November 19, 2021
DWR# 21-1555
Cabarrus County
Gladstone Development, LLC
c/o Nick Elder
967 NC Highway 211 E
Candor, NC 27229
Delivered via email to nelder@acwr.com
Subject: APPROVAL of 401 Water Quality Certification with Additional Conditions
Midland East Railyard Project
Dear Mr. Elder:
You have our approval for the impacts listed below for the purpose described in your application
submitted to the Division of Water Resources (Division) October 25, 2021, and payment received on
October 28, 2021, with subsequent information on November 18, 2021. The Division has determined
that the proposed project and impact will comply with water quality requirements covered by the
attached Water Quality General Certification Number 4132, 4135, and the conditions listed below,
provided that you adhere to the certification located at https://deq.nc.gov/about/divisions/water-
resources/water-quality-permitting/401-buffer-permitting-branch/general and the conditions listed
below.
This certification is associated with the use of General Permit Number 3 and 14 once it is issued to you
by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local
permits before proceeding with your project, including those required by (but not limited to) Sediment
and Erosion Control, Non -Discharge, and Water Supply Watershed regulations.
The Division has determined that the proposed project will comply with the water quality requirements
provided that you adhere to the conditions listed in the certification and to the additional conditions
listed below. The following proposed impacts are hereby approved. No other impacts are approved,
including incidental impacts. [15A NCAC 02H .0506(b)]
Type of Impact
Amount Approved
Temporary Impact
Amount Approved
Permanent Impact
Stream
86 linear ft.
76 linear ft.
Wetland
0.002 acre
0.023 acre
D_E
NORTH CAROUNA 1
n.p,rm. t or Fn.irwmeMei Oiwlh
North Carolina Department of Environmental Quality 1 Division of Water Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115
704.663.1699
This approval is for the purpose and design described in your application. The plans and specifications
for this project are incorporated by reference as part of this Certification. If you change your project,
you must notify the Division and you may be required to submit a new application package with the
appropriate fee. If the property is sold, the new owner must be given a copy of this Certification and is
responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)].
If you are unable to comply with any of the conditions of the attached Water Quality General
Certification or with the additional conditions itemized below, you must notify the Mooresville Regional
Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee
becomes aware of the circumstances.
The permittee shall report to the Mooresville Regional Office any noncompliance with, and/or any
violation of, stream or wetland standards [15A NCAC 02B .0200] including but not limited to sediment
impacts to streams or wetlands. Information shall be provided orally within 24 hours (or the next
business day if a weekend or holiday) from the time the permittee became aware of the non-compliance
circumstances.
Additional conditions (15A NCAC 02H .0507(c)):
1. Diversion Ditches and other storm water conveyances as related to the sediment and erosion control
measures shall be matted and/or stabilized to reduce sediment loss and turbidity. This includes
interior/exterior slopes of sediment basins. 15A NCAC 02H .0506 (b)(3) and (c)(3)
Justification: Failure to reduce erosion of runoff conveyances and to provide for maximum reduction of
erosion on areas not related to ongoing construction, shortens basin holding times, increases turbidity
of discharge and creates a greater potential of bypass discharge.
2. Bare/fill slopes in excess of 10 feet in height and within 30 feet of surface waters shall be matted.
15A NCAC 02H .0506 (b)(1) and15A NCAC 02H .502 (c)
Justification: A project that affects waters shall not be permitted unless the existing uses, and the water
quality to protect such uses, are protected. In determining that the proposed activity will comply with
state water quality standards (including designated uses, numeric criteria, narrative criteria and the
state's antidegradation policy), the Division must evaluate if the activity has avoided and minimized
impacts to waters, would cause or contribute to a violation of standards or would result in secondary or
cumulative impacts
3. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless
otherwise authorized by this Certification. 15A NCAC 02H.0506(b)(2)
4. The permittee shall report to the DWR Mooresville Regional Office any noncompliance with, and/or
any violation of, stream or wetland standards [15A NCAC 02B .0200], including but not limited to
sediment impacts to streams or wetlands. Information shall be provided orally within 24 hours (or
the next business day if a weekend or holiday) from the time the permittee became aware of the
non-compliance circumstances.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
Justification: Timely reporting of non-compliance is important in identifying and minimizing
detrimental impacts to water quality and avoiding impacts due to water pollution that precludes
NORTH AROLIµAD
Department of Emlrunmenlal Wally
North Carolina Department of Environmental Quality 1 Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
any best use on a short-term or long-term basis.
5. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the footprint
of the approved impacts (including temporary impacts).
Citation: 15A NCAC 02H .0506; 15A NCAC 02H .0507(c)
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule (including, at minimum: aquatic life propagation, survival, and
maintenance of biological integrity; wildlife; secondary contact recreation; agriculture); and that
activities must not cause water pollution that precludes any best use on a short-term or long-term
basis.
6. All activities shall be in compliance with any applicable State Regulated Riparian Buffer Rules in
Chapter 2B of Title 15A in the North Carolina Administrative Code.
Citation: 15A NCAC 02H.0506(b); 15A NCAC 02H .0507(c)
Justification: The referenced Riparian Buffer rules were adopted to address water quality
impairments and further protect existing uses.
7. When applicable, all construction activities shall be performed and maintained in full
compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973).
Regardless of applicability of the Sediment and Pollution Control Act, all projects shall
incorporate appropriate Best Management Practices for the control of sediment and erosion so
that no violations of state water quality standards, statutes, or rules occur.
Design, installation, operation, and maintenance of all sediment and erosion control measures
shall be equal to or exceed the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Manual, or for linear transportation projects, the North
Caroline Department of Transportation Sediment and Erosion Control Manual.
All devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil)
sites, including contractor -owned or leased borrow pits associated with the project. Sufficient
materials required for stabilization and/or repair of erosion control measures and stormwater
routing and treatment shall be on site at all times.
Citation: 15A NCAC 02H.0506(b); 15A NCAC 02H .0507(c); 15A NCACO2B.0200; 15A NCAC
02B .0231
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. Activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. As cited in Stream Standards: (12) Oils,
deleterious substances, or colored or other wastes: only such amounts as shall not render the
waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or adversely
affect the palatability offish, aesthetic quality, or impair the waters for any designated uses; and
(21) turbidity in the receiving water shall not exceed 50 Nephelometric Turbidity Units (NTU) in
streams not designated as trout waters and 10 NTU in streams, lakes, or reservoirs designated as
trout waters; for lakes and reservoirs not designated as trout waters, the turbidity shall not exceed
25 NTU; if turbidity exceeds these levels due to natural background conditions, the existing
turbidity level shall not be increased. As cited in Wetland Standards: (c)(1) Liquids, fill or other
solids, or dissolved gases shall not be present in amounts that may cause adverse impacts on
existing wetland uses; and (3) Materials producing color or odor shall not be present in amounts
that may cause adverse impacts on existing wetland uses.
NORT�D `�
Department of&nlronme�l Ouellty�
North Carolina Department of Environmental Quality 1 Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
8. Sediment and erosion control measures shall not be installed in wetland or waters except
within the footprint of temporary or permanent impacts otherwise authorized by this
Certification. If placed within authorized impact areas, then placement of such measures shall
not be conducted in a manner that results in dis-equilibrium of any wetlands, streambeds, or
streambanks. Any silt fence installed within wetlands shall be removed from wetlands and the
natural grade restored within two (2) months of the date that DEMLR or locally delegated
program has released the specific area within the project to ensure wetland standards are
maintained upon completion of the project.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H.0507(c); 15A NCAC 02B .0200; 15A NCAC 02B
.0231
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. Activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. As cited in Stream Standards: (12) Oils,
deleterious substances, or colored or other wastes: only such amounts as shall not render the
waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or adversely
affect the palatability offish, aesthetic quality, or impair the waters for any designated uses; and
(21) turbidity in the receiving water shall not exceed 50 Nephelometric Turbidity Units (NTU) in
streams not designated as trout waters and 10 NTU in streams, lakes, or reservoirs designated as
trout waters; for lakes and reservoirs not designated as trout waters, the turbidity shall not exceed
25 NTU; if turbidity exceeds these levels due to natural background conditions, the existing
turbidity level shall not be increased. As cited in Wetland Standards: (c)(1) Liquids, fill or other
solids, or dissolved gases shall not be present in amounts that may cause adverse impacts on
existing wetland uses; and (3) Materials producing color or odor shall not be present in amounts
that may cause adverse impacts on existing wetland uses.
9. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be used
along streambanks or within wetlands.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H.0507(c)
Justification: A project that affects waters shall not be permitted unless the existing uses (including
aquatic life propagation and biological integrity), and the water quality to protect such uses, are
protected. Protections are necessary to ensure any remaining surface waters or wetlands, and any
surface waters or wetlands downstream, continue to support existing uses during and after project
completion. The Division must evaluate if the activity has avoided and minimized impacts to
waters, would cause or contribute to a violation of standards, or would result in secondary or
cumulative impacts.
