Loading...
HomeMy WebLinkAbout20131223 Ver 1_Site Plan_20131125"• • 1 1 1• , NORTH A " • LINA LAND QUALITY, EROSION CONTROL NOTES REVISION DAOCTOBER, GENERAL: ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND QUALITY SECTION. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL WORK. 1. PRIOR TO BEGINNING WORK ON THE PROJECT THE CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE "EROSION AND SEDIMENT CONTROL APPROVAL" FROM THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND QUALITY, OR THE LOCAL AUTHORIZED PROGRAM. THE APPROVAL NOTICE MUST BE AVAILABLE ON -SITE DURING ALL GRADING AND CONSTRUCTION ACTIV' TES. 2. - INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND QUALITY SECT ON. 3. - NO WORK SHALL BE PERFORMED IN STREAM FROM OCTOBER 15 TO APRIL 15 (TO ACCOMMODATE COE AND DWQ RECOMMENDATIONS CONCERNING WORK IN TROUT WATERS.) 4. - CONTRACTOR IS TO PLACE PERMANENT STAKES MARKING CLEARLY THE 25' BUFFER FOR STREAMS WHERE SHOWN ON THE PLANS AND THE MARKERS ARE TO BE VISIBLE AT ALL TIMES DURING CONSTRUCTION. 5. - OBTAIN CERTIFICATE OF COMPLIANCE THROUGH ON -SITE INSPECTION BY A REPRESENTATIVE OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND QUALITY SECTION. 6. - CONSTRUCTION SHALL BE LIMITED TO 2000' OF CONTIGUOUS ROAD CORRIDOR UNTIL ALL CUTS, FILLS, AND DITCHES ARE STABILIZED FOR THAT 2000' SECTION. UPON STABILIZATION OF THAT SECTION ANOTHER 2000' SECTION CAN BE CONSTRUCTED AND STABILIZED. 7. - ALL STREAM CROSSINGS AND PERENNIAL STREAMS WILL BE ALIGNED WITH THE NATURAL STREAM PATTERNS ABOVE AND BELOW THE PROPOSED ROAD. ARCH CULVERTS WILL BE USED AND FOOTERS WILL BE CONSTRUCTED IN UNDISTURBED BANKS AWAY FROM THE STREAM FLOW. 8. - PROCEED WITH GRADING, CLEARING AND GRUBBING. NOTE: NO OFF SITE DISPOSAL OF MATERIAL IS ALLOWED UNLESS THE DISPOSAL SITE HAS AN APPROVED EROSION CONTROL PLAN. 9. - SEED AND PLACE EROSION CONTROL MATTING ON ALL CUT AND FILL SLOPES THAT ARE NOT ROCK IMMEDIATELY UPON COMPLETION OF SLOPE STABILIZATION. 10. - ALL TEMPORARY STREAM AND CREEK CROSSINGS FOR EQUIPMENT DURING CONSTRUCTION SHALL BE MADE USING TEMPORARY BRIDGES. NO STREAM BANK OR STREAM BED DISTURBANCE SHALL BE ALLOWED FOR EQUIPMENT CROSSINGS. 11. - SEED AND MULCH DENUDED AREA WITHIN 15 DAYS AFTER FINISHED GRADE ARE ESTABLISHED. SEED AND SOIL AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE. STRAW MULCH SHALL BE TACKED WITH TACKING AGENT APPLIED BY HYDROSEEDER. LIME 4,000 LBS FERTILIZER (10- 10 -10) 1,000 LBS KY -31 FESCUE (POA PRATENSIS) 100 LBS STRAW MULCH 60 -80 BALES FOR SUMMER SEEDING ADD TO THE ABOVE: GERMAN MILLET (SETARIA ITALICA) 40 LBS SMALL- STEMMED SUDAN GRASS (SORGHUM BICOLOR) 50 LBS FOR WINTER SEEDING ADD TO THE ABOVE: RYE GRAIN (SECASE CEREALE) 120 LBS IF HYDROSEEDING, WOOD CELLULOSE MAY BE USED IN ADDITION TO STRAW MULCH AT THE RATE OF 1,000 LBS PER ACRE. ALL SEEDING SHALL BE MAINTAINED, WATERED ETC.., UNTIL A PERMANENT VEGETATIVE GROUND COVER IS ESTABLISHED OVER ALL DISTURBED AREAS. FOR ALL SLOPES 2.1 OR STEEPER ADD TO THE ABQVE, PURE LIVE SEED SWITCHGRASS 4 LBS SERICEA LESPEDEZA 2 LBS BROWNTOP MILLET OR PEARL MILLET (PENNISETUM GLAUCUM) a LBS GRAIN SORGHUM (SORGHUM BICOLOR (L.) MOENCH SSP. BICOLOR) 2 LBS ALL SLOPES 2.1 OR STEEPER SHALL BE COVERED BY EROSION CONTROL ?MATTING. NATIVE SEEDING: THE CORRECT SEEDBED pH IS 5.5 TO 6.5. APPLY ZERO NITROGEN AT PLANTING. INCORPORATE SOIL AMENDMENTS INTO TOPSOIL /ROOT ZONE KOBE SEEDING.. FIRM SEEDBED BEFORE SEEDING (TRAVEL WITH DOZER CLEATS). SEEDING DEPTH FOR ALL NATIVE SSP. EXCEPT E.GAMAGRASS (TRIPSACUM DACTYBIDES) NEED TO BE 1/4- - 1/2-. GREATER DEPTHS CAUSE HIGH SEED MORTALITY. SPECIALIZED SEEDING IMPLEMENTS ARE REQUIRED. SEED MIXES AND RATES TO MATCH SEEDER USED. A NO -TILL, DROP SEEDER OR BROADCASTER WITH PRECISION METERING TO CONTROL SMALL SEED FLOW AND PICKER WHEEL AGITATORS TO HANDLE FLUFFY SEED ARE BEST SUITED FOR NATIVE SEED. NATIVE PLANT SEEDING MIX FOR STREAM OR RIVERBANK STABILIZATION SEEDING FOR STREAM OR RIVERBANK STABILIZATION SHALL BE A MIXTURE OF NATIVE GRASSES, PLANTS AND TREES. NATIVE PLANT MIX SHALL INCLUDE THE FOLLOWING: GRASSES - BIG BLUESTEM (ANDROPOGAN GERARDII), INDIAN GRASS (SQRGASTRUM NUTANS), LITTLE BLUESTEM (SCHIZACHYRIUM H AUGUST THRU LL MAY - GREENRYE (SECALE CEREA) S (PANICUM VIRGATUM }. 25 LBS /ACRE EACH MAY 1 THRU AUGUST - MILLET (PENNISETUM GLLAUCUM) 25 LBS /ACRE EACH TREES - SILKY DOGWOOD (CORNUS AMONUM), SILKY WILLOW (SALIX SERICEA), HAZEL ALDER (ALMUS SERRULATA) AND ELDERBERRY (SAMBUEUS CANADENSIS) NATIVE PLANT MIX VARIATIONS SHALL BE APPROVED BY ENGINEER. NOTE: NO FERTILIZER SHALL BE USED WITHIN 10' OF TOP OF STREAM OR RIVER BANK. NPDES PERMITS - NOTE -FOR PROJECTS REQUIRING NPDES PERMITS, THE FOLLOWING STABILIZATION SCHEDULE SHALL APPLY: SITE AREA STABILIZATION STABILIZATION DESCRIPTION TTMEFRAME TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES 7 DAYS NONE DITCHES AND SLOPES RBF REBAR FOUND HIGH QUALITY WATER 7 DAYS NONE (HOW) ZONES OCPHUS 5 > w III z SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE CONTROL POINT NAIL SET / FOUND 29 p w Q NOT STEEPER THAN' 2:1, 14 DAYS ARE ALLOWED CP /NL GPS CONTROL POINT /NAIL SET GPS 7 -DAYS FOR SLOPES GREATER SLOPES 3:1 OR FLATTER 14 DAYS THAN 50 FEET IN LENGTH ALL OTHER AREAS WITH 14 DAYS NONE (EXCEPT FOR PERIMETERS SLOPES FLATTER THAN 4:1 AND HOW ZONES) 12. - MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 13. - REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. 14. - REQUEST FINAL APPROVAL BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND QUALITY SECTION. NOTES GENERAL SEWER REVISION DATE - NOVEMBER 19, 2010 1. ALL CONSTRUCTION OUTSIDE RIGHTS -OF -WAY SHALL TAKE PLACE '',MTHIN THE PERMANENT AND TEMPORARY ACCESS EASEMENTS SHOWN. 2. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN THE ORIGINAL SITE, OR AS NOTED. 3. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE OIN'LY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. AT LEAST THREE DAYS PRIOR TO CONSTRUCTION, CONTRACTOR MUST NOTIFY EXISTING UTILITY OWNERS. CALL 811 BEFORE YOU DIG. 4. ALL WORK NEAR AND AROUND WATERWAYS MUST CONFORM TO TI7E RULES OF THE STATE OF NORTH CAROLINA. 5. CONTRACTOR MUST PROVIDE EROSION CONTROL DEVICES TO CONTF'0L RUNOFF FROM THE CONSTRUCTION SITE. CONTRACTOR WILL BE RESPONSIBLE FOR ANY FINES THAT MAY BE LEVIED DUE TO POLLUTION CREATED DURING CONSTRUCTION. 6. CONTRACTOR SHALL FOLLOW ALL FEDERAL, STATE AND LOCAL HEALTH AND SAFETY REGULATIONS PERTAINING TO CONSTRUCTION OPERATIONS. 7. SEWER FORCE MAINS AND WATER LINES SHALL HAVE 3' -0" MINIMLM COVER UNLESS OTHERWISE SHOWN ON THE DRAWINGS. 8. WATER AND SEWER LINES SHALL HAVE A MINIMUM 10' HORIZONTAL, SEPARATION OR A MINIMUM 18" VERTICAL SEPARATION WITH THE WATER OVER SEWER, OR BOTH WATER AND SEWER LINES SHALL BE DUCTILE IRON PIPE 10' EITHER SIDE OF THE CROSSING. 9. SEWER AND STORM SEWER LINES SHALL HAVE A MINIMUM 24" VEF' -.nCAL SEPARATION UNLESS OTHERWISE NOTED. 10. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION. 11. UNLESS OTHERWISE NOTED, ALL BURIED PIPE SHALL BE INSTALLED WITH PUSH -ON JOINTS AND EXPOSED PIPING SHALL BE FLANGED JOINT. 12. LEGAL DESCRIPTIONS FOR PROPOSED EASEMENTS BY OTHERS. 13. SITE TOPOGRAPHIC AND BOUNDARY SURVEY PROVIDED BY SURVEYOR NOTED ON PLANS. 14. CONTRACTOR SHALL NOTIFY THE PROPER LOCAL AUTHORITIES 24 r�'OURS PRIOR TO ANY ROAD BEING CLOSED FOR CONSTRUCTION, INCLUDING BUT NOT LIMITED TO LOCAL NEWSPAPER, RADIO STATION, FIRE DEPARTMENT, COUNTY SHERIFF'S DEPARTMENT, AMBULANCE, AND COUNTY EMERG31 NCY AGENCY. ALL TRAFFIC CONTROL SHALL CONFORM TO THE REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 15. CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER EXISTING BURIED ' UTILITIES HAVE BEEN LOCATED AND 24 HOURS PRIOR TO CONSTRUCTION. 