Loading...
HomeMy WebLinkAbout20211489 Ver 1_NDP-Ph1 Roadway Working Set (2021-11-17)_20211123Norfolk%15 6"DIP FM16"DIP FMSSVSVHHSSSSSSSSSSSSSSHHSEWER MANHOLERIM-386.06'FORCE MAINHHASPHALTSSVICINITY MAP GRAPHIC SCALE PLANS PROFILE (HORIZONTAL) PROFILE (VERTICAL) 0 5025 0 5025 0 105 BYDATEAS SHOWNREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEKHA PROJECT019139023NORTH CAROLINAR0.0011/17/2021TITLE SHEETDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Plan Sheets\019139023_tsh.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS DESIGNED BY: DJDOF FERRELL ROAD (SR 1671) FERRELL ROAD (SR 1671) TO 3065' SOUTH LOCATION: NORTH DURHAM PARKWAY FROM PHASE 1 NORTHERN DURHAM PARKWAY PHASE 1PARKWAYNORTHERN DURHAM ENGINEER: -L- Sta. 37+00.00 BEGIN PROJECT -L- Sta. 67+70.52 END PROJECT PROJECT END PROJECT BEGIN CHEEK ROAD (SR-1800) FERRELL ROAD (SR -1671)JUNCTION ROAD (SR-1675)CARPENTER ROAD (SR-1822) R0.02 CONVENTIONAL SYMBOLS PROJECT NOTESR0.01 TITLE SHEET DESCRIPTIONSHEET NO. R0.00 TYPICAL SECTIONS R2.00 THRU 2.02 R1.00 R2.00 R2.01R2.02R2.03 THRU 2.04 SURVEYOR: for the specific purpose and client. reliance on this document instrument of service, is intended only Associates, Inc. for which it was prepared. Reuse of and improper Horn and Associates, Inc. shall be without liability to Kimley-Horn and herein, as an without written authorization and adaption by Kimley- This document, together with the concepts and designs presented BEFORE YOU DIG IT'S THE LAW N.C. ONE-CALL CENTER CALL 1 800 632-4949 STOP APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE rob.baumgartner@kci.com 919.280.7944 ROB BAUMGARTNER, PLS RALEIGH, NC 27609 4TH FLOOR 4505 FALLS OF NEUSE RD. KCI ASSOCIATES OF NC, P.A. tyler.white@kimley-horn.com 919.677.2074 TYLER WHITE, P.E. DURHAM, NC 27701 SUITE 200 300 MORRIS ST. KIMLEY-HORN AND ASSOCIATES, INC. TO I-85 TO CARPENTER ROADR4.00 THRU R4.02 R3.00 R6.00 THRU R6.14 R2.05 PAVEMENT MARKING AND SIGNING PLAN ROADWAY CROSS SECTIONS TRAFFIC MANAGEMENT PLAN -L- NORTHERN DURHAM PARKWAY EXTENSION NOT TO SCALE DURHAM COUNTY FERRELL ROAD (SR-1671)-Y1-MSE RETAINING WALL LAYOUT AND ENVELOPE PLAN VIEW PROFILE VIEW JUNCTI ON ROAD (SR-1675)NAD 83 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECTNORTH CAROLINAR0.01PROJECT NOTESNTSDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Plan Sheets\019139023_tsh.dgn11/17/2021DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583019139023 300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM UTILITY NOTES TO BE RELOCATED OUT OF THE PROPOSED PAVEMENT. WATER METER BOXES THAT ARE ENCOUNTERED WITHIN THE PROPOSED PAVEMENT SECTION ARE 3. WORK. PROPOSED PAVEMENT SECTION ARE TO BE RAISED OR LOWERED TO MATCH THE ADJACENT FINISHED WATER METER BOXES THAT ARE ENCOUNTERED WITHIN THE PROJECT LIMITS OUTSIDE THE 2. RAISED OR LOWERED TO MATCH THE ADJACENT FINISHED WORK. WATER VALVE BOXES THAT ARE ENCOUNTERED WITHIN THE PROJECT LIMITS ARE TO BE 1. GENERAL NOTES ISSUED. TREE PROTECTION FENCING SHALL BE INSTALLED AND INSPECTED BEFORE THE GRADING PERMIT IS AND SAFETY REQUIREMENTS. ENCOUNTERED. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL BLASTING THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR BLASTING ROCK IF BLAST ROCK IS EXCAVATE BENCHES WITH A MAXIMUM DEPTH OF 3'. WHERE FILL IS TO BE PLACED ON EXISTING SLOPES STEEPER THAN 4:1, CONTRACTOR SHALL REFER TO ROADWAY PLAN FOR HORIZONTAL DIMENSIONS. PROFILES/SUPERELEVATIONS ARE TO BE USED IN CASE OF DISCREPANCY. PROPOSED CONTOURS AND GUTTER GRADIENTS ARE APPROXIMATE. PROPOSED ROADWAY BY THE OWNER AND PROPERLY DISPOSED OF. ALL DEMOLITION DEBRIS AND OTHER EXCESS MATERIAL SHALL BE HAULED OFF-SITE AS DIRECTED FROM THE DEPARTMENT'S MATERIALS AND TESTS UNIT. DEPARTMENT. COPIES OF THESE MODIFIED TESTING PROCEDURES ARE AVAILABLE UPON REQUEST ADHERE TO NCDOT REQUIREMENTS, IN ACCORDANCE WITH AASHTO T99 AS MODIFIED BY THE ALL GRADING / SOIL COMPACTION OPERATIONS WITHIN THE LIMITS OF STATE RIGHT OF WAYS SHALL MAN-MADE FILLS AND REFUSE DEBRIS DERIVED FROM ANY SOURCE. OTHER NON-COMPATIBLE SOIL TYPE MATERIAL. UNSATISFACTORY MATERIALS ALSO INCLUDE ALL MATERIALS USED FOR BACKFILL SHALL BE FREE OF WOOD, ROOTS, ROCKS, BOULDERS, OR ANY ADJUSTMENTS AND/OR RELOCATIONS. GRADING CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANIES FOR ANY REQUIRED UTILITY GRASS OR OTHER GROWTH TO PREVENT EROSION. UPON COMPLETION OF PERMANENT DRAINAGE FACILITIES AND THE ESTABLISHMENT OF A STAND OF SILTATION ORDINANCES. CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION CONTROL DEVICES CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE STATE AND LOCAL EROSION, CONSERVATION, AND PREVENT SILT AND CONSTRUCTION DEBRIS FROM FLOWING ONTO ADJACENT PROPERTIES. SHOWN ON THESE PLANS, TO BEST UTILIZE THE EROSION CONTROL DEVICES IN PLACE, AND TO FENCES, DIVERSION DITCHES, BERMS, OR OTHER METHODS AS REQUIRED TO DIRECT DRAINAGE AS ADDITION TO THE MEASURES SHOWN IN THESE PLANS, THE CONTRACTOR SHALL USE INTERIM SILT CONTRACTOR SHALL MAINTAIN ADEQUATE SITE DRAINAGE DURING ALL PHASES OF CONSTRUCTION. IN ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE, AND AS SHOWN ON THESE PLANS. THE NECESSARY TO OBTAIN A DENSE STAND OF GRASS. BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED, AND MULCHED AS WHEN AND AS NECESSARY, AND SHALL BE CHECKED AFTER EVERY RAINFALL. SEEDED AREAS SHALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED DEVICES TO BE INSTALLED PRIOR TO COMMENCING CONSTRUCTION. REFER TO EROSION CONTROL SHEETS FOR CLEARING LIMITS AND TEMPORARY EROSION CONTROL ENGINEER IN ORDER TO SECURE A PROPER TIE-IN. BEGINNING AND ENDING AND AT STRUCTURES AND EXISTING PAVEMENT AS DIRECTED BY THE GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. GRADE LINES MAY BE ADJUSTED AT THEIR THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED SURFACING AT 13. 12. 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. GRADING 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. PAVING/CURBING SECTIONS. SUPERELEVATION IS TO BE REVOLVED ABOUT THE GRADE POINTS SHOWN ON THE TYPICAL 225.05 USING THE RATE OF SUPERELEVATION AND RUNOFF SHOWN ON THE PLANS. ALL CURVES ON THIS PROJECT SHALL BE SUPERELEVATED IN ACCORDANCE WITH STD. 225.04 & PAVEMENT IS BEING WIDENED OR WHERE NEW CURB AND GUTTER IS PROPOSED. CONTRACTOR SHALL SAWCUT & REMOVE ANY THE EXISTING PAVEMENT WHEN THE EXISTING ON THE PLANS AT APPROXIMATE LOCATIONS. ALL RAMPS SHALL COMPLY WITH THE LATEST NCDOT STANDARDS. WHEELCHAIR RAMPS ARE SHOWN REQUIREMENTS AND THE "NORTH CAROLINA STATE BUILDING CODE, VOL 1-C ACCESSIBILITY CODE." ALL HANDICAP RAMPING, STRIPING, AND PAVEMENT MARKINGS SHALL CONFORM TO ADA SHALL CONFORM TO MUTCD, AND NCDOT STANDARDS. ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES ON PUBLIC STREETS GRADE 60, AND SHALL BE SUPPORTED BY BAR CHAIRS. ALL REINFORCING STEEL SHALL BE NEW DOMESTIC BILLET STEEL CONFORMING TO ASTM A-615, SPECIFICATIONS. PROCEDURES THAT THE WORK CONSTRUCTED DOES MEET THE REQUIREMENTS OF THE NCDOT OWNER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SHOW BY STANDARD TESTING TESTING LABORATORY AND THE PAYMENT OF SUCH TESTING SERVICES SHALL BE MADE BY THE BE PERFORMED BY AN APPROVED AGENCY FOR TESTING MATERIALS. THE NOMINATION OF THE TESTING OF MATERIALS REQUIRED FOR THE CONSTRUCTION OF THE PAVING IMPROVEMENTS SHALL RADIUS POINTS IS 1.5 FEET. ALL JOINTS SHALL BE SEALED WITH JOINT SEALANT. ALL CURB JOINTS SHALL EXTEND THROUGH THE CURB. MINIMUM LENGTH OF OFFSET JOINTS AT PLACEMENT. MATERIAL TO BE USED SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO CONDITION ALL FILL PER THE PROJECT GEOTECHNICAL ENGINEER'S SPECIFICATIONS. THE FILL THE CONTRACTOR SHALL CLEAR AND GRUB THE SITE AND PLACE, COMPACT, AND MOISTURE PROVIDE A SMOOTH SURFACE FOR PAVING. LEVELING COURSE OF SANDY CLAY OR CLAYEY SAND (P.I. BETWEEN 4 AND 15) AS NEEDED TO IS ENCOUNTERED AT FINAL SUB GRADE ELEVATION, THE EXPOSED ROCK SHALL BE TOPPED WITH A ENGINEER. FILL SHALL BE PLACED AND COMPACTED IN MAXIMUM 8" LIFTS. IN AREAS WHERE ROCK UNLESS OTHERWISE SHOWN ON THE CONSTRUCTION PLANS OR AS DIRECTED BY THE GEOTECHICAL A MINIMUM DENSITY OF 100 PERCENT OF ASTM D-1557 DENSITY AT OPTIMUM MOISTURE CONTENT ALL PAVEMENT SUB GRADES SHALL BE SCARIFIED TO A DEPTH OF 8 INCHES AND COMPACTED TO EARTHWORK. NECESSARY ENGINEERING AND SURVEYING FOR LINE AND GRADE CONTROL POINTS RELATED TO PAVEMENT AND OTHER ITEMS ESTABLISHED IN THE PLANS. THE CONTRACTOR SHALL PROVIDE ALL BEFORE ANY EARTHWORK IS DONE, THE CONTRACTOR SHALL STAKE OUT AND MARK THE LIMITS OF OF 10' SHALL BE MADE TO CONFORM TO THE EXISTING HEIGHTS AND SHAPES. WHERE PROPOSED CURB AND GUTTER TIES TO EXISTING CURB OR CURB AND GUTTER, A TRANSITION LIMITS OF OFFSITE IMPROVEMENTS NOT WITHIN FLOODPLAIN. OF THE PROJECT ARE KEPT CLEAN AT ALL TIMES OR A WASH STATION WILL BE REQUIRED. CONTRACTOR TO ENSURE THAT ALL STREETS WITHIN THE LIMITS OF THE PROJECT AND IN FRONT OCCUPANCY (CO). FENCING SHALL BE REMOVED PRIOR TO THE FINAL SITE INSPECTION FOR THE CERTIFICATE OF ALL TREE PROTECTION FENCING SHALL BE MAINTAINED UNTIL ALL SITE WORK IS COMPLETED. THE APPROVAL OF NCDOT. LANDSCAPING, GRADING, BUILDING ELEVATIONS, LIGHTING, OR UTILITIES WILL BE MADE WITHOUT THE NO CHANGES TO ANY ASPECT OF THIS ROADWAY PLAN, INCLUDING BUT NOT LIMITED TO, DETAILS AND ENCROACHMENT AGREEMENTS. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CURRENT NCDOT STANDARDS, SPECIFICATIONS, ROADWAYS MUST BE CAPABLE OF SUPPORTING FIRE APPARATUS DURING CONSTRUCTION. ELEVATIONS AND SLOPES. MAIN, GAS, AND WIRE UTILITY STRUCTURES SHALL BE ADJUSTED TO MATCH PROPOSED FINISHED THE FRAMES AND COVERS OF ALL EXISTING AND PROPOSED DRAINAGE, SANITARY SEWER, WATER THE ENGINEER. APPROVALS PRIOR TO COMMENCING CONSTRUCTION. NCDOT ENCROACHMENTS SHALL BE OBTAINED BY CONTRACTOR IS RESPONSIBLE FOR VERIFYING OR OBTAINING ALL REQUIRED PERMITS AND CONTRACTOR SHALL ARRANGE THE MEETING WITH NCDOT AND THE CITY OF DURHAM. A PRE-CONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE CONSTRUCTION STAKEOUT FOR THIS PROJECT SHALL BE PROVIDED BY THE CONTRACTOR. INCONSISTENCIES, OR AMBIGUITIES SHALL BE DONE AT THE CONTRACTOR'S RISK. AMBIGUITIES. WORK DONE BY THE CONTRACTOR AFTER HIS DISCOVERY OF SUCH DISCREPANCIES, REPORTED TO THE ENGINEER, IN WRITING, WHO SHALL PROMPTLY ADDRESS SUCH INCONSISTENCIES OR ANY INCONSISTENCIES OR AMBIGUITIES IN DRAWINGS OR SPECIFICATIONS SHALL BE IMMEDIATELY ANY DISCREPANCIES FOUND BETWEEN THE DRAWINGS AND SPECIFICATIONS AND SITE CONDITIONS OR SHALL BE INSTALLED PER THE MANUFACTURERS' SPECIFICATIONS. ALL MANUFACTURERS' PRODUCTS SPECIFIED IN THESE PLANS OR USED AS APPROVED ALTERNATES DEVICES," AND AS FURTHER DIRECTED BY THE TOWN AND STATE INSPECTORS. IN CONFORMANCE WITH THE TRAFFIC CONTROL PLAN, THE "MANUAL OF UNIFORM TRAFFIC CONTROL TRAFFIC CONTROL ON PUBLIC STREETS IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE SHALL REPAIR, AT HIS OWN EXPENSE, ANY EXISTING UTILITIES DAMAGED DURING CONSTRUCTION. TELEPHONE RISERS, WATER VALVES, ETC. DURING ALL CONSTRUCTION PHASES. THE CONTRACTOR THE CONTRACTOR SHALL SALVAGE AND PROTECT ALL EXISTING POWER POLES, SIGNS, MANHOLES, SITE. SERVICE (ULOCO) AT 1-800-632-4949 FOR PROPER IDENTIFICATION OF EXISTING UTILITIES WITHIN THE ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE NORTH CAROLINA ONE-CALL UTILITIES LOCATION CONSTRUCTION SITE. AT LEAST 48 HOURS PRIOR TO ANY DEMOLITION, GRADING, OR CONSTRUCTION PUBLIC OR PRIVATE UTILITIES (SHOWN OR NOT SHOWN) WHICH LIE IN OR ADJACENT TO THE CONTRACTOR IS RESPONSIBLE FOR HORIZONTALLY AND VERTICALLY LOCATING AND PROTECTING ALL THE LOCATION AND SIZE OF EXISTING UTILITIES AS SHOWN IS APPROXIMATE ONLY. THE LIMITED TO TRENCH SAFETY, DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL JOBSITE SAFETY, INCLUDING BUT NOT OTHERWISE NOTED IN THESE PLANS. THESE STANDARDS, SPECIFICATIONS, OR PLANS, THE MOST STRINGENT SHALL GOVERN UNLESS SPECIFICATIONS, AND GENERAL DESIGN STANDARDS. IN THE EVENT OF CONFLICT BETWEEN ANY OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS, CITY OF DURHAM ROAD AND BRIDGE STANDARDS, THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK, CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) ROAD AND BRIDGE SPECIFICATIONS, THE NCDOT WORK IN THIS PROJECT SHALL CONFORM TO THESE PLANS, THE LATEST EDITIONS OF THE NORTH 17. 16. 15. 14. 13. 12. 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE *S.U.E. = Subsurface Utility Engineering Note: Not to Scale CONVENTIONAL PLAN SHEET SYMBOLS Existing Edge of Pavement Existing Curb Proposed Slope Stakes Cut Proposed Slope Stakes Fill Proposed Wheel Chair Ramp Curb Cut for Future Wheel Chair Ramp WCR CCFR Existing Metal Guardrail Existing Cable Guiderail Proposed Guardrail Equality Symbol Pavement Removal Baseline Control Point RIGHT OF WAY: Existing Right of Way Marker Existing Right of Way Line h Iron Pin and Cap Marker Proposed Right of Way Line with Concrete or Granite Marker Proposed Right of Way Line with Existing Control of Access Proposed Control of Access Proposed Right of Way Line C F:Existing Easement Line Proposed Temporary Construction Easement Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Proposed Permanent Utility Easement HYDROLOGY: Hydro, Pool or Reservoir Flow Arrow Disappearing Stream Spring Swamp Marsh ;zvW Proposed Lateral, Tail, Head Ditch False Sump Proposed Cable Guiderail MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall MINOR: Head and End Wall Pipe Culvert Footbridge Paved Ditch Gutter UTILITIES: ROADS AND RELATED FEATURES: Existing Power Pole Proposed Power Pole P U/G Power Cable Hand Hole Power Manhole Power Line Tower Power Transformer Existing Joint Use Pole Proposed Joint Use Pole Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Booth Telephone Pedestal U/G Telephone Cable Hand Hole R }Tp ] Q l e ] / b H-Frame Pole O O POWER: TELEPHONE: Telephone Cell Tower Recorded U/G Power Line Recorded U/G Telephone Cable Designated U/G Telephone Cable (S.U.E.*) Recorded U/G Telephone Conduit Designated U/G Telephone Conduit (S.U.E.*) Recorded U/G Fiber Optics Cable WATER: Water Manhole Water Meter Water Valve Water Hydrant Recorded U/G Water Line 4 I H a TV: TV Satellite Dish TV Pedestal TV Tower U/G TV Cable Hand Hole Recorded U/G TV Cable Recorded U/G Fiber Optic Cable Designated U/G Fiber Optic Cable (S.U.E.