HomeMy WebLinkAboutWQCS00223_CEI_Nov2021_20211118Compliance Inspection Report
Permit: WQCS00223 Effective: 01/01/17 Expiration: 12/31/25 Owner : Town of Denton
SOC: Effective: Expiration: Facility: Denton Collection System
County: Davidson PO Box 306
Region: Winston-Salem
Contact Person: Troy B Branch
Directions to Facility:
System Classifications: CS2,
Primary ORC: Troy B Branch
Secondary ORC(s):
Micheal Sean High
On -Site Representative(s):
Related Permits:
Denton NC 272390306
Title: ORC Phone: 336-859-4460
NC0026689 Town of Denton - Denton WWTP
Inspection Date: 11/18/2021
Certification: 23102 Phone: 336-859-4460
992681 336-859-5885
Entry Time 10:OOAM Exit Time: 12:15PM
Primary Inspector: Patricia Lowery Phone: 336-776-9691
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling
Permit Inspection Type: Collection system management and operation
Facility Status: Compliant ❑ Not Compliant
Question Areas:
▪ Miscellaneous Questions
II Capital Improvement Plan
▪ Inspections
▪ Lines
(See attachment summary)
▪ General
▪ Map
▪ Spill Response Plan
▪ Pump Stations
▪ Sewer & FOG Ordinances
▪ Reporting Requirements
▪ Spills
Page 1 of 10
Permit: WQCS00223 Owner - Facility:Town of Denton
Inspection Date: 11/18/2021
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Inspection Summary:
Tricia Lowery of the NC Division of Water Resources, Winston-Salem Regional Office conducted a compliance evaluation
inspection (CEI) of the Town of Denton (WQCS00223) on November 18, 2021. Troy Branch (ORC) and Michael High (BORC
& Public Utilities Director) were present for the inspection. Troy Branch was present and assisted Ms. Lowery for the HPL
and pump station inspections. Results of the inspection are summarized in the following paragraphs:
PERMIT PART I, PERFORMANCE STANDARDS
Part I, Paragraph 2, requires the wastewater collection system shall be effectively managed, maintained and operated at all
times.
Observations: There were 4 SSO's in 2020: Jan 24th, Feb 6th, May 21st, Nov 12th. All >1000 gallons. Proper notices were
sent out (with affidavits) and 5-day reports in BIMS were completed. Jan/Feb/May resulted in Notice of Violation with Intent.
No SSO's have been reported in 2021 as of November 18th. Substantial improvement in operations, management, and
maintenance from last inspection on 10/22/2018. The system is well operated and maintained.
Compliance Status: Compliant
Part I, Paragraph 3, the Permittee shall establish an effective sewer use ordinance (SUO).
Observations: The SUO contains all pertinent information required by the permit. In addition, the SUO can easily be found
on the town's website for public notice and educational purposes.
Compliance Status: Compliant
Part I, Paragraph 4, requires the Permittee shall develop and implement an educational fats, oils and grease program and an
enforceable fats, oils and grease program for non-residential users.
Observations: The FOG program is comprehensive and detailed. Flyers are sent to residents bi-annually through billing,
FOG information is easily accessed from main page of town's website, and they attend the town's annual fall festival where
they distribute educational information (ie: brochures, can lids, pencils, etc) to the public. Permittee has implemented and
enforced FOG program for non-residential users. Logs are kept with detailed information concerning inspections and
enforcements if violations occur. FOG enforcement policy can also be found on town's website.
Compliance Status: Compliant
Part I, Paragraph 5, requires the Permittee shall adopt and implement a Capital Improvement Plan (CIP) to designate fundinc
for reinvestment into the wastewater collection system infrastructure.
Observations: The CIP ranges from 2022-2026. Due to the small nature of the town, the CIP is all inclusive of differing
departments, however, each department is categorized and detailed concerning funding for improvements and/or repairs.
Mr. Branch did clarify funding is low and supplementary money is needed for upgrades and maintenance. Ms. Lowery
suggested to inquire with DEQ's Division of Water Infrastructure to apply for ARPA grants for needed funding.
Compliance Status: Complaint
Part I, Paragraph 6 requires there be no overflow or bypass structures within the system and if any are discovered that they
be immediately eliminated.
Observations: No structures were identified during the inspection.
