Loading...
HomeMy WebLinkAboutWQ0031492_Regional Office Historical File Pre 2018 (2)ofNArF9 P6 Mr. Eric Davis, Town Manager Town of China Grove 205 Swink Street PO Box 15 China Grove, NC 28023 Dear Mr. Davis, Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality March 28, 2007 Subject: Permit No. WQ0031492 China Grove Infrastructure Project Wastewater Collection System Extension Rowan County, North Carolina In accordance with your application received on February 26, 2007, we are forwarding herewith Permit No. WQ0031492, dated March 27, 2007, to the Town of China Grove for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T ,0403 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2T; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone: (704) 663-1699 Fax: (704) 663-6040 Internet: www.ncmwaterquality.org Customer Service: 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer —50% Recycled/10°% Post Consumer Paper Nor` hCarolina ?atura!!i Mr. bavis Page 2 March 27, 2007 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Town of China Grove for the construction and operation of approximately 5,131 linear feet of 8-inch gravity sewer, 3,430 linear feet of 4-inch force main, a 110 gallon per minute pump station with duplex pumps, on -site audible and visual high water alarms, and an on -site generator with automatic transfer switch and the discharge of 17,640 gallons per day of collected domestic wastewater into the City of Salisbury existing sewerage system, pursuant to the application received February 26, 2007, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the City of Salisbury WWTP (NPDES No. NC0023884) prior to being discharged into the receiving stream. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Dee Browder at (704) 663-1699. Sincerely, Cor Alan W. Klimek, cc: Mooresville Regional Office, Collection System Permit File Jeffrey Jones, City of Salsibury Bradley Buoy, Hobbs, Upchurch & Associates, PA Surface Water Protection Central Files Tom Asenzo, PERCS NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (Le. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1 C. 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Per 15A NCAC 2T .0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H ,0500. 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. 2 Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing Part 1 of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 27th day of March, 2007. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 2t for Alan W. Klimek, P.E., Director Div�sion1of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0031492 3 Fatt Track Engineering Certification Permit No. W00031492 March 27, 2007 Eric Davis, Town Manager Town of China Grove 200 Swink Street PO Box 15 China Grove, NC 28023 Bradley Bucy, PE Hobbs, Upchurch & Associates, Inc. 1300 Baxter Street, Suite 108 Charlotte, NC 28204 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension o Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION ❑ Partial ❑ Final , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ['full time) the construction of Ashton Manor — Ph I, a Rowan County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. FAST -TRACK APPLICATION for GRAVITY SEWERS, PtwrTP STATIONS, ANI) FORCE t4IAINS PAGE 3 USE THE' TAB KEY TO MOVE FROM FIELD TO FIELD! 1. Owner: 1 a. Town of China Gro Full Legal Name (company, municipality, HOA, utili lb. Eric C. Davis, Town Manager Application Number: (to be completed by DWQ) Signing Official Name and Title (Please review 15A NCAC 2H .6206(b) for authorized signing officiais!) lc, The legal entity who will own this system is:. ❑ Individual ❑ Federal Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (speci 1d. 205 Swink ST, PO Box 15 ailing Address f. North Carolina State i1 h. 704-857-2466 704-855-1855 Telephone Facsimile Project (Facility) Information: 2a. China Grove CDBG Infrastructure Proec Brief Project Name (permit will refer to .3. Contact Person: 3a. Brad Bucy, Hobbsj_Upchurch & Associates, P.A. le. China Grove City g. 28023 Zip Code edavis acchinagrovenc.gov E-mail County Where Project is Located Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. 