*) r | I ] GAS: Gas Valve Gas Meter Recorded U/G Gas Line n c SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E.*) d o A/G Water Above Ground Gas Line A/G Gas Above Ground Water Line Above Ground Sanitary Sewer A/G Sanitary Sewer MISCELLANEOUS: Utility Pole O F S 3 Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line ? CONC CONC WW vvDrainage Box: Catch Basin, DI or JB Storm Sewer Storm Sewer Manhole m U/G Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil BOUNDARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument Existing Fence Line Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence g F 123 Existing Wetland Boundary Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary BUILDINGS AND OTHER CULTURE: Area Outline Gas Pump Vent or U/G Tank Cap Church School Dam Sign Small Mine Well V M WW S x Foundation S Building y y VEGETATION: Single Tree X Y Vineyard Single Shrub Hedge Woods Line Orchard Vineyard RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled S FLOW Designated U/G Power Line (S.U.E.*) Designated U/G Fiber Optics Cable (S.U.E.*) Designated U/G Water Line (S.U.E.*) Designated U/G TV Cable (S.U.E.*) Designated U/G Gas Line (S.U.E.*) U/G Test Hole (S.U.E.*) WLB EIP BECM CONC HW CB CSX TRANSPORTATION MILEPOST 35 SWITCH Cemetery EXISTING STRUCTURES: Parcel / Sequence Number E AATUR End of Information E.O.I. Abandoned According to Utility Records WLB EAB EPB R W R W R W C A E TDE PDE PUE S P P T T TC TC T FO T FO W W TV TV TV FO TV FO G G SS FSS FSS ?UTL Jurisdictional Stream JS Buffer Zone 1 Buffer Zone 2 BZ 1 BZ 2 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINAR0.02SYMBOLSCONVENTIONAL NTSDRAWN BY: DJD Stream or Body of Water 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Plan Sheets\019139023_tsh.dgn11/17/2021DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA1"=50'DRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Plan Sheets\019139023_typ.dgn11/17/2021DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM PAVEMENT SCHEDULE PROPOSED 2'-6" CONCRETE CURB & GUTTER D1 R1 T AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROPOSED APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE TYPE I19.OC, EARTH MATERIAL AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS PROPOSED APPROX 3" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5C, S PROPOSED 4" CONCRETE SIDEWALK PROPOSED 1'-6" CONCRETE CURB & GUTTERR2 J1 PROPOSED 10" AGGREGATE BASE COURSE R1.00 C1 TYPICAL SECTIONSC2 AT AN AVERAGE RATE OF 224 LBS. PER SQ. YD. PROPOSED APPROX 2.0" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C -L- STA. 38+35.64 TO STA 67+70.52 11'2' R1 T 0.5' 0.02 J1D1 C1 1.5' T 0.5' R2 0.5' 0.5' MIN. 2 :1 T O 4 :1 2:1 TO 4:1 -L- NORTHERN DURHAM PARKWAY 55' 0.02 POINT GRADE CL 10' MUP 1' C2 J1 2:1 TO 4:1 2 :1 TO 4:1 0.02 1' 11'8.75'MATCHLINE AMATCHLINE B2' R1 T 0.5' 0.02 0.5' GROUND EXISTING 10' MUP 1' C2 J1 1'MATCHLINE AJ1 2'2:1-L- STA. 41+99.00 TO STA 45+20.00 -L- STA. 54+30.00 TO STA 57+52.00 -L- STA. 59+94.00 TO STA 61+10.00 -L- STA. 42+17.00 TO STA 45+21.00 1.5' T 0.5' R2 POINT GRADE CL 0.02 14.75'MATCHLINE BJ1 -L- NORTHERN DURHAM PARKWAY GROUND EXISTING 2:1 2' -L- STA. 54+05.00 TO STA 57+25.00 -L- STA. 60+51.00 TO STA 63+65.00 1. REFER TO PLAN SHEETS FOR VARIABLE WIDTHS. NOTES: TYPICAL SECTION 2A TYPICAL SECTION 2B -L- STA. 62+50.00 TO STA 63+47.00 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE 4.5' TYPICAL SECTION 2 GRADING SITE GRADING SITE VAR. 4.5'-10.5' 2' R1 T 0.5' 0.02 0.5' 10' MUP 1' C2 J1 1'MATCHLINE AJ1 2' -L- STA. 61+10.00 TO STA 62+50.00 TYPICAL SECTION 2C 4.5'7.75'2:1GROUND TIE TO EXISTING WALL RETAINING PROPOSED -L- STA. 37+00.00 TO STA 38+35.64 2' R1 T 0.5' J1D1 C1 1.5' T 0.5' R2 0.5' 2 :1 T O 4:1 2:1 TO 4:1 -L- NORTHERN DURHAM PARKWAY 0.01 POINT GRADE R/W PROP CL 2:1 TO 4:1 2 :1 T O 4:1 0.02 8.75' TYPICAL SECTION 1 GRADING SITE GRADING SITE 55' R/W PROP R/W PROP VAR. 55'-122' R/W PROP 55' TURN-AROUND AREA 22'-94' VAR. 20.5' BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA1"=50'DRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Plan Sheets\019139023_psh_4.dgn11/17/2021DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM PLAN VIEWR2.00 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATEMATCH LI NE -L- STA 42 +0 0.00 (SEE SHEET R2. 0 1) UNLESS OTHERWISE NOTED (APPLIES TO ALL SHEETS) 1. RADII DIMENSIONS ARE TO THE EDGE OF PAVEMENT GENERAL SHEET NOTES: 3 0 35400001 0 2 03 040 1-L- PT Sta. 39+96.95 -L- PC Sta. 38+16.07 -L- PT Sta. 33+82.67 -L- PC Sta. 31+16.61 PI Sta 32+52.48 D L = 266.06' T = 135.86' R = 533.00' -L- PI Sta 39+07.39 D L = 180.88' T = 91.32' R = 533.00'041'-6" C&G 03-L- POT Sta. 27+00.00 PARKWAY NORTHERN DURHAM-L-32' R 50' R 30.75' TYPE 3 -L- STA. 42+17.00GREU TL-2BEGI N GUARDRAI L2'-6" C&G 10'+90.07+51.07TYP. 39' INC.+68.95 TYP.39' INC.+3 9. 0 0 +8 9. 0 0 TRANSITION50' TRAIL+2 9. 9 5-L- POT Sta. 37+00.00 BEGIN CONSTRUCTION 8.75' RT +47.00 1'-6" C&G 47' 47' 66.54' RT +92.7401 0247' R -L- STA. 38+25.93 BEGIN 2'-6" C&G END 1'-6" C&G 30.75' RT +35.64 11' 11' 32' R32' R 1 TYPE 1 TYPE 24.22' LT +64.80 -L- STA. 38+64.83 TIE TO SITE END 5' SIDEWALK END 1'-6" C&G 5' SIDEWALK 4' -L- STA. 38+88.01 TIE TO SITE BEGIN 2'-6" C&G -L- STA. 38+63.83 TIE TO SITE END 2'-6" C&G -L- STA. 38+54.16 TIE TO SITE END 5' SIDEWALK -L- STA. 38+92.23 TIE TO SITE BEGIN 1'-6" C&G 10' MUP -L- STA. 37+76.00 GREU TL-2 BEGIN GUARDRAIL -L- STA. 37+76.00 GREU TL-2 END GUARDRAIL 24" RCP-IV 24" RCP-IV 24" RCP-IV 18" RCP-IV EST 14 SY FF EST 5 TONS CLASS B RIP RAP OUTLET PROTECTION CB-E 2001 2002 2003 2004 2008 2005 2007 2006 2009 2010 2012 2013 2011 CB-F CB-F CB-F OEP CB-F CB-G CB-F CB-F CB-F CB-G 24" RCP-IV RCP-IV 18" RCP-IV 24" 18" RCP-IV 2GI 24" RCP-IV SEE DETAIL 1 SPECIAL CUT DITCH RCP-IV 18" RCP-IV 24" BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA1"=50'DRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Plan Sheets\019139023_psh_5.dgn11/17/2021DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM PLAN VIEWR2.01 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE MATCH LINE -L- STA 42+00.00 (SEE SHEET R2.00)MATCH LINE -L- STA 56+00.00 (SEE SHEET R2.02) UNLESS OTHERWISE NOTED (APPLIES TO ALL SHEETS) 1. RADII DIMENSIONS ARE TO THE EDGE OF PAVEMENT GENERAL SHEET NOTES: 4 5 5055 020304 000102010203030402 01 0002 01 0304 -L- PC Sta. 49+60.29 -L- PT Sta. 47+30.29 -L- PC Sta. 42+96.95 -L- PT Sta. 54+04.43 PI Sta 51+96.17 D L = 444.14' T = 235.88' R = 533.00' D -L- PI Sta 45+26.40 L = 433.34' T = 229.45' R = 533.00' 1'-6" C&G 11'11' 11' 11' 4' 4'11'11' 1'-6" C&G NORTHERN DURHAM PARKWAY -L- 32' R32' R 30.75' 30.75'11'11'04-L- STA. 54+05.00 GREU TL-2 BEGIN GUARDRAIL -L- STA. 45+21.00 GREU TL-2 END GUARDRAIL -L- STA. 45+20.00 GREU TL-2 END GUARDRAIL -L- STA. 54+30.00 GREU TL-2 BEGIN GUARDRAIL -L- STA. 41+99.00 GREU TL-2 BEGIN GUARDRAIL TYPE 1 TYPE 3 -L- STA. 42+17.00 GREU TL-2 BEGIN GUARDRAIL 2'-6" C&G 2'-6" C&G5' SIDEWALK10' 10' +89.00 +63.95 +02.95TYP.39' INC.+3 0. 0 0 +80.00TRANSITION50' TRAIL +89.29+28.29TYP. 39' INC. +63.43TYP.39' INC.