DWR Pre-Filing Meeting Request Form
Contact Name *
Contact Email Address *
Project Owner *
Project Name *
Project County *
Owner Address:*
Is this a transportation project?*
Type(s) of approval sought from the DWR:
Does this project have an existing project ID#?*
Do you know the name of the staff member you would like to request a meeting with?
William Sullivan
william.sullivan@kimley-horn.com
City of Durham; ATTN: Robert Joyner (Robert.Joyner@durhamnc.gov)
Northern Durham Parkway
Durham
City
Durham
State / Province / Region
NC
Postal / Zip Code
27701
Country
USA
Street Address
101 City Hall Plaza
Address Line 2
Yes No
401 Water Quality Certification - Regular 401 Water Quality Certification - Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Rob Ridings
10/5/21, 8:49 AM Submission Completed
https://edocs.deq.nc.gov/Forms/Form/Submit 2/2
Please give a brief project description below and include location information.*
Please attach the documentation you would like to have the meeting about.
Signature *
Submittal Date
On behalf of the City of Durham, Kimley-Horn is submitting this pre-filing meeting request for a section of the proposed
Northern Durham Parkway project located in Durham, Durham County, NC. The proposed section would extend from
Ferrell Road south to Cheek Road. The typical section of the proposed roadway would consist of a 2-lane road with curb
and gutter and a sidewalk facility. The project will be constructed through the proposed Junction Road and Ferrell Road
industrial development and the road will be built in phases. Phase I will extend from Ferrell Road south to a point north of
Panther Creek and Phase II will extend from Phase I south to Cheek Road. The project is aligned to tie into previously
dedicated right-of-way on both the north and south termini. The project is located within the Neuse River Basin (03020101).
Stephanie Goss (NCDWR) conducted a field review to determine which streams in the project area are subject to the
Neuse River Basin Buffer Rules and to identify isolated wetlands that may be subject to State regulation on March 8,
2021(NBRRO #21-004). Additionally, April Norton (USACE) issued a Preliminary and Approved Jurisdictional Determination
for the covering the proposed roadway on April 9, 2021. A pre-app meeting was conducted with April Norton, Sam Dailey
(USACE), and Andy Williams (USACE) to discuss the project permitting approach. During this meeting, it was determined
that the stretch of Northern Durham Parkway that is to be constructed through the proposed Junction Road and Ferrell
Road site would be considered a separate project from the industrial development and would need to be permitted by the
City of Durham under a separate permit application.
Phase I of the proposed roadway will result in unavoidable impacts to two 404/401 wetlands, three intermittent streams,
and multiple buffer zones. All three stream and buffer crossings are proposed to be near perpendicular. Phase II, which is
still in design and would be constructed following completion of Phase I, would result in unavoidable impacts to Panther
Creek, floodplain wetlands along Panther Creek, and associated buffer zones. It is anticipated that impacts resulting from
Phase I of the NDP project will qualify for authorization under Nationwide Permit #14 and corresponding Water Quality
General Certification 4135. Additionally, the project will require a Riparian Buffer Authorization for impacts to buffer zones 1
and 2.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401
Certification Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting
location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you
can submit an application.
10/5/2021