704-342-3000 3c. bbucy@hobbsupchurch.com Phone Number E-mail Project is New 0 Modification (of an existing permit) If Modification, Permit No.: For modifications, attach a separate sheet clearly explaining the reason for the modification (i.e. adding another phase, changing line size/length, etc.). Only include the modified information in this permit application - do not duplicate project information in B(7) and B(10-11) that has already been included in the original permit. 2. Owner is Public (skip to item 8(3)) 2a. If private, applicant will be: ❑ Private (go to item 2(a)) 2b. If sold, facili ❑ Retaining Ownership (Le, store, church, single office, etc.) or ❑ Leasing units (lots, townhomes, etc. - skip to item 8(3)) Selling units (lots, townhomes, etc. - go to Item B(2b)) City of Salisbury s owned by a (must choo one ❑ Public Utility (Instruction III) 0 Homeowner Assoc./Developer (Instruction IV) Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 4b, NC0023884 Rowan WWTP Name of WWTF WWTF Permit No. Town of China Grove 5b. 8" T® Gravity 5c Owner of Downstream Sewer Receiving Sewer Size E❑ Force Main Permit Number of Downstream Sewer (if known . The origin of this wastewater is (check all that apply): Residential Subdivision ❑ Apartments/Condominiums O Mobile Home Park ❑ School O Restaurant • Office ❑ Car Wash • Institution El Hospital El Church O Nursing Home 0 Other (specify): Volume of wastewater to be allocated for this particular project: 17,640 gallons per day *Do not include previously permitted allocations 0 % Domestic/Commercial % Industrial %4 Other (specify): If the permitted flow is zero, indicate why: interceptor Line - Flow will be permitted in subsequent permits that connect to this line 0 Flow has already been allocated in Permit No. ❑ Rehabilitation or replacement of existing sewer with no new flow expected FTA fl2/03 - Rev. 3 04/05 FAST -.TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 4 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(1) for Item 6(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(1)(1-2) must be sqpiorted with actual water or wastewater use data in accordance with 15A NCAC 2H .0219(1)(3), 49 Residential Units (3 pedroortts)' at 360 gi 17,640 gpd 46 Acresof Potential Development — Projected 2.5 Units per Acre at 360 gpd = 4't4Q0 gp Peak Flow = 2.5 x ADF = 2,5 x (59,040) = 147,600 gpd - Design Flow ,a.v_o_f Sewer Lines to be Permitted (attach additional she nece Size (inches) 8" 4, Z Z 0 0 Length (feet) 5,131 3,430 Gravity or Force Main (use the pull down menu) Gravity Force Main ENTER TOTAL LINE LENGTH IN MILES 11. Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Z 0 0 Location ID (self chosen - as shown on Design Flow plans for cross-reference) (MGD) STA 0+00 Line SS-1 (Sheet S2) 0.15 Power Reliability Option Operational Point (1- dual line feed; 2- permanent generator w!ATS; 3- GPM et TDH portable generator witelemetry; 4-wet well storage) 110 © 120 Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H .0200 as applicable?! Yes El No If no, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION 13.. Have the following permits ertifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? Sedimentation and Erosion Control Plan? Stormwater? 14. Does this project involve aerial lines or siphons? Check if yes: These lines will beconsideted hiehoriority and must be checked one everv.six months 1 5. Does this project have gravity sewer lines designed at minimum slopes'? Be aware that the Division will not accept installed lines more than 10% flatter than the minimum slope Lines installed outside this tolerance should be corrected prior to submitting the final engineering certification. Yes 0 No Yes LNo Yes El No O N/A N/A N/A FTA 02/03 - Rev. 3 04/05 FAST I APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 5 0 Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02103 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets est necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) OR