+02.43 +20.00+70.00TRANSITION50' TRAIL 55'R 17.75' LT +11.33 39.74' LT +16.39 -L- STA. 47+20.51 TIE TO SITE BEGIN 5' SIDEWALK -L- STA. 47+46.38 TIE TO SITE END 1'-6" C&G -L- STA. 47+73.38 TIE TO SITE BEGIN 1'-6" C&G 10' MUP 10' MUP 18" RCP-IV 18" RCP-IV 18" RCP-IV 18" RCP-IV 24" RCP-IV JB w/MH JB w/MH (BURIED 1.0') 81 LF 12' x 6' RCBC 95 LF 42" RCP-IV CULVERT 2118 2116 2115 2114 2113 2112 2111 2110 2109 2108 2106 2107 2105 2104 2103 2102 CB-G CB-G CB-G CB-G CB-G CB-F CB-F CB-F CB-F CB-F CB-F 2117 BOX TREATMENT TSS 24" RCP-IV 18" RCP-IV 18" RCP-IV 18" RCP-IV 18" RCP-IV 24" RCP-IV 24" RCP-IV 24" RCP-IV 24" RCP-IV 18" RCP-IV SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 2 EST 100 SY GFD EST 50 TONS CLASS 'B' RIP RAP TOE PROTECTION SEE DETAIL 2 EST 12 SY GFD EST 6 TONS CLASS 'B' RIP RAP TOE PROTECTION JB W/ MH SSSGRAVEL DRIVEGRAVELDRIVEGRAVELDRIVE1-STORYBLOCKRESIDENCEWELLWELLCHAINLINK FENCE1-STORYBLOCKRESIDENCERETAININGWALLCHICKENCONCRETEDRIVEINVERT 15"RCP376.93'INVERT 15"RCP376.88'INVERT 12"RCP380.16'INVERT 12"RCP380.14'INVERT 12"RCP384.70'INVERT 12"RCP384.90'INVERT 12"RCP383.65'INVERT 12"RCP383.57'BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA1"=50'DRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Plan Sheets\019139023_psh_6.dgn11/17/2021DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM PLAN VIEWR2.02 MATCH LINE -L- STA 56+00.00 (SEE SHEET R2.01) APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE UNLESS OTHERWISE NOTED (APPLIES TO ALL SHEETS) 1. RADII DIMENSIONS ARE TO THE EDGE OF PAVEMENT GENERAL SHEET NOTES:600304 -L- PC Sta. 56+34.43 11'11'4' 1'-6" C&G 2'-6" C&G 30.75' -L- PT Sta. 61+25.56 0211 '11 '0403PI Sta 58+57.80 D L = 423.03' T = 223.36' R = 533.00'02013-L- 100 ' TURN LANE TAPER+59.00+09.006570-L- PC Sta. 69+76.33 R = 533.00' T = 115.40' L = 227.29' D PI Sta 70+91.73 NORTHERN DURHAM PARKWAY -L- 2'-6" C&G 2 .25 '-Y1- POT Sta. 18+39.41 -L- POT Sta. 67+65.95= D DS = 40 MPHDS = 40 MPH 15 20 30.75 '(SR 1671)FERRELL ROAD-Y1-+59.00295 ' SB LANE SHIFT+64.008.75 '8 .75 '19.75 '11 '11 '11 '+73.56+12.56TYP. 39' INC. 1 '-6" C&G 1'-6" C&G -L- STA. 60+51.00 GREU TL-2 BEGIN GUARDRAIL -L- STA. 59+94.00 GREU TL-2 BEGIN GUARDRAIL -L- STA. 57+25.00 GREU TL-2 END GUARDRAIL -L- STA. 63+47.00 GREU TL-2 END GUARDRAIL -L- STA. 57+52.00 GREU TL-2 END GUARDRAIL -L- STA. 63+65.00 GREU TL-2 END GUARDRAIL 5' SIDEWALK10' 4 '10 'PI Sta 15+18.32 D L = 363.23' T = 182.40' R = 1,600.00' PI Sta 23+58.02 D L = 397.59' T = 200.31' R = 1,320.00' -Y1- DS = 40 MPHDS = 40 MPH -Y1- PT Sta. 16+99.15 -Y1- PC Sta. 21+57.71 -Y1- PC Sta. 13+35.92 5' SIDEWALK55' R -L- POT Sta. 67+70.52 END CONSTRUCTION 55' R -L- STA. 67+47.53 TIE TO EXIST PS END 1'-6" C&G +36.43+75.43TYP.39' INC. + 6 2.0 0 + 12.0 0 TRANSITION50' TRAIL -L- STA. 61+10.00 WALL BEGIN RETAINING -L- STA. 62+50.00 WALL END RETAINING 250 ' LEFT TURN LANE +06.95+32.95-Y1- STA. 15+05.00 END 5' SIDEWALK -Y1- STA. 22+61.94 END 5' SIDEWALK 4:14:1TYPE 1 TYPE 1 -Y1- POT Sta. 12+50.00 -L- POC Sta. 70+00.00 -Y1- POC Sta. 23+00.00 10' MUP 10 ' MUP 18" RCP-IV CB 18" RCP-IV 18" RCP-IV 18" RCP-IV 18" RCP-IV JB w/MH JB w/MH JB w/MH 100 LF 10' X 7' RCBC (BURIED 1') 2203 2202 2204 2205 2206 2208 2207 2210 2209 2211 2212 2213 2215 2216 2218 2217 2201 BOX TREATMENT TSS CB-G CB-E 2GI CB-G CB-G BOX TREATMENT TSS CB-G CB-G CB-G CB-G CB-F 18" RCP-IV 18" RCP-IV 18" RCP-IV RCP-IV 18" 18" RCP-IV RCP-IV 18" 18" RCP-IV 18" RCP-IV 18" RCP-IV 18" RCP-IV SEE DETAIL 3 SPECIAL LATERAL 'V' DITCH SEE DETAIL 2 EST. 80 SY GFD EST. 40 TONS CLASS 'B' RIP RAP TOE PROTECTION SEE DETAIL 2 EST. 150 SY GFD EST. 75 TONS CLASS 'B' RIP RAP TOE PROTECTION 2214 JB w/MH 18" RCP-IV REMOVE RETAIN BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECTNORTH CAROLINA11/17/20211"=50'DRAWN BY: DJD DURHAM019139023WWW.KIMLEY-HORN.COMNC LICENSE #: F-0102PHONE: 919-682-3583© 202111/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Plan Sheets\019139023_pfl.dgn300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM PROFILE VIEW29 30 31 32 33 34 35 36 37 38 39 40 320 330 340 350 360 370 380 390 400 42 43 44 45 46 47 48 49 50 51 52 53 54 320 330 340 350 360 370 380 390 400 410 420 410 420 R2.03 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE 41 42 55 56 320 330 340 350 360 370 380 390 400 320 330 340 350 360 370 380 390 400 410 420 410 420 NORTHERN DURHAM PARKWAY -L- NORTHERN DURHAM PARKWAY -L- GROUND EXISTING GRADE PROPOSED (+)1.38% ELEV = 366.93' -L- STA 37+00.00 BEGIN GRADE BEGIN PROJECT (+)1.30% ELEV = 368.00' -L- STA 39+50 DITCH GRADE LT BEGIN SPECIAL -L- STA 42+00 LTELEV = 371.25'GROUND EXISTING GRADE PROPOSEDPI = 43+79.47 EL = 376.29' VC = 150' K = 96 PI = 48+95.89 EL = 391.49' VC = 300' K = 46 PI = 55+60.56 EL = 367.76' VC = 300' K = 66(-)3 .57% (+)2.94% (+)1.38% ELEV = 370.75' -L- STA 42+75 DITCH GRADE LT END SPECIAL ELEV = 371.25'(-)0.67% BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECTNORTH CAROLINA11/17/20211"=50'DRAWN BY: DJD DURHAM019139023WWW.KIMLEY-HORN.COMNC LICENSE #: F-0102PHONE: 919-682-3583© 202111/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Plan Sheets\019139023_pfl.dgn300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM PROFILE VIEW56 57 58 59 60 61 62 63 64 65 66 67 330 340 350 360 370 380 390 420 410 400 430 R2.04 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE 68 69 330 340 350 360 370 380 390 420 410 400 430 NORTHERN DURHAM PARKWAY -L- FERRELL ROAD GROUND EXISTING GRADE PROPOSED PI = 62+50.00 EL = 374.66' VC = 200' K = 100 PI = 65+59.37 EL = 383.94' VC = 200' K = 50 (-)1.00% (+)3.00% (+)1.00% ELEV = 382.10' -L- STA 67+42.94 END GRADE TIE TO EXIST PAVEMENT ELEV = 381.99' -L- STA 67+56.42 END PROJECT (+)1.14% ELEV = 366.00' -L- STA 57+75 DITCH GRADE LT BEGIN SPECIAL ELEV = 368.00' -L- STA 59+50 DITCH GRADE LT END SPECIAL 360360 360 365365 370BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDWSCALEKHA PROJECTNORTH CAROLINA11/17/2021DRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Plan Sheets\019139023_psh_WALL.dgnDESIGNED BY: DJDWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, SUITE 200, DURHAM, NC, 27701DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS DURHAMBYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDWSCALEKHA PROJECTNORTH CAROLINA11/17/2021DRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Plan Sheets\019139023_psh_WALL.dgnDESIGNED BY: DJDWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, SUITE 200, DURHAM, NC, 27701DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS DURHAMBYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDWSCALEKHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'DRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Plan Sheets\019139023_psh_WALL.dgnDESIGNED BY: DJDWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, SUITE 200, DURHAM, NC, 27701DO NOT USE FOR CONSTRUCTION DURHAMPHASE 1PARKWAYNORTHERN DURHAM 340 350 360 345 355 365 370 375 380 385 390 10 11 0 HORIZONTAL 0 VERTICAL 10 10 20 5 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE R2.05 340 345 350 355 360 365 370 375 380 385 390 -L- STA 61+10.00 58.00' RT -WALL1- STA 10+25.00 = BEGIN RET WALL -L- STA 61+73.80 58.00' RT -WALL1- STA 10+87.11 = OPENING IN WALL FOR 10'x5' RCBC -L- STA 61+83.90 58.00' RT -WALL1- STA 10+97.21 = OPENING IN WALL FOR 10'x5' RCBC -L- STA 62+50.00 58.00' RT -WALL1- STA 11+63.31 = END RET WALL ENVELOPEWALL LAYOUT AND MSE RETAINING 2210 2211 2212 2213ONORTH DURHAM PARKWAY -L- NAD 83NAD 83NAD 83 STATIONING ALONG WALL OF WALL COPING PROPOSED TOP GRADE PROPOSED FINISHED FACE OF WALL EXIST GROUND INVERT: 356.5' PROPOSED 10'x5' RCBC -WALL1- STA 10+86.38 FOR 10'x5' RCBC OPENING IN WALL -WALL1- STA 10+98.05 FOR 10'x5' RCBC OPENING IN WALL ELEV. = 358.00' -WALL1- STA 10+25.00 ELEV. = 358.00' -WALL1- STA 10+50.00 ELEV. = 357.00' -WALL1- STA 10+51.00 ELEV. = 357.00' -WALL1- STA 10+75.00 ELEV. = 356.00' -WALL1- STA 10+76.00 ELEV. = 357.00' -WALL1- STA 11+11.00 ELEV. = 356.00' -WALL1- STA 11+10.00 ELEV. = 359.00' -WALL1- STA 11+38.00 ELEV. = 357.00' -WALL1- STA 11+36.00 ELEV. = 359.00' -WALL1- STA 11+63.31 ELEV. = 369.62' -L- STA 61+10.00 58.00' RT -WALL1- STA 10+25.00 = BEGIN RET WALL ELEV. = 371.87' -L- STA 62+50.00 58.00' RT -WALL1- STA 11+63.31 = END RET WALL BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA1"=50'DRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Plan Sheets\019139023_wztc.dgn11/17/2021DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM ADVANCE WARNING SIGNS TRAFFIC NOTES ARE CONSIDERED A PART OF THESE PLANS: PROJECT SERVICES UNIT - N.C. DEPARTMENT OF TRANSPORTATION - RALEIGH, N.C., THE FOLLOWING ROADWAY STANDARDS AS SHOWN IN "ROADWAY STANDARD DRAWINGS" - ROADWAY STANDARD DRAWINGS TITLESTD. NO. IS IMPACTED BY CONSTRUCTION, CONTRACTOR TO PROVIDE ALTERNATE ADA ROUTE. FF) EXISTING PEDESTRIAN FACILITIES ARE TO REMAIN OPEN DURING CONSTRUCTION. IF A PEDESTRIAN FACILITY UNEVEN AREAS. USE DRUMS TO DELINEATE THE EDGE OF ROADWAY ALONG UNPAVED AREAS. SIGNS (W8-7) AND BLACK ON ORANGE ''PAVEMENT ENDS'' SIGNS (W8-3) AND RESPECTIVELY IN ADVANCE OF THE APPROPRIATE ROADWAY ELEVATION AS DETERMINED BY THE ENGINEER. PLACE BLACK ON ORANGE "LOOSE GRAVEL" EE) IN THE EVENT A TIE-IN CANNOT BE MADE IN ONE DAY'S TIME, BRING THE TIE-IN AREA TO AN DD) ACCESS SHALL BE MAINTAINED TO ALL RESIDENCES AND BUSINESSES AT ALL TIMES. CC) STOCKPILE EXISTING SIGNS FOR USE WHEN NEEDED IN TEMPORARY LOCATIONS DURING CONSTRUCTION. BB) POLICE MAY BE USED TO MAINTAIN TRAFFIC THROUGH INTERSECTIONS. MISCELLANEOUS FENCING, AND SIGNAGE. AA) PEDESTRIAN AND BICYCLIST SAFETY MUST BE MAINTAINED AT ALL TIMES BY ADEQUATE PROJECT LIMITS, PEDESTRIAN AND BICYCLIST SAFETY Z) CHANGES TO THE TRAFFIC CONTROL REQUIRE APPROVAL FROM NCDOT PRIOR TO COMMENCING FIELD OPERATIONS. WITH THE NEW TRAFFIC PATTERN(S). Y) BEFORE SHIFTING TRAFFIC TO NEW LOCATIONS, CONTRACTOR SHALL REMOVE ANY MARKINGS WHICH CONFLICT THERMOPLASTIC PAVEMENT MARKING INSTALLATION. X) CONTRACTOR SHALL MAINTAIN ALL TEMPORARY PAINT PAVEMENT MARKINGS UNTIL COMPLETION OF DRYING TIME, AS DETERMINED BY THE ENGINEER. WILL REMAIN IN PLACE OVER THREE (3) MONTHS. PLACE ADDITIONAL APPLICATIONS OF PAINT UPON SUFFICIENT W) PLACE AT LEAST TWO APPLICATIONS OF PAINT ON NEW ASPHALT WITH TEMPORARY TRAFFIC PATTERNS WHICH V) REPLACE ANY PAVEMENT MARKINGS THAT HAVE BEEN DAMAGED BY THE END OF EACH DAY'S OPERATION. U) TIE PROPOSED PAVEMENT MARKING LINES TO EXISTING PAVEMENT MARKING LINES. DETERMINED BY THE ENGINEER. ASPHALT PAVEMENT. PLACE ADDITIONAL APPLICATIONS OF PAINT UPON SUFFICIENT DRYING TIME, AS T) PLACE AT LEAST TWO APPLICATIONS OF PAINT PAVEMENT MARKINGS ON THE FINAL WEARING SURFACE ON NEW DATED JANUARY 2018 FOR APPLICATION TIMES AND TEMPERATURE CONDITIONS FOR PAVEMENT MARKINGS. S) REFER TO SECTION 1205 OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES R) INSTALL PAVEMENT MARKINGS AS SHOWN ON PLAN SHEETS. PAVEMENT MARKINGS AND MARKERS ALL TRAFFIC CONTROL SHALL CONFORM TO THE LATEST MUTCD AND 2018 NCDOT STANDARDS DATED JANUARY 2018 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY SNOWPLOWABLE RAISED PAVEMENT MARKERS1253.01 RAISED PAVEMENT MARKERS - PERMANENT AND TEMPORARY 1251.01 PAVEMENT MARKER SPACING1250.01 PAVEMENT MARKINGS - NEW INTERCHANGES AND INTERSECTIONS1205.13 PAVEMENT MARKINGS - PAINTED ISLANDS1205.09 PAVEMENT MARKINGS - SYMBOLS AND WORD MESSAGES1205.08 PAVEMENT MARKINGS - PEDESTRIAN CROSSWALKS 1205.07 PAVEMENT MARKINGS - TURN LANES1205.05 PAVEMENT MARKINGS - INTERSECTIONS1205.04 PAVEMENT MARKINGS - DIVIDED AND UNDIVIDED ROADWAYS1205.02 PAVEMENT MARKINGS - LINE TYPES AND OFFSETS1205.01 SKINNY DRUM 1180.01 FLAGGING DEVICES1150.01 BARRICADES1145.01 CONES1135.01 DRUMS 1130.01 FLASHING ARROW BOARDS1115.01 PORTABLE WORK ZONE SIGNS1110.02 STATIONARY WORK ZONE SIGNS1110.01 TRAFFIC CONTROL DESIGN TABLES1101.11 TEMPORARY SHOULDER CLOSURES1101.04 TEMPORARY LANE CLOSURES1101.02 WORK ZONE WARNING SIGNS1101.01 R3.00MANAGEMENT PLANTRAFFICAPPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE - DO NOT BACK BRACE SIGN SUPPORTS. REMOVE ENTIRE POST WHEN REMOVING SIGNS WITH SPLICED POSTS. - WHEN NECESSARY, USE SPLICING IN ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 1110.01. TO STANDARD SPECIFICATION "WORK ZONE SIGNS" SECTION 1110. POSTS, 3 LB STEEL U-CHANNEL AND SQUARE STEEL TUBING POSTS WITH SIGNS WILL BE MADE ACCORDING ACCEPTABLE FOR USE. ERECT SIGNS PER ROADWAY STANDARD DRAWING 1110.01. PAYMENT FOR WOOD TUBING POSTS HAVING EQUIVALENT STRENGTH OF THE 3 LB STEEL U-CHANNEL POST ARE ALSO MAY BE GALVANIZED STEEL, OR MAY BE PAINTED GREEN BY THE POST MANUFACTURER. SQUARE STEEL U-CHANNEL POSTS MUST MEET THE REQUIREMENTS OF STANDARD SPECIFICATION SECTION 1094-1(B), - USE 3 LB STEEL U-CHANNEL POST OR 4" X 4" WOOD POST FOR ALL WORK ZONE SIGNS. 3 LB STEEL - ALL SIGN SPACING DIMENSIONS ARE APPROXIMATE, FIELD ADJUST AS NECESSARY OR AS DIRECTED. -FERRELL RD - 500' BEFORE CONSTRUCTION LIMITS - ADVANCE WARNING SIGN SPACING IS RECOMMENDED TO BE THE FOLLOWING: APPLICATION IS USED, SIGNS MAY BE PORTABLE MOUNTED. MAY USE ONLY APPLICABLE ROADWAY STANDARD DRAWINGS INSTEAD. HOWEVER, IF THIS SIGNING SHORT-TERM DAILY MAINTENANCE TYPE OPERATIONS, THIS SIGNING APPLICATION IS OPTIONAL; - SIGNS SHOWN ARE REQUIRED FOR WORK ZONES THAT WILL REMAIN IN EFFECT OVERNIGHT. FOR - DO NOT INSTALL ADVANCE WARNING SIGNS MORE THAN 3 DAYS PRIOR TO BEGINNING OF WORK. WORK ZONE SIGNS. - USE FLUORESCENT ORANGE SHEETING (TYPE VII OR HIGHER) ON ALL ADVANCED UNOPENED LANES ARE CLOSED TO TRAFFIC. THESE DRUMS SHALL BE IN ADDITION TO CHANNELIZING DEVICES. Q) PLACE SETS OF THREE DRUMS PERPENDICULAR TO THE EDGE OF THE TRAVELWAY ON 300 FT CENTERS WHEN CLOSURES ARE NOT IN EFFECT. EXCEPT 10 FT ON-CENTER IN RADII, AND 3 FT OFF THE EDGE OF AN OPEN TRAVELWAY, WHEN LANE P) SPACE CHANNELIZING DEVICES IN WORK AREAS NO GREATER THAN TWICE THE POSTED SPEED LIMIT (MPH), TRAFFIC CONTROL DEVICES O) ENSURE ALL NECESSARY SIGNING IS IN PLACE PRIOR TO ALTERING ANY TRAFFIC PATTERN. N) PROVIDE PERMANENT SIGNING. ZONE WARNING SIGNS, AS DIRECTED BY THE ENGINEER. WHEN NO WORK IS BEING CONDUCTED FOR A PERIOD LONGER THAN ONE WEEK, REMOVE OR COVER ALL ADVANCE WORK AND NO MORE THAN THREE (3) DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION. M) INSTALL ADVANCE WORK ZONE WARNING SIGNS WHEN WORK IS WITHIN 100 FT FROM THE EDGE OF TRAVEL LANE SIGNING ADVANCE WARNING "UNEVEN LANES" SIGNS (W8-11) 500 FT IN ADVANCE OF THE UNEVEN AREA. L) DO NOT EXCEED A DIFFERENCE OF 1.5 INCHES IN ELEVATION BETWEEN OPEN LANES OF TRAFFIC. INSTALL BACKFILL WITH