HomeMy WebLinkAbout20131256 Ver 1_401 Application_20131213LMG 2 0 1 3 1 2 5 6 LAND MANAGEMENT GROUP ixc. Environmental Consultants DDecember 2 "d 2013 D 4 20113 TO: Ms. Liz Hair U.S. Army Corps of Engineers tDwA�oer 69 Darlington Avenue "`h Wilmington, NC 28403 RE: NWP 12 Application; Fifty Lakes Drive Waterline; Wilmington, NC Boiling Spring Lakes, NC Dear Liz: ^ PY Enclosed is a NWP 12 application for your review. This application is submitted on behalf of Mr. William Pinnix with the County of Brunswick Engineering Services for the construction of a waterline along Fifty Lakes Drive in Boiling Spring Lakes, NC. This waterline will provide potable water to 48 lots. The County has attempted to minimize wetland impacts as much as possible in the site design. However, 0.062 acre of temporary wetland impact is needed to install the line. The wetland impact areas will be returned to preconstruction grade and seeded once the installation is complete. The project will take place within a maintained NC DOT right - of -way and no trees will be removed. Therefore, no impacts to red - cockaded woodpeckers will occur. The Pre - Construction Notification form, associated maps, and site plan are enclosed for your review. Please contact me if you have any questions. Thank you for your assistance with this project. Sin erely, _ Kim Williams Environmental Scientist Encl. Cc: Mr. William Pinnix, P.E., County of Brunswick Engineering Services Mr. Michael Norton, Compass Pointe Engineering, PA Mr. Chad Coburn, NC DWR Ms. Jennifer Burdette, NC DWR www.lmgroup.net • info @lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 20 1 3 1 %'.5 6 W ATjSgQG O Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 12 PCN Form —Version 1.3 December 10, 2008 Version Pre- Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ❑Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number: _Z 1 c. Has the NWP or GP number been verified by the Corps? Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ❑ No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ® Yes ❑ No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Fifty Lakes Drive Waterline 2b. County: Brunswick County 2c. Nearest municipality / town: Boiling Spring Lakes 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Various NC DOT Rights -of -Way 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 12 PCN Form —Version 1.3 December 10, 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other, specify 4b Name Mr William Pinnix, P E 4c Business name (if applicable) County of Brunswick Engineering Services 4d Street address P O Box 249 4e City, state, zip Bolivia, NC 28422 4f Telephone no 4g Fax no 4h Email address 5. Agent/Consultant Information (if applicable) 5a Name Kim Williams 5b Business name (if applicable) Land Management Group, Inc 5c Street address 3805 Wrightsville Avenue, Suite 15 5d City, state, zip Wilmington, NC 28403 5e Telephone no (910) 452 -0001 5f Fax no (910) 452 -0060 5g Email address kwdliams @lmgroup net Page 2 of 12 B. Project Information and Prior Project History 1. Property Identification 1a Property identification no (tax PIN or parcel ID) Various NC DOT Rights -of -Way 1 b Site coordinates (in decimal degrees) Latitude 34 018860 N Longitude 78 051788 W DD DDDDDD -DD DDDDDD 1c Property size 3,200 LF of road ROW 2. Surface Waters 2a Name of nearest body of water (stream, river, etc ) to UT to Boiling Spring Lake proposed project 2b Water Quality Classification of nearest receiving water B, Sw 2c River basin Cape Fear River Basin 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Project