indicate the following: 0 A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope waterbody; AND, 0 A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. Location ID on Map self chosen - as shown on map for cross-reference) 1 Name of Waterbody Id Water Creek County Rowan erbody Stream Waterbody River Basin Index Classification Yadkin 13-17-9-4-(0.5) WS-IV Submit the 8.5" x 11" COLOR topographic map as required in Instruction VI regardless of whether a classification is providedl' Applicant's Cert fIati+n: to Eric C. Davis, attest that this application for China Grove CDBG Infrastructure Project has been reviewed by me and i. accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note.: In accordance with North Carolina General Statutes 143-215,6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signing Official Signature Professional Engineer's Certification: /3- Gf© Date I attest that this application for the Town of China Grove has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, .inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215,6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10 000 as well as civil penalties up to $25,000 per violation. 2a. Bradley H. Bucy Professional Engineer Name 2b. Hobbs, Upchurch & Associates, RA, Engineering Finn =2c. 1300 Baxter St., Suite 108 Mailing Address 2d, Charlotte City 2g, 704-342-3000 Telephone 2h. 704-342-3077 Facsimile 2e. NC 2f. 28204 State Zip 2i. bbucy@hobbsupchurch.com E-mail Seal, Signature & Date FTA 02/03 - Rev. 3 04/05 February 14, 2007 Mr. Bradley H. Bucy, P.E. Hobbs, Upchurch & Associates, PA 1300 Baxter Street, Suite 108 Charlotte, NC 28204 RE: China Grove CDBG Infrastructure Project Dear Mr, Busy: The City's wastewater tr"en cent facility, the Salisbui -Rowan W astewat r Treatment Plant Grant Creek Train, permit # NC0023884, and collection system have sufficient capacity to support an estimated additional flow of 17,640 gpd created by the proposed China Grove CDBG lnf�rastructurc Project. you :have any quest or conaansts ptcasc, contact me at (704) 638-2146. Cc: File tree: NC 28144 Sincerely, Saiisbulry-Rowan Utilities Utilities Engineering Division ona PaE, .ngineer Telephone (7 4) 638-5205 Fax (7041638-8491 hina Grove cQBG n arstrucure Pro e Legend Prop. PS Prop. FM Prop. Gravity Project Area QUAD NAME: CHINA GROVE SCALE: 1 INCH EQUALS 1000 FEET DATE 12/13/2006 1,000 2,000 Feet Central Files: APS SWP 03/27/07 Permit Number WQ0031492 Permit Tracking Slip Program Category Status Project Type Non -discharge In review New Project Permit Type Fast Track Version Gravity Sewer Extension, Pump Stations, & Pressure Sewer A Extensions Primary Reviewer dee.browder Permitted Flow 17640 Facility Facility Name China Grove CDBG Infastructure Project Location Address Owner Permit Classification Individual Permit Contact Affiliation Major/Minor Region Minor Mooresville County Rowan Facility Contact Affiliation Owner Name Owner Type Town of China Grove Government - Municipal Dates/Events Orig Issue App Received 03/28/07 02/16/07 Draft Initiated Scheduled Issuance Owner Affiliation Eric Davis, Manager Town PO Box 15 China Grove NC 28023 Public Notice issue Effective Expiration 03/28/07 03/28/07 Regulated Activities Requested/Received Events Subdivision Wastewater collection Outfall NULL Additional information requested Additional information received Waterbody Name Stream Index Number Current Class Subbasin foBBS INI C5l e .55QCJ 2E5, Est-. :CONSULTING ENGINEERS " P.U. BOX,1737, 300 S.W. BROAD STREET _SOUTHERN PINES, NC 28388 1 T(9101692-5616 : Exactly Four, hundred PAY TO THE NC, DENR Division of Water Quality ORDER , - OF: and no / 100 Dollars .