MEMORANDUM FOR RECORD
SUBJECT: Compliance Report
DA -SAW Number: SAW - 2013 -00847 Project Name: Hellier- Keziah Stream Restoration
City: Burlington County: Alamance
Applicant: Anne Hillier
POC: Anne Hillier Telephone: 386 -931 -4356
L FILE REVIEW FINDINGS: Date: December 5, 2013
Action: NWP IP JD Pre -App Compliance
II. FIELD VISIT FINDINGS- Date- December 5 2013
Remarks: No mitigation was required. Work has started at the site. Some fill had been placed into the
drained easternmost pond. No temporary sediment and erosion control measures were in place
in the immediate vicinity of the fill. However. there was a small stone check dam at discharize
pipe in the westernmost pond. A stream had formed in the bottom of the pond sites and the fill
located within the footprint of the upper pond was not in direct contact with the stream. There
was no evidence of any of the fill being washed into the stream. There was no visible
difference in the turbidity of the water in the upstream and downstream portions of the stream.
Light rain had occurred in the area immediately preceding the site visit.
III. CONCLUSIONS Date: December 6, 2013
In Compliance: Yes No If No, (i.e., out of compliance), describe concerns:
Site appears to be in compliance with the NWP 27. However, USACE called both the permittee and the
permittee's agent on 5 December 2013, to discuss the use of temporary erosion control measures at the
project site. USACE also provided results of compliance inspection to representatives of the NC
Department of Water Resources on 6 December 2013.
Page 1 of 2
Yes
I No
Remarks
Easement Recorded / Provided
Was not a requirement of this permit authorization
Mitigation Responsibility
Transfer Form /Receipt
Was not a requirement of this permit authorization
Submission of Plat/ As- Builts(s)
Was not a requirement of this permit authorization
Monitoring Report(s)
Not applicable at this time. Project is still in construction.
II. FIELD VISIT FINDINGS- Date- December 5 2013
Remarks: No mitigation was required. Work has started at the site. Some fill had been placed into the
drained easternmost pond. No temporary sediment and erosion control measures were in place
in the immediate vicinity of the fill. However. there was a small stone check dam at discharize
pipe in the westernmost pond. A stream had formed in the bottom of the pond sites and the fill
located within the footprint of the upper pond was not in direct contact with the stream. There
was no evidence of any of the fill being washed into the stream. There was no visible
difference in the turbidity of the water in the upstream and downstream portions of the stream.
Light rain had occurred in the area immediately preceding the site visit.
III. CONCLUSIONS Date: December 6, 2013
In Compliance: Yes No If No, (i.e., out of compliance), describe concerns:
Site appears to be in compliance with the NWP 27. However, USACE called both the permittee and the
permittee's agent on 5 December 2013, to discuss the use of temporary erosion control measures at the
project site. USACE also provided results of compliance inspection to representatives of the NC
Department of Water Resources on 6 December 2013.
Page 1 of 2
Remedial Actions Required: Yes No If YES, describe actions to be taken:
None. Follow up visits should be performed during the construction period.
'4A'-Z� GL)'�/
Corps Official:
Page 2 of 2
Ejhjibimkjhof e!cz!
X 1MBN TBOESFX /F2355672766!
Ed1d>VT- !p >V/i /!Hpx4gDn fou!pv >EpE -!
pv >Q- J!pv >VTB -!
do >X J44BN TBOESFX /F/2355672766!
E! J;! 312423/17!19;18£1!.16(11(
Date: December 6, 2013