HomeMy WebLinkAbout20181273 Ver 1_Initial Credit Release_20211123Mitigation Project Name DMS ID River Basin Cataloging Unit County Bug Headwaters Mitigation Site 100084 Yadkin 03040101 Wilkes USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/Wet. Service Area Signature of Official Approving Credit Release 2018-01788 2018-1273 6/22/2018 10/28/2021 Yadkin 03040101 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Cool Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 2,276.860 2,276.860 0.000 2,276.860 2021 10/28/2021 3 - Year 1 Monitoring 10.00% 758.953 2022 4 - Year 2 Monitoring 10.00% 758.953 2023 5 - Year 3 Monitoring 10.00% 758.953 2024 6 - Year 4 Monitoring 5.00% 379.477 2025 7 - Year 5 Monitoring 10.00% 758.953 2026 8 - Year 6 Monitoring 5.00% 379.477 2027 9 - Year 7 Monitoring 10.00% 758.953 2028 Stream Bankfull Standard 10.00% 758.953 2025 Totals 2,276.860 Total Gross Credits 7,589.533 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 2,276.860 Total Percentage Released 30.00% Remaining Unreleased Credits 1 5,312.673 Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Cool Stream Restoration 6,055.000 Cool Stream Enhancement I 1,769.000 Cool Stream Enhancement II 936.000 Page 1 of 2 Mitigation Project Name DMS ID River Basin Cataloging Unit County Bug Headwaters Mitigation Site 100084 Yadkin 03040101 Wilkes USACE Action ID 2018-01788 DWR Permit 2018-1273 Date Project Instituted 6/22/2018 Date Prepared 1O/28/2021 Stream/Wet. Service Area Yadkin 03040101 Debits Cool Stream Restoration Credits Beginning Balance (mitigation credits) 7,589.533 Released Credits 2,276.860 Unrealized Credits 0.000 Converted Credits 0.000 Owning Program Req. Id TIP # Project Name USACE Permit DWR DCM Remaining Balance (Released credits) 2,276.860 Remaining Balance (Unreleased credits) 5,312.673 Total Remaining Balance (Released and Unreleased credits) 7,589.533 Page 2 of 2 l4:erfiche Upload: Email &Attachment DWR#: 20181273 v.1 Doc Type: Mitigation Evaluation From: Bmwnin& Kimberly DCIV USARMY CESAW (USA( [maiko:Kimberly.D.Browning@usace.army.mil] SeM: Tuesday, Nwember 23, 20214:35 PM TO: Wiesner, Paul <paul.wiesrier@ncdenr.gov> CC: Reid, Matthew<matthe d,d@ncdenr.g,—;Cmmbley,TykrACIV USARMY CESAW (USA(<Tyler.A.CmmbIW2@usace.,,- ill; Leff Keaton<jkeaton@wildlandseng.com>; Shawn Wikerson<swilkerson@wildlandseng.com>;Haywood, Casey M CIV USARMY CESAW (UM) <Casw.M.Haywood@usace.army.mib; Tugwell, Todd 1 CIV USARMY CESAW (US(<T.,d.I.Tu—II@u.t, 1-.d,iI1; Davis, Ed. B<ed..d,%ds@.tdenr.g—; Bowers, Todd <bo—.wdd@epa —; Youngman, Holland 1 <h0h.d youdg—.@f es.g—, Wilson, Travis W. .wilson@ncwildlife.org>; Leslie, Addh-1 <andrea.leslie@d-Idlife.org>; Hannon, Beth <beth. harmon@ncdenr.gw>; Stanfill, lim <jim.rtanFll@ncdenr.gov>; Men, Melanie <mebnk.allen@ncdenr.gov> Subj—(Ex Al Notice of Initial CreditRelease/NCDMS Bug —"M— Mitigation Site/SAW-218—./Mike, County verky. se rag¢pyySLym, Paul, The 15-Day&-Built/MYO review far the Bug Headwaters Mitigation Site (SAW-2018-01—B ended Nwember 19, 2021. Per Section 332.8(0((9( ofthe 20M Mitigation Rule, this review followed the streamlined review process. All comments received from Ube NCIRT are incorporated in the mail below. Please address IRT concerns in the MY1 Report and provide a response to this email. The IRT would like Uo visit this site in 2022 during Ube credit release site vkits. There were no objection to issuing the initial 30%credit release of 2276.860 cool SMM Please find attached thecurrent signed ledger. 