Compliance Status: Compliant
Part I, Paragraph 7 requires the Permittee maintain a contingency plan for pump failure at each pump station.
Observations: Permittee maintains a contingency plan for each pump station. It is comprehensive and compliant with permit
standards.
Compliance Status: Compliant
Part I, Paragraph 8 requires each pump station shall be clearly and conspicuously posted with a pump station identifier and
an emergency contact telephone number at which an individual who can initiate or perform emergency service for the
wastewater collection system 24 hours per day, seven days per week can be contacted.
Observations: Permittee has signs posted at pump stations with identifier and emergency phone number with a disclosure if
alarm is sounding/flashing, please call number provided.
Compliance Status: Compliant
Part I, Paragraph 9 requires pump station sites, equipment and components shall have restricted access, as per 15A NCAC
02T .305(h)(4).
Observations: Two pump stations observed: Nacoma Park and Wilson Carter. The pump station at Nacoma Park is in a
residential community and is securely fenced (with additional barbwire on top). Pump Station at Wilson Carter is in a
business parking lot and locked securely with padlocks. No fence is present at this location. Keys to deadbolt are
Page 2 of 10
Permit: WQCS00223 Owner - Facility:Town of Denton
Inspection Date: 11/18/2021
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
secured. Personnel retain keys and always carry with them.
Compliance Status: Compliant
Part I, Paragraph 10 requires pump stations that do not employ an automatic polling feature (i.e. routine contact with pump
stations from a central location to check operational status of the communication system) shall have both audible and visual
high water alarms.
Observations: All pump stations are connected to a SCADA (Mission) system. Additionally, they have both audible and
visual alarms. Of the two stations inspected, both alarms systems were functioning properly (inspector requested ORC to
raise floats for alarm test). Nacoma park audible alarm's volume was lowered due to neighbor complaints. Although the
alarm is notably clear, operational, and could be heard, Inspector advised Permittee to raise the volume of alarm level.
Compliance Status: Compliant
Part I, Paragraph 11 requires that for all newly constructed, modified and rehabilitated pump stations, all equipment and
components shall be sealed within a corrosion -resistant coating or encasement to the extent practicable and equivalent to
the minimum design criteria unless the permittee can demonstrate it is not practicable or another form of corrosion
resistance is employed.
Observations: No conditions were noted in inspection to suggest non-compliance.
Compliance Status: NA
PERMIT PART II OPERATION AND MAINTENANCE REQUIREMENTS
Part II, Paragraph 1 requires the Permittee shall designate and employ a certified operator to be in responsible charge (ORC,'
and one or more certified operator(s) to be back-up ORC(s) of the facilities in accordance with 15A NCAC 8G .0201. The
ORC shall visit the system within 24 hours of knowledge of a bypass, spill, or overflow of wastewater from the system,
unless visited by the Back -Up ORC, and shall comply with all other conditions of 15A NCAC 8G .0204.
Observations: Permittee has designated and employed suitable ORC and BORC for facility. Troy Branch is ORC and
Michael High is BORC (and public utilities director). Both are licensed Grade IV operators (one grade above system's
status of Grade III). It has been demonstrated and documented both have responded appropriately to emergency situations
and other conditions of 15A NCAC 8G .0204.
Compliance Status: Compliant
Part II, Paragraph 2 requires the Permittee shall develop and adhere to a schedule for reviewing all inspection, maintenance,
operational and complaint logs.
Observations: Inspector reviewed logs pertaining to scheduled inspections of collection system, including review of
maintenance and complaint logs. Logs are segmented by month. All logs include supervisory signature, demonstrating Mr.
Branch consistently surveys operations conducted in collection system. Inspector is confident all logs are reviewed in
compliance with permit standards.
Compliance Status: Compliant
Part II, Paragraph 3 requires the Permittee shall develop and adhere to a schedule for testing emergency and standby
equipment.
Observations: As in Part II, Paragraph 2, ORC reviews and signs logs concerning testing/standby equipment monthly.
Generators are on site at most pump stations with a portable available for Wilson Carter pump station.
