fsites%2FIRT%2DDMS%2FASBuik%20Report%209620Drawing%2FBug%20Headwaters%20%2810MM%29%2FBWHeadwaters%5F100 M8 FAB%5F2021%2Epdf&parent=%2Fsites%2FIRT%2DDM5%2FASBuilt%20Report%20%20Drawing%2FBug%20Headwaters%20%28108080%29,
RIBITS:
®'
Mitigation Speciality, Regulatory Division I U.S. Army C,rps,f Engireers
(919(750-)397w,rk cell
BUILDING STRONG s