-NC'' r • Z BBB' Branch Banking and Trust Company 66.1121531 DATE 2/13/2007 VOID AFTER 90 DAYS AUTHOR] StG TURF 5§M 33 AMOUNT $400.00 Details on back, 8 11'0S4233ie' 1:0 53 LO L 2 Li:Li36 L000i64i1' Fast Track Engineering Certification Permit No, WQ0031492 March 27, 2007 Eric Davis, Town Manager Town of China. Grove 200 Swink Street PO Box 15 China Grove, NC 28023 Bradley Bucy, PE Hobbs, Upchurch & Associates, Inc. 1300 Baxter Street, Suite 108 Charlotte, NC 28204 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria, This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division, Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. Line SS 1; Sta 0+00 to 15+07 and Line SS-2; Sta 0+00 to 1+59 ENGINEER'S CERTIFICATION Partial E Final I, Bradley H. Bucy, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (Z periodically, L weekly, Q full time) the construction of China Grove CDBG Infrastructure Project, a China Grove project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials, North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received, Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. .16 rci ,flov Li :f1 S P Y VII t PWOr S s -T ctk To; Engineered Products Division 315 9" StrA 1-licory, NC 28602 (828) 3249705 Fax 823-3244355 Brad Bucey; Hobbs .Upchurch & Assoc F r m;.. David Groe Fax; (704) 242-2077 Phone: (704) 342-3000 (Inc,iuding cover) Chinn Grove — Fairbanks More pump selection q.u0rantee0prrf Fax; (328) 324-4305 P ono: (328) 324-9705 g David.Grose'khdsuPnlv.com Date: July 23, 2007 E] PLEAS ELPIER itiircEDiATELY F.] FOR REVIEW LIPLEAGE C0 AENT Brad, Piease refer to fro attached 5;klarante-ec1 performance alivefor your review. For 110 GP efficiency shouid be about 28"A, Let mo know if YOU have any que,3Vo1s or need iadditona information for roviewing our proposed pump kcVoru Sincerely, David Grose Cc: Bobby Spires; Hickory Sand Construction --- James Hicks: HD Supply Waterwencs Engineere.,:d Products Division 18 V 'I i'A f$61A tar W to i 14 L _.. 1120 10, VALL J HOBBS, UPCHURCH & ASSOCIATES, P.A. Consulting Engineers 1300 Baxter Street, Suite 108 Charlotte, North Carolina 28204 Phone: (704) 34 2-3000' Fax: (704) 342-3077 LETTER OF TRANSMITTAL TO: Mooresville Regional Office 610 East Center St, Suite 301. Mooresville, NC 28115 The Following Item(s) : X Drawirres Copies R Copy of Letter Date 8-Oct-08 8-Oct-08 8-Oct-08 Submittal Bid Package Change Order Fast Track. En Dra ngs Design d as Checked Below : For Approval For Your Use X As Requested For Your Review s e DATE: RlJA # CG0601/415 101812008 RE: China Grove CDBG Infrastructure AT TN: We are sending you : Via US Mail X Overnight Maill2nd Day Air Hand Delivered Project Surface Water Pro tel lion (cation Pay Request X Sped " taons D' 4.41rc Reviewed Reviewed with Comments Resubmit per Comments Information No Comments Description Resubmit for Approval Submit for Distribution Return Corrected Prints. HOBBS, UPCHURCH & ASSOCIATES, P.A. Consulting Engineers Distribution File N.C'. ("opies 0 I 018/200S • 4 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality October 20, 2008 Eric C. Davis, Town Manager Town of China Grove 205 Swink Street China Grove, NC 28023 SUBJECT: China Grove infrastructure Project Permit No. WQ0031492 Wastewater Collection System Extension Partial Engineering Certification Acknowledgement Dear Permittee: D Surface Water Per 15A NCAC 2H ,0220, the Division received a Partial engineering certification for the subject project on 10/17/2008. Enclosed is a copy of the certification page for your records. A full review of the certification materials may or may not be conducted. It is assumed that receipt of this certification indicates compliance with all regulations, design criteria and the permit, However, if a full technicalreview is conducted, you will be notified of any items of non-compliance. Please be reminded that the Permittee is responsible for keeping a copy of the final record drawings for the life of the project. If you have not received such copy from your consultant, please contact them immediately to obtain a copy. Lastly, you are receiving this letter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you or your company, please complete Form PNOCF-S as this permit is not automatically transferable. Form PNGCF-S can be downloaded from http://h2o.enr.state.nc.us/peres from the Collection Systems Applications page. If you have any questions concerning this document or the completion of Form PNOCF-S (if necessary), please contact me at the letterhead address or via E-mail at tom.ascenzo@ncrnail.net, Thomas Ascenzo Environmental Specialist Enclosure Cc: Mooresville Regional Office, Surface Water Protection Section (all documents) Bradley H Buoy PE, Hobbs, Upchurch & Associates, P.A. (no enclosures) 1300 Baxter Street -Suite 108 , Charlotte, NC 28204 Surface Water Protection Section Central Files (certification fication page only) On NorthCaro Ina, Naturally Pretreatment, Emergency Response and Collection Systems Unit Internet httpr/Ih2o.enr.nc.state.us/ndpu 1617 Mail Service Center, Raleigh, NC 27699-1617 An Equal Opportunity Action Employer Telephone (919) 807-6300 Fax (919) 807-6489 50% recycled/10% post -consumer paper Flp7 Fast Track Engineering Certification Permit No. WQ0031492 March 27, 2007 Eric Davis, Town Manager Town of China Grove 200 Swink Street PO Box 15 China Grove, NC 28023 Bradley Bucy, PE Hobbs, Upchurch & Associates, Inc. 1300 Baxter Street, Suite 108 Charlotte, NC 28204 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit. regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. Line SS-1; Sta 0+00 to 15+07 and Line SS-2; Sta 0+00 to 1+59 ENGINEER'S CERTIFICATION ® Partial ❑ Final 1, Bradley H. Bucy, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (® periodically, ❑ weekly, ❑ full time) the construction of China Grove CDBG infrastructure Project, a China Grove project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS • ,-MOORESVILLE REGIONAL OFFICE �. ! SURFACE WATER PROTECTION 61 ' BAST CENTER AVENUE, SUITE 301 I MOORESVILLE NC 28115 l~f i� qirT11 OCT i 7 2003 DENR - WATER QUALITY rr IN SOURCE Pr,i:C I The Permittee is responsible for tracking all parfial cefrtiCatians•up-until a-finat..certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. PF: Hrilj OBBS, UPCHURCH & ASSOCIATES, P.A. Consulting Engineers 1300 Baxter Street, Suite 108 Charlotte, North Carolina 28204 Phone: (704) 342-3000 Fax: (704) 342-3077 DATE: 10/8/2008 HUA # CG0601/415 RE: China Grove CDBG Infrastructure Project - ATTN: Thomas Ascenzo LETTER OF TRANSMITTAL . `'; i fji.}1 TO: NCDENR 1617 Mail Service Center Raleigh, NC 27699 The Following Item(s) : X Drawings Copy of Letter Bid Package We are sendyou : J � t ' OCT 1 7 2008 X Via US Mail Overnighingt Mail/2nd Daay�Air Hand Delivered ,'' L Pay Request X Specifications Change Order Other Copies Date Submittal Description 1 8-Oct-08 • Fast Track Engineering Certification • 1 8-Oct-08 Drawings 1 8-Oct-08 Design Calcs These are -Transmitted as Checked Below : For Approval For Your Use X As Requested For Your Review Remarks: Reviewed Reviewed with Comments Submit for Distribution Resubmit per Comments Return Corrected Prints Information No Comments Resubmit for Approval Signed: HOBBS, UPCHURCH & ASSOCIATES, P.A. Consulting Engineers Distribution Name Copies File Southern Pines, N.C. - Raleigh, N.C. - Kill Devil Hills, N.C. - Charlotte, N.C. 1 10/16/2008 2:16 PM Fir 007' 1:02PM HD Supply Waterworks t$099'kQ' i(8ff TD • 4" D5433MV susivo l •AL cuRV1~ GUARANTEED VALUES 13HP No.4035 P. 2/2 Fairbanks Morse Pentair Water CURVE NO.: REEF: I BCTET PROJECT NO.: 140 120 100 W R21 111 80 u. 12103 $0 40 20 0 30 70 t 30 F 50 e! W 4Q • 30 �.- 20 07 z 10 Power - BHP 0 0 35 30 n 20 1b 10 • 090799C 090799 SPEED 1735 RPM SPHERE IMPELLER DIAMETER VANES IMPS T4C1A 10.75' DRIVER DATE 2 MS 2D HP 7/23/07 H}5L'4JRV iiiCIASE0 C/N maACTUAL TEST P O C'A OFA&!M1LAR PUMP. ONLY THE EJDICATED POURS) 15 13UARANTEED. 3.rr 11 1 i 1 ) . : 1 . I.. 1 : 1 • • r i 'I •'!"-: rI--1 f' -e 1 . • - r 1 ,,;, . .. � ...1---..-.--,-- 4- 4-.1 - .5.- _i . • .1 .I.+; _ ..;, L-./-":.. .� ,;�; f_ _./ - 100 200 i ENIMIEINEE _�. r • 1.: i - i ._l •-.L• •H .. • . - 1 •_ .. ' MIEIENI • 1• ;� -1.- i00 200 300 300 • I 1 . •1 1 : " S j • rI •1 ' I' s • .1._ 50D 800 700 j i• FLOW 11D 1 HEAD 110 EFF. 1 ' I:1,.. •I 7 • EQD • 1. • .1. 1 • .1 .=E::•.. •;.I ---- 1 1" :':;:., S00 1000 1100 ::1_I •I_. ter;. I � ' 1 -.1-•• : .__I-.rJ• ._1-�- r -iT1•- I�lI�• -- -•.,..,,-• i-•1 ,----1-•i:• I,••,, •Y4. L—.••}___.. ':}iF : -'L. •1-, _•�-,_7^1 __, - .:r jl . _ L;..I. .a_r—? Efficiency 1-, .•--1- - . _I�-1-1- ! •---._ i.•1 r L.•i• ._.•-- 1-,•.' •t_ -' _ -•i-.!4_r• ._�.i--I•_ s• �•I.f -i«i • i._r r. • 1. s ..x. ;�-.-f.. '1 • iILi.. .»n•-� •'f,..L1.. «---1" j iL--1- • r- —+. -i__•_1.•—i_J_,_.- -I- .h--1_L••_ • -Lr..•I__1_' -.- ,L.,, .•._. ry_ �_ I...•1 ; }: i.. . 1.r,--- I 'sk 7. 1•-:-1-- 1- ..-:7 _.f, i ` f NPSHb I.l- i .• F.i. R • L_,. L_ ram. _i 1•-:---L-i- 1 . I. •:. • 1-••rl»• 1 4- . -I r 1 Ali=-'_-_f-., •-.•.• --t-__'_-r'�- -•1. •! L•,'_ .._1- . • 1 , • . : !•i^r' 1 i .. i I [ ' .1..1 --r--.-4- f- �• L.I. i. }: -... • •; 'i - r•.1. _� ..r_T.a.- 404 500 lion 700 000 900 'ID00 1100 •i . 1 ;•1- I- - - _ -•• • I , 1 r- j 1 l i 1 ; • 1 1 1 •• .i ; • _• I 1 i ,1 • �. F- S•.. .1 •I-�.. . 1. • ' • •} • ' ( 1 S• - 1I' r •r •1 - 1 •r f• 1• � 1 - I' r i • I 4 SHP ! •1 . _• :' • ;: = 31 0 100 200 300 40D 390 500 700 Flow Rate - GPM 1. r-• • F f 1 i..-.7 t<�i i_-, i; li I:17_ : r i I i i 1 1.a H.. f O C f 1 7 2003 } 3. 2007 .1:O2PM HD Supply Waterworks No. 4035 P. 1/2 Fax 5 sStreet Division 3 Hickory, NC 28602 Tel (828) 324-9706 Fax 828-324-4365 Brad Bracey; Hobbs Upchurch & Assoc From:. David Grose Fax: (704) 342-3077 Phone: (704) 342-3000 Pages: 2 Fax: (828) 324-4385 Phone: (828) 324-9705 (Including cover) Email: David,GreseCdhdsupPIvv.com Re: China Grove — Fairbanks Morse pump Date: July 23, 2407 selection / guaranteed parr curve ❑ PLEASE DELIVER IMMEDIATELY [] FOR REVIEW ❑ PLEASE COMMENT Q PLEASE REPLY Brad, Please refer to the attached guaranteed performance curve for your review. For 110 GPM 118'7DH, efficiency should be ailout 28%_ Let me know if you have any questions or need additional information for reviewing our proposed pump selection, Sincerely, David Grose Cc: Bobby Spires Hickory Sand Construction James Hicks; HD Supply Waterworks - Engineered Products Division iL OCT 1 7 2008 Ur.+ ..WAT-ER(U9.LIn e wgrFR Beverly Eaves Perdue, Governor Dee Freeman, Secretary North Carolina Department of Environment and Natural Resources r —t Coleen Sullins, Director Division of Water Quality January 13, 2009 Town of China Grove P.O. Box 15 China Grove, North Carolina 28023 Attn: Eric Davis, Town Manager SUBJECT: China Grove CDBG Infrastructure Project Permit No. WQ0031492 Wastewater Collection System Extension Final Engineering Certification Dear Permittee: The Division received a final engineering certification for the subject project on December.22, 2008, A full review of the certification materials may or may not be conducted. It is assumed that.receipt of this certification indicates compliance with all regulations, design criteria and the permit. Please be reminded that the Permittee is responsible for keeping a copy of the final record drawings for the lifebf the project If you have not received a copy, please contact your consultant irrimediately to obtain a copy. You are receiving this letter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you, please complete Form PNOCF-S as this permit is not automatically transferable. Form PNOCF-S can be downloaded from http://h2o.enr.state.nc.us/ndpu/ndpuapps.html#Sewer. If you have any questions concerning this document or the completion of Form PNOCF-S (if necessary), please contact Ms. Dee Browder at the letterhead address or via E-mail at dee.browder@ncmail.net. Sincerely, Robert Krebs Surface Water Protection Regional Supervisor Enclosure Cc: Surface Water Protection Section Central Files (certification page only) Bradley Bucy, PE Hobbs, Upchurch & Associates Nne orthCarolina Naturally Pretreatment, Emergency Response and Collection Systems Unit Internet http:Rh2o.enr.nc.state.uslndpu 1617 Mail Service Center, Raleigh, NC 27699-1617 An Equal Opportunity Action Employer Telephone (919) 733-5083 Fax (919) 733-0059 50% recycled/10% post -consumer paper Fast Track Engineering Cetiatien Permit No. WQ0031492 March 27, 2007 Eric Davis, Town Manager Bradley Bucy, PE Town of China Grove Hobbs, Upchurch & 200 Swink Street 1300 Baxter Street, PO Box 15 Charlotte, NC 28204 China Grove, NC 28023 Complete and submit this form to the permit issuing regional office with the following. One copy of the project record drawings (plan & profile views of sewer lines) of tias system extension t" • Supporting design calculations (selected pumps, system curve, operating ,point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form, Permit modifications are required for an changes resulting in non-compliance with this permit, regulations or minimum design criteria. ater co This 'project shaft not be co nsi lured completebnor" aliower1 t operate until this Engineer's Certification and all required supporting document ion have been received b tine Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division, ENGINEER'S CERTIFICATION LI Partial Final I, Bradley H. Bucy, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (El periodically, El weekly, [l full time) the construction of China Grove CDBG Infrastructure Project, a China Grove project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date. SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection systemextension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. Tom Elmo Buced,r, rOV refer to fee shoule Linn Me know SE PLEL ( rn- 1 t �j P Jul. 23. 2007' 1:02PM HD Supply waterworks i 11 ogip`"' � t i cf T®ft Fflnt Water CURVE NO.: ROJECT NO.: 140 100 ld €0 60 .s q 40 O9O7g9C 09a799 1 i i. 1 i 1.-I I ' --I• r 1 J. - ... ; •;-° t, a 1,'. .4i I ' •, • I�..1 I 5..1.. 1 I ' 1 • '•� E_.L..i - 'j.« - 'I'• i' 1 I _ •S ..1.'+ •r-. • I_ 1- 1 ..-�i .;•.� • _F ' ." I • 1 1 • 1—:•••F. ••• •r-..�_ j...•- 1. ••1 }- I'•r 1 _ 1 4 s S• . _7-.- tL! --i.. S • . _ . I. # L_� _L� 1, r ^� - r _11 • • I•1 �• : _ ..1.+ 1. �. I., ;". .9 '+ I.,: -I. . -i...— 1_ 3'7 -y ,. .j 1... #_. ,..1_.1. .1�.•_.,.. i.. • }.• r '. i••I _.�" '�[.. !" •• y '1' -'•�S•' ^F k• rr•1• ' .v «i 1 I ! ! i .3 .3.., ..'i•'..L.iy : i 1 i 1, , 1 L _ , ,,_,I„_ 4_?, •: .. •r• -•'I-'i I•i'••`",•t,-..1 _1 .•:,•,L•, -;. 1. ^._.�.• _ '!— - -_i_ •i -..;_ i.. I_.t •(-, 'I'. I_., I . .l•�j. •1 ! - i-- ... : .j •i-•f� I ; '^,' -i-o-• I, r� —i.—:...L• • _I I'•r i" _ •I—F_ .. _ — _,.-»• .•- _{_•..1. _l.•. ! !II:. . _ 1.- _f' 1 i •I - i' • I i' Li 11. 20 1 • 1 .i- . W'-.;.._I,. _I_ _:i-.�•�• -S._ _.v�s.. �._ r '_ " } •� i .i•. } - i .. • . ' •S _ i-. -_I.. " S • '.—y ••''� • ' • . - ; : .. •'r " . � � 500 EN 700 e00 Jna ioQn 1'iQD 100 20Q 350 40p �• it �I i I _r"• '1 Q 70 t. r• I 1. I + 1.. 7• ' �. r.•• .�F..i..•• ;. _ • i r...:' gal. I I .-� . 1 .L . I j _- '}..•._}:.._IT.-;--. - ,1 "1••'-'r'..-1:, .:/•«• }:,� i-1....•_� .• y .. I te- 1:-� -, so--`+-L -.N+ is r --i...,_I_}----H.•—.1 {' _i. —... s', I—r I 5_ i': _%J.:-,may 2. ,÷_—f_f t-4 iii L ▪ 20 � 0 0 'F1 ? F" •�«}•••,• L 1 I `1 •'r�• -�-"'T-F N ,• ye ��,}} _ �•�I •-y' • �S T��'E' I., 'f ' I a [_ •., I.'�`. �.•.•'• w.A.. i ; ..I . . „ .ram I.. - ..1 ! 1_• 1•'�3�y�--T _. _I--"-_i �'• � � � I -41 •E ' f' No.4035 P. 2/2. +'cu I:Y��L'+7�6ir1 �! �LY13��1� 1F3u.. 4A�d4V� IMPELLER lxL4 qP VANES G U A R A I l T E L VALUES 1735 RPM T4CIA 10'76' 2 FLGINV Hit Et .• SNP ..aPUER' DRIVER L'A'TE BY 110 11a — 20 HP •.. 7/23107 N{B L.''RV 5 •iPIMEA p•LTE&vE.-OR101Nc;= OFA&JlAl1ARPUMP. C) THE DICATMpOlhq(3)nLIARAls Ea {I r I :7 Head 100 200 300 400 500 500 7113 $r76 900 1000 1100 .?. I •r i - i•'• `:-� I • • . f.•-j..�, •f i j....'. " • ...,r , 1 ;•• L S I : .1. ; i. +,�,�1/r11 �. • •I I I •I �. ' .. • .. _ _y i' ' i ' I L 1 •I'' 1 dY _ 1 1' • ..I - i- -I ', •T ,:• •1'_: •= I 1 ! I I [ - . • I 1�-T-1 . _r_:1_L-__ 1, _• 1_.I S r_. ISM {••_. - 77 - -I• •1 ; _; 1__ • 1 11 .•I ' i _1ff ,. 1 i 1 • !MI i 1 1 ? i I— r._;. j --r- i _ ' ' _.• • ! r—r •_.•,..]_ • ' , irgriF••• • 1'•• 5 - 0 €00 2.04 300 400 600 500 700 Flow Rote o GPM S00 1 �0 1110 Doc 1 f`t7��r�N ik'G;ti.f��;�C1^=6ti "I' )1%'1 L'r.f?.i K arrerrr el .-f. H/J r (;R() 2008 Hobbs,. Upchurch S Associtn PA 13O()Ba rcrDrive. Ste 1O (;'ltrerlotte, NC" , 8 c =1 Ability to Main -tan r ;.t trr t1 sign for the t't)rlit ra lit\` I)Estixeil0 r tt l: Bh new sewer is 'being const.rrxttc C1 `u. ithin Bastian Road in the the new sewer along line 1 rc t tt1nnholc 14 and 15 has a tota This extended length is rapt tt- ensure that no sewer appurtenance„ 1 fah within .100 feet of existing vei,lter wells.. The Toyer" of China Grove c rrentl)capacity to rod 8-ineh diameter se-'w ,r iin tt t0 500 fcct in length and .let sewer line up to C)tiCt feet. For tl is reason, China Grove 'e ran p.rt. Yic rt tatirrt: rx trlrnena fce to the extended (450 11 1 sc:ctit ra r,tf d ,cner1;u. Lice 1€k.=aa -ince can be cxcee extended sewer er° length cilit be routlrl .t 0f China Grove'; ability iti.»:oratitrcl y- n-ra Kentj r4 1�.a k SN;p�9 JA.�.Gz.PS.. Public t.ltl.lttics l)fle '1 no tbr"f't of China na 1;1 N1COFNR rikM ocunl(mv, ar rJ 205Swink ,S ect.Chin Cirmic :rr1' r70118_ 466 manholes of 425 rr:tcs that this al the intended to document HOBBS,. UPCHURCH & ASSOCIATES, RA. Consulting Engineers 1300Barter Street, Suite 108 Charlotte, North Carolina 28204 Phone: (704) 342-3000 Fax: (704) 342-3077 LETTER OF TRANSMITTAL DATE: A# ATTN: TO: Mooresville Regional Office We are sending you 610 East Center St, Suite 301 Mooresville, NC 28115 The Following Itern(s) : X Drawings Copy of Letter Copies Date 8-Dec-08 I 8-Dec-08 Submittal Bid Package Change Order /2008 CGO6O 1I4115 China Grove CDBG Infrastructure Project Via US Mail X Overnight MaiilI2nd Day Air Hand Delivered Fast Track Engineering Certification Drawings Design Cale These are Trarrsantitted as Checked Below : For Approval For Your Use X As Requested For Your Review Remarks: Pay Request Q Reviewed Reviewed with Convents Resubmit per Comments Information No Comments Description Other Resubmit or Approval Submit for Distribution Return [Corrected Prints �.� ,M1tt r tct‘,lion HOBBS, UPCHURCH & ASSOCIATES, P.A. C ansul Ling Engineers Name File Distri Southern Pines, NC - Raleigh, N.C. - KflJ Devil Hills., N.C. - Charlotte, N.C::', ion Copies I2/I9/2OO$ 501 I'M Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality September 28, 2007 ERIC C DAVIS THE TOWN OF CHINA GROVE 205 SWINK STREET CHINA GROVE, NC 28023 Subject: Acknowledgement of Application No, WQ0031492 CDBG infrastructure Project-LPFM System Wastewater Collection System Extension Rowan County Dear Mr. Davis: 0 The Division of Water Quality (Division) acknowledges receipt of your permit application and supporting materials on September 19, 2007. This application package has been assigned the number listed above and will be reviewed by Adrian Eaton. The reviewer will perform a detailed review and contact you with a request for additional information if necessary, To ensure the maximum efficiency in processing permit applications, the Division requests your assistance in providing a timely and complete response to any additional information requests. Please note at this time, processing permit applications can take as long as 60 - 90 days after receipt of a complete application, To check on the status of an application, please visit http://h2o.enr.state.nc.uslbiros/Reports/reportsPermits,htrnl, The Division has recently reorganized. All sewer related matters are now handled through the Pretreatment, Emergency Response and Collection Systems Unit under the Pont Source Branch EXCEPT FOR FAST -TRACK SEWER EXTENSION PERMITTING WHICH CONTINUES TO BE ADMINISTERED THROUGH. OUR REGIONAL OFFICES. The Unit is located on the 13"^ floor of the Archdale building in downtown Raleigh. If you have any questions, please contact Adrian Eaton at 919-733-5083, extension 580, or via e-mail clt adrian,eaton@ncmail.net. If the reviewer is unavailable, you may leave a message, and they will respond promptly, PLEASE REFER TO THE ABOVE APPLICATION NUMBER WHEN MAKING INQUIRIES ON THIS PROJECT, Sincerely, effrey O. Poupart Supervisor cc: Mooresville Regional Office, Surface Water Protection Section Hobbs„ Upchurch ,& Associates, P.A„ 1300 Baxter St„ Suite 108, Charlotte NC 28204 Permit Application File WQ0031492. One North,Carolina Natllra1/iy Pretreatment, Emergency Response and Collection Systems linit 1617 Mail Service Center, Raleigh, NC 27699-1617 Telephone (919) 733-5083 Fax (919) 733-0059 Internet http://h2o.enr,nc.state.us/ndpu An Equal opportunity Action Employer 50% recycled/10% post -consumer paper