area consists of a maintained DOT right -of -way along Fifty Lakes Drive in Boding Spring Lakes 3b List the total estimated acreage of all existing wetlands on the property — 05acre 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property N/A 3d Explain the purpose of the proposed project As part of Brunswick County's continuing efforts to provide public services in areas of need, the 2014 FY Waterline Project is intended to provide potable water supply to various locations, including a corridor along Fifty Lakes Drive in Boiling Spring Lakes The project along Fifty Lakes Drive proposes 3,200 linear feet of 8" waterline, which will connect to an existing 8" waterline at the intersection of Fifty Lakes and Lexington Avenue to the northeast, and an existing 24" waterline at the intersection of Fifty Lakes and NC HWY 87 to the southwest Approximately 48 single family lots will be served with the new line This installation will also provide anew loop from the county's 24" waterline to Boiling Spring Lakes' distributions stem, thus improving fire flow and domestic service capability to the entire Boiling Spring Lakes area 3e Describe the overall project in detail, including the type of equipment to be used The applicant will dig a trench along the road and install the waterline The trench will then be returned to pre - construction graded and seeded Certain areas will be bored, as indicated on the site plan 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes E] No El Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination, what type ❑ Preliminary ® Final of determination was made? 4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Other LMG 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation Ms Liz Hair with the USACE approved the wetland line in the field on 11/5/13 5. Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes, explain in detail according to "help file" instructions Page 3 of 12 PCN Form — Version 1 3 December 10, 2008 Version B. Project Information and Prior Project History 6. Future Project Plans 6a Is this a phased project? ® Yes ❑ No 6b If yes, explain The proposed project is one phase of a larger 2014 FY Waterline Project for Brunswick County Page 4 of 12 C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply) ® Wetlands ❑ Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts NIA If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary W1 ❑ P ®T Utility Line Installation Non - riparian ❑ Yes ® No ® Corps ® DWQ 0 015 W2 ❑ P ®T Utility Line Installation Non - riparian ❑ Yes ® No ® Corps ® DWQ 0 018 W3 ❑ P ®T Utility Line Installation Non - riparian ❑ Yes ® No ® Corps ® DWQ 0 029 W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 0 062 2h Comments 3 Stream Impacts NIA If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps [:11 NT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps [:11 NT ❑ DWQ S3 ❑ P FIT ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments Page 5 of 12 PCN Form — Version 1 3 December 10, 2008 Version 4 Open Water Impacts N/A If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a Open water impact number — Permanent (P) or Temporary 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 ❑P ❑T 02 ❑P ❑T 03 ❑ PEI T 04 ❑P ❑T 0. Total open water impacts 4g Comments 5. Pond or Lake Construction: N/A If pond or lake construction proposed, the com lete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 Stormwater P2 5f. Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction Page 6 of 12 6. Buffer Impacts (for DWQ): N/A If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a. ❑ Neuse ❑Tar- Pamlico El Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required? B1 ❑P ❑T ❑Yes ❑ No B2 ❑P ❑T El Yes ❑ No B3 ❑P ❑T El Yes ❑ No 6h Total buffer impacts 61 Comments Page 7 of 12 D. Impact Justification and Mitigation 1 Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The applicant has attempted to avoid and minimize impacts to jurisdictional areas as much as possible All impacts will occur within a maintained DOT right -of -way and will be restored to pre - construction grade once the line is installed 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Silt fencing will be installed to prevent erosion into adjacent jurisdictional areas and wetland impact areas will be seeded 2. Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this projects ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank: N/A 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In -lieu Fee Program, NIA 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested N/A 4c If using stream mitigation, stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) N/A square feet 4e Riparian wetland mitigation requested N/A acres 4f Non - riparian wetland mitigation requested N/A acres 4g Coastal (tidal) wetland mitigation requested N/A acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan- N/A 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 8 of 12 PCN Form — Version 1 3 December 10, 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required N/A 6c 6d 6e Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) N/A 6h Comments N/A Page 9 of 12 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes ❑ No Comments 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project? None 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan, explain why No impervious cover is proposed with this project 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review: N/A 3a In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4 DWQ Stormwater Program Review N/A ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes E] No attached? 5. DWQ 401 Unit Stormwater Review N/A 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 10 of 12 PCN Form — Version 1 3 December 10, 2008 Version F. Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval Yes ❑ No letter ) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Project will provide water to the community No wastewater will be generated by project Page 11 of 12 PCN Form —Version 1 3 December 10, 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a WIII this project occur in or near an area with federally protected species or ® Yes ❑ No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No Impacts? ❑ Raleigh 5c If yes, Indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The NC Natural Heritage Program GIS layer and information from the Town of Boding Spring Lakes were used to determine the presence of federally listed species The proposed waterline is located within a known red - cockaded woodpecker cluster ( #32) However, the line will be Installed within a maintained DOT ROW and no trees will be removed during construction 6. Essential Fish Habitat (Corps Requirement) 6a WIII this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? The NOAA Fisheries Essential Fish Habitat Mapper GIS program was used to determine the presence of Essential Fish Habitat No EFH was noted within the project area 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a WIII this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? The NC State Historic Preservation