HomeMy WebLinkAbout20211505 Ver 1_Appendix C - Dutchman 230kV Transmission Line Relocation - Initial Estimate Letter_20211122APPE?� DUKE ENERGY COST ESTIMATE (Al (� DUKE ENERGY. Mar. 10, 2019 Jason Conner Hedrick Industries P.O. Box 425 Swannanoa, NC 28778 Subject: Cost Estimate for Transmission Line RE Dear Mr. Conner: It is our understanding that you would like to pur transmission line (Line Index # 2R66/2R3079) bi your Lake Norman Quarry property in Lincoln Cc The high-level cost of this relocation is currently high-level estimate and is not the final cost of the design and scope of work, outlined below: • All work associated to relocate this lir access from another property owner Duke Energy, or provide alternate ac • Natural Resource Assessment requir Sediment & Erosion Control permit ai construction work can begin until the: • CPCN permit required when relocatir process typically takes 6+ months an complete. No construction, material p acquisition can take place until this pi • Significant access/erosion control co; clearing/trimming also required. • Assuming single circuit outage availa year, therefore (4) temporary pull-out 23.0E and 28.OE. The project estimate is subject to change shoulc change. The estimate is broken down as follows: Project Estimate CIAC Tax Gross Up (11.7%) Total Estimated Project Cost This relocation is with the understanding that yoi of which is available upon request. Please be ac assets will remain the property of Duke Energy. This correspondence is valid for 90 days from th If you have additional questions about this reloc< 980-373-1219 or by email at lisa.plum ley@duke appreciate the opportunity to serve your electric Sincerely, Lisa Plumley Project Manager, Transmission — Carolinas WeE Cc: Leah Holleman, Kevin Johnson, Brandon M,,