16. LOCATIONS SHOWN FOR SANITARY SEWER SERVICES ARE ASSUMED,. COORDINATE LOCA11ONS OF ALL PROPOSED SEWER SERVICE CONNECTIONS WITH PROPERTY OWNER PRIOR TO CONSTRUCTION. 17. CONTRACTOR SHALL FIELD VERIFY ALL PROPOSED MANHOLE TOP Ei EVATIONS AND EXISTING MANHOLE INVERTS PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES. CONTRACTOR SHALL ADJUST ALL PROPOSED SEWER STRUCTURES TO MATCH FINISHED PAVEMENT ELEVATIONS. COSTS OF RAISING STRUCTURES SHALL BE CONSIDERED INCIDENTAL TO OTHER WORK ON THE PROJECT. 18. MANHOLES AND CASTINGS SHALL MEET THE REQUIREMENTS OF OWNER AS WELL AS THE PROJECT SPECIFICATIONS. 19. 4" SANITARY SEWER SERVICE LINES SHALL BE INSTALLED AT 2.= MINIMUM SLOPE AND SHALL BE DUCTILE IRON IN PAVED AREAS. 20. ALL FENCE DAMAGED DURING CONSTRUCTION SHALL BE REPLACED' WITH LIKE MATERIALS IN A WORKMANLIKE MANNER AND IN ACCORDANCE WITH STANDARD FENCE CONSTRUCTION PRACTICES AT THE CONTRACTOR'S EXPENSE. 21. CONTRACTOR SHALL FIELD LOCATE ALL BURIED TELEPHONE LINE IN CONFLICT WITH THE PROPOSED UTILITY LINE. WHERE NECESSARY, EXISTING BURIED TELEPHONE LINE SHALL BE TEMPORARILY MOVED DURING CONSTRUCTION OF THE PROPOSED UTILITY LINE AND RE -LAID AT NO ADDITIONAL COST TO THE OWNER. 22. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING ROADS DURING CONSTRUCTION AND SHALL REPAIR ROADS PER REQUIREMENTS OF THE NORTH CAROLINA DEPAcRTMENT OF TRANSPORTATION. NO OPEN CUTS OF EXISTING ROADS SHALL BE ALLOWED EXCEPT WHERE INDICATED ON THE DRAWINGS OR WHERE SPECIFIC PERMISSION IS GRANTED BY THE NORTH CAROLINA DEPARTMENT 07- TRANSPORTATION. SAND OR A SIMILAR MATERIAL APPROVED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION SHALL BE PLACED ON THE ROAD TO AID IN THE CLEAN UP AFTER CONSTRUCTION. A MINIMUM OF 2" OF SAND SHALL BE PLACED ON THE ROAD PRIOR TO STOCKPILING SPOIL MATERIAL ON THE ROAD SURF:ACE TO FACILITATE CLEANUP. SEWER LIMO 120' PERMANENT EASEMENT 10' TEMPORARY EASEMENT ..�-� •� • -? ROCK PIPE r r • • NOTE: UNLESS OTHERWISE NOTED, THE PERMANENT SEWER LINE EASEMENT SHALL BE 10.0' EITHER SIDE OF SEWER LINE FOR A TOTA.,Ll PERMANENT EASEMENT WIDTH OF 20'. AN ADDITIONAL 10' ON ONE SIDE OF THE PERMANENT EASEMENT SHALL BE TEMPORARY CONSTRUCTION EASEMENT UNLESS OTHERWISE NOTED. ° TELEPHONE PEDESTAL TEMPORARY EXC. DROP INLET, PROTECTION ELECTRIC PEDESTAL ° CABLE TV PEDESTAL TEMPORARY SILT FENCE SIGN UNDERGROUND CABLE TV SIGN UNDERGROUND FIBER OPTIC CABLE SIGN UNDERGROUND TELEPHONE CABLE SIGN WATTLE BARRIER (ASPHALT AREAS) UNDERGROUND GAS LINE SIGN UNDERGROUND ELECTRIC LINE SIGN LIGHT POLE UTILITY POLE V GUY WIRE ANCHOR 0 MANHOLE 0 SANITARY SEWER MANHOLE 0 STORM DRAIN MANHOLE 0 COMMUNICATION MANHOLE 0 ELECTRICAL MANHOLE JUNCTION BOX 1' SPIGOT /YARD HYDRANT (D C.o. SEWER CLEAN -OUT O E -SS ELECTRIC SERVICE STUB -OUT O G.ss GAS SERVICE STUB -OUT ® CATCH BASIN CURB INLET O WATER METER JQ FIRE HYDRANT D° WATER VALVE >< BLOW OFF VALV. BLOW OFF VALVE b GAS METER b GAS VALVE D4 IRRIGATION CONTROL VALVE POST INDICATOR VALVE ® ELECTRIC JUNCTION BOX OR OUTLET FINAL NOT RELEASED CONSTRUCTION A CALCULATED POINT 0 1/2" REBAR SET WITH CAP ® CONCRETE MONUMENT ® RIGHT -OF -WAY MONUMENT ODOT MON D.O.T. CONTROL POINT RBF REBAR FOUND o PK NL PK NAIL FOUND / SET nj 0 SPINDLE FOUND / SET OCPHUS 5 > w III z <C 4 HUB & TACK SET Z 0 Q CONTROL POINT NAIL SET / FOUND 29 p w Q C9 v? w O CP /NL GPS CONTROL POINT /NAIL SET GPS OCP /TEMP CONTROL POINT TEMPORARY MARK STAKE FOUND (7 INTERSTATE HIGHWAY 66 ' U.S. HIGHWAY +ELEVATION FINISHED FLOOR ELEVATION ®MW MONITORING WELL ® PIEZOMETER ® LANDFILL GAS MONITORING PROBE 0 SURFACE WATER SAMPLING LOCATION ® LANDFILL GAS VENT 0 LANDFILL GAS COLLECTION WELLHEAD ® POTABLE WATER WELL MAILBOX OR PAPER BOX npB POSTAL DROP BOX 1 SAT DISH SATELLITE DISH ®YARD ORNAMENT STATUE, BIRD BATHS, ETC. TREES vi SHURBS / BUSHES _ -- ---- --- -- --= CU'LVERT FENCE CI C- SILT FENCE GUARD RAIL - - - - -s- - - - -s-- APPROXIMATE LOCATION OF EXISTING SEWER LINES APPROXIMATE LOCATION OF EXISTING WATER LINES - - - - - c- - - - - c- APPROXIMATE LOCATION OF EXSTING GAS LINES i i i i i E i t i I I I i i i TOP & TOE LINES --- D�----- OL--- - -DL -- DITCH LINES - -- - - - CTV- - - - - CTV- APPROXIMATE LOCATION OF UN "DERGROUND CABLE TV LINE ATV__ APPROXIMATE LOCATION OF OVERHEAD CABLE TV LINE - - - - - FOC - --•- - - - FOC - APPROXIMATE LOCATION OF UNDERGROUND FIBER OPTIC CABLE LINE - - - ^ E- ®- - - E- APPROXIMATE LOCATION OF UNDERGROUND ELECTRIC LINE - E- E APPROXIMATE LOCATION OF OVERHEAD ELECTRIC LINE - - - - - T- - - - - T-- APPROXIMATE LOCATION OF UNDERGROUND TELEPHONE LINES T T APPROXIMATE LOCATION OF OVERHEAD TELEPHONE LINES - - - -- ROW - - -- -ROW- RIGHT -OF -WAY TREELINE '3 O O O C) O C) C) C) SHRUBLINE - - - PROPERTY LINE NOT SURVEYED ROCKLINE -.. - - - STREAM LINE CEIITERLINE ROADS CENTERLINE OTHER THAN ROADS SWAMPLINE /WETLANDS IPS IRON PIN SET RBF REBAR FOUND OTIPF OPEN TOP IRON PIN FOUND CTIPF CR UPED TOP IRON PIN FOUND CMU CONCRETE MASONRY UNIT R/W RICIHT OF WAY CL CENTERLINE C CURVE (SEE CURVE TABLE) POB POINT OF BEGINNING CP CALCULATED POINT PB PLAT BOOK DB DEED BOOK L LINE (SEE LINE TABLE) BLDG BUILDING CIP CAST IRON PIPE CMP CORRUGATED METAL PIPE CONC CCdCRETE CMU CONCRETE MASONRY UNIT CPP CORRUGATED PLASTIC PIPE DIP DUCTILE IRON PIPE E &T ELECTRIC & TELEPHONE FOC FIBER OPTIC CABLE GIP GALVANIZED IRON PIPE 0/H OVERHEAD RCP RENFORCED CONCRETE PIPE U/G UNDERGROUND SURVEY INFORMATION PROVIDED BY: VCP VITRIFIED CLAY PIPE I It" m PVC POLYVINYL CHLORIDE PIPE FFE FINISHED FLOOR ELEVATION PG PAGE REF REFERENCE .A S S 0 C✓ I .A `I' E S DOT DEPARTMENT OF TRANSPORTATION 55 BROAD STREET ASHEVILLE, NC 28806 PM(828 ) 252 -0575 NGS NATIONAL GEODETIC SYRVEY NC BOARD OF EXAMINERS CORPORATE LICENSE NO. C -0459 NCSP NORTH CAROLINA STATE PLANE NO. I DATE I BY REVISION DESCRIPTION . �Acopj%, IItIII$fill�"A / !",OOO ° r-j o{l- uW 47 M e° I � °�O � N► °OC � 1 SHEET 11 I M g c ~ w w ' 0 nj 0 CO z m 5 > w III z <C 4 Z 0 Q tii 29 p w Q C9 v? w O Z o �04 m •0 Z vi w vi 0 z J z W SHEET 11 I 0) J J W O n a rn WE 815 OR ff$Eo WR 0 MR o 775 y.. MARION ST. CL 24" CMP 4.17 LF 20" _ • • WATER u i Moo LF ! ! � c' ! 12 +00 i PL 1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCA11ONS ARE TO BE VERIFIED IN THE PR 1, 50 0 2 50 100 150 FIELD BY THE CONTRACTOR. FILL EXISTING 8" PIP 18" PIPE & 2. CONTRACTOR SHALL REMOVE AND REPLACE ROADWAY SIGNS AND MAILBOXES AS NECESSARY TO INSTALL PROPOSED ENCASEMIE T UNDER B (.,`DING AND AD UTILITY LINE. CONTRACTOR SHALL COORDINATE SIGN REMOVAL AND REPLACEMENT WITH THE ROADWAY AUTHORITY. WITH 500 P FLOWABLE FILL. PL GRAPHIC SCALE 1 INCH - SQ FEET 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIWI TY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. EXISTING MANHOLE LINES WI 300 PSI 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL. CONCRETE AND A NDON IN PL CE. / 5. CONTRACTOR SHAH CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO / CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL PROPOSED UTILITY LINE, & RE- INSTALL EXISTING UTILITY CABLES. 6. FLOODPLAIN INFORMATION FROM NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM PROPOSED MANHOLE W/ WATERTIGHT LID 7. ALL SEWER SERVICES SHALL BE FIELD LOCATED BY THE CONTRACTOR AND CONNECTED TO THE NEW SEWER LINE WITH SEWER TAPS PER DETAILS. CLEANOUTS SHALL BE PLACED AT EDGE OF EASEMENT. COORDINATE WITH CITY OF SHELBY STA. 13+14.17 LINE 1 FOR LOCATION OF EXISTING SERVICES. No 571074.71 8. STA 13 +10 TO STA 13 +58 PIPING SHALL BE BEDDED IN 4" MINIMUM WASHED STONE, BACKFILL AND TRENCH WIDTH PER STANDARD DETAIL. F 1744475. RA EXISTING IGROUND _ BORED AND A # !