Office HPOWEB GIS mapping resource was used to determine the presence of cultural or historic resources No cultural or historical resources were noted within or adjacent to the site 8. Flood Zone Designation (Corps Requirement) 8a WIII this project occur In a FEMA - designated 100 -year floodplain? ❑ Yes ® No 8b If yes, explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? The NC Floodplain Mapping Information System website was used to determine the boundaries of the 100 -year floodplain Kim Williams 12/2/2013 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided ) Page 12 of 12 t M1 Yi �E X U -i � ` ' 7 dam, ^ i �" sCy z..i `3f � ..' r �� � � •• I i _ ,e. . e H , _ ♦ i -�"+ `Y r " COUNTY OF BRUNSWICK 1= ENGINEERING SERVICES ,o- PO Box 249 20 Referendum Drive NE r — fz` BuwldmgG Bolivia, North Carolma 28422 _ William L. Pinnig, P.E. ` Dirwtor of Engineering v Office (910) 253 -2408 cell (910) 409 -2557 , Fax. ( 910) 253 -2704 email wpmnixftmnecom t bk-\. AGENT AUTHORIZATION FORM TO WHOM rr MAYtCONCERN:_ - Uwe; the�undeisigned,.hereby au&rize Land Management Gro%ip; Inc. for act as our agent in the x ^ s; „ s 'preparation and >representationaof °information'related the Section 404 /401 permit application Ito x for the;fBrdnswick Count TY'14,Waterline Corrid'ors�pr'oject Area., AE questions n regards -to _ _ this_project- should be directed to LandManagement Group,-Inc:,_ _ k 7 Sincerely - Owner /Applicant ` -Print Name` na',{,�Y lot 'Date - `Boundaries are approximate and are -lot meant to be absolute. Map Source: ArcGIS World Street Map SCALE 1" = 3000' Brunswick County Water Line LMG 50 Lakes Drive, BSL Figure 1 Brunswick County, NC vw�w.LMGroup.net Vicinity Map y Phone: 910.452.0001 •1.866.LMG.1078 September 2013 Fax 910.452.0060 40 -13 -192 3805 Wrightsville Avenue Wilmington, NC 28403 000r' IN 0 41 porli • 1-7 i t Water Line ',1*'" d ~+mot' � V''' i • ` • ' _ _ . i 000r' N_doR i r tl R CAW rat USGS ? 13` Corporatior *Boundaries are approximate and are not meant to be absolute. Map Source: USGS Funston Quadrangle 7.5 minute SCALE 1" = 1000' Brunswick County Water Line ; LMG 50 Lakes Drive, BSL Figure 2 Brunswick County, NC — www.LMGroup.net USGS Topographic Map Phone: 910.452.0001 •1.866.LMG.1078 September 2013 Fax 910.452.0060 40 -13- 192 3805 Wrightsville Avenue Wilmington, NC 28403 *Boundaries are approximate and are not meant to be absolute. Map Source: NRCS Soil Survey GIS Data. Legend Lo: Leon fine sand Ma: Mandarin fine sand Mu: Murville mucky fine sand SCALE 1" = 500' Brunswick County Water Line LMG 50 Lakes Drive, BSL Figure 3 Brunswick County, NC — ` vvw.LMGroup.net Soils Map Phone: 910.452.0001 •1.866.1-MG.1078 September 2013 Fax 910.452.0060 40 -13- 192 3805 Wrightsville Avenue Wilmington, NC 28403 Areas considered to be jurisdictional wetlands as regulated by the U.S. Army Corps of Engineers (no development, soil disturbance or fill activities without prior 404/401 certification) - 0.51 ac NOTE: This is not a survey. All boundaries and distances are considered approximate. This represents a preliminary sketch prepared from field notes. This delineation was verbally approved by the US Army Corps of Engineers on 11/5/13. Map Source: 2013 BING Aerial Photography SCALE 1" = 500' Brunswick County Water Line LMG 50 Lakes Drive, BSL Figure 4. Aerial photograph Brunswick County, NC — www.LMGroup.net with wetland sketch September 2013 Phone: 910a52.00452.0060.LMG.1078 (as approved by USACE) 40 -13- 192 3805 Wrightsville Avenue Wilmington, NC 28403 LEGEND OF PROPOSED FEATURES —W— WATER MAIN l�N GATE VALVE 8 BOX 