1. Groudd instability in both pond bottoms will likely be something to watch during monitoring with regard to vegetation establishment. Was the sediment from the pond removed, and were soil amendments added prior W plating? 2. What b the source dsedimentcweringthe riffleat STAM-6? 3. If the exirting wetlands were planted, please capture same of those areas with random veg plats in future monitoring years. 4. Were plantingsubstituti0ns made?lU's difficult UO UellUhe percent of each species planted from Table 6. 1. Overall, DWR was pleased with the level of detail included in Ube MEM Report. We also appreciated DMS' comments. And thank you for providing the drone video, it was very helpful for this review. 2. UT3&UT6— It could simply be a Uermir Il thin&but "stone bank fortifi Uion"raises aye lbw Flag about di pping a section ofsUream. Please provide a brief description of what was done as an d Ube stone bank fortifcaUion, as well asa bdefjuAfficatbn of need. 3. Looking at the redline drawing set rertoratbn reaches profiles, many d Ube as -built pools are shallower than the design. Are these features expectedUO deepen over time? Will changes be captured by the proj-cross-sMbns? 4. Based on observa ns from the video, if not support channelm N beincom g imana dered W manage any vegetation growing within stream channels it should be proposed within the neM two years. In general, DWR does channel maintenance beyond to eva MY3 in order luate the trajectoryd a credit feature's function (sream vs. wetbnd(nce Tndd Rrwnrc I have performed a cursory r ie—fthe Bug Headwaters mtigaton site -Bulk and MYO Reports dated October 2021.AtINN time Ida rot have anyspecific comments or coricems withthe site as presented by WlldlandsEngineering.The—p,diwlationssuch as rock All replacement with -ill, Ube realignment d UT 3, brush toe and riffle enhancements, fence realignments, BMP enhancements, and Ube replacement of tag He, with other species in the planting plan were all noted and acceptable. Happy Thanksgivin& Kim Kim Browning Mitigation ProjM Manager, Regulatory Divis'pn U.S. Army Corps of Engineers —Original Message — From: Haywood, Casey M CIV USARMY CESAW (USA(<Casev.M.Havwood@usace.armv.mil> Sent: Thursday, November04, 202112:33 PM To: Tugwell,=atCIVUTARMY CESAW (USA(<Tndd lTnawrlllolnca mil>;Bmwnin&Kimbedy DCIV USARMY CESAW(USA(<KimbnrlvrtRrnwnina mib; Davis, Erin B<nrin davisllonr�l nv>;Bowers,Todd<bnwrrc mddlolrna an�o; Youngman, HollandI <holland vounemanlafws.eov>; [ravis.wilsonlancwildlife.ore; andrea.leslielancwildlife.ore CC Wiesner, Paul<oanl wircnrrloln v>;Reid, M,Bhem, brw rridloln vrlones,MScott(Scott( CIV USARMYCESAW(USA(IS— Innrclod miI>;CrumblwTNerACIVUSARMYCESAW(USA(<TNrrA ('n�mblrv�on mib; Boggs, Brandee C CIV USARMY CHAD(USA(<Bmnrlrr. ('. mil>; Leff Keaton<krainn wildbndcrn�r�m>; Shawn Wilkerson <s�ilkrrrnn onw�ldbndrrne rnm> Subj— Notice d As -Built & MYO Review/ NCDMS Bug Headwaters Mkigation Site/SAW-2018-01788/ Wilkes County Good after The bebw referenced FINAL Record Drawing (As -Built( Report review