10. If the project is covered by NPDES Construction Stormwater Permit Number NCG010000 or
NPDES Construction Stormwater Permit Number NCG250000, full compliance with permit
conditions including the erosion & sedimentation control plan, inspections and maintenance,
self -monitoring, record keeping and reporting requirements is required.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H.0507(c); 15A NCAC 02B .0200; 15A NCAC
02B .0231
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. Activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. As cited in Stream Standards: (12) Oils,
deleterious substances, or colored or other wastes: only such amounts as shall not render the
waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or adversely
affect the palatability offish, aesthetic quality, or impair the waters for any designated uses; and
NORTH AROLIµAD
Department of Emlrunmenlal Wally
North Carolina Department of Environmental Quality 1 Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
(21) turbidity in the receiving water shall not exceed 50 Nephelometric Turbidity Units (NTU) in
streams not designated as trout waters and 10 NTU in streams, lakes, or reservoirs designated as
trout waters; for lakes and reservoirs not designated as trout waters, the turbidity shall not exceed
25 NTU; if turbidity exceeds these levels due to natural background conditions, the existing
turbidity level shall not be increased. As cited in Wetland Standards: (c)(1) Liquids, fill or other
solids, or dissolved gases shall not be present in amounts that may cause adverse impacts on
existing wetland uses; and (3) Materials producing color or odor shall not be present in amounts
that may cause adverse impacts on existing wetland uses.
11. All work in or adjacent to streams shall be conducted so that the flowing stream does not come
in contact with the disturbed area. Approved best management practices from the most current
version of the NC Sediment and Erosion Control Manual, or the NC Department of Transportation
Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and
other diversion structures shall be used to minimize excavation in flowing water.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule, and that activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. As cited in Stream Standards: (12) Oils,
deleterious substances, or colored or other wastes: only such amounts as shall not render the
waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or adversely
affect the palatability offish, aesthetic quality, or impair the waters for any designated uses; and
(21) turbidity in the receiving water shall not exceed 50 Nephelometric Turbidity Units (NTU) in
streams not designated as trout waters and 10 NTU in streams, lakes, or reservoirs designated as
trout waters; for lakes and reservoirs not designated as trout waters, the turbidity shall not exceed
25 NTU; if turbidity exceeds these levels due to natural background conditions, the existing
turbidity level shall not be increased.
12. Culverts shall be designed and installed in such a manner that the original stream profiles are
not altered and allow for aquatic life movement during low flows. The dimension, pattern, and
profile of the stream above and below a pipe or culvert shall not be modified by widening the
stream channel or by reducing the depth of the stream in connection with the construction
activity. The width, height, and gradient of a proposed culvert shall be such as to pass the
average historical low flow and spring flow without adversely altering flow velocity. If the
width of the culvert is wider than the stream channel, the culvert shall include multiple
boxes/pipes, baffles, benches and/or sills to maintain the natural width of the stream channel.
If multiple culverts/pipes/barrels are used, low flows shall be accommodated in one
culvert/pipe and additional culverts/pipes shall be installed such that they receive only flows
above bankfull.
Placement of culverts and other structures in streams shall be below the elevation of the
streambed by one foot for all culverts with a diameter greater than 48 inches, and 20% of the
culvert diameter for culverts having a diameter less than or equal to 48 inches, to allow low
flow passage of water and aquatic life. If the culvert outlet is submerged within a pool or scour
hole and designed to provide for aquatic passage, then culvert burial into the streambed is not
required.
For structures less than 72" in diameter/width, and topographic constraints indicate culvert
slopes of greater than 2.5% culvert burial is not required, provided that all alternative options
for flattening the slope have been investigated and aquatic life movement/connectivity has
been provided when possible (e.g. rock ladders, cross -vanes, sills, baffles etc.). Notification,
including supporting documentation to include a location map of the culvert, culvert profile
NORTH CAROLINA
Department of EmlmnmeMal Dually
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
drawings, and slope calculations, shall be provided to DWR 30 calendar days prior to the
installation of the culvert.
When bedrock is present in culvert locations, culvert burial is not required, provided that there
is sufficient documentation of the presence of bedrock. Notification, including supporting
documentation such as a location map of the culvert, geotechnical reports, photographs, etc.
shall be provided to DWR a minimum of 30 calendar days prior to the installation of the culvert.
If bedrock is discovered during construction, then DWR shall be notified by phone or email
within 24 hours of discovery.