SUITABLE COMPACTED MATERIAL, AS APPROVED BY THE ENGINEER. BACKFILL DROP-OFFS THAT EXCEED 3 INCHES ON ROADWAYS WITH POSTED SPEED LIMITS LESS THAN 45 MPH. AN OPENED TRAVEL LANE THAT HAS A DROP-OFF AS FOLLOWS: K) BACKFILL AT A 6:1 SLOPE UP TO THE EDGE AND ELEVATION OF EXISTING PAVEMENT IN AREAS ADJACENT TO PAVEMENT EDGE DROP OFF REQUIREMENTS IS BEING PERFORMED BEHIND A LANE CLOSURE ON THE OPPOSITE SIDE OF THE TRAVELWAY. J) DO NOT PERFORM WORK INVOLVING HEAVY EQUIPMENT WITHIN 15 FT OF THE EDGE OF TRAVELWAY WHEN WORK A TWO-LANE, TWO-WAY ROAD. I) DO NOT WORK SIMULTANEOUSLY, ON BOTH SIDES OF AN OPEN TRAVELWAY, WITHIN THE SAME LOCATION, ON CONDUCT THE WORK SO THAT ALL PERSONNEL AND/OR EQUIPMENT REMAIN WITHIN THE CLOSED TRAVEL LANE. FACILITY, CLOSE THE LANE ACCORDING THE ROADWAY STANDARD DRAWINGS OR AS DIRECTED BY THE ENGINEER. H) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN A LANE OF TRAVEL OF AN UNDIVIDED OR DIVIDED DRAWING NO. 1101.02 UNLESS THE WORK AREA IS PROTECTED BY BARRIER OR GUARDRAIL. AND WITHIN 5 FT OF AN OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN TRAVEL LANE USING ROADWAY STANDARD G) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON THE SHOULDER ADJACENT TO AN UNDIVIDED FACILITY BY BARRIER OR GUARDRAIL. NEAREST OPEN SHOULDER USING ROADWAY STANDARD DRAWING NO. 1101.04 UNLESS THE WORK AREA IS PROTECTED F) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN 15 FT OF AN OPEN TRAVEL LANE, CLOSE THE CLOSURE OR WHEN A LANE CLOSURE IS NO LONGER NEEDED, OR AS DIRECTED BY THE ENGINEER. E) REMOVE LANE CLOSURE DEVICES FROM THE LANE WHEN WORK IS NOT BEING PERFORMED BEHIND THE LANE LANE AND SHOULDER CLOSURE REQUIREMENTS THE WORK AREA IS PROTECTED BY BARRIER OR GUARDRAIL OR OTHERWISE DIRECTED BY THE ENGINEER. D) DO NOT CONDUCT ANY HAULING OPERATIONS AGAINST THE FLOW OF TRAFFIC OF AN OPEN TRAVELWAY UNLESS FROM 6 AM TO 9 AM AND FROM 4 PM TO 6 PM 1. FERRELL RD MONDAY THROUGH FRIDAY TRAFFIC SHIFTS ROAD NAME DAY AND TIME RESTRICTIONS OPERATIONS C) DO NOT STOP TRAFFIC FOR MORE THAN 15 MINUTES AS FOLLOWS: DIRECTED BY THE ENGINEER. AND 6:00 AM THE MONDAY AFTER THE SPECIAL EVENT, OR AS OTHERWISE BETWEEN THE HOURS OF 9:00 PM THE THURSDAY BEFORE THE SPECIAL EVENT IF THE SPECIAL EVENT IS ON A FRIDAY, SATURDAY, OR SUNDAY, THEN FOLLOWING THE SPECIAL EVENT. OF 9:00 P.M. THE DAY BEFORE THE SPECIAL EVENT AND 6:00 A.M.THE DAY 9. FOR SPECIAL EVENTS, NOTED BY THE ENGINEER, BETWEEN THE HOURS TUESDAY AFTER THE WEEK OF CHRISTMAS. BEFORE THE WEEK OF CHRISTMAS DAY AND 6:00 A.M. THE FOLLOWING 8. FOR CHRISTMAS, BETWEEN THE HOURS OF 9:00 P.M. THE FRIDAY 6:00 A.M. MONDAY. 7. FOR THANKSGIVING DAY, BETWEEN THE HOURS OF 9:00 P.M. TUESDAY TO 6:00 A.M. TUESDAY. 6. FOR LABOR DAY, BETWEEN THE HOURS OF 9:00 P.M. FRIDAY AND INDEPENDENCE DAY. INDEPENDENCE DAY AND 6:00 A.M. THE TUESDAY AFTER THEN BETWEEN THE HOURS OF 9:00 P.M. THE THURSDAY BEFORE IF INDEPENDENCE DAY IS ON A FRIDAY, SATURDAY, SUNDAY OR MONDAY INDEPENDENCE DAY. DAY BEFORE INDEPENDENCE DAY AND 6:00 A.M. THE DAY AFTER 5. FOR INDEPENDENCE DAY, BETWEEN THE HOURS OF 9:00 P.M. THE 6:00 A.M. TUESDAY. 4. FOR MEMORIAL DAY, BETWEEN THE HOURS OF 9:00 P.M. FRIDAY TO 6:00 A.M. MONDAY. 3. FOR EASTER, BETWEEN THE HOURS OF 9:00 P.M. THURSDAY AND TUESDAY. SATURDAY, SUNDAY, OR MONDAY THEN UNTIL 6:00 A.M. THE FOLLOWING TO 6:00 A.M. JANUARY 2ND. IF NEW YEAR'S DAY IS ON A FRIDAY, 2. FOR NEW YEAR'S, BETWEEN THE HOURS OF 9:00 P.M. DECEMBER 31st VOLUMES, AS DIRECTED BY THE ENGINEER. 1. FOR ANY UNEXPECTED OCCURRENCE THAT CREATES UNUSUALLY HIGH TRAFFIC HOLIDAY 1. FERRELL RD ROAD NAME B) DO NOT CLOSE OR NARROW TRAVEL LANES DURING HOLIDAYS AND SPECIAL EVENTS AS FOLLOWS: FROM 6 AM TO 9 AM AND FROM 4 PM TO 6 PM 1. FERRELL RD MONDAY THROUGH FRIDAY ROAD NAME DAY AND TIME RESTRICTIONS A) DO NOT CLOSE OR NARROW TRAVEL LANES AS FOLLOWS: TIME RESTRICTIONS WHEN OTHERWISE NOTED IN THE PLAN, OR DIRECTED BY THE ENGINEER. THE FOLLOWING GENERAL NOTES APPLY AT ALL TIMES FOR THE DURATION OF THE CONSTRUCTION PROJECT, EXCEPT REMOVAL OF DEVICES. UNDESIRED OVERLAPPING OF DEVICES. MODIFICATION MAY INCLUDE: MOVING, SUPPLEMENTING, COVERING OR DETAIL DRAWINGS, STANDARD DETAILS AND ROADWAY DETAILS ARE NOT ATTAINABLE, OR RESULT IN DUPLICATE, OR SAFE AND EFFICIENT TRAFFIC MOVEMENT. CHANGES MAY BE REQUIRED WHEN PHYSICAL DIMENSIONS IN THE ADAPT THE TRAFFIC CONTROL CONCEPTS, WHEN DIRECTED BY THE ENGINEER, TO MEET FIELD CONDITIONS TO PROVIDE BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA1"=50'DRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\PMP & Signing\019139023_pmp_psh_4.dgn11/17/2021DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM MATCH LI NE -L- STA 42+00.00 (SEE SHEET R4.01)AND SIGNING PLANPAVEMENT MARKING PAVEMENT MARKING SYMBOLS PAVEMENT MARKING LINES PAVEMENT MARKING PAVEMENT MARKER LEGEND - CRYSTAL / RED PAVEMENT MARKER - YELLOW / YELLOW PAVEMENT MARKER - DIRECTION OF TRAFFIC FLOW DENOTES SIGNALIZED INTERSECTION DENOTES EXISTING SIGNAL DENOTES NEW "U" CHANNEL POST/PROPOSED SIGN LOCATION DENOTES EXISTING "U" CHANNEL POST/EXISTING SIGN LOCATION DENOTES EXISTING SIGN SIGNING LEGEND SIGNING NOTES T46 - THERMOPLASTIC (8" WHITE, 90 MILS) CROSSWALK LINE T70 - THERMOPLASTIC (LEFT TURN ARROW) (90 MILS) T61 - THERMOPLASTIC (24" WHITE, 90 MILS) STOPBAR PRIOR TO INSTALLATION. TRANSPORTATION AND FACILITIES DEPARTMENT STAFF ALL STREET NAME SIGNS SHALL BE APPROVED BY THE 5. ALL STREET NAME SIGNS SHALL ADHERE TO 2009 MUTCD. REFLECTIVE SHEETING. 4. THE BACKGROUND FOR TYPE E & F SIGNS SHALL BE TYPE C 3. REMOVE AND DISPOSE OF EXISTING SIGNS AND "U" CHANNEL POST. 2. ERECT EXISTING SIGN ON NEW "U" CHANNEL POST. 1. REMOVE AND DISPOSE OF EXISTING "U" CHANNEL POST. T13 - THERMOPLASTIC (4" YELLOW, 90 MILS) YELLOW DOUBLE CENTER T42 - THERMOPLASTIC (8" YELLOW, 90 MILS) DIAGONAL LINE R4.00 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE T4 - THERMOPLASTIC (4" WHITE, 90 MILS) 3' - 9'/SP MINISKIP T2 - THERMOPLASTIC (4" WHITE, 90 MILS) LANE LINE T71 - THERMOPLASTIC (RIGHT TURN ARROW) (90 MILS) ADJACENT DEVELOPMENT PROJECT ON FERRELL ROAD. 5. COORDINATE PROPOSED PAVEMENT MARKINGS WITH SNOWPLOWABLE 4. ALL RAISED REFLECTIVE PAVEMENT MARKERS TO BE DRAWINGS. PLACED ACCORDING TO NCDOT ROADWAY STANDARD 3. RAISED REFLECTIVE PAVEMENT MARKERS ARE TO BE OR SYMBOLS IN CONFLICT WITH PROPOSED MARKINGS. 2. CONTRACTOR SHALL MILL ANY EXISTING MARKINGS EXISTING MARKINGS AT PROJECT LIMITS. 1. CONTRACTOR TO TIE PROPOSED MARKINGS TO NOTES: 11' 11' T13 T46 T46 11'11' 11'11' T61 STOP PARKWAYNORTHERN DURHAM-L-STOP T61 30" X 30" R1-1 BEGIN -L- STA 39+20 30" X 30" R1-1 -L- STA 38+97 -L- STA 38+53 -L- POT Sta. 37+00.00 BEGIN CONSTRUCTION T13 3 0 3540 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA1"=50'DRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\PMP & Signing\019139023_pmp_psh_5.dgn11/17/2021DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM MATCH LINE -L- STA 56+00.00 (SEE SHEET R4.02) MATCH LINE -L- STA 42+00.00 (SEE SHEET R4.00)AND SIGNING PLANPAVEMENT MARKING PAVEMENT MARKING PAVEMENT MARKER LEGEND - CRYSTAL / RED PAVEMENT MARKER - YELLOW / YELLOW PAVEMENT MARKER - DIRECTION OF TRAFFIC FLOW DENOTES SIGNALIZED INTERSECTION DENOTES EXISTING SIGNAL DENOTES NEW "U" CHANNEL POST/PROPOSED SIGN LOCATION DENOTES EXISTING "U" CHANNEL POST/EXISTING SIGN LOCATION DENOTES EXISTING SIGN SIGNING LEGEND SIGNING NOTES PRIOR TO INSTALLATION. TRANSPORTATION AND FACILITIES DEPARTMENT STAFF ALL STREET NAME SIGNS SHALL BE APPROVED BY THE 5. ALL STREET NAME SIGNS SHALL ADHERE TO 2009 MUTCD. REFLECTIVE SHEETING. 