Loading...
HomeMy WebLinkAbout20211716 Ver 1_004 - flow documentation_20211123The proposed site improvements will intercept stormwater that currently flows over the existing greenway trail and through the riparian buffer, and routes it through the proposed piping to discharge onto the large riprapped energy dissipation pad at the outlet of the double 48" x 72" box culverts.