- ai • • ff n NNELED • • • r- Psi II z^ MARION ST. CL 24" CMP 4.17 LF 20" _ • • WATER u i Moo LF ! ! � c' ! 12 +00 i PL 1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCA11ONS ARE TO BE VERIFIED IN THE PR 1, 50 0 2 50 100 150 FIELD BY THE CONTRACTOR. FILL EXISTING 8" PIP 18" PIPE & 2. CONTRACTOR SHALL REMOVE AND REPLACE ROADWAY SIGNS AND MAILBOXES AS NECESSARY TO INSTALL PROPOSED ENCASEMIE T UNDER B (.,`DING AND AD UTILITY LINE. CONTRACTOR SHALL COORDINATE SIGN REMOVAL AND REPLACEMENT WITH THE ROADWAY AUTHORITY. WITH 500 P FLOWABLE FILL. PL GRAPHIC SCALE 1 INCH - SQ FEET 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIWI TY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. EXISTING MANHOLE LINES WI 300 PSI 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL. CONCRETE AND A NDON IN PL CE. / 5. CONTRACTOR SHAH CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO / CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL PROPOSED UTILITY LINE, & RE- INSTALL EXISTING UTILITY CABLES. 6. FLOODPLAIN INFORMATION FROM NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM PROPOSED MANHOLE W/ WATERTIGHT LID 7. ALL SEWER SERVICES SHALL BE FIELD LOCATED BY THE CONTRACTOR AND CONNECTED TO THE NEW SEWER LINE WITH SEWER TAPS PER DETAILS. CLEANOUTS SHALL BE PLACED AT EDGE OF EASEMENT. COORDINATE WITH CITY OF SHELBY STA. 13+14.17 LINE 1 FOR LOCATION OF EXISTING SERVICES. No 571074.71 8. STA 13 +10 TO STA 13 +58 PIPING SHALL BE BEDDED IN 4" MINIMUM WASHED STONE, BACKFILL AND TRENCH WIDTH PER STANDARD DETAIL. F 1744475. RA EXISTING IGROUND PROFILE SCALE: HORIZ. 1 "= 50' VERT. 1"= 5' 13431mmlilkl 0 WALL _ BORED AND A # !- • f n NNELED 8 LJ • r- Psi II z^ 00 N i • • r� PROFILE SCALE: HORIZ. 1 "= 50' VERT. 1"= 5' 13431mmlilkl 0 WALL U° • f C a .L NNELED 8 LJ LL r- Psi II z^ 00 N mpw `- z ® a T^ A-+ 00 N L4 ® w J Z_ Z.% = Z W 8® . • t S --I p Q" 11 I\ Z Z C7 _ �_ N ul ,,,,J,r11r►►,,, I- oo 0000000- 0 ZZ e° M °e u i _Uouwo°o�V"� °s� °1i1 (n M W5 to w V) o Ld . .� U Wo w + cn cfl a �o o . -.-�,Z © or T® ® Z � Z ` CL V) •�! Z Z 6- V) (n 14 +00 15 +00 16 +00 17=4 24" MP !1 wm,qp 18 +00 m m OR :' EON Fm bw REVISION DESCRIPTION W� U° • f C a .L z W z LL r- wm,qp 18 +00 m m OR :' EON Fm bw REVISION DESCRIPTION W� U° W 'z' W C a .L z W z LL r- Psi a N z^ 00 N mpw 0o z Q a T^ A-+ 00 N �z za Z.% Ul W� Z L)! Z �= Z Z C7 W� Z O C9 ,,,,J,r11r►►,,, I- oo 0000000- 0 ZZ e° M °e u i _Uouwo°o�V"� °s� °1i1 (n M W5 to 4e° oo N o U Wo 0 0 C a .L LL ca O N I� w W Q to > W > � > W � Ul (J) �'o Z Z L)! Z �= t1 p Z C7 a Z O C9 m I- to 0 0 Z W5 to 0 0 o U Wo 0 -1 T® 0 LL wwo I� , C,. ui -r i Q J J W O n M 0 N N O 'S Z w a 0 0 cc m cV Ei PROFILE SCALE: HORIZ. 1 "= 50' 820 VERT. 1"= 5' NOTE: CONNECT EXISTING PROPOSE 8" SEWER LINES WI TH DROP CREEK CROSSING PER MEDIUM 815 CONNECTIONS PER DETAILS CREEK CROSSING DETAIL EgR WE m M-0 o !' WN ' -82.91 LF 20" DIP CAD 0.30% 134.31 LF 20" DIP 0 0.31 7o 790 _ 47.96 LF 20" DIP w 0.23% 790 9 r � J ®_ Z -, J ° W N _ Q Cpl- �- 148.28 LF 20" DIP 0 0.11% d•or-: 0) W ®NW..ZO } "' W NWZO W • > �� R Lu 785 C9 y W W W `� Z m � (=n Ix <,tz p z 6j z U p 0 (j) Zo (J m t- (/) a (n z W5 cn n 0 q0O E o I.c.l 3 f U' �- N d- 780 K? J _ r` _ ® J �- c (V = W OD L0 J to I� 'A LC dam' 0) ®� � j 00ui� 6� co co ��h `Q X ONO � � 00 0) � � � � � 00 �^ ?75 Oi ®� ��-J..� Uj n O JZ..� N ®�NZ � a No J Z Z W_WZ® W® W0 _ > W > ® Z Z Q F_ 0 O. o - � - > LQ Z Z Z � o ®� F- _ CL I- 19 +00 20 +00 21 +00 22 +00 23 +00 24+00 9 r � J ®_ Z -, J ° W N _ Q Cpl- J� uf o d•or-: 0) W ®NW..ZO } "' W NWZO W • > �� 25 +00 26 +00 mm 27 +00 27 +50 GRAPHIC SCALE ON u U 100 150 z z Z. a 1 INCH= 50 FEET REVISION DESCRIPTION O ui _M ° N c7 � ! W Z 27 +00 27 +50 GRAPHIC SCALE ON u U 100 150 z z Z. a 1 INCH= 50 FEET REVISION DESCRIPTION l*mlo 2 O ui _M ° N c7 � W Z Lu C9 y W W W `� Z m � (=n Ix <,tz p z 6j z U p 0 (j) Zo (J m t- (/) a (n z W5 cn n 0 q0O E o 3 f U' l*mlo 2 LL Z l*mlo 2 7 7 7 19 77 7p 71 77Z__�1111KX 77 7T , M P57 k/7 " i TZ 77- -3. 1 CN ui 0 o. rn 0 O z w 0 cs SEWER LINE 2 825 1 m 815 • 805 gKol 795 U.ltl M-1-i Will 9+00 EXISTING I GROUND 11 a. 9, 16 LF 8- DIP 06.86 �m 820 f-w MKI 805 Me I 795 V1,•1• PROFILE SCALE: HORIZ. 1 "= 50' VERT. 1"= 5' 11 04 0 CIO ui ui a _j o _j UJ uJ z _j uJ (o _j Flj _J 785 06 J co w LL w W N 0 10.34 0 Lo 0 04 0 rZ, r1i 00 0 < 0 C-4 :2 ON oi r*_ 0060 (5 C F= IBM U) lS,3EWErm­` La + > C.N LLJ i .. • :3 (11) W Lij -i 0 C'4 ELI o 0 ;<;t LLIZO w a- < 0 V) V) �_ Z_ >; 0 z Q cr _ < a- 0>> �-Zz 10+00 11+010 �m 820 f-w MKI 805 Me I 795 V1,•1• PROFILE SCALE: HORIZ. 1 "= 50' VERT. 1"= 5' 790 VT.M NCONCREJE ENCASEV PER DET�11_ :o is EM 60 0 CIO ui 785 06 J ou w LL w W N 0 10.34 LF 8" 61P @ 0.91�. IBM U) lS,3EWErm­` LINE 3`1 w CL LL 780 z C cl U) z z w 0 now== 4< z 810 Of uJ Z 810 LL < W U) FM w 805 805 A Alk w Ar 'RM ff a c) 100---YEAR FLOOD ELEY. EX SUNG GROUND 800 800 .0 PROPO SFD CREEK BOSSING PER MEDIUM R co m ^mr-r-11 p^e%e%mi^ %r-r A I I ce) W w 0 'o I 795 795 (D e-% W W 6i 0:55 ww D W �.: W W m < "T z 5 I > 6 z ca z .-: < C") z w (9 0 2 0 z (D z C� > 12" co 0 0) w 9 U) 0 Q w¢ w 0 _JN w <> T A 790 VT.M NCONCREJE ENCASEV PER DET�11_ :o is EM 60 0 CIO ui 785 06 J w LL w W N 0 10.34 LF 8" 61P @ 0.91�. IBM U) w CL LL 780 z cl U) z z w 0 now== 775 Of uJ Z W U) NOTE: DIVERT FLOW INTO EASTERN AERIAL SEWER LINE, REMOVE WESTERN AERIAL SEWER LINE AND PIERS FOR INSTALLATION OF NEW AERIAL CROSSING PROPOSED CONCRETE PIERS PER DETAIL --� PROPOSED NEW MANHOLE STA. 19 +88.42 N: 567464.70 E: 1244500.25 �— SANITARY SEWER MANHOLE TOP EL: 768.45' SURCHARGED 12" DIP IN I.E. :761.64' 12" DIP OUT LE.:761.57' SANITARY SEWER MANHOLE TOP EL: 766.65' 12" DIP IN I E.: 76163' ,ry .7L VWL l% vi 1L.L.IYVL. vrU6." uL. L. I I nvf". A IAL LE. 762.53' 12" DIP OUT LE.:7Si.6f' SANITARY SEWER MANHOLE -o TOP EL: 766.22' —� 8" PVC IN I.E. :763.19 OSED REPLACE -, 12` DIP IN l.E.:76L2i' r� NOTE LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE u 2. FIELD BY THE CONTRACTOR. CONTRACTOR SHALL REMOVE AND REPLACE ROADWAY SIGNS AND MAILBOXES AS NECESSARY TO INSTALL PROPOSED W 4# w ® r UTILITY LINE. CONTRACTOR SHALL COORDINATE SIGN REMOVAL AND REPLACEMENT WITH THE NCDOT. PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. Z 3. CONTRACTOR SHALL COORDINATE WORK IN THE _ a1 ou 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING a-- (o z w = � 04 Q� �0) In EXCAVATED MATERIAL A2.; A/x°01 740 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO ono oo ` 00 CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR w LLJ Op Z SHALL STRIP OUT EXISTING CABLES, INSTALL PROPOSED UTILITY LINE, do RE-- INSTALL EXISTING UTILITY CABLES. 6. FLOODPLAIN INFORMATION FROM NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM CL v) 7. ALL SEWER SERVICES SHALL BE FIELD LOCATED BY THE CONTRACTOR AND CONNECTED TO THE NEW SEWER LINE WITH xg Z 19 +00 20 +00 SEWER TAPS PER DETAILS. CLEANOUTS SHALL BE PLACED AT EDGE OF EASEMENT. COORDINATE WITH CITY OF SHELBY jam{ Z Q a a FOR LOCATION OF EXISTING SERVICES. 00i 00 0r4 N 00 ,ry .7L VWL l% vi 1L.L.IYVL. vrU6." uL. L. I I nvf". A IAL LE. 762.53' 12" DIP OUT LE.:7Si.6f' SANITARY SEWER MANHOLE -o TOP EL: 766.22' —� 8" PVC IN I.E. :763.19 OSED REPLACE -, 12` DIP IN l.E.:76L2i' J J 780 775 770 765 GIDNEY STREET ■ • i c� i , . 760 755 EXISTING 118" DIP 750 745 r� O� 00 j \./ u z a W Q W w ® r JO o ■ • •� .,� gym) _ a1 ou IX < W a-- (o w = � 04 Q� �0) In • a A2.; A/x°01 740 * O U) =�0.�_ w°w� ?g3= ono oo ` 00 ZN w LLJ Op Z J J 780 775 770 765 GIDNEY STREET ■ • i c� i , . 760 755 EXISTING 118" DIP 750 745 EXISTING I GROUND ul 14 +00 Q s • JO w ® r JO . v- ■ • •� .,� gym) _ a1 ou IX < F-00 a-- (o w = � 04 Q� �0) In • a a 740 * O U) • a pe- 00 ZN w LLJ Op Z W ( O N W z J.O � CL v) Z Z O xg Z 19 +00 20 +00 ®LL Zj a a � 00i 00 cr_x x IZ W I-- o to !-- �xlQ_0�> 0- uj to F- Z Z 9 +50 10 +00 11 +00 12 +00 15 +00 EXISTING I GROUND ul 14 +00 LF •a. ur - Ch iwR :ate— —I,as - i Q s • • w ® r ' ■ • •� .,� gym) a1 ou • .. • 00 a-- (o Q t to • a a a • a pe- Zp ZN w t/� CL v) Z Z xg Z 19 +00 20 +00 21+00 a a ► � a a � 00i 00 LF •a. ur - Ch iwR :ate— —I,as - i Q s • • w ® r 00 a-- (o Q t to • a a a • a pe- Zp ZN w LF •a. ur - Ch iwR :ate— —I,as - i y X 755 Q s • • w ® r 00 a-- (o Q t to • a L� O+ w pe- Zp ZN w t/� CL v) Z Z xg Z 19 +00 20 +00 21+00 y X 755 s • • • a 23+00 ti mow°' UU Lu O J = ♦ !'r'1 raj Z � a 750 �w c7 H N Imo^( }^{ N u z 00_ N 00 4 x � a 770 00 00 N Z M z;, W .t ---- J J �To W -" Q W Zp ruj(o iWl W C/9Z O EKI � rT�ry W in Cp e °ppOOOOOOepOOe 0) to �Uow. waaoEl= ow (n Pry ` ° o1Y 0 V ,s oo ZZ uu 790 785 hia 775 C3 24 +00 25 +00 26 +00 EXISTING I GROUND 24 "CPP 23.14 LF 20" DIP ®021 % COVER • r R ' TO )' 24" CPP Lu O J = ♦ LL LLi _ 0 Lo 750 Z ♦� l < ® ., r. • "r • ': Q 770 CL ---- J J Z � ®; r Zp ruj(o �R DETAIL EKI Cp O 0) to uu w O c® ®N Z� M ♦ Z ZO 745 765 20" DIP 0 0.3 of `LI .. MF- N z AO J .. . . ZO avi ZZ CL zZZ O n F= CL(/) P 0 N N 27 +00 28 +00 29 +00 30 +00 31+00 �K) W Z p L`� IZi < (L O f� X�- C W O ui F- Z Z ir z XE" O Z W v) F_ 760 32 +00 33 +00 34 +00 35 +00 36 +00 37 +00 38 +00 38 +50 0 U) Q m 755 c� 0 N 750 o o 00 � ID =N Z (o 745 cp C-4) gyp. m � ZN --+I� W o cV —p O Q a. iiv~i ®zz C3 24 +00 25 +00 26 +00 EXISTING I GROUND 24 "CPP 23.14 LF 20" DIP ®021 % COVER • r R ' TO )' 24" CPP 90.33 LF 0" DIP o 0.56% Lu O J = ♦ LL LLi _ 0 Lo 750 Z ♦� l < ® ., r. • "r • ': Q (o CL r • Z � ®; r Zp ruj(o �R DETAIL Cp O 0) to uu c® ®N Z� ON I j ♦ Z ZO 745 Ov) WZO of `LI .. MF- RKK z AO J .. . . ZO avi ZZ CL zZZ O n F= CL(/) 27 +00 28 +00 29 +00 30 +00 31+00 90.33 LF 0" DIP o 0.56% m E W-1 Wro. W, 11 i III 50.23 LF 20" DIP CAD 0.15% 765 63.30 LF 20 DP ® 0.2076 PROPOSED 760 CONCRETE ENCASEMENT --J —7 PER DETAIL v now* W LL 0 Lo 750 l < ® ., r. • "r • ': x co to °6 r • COVER •' ' �R DETAIL < 0) uu c® m E W-1 Wro. W, 11 i III 50.23 LF 20" DIP CAD 0.15% 765 63.30 LF 20 DP ® 0.2076 PROPOSED 760 CONCRETE ENCASEMENT --J —7 PER DETAIL v W LL 0 Lo 750 < ® ., x co to °6 < 0) uu c® . ® p 745 (n O.d Zv) `LI .. 41 z AO J .. . . ZO O n F= �tiZ® �K) W Z p L`� IZi < (L f� X�- C W O ui F- Z Z XE" O Z W v) F_ ZZ 32 +00 33 +00 34 +00 35 +00 36 +00 37 +00 38 +00 38 +50 W LL 0 ;. ., 1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE CONSTRUCTION SEQUENCE NOTES: FIELD BY THE CONTRACTOR. ® / 2. CONTRACTOR SHALL REMOVE AND REPLACE ROADWAY SIGNS AND MAILBOXES AS NECESSARY TO INSTALL PROPOSED ®;' , 1. THE EASTERN EXISTING SEWER LINE SHALL REMAIN IN SERVICE UNTIL THE NEW 20" INATE 3. CONTRACTOR SHALL ACOORDINATE WORK DIN THE PIROXIMITYVOF UTIAL POLESMWITH APPROPRIATE U TILITY COMPANIES. SEWER LINE UP TO STATION 43 +20t HAS BEEN INSTALLED, TESTED AND ACCEPTED ° 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR, CONCRETE SURFACES PRIOR TO PLACING BY THE ENGINEER AND THE CITY OF SHELBY EXCAVATED MATERIAL. 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISI1NG LINES PRIOR TO CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL PROPOSED UTILITY LINE, & RE- INSTALL EXISTING UTILITY CABLES. 6. FLOODPLAIN INFORMATION FROM NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM 7. ALL SEWER SERVICES SHALL BE FIELD LOCATED BY THE CONTRACTOR AND CONNECTED TO THE NEW SEWER LINE WITH SEWER TAPS PER DETAILS. CLEANOUTS SHALL BE PLACED AT EDGE OF EASEMENT. COORDINATE WITH CITY OF SHELBY FOR LOCATION OF EXISTING SERVICES. w 0 a u> M N M O N N O r rpl-i E 785 780 775 U49 Ij7.11 755 K&TC 38 +50 39 +00 2. AFTER THE NEW SEWER LINE IS READY TO BE PLACED IN SERVICE, THE I _ CONTRACTOR MAY USE THE NEW SEWER LINE AS A MEANS TO PROVIDE TEMPORARY PIPING OR BYPASS PUMPING FOR THE REMAINDER OF THE WORK. o - 3. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SEWER FLOW AT ALL TIMES. i NO SEWER SPILLAGE WILL BE ALLOWED AT ANY TIME. / \ \ \ t 1 NO. DATE - BY n co to r; �Wi PROFILE SCALE: HORIZ. 1 "= 50' VERT. 1"= 5' EXISTING I GROUND 41+00 •• FUE J r ` w w g J (L >; >' U CJ �r0 +00 PROFILE SCALE: HORIZ. 1 "= 50' VERT. 1"= 5' EXISTING I GROUND 41+00 •• FUE s r ` w • me. J U CJ Wz • • • f "Ak "I'll, I'll I A I " I ! " m= rI &I 63+00 44+00 45+cq V" mag m rif , N I s r ` w °on` J U CJ Wz J - i Jd �- s r 1 1 1 i i■ • V" mag m rif , N I r ` w °on` J U CJ Wz J - i Jd �- s r REVISION DESCRIPTION w cv) c� Lo N F- 0o j j; - W ci m >> 'C-0� Q Z 00 Z Z Z 111 C9 0 (D U) Z o (D m t- cn a to Z w 0 c) O-� U V U. 1 CL >- z U. 1 CL >- z a J W 0 a v v M N N C1 e» ppnpnqpn 750 745 740 735 730 725 720 715 am 705 9 +50 A _ 79, Lr L I v ..f A PI E r rr _ i r in M © O / Z 0 0 C V) (n 0 _j O X W x Z90, C U. O to if 10 +00 OUR 11+00 12 +00 .75 LF if i!'It A 14 +00 AM r' IM i 1. SCALE: PROFILE 0 r • i • M i .. •'l co co N w • a p N fn >- c cl > Lu w td. Z i 735 ff uj a t-- cn D 0 0) 0 ® �o 0 ZMo Z wa 0�O U 730 1 J Q r: LLLL F--- � r 725 r LL 11+00 12 +00 .75 LF if i!'It A 14 +00 AM r' IM i 1. SCALE: PROFILE 0 r • i • M i .. •'l I= M r `: of !t EXISTING 20 +00 � 70,63PRIKIMS 750 M, 740 co co N w • a p N fn >- c cl > Lu w td. Z i 735 ff I= M r `: of !t EXISTING 20 +00 � 70,63PRIKIMS 750 M, 740 co co N w v v CM 2 p N fn >- c cl > Lu w td. Z i 735 �¢mz� Z m uj a t-- cn D 0 0) 0 ® �o 0 ZMo Z wa 0�O U 730 J Q LLLL F--- 725 D LL 720 w CL z U5 e C/ 715 710 0) o N nn P4 705 SHEET M�.O N WZO <� CL >: >: 47 V) PZZ 750 0 d i NF + 1-. - MATC x t I ( I I it / Ix o \� ! 3I 1tlil / r f 1 I I ((11 inn) `I 380.20 LF 24" DIP t 1 t t \\ +1 lfll IIj l 1 I \ \il {IIIU I 5 0 25 50 'i GRAPHIC SCALE I INCH = SO FEI Ii t i�tCt{ttt tlli I ` PROPOSED m \t ��tt t PROPOSED SILT FENCE n i�ty�llii� / AFTER SEWER LINE AND GRADING ARE PER DETAILS \ \IIIIiIU► / COMPLETE, CONTRACTOR SHALL CONSTRUCT �� tl Il 10' GRAVEL ACCESS ROAD ON NORTHERN 246.65 LF 24" DIP \ $ II 11111111 x �. \\ I'll Iffi fill }� HALF OF EASEMENT PER DETAILS 1111 SHELBY ADMINISTRATIVE UNIT \ \� II 1111 Ilf(l l zx,.m PARCEL NO.:51566 PROPOSED 111f IIII Iljl l t ' SANITARY SEWER MANHOLE SELECT BACKFILL OVER PIPE TO tt�ttitt t�\ TOP EL 76''12' �\ MAINTAIN MIN. 12" COVER OVER ��� \�1 ` 10 TEMPORARY EASEMENT PROPOSED REPLACE SEWER LINE. GRAD TO DRAIN, SOW GRASS AND MULCH \� \ \ \ \\ c� SANITARY SEWER MANHOLE EXISTING MANHOLE PER DETAILS. \ \ \ \\ i TOP EL- 758.66' � \ \ \ \\ \ 18' DIP IN I.F- :745.62' STA. 48 +64.20 18" DIP OUT LE.:745.42' N :563880.54 E: 1.243690.65 20 ° PERMANENT F I �` -� � PROPOSED EASEMENT t\ \�;r DEMOLISH AND ABANDON MANHOLES PER DETAIL AFTER NEW SEWER LINE t t�\ 1\\\ �\ i -� °F IS COMPLETE AND ACCEPTED BY OWNER AND ENGINEER (TYP) PROPOSED MANHOLEv� \\ �. REMAIN STA. 42 +22.51 EXISTING 24 DIP TO REM i N• 563452 09 ` ` E:1243562.15 \ \ _ _ FOUL POLE 1 \ \ \ 198.72 LF 24" DIP \ s ` \� SANITARY SEWER MANH�LE \ P EL- 751.3'\ CHARGED 205.56 LF 24" DIP PROPOSED MANHOLE / /� rli II ►I I ! I STA. 44 +21.22 --_._. �(� N: 563529.65 S \ -_ , (, � / /�! I /it E: 1243745.10 - - \ NOTE: NEW SEWER LINE DOWNSTREAM OF THIS MANHOLE T8M RRS SHALL BE TESTED BY CONTRACTOR AND ACCEPTED BY TIT , ? r ` EiI THE OWNER AND ENGINEER BEFORE PROCEEDING TO SANITARY SEWER MANHOLE SANITARY SEWER M !H0 PROVIDE TEMPORARY PUMPING OR PIPING OPTIONS TOP DIP IN i.E.' '� TOP EL- IN I.E.' 18° DIP IN i.E.:745.83' 24' DIP IN t.E.:746.4ii' ( 18" DIP OUT 1,E.:745.62' 18° DIP OUT i.E:746,:29' 770 765 .c 755 v} Q _j /OU w 0 n a co co 4 745 N N O r 740 730 725 F_ 39 +00 20 LF 24" DIP @ 0.25% 41+00 M "411 i 1 24" pIP SHELBY ADMINISTRATIVE UNIT PARCEL NO.:51566 126.23 LF 24" DIP PROPOSED MANHOLE STA. 51+80.47 N: 564182.73 E: 1243615.88 I.E.: 746.43' t 69.62 LF 24" DIP �tl,l� L1 i 7 (/ SANITARY SE TOPE • 9' DIP, OUT LE.: : EXISTING IGROUND mow°' _ vL Z a u �. C �� Z 1 OCA11ONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE � FIELD BY THE CONTRACTOR. Q; U 2. CONTRACTOR SHALL REMOVE AND REPLACE ROADWAY SIGNS AND MAILBOXES AS .NECESSARY TO INSTALL PROPOSED AND REPLACEMENT WITH THE NCDOT. �I Z a UTILITY LINE. CONTRACTOR SHALL COORDINATE SIGN REMOVAL d- 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. z 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING w �' EXCAVATED MATERIAL. NOTE: NEW 5EWER 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO Za SHALL BE TESTED CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR BY THE CONTRACTOR AND ACCEPTED SHALL STRIP OUT EXISTING CABLES, INSTALL PROPOSED UTILITY LINE, & RE— INSTALL EXISTING, UTILITY CABLES. Z o 6. FLOODPLAIN INFORMATION FROM NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM. N 7. ALL SEWER SERVICES SHALL BE FIELD LOCATED BY THE CONTRACTOR AND CONNECTED TO THE NEW SEWER LINE WITH PUMPING OR PIPING 0P110NS 0 SEWER TAPS PER DETAILS. CLEANOUTS SHALL BE PLACED AT EDGE OF EASEMENT. COORDINATE WITH CITY OF SHELBY u z o O'4'w20 FOR LOCATION OF EXISTING SERVICES. IS STRUCTURALLY DEFICIENT. CONTRACTOR SHALL AVOID OPERATING HEAVY EQUIPMENT Z 0 8. EXISTING SEWER INTERCEPTOR . OVER EXISTING SEWER LINE TO MAXIMUM EXTENT POSSIBLE. px 0 '•/ L � N NOT RELEASED FOR-00.UX °w°coe o.. V) 1-- EXISTING IGROUND _ vL Z a I z n C _ � `c) Puri • h •� W :24 rr 'co d- z N co �' o NOTE: NEW 5EWER LINE DOWNSEEAM QF THIS MANHOLE Za SHALL BE TESTED 04w..� BY THE CONTRACTOR AND ACCEPTED Y THE OWNE R ND NGINEER BEEORE BEFORE PROCEEDING TO W ,,:PROVIDE TEMPORARY PUMPING OR PIPING 0P110NS 0 t\it t l H,11//j7, O'4'w20 FINAL DESIGN . . °8�= V3 F_ NOT RELEASED FOR-00.UX °w°coe o.. V) 1-- Z CONSTRUCTION (LV) R Z Z 43 +00 44 +00 45 +00 46 +00 47 +00 48 +00 49 +00 " s ° �► ��, EXISTING IGROUND _ z n C _ � `c) Puri • h •� :24 rr 'co d- �' 04w..� �tJ�.. L�! e. 0 O'4'w20 . . V3 F_ o.. V) 1-- Z (LV) R Z Z 43 +00 44 +00 45 +00 46 +00 47 +00 48 +00 49 +00 i i. ff I 4 770 R 9401 755 M& 745 MIN tW9 730 50 0 25 50 100 150 IOU Lr LVIdV af- Mll Vlr FIFF- M11t1 --- / CONCRETE PIERS PER DETAILS J 1 1 � Z 1 GRAPHIC SCALE 1 INCH = 50 FEET 1 w P-- PROPOSED MANHOLE PROPOSED MANHOLE, 53+92.03 / SD" CMP (WASHED OUT) ° �� SANITARY SEWER MANHOLE I.E.:735.18' CAPITOL FUNDS INC STA. 53 +06.70 54387.10 / /�(� TOP EL: 755.32' 18' LONG PARCEL NO.:22825 1 18" DIP IN I E • 749 83' N° 564308.21 ''43662.12 20 PERMANENT / /� 1 18" DIP OUT I.E.: 749.73' EASEMENT SANITARY SEWER MANHOLE �y�1ii " ► ►/ ►� /, E :1243629.59 j/ ( / TOP EL:7IN IE / 754 41' S -1ELBY ADMINISTRATIVE UNIT / az" DIPOlN LE. 750.28' Fill I 1s" DIP OU ! PARCEL NO.:51566 I i T .E.:75O.iT ^ ' or 0�.. ot PROPOSED MANHOLE / ri �` PROPOSED �''� 1 -�° "N�`;�c� A/ NOT RELEASED FOR STA. 55 +51.99 / r� PROPOSED MANHOLE ABANDON SEWER LINE W GRA / E �'� •��p� oo ° ° SANITARY STA. 56 +51.83 C� LNOT ,. , . _;. ! 18 .R hfAAi,:O� N: 564545.32 N° 564642.39 PER DETAIL. REMOVE EXISTING IAL 78" DIP 487Q, E :1243685.69 / 4/� // PIPING AND CONCRETE PIERS. j >rn +1>>� t ' E :1243662.37 !� our o 747.9S, SSMH - T - N SOCA110NS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE _ -- ---_ r SANITARY SEWE MANHOLE FIELD BY THE CONTRACTOR. ® i \ TOP EL' 754.1 2. CONTRACTOR SHALL REMOVE AND REPLACE ROADWAY SIGNS AND MAILBOXES AS NECESSARY TO INSTALL PROPOSED ! p _ S ' 1gr 18" DIP IN .E.:748.99' UTILITY LINE. CONTRACTOR SHALL COORDINATE SIGN REMOVAL AND REPLACEMENT WITH THE NCDOT. 18" DIP I.E.:748.83' 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING //-- SANITARY SEWER MANHOLE PROPOSED EXCAVATED MATERIAL. TOP Et 754.69' 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO 18" DIP IN t.E.:748.75' SILT FENCE PER DETAIL (TYP) CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY. LINE, CONTRACTOR 18" DIP OUT LE.. 748.61' l CABLES, INSTALL PROPOSED UIIUTY LINE, & RE— INSTALL EXISTING UTILITY CABLES. � SHALL STRIP OUT EXISTING GAB ! SANiTAR1 SEWER MANHOLE �ANI7ARY SEWER MANHOLE 6. FLOODPLAIN INFORMATION FROM NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM. � .�.n -.. .�.n�rr. �s a r�r a �r� n 1 nnATCn 0V 71J= Akin ^^kik IC/TCf1 TA Tll[ AIC10! CC1liC� I IAIC 1lMTLI r EXISTING I GROUND .33 LF 24" DIP CAD 0.15% Y N ® ® U J Lo 0 J sS 00 r' w tf) 0 0) to 00 00 725 a a. f\ v 1: ° ° F- cC) L J 0 r O Ld .. �--° LLLJ_o N LL.� to uJ uJJKo - - N m - ON 0 CL ®mom RLZ Z V) t7 �Z.G VO 53 +00 54 +00 55 +00 56+00 .3 0 PROPOSED 770 R 9401 755 M& 745 MIN tW9 730 50 0 25 50 100 150 IOU Lr LVIdV af- Mll Vlr FIFF- M11t1 --- / CONCRETE PIERS PER DETAILS J 1 1 � Z 1 GRAPHIC SCALE 1 INCH = 50 FEET 1 w P-- PROPOSED MANHOLE PROPOSED MANHOLE, 53+92.03 / SD" CMP (WASHED OUT) ° �� SANITARY SEWER MANHOLE I.E.:735.18' CAPITOL FUNDS INC STA. 53 +06.70 54387.10 / /�(� TOP EL: 755.32' 18' LONG PARCEL NO.:22825 1 18" DIP IN I E • 749 83' N° 564308.21 ''43662.12 20 PERMANENT / /� 1 18" DIP OUT I.E.: 749.73' EASEMENT SANITARY SEWER MANHOLE �y�1ii " ► ►/ ►� /, E :1243629.59 j/ ( / TOP EL:7IN IE / 754 41' S -1ELBY ADMINISTRATIVE UNIT / az" DIPOlN LE. 750.28' Fill I 1s" DIP OU ! PARCEL NO.:51566 I i T .E.:75O.iT ^ ' or 0�.. ot PROPOSED MANHOLE / ri �` PROPOSED �''� 1 -�° "N�`;�c� A/ NOT RELEASED FOR STA. 55 +51.99 / r� PROPOSED MANHOLE ABANDON SEWER LINE W GRA / E �'� •��p� oo ° ° SANITARY STA. 56 +51.83 C� LNOT ,. , . _;. ! 18 .R hfAAi,:O� N: 564545.32 N° 564642.39 PER DETAIL. REMOVE EXISTING IAL 78" DIP 487Q, E :1243685.69 / 4/� // PIPING AND CONCRETE PIERS. j >rn +1>>� t ' E :1243662.37 !� our o 747.9S, SSMH - T - N SOCA110NS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE _ -- ---_ r SANITARY SEWE MANHOLE FIELD BY THE CONTRACTOR. ® i \ TOP EL' 754.1 2. CONTRACTOR SHALL REMOVE AND REPLACE ROADWAY SIGNS AND MAILBOXES AS NECESSARY TO INSTALL PROPOSED ! p _ S ' 1gr 18" DIP IN .E.:748.99' UTILITY LINE. CONTRACTOR SHALL COORDINATE SIGN REMOVAL AND REPLACEMENT WITH THE NCDOT. 18" DIP I.E.:748.83' 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING //-- SANITARY SEWER MANHOLE PROPOSED EXCAVATED MATERIAL. TOP Et 754.69' 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO 18" DIP IN t.E.:748.75' SILT FENCE PER DETAIL (TYP) CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY. LINE, CONTRACTOR 18" DIP OUT LE.. 748.61' l CABLES, INSTALL PROPOSED UIIUTY LINE, & RE— INSTALL EXISTING UTILITY CABLES. � SHALL STRIP OUT EXISTING GAB ! SANiTAR1 SEWER MANHOLE �ANI7ARY SEWER MANHOLE 6. FLOODPLAIN INFORMATION FROM NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM. � .�.n -.. .�.n�rr. �s a r�r a �r� n 1 nnATCn 0V 71J= Akin ^^kik IC/TCf1 TA Tll[ AIC10! CC1liC� I IAIC 1lMTLI r EXISTING I GROUND .33 LF 24" DIP CAD 0.15% Y N ® ® U Lo 0 00 r' Q tf) 0) to 00 00 725 c6 cO a. f\ 1: ° ° F- cC) L J 0 to M 0 Ld .. �--° LLLJ_o LL.� to uJ uJJKo - - - m - ON 0 CL ®mom RLZ cli V) 1.8,. �Z.G VO 53 +00 54 +00 55 +00 56+00 .3 740 PROPOSED 3 d c ,t rn FILL AND RE—GRADE ERODED SLOPE AREAS WITHIN •y 1'n o - 0 N r O PROPOSED CONCRETE PIER 770 R 9401 755 M& 745 MIN tW9 730 50 0 25 50 100 150 IOU Lr LVIdV af- Mll Vlr FIFF- M11t1 --- / CONCRETE PIERS PER DETAILS J 1 1 � Z 1 GRAPHIC SCALE 1 INCH = 50 FEET 1 w P-- PROPOSED MANHOLE PROPOSED MANHOLE, 53+92.03 / SD" CMP (WASHED OUT) ° �� SANITARY SEWER MANHOLE I.E.:735.18' CAPITOL FUNDS INC STA. 53 +06.70 54387.10 / /�(� TOP EL: 755.32' 18' LONG PARCEL NO.:22825 1 18" DIP IN I E • 749 83' N° 564308.21 ''43662.12 20 PERMANENT / /� 1 18" DIP OUT I.E.: 749.73' EASEMENT SANITARY SEWER MANHOLE �y�1ii " ► ►/ ►� /, E :1243629.59 j/ ( / TOP EL:7IN IE / 754 41' S -1ELBY ADMINISTRATIVE UNIT / az" DIPOlN LE. 750.28' Fill I 1s" DIP OU ! PARCEL NO.:51566 I i T .E.:75O.iT ^ ' or 0�.. ot PROPOSED MANHOLE / ri �` PROPOSED �''� 1 -�° "N�`;�c� A/ NOT RELEASED FOR STA. 55 +51.99 / r� PROPOSED MANHOLE ABANDON SEWER LINE W GRA / E �'� •��p� oo ° ° SANITARY STA. 56 +51.83 C� LNOT ,. , . _;. ! 18 .R hfAAi,:O� N: 564545.32 N° 564642.39 PER DETAIL. REMOVE EXISTING IAL 78" DIP 487Q, E :1243685.69 / 4/� // PIPING AND CONCRETE PIERS. j >rn +1>>� t ' E :1243662.37 !� our o 747.9S, SSMH - T - N SOCA110NS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE _ -- ---_ r SANITARY SEWE MANHOLE FIELD BY THE CONTRACTOR. ® i \ TOP EL' 754.1 2. CONTRACTOR SHALL REMOVE AND REPLACE ROADWAY SIGNS AND MAILBOXES AS NECESSARY TO INSTALL PROPOSED ! p _ S ' 1gr 18" DIP IN .E.:748.99' UTILITY LINE. CONTRACTOR SHALL COORDINATE SIGN REMOVAL AND REPLACEMENT WITH THE NCDOT. 18" DIP I.E.:748.83' 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING //-- SANITARY SEWER MANHOLE PROPOSED EXCAVATED MATERIAL. TOP Et 754.69' 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO 18" DIP IN t.E.:748.75' SILT FENCE PER DETAIL (TYP) CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY. LINE, CONTRACTOR 18" DIP OUT LE.. 748.61' l CABLES, INSTALL PROPOSED UIIUTY LINE, & RE— INSTALL EXISTING UTILITY CABLES. � SHALL STRIP OUT EXISTING GAB ! SANiTAR1 SEWER MANHOLE �ANI7ARY SEWER MANHOLE 6. FLOODPLAIN INFORMATION FROM NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM. � .�.n -.. .�.n�rr. �s a r�r a �r� n 1 nnATCn 0V 71J= Akin ^^kik IC/TCf1 TA Tll[ AIC10! CC1liC� I IAIC 1lMTLI r EXISTING I GROUND .33 LF 24" DIP CAD 0.15% 9.84 LF 24" DIP N ® ® N N Lo 0 00 r' Q tf) 0) to 00 00 725 c6 cO a. f\ 1: ° ° F- cC) L J 0 to M 0 Ld .. �--° LLLJ_o LL.� to uJ uJJKo '. - Q_ q, q t��y >> SI"J ZZ ON ®�,p ��yy' CL ®mom RLZ V) 1.8,. �Z.G VO 53 +00 54 +00 55 +00 56+00 9.84 LF 24" DIP ® 0 :157 y0 Lr /-,4 vir w v°Jva® U LL.� - 740 PROPOSED FILL AND RE—GRADE ERODED SLOPE AREAS WITHIN EXISTING AND PROPOSED SEWER ALIGNMENT AREAS. • PROPOSED CONCRETE PIER PROVIDE SLOPE STABILIZATION WITH MATTING AND VEGETAnON PER DETAILS. • - PER DETAILS (TYP) 735 PROPOSED REMOVE EXISTING PIECES OF 60" CMP, REGRADE CREEK AND BANK AND INSTALL RIP RAP CREEK BANK STABILIZATION PER STREAM BANK PROTECTION DETAILS. NOTE: CENTER NEW 730 CANNEL BETWEEN NEW RS UTILIZE MEDIUM CREEK CROSSING DETAIL TO BYPASS STREAM FLOW AROUND T -� - w ca w ,.. I � I 11 - " I I " 111. � I 1. I I 11 � I 0V . I � , , I I . ' ' , " , � I - ��-�':�'� �'f; , ,�� ./ , �'� 18" k'14..-'��Ozm::�� I � t --::,r";'1": - , , , - � , - I , � ", , . � � - :::� :: ,' ' " ,� ,.. � , , 11,11. , , � , , , I � _1 , I REMOVE EXItSIINIIJ MANHULt. :- 1. I --!�' ,. , , , � X. , �'... �.�. �:� � - I , � - �. - - , , , I 1: , � �4;' � '. - . f , - I � 11 I I 1. 1, .. -,' , . , . 11 I I . 1, , ,- � I � - 'Dip ly:fx�."?O;.58:�: I -- - '� �'� � � : '��."V ,'� �� � .>Z, � �! �� ".1 , DIP ' " 24- ,OUT V.Ml � I . --- PROFILE. - SCALE: HORIZ. 1 "= 50' 1 . 730 VERT. 1 "= 5' 730 725 -- 725 PROPOSED PIPE LOPE KEY PER - 720 1 DETAIS AT MIDPOINT A A 720 EXISTING GROUND / " 715715 PROPOSED \ � \ / m ADD SELECT BACKFI L TO ----- \ - I PROVIDE 5"' MIN. CCVER OVER 'V 710 PIPE AND GJ,RADE TO DRAIN T \ 710 6951 1 1 1 1 1 1 1 1695 M3 I IL ` SR MANHO)"ANITARY SEWE 41-- r10 I z a , - --I" SED ' ,.'L;:.'�:.;.r� , kn e I-- le� .Rr, . L :� � I ' 6 A. EREDD TOP EL709.44NWMAOLEPOPOS DIP IN 1.E.: 1 6' 0 -'!� � E I -Y OF SHELBYC , � � REPL ACE EXISTING MANHOLE . V) z I> 0 '70-�24j­ A F40 . . .00 1 0+00 ' - � I .I 24DIP IN 11: ?'' ' . `II P TIE.: 700,�, 24DIOU -4 1111111111111111111111� 7IIIIIIIIIIIIIIIIII W �11111` � z PASTA. RC ' 4NHOLE WNEW DIA.MA / L `�' � . . . 009.15 . N562 . m I 0 � W . I,­ I I E:1231716.80 Zl � D 11 CSET N.R2 , ei - --_ f..-----" - � I . . :, .�:. . rII Ir K Z_ -1 707,61EL: PIPE KEY PER � ' L ­ C) L LLIII 0 -- LAJ 0 -- - - DETAIL AT MIDPOINT ' ' z z I . 4 F 30 D LLINSTALL 2L .I � - - -- -- /I // / � - -- - - -- -- I- ;Ir,r: L 13.5. NOTE: FIELD - I - -- - - - - -- I - - / - -,� A T IDE OF NE- � . , . � VERIFY INVERTS - -- / 1 I -o/p / � // I--- - / MANHOLES PER DETAIL 18 & INS 3 0SEWR LE ; ,L rI IL I r SANITARY SEWER MANHOLE EL: 708.75 - -r I / / / / I�� � /-- - - / `�'-: �� �_ // ��;��" S . L ��'�' �: �" .-1" � � , � .' �TOP rL '"'� I 4PVC IN IZ:3,8 * I - / - 57.48LF " ' I _707 / SANITA _1,�� ,_�� ]--'", � "�'"I '- DPIN I.E.: 700.50 - I.rIrII - I.E.: 700.46 D-S $- - II, II-IIII 1p-= =- �D- -= - . SEWER 18 DIP / /24).7 'I -24 1IP0UT 24 D11 1. .01. ; ITARYSEA IT 24DIPU.�7 6 ,, I EL7 i / TOP EL: 720.70' 009.6-5' 0TOP . II IIIIII 30" DIP IN IE.: 704.6' - - ; 30 DIP OUTI. ..703,6,- OUT "� " - 1 '- _ "��� / - 715.66'18' DIP IN 1E; 18* DIP OUT 1E; 714. 76' , L Ir 4 § / I BLANTON,JOSEPH / ,pPARCEL NO.:28018 - - - - ADD SELECT BACKFILL TO _.,._� CTI CP5/N2SET1 PROVIDE 6" MIN. COVER OVER :":� . 123 745.74 / EL: 71 ,44 PIPE AND GRADE TO DRAIN EXISTING A EE , .- IPS GPS STATIC N: 5618'4�19 0/ W/ NEW 4' DIA. MANHOLE / LIILI II E:123184.43 711�: //- REMOVE EXISTING SEWER LINE TO STA. 12+18.73EL; ,� LII Z ACCOMMODATE INSTALLATION OF N: 562185.32 � II".I I /b' NEW SEWER LINE. E:1231616.79 .� .j� STING N ILLII IILIL II I / " UPSTREAM 18SEWER LINE �" - L,. II FIRST BROAD RIVER , L-",L.� I CLASS CWATERS 4/ REPLACE EXISTING MANHOLE :' 'j NOTES; 1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE ,AND RECONNECT UPSTREAM FIELD BY THE CONTRACTOR. c 30" SEWER LINE 2. CONTRACTOR SHALL REMOVE AND REPLACE ROADWAY SIGNS AND MAILBOXES AS NECESSARY TO INSTALL PROPOSED � L UTILITY LINE. CONTRACTOR SHALL COORDINATE SIGN REMOVAL WITH THE NCDOT.­­ L 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WIT1,H APPROPRIATE UTILITY COMPANIES. L 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING r EXCAVATED MATERIAL - L 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO . I \- . CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT W"Ti PROPOSED UTILITY LINE, CONTRACTOR SEWER MANHOLE SHALL STRIP OUT EXISTING CABLES, INSTALL PROPOSED UTILITY LINE, & RE -INSTALL EXISTING UTILITY CABLES. SANITARY TOP EL: 736.43' 1 6. FLOODPLAIN INFORMATION FROM NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM. 32' DIP IN I.E.: 728.56' 7. ALL SEWER SERVICES SHALL BE FIELD LOCATED BY THE CONTRACTOR AND CONNECTED TO THE NEW SEWER LINE WITH 24' DIP OUT I.E.:718.63' DETAILS.SEWER TAPS PER CLEANOUTS SHALL BE PLACED AT EDGE OF EASEMENT. COORDINATE WITH CITY OF SHELBY I FOR LOCATION OF EXISTING SERVICES. //. L "__� z \ /------------------------- NO. DATE BY REVISION DESCRIPTION --- PROFILE. - SCALE: HORIZ. 1 "= 50' 1 . 730 VERT. 1 "= 5' 730 725 -- 725 PROPOSED PIPE LOPE KEY PER - 720 1 DETAIS AT MIDPOINT A A 720 EXISTING GROUND / " 715715 PROPOSED \ � \ / m ADD SELECT BACKFI L TO ----- \ - I PROVIDE 5"' MIN. CCVER OVER 'V 710 PIPE AND GJ,RADE TO DRAIN T \ 710 6951 1 1 1 1 1 1 1 1695 M3 (31, 0 Zw 41-- r10 I z a I . "-'� I 0 ) kn . F� Z I-- le� .Rr, 1 0--i ®/ z, ('tn 4 . 0 -'!� � E i 11 V) 0. 8 A . V) z I> 0 U z 11� 0-� A F40 V) W -4 1111111111111111111111� 7IIIIIIIIIIIIIIIIII W �11111` � z E. "I R 0 Rkl &n � Z � Wt w . m I 0 � W w W - a 40 -- 0 - U. 0 ei - --_ f..-----" - I ^00 LL. . • w K Z_ Z C) LAJ 0 a z z I OZZ I co I z r ^ w vi Uv m (31, 0 Zw 41-- r10 I z a I . "-'� I 0 ) kn . F� Z I-- le� .Rr, 1 0--i ®/ z, ('tn 4 . 0 -'!� � E i 11 V) 0. 8 A . V) z I> 0 U z 11� 0-� A F40 V) W -4 1111111111111111111111� 7IIIIIIIIIIIIIIIIII W �11111` � z E. "I R 0 Rkl &n � Z � Wt w kn \\%%jjII1Ijjjj I' 1/.' A I P'- 00 . . . . . . . . 11 I I 010, 'IV " 1. k 9" I I - - QF o'. . 46� "�' -- ,�,�� -i , :..I :� ..:c 0 P.. 5i :=: - CoNa -000 ' w 00 -0 - 0 0 ;396� &**(�). $�j - - o - -9 , . �� -�r' $a " 'Z � I , .e ' -- V, -, '�� - ". '�- b *-- .....'♦' / , - I \ ( I I I I I U'> ,It v - 0 N.. I � .. 3: �: W E w co co :) ** .. - > > of w c: - 0) E UJ 3: . < w >- (9 co 05 z 2 to :2 < 'tt ZQ (D wq- 0) 0 i 0 w a 6 LU 0 a Q w -LJL Cr'4- 0- I I w > W w � 0 .J U. 0 I ^00 LL. . w CL Z C) I < < I co z I Z < A"mik I z I .j "HEET 0 J >J ttJ 0 �1 Q Cl) N UD M r O N Cl) N O r PROPOSED REPLACE EXISTING MANHOLE N: 42 STATIC 69�/jj J I f PROPOSED N:554279.12 N: 554418.40 I IJ SILT FENCE E::694,1 8.54 SANITARY SEWER MANN J J EL: 694.10 E:1232488.36 TOP EL 701.4' I I PER DETAIL CITY OF SHELBY PROPOSED MANHOLE 42 DIP IN I.E.:690.5 l PARCEL NO.:27947 42" DTP OUT LE.:690.23 11� It STA. 13 +13.12 N: 554674.98 E: 1232540.11�� �I NOTE: ALL MANHOLES 87.93 LF 2" DIP °- SANIT w MANHo SHALL BE fi' DI,:A. U.O.N. 162.59 LF 48" DIP ws EL71o.ao' OAKS, DAVID CHIVOUS o 36" DIP IN I.E.:692.41' PARCEL NO.:44043 36" DIP OUT I.E.:692.36' NOTES: 1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. 2. CONTRACTOR SHALL REMOVE AND REPLACE ROADWAY SIGNS AND MAILBOXES AS NECESSARY TO INSTALL PROPOSED UTILITY LI'E. CONTRACTOR SHALL COORDINATE SIGN REMOVAL AND REPLACEMENT WITH THE ROADWAY AUTHORITY. 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF U1ILITY POLES WITH APPROPRIATE U11UTY COMPANIES. 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL. 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL PROPOSED UTILITY LINE, & RE- INSTALL EXISTING UTILITY CABLES. 6. FLOODPLAIIN INFORMATION. FROM NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM 7. ALL SEWER SERVICES SHALL BE FIELD LOCATED BY THE CONTRACTOR AND CONNECTED TO THE NEW SEWER LINE WITH SEWER TAPS PER DETAILS. Cl EANOUTS SHALL BE PLACED AT EDGE OF EASEMENT. COORDINATE WITH CITY OF SHELBY FOR LOCATION OF EXISTING SERVICES. 8. STA 13 +13 TO STA 14 +75 PIPING SHALL BE BEDDED IN 4" MINIMUM WASHED STONE, BACKFILL AND TRENCH WIDTH PER STANDARD DETAIL. Qom r _yl REVISION DESCRIPTION OWE O N } W Q- N .. Q IL m Z WS0 <4 W Z O Z C� u1 p C7 Q w Z o p 0 -1CZ w J J LL SCALE: HORIZ. 1 "= 50' �_ —I U-) 720 VERT. 1"= 5' x 0 w = R Lo ® V) 720 w ¢ to J _¢,.I L0 N co = M 715 w 715 W J +w � w +wl= NOTE: ALL MANHOLES ® ®�' w ° z o ®� wo SHALL BE 6' DIA. U.O.N. 5 2 ¢ a. ° � � ®<C a� EXISTING GROUND----t\ (L� V) �O Z Z iLt) ®Z 710 710 705 7 05 xi Q 700 �'� X1 700 PROPOSED '� LNG 40 LF SPA EXISTING 36" SEWER LINE o RECONNECT EXISTING 42" PIPE __ r,. MID 20 t N 695 —_rN 695 0 261.7 LF 48" IP 0 0.25 N co 690 690 ui — \-87.93 LF 42 DIP ® 1.34% W Z EXI TING 42" SEWER LINE \-151.37 LF 48" DIP @ 0.29% 655 sa35 u 0 0 3' MIN. 680 680 n ¢ w �. a, ® uj Po N PROPOSED —10 cv co a) CONCRETE PIERS w� °o ff ��o®o ¢cal ®op 0) r 00 �M �m� PER DETAILS N 675 <� �� r ��� 675 ° w� V) Z'_ +w +w �:.: w +w 1 ®v- 0 N_ w- N !Ll >> CL y ®° S-11 0- W u) 1-- z N R Z Z t/) d 9 REVISION DESCRIPTION DQLL OWE O N } W Q- N .. Q p Z m Z WS0 <4 W Z O LLI �t C� u1 p C7 Q w Z o p 0 -1CZ w J J LL DQLL OWE aZZ z � a � w SHEET Cm 1 1 2 AL NOTES: 1. MANHOLE RISERS AND CONE SECTIONS SHALL CONFORM TO ASTM C -478, LATEST REVISION. 2. TRANSITION RINGS SHALL HAVE A MINIMUM CLEARANCE. OF 2' -0" ABOVE THE EFFLUENT OVERT ELEVATION. 3. FLEXIBLE WATERTIGHT, SYNTHETIC RUBBER SLEEVES. WITH STAINLESS STEEL CLAMP: DRAW BOLT AND NUT; OR CAST—IN SLEEVE; OR "A" LOCK CONNECTION SHALL BE FURNISHED FOR EACH PIPE TO MANHOLE CONNECTION. 4. CONE SECTION TYPE TO BE DETERMINED BY CITY BASED ON INDIVIDUAL PROJECT NEEDS. PER Al VI rLAN•nAM MH lanaGS awn rn�lta NACAN FAY, INC., 'V- 81384°. 47MAH 'R- 1550'. U S. FOUNDARY 'USF -669 VENiW. OR EQUAL >y'a ai Rllii�S ENO VULCAN F�1PfDARY, ING, °V- 2328'. MM- qAH 'R -1915H ; U.S FOUNDARY 'USF -869 BWT', OR EQUAL. 90LTS ON MH FRAME AND i`AIER ® / PROMX BOLTS ONLY ram SPEOFIED VARIES If WL 20 f /�, .. PiACC MASTFC BETKEN GRADE RHOS TRADE RNW AS f0WJ reD IV (TmfCAL) GtOtlT AIM „R.r PAVOW JOMTS MI1N A HEATT SHRtN#AHI£ 97EP8 gsRAiCttY' WdL d? N H SHEET SDiIL1R TO MRAPJrS Al lO ovum" E tm D ovm MAM 3VAIMR ••9P .i+ •ice. ,i., '• `♦.;'�.. Pt; �. «f'a p ' °A. ;:i':!. ::`1 ,•*�, �. -�}. '; •�± sY'�•r�4 %• •'`see 's } v.'. do . a' ev w - 4' MK DIA. I�. a pirly, m 0 A 4 t= NOTE'S 1. MANHOLE RISERS AND CONE SECTIONS SHALL CONFORM TO ASTM 0-474 LATEST REVISION. 2. TRANSITION RINGS SHALL HAVE A MINIMUM CLEARANCE OF 2' -O° ABOVE THE EFFLUENT OVERT ELEVATION. 3. FLE%181,E WATERTIGHT, SYNTHETIC RUBBER SLEEVES, WITH STAINLESS STEEL. CLAMP: DRAW BOLT AND NUT: OR CAST -IN SLEEVE; OR A' LOCK CONNECTION SHALL BE FURNISHED FOR EACH PIPE 70 MANHOLE CONNECTION. 4. CONE SECTION TYPE TO BE DETERMINED BY CITY BASED ON IN PROJECT NEEDS FRm PER As STD. N0. 7.03 STANDARD MH RINGS AND.COIlfRS VULCAN FOUNDARY, INC., 'V- 81384'. NEENAH "R- 1550 °. US 91SF -689 VENTED', OR EQUAL WA70117HT UN RINP.S AND COVERS• VULCAN FOUNDARY, INC., 'V- 2328', NEENAH 'R- 1915H °, U.S. FOUNDARY "USF- -669 8WT', OR EQUAL VULCAN. FOUNDRY: INC. , BOLTS ON MH FRAME AND COVER PROVOE BOLTS ONLY WIERE SPECIFIED IIQI ial�11 . U.& FOUNDRY 'USF - 689 VENTED° rail{' -:" 1�7ffw11t VARIES Or Mkt. 24• BOLTS ON MH FRAME AND COVER PLACE MAS110 OrfW EN GRADE RHOS 1Y MAX. 4n PROVIDE BOLTS ONLY WHERE . SPECIFIED. J_ ac,f wall =11 rh`�It�tt�,aa,� GRACE RINGS AS REQU1RfD 0) VARIES 0°.IAIN. ... 44° -"°'` PLACE MASTIC BETWEEN GRADE "CAL) NOTE VW ALL VN+H= +MARS c SIRAft%IT WALL Of ILK ►� 914 R TO NRAPrDSLVL F STT � PIPES RtRHIER Sl q-wr k4' DIAMETER d.L REVISIONS }�+, ' . ; }• t, tee. "6'rtitaw BATE R 0 iRyw +Y.1 :!'taY:r.. ,w►a�xs °r , : �Y- 8° STONE 6 BASE: cny QPI sOffm 1 STD. N 0. 6 ETEI R CAST EE ffAMAM 7.04 7.07 CONCRETE ENCASEMENT (3000 PSI. MIX) •a0 18" MIN O • t• R '# t 8 °•b� , 1. SID MANHOLE RING & COVER LLAM BASE COURSE (THICKNESS PER ROADWAY DESIGN) STANDARD MANHOLE CONE 3000 PSI CONCRETE MINIMUM 6" THICK COMPACTED BACKFILL I Z11,17it0W ito _(f) 114 "1 Ilk - ;; a 1♦ s ALL MANHOLE COVERS LOCATED OUTSIDE OF THE PAVEMENT SHALL, BE BOLTED AND GROUTED TO THE MANHOLE CONE PER STD 7.06 DETAIL NOTE: MANHOLE COVERS.-IN ROADS 8/8" LIFTING BAR TO BE SOLID 4 1 "0 HOLES AT 90° 1 • -I a m o-i VULCAN TYPE V-1384 U.S, f-01NDAW 889 FUNG & :KL OOVVt LOAD RATING HEAVY. OUTS` LOAD PA11HP - HEAVY DUTY FRAME 240 LB& :Htme 180 LSS. COVER. 145 4RS iiStYEB_- 125 LM. TOTAL. 385 ! BS TOTAL 315. NOTE: MANHOLE. COVENS; IN ROADS, TO BE SOLID f ,. NOTE: SEE STANDARD VENT DETAIL AND MANHOLE DETAILS FOR COMPLETE DETAILS FOR VENT AND MANHOLE 3'X3'x3' CONCRETE -FOOTING 1' -0" ; .: 2' -0" 0.5% MINIMUM SLID 3' -0" SEE PLAN VENT OUTLET TO POINT DOWNSTREAM I2" VENT OPENING TO BE SCREENED 4' MIN. 4" STEEL VENT PIPE- MANHOLE TO HAVE CAST OR CORED HOLE — z_ PRECAST CONI o MANHOLE PER .S MANHOLE d ®® STEPS Gi"4' CONCRETE ANCHOR " MIN. 4 .d .•., ARIES A •4 4 4 a ' JI d 4a d •4 STANDARD MANHOLE VENT NOTES: 1. VENT PIPE SHALL BE 4" SCHEDULE 40 STEEL PIPE. 2. INSIDE OF VENT PIPE SHALL HAVE A 3/32 INCH COAL TAR UNING ACCORDING TO AWWA 2 3. OUTSIDE OF VENT PIPE SHALL BE SAND BLASTED TO COMMERICIAL STANDARDS AND HAVE COATS OF EPDXY PAINT AS APPROVED BY THE ENGINEER. 4. VENT EXTENSION FOR OFFSET VENT SHALL BE JOINED BY WELDING OR MJ SLEEVES 5. COORDINATE WITH OWNER IN THE FIELD TO DETERMINE VENT LOCATION 6. EXTEND VENT OUTSIDE OF VEHICLE /EQUIPMENT ACCESS PATH "VENT MANHODLE I REVISION DATE - OCTOBER 2013 VULCAN. FOUNDRY: INC. , 'V- 81380, NEENAH 'R -ISW OR . U.& FOUNDRY 'USF - 689 VENTED° BOLTS ON MH FRAME AND COVER PROVIDE BOLTS ONLY WHERE . SPECIFIED. ac,f wall =11 rh`�It�tt�,aa,� 0) VARIES 0°.IAIN. ... 