has been requerted by NCDMS. PerSMion 332.8(0((9(of the 2008 Mitigation Rule, this rwkw requires an IRT review period of 15 calendar days. Please provide anycommen[s by 5 PM on the 15-daycomment deadline shown bebw. When providing comments please indicate if your coricems are great enough that you recommend not issuingthe credit release. Comments provided aRerthe 15-daycomment deadline (shown below( may not be considered. Please no[e:lf an IRi site visit is requerted, comments will be due 1"d after the site vkit is conducted. At the conclusion of this comment period, a copyof all comments will be provided W NCDMS and the NCIRT aI,ngwith Dbtdd Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: November 04, 2021 15-Day Comment Deadline: November 19, 2021 45-Day DE Decision: December 19, 2021 Project information and bcatbn d Ube FINAL As -Built Baseline Monitoring Report (MYO(: Bug Headwaters Mitigation Site DMS P,.*d # 100084 RFP#16-00 —Issued 12/)/201) Inrtkution Date: 6/22/2018 Full Delivery SAW -20 -788 MU M181273 Yadkin River Basin Catalo®ng Unit 0-0101 Wilkes County, North Carolina Mitigation Plan Projel Credits: ), 589.533 SMUs (cool( As-Built-MYO Proj-Credits: 7,58S.533 SMUs (cool( Mitigation Pbn Lengths/ Acreages: 8,760 ff. As-Built-MYO Lengths/ Acreages: 8,—ft. Please Note: There wasa 68-foot reduction ins[ream length from Mitigation Plan Footaget,As-Built Footage throughout the SRe. UT3 hasa 28-foot reduction in stream length, however, this of due, thealignment change. Theoriginally p,po alignment was 810 feet, while the realigned submitted t, the IRT was 811 feet. The As -Built Plansshow that A- werec,n—m as designed with-1,min,rdeviatpns. The reduction in sream footage is relatedWthe typical difference between Overall design Mg. —length and the surveyed sream lengths. ProjM adju—ts are detailed in S di,n 2.1 As -built/ Record Drawings. 2021 is Monitoring Year 1 for this proj— FD Provider: Wildlends Engineering Inc Contact Leff Keaton,-kratnn onwilAland�rn� rim <maihn�ikratnn anwilAland�rn� r�mI, (919( 851-9986-103 NCDEQ- DMS PM: Matthew Reid, matthrwrrid onn maihn�matthrw rrid unnrdrnrenv�,(828(-231-7912 FINAL ACBuilt Baseline Monitoring Reportand Record Drawings can be accessed dir ly,. the DIMS Sh,,Pd¢ site here: Adr,nevideo Nth,,k,isavailablehere:httm//vrnmrnP/ ra a<Blockedhttp,l/youtu.be/_p0MV27— IRT-DMS Share—t Page (Updated(: <Blockedhttplj/nccOnrectsharep,intc,m/sites/IRT-DMS/SRePages/H,me.aspx> Bug—dwaters 100084 MYD 2021.pdf <Blockedhttps://ncconn.—harepoi ,../sites/IRT-DMS/ASBuik%20Report%20%20Drawing/Forms/Nlltems.aspxi id=%2Fsites%2FIRT%2DDMS%2FASBuik%20Report%20%20Drawing%2FBug%20Headwaters%20%28MMM%29%2FBWHeadwaters%5F1000M0 FMY 5F2021%2Epdf&pave -%2Fsites%2FIRT%2DDMS%2FASBuilt%20Report%20%20Drawing%2FBug%20Headwaters%20%28100080%29> Bug—dwaters_108080_AB_2021.pdf <BlockedhttpsJ/ncconn.—harepoirk.com/sites/IRT-DMS/ASBuik%20Report%20%20Drawing/Forms/Nlltems.aspxi id=%2Fsites%2FIRT%2DDMS%2FASBuik%20Report%209620Drawing%2FBug%20Headwaters%20%2810MM%29%2FBWHeadwaters%5F100 M8 FAB%5F2021%2Epdf&parent=%2Fsites%2FIRT%2DDM5%2FASBuilt%20Report%20%20Drawing%2FBug%20Headwaters%20%28108080%29, RIBITS: ®' Mitigation Speciality, Regulatory Division I U.S. Army C,rps,f Engireers (919(750-)397w,rk cell BUILDING STRONG s