Installation of culverts in wetlands shall ensure continuity of water movement and be designed
to adequately accommodate high water or flood conditions. When roadways, causeways, or
other fill projects are constructed across FEMA-designated floodways or wetlands, openings
such as culverts or bridges shall be provided to maintain the natural hydrology of the system as
well as prevent constriction of the floodway that may result in destabilization of streams or
wetlands.
The establishment of native woody vegetation and other soft stream bank stabilization
techniques shall be used where practicable instead of rip -rap or other bank hardening methods.
Citation: 15A NCAC 02H.0506(b); 15A NCAC 02H .0507(c)
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule, and that activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. Ensuring that structures are installed
properly in waters will ensure that surface water quality standards are met and conditions of
waters are suitable for all best uses.
13. If concrete is used during construction, then all necessary measures shall be taken to prevent
direct contact between uncured or curing concrete and waters of the state. Water that
inadvertently contacts uncured concrete shall not be discharged to waters of the state.
Citation: 15A 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200; 15A NCAC 02B .0231
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. Activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. As cited in Stream Standards: (12) Oils,
deleterious substances, or colored or other wastes: only such amounts as shall not render the
waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or adversely
affect the palatability offish, aesthetic quality, or impair the waters for any designated uses. As
cited in Wetland Standards: (c)(1) Liquids, fill or other solids, or dissolved gases shall not be
present in amounts that may cause adverse impacts on existing wetland uses; and (3) Materials
producing color or odor shall not be present in amounts that may cause adverse impacts on
existing wetland uses.
14. All proposed and approved temporary fill and culverts shall be removed and the impacted area
shall be returned to natural conditions within 60 calendar days after the temporary impact is no
longer necessary. The impacted areas shall be restored to original grade, including each
stream's original cross -sectional dimensions, planform pattern, and longitudinal bed profile. All
temporarily impacted sites shall be restored and stabilized with native vegetation.
Citation: 15A NCAC 02H.0506(b); 15A NCAC 02H .0507(c)
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. Protections are necessary to ensure any
NORT�D `�
Department of&nlronme�l Ouellty�
North Carolina Department of Environmental Quality 1 Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
remaining surface waters or wetlands, and any surface waters or wetlands downstream, continue
to support existing uses after project completion.
15. All proposed and approved temporary pipes/culverts/rip-rap pads etc. in streams or wetlands
shall be installed as outlined in the most recent edition of the North Carolina Sediment and
Erosion Control Planning and Design Manual or the North Carolina Surface Mining Manual or the
North Carolina Department of Transportation Best Management Practices for Construction and
Maintenance Activities so as not to restrict stream flow or cause dis-equilibrium during use of
this Certification.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule, and that activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. Ensuring that structures are installed
properly in waters will ensure that surface water quality standards are met and conditions of
waters are suitable for all best uses.
16. Any rip -rap required for proper culvert placement, stream stabilization, or restoration of
temporarily disturbed areas shall be restricted to the area directly impacted by the approved
construction activity. All rip -rap shall be placed such that the original streambed elevation and
streambank contours are restored and maintained and shall consist of clean rock or masonry
material free of debris or toxic pollutants. Placement of rip -rap or other approved materials
shall not result in de -stabilization of the stream bed or banks upstream or downstream of the
area or be installed in a manner that precludes aquatic life passage.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c)
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule, and that activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. The Division must evaluate if the
activity has avoided and minimized impacts to waters, would cause or contribute to a violation of
standards, or would result in secondary or cumulative impacts.
17. All mechanized equipment operated near surface waters shall be inspected and maintained
regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, or
other toxic materials. Construction shall be staged in order to minimize the exposure of
equipment to surface waters to the maximum extent practicable. Fueling, lubrication, and
general equipment maintenance shall be performed in a manner to prevent, to the maximum
extent practicable, contamination of surface waters by fuels and oils.
Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200; 15A NCAC 02B
.0231
Justification: A project that affects waters shall not be permitted unless the existing uses, and the
water quality to protect such uses, are protected. Activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. As cited in Stream Standards: (12) Oils,
deleterious substances, or colored or other wastes: only such amounts as shall not render the
waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or adversely
affect the palatability offish, aesthetic quality, or impair the waters for any designated uses. As
cited in Wetland Standards: (c)(1) Liquids, fill or other solids, or dissolved gases shall not be
present in amounts that may cause adverse impacts on existing wetland uses; and (3) Materials
producing color or odor shall not be present in amounts that may cause adverse impacts on
existing wetland uses.