4 -v[rgv FIRE HYDRANT ASSEMBLY HORIZONTAL BEND REDUCER LIMIT OF DISTURBANCE (NOTE'. The right ofway line constitutes a -� Limit of Disturbance Boundary. It is not shown for purposes of clarity.) ITr SILT FENCING STONE CHECK DAM EROSION CONTROL MATTING �— PC POTENTIAL CLEARING ALIGNMENT U w#i73AB000 N w U a I I p rut. wr,l [)cull[ I # 1 73AF003 - 8" X 0" MJ TEE FIRE HYDRANT ASSEMBLY #173AF00i ALL PIPE FROM 45- BEND TO POINT OF TAP SHALL BE 8" PRESSURE CLA55 350 DIP. PIPE SHALL BE RJ. MJ WITH RETAINER. GLANDS. OR COMBII IATIOIJ THEREOF. SURVEY LEGEND . O •,.« s�. ne„m. Fqw m EXISTING 24" DI — WATERLIIIE GENERAL NOTES 1. The contractor snail roc nstruct all road Shoulders. drainage —'se. and Swale' di— bsd by construchor MIN. GO LF G" STEEL CASING PIPE W! 0.25" m acb "gybes m the r original grade. If are dmwrbce by tins wort, mtenes shall be reconstmded with pomtve I G' x 8" TAPPING SLEEVE 8" TAPPING GATE VALVE b BOX 2. The contractor shall be r —r—ble for the remo.l and rell—h m with equal or better naeer.al for all easbny 2 - 8" MJ BENDS AS REQUIRED TO pavements, driveways, jr 1 roadways. pipe cohorts. culvert head walls. fences. billboard, maAboms. and ALIGN 8" WATERLINE WITH TAPPING -..h m'cellaneo—temS where req—ed to complete constructior VALVE. OFFSET THE TAP LOCATIOFI I I 3. All fittmys and dead eds shall be restrained Joint to the II Specified .n 5ecton 150C.0 of the c,hst,,,b., FROM THE ALIGNMENT OF THE NEW dO a -tS or as snow. on these pans. whIcne,her 11 the greater lenytr WATERLII IE IF NECESSARY TO I1 4. DO hot ace may. lire o h,e h dons wNe o h dram .h bunt mope, back Slo ter of mar C,ordinate P � Y r Y Pe. or con FACILITATE COI NNECTION. ALL JOINTS 1 I wmh °ransw ek County or enyneer prior to Pacement of these gems SHALL BE RESTRAINED. BED 4 PIPE IN COMPACTED #57 I 5 water shall be mswued for eye,'arcs' w'th a .abatable stn,ctars and shall be coom,ated with ooanty HAUNCH 'raff'rior w instanaton STONE. I 6. If a parcel n S bo public Sewer the contractor snail install a double water mete- box if 10 pub11c hewer 'I , a -table a singles yang -., meter box may be used. ,I -. Depth of bury of -.11 re shall be such that there 11 a m nm um clearance of • 3G' between top of I and natural ground el°Vdbo • 3G' between top of p pe and a for tlow.l ne TOP OF SLOPE OF 30'x 30 X O' • 30" between top of pipe and Invert of ow errs, and, DEEP RECEIVING E TAPPING PIT ' • 3G" between outside wall of pipe and any ve .wl h— ban. surface. 8. Waterlines Shall be installed under driveways by ether open cut and patch restoraton of Headwall or dry bore without dlStu —j headwalls No payment Shall be made for open cut and patch operaG,ns or dry bores The cost for said won shall be 1-1 bed'h the b•d price for —s Ilat on of the "ten— - 9. No duturbarce Shall occur beyond the nynt-ol-way line unless directed by the County based on easements obtained by the County for Said msWrbarr<. LEGEND OF PROPOSED FEATURES —W— WATER MAIN l�N GATE VALVE 8 BOX 4 -v[rgv FIRE HYDRANT ASSEMBLY HORIZONTAL BEND REDUCER LIMIT OF DISTURBANCE (NOTE'. The right ofway line constitutes a -� Limit of Disturbance Boundary. It is not shown for purposes of clarity.) ITr SILT FENCING STONE CHECK DAM EROSION CONTROL MATTING �— PC POTENTIAL CLEARING ALIGNMENT U w#i73AB000 N w U a I I p rut. wr,l [)cull[ I # 1 73AF003 - 8" X 0" MJ TEE FIRE HYDRANT ASSEMBLY #173AF00i ALL PIPE FROM 45- BEND TO POINT OF TAP SHALL BE 8" PRESSURE CLA55 350 DIP. PIPE SHALL BE RJ. MJ WITH RETAINER. GLANDS. OR COMBII IATIOIJ THEREOF. SURVEY LEGEND . O •,.