HomeMy WebLinkAbout20211705 Ver 1_Shoreline Stabilization_20211123Submission Form
I. Applicant Information [15A NCAC 02H .0502(a)]
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email* sharon.griffithmorris@gmail.com
Please provide an email address for payment and requests for more information here.
Owner Information:
Name: *
Sharon Morris
Email: *
sharon.griffithmorris@gmail.com
Phone Number:*
(704)517-2976
(xxx)xxx-xxxx
Mailing Address: *
Street Address
4033N Course Drive
Address Line 2
City
Charlotte
Postal / Zip Code
28277
Is there an agent working on the project?* Yes
No
Project Information [15A NCAC 02H .0502(a) & (b)]
......................................................................................................................................................................
Project Name:* Morris Property Erosion Control
State / Province / Region
North Carolina
Country
United States
If your project has a formal name please use this. If your project does not have a formal name, please identify your project
by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses
any other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads.*
Upload File
• Look up address
Property Address Lookup: * Street Address
188 Fairfield Rd
Address Line 2
City
Mt Gilead
Postal / Zip Code
27306
Latitude: * 35.845213
State / Province / Region
NC
Country
US
Longitude: *-80.544336
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below
Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under
section 12.normal pool lake level/normal water level *
Project Sketch.pdf 170.81KB
Please use the diagram at the link below:
https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/ShoreIine%20Layout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard
stick, shovel handle, etc.)*
LakeTillery_Photos Erosion 20211122.pdf 3.54MB
4. Location of the property (where work is to be conducted)
Nearest Town: * Mt. Gilead
County: * Montgomery
Lake/ river/ ocean adjacent to Lake Tillery
property:
Subdivisions name or site address: * Woodrun, Lot 14
Include phase/lot number
Directions to site: *
East from Albemarle on 24/27; left on River Rd at the BP station; one
mile and left into Woodrun Subdivision (will need to alert security guard
of arrival). Stay on Woodrun Rd approximately 1 mile and take a left on
Fairfield Rd. Go down a steep hill and up a steep hill and house is on the
right (lakeside). Gray sided two-story house with hunter green trim. 188
Fairfield Rd
Please include road names and numbers, landmarks etc.
5. Describe the existing land use or condition of the site at the time of this application:
vacation home with steep slope to water; stairs to top of boathouse and
stairs to a lower deck with boatlift. Used for recreation
Residential, undeveloped, etc.
6. Property Size .34 acres
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or
why it is necessary):
The shoreline along our property has a lot of natural rock to help control
erosion but there are sections where the rate of erosion and wildlife
(muskrats) disturbance has increased the erosion specifically at the
shoreline behind our boathouse, to the point where the structure that
supports stairs to the top of the dock will be compromised if not
addressed.
Several contractors have looked at the site, which has a steep grade to the
waterfront and suggested removing about a half dozen scrub trees to
access the shoreline, dropping rip rap rock above the buffer zone and
manually wheel barrow materials, using large rocks as well as smaller
rocks to backfill. Since there is natural stone and a steep drop off, we have
contacted Duke Energy to consult as to the approach and amount of stone
needed to address erosion (contractor estimates 6 loads) both below and
above pond and will adjust as to their specifications. More rock and
backfill will be required where the erosion is worst (behind the boathouse)
and the intention is to use as little as possible in the areas where the
natural stone is doing a good job to minimize erosion.
8. How will the work be done?* From Land
From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
approx. 225 sf (75'
of shoreline X 3'
below water
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land-
ward: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
approximately 400
sf for rock
placement above
normal lake,
removal and
replanting of scrub
trees to provide
access to the
waterfront by
wheelbarrows
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to
be impacted:*
(number of trees, for instance)
Some small/scrub brush (e.g., holly bush, small scrub pine, Virginia
Creeper vine and raspberry overgrowth) on the south side of the stairs
leading to the boathouse will be removed to allow wheelbarrow access to
the shoreline
Sketch:
Application Fee:
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
a $240.00 for impacts to lake (below normal water level) of less than 1 acre
a $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certify that:
o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best
of my knowledge and belief
o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act');
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
a 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
o I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name:* Sharon R Morris
Signature:
a 104"
Submittal Date: 11/22/2021
Initial Review
Is this accepted into the review process?* Yes No
Project Number:* 20211705 Version: *
Select Reviewer:*
Select Reviewing Office:
Has payment been received?*
What amount is owed?*
Chad Turlington:eads\ccturlington
Fayetteville Regional Office - (910) 433-3300
No Payment Needed
Fee Received
• Need Fee - send electronic notification
• $240.00
$570.00