Compliance Status: Compliant
Part II, Paragraph 4 requires the Permittee shall develop and implement a routine pump station inspection and maintenance
program, which shall include, but not be limited to, the following maintenance activities:
a. Cleaning and removing debris from the pump station structure, outside perimeter, and wet well;
b. Inspecting and exercising all valves;
c. Inspecting and lubricating pumps and other mechanical equipment according to the manufacturer's
recommendations; and
d. Verifying the proper operation of the alarms, telemetry system and auxiliary equipment.
Observations: Permittee has satisfactorily developed and implemented a pump station inspection and maintenance program.
Logs are kept and reviewed with supervisory signature.
Compliance Status: Compliant
Part II, Paragraph 5 requires for each pump station without pump reliability (i.e. simplex pump stations serving more than a
single building or pump stations not capable of pumping at a rate of 2.5 times the average daily flow rate with the largest
pump out of service), at least one fully operational spare pump capable of pumping peak flow shall be maintained on hand.
Observations: All pump stations are duplex systems. Lead/lag system as to not intensify wear to one pump. Duplex
Page 3 of 10
Permit: WQCS00223 Owner - Facility:Town of Denton
Inspection Date: 11/18/2021
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
system meets requirements.
Compliance Status: Compliant
Part II, Paragraph 6 requires the Permittee shall maintain on hand at least two percent of the number of pumps installed, but
no less than two pumps, that discharge to a pressure sewer and serve a single building, unless the Permittee has the ability
to purchase and install a replacement pump within 24 hours of first knowledge of the simplex pump failure or within the
storage capacity provided in any sewer line extension permit.
Observations: All pump stations are duplex systems.
Compliance Status: NA
Part II, Paragraph 7 requires that rights -of -way and/or easements shall be properly maintained to allow accessibility to the
wastewater collection system.
Observations: ROWs are maintained as needed, but no less than twice a year. Maintenance is properly documented. No
impediments were noted during inspection.
Compliance Status: Compliant
Part II, Paragraph 8 requires the Permittee assess cleaning needs, and develop and implement a program for appropriately
cleaning at least 10 percent of the wastewater collection system each year.
Observations: Permit indicates the collection system contains 17 miles of gravity sewer (approx. 89,760 ft), therefore, 10%
(approx. 8,976 ft) is the required minimum to be cleaned annually. Records reviewed during inspection showed 9,583 ft were
cleaned in 2019; and 8,325 ft were cleaned in 2020. Year 2020 was slightly less than targeted goal (-650 ft), however due to
COVID epidemic (severe staff shortages) collection system operations were adversely affected. However, they were able to
clean 9.2% during adversarial conditions.
Compliance Status: Compliant
Part II, Paragraph 9 requires adequate measures shall be taken to contain and properly dispose of materials associated with
SSOs. The Permittee shall maintain a Response Action Plan that addresses the following minimum items:
a. Contact phone numbers for 24-hour response, including weekends and holidays;
b. Response time;
c. Equipment list and spare parts inventory;
d. Access to cleaning equipment;
e. Access to construction crews, contractors and/or engineers;
f. Source(s) of emergency funds;
g. Site sanitation and clean up materials; and
h. Post-SSO assessment.
Observations: A detailed and comprehensive plan was presented for review.
Compliance Status: Compliant
Part II, Paragraph 10 requires the Permittee, or their authorized representative, shall conduct an on -site evaluation for all
SSOs as soon as possible, but no more than two hours after first knowledge of the SSO.
Observations: Upon review of SSO events in 2020, proper response and reporting time during SSOs were conducted.
Compliance Status: Compliant
Part II, Paragraph 11 requires the Permittee, in the event of an SSO or blockage within the wastewater collection system, to
restore the system operation, remove visible solids and paper, sanitize any ground area and restore the surroundings.
Observations: Upon review of SSO events in 2020, actions were taken to clean and sanitize the affected areas according to
permit standards.
Compliance Status: Compliant
PERMIT PART III, RECORDS
Part III, Paragraph 1 requires that records be maintained to document compliance with Conditions I (4), 11(2) - II(4), 11(7) -11(8)
IV(3) and V(1) -V(4). Records shall be kept on file for a minimum of three years.
Observations: All records have been maintained properly according to permit conditions.
