Loading...
HomeMy WebLinkAboutNCC211219_NOT Closeout Documents_20211123North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Wayne Project: Lee Plant Black Creek East 115 River basin: Neuse Person financially responsible: Duke Energy Progress, LLC - Randy Veltri, Project #: WAYNE-2021-018 Director of Transmission Permitting Address: 440 South Tryon St, Charlotte, NC 28202 1. Project Location: Governor Aycock Rd, Fremont Pictures: No 2. Weather and soil conditions: sunny, warm, wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one onsite Title: Inspection report: Sent Report Date given/sent: November 17, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self - inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES 10. Comments: General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deg.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Bradley West Others present: Date of inspection: November 16, 2021 Time arriving on site: 1:15 PM Time leaving site: 1:45 PM cc: