Loading...
HomeMy WebLinkAboutNCC200330_NOT Closeout Documents_20211129North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Yadkin Project: Yadkin Memorial Park Phase Two River basin: Yadkin-PeeDee Person financially responsible: YADKIN COUNTY - JASON WALKER Project #: YADKI-2020-002 Address: P.O. BOX 220, YADKINVILLE, NC 27055 1. Project Location: Old US 421, Yadkinville Pictures: No 2. Weather and soil conditions: 40's clear Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Caleb Inspection report: Sent Report 9. Corrective action needed: Title: Yadkin Co. Parks Date given/sent: March 02, 2021 10. Comments: Project construction is complete and all areas are adequately stabilized. Project file is closed. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via Notice of Termination. Reported by: Tim Latham Others present: Date of inspection: February 23, 2021 Time arriving on site: 8:30 AM Time leaving site: 8:45 AM cc: jwalker&yadkincoun , nc._ov; cpoplinkyadkincount, n�c.gov;