Loading...
HomeMy WebLinkAboutNCG030722_Inspection Report_20211013Compliance Inspection Report Permit: NCG030722 Effective: Expiration: Owner: The Timken Company SOC: Effective: Expiration: Facility: Asheboro Bearing Plant County: Randolph 3500 Timken PI Region: Winston-Salem Randleman NC 27317 Contact Person: Craig Fields Title: Phone: 336-495-2115 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/13/2021 Entry Time 02:OOPM Exit Time: 03:OOPM Primary Inspector: Blane Houck Phone: 336-776-9660 Secondary Inspector(s): Levi Hiatt Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 4 Permit: NCG030722 Owner - Facility: The Timken Company Inspection Date: 10/13/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: This site was inspected for compliance on October 13, 2021. At the time of inspection, the facility was found to be existing prior to submittal of the permit application. Both outfalls were observed during the inspection. A Stormwater Pollution Prevention Plan (SWPPP) will be submitted to this office in accordance with the time limits of the permit application. The inspection revealed no compliance issues, and the facility will be recommended for approval of permit coverage. Page 2 of 4 Permit: NCG030722 Owner - Facility: The Timken Company Inspection Date: 10/13/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Permit application submitted for an existing facility. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: This facility has not been qranted a Certificate of Coveraqe (COC), and enouqh time has not been allotted to necessitate sampling. Technical guidance was provided to the site contact regarding Qualitative Monitoring requirements Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑❑■❑ Comment: This facility has not been granted a Certificate of Coveraqe (COC), and enouqh time has not been allotted to necessitate sampling. Technical guidance was provided to the site contact regarding Analytical Monitoring requirements. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑ Comment: This facility has not been granted a Certificate of Coverage (COC). Two outfalls were observed during the site visit. However, information regarding representative outfall status for this facility has not been received by this office. Enough time has not been allotted to necessitate the evaluation of illicit (non-stormwater) discharges in accordance with the proposed SWPPP. Page 3 of 4 Permit: NCG030722 Owner - Facility: The Timken Company Inspection Date: 10/13/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Page 4 of 4