« s�. ne„m. Fqw m U1 2 - H ET 45` BEI IDS 100' TYP J WITH RETAINJER GLANDS �. }. _ PROPOSED 8" C900 DR 8 PVC WATERLIIIE ` II PLAN VIEW SCALE: I " = 50' i -8 "xG "MJTEE 1 - G" MJ GATE VALVE E BOX o JOINT (i 8' MIN.) G" PRESSURE CLASS 350 MJ DIP ° - G" MJ PLUG ALL JOINTS RESTRAINED #157PE007 #157PE00200 #157PE002OG FIFTY LAKES DRIVES - _ - - -- 1 <k7 I JOINT (I&' MIN) 8" PRESSURE CLA55 350 MJ DIP PROPOSED 8" DIP SHALL PA55 UNDER EXISTING 0" FORCE MAIN WITH MIN. CLEARANCE OF 18". ENSURE ADEQUATE SUPPORT OF EXISTING FORCE MAIN DUPING BORE 4 JACK OPERATIONS. TOP OF SLOPE OF 50'x 20' x ! O' DEEP SENDING PIT. END VIEW SECTION (a) CONNECTION LOCATION NOT TO SCALE 60 58 5G 54 52 50 49 p 4G W 44 42 40 ° o � o #173AP004 #173AD00102 #173AE00101 1 -8 "x IMJ TEE J OPEN CUT R PATCH 1 - FIRE HYDRANT A55EMBLY 1 - 8" MJ GATE VALVE E BOX 5' #173AGO04 #173AG003 #i73AG002 111731G001 s ° a - #173AH004 #173AH003 #173AM002 #(73AH001 s e o e a 1- 8" x G" MJ TEE 2 - 8" MJ GATE VALVE t BOX 1 JOINT (1 8' MIN.) 8" PRESSURE CLASS 350 MJ DIP 1- 8" MJ PLUG PLAN VIEW ALL JOINTS RESTRAINED SCALE: " = 50' 0 +00 0 +5C I +00 I +50 2 +00 0 +00 0 +50 1+00 I +50 2 +00 S -ATION (FEE-) BORE AND JACK SECTION UNDER NC 87 SCALE: I' = 40' H 1 =4'V I -8 "xG "MJTEE 1 - 5" M.) GATE VALVE E BOX 1 - I M.) GATE VALVE t BOX 1 JOINT (i 8' MIN.) G" PRESSURE CLA-95 35C MJ DIP - G" MJ PLUG ALL JOINTS RESTRAINED I o #157PF001 #173AE01i I Impact W2: 0.018 ac 1 8 PVC WATERLIIIE I it' - •, rya ~_ jWl: '# 1 73A1004 # 1 73A13A1002 # 1 73A1001 Imp015 ac e 1 -8 "xG "MJTEE 1 - 8" MJ GATE VALVE t BOX i - G" MJ GATE VALVE d BOX 1 JOINT (I B' MIN.) G" PRESSURE CLA55 350 MJ DIP - G" MJ PLUG ALL JOINTS RESTRAINED 0 25 so .00 200 5ca1e: 1' = 50' Gr, ss 5G 54 50 48 48 4G 44 42 a0 - W W Uf w N U Q i tASSEMBLY ImpacMJ TEE HYDRANT PRELIMINARY #173AI3009 — — MIN. GO LF G" STEEL CASING PIPE W! 0.25" m m WALLS INSTALLED BY BORE B JACK PLAN VIEW SCALE: I " = 50' i -8 "xG "MJTEE 1 - G" MJ GATE VALVE E BOX o JOINT (i 8' MIN.) G" PRESSURE CLASS 350 MJ DIP ° - G" MJ PLUG ALL JOINTS RESTRAINED #157PE007 #157PE00200 #157PE002OG FIFTY LAKES DRIVES - _ - - -- 1 <k7 I JOINT (I&' MIN) 8" PRESSURE CLA55 350 MJ DIP PROPOSED 8" DIP SHALL PA55 UNDER EXISTING 0" FORCE MAIN WITH MIN. CLEARANCE OF 18". ENSURE ADEQUATE SUPPORT OF EXISTING FORCE MAIN DUPING BORE 4 JACK OPERATIONS. TOP OF SLOPE OF 50'x 20' x ! O' DEEP SENDING PIT. END VIEW SECTION (a) CONNECTION LOCATION NOT TO SCALE 60 58 5G 54 52 50 49 p 4G W 44 42 40 ° o � o #173AP004 #173AD00102 #173AE00101 1 -8 "x IMJ TEE J OPEN CUT R PATCH 1 - FIRE HYDRANT A55EMBLY 1 - 8" MJ GATE VALVE E BOX 5' #173AGO04 #173AG003 #i73AG002 111731G001 s ° a - #173AH004 #173AH003 #173AM002 #(73AH001 s e o e a 1- 8" x G" MJ TEE 2 - 8" MJ GATE VALVE t BOX 1 JOINT (1 8' MIN.) 8" PRESSURE CLASS 350 MJ DIP 1- 8" MJ PLUG PLAN VIEW ALL JOINTS RESTRAINED SCALE: " = 50' 0 +00 0 +5C I +00 I +50 2 +00 0 +00 0 +50 1+00 I +50 2 +00 S -ATION (FEE-) BORE AND JACK SECTION UNDER NC 87 SCALE: I' = 40' H 1 =4'V I -8 "xG "MJTEE 1 - 5" M.) GATE VALVE E BOX 1 - I M.) GATE VALVE t BOX 1 JOINT (i 8' MIN.) G" PRESSURE CLA-95 35C MJ DIP - G" MJ PLUG ALL JOINTS RESTRAINED I o #157PF001 #173AE01i I Impact W2: 0.018 ac 1 8 PVC WATERLIIIE I it' - •, rya ~_ jWl: '# 1 73A1004 # 1 73A13A1002 # 1 73A1001 Imp015 ac e 1 -8 "xG "MJTEE 1 - 8" MJ GATE VALVE t BOX i - G" MJ GATE VALVE d BOX 1 JOINT (I B' MIN.) G" PRESSURE CLA55 350 MJ DIP - G" MJ PLUG ALL JOINTS RESTRAINED 0 25 so .00 200 5ca1e: 1' = 50' Gr, ss 5G 54 50 48 48 4G 44 42 a0 - W W Uf w N U Q i tASSEMBLY ImpacMJ TEE HYDRANT PRELIMINARY GENERAL NOTE5 I. The contractor shall re nstruct all road sM1OUlders. drainage 1-- and —1- disturbed by constructor actv6— to t", or.g.nal grade. If dit - are 611W bed by th.s wore, dhcnes shall be reconstructed with posltve flow 2. Tne contractor shall be responsible for the removal and replacement with equal or better all e,uting pavements. driveways. gravel roadway=_, pipe culverts, culvert Head walls. fences. b llin —kis. mailboxes. and m scellaneaus items where required to complete constructlor. 