44° -"°'` PLACE MASTIC BETWEEN GRADE 12° MAX.. a THE SEWER LINE ENTERING A DROP GRADE RINGS AS MANHOLE SHALL. BE CONTINUOUS D.S.P. FROM REQUIRED w THE UPSTREAM MANHOLE. °_.. O A DROP MANHOLE IS REQUIRED WHEN THE M DIFFERENCE BETWEEN INVERTS IS 30" OR GREATER. -j N J DIP. FOR 20' ALL JOINTS WITHIN THE MANHOLE SHALL BE _- 1 OUTSIDE MANNOEE N OF THE MECHANICAL J6114T TYPE. N -4 GRDUT JOINT 7Otr1T o INSIDE DROP PIPE DIAMETER SHALL BE THE SAME AS THE INFLOW SEWER LINE DIAMETER. STRAIGHT. WALL OF M.H. ; TO BE LOCATED OVER y STAINLESS STEEL, STRAPPING. SHALL. BE 1" INFLUENT PIPE T WIDE BY 1/8" THICK AND ATTACHED TO. THE > . MANHOLE WALL WITH MASONRY ANCHORS. t N 1 iNA BUM " O RUBBER SEALANT 4' DIP DROP PIPE (9 °' • MOUNTED WITH to RAD STAINLESS f o TRAPSS ANDANC14OR ' o - . A ° BOLTS AT 24 CENTERS 0 4® 3/.4" PIPE KATE 3 DIAMETER C ONCRM ?• ENCASEMENT ' .: r A. E lo u) REVISIONS iT DATE P a 1r: N 67 M 0 0 STONE CV a- r ciff OF SF MW 'n STD. i�C?, ffAND' P 7.07 CONCRETE ENCASEMENT (3000 PSI. MIX) •a0 18" MIN O • t• R '# t 8 °•b� , 1. SID MANHOLE RING & COVER LLAM BASE COURSE (THICKNESS PER ROADWAY DESIGN) STANDARD MANHOLE CONE 3000 PSI CONCRETE MINIMUM 6" THICK COMPACTED BACKFILL I Z11,17it0W ito _(f) 114 "1 Ilk - ;; a 1♦ s ALL MANHOLE COVERS LOCATED OUTSIDE OF THE PAVEMENT SHALL, BE BOLTED AND GROUTED TO THE MANHOLE CONE PER STD 7.06 DETAIL NOTE: MANHOLE COVERS.-IN ROADS 8/8" LIFTING BAR TO BE SOLID 4 1 "0 HOLES AT 90° 1 • -I a m o-i VULCAN TYPE V-1384 U.S, f-01NDAW 889 FUNG & :KL OOVVt LOAD RATING HEAVY. OUTS` LOAD PA11HP - HEAVY DUTY FRAME 240 LB& :Htme 180 LSS. COVER. 145 4RS iiStYEB_- 125 LM. TOTAL. 385 ! BS TOTAL 315. NOTE: MANHOLE. COVENS; IN ROADS, TO BE SOLID f ,. NOTE: SEE STANDARD VENT DETAIL AND MANHOLE DETAILS FOR COMPLETE DETAILS FOR VENT AND MANHOLE 3'X3'x3' CONCRETE -FOOTING 1' -0" ; .: 2' -0" 0.5% MINIMUM SLID 3' -0" SEE PLAN VENT OUTLET TO POINT DOWNSTREAM I2" VENT OPENING TO BE SCREENED 4' MIN. 4" STEEL VENT PIPE- MANHOLE TO HAVE CAST OR CORED HOLE — z_ PRECAST CONI o MANHOLE PER .S MANHOLE d ®® STEPS Gi"4' CONCRETE ANCHOR " MIN. 4 .d .•., ARIES A •4 4 4 a ' JI d 4a d •4 STANDARD MANHOLE VENT NOTES: 1. VENT PIPE SHALL BE 4" SCHEDULE 40 STEEL PIPE. 2. INSIDE OF VENT PIPE SHALL HAVE A 3/32 INCH COAL TAR UNING ACCORDING TO AWWA 2 3. OUTSIDE OF VENT PIPE SHALL BE SAND BLASTED TO COMMERICIAL STANDARDS AND HAVE COATS OF EPDXY PAINT AS APPROVED BY THE ENGINEER. 4. VENT EXTENSION FOR OFFSET VENT SHALL BE JOINED BY WELDING OR MJ SLEEVES 5. COORDINATE WITH OWNER IN THE FIELD TO DETERMINE VENT LOCATION 6. EXTEND VENT OUTSIDE OF VEHICLE /EQUIPMENT ACCESS PATH "VENT MANHODLE I REVISION DATE - OCTOBER 2013 ON STAINLESS STEEL BOLT STEEL ENCASEMENT MASONRY SEAL AT END OF PIPE U R/W STEEL ENCASEMENT z � 4" SCREWED CLEAN OUT (PVC) FINISHED+ GRADE -�- BOLT -ON TYPE SKID SIDEWALK & WATER UNE ° WATER UNE W/ BITUMASTIC PAINT OR STAINLESS STEEL Z o ROADWAY #�j j j� t i .•.. ,,• . � — — — — -- .. , —' 1 i ; WA "tom MAIN TAtiDARD — SEVER LINE w /�� I _f L ( f -- -SEVER LINE DIP or CIP - 4" PVC 18" MIN PLAN VIEW' FOR WATER LINE OVER SEWER LINE W/LESS THAN fir CLEARANCE ® �, s - LESS THAN 18 BOTH WATER AND SEWER LINE � O ASTM D 3034, SHALL' BE WATER MAIN ST DARDS (JOIN CURB &GUTTER . ••(�� o0 SDR21 OR 4" 10° 10 FERROUS METAL PIPE (OIP�,NFOR 10° EAM SIDE OF CROSSING T/1 QI N o -.OVER 18° SOR 21 PVC SHALL APPLY 3 MIN 1/$+ BEND Cl 501E PIPE, CARRIER PIPE Z WEEP HOLES NOTE: SEE STANDARD SPECIFICATIONS SECTION 2.12 BOLT -ON TYPE SKID AT BOTTOM a (MIN. 2 PER JOINT, CARRIER PIPE v1 'Z WATER TIGHT PLUG MINIMUM GRADE OF 1/4" PER FOOT UNTIL HOUSE SERVICE WATER LINE ° SPACED EVENLY) 0 o a 0 o n o o °o °0,0 °0 °0 °0° CONNECTION IS MADE 0° 0°o O, oDOOOOOOOOOOOOOOaOOOOOOa0000a0a0000000o0oa o,o4aoo°o0000000000 0 0 0000000 b W _ NOTES: 0 °o °0 °a° •�-) �n-�I r �rs,) cEN ANT 1. SEE PLANS AND SPECIFICATIONS FOR STEEL ENCASEMENT SIZE, MATERIAL, COATING AND w 0 0 0 COMBINATION LONG TURN °t � SEVER LINE PERFORMANCE REQUIREMENTS. W (sod OF1FE A CROSSING I! w LINER °°o o ° _ I �- PATTERN Y AND BEND Q "-° LINE 2. CARRIER PIPE SHALL BE DUCTILE IRON PUSH -ON RESTRAINED JOINT UTILIZING AMERICAN 0 o COMPACTED SOIL #57 STONE .,_, °o o ° °° � ° 4" DEEP STONE BED � 1 FAST -GRIP GASKET, U.S. PIPE FIELD LOK 350 GASKET, OR APPROVED EQUAL �, O O I PLAN VIEW FOR' WATER LINE UNDER SEWER LINE H A� - I ° °000ao ° � _ TAP TO BE .MADE BY DIP a cIF DETAIL CCOCC THE CITY OF SHELBY jj ��-'�++ -1 E wAtEFt LINE MODIFIED FOR THIS PROJECT 9 l7 �' pq pN kn REVISIONS NOM- OF PIPE AT GIBBING FOR CENTER E NT DATE IP WHEN A SADDLE IS USED. THE HOLE SH1 BE INSTALLED BY CORING REVISIONS ,t�ttttlttUrrrr 2.. THE FULL LENGTH OF THE SERVICE DITCK SHALL BE COMPACTED IN B LAYERS DATE IP ATER ND SEWER LINE SHALL E Wrt O 1M0�NEACCH &DE F CONSTRUCTION ��� A WITH MECHANICAL TA►1P. GUARD STAKE FI:QUiRED AT CLEAN OUT LOCATION F UNTIL LANDSCAPING IS - COMPLETED. JOINTS FERROUS METat FIFE O!P ` 3. PROPERTY OWNERS RESPONSIBILITY FROM' SEWER MAIN TO STRUCTURE CROSSI Ge ONE JOINT OF WAT ►�i�N PIPE SHALL BE CENTERED x. �` 000000000 �i AT THE POINT OF CROSSING. ° 12" 12" - e 'C�o F I o° wGOA o >- Q OF SHEM T STD. N0. "m OF OUS STD. N0. _" oCi �, the o �n� .�. � � °oo ° o ti ARDS CE NEW 7.016 PROPOSED CONCRETE 6.19 ENCASEMENT ° 12" (TYP) EXISTING °� ". ° • a PROPOSED GRAVITY 1. ' GRAVITY SEWER LINE SEWER LINE >= PROPERTY UNE PVC SCREWED CLEAN OUT 6" FINISHED GRADE FINISHED GRADE FINISHED GRADE _ MATCH PIPE INVERTS FLEXIBLE TRANS111ON COUPLING Lu CURB � � APPRDPRIATE FOR PIPE MATERIALS (,� PA T. ',r. b *�.•¢, > s< b p ¢ / / / l ��' � ��\% FINAL BACKFILL PER °... a a» '. • Sa r • > „p r- m 5PECIFIGATIONS 2 MINIMUM FINAL BACKFILL PER .� uj :p ::. •� a .,- SPECIFICATIONS . — (95X STANDARD 4+ 4 .. N . .. r (95% STANDARD ._ TRANSITION L� L I PROCTOR DENSITY) _. ..� .. — • PROCTOR DENSITY) L°i.. I _ DISSIMILAR ILL PIPES ";;• INITIAL. BACKFILI - _ _ - _ 12° -° — . A , , • �* 4" PVC COMPACTED IN _ - - zaoo PSI a A REVISION DATE - NOVEMBER 3,; 2008 •' ASTM D 3034 LAYERS (MAX) 'IF - CONCRETE 4j:. . { SDR21 OR .,..�� - `" °SPRING LINE :. :.:' • SPRING LINE VIP 4" Cl SOIL PIPE ✓a ai d' a a g• A: s dM� ' ° 4° PLUG UNTIL HOUSE r.s `.` Y♦ , SCI l,•a•M ° +• NO. 67 STONE- 4'-0' .. S MADE CONNECTION WORK WELL UNDER A ~ �� • "+ " �'- WORK WELL UNDER �,.•e :;° LL . : • - . BOTTOM OF PIPE BOTTOM OF PIPE PIPE 8° MIN SIDE CLEARANCE PIPS: 8' SIDE CLEARANCE 1 4 PER FT MIN. 0 0. 12" MAX SIDE CLEARANCE O.D. 141° MAX SIDE CLEARANCE CONCRETE BARREL OF PIPE. TO REST ON UNDISTURBED SOIL �\ \� COMBINATION LONG .. ► s a s >= z CORE ac NEOPRENE BOOT BY CITY ON EXISTING MH TURN PATTERN Y �LA'' �5 B BEDDING: C, LASS A BEDDING � / \ \// \ \� /\ CORE & NEOPRENE BOOT BY DEVELOPER ON NEW MIH AND 1/8 BEND s REQUIRED FOR FOR PVC SEWER // UNDISTURBED PIPE, SDR -35 •1 — ®" VA�A \j EARTH ,j PROPERTY OWNERS �i \ % \ \// \ \ / / \ \ //� RESPONSIBILITY' \ A a \�� w REVISIONS FROM M.H. TO STRUCTURE NOTE: . \ \/ ® o :. o a + • .. ®. ® \ DATE REVISIONS a \ ATE FOR TRENCHES REQUIRING SHORING & BRACING, DIMENSIONS 4 I °) .a °- SHALL BE TAKEN FROM THE INSIDE FACE OF THE SHORING & , \ o : °' ®'' ® ` . ° . e. ' a® \ BRACING. GTTY OF w A;z STANDS Y T STD: NO. L / \ //% // PIPE ,ARDS SERVICE NEW o STD. N0. 3000 PSI CONCRETE ,/\ 7 °01A } . 6 ° 01 B \ \// \ \� \\ #4 REBAR ®12" O.C., E.W., E.F. EF (12" AND LARGER PIPE ONLY} M N N TRENCH 0 Q Z CO Z� Q d- PLAN VIES Z LU Q � z w o NOTES: PIPING CONFIGURATION TO BE USED ON ALL DROPS OVER 30 \ \ / \\ � \ \, a \ \� \\ FINt cIHED GRADE FINISHED GRADE DROPS TO. BE ,CONSTRUCTED OF ' \// /it TRENCH ALBS:. OR P V., PIPS. WIDTH