HomeMy WebLinkAboutNCC200330_NOT Closeout Documents_20211129North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336)
776-9800
County: Yadkin Project: Yadkin Memorial Park Phase Two River basin: Yadkin-PeeDee
Person financially responsible: YADKIN COUNTY - JASON WALKER Project #: YADKI-2020-002
Address: P.O. BOX 220, YADKINVILLE, NC 27055
1. Project Location: Old US 421, Yadkinville
Pictures: No
2. Weather and soil conditions: 40's clear Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Caleb
Inspection report: Sent Report
9. Corrective action needed:
Title: Yadkin Co. Parks
Date given/sent: March 02, 2021
10. Comments: Project construction is complete and all areas are adequately stabilized. Project file is closed.
Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is released. Termination of
coverage under the NPDES General Stormwater Permit for Construction Activities should be
requested by the permittee via Notice of Termination.
Reported by: Tim Latham Others present:
Date of inspection: February 23, 2021 Time arriving on site: 8:30 AM Time leaving site: 8:45 AM
cc: jwalker&yadkincoun , nc._ov; cpoplinkyadkincount, n�c.gov;