4. THE BACKGROUND FOR TYPE E & F SIGNS SHALL BE TYPE C 3. REMOVE AND DISPOSE OF EXISTING SIGNS AND "U" CHANNEL POST. 2. ERECT EXISTING SIGN ON NEW "U" CHANNEL POST. 1. REMOVE AND DISPOSE OF EXISTING "U" CHANNEL POST. R4.01 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE PAVEMENT MARKING SYMBOLS PAVEMENT MARKING LINES T46 - THERMOPLASTIC (8" WHITE, 90 MILS) CROSSWALK LINE T61 - THERMOPLASTIC (24" WHITE, 90 MILS) STOPBAR T13 - THERMOPLASTIC (4" YELLOW, 90 MILS) YELLOW DOUBLE CENTER T42 - THERMOPLASTIC (8" YELLOW, 90 MILS) DIAGONAL LINE T4 - THERMOPLASTIC (4" WHITE, 90 MILS) 3' - 9'/SP MINISKIP T2 - THERMOPLASTIC (4" WHITE, 90 MILS) LANE LINE T70 - THERMOPLASTIC (LEFT TURN ARROW) (90 MILS) T71 - THERMOPLASTIC (RIGHT TURN ARROW) (90 MILS) ADJACENT DEVELOPMENT PROJECT ON FERRELL ROAD. 5. COORDINATE PROPOSED PAVEMENT MARKINGS WITH SNOWPLOWABLE 4. ALL RAISED REFLECTIVE PAVEMENT MARKERS TO BE DRAWINGS. PLACED ACCORDING TO NCDOT ROADWAY STANDARD 3. RAISED REFLECTIVE PAVEMENT MARKERS ARE TO BE OR SYMBOLS IN CONFLICT WITH PROPOSED MARKINGS. 2. CONTRACTOR SHALL MILL ANY EXISTING MARKINGS EXISTING MARKINGS AT PROJECT LIMITS. 1. CONTRACTOR TO TIE PROPOSED MARKINGS TO NOTES: T13 T46 NORTHERN DURHAM PARKWAY -L- T13 11'11' 11'11' END -L- STA 47+08 BEGIN -L- STA 48+05 SPEED35LIMIT STOP -L- STA 47+28 30" X 30" R1-1 T61 SPEED35LIMIT 30" X 36" R2-1 -L- STA 49+65 -L- STA 45+51 30" X 36" R2-1 4 5 5055 T13 T13 657015 20 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA1"=50'DRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\PMP & Signing\019139023_pmp_psh_6.dgn11/17/2021DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM MATCH LINE -L- STA 56+00.00 (SEE SHEET R4.01)AND SIGNING PLANPAVEMENT MARKING PAVEMENT MARKING PAVEMENT MARKER LEGEND - CRYSTAL / RED PAVEMENT MARKER - YELLOW / YELLOW PAVEMENT MARKER - DIRECTION OF TRAFFIC FLOW DENOTES SIGNALIZED INTERSECTION DENOTES EXISTING SIGNAL DENOTES NEW "U" CHANNEL POST/PROPOSED SIGN LOCATION DENOTES EXISTING "U" CHANNEL POST/EXISTING SIGN LOCATION DENOTES EXISTING SIGN SIGNING LEGEND SIGNING NOTES PRIOR TO INSTALLATION. TRANSPORTATION AND FACILITIES DEPARTMENT STAFF ALL STREET NAME SIGNS SHALL BE APPROVED BY THE 5. ALL STREET NAME SIGNS SHALL ADHERE TO 2009 MUTCD. REFLECTIVE SHEETING. 4. THE BACKGROUND FOR TYPE E & F SIGNS SHALL BE TYPE C 3. REMOVE AND DISPOSE OF EXISTING SIGNS AND "U" CHANNEL POST. 2. ERECT EXISTING SIGN ON NEW "U" CHANNEL POST. 1. REMOVE AND DISPOSE OF EXISTING "U" CHANNEL POST. R4.02 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE PAVEMENT MARKING SYMBOLS PAVEMENT MARKING LINES T46 - THERMOPLASTIC (8" WHITE, 90 MILS) CROSSWALK LINE T61 - THERMOPLASTIC (24" WHITE, 90 MILS) STOPBAR T13 - THERMOPLASTIC (4" YELLOW, 90 MILS) YELLOW DOUBLE CENTER T42 - THERMOPLASTIC (8" YELLOW, 90 MILS) DIAGONAL LINE T4 - THERMOPLASTIC (4" WHITE, 90 MILS) 3' - 9'/SP MINISKIP T2 - THERMOPLASTIC (4" WHITE, 90 MILS) LANE LINE T70 - THERMOPLASTIC (LEFT TURN ARROW) (90 MILS) T71 - THERMOPLASTIC (RIGHT TURN ARROW) (90 MILS) ADJACENT DEVELOPMENT PROJECT ON FERRELL ROAD. 5. COORDINATE PROPOSED PAVEMENT MARKINGS WITH SNOWPLOWABLE 4. ALL RAISED REFLECTIVE PAVEMENT MARKERS TO BE DRAWINGS. PLACED ACCORDING TO NCDOT ROADWAY STANDARD 3. RAISED REFLECTIVE PAVEMENT MARKERS ARE TO BE OR SYMBOLS IN CONFLICT WITH PROPOSED MARKINGS. 2. CONTRACTOR SHALL MILL ANY EXISTING MARKINGS EXISTING MARKINGS AT PROJECT LIMITS. 1. CONTRACTOR TO TIE PROPOSED MARKINGS TO NOTES: 11'11'T13 11 '11 'NORTHERN DURHAM PARKWAY -L- T42 T13 T13 T46 T61 T4 T4 T70 T71 T70 T71 11 '11 '11 'STOP 30" X 30" R1-1 BEGIN -L- STA 63+59 END -L- STA 67+11 END -L- STA 67+12 T2 BEGIN -L- STA 61+64 T2 (SR 1671)FERRELL ROAD-Y1- SPEED35LIMIT 30" X 36" R2-1 -L- STA 65+33 -L- STA 67+13 (SR 1671)FERRELL ROAD-Y1-657015 20 BEGIN END -L- STA 64+59 T13 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 345 345 350 350 355 355 360 360 365 365 370 370 375 375 380 380 36+00.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 36+50.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 37+00.00 355 355 360 360 365 365 370 370 375 375 380 380 385 385 37+50.00 R6.00 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L- 3:1 PROPOSED SITE GRADING 367.700.010 3:1PROPOSED SITE GRADING 368.64CL 367.62 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 360 360 365 365 370 370 375 375 380 380 385 385 390 390 38+00.00 360 360 365 365 370 370 375 375 380 380 385 385 390 390 38+50.00 360 360 365 365 370 370 375 375 380 380 385 385 390 390 39+00.00 360 360 365 365 370 370 375 375 380 380 385 385 390 390 39+50.00 360 360 365 365 370 370 375 375 380 380 385 385 390 390 40+00.00 R6.01 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L-3:1PROPOSED SITE GRADING 368.423:1PROPOSED SITE GRADING 0.023 369.44 CL 368.310.035 DRIVE SITE PROPOSED SITE GRADING PROPOSED SITE GRADINGDRIVE SITE CL 369.0000.04 PROPOSED SITE GRADING PROPOSED SITE GRADING DRIVE SITE DRIVE SITE CL 369.68370.69371.6000.04 PROPOSED SITE GRADING PROPOSED SITE GRADINGCL 370.37368.00 4:12:10.038371.36372.22PROPOSED SITE GRADING PROPOSED SITE GRADINGCL 371.06368.65 4:12:1 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 355 355 360 360 365 365 370 370 375 375 380 380 385 385 40+50.00 355 355 360 360 365 365 370 370 375 375 380 380 385 385 41+00.00 355 355 360 360 365 365 370 370 375 375 380 380 385 385 41+50.00 355 355 360 360 365 365 370 370 375 375 380 380 385 385 390 390 42+00.00 R6.02 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L- 0.025371.95372.48PROPOSED SITE GRADING PROPOSED SITE GRADING CL 371.75369.30 4:12:10.012372.54372.75PROPOSED SITE GRADING PROPOSED SITE GRADING CL 372.44369.95 4:12:10.001373.12373.02PROPOSED SITE GRADING PROPOSED SITE GRADING CL 373.13370.602:14:1 2:10.014 373.29373.71PROPOSED SITE GRADING PROPOSED SITE GRADINGCL 373.82371.25 4:12:1 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 355 355 360 360 365 365 370 370 375 375 380 380 385 385 42+50.