Compliance Status: Compliant
Part III, Paragraph 2 requires the Permittee shall maintain adequate records pertaining to SSOs, and complaints for a
minimum of three years. These records shall include, but are not limited to, the following information:
a. Date of SSO or complaint;
b. Volume of wastewater released as a result of the SSO and/or nature of complaint;
c. Location of the SSO and/or complaint;
Page 4 of 10
Permit: WQCS00223 Owner - Facility:Town of Denton
Inspection Date: 11/18/2021
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
d. Estimated duration of the SSO;
e. Individual from the Division who was informed about the SSO and/or complaint, when applicable;
f. Final destination of the SSO;
g. Corrective actions;
h. Known environmental/human health impacts resulting from the SSO; and
i. How the SSO was discovered.
Observations: All records and information pertaining to SSO events are sufficiently maintained and kept in compliance with
permit standards.
Compliance Status: Compliant
Part III, Paragraph 3 requires the Permittee shall maintain records of all the modifications and extensions to the collection
system permitted herein. The Permittee shall maintain a copy of the construction record drawings and specifications for
modifications/extensions to the wastewater collection system for the life of the modification/extension. Information
concerning the extension shall be incorporated into the map of the wastewater collection system within one year of the
completion of construction. The system description contained within this permit shall be updated to include this
modification/extension information upon permit renewal.
Observations: No indications were noted during inspection of any non-compliance concerning this permit standard.
Compliance Status: Compliant
Part III, Paragraph 4 requires the Permittee shall maintain an up-to-date, accurate, comprehensive map of its wastewater
collection system. The comprehensive map shall include, but is not limited to: pipe size, pipe material, pipe to
Page 5 of 10
Permit: WQCS00223 Owner - Facility:Town of Denton
Inspection Date: 11/18/2021
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
General
Is there a properly designated primary ORC and at least one back-up of proper grade?
Are logs being reviewed by the system management or owner on a regular basis?
# What is that frequency?
# Are there any issues being addressed currently or any in the planning stages?
Is there a specific pump failure plan available for all pump stations?
Does plan indicate if pump parts/new pumps are in spare parts/equipment inventory?
Are new/significantly upgraded pump stations equipped with anti -corrosion materials?
Does the permittee have a copy of their permit?
# Is permit expiring within the next 6 months?
If Yes, has the Permittee applied for renewal?
Comment: Current Interim Town Manager is Kelly Craver.
See summary concerning questions.
Sewer and FOG Ordinances
Is Sewer Use Ordinance (SUO) or other Legal Authority available?
Does it appear that the Sewer Use Ordinance is enforced?
Is there a Grease Control Program that legally requires grease control devices?
What is the standard grease trap cleaning requirement in the FOG ordinance?
Is Grease Control Program enforced via periodic inspections/records review?
Is action taken against violators?
# Have satellite systems adopted an equivalent or more stringent ordinance?
Is grease/sewer education program documented with req'd customer distribution?
# Are other types of education tools used like websites, booths, special meetings, etc?
If Yes, what are they? (This can reduce mailing to annual.)
FOG information is readily available on the Town's website. Additionally, personnel attend the Town's annual
fall festival. They hand out education information to residents along with can caps and pencils with logo
concerning proper disposal of FOG.
Comment: See summary
Capital Improvement Plan
Has a Capital (CIP) or System Improvement Plan been developed and adopted?
Is it designated for wastewater only or does it have a dedicated section?
Does CIP cover three to five year period of earmarked improvements?
Does CIP include description of project area?
Does CIP include description of existing facilities?
Does CIP include known deficiencies?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
Monthly
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
▪ •
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Pumped as needed
and/or quarterly
basis
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Page 6 of 10
Permit: WQCS00223 Owner - Facility:Town of Denton
Inspection Date: 11/18/2021
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Does CIP include forecasted future needs?
Comment: See summary
Map
Is there a overall sewer system map?
Does the map include:
Pipe Type (GS/FM)
Pipe sizes
Pipe materials (PVC, DIP, etc)
Pipe location
Flow direction
Approximate pipe age
Pump station ID, location and capacity
# Force main air release valve location & type
# Location of satellite connections
Is the map being updated for changes/additions within 1 year of activation?
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
❑ • ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: The town is actively trying to update maps with proper information and currently under revision.
They are trying to implement GIS, however issues have come up, pausing the project right
now. See summary for details.
Reporting Requirements
# Have there been any sewer spills in the past 3 years?
If Yes, were they reported to the Division if meeting the reportable criteria?
