Loading...
HomeMy WebLinkAbout20211704 Ver 1_Shoreline Stabilization_20211123Submission Form I. Applicant Information [I5A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * Owner Information: Name: * Email: * Phone Number: * Mailing Address:* RLMORGANJR30@GMAIL.COM Please provide an email address for payment and requests for more information here. Mary Webster webster.mary59@gmail.com (704)517-0205 (xxx)xxx-xxxx Street Address 6821 Fairway Row Lane Address Line 2 City Charlotte Postal / Zip Code 28277-4188 Is there an agent working on the project?* - Yes O No Agent/Consultant Information ................................................................................................... Name: * Company Affiliation: Email: * Phone Number:* Robert Morgan R Morgan Homes LLC RLMORGANJR30@GMAIL.COM (704)607-4438 (xxx)xxx-xxxx State / Province / Region NC Country US Mailing Address: * Street Address 4110 Little Tree Ln Address Line 2 PO Box 1801 City Denver Postal / Zip Code 28037 A signed and dated copy of the Agent Authorization letter: LFWAGENT AUTHORIZATION 614.11KB FORM.signed.pdf Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name: * Webster Residence State / Province / Region NC Country United States If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* Upload File Look up address Property Address Lookup:* Latitude: * 35.528794 Street Address 4387 Little Fork Cove Rd Address Line 2 NC City Denver Postal / Zip Code 28037-8483 State / Province / Region NC Country US Longitude: *-80.984366 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* LFW SSGP09- 915.lKB 2020_OnlineShorelineApp.11.17.2 Lpdf Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/ShoreIine%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) * LFW Shoreline.Pics.pdf 812.69KB 4. Location of the property (where work is to be conducted) Nearest Town: * Denver County: * Lincoln Lake/ river/ ocean adjacent to Lake Norman property: Subdivisions name or site address: * 4387 Little Fork Cove Rd Include phase/lot number Directions to site:* From NC Business 16 between NC-73 and NC-150 Turn west on Webbs Rd Proceed approx. 1 mi on Webbs Rd Turn Left on Little Fork Cove Rd 4387 Little Fork Cove Rd approx lmi on left Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: Single Family Residence Residential, undeveloped, etc. 6. Property Size 0.76 ac Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Shoreline has previously been stabilized with rip -rap. Existing rip -rap has failed areas where the rip -rap has slid down the embankment setting up bank erosion. Work scope involves adding rip -rap to stabilize the rock at the tow of the embankment and adding fabric and rip -rap from approx. elevation 758 to 761. 8. How will the work be done?* From Land From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 500 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 500 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted: * (number of trees, for instance) Predominantly cleared with trees limited to the property corners; so there is no expected impact to trees. (see photos on previous attachment) Sketch: Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Robert L. Morgan, Jr. Signature: Submittal Date: 11/20/2021 Initial Review Is this accepted into the review process?* Yes No Project Number:* 20211704 Version: * Select Reviewer:* Select Reviewing Office: Has payment been received?* What amount is owed?* Alan Johnson: eads\adjohnson I Mooresville Regional Office - (704) 663-1699 No Payment Needed Fee Received • Need Fee - send electronic notification • $240.00 $570.00 SAMPLE AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. PLAN NO. STREET ADDRESS: _4387 Little Fork Cove Rd Please print: Property Owner: Mary Webster, Dale Webster, Property Owner: Graham Webster PARCEL ID: 29731 The undersigned, registered property owners of the above noted property, do hereby authorize Robert Morgan , of R. Morgan Homes, LLC (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): . & N-! lcGtire, 'e� Telephone: 704-517-0205 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. P ! a i"Z_---`- Authorized Signature Date: 11-� - MLVt-� �) �U�4& Authori d Signature Date: Example 1 of area where rip -rap has failed Example 2 of area where rip -rap has failed PROW# a s.�awelR�:fi p View From approx. middle of lot looking through the 50' buffer a 's ; y,v State of North Carolina Department of Environment and Natural Resources e. Division of Water Resources Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation SEE ATTACHED DRAWINGS AND PHOTOS FORM: SSGP 02-2017 Page 1 of 3 =moma>z N V m❑ o j ��� v ona °' W GEC a F¢ o . 2 aY q 45a$Q�ra L ul L1 a �r mz a�a��� w m C] o 2 U N 6b-3 8d z y [7 oW5 �o a N a 2Z �OF W Oo OJp x ¢zpQ Fw rc 0i0 Y J u Q. am N w a �o v`o Faso NW �z x NN �� zoz a g wg Wri N>' LL p 0z- �oa�No off �� 04 z i=D N��� og0 $2 o � Fp w WSWa� a¢ �O 66 oa�zc�z 2z id az w o � - o � a7Zp�U 0 m� Z N � asW` w a��w 3 wo J a¢ RtiR %A av # 6 I I 31�r G�1 0 w w E" W w o I W R.1 d r W � I • r � - � I 2w I Q .y~ m cru � t v � L S a Cl) O 14) r Q Q) �. c6 () r6 �6 m U Lake Norman Full Pond Water Level = el.160— Plan View approx bank 3 approx bank width width below full above full pond pond impacted impacted Lake Norman Full Pond Water Level —new rip -rap added to impacted area abric added to impacted area g use a portion of existing upper rip -rap to re -enforce toe and add fabric 8 new rip rap to bare areas in approx 6' wide impacted area Section View