Mar. 10, 2019
Jason Conner
Hedrick Industries
P.O. Box 425
Swannanoa, NC 28778
Subject: Cost Estimate for Transmission Line RE
Dear Mr. Conner:
It is our understanding that you would like to pur
transmission line (Line Index # 2R66/2R3079) bi
your Lake Norman Quarry property in Lincoln Cc
The high-level cost of this relocation is currently
high-level estimate and is not the final cost of the
design and scope of work, outlined below:
• All work associated to relocate this lir
access from another property owner
Duke Energy, or provide alternate ac
• Natural Resource Assessment requir
Sediment & Erosion Control permit ai
construction work can begin until the:
• CPCN permit required when relocatir
process typically takes 6+ months an
complete. No construction, material p
acquisition can take place until this pi
• Significant access/erosion control co;
clearing/trimming also required.
• Assuming single circuit outage availa
year, therefore (4) temporary pull-out
23.0E and 28.OE.
The project estimate is subject to change shoulc
change.
The estimate is broken down as follows:
Project Estimate
CIAC Tax Gross Up (11.7%)
Total Estimated Project Cost
This relocation is with the understanding that yoi
of which is available upon request. Please be ac
assets will remain the property of Duke Energy.
This correspondence is valid for 90 days from th
If you have additional questions about this reloc<
980-373-1219 or by email at lisa.plum ley@duke
appreciate the opportunity to serve your electric
Sincerely,
Lisa Plumley
Project Manager, Transmission — Carolinas WeE