3. All fltdngs and dead ends shall he restrained font to the lengtr speclhcd m Sect on 1 5060 of the constructlor e_br_ts or as shown on these plans. Wh,chever .s the greater 1-99, 4. Do not place main Ilse valve hydrant valve. or hydrant .n frost slope. back slope. or center of dltcr Coordinate wtn 5runswi ck Cwnty or -q—, pr.or to placement of these items 5 Water . hall be .nstalled for every parcel wlln a nabtable sGucWre and shall be cogrdnated with county sta'f pr.orsto mstallaton 6. If a parcel has Ice.. to public sewer the contractor shall install a double water mece- box .r - pu bh, sewe. avalable a single gang water mete- bc. may be used Depth of bury of waterline shall be such that there Is a m of • 36" between top of p.pe and natural grrurd elevat.gn. • 30" between toP of p.pe aand nd d.tcr overt Ilow -I.ne, • 30" between top of p.pe . of culverks. and. • 36" between outside wall of pipe and any vert 1 d.tc. bang sarface 8. Waterlm es shall be installed under drweways by either opee cat and patch reetoration of headwall or dry bore w.thouf d.sturb.nq headwalls No payment snail be made br open cut and patch operators or dry bores Tne cost for sa.d work shall be included .n the bid pr.ce for mstallaton of the watsrl.ne 9 No d.sturbar ce shall —, beyond the r.q_nt-of -way Ilre unless detected by the County based on easements obLained by the County for said d.sturbarce 0 U w _('r-) — #157PGO0103— - #157PG0C3 w Vi w Z J PROPOSED 8" C900 DK '2 1 8 PVC WATERLII IE Impact W3 cont( 5' 0.029 ac #173B[3017 #1738BOiG #I73BBO 5 1 -8 "xG "MJTEE 1 - 8" MJ GATE VALVE # BOX - G" MJ GATE VALVE £ BOX I JOINT (I 8' MIN.) G" PRESSURE CLASS 350 MJ DIP G" MJ PLUG ALL JOINTS RESTRAINED c 3 S #157PH00303 I #i57PH00302 I #I57PH00301 I #157PHCC5 LEGEND OF PROPOSED FEATURES — W WATER MAIN x GATE VALVE 8 BOX FIRE HYDRANT ASSEMBLY HORIZONTAL BEND REDUCER LIMIT OF DISTURBANCE (NOTE. The right of way line constitutes a Limit of Disturbance Boundary. It is not shown for purposes of clarity.) SILT FENCING STONE CHECK DAM EROSION CONTROL MATTING �— PC POTENTIAL CLEARING ALIGNMENT 'e #1570800201 SURVEY LEGEND a O: rs our eev +m. © ,Ern er QTyo� W.w� b :r #15708002 - #15708005 #157012 5CAfE: 5EE DRA G DRA Vll BY TMM CFECr£D BY DMG I15ueD ­1 srza; a C41 C41 aR C41 R Ul � U W W UJ OZ Z O Q 3Z Cz � W ~ U Q Z Q W — H UJ W O oL o Z 0 O o uJ U — U Q J Q u U_ �':A LL z U m LL m O N Q PROPOSED 8' C300 DR REMOVE 8" PLUG B MAKE CONNECTION r GPEII CUT PATCH 5 PVC WATERLINE n _ n 0 6 d, W EXISTING GATE VALVES BOX ® ° E E rn ° � E � #173B004 #173BE003 #173BE002 #173BE001 #i- 3BF018 #173BFOi7 #i73BF01G #i73BF015 #i73B1018 = O In m #173150015 Ai73BDC14 #I73BD013 #173130012 o 1 -8 "xG "MJTEE NT ASSEMBLY - N - FIRE HYDRA - EXISTING 8" PVC WATERLItJE - 8" MJ GATE VALVE $ BOX m 1 - 8" x G" MJ TEE I,- 8" x G" MJ TEE c6 yai z 1 - G" MJ GATE VALVE it BOX i - G" MJ GATE VALVE 4 BOX p I JOINT (I 8' MIN.) G" PRESSURE CLASS 350 MJ DIP JOINT (i 8' MIN.) G" PRESSURE CLASS 350 MJ DIP E s 1 - G" MJ PLUG PLAN VIEW - G" MJ PLUG 0 N ALL JOINTS RESTRAINED ALL JOINTS RESTRAINED U SCALE I "= 50' �L_ 7r o 25 so GO 200 Sole: I = 50' PRELIMINARY C II ROJECT# 130903