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 43+00.00 355 355 360 360 365 365 370 370 375 375 380 380 385 385 43+50.00 355 355 360 360 365 365 370 370 375 375 380 380 385 385 44+00.00 R6.03 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L-2:10.026 373.56374.30PROPOSED SITE GRADING PROPOSED SITE GRADING CL 374.51371.50 4:12:12:1373.83374.880.0402:1 CL 375.202:10.040 374.60375.672:1 CL 375.992:10.040 375.66376.732:1 CL 377.05 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 360 360 365 365 370 370 375 375 380 380 385 385 390 390 44+50.00 365 365 370 370 375 375 380 380 385 385 390 390 395 395 45+00.00 365 365 370 370 375 375 380 380 385 385 390 390 395 395 45+50.00 365 365 370 370 375 375 380 380 385 385 390 390 395 395 400 400 46+00.00 R6.04 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L-2:10.040 376.98378.052:1 PROPOSED SITE GRADING PROPOSED SITE GRADINGCL 378.372:10.040 378.45379.52PROPOSED SITE GRADING PROPOSED SITE GRADINGCL 379.842:1 380.99379.920.040 PROPOSED SITE GRADING PROPOSED SITE GRADINGCL 381.31382.46381.390.040 PROPOSED SITE GRADING PROPOSED SITE GRADING CL 382.79 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 370 370 375 375 380 380 385 385 390 390 395 395 400 400 46+50.00 370 370 375 375 380 380 385 385 390 390 395 395 400 400 47+00.00 375 375 380 380 385 385 390 390 395 395 47+50.00 375 375 380 380 385 385 390 390 395 395 400 400 405 405 48+00.00 R6.05 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L-383.93382.860.040 PROPOSED SITE GRADING PROPOSED SITE GRADING CL 384.253:1 0.037385.43384.42PROPOSED SITE GRADING PROPOSED SITE GRADING CL 385.720.024 DRIVE SITE 386.293:1PROPOSED SITE GRADING PROPOSED SITE GRADING CL 387.190.012388.26387.89PROPOSED SITE GRADING PROPOSED SITE GRADING CL 388.35 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 370 370 375 375 380 380 385 385 390 390 395 395 400 400 405 405 48+50.00 370 370 375 375 380 380 385 385 390 390 395 395 400 400 49+00.00 370 370 375 375 380 380 385 385 390 390 395 395 400 400 49+50.00 370 370 375 375 380 380 385 385 390 390 395 395 400 400 50+00.00 R6.06 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L- 0.001388.97388.92PROPOSED SITE GRADING PROPOSED SITE GRADING CL 388.960.014389.15389.41PROPOSED SITE GRADING PROPOSED SITE GRADING CL 389.030.027388.77389.36PROPOSED SITE GRADING PROPOSED SITE GRADING CL 388.56387.86388.760.040 PROPOSED SITE GRADING PROPOSED SITE GRADING CL 387.54 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 365 365 370 370 375 375 380 380 385 385 390 390 395 395 400 400 50+50.00 365 365 370 370 375 375 380 380 385 385 390 390 395 395 51+00.00 365 365 370 370 375 375 380 380 385 385 390 390 51+50.00 365 365 370 370 375 375 380 380 385 385 390 390 52+00.00 365 365 370 370 375 375 380 380 385 385 52+50.00 R6.07 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L-386.31387.220.040 PROPOSED SITE GRADING PROPOSED SITE GRADING CL 385.99384.52385.430.040 PROPOSED SITE GRADING PROPOSED SITE GRADING CL 384.20382.74383.650.040 PROPOSED SITE GRADING PROPOSED SITE GRADING CL 382.42380.95381.860.040 PROPOSED SITE GRADING PROPOSED SITE GRADINGCL 380.63379.17380.080.040 PROPOSED SITE GRADING PROPOSED SITE GRADINGCL 378.85 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 360 360 365 365 370 370 375 375 380 380 385 385 53+00.00 360 360 365 365 370 370 375 375 380 380 385 385 53+50.00 360 360 365 365 370 370 375 375 380 380 54+00.00 355 355 360 360 365 365 370 370 375 375 54+50.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 55+00.00 R6.08 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L-377.38378.290.040 PROPOSED SITE GRADING PROPOSED SITE GRADINGCL 377.06375.60376.510.040 PROPOSED SITE GRADING PROPOSED SITE GRADINGCL 375.283:10.031 374.42373.743:1 PROPOSED SITE GRADING PROPOSED SITE GRADING CL 373.492:10.018 372.33371.972:1 CL 371.832:10.005 370.62370.572:1 CL 370.53 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 350 350 355 355 360 360 365 365 370 370 375 375 380 380 55+50.00 345 345 350 350 355 355 360 360 365 365 370 370 375 375 56+00.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 56+50.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 57+00.00 R6.09 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L-2:10.008 369.28369.562:1 CL 369.622:10.021 368.33368.922:1 CL 369.092:10.033 367.76368.672:1 CL 368.942:10.040 367.77368.842:1 CL 369.16 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 350 350 355 355 360 360 365 365 370 370 375 375 380 380 57+50.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 58+00.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 58+50.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 59+00.00 R6.10 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L-2:10.040 368.27369.34CL 369.663:1 369.84368.770.040CL 370.163:1 3:1366.293:1370.34369.270.040CL 370.663:1 3:1366.863:1370.84369.770.040CL 371.163:13:1 367.433:1 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 350 350 355 355 360 360 365 365 370 370 375 375 380 380 59+50.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 60+00.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 60+50.00 345 345 350 350 355 355 360 360 365 365 370 370 375 375 61+00.00 R6.11 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L-371.34370.270.040 PROPOSED SITE GRADING CL 371.663:1368.003:13:1 2:10.040 370.77371.843:1 PROPOSED SITE GRADING CL 372.162:10.040 371.27372.34PROPOSED SITE GRADING CL 372.662:10.033 371.992:1 372.892:1 CL 373.16 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 345 345 350 350 355 355 360 360 365 365 370 370 375 375 380 380 61+50.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 62+00.00 355 355 360 360 365 365 370 370 375 375 380 380 62+50.00 355 355 360 360 365 365 370 370 375 375 380 380 63+00.00 360 360 365 365 370 370 375 375 380 380 63+50.00 R6.12 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L-2:10.020 372.91373.492:1 370.35CL 373.660.020 373.55374.152:1 2:1370.99CL 374.282:10.020 374.422:1 375.06371.87CL 375.16PROPOSED SITE GRADING 2:10.020 375.552:1 376.22PROPOSED SITE GRADING CL 376.28PROPOSED SITE GRADING3:10.020 376.922:1 377.63PROPOSED SITE GRADING PROPOSED SITE GRADINGCL 377.66 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 360 360 365 365 370 370 375 375 380 380 385 385 64+00.00 365 365 370 370 375 375 380 380 385 385 64+50.00 365 365 370 370 375 375 380 380 385 385 390 390 65+00.00 365 365 370 370 375 375 380 380 385 385 390 390 395 395 65+50.00 365 365 370 370 375 375 380 380 385 385 390 390 395 395 66+00.00 R6.13 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L-379.17378.420.020 PROPOSED SITE GRADING PROPOSED SITE GRADING CL 379.163:1380.71379.920.020 PROPOSED SITE GRADING PROPOSED SITE GRADING CL 380.66382.050.020 381.26PROPOSED SITE GRADING PROPOSED SITE GRADING CL 381.99382.89382.100.020 PROPOSED SITE GRADING PROPOSED SITE GRADING CL 382.83383.240.020 382.44PROPOSED SITE GRADING PROPOSED SITE GRADING CL 383.18 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: TDW SCALEDESIGNED BY: DJD KHA PROJECT019139023NORTH CAROLINA11/17/20211"=10'CROSS-SECTIONSROADWAYDRAWN BY: DJD 11/17/2021K:\DUR_Roadway\019139023 - Junction & Ferrell Durham\Plan\Cross-Sections\019139023_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2021PHONE: 919-682-3583300 MORRIS STREET, DURHAM, NC 27701, SUITE 200DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PHASE 1PARKWAYNORTHERN DURHAM 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 365 365 370 370 375 375 380 380 385 385 390 390 395 395 400 400 66+50.00 370 370 375 375 380 380 385 385 390 390 395 395 400 400 67+00.00 370 370 375 375 380 380 385 385 390 390 395 395 400 400 67+50.00 370 370 375 375 380 380 385 385 390 390 395 395 400 400 68+00.00 R6.14 DATE DATE DATE DATE DATE TRANSPORTATION STORM WATER ENGINEERING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM NORTH DURHAM PARKWAY -L-383.08382.290.020 PROPOSED SITE GRADING PROPOSED SITE GRADING CL 383.023:10.020 381.803:1382.60PROPOSED SITE GRADING PROPOSED SITE GRADING CL 382.53