If applicable, is there documentation of press releases and public notices issued?
Is an Annual Wastewater Performance Report being filed with the Division, if required?
Is the report being made available to all its sewer customers?
# How is it being made available?
Comment: Average daily flow is 400,000 gallons. Annual report was in order with no deficiencies.
Inspections
Are adequate maintenance records maintained?
Are pump stations being inspected at the required frequency?
# Is at least one complete functionality test conducted weekly per pump station?
Is there a system or plan in place to observe the entire system annually?
Is the annual inspection documented?
# Does the system have any high -priority lines/locations?
Are inspections of HPL documented at least every 6 months?
Are new lines being added to the HPL list when found or created?
Comment: See summary
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Local newspaper
and website
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ❑ •
Page 7 of 10
Permit: WQCS00223 Owner - Facility:Town of Denton
Inspection Date: 11/18/2021
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Spill Response Action Plan
Is a Spill Response Action Plan available?
Is a Spill Response Action Plan available for all personnel?
Does the plan include:
24-hour contact numbers
Response time
Equipment list and spare parts inventory
Access to cleaning equipment
Access to construction crews, contractors, and/or engineers
Source of emergency funds
Site sanitation and cleanup materials
Post-overflow/spill assessment
Does the Permittee appear to respond within 2 hours of first knowledge of a spill?
Comment: See summary
Spills
Is system free of known points of bypass?
If No, describe type of bypass and location
Are all spills or sewer related issues/complaints documented?
# Are there repeated overflows/problems (2 or more in 12 months) at same location?
# If Yes, is there a corrective action plan?
Comment: See summary
Lines/Right-of-Ways/Aerial Lines
Please list the Lines/Right of Ways/Aerial Lines Inspected:
1. Peacock; 2. Councl Access Rd.
In good shape, no deficiencies found. See summary for details.
Are right-of-ways/easements maintained for full width for access by staff/equipment?
If No, give details on temporary access:
Is maintenance documented?
Are gravity sewer cleaning records available?
Has at least 10% of lines older than 5 yrs been cleaned annually?
Were all areas/lines inspected free of issues?
Comment: See summary
Pump Stations
Please list the Pump Stations Inspected:
1. Nacoma Park; 2. Wilson Carter
See summary for details.
# Number of duplex or larger pump stations in system
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
6
Page 8 of 10
Permit: WQCS00223 Owner - Facility:Town of Denton
Inspection Date: 11/18/2021
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
# Number of vacuum stations in system
# Number of simplex pump stations in system
# Number of simplex pump stations in system serving more than one building
How many pump/vacuum stations have:
# A two-way "auto polling" communication system (SCADA) installed?
# A simple one-way telemetry/communication system (auto -dialer) installed?
For pump stations inspected:
Are they secure with restricted access?
Were they free of by-pass structures/pipes?
Were wet wells free of excessive grease/debris?
# Do they all have telemetry installed?
Is the communication system functional?
Is a 24-hour notification sign posted ?
Does the sign include:
Owner Name?
Pump station identifier?
# Address?
Instructions for notification?
24-hour emergency contact numbers?
Are audio and visual alarms present?
Are audio and visual alarms operable?
# Is there a backup generator or bypass pump connected?
If tested during inspection, did it function properly?
Is the back-up system tested at least bi-annually under normal operating conditions?
# Does it have a dedicated connection for a portable generator?
# Is the owner relying on portable units in the event of a power outage?
# If Yes, is there a distribution plan?
If Yes, what resources (Units/Staff/Vehicles/etc) are included in Plan?
Only one portable back up unit is needed for one pump station - Wilson Carter pump station. Back up
generator is nearby and port readily available for hook up. The remaining pump stations have installed
generators connected and on -site. See summary for details.
# Does Permittee have the approved percentage of replacement simplex pumps?
Is recordkeeping of pump station inspection and maintenance program adequate?
Do pump station logs include at a minimum:
Inside and outside cleaning and debris removal?
Inspecting and exercising all valves?
Inspecting and lubricating pumps and other equipment?
Inspecting alarms, telemetry and auxiliary equipment?
0
0
0
6
0
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ • ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Page 9 of 10
Permit: WQCS00223 Owner - Facility:Town of Denton
Inspection Date: 11/18/2021
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Comment: See summary
Page 10 of 10