NORTH
D E
Department of Emlrunmenlal Wally
North Carolina Department of Environmental Quality 1 Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
18. In accordance with 143-215.85(b), the permittee shall report any petroleum spill of 25 gallons
or more; any spill regardless of amount that causes a sheen on surface waters; any petroleum
spill regardless of amount occurring within 100 feet of surface waters; and any petroleum spill
less than 25 gallons that cannot be cleaned up within 24 hours.
Citation: 15A NCAC 02H.0507(c); N.C.G.S 143-215.85(b)
Justification: Person(s) owning or having control over oil or other substances upon notice of
discharge must immediately notify the Department, or any of its agents or employees, of the
nature, location, and time of the discharge and of the measures which are being taken or are
proposed to be taken to contain and remove the discharge. This action is required in order to
contain or divert the substances to prevent entry into the surface waters. Surface water quality
standards require that conditions of waters be suitable for all best uses provided for in state rule
(including, at minimum: aquatic life propagation, survival, and maintenance of biological
integrity; wildlife; secondary contact recreation; agriculture); and that activities must not cause
water pollution that precludes any best use on a short-term or long-term basis.
19. The permittee and their authorized agents shall conduct all activities in a manner consistent
with State water quality standards (including any requirements resulting from compliance with
§303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal
Law.
Citation: 15A NCAC 02H.0506(b); 15A NCAC 02H.0507(c)
Justification: Surface water quality standards require that conditions of waters be suitable for all
best uses provided for in state rule, and that activities must not cause water pollution that
precludes any best use on a short-term or long-term basis. The Division must evaluate if the
activity has avoided and minimized impacts to waters, would cause or contribute to a violation of
standards, or would result in secondary or cumulative impacts.
20. The permittee shall require its contractors and/or agents to comply with the terms and
conditions of this permit in the construction and maintenance of this project, and shall provide
each of its contractors and/or agents associated with the construction or maintenance of this
project with a copy of this General Certification. A copy of this General Certification shall be
available at the project site during the construction and maintenance of this project.
Citation: 15A NCAC 02H.0506(b); 15A NCAC 02H.0507(c)
Justification: Those actually performing the work should be aware of the requirements of this 401
Water Quality General Certification to minimize water quality impacts.
This approval and its conditions are final and binding unless contested [G.S. 143-215.5]. Please be aware
that by having impacted waters without first applying for and securing the issuance of a 401 Water
Quality Certification, you have violated Title 15A of the North Carolina Administrative Code (NCAC) 2H
.0500. Title 15A NCAC 2H .0500 requires certifications pursuant to Section 401 of the Clean Water Act
whenever construction or operation of facilities will result in a discharge into navigable waters, including
wetlands, as described in 33 Code of Federal Regulations (CFR) Part 323. It also states any person
desiring issuance of the State certification or coverage under a general certification required by Section
401 of the Federal Water Pollution Control Act shall file with the Director of the North Carolina Division
of Water Quality. Pursuant to G.S. 143-215.6A, these violations and any future violations are subject to
a civil penalty assessment of up to a maximum of $25,000.00 per day for each violation.
This Certification can be contested as provided in Chapter 150B of the North Carolina General Statutes
by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of
NORT�D `�
Department of&nlronme�l Ouellty�
North Carolina Department of Environmental Quality 1 Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set
forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina
Administrative Code. Additional information regarding requirements for filing a Petition and Petition
forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-
3000
One (1) copy of the petition must also be served on DEQ as follows:
Mr. Bill Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review by the Division under Section 401 of the Clean Water Act. If you have
any questions, please telephone Mr. Doug Perez in the Mooresville Regional Office at 704-743-6872.
Sincerely,
DocuSigned by:
114441w H P;44,e4
F161 FB69A2D84A3...
for
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Mooresville Regional Office, DEQ
Attachments
cc: Krysta Stygar, Army Corps of Engineers, Charlotte, krystynka.b.stygar@usace.army.mil
Kevin Thomas, Civil and Environmental Consultants, Kthomas@cecinc.com
DWR 401 & Buffer Permitting Branch file
Olivia Munzer, NCWRC, email
D_E
NoFn, 0,%ka,A
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
Daparonenl of EnVhunmenlal Dually
CERTIFICATE OF COMPLETION
NCDWR Project No.: County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401
Wetland & Buffer Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center,
Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's
authorized agent, or the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed
to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature: Date:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed
to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
I, , as a duly registered Professional Engineer in the State
of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of
the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporting materials.
Signature Registration No. Date
NORTH D `E�
Department of&nlronme�l Ouellty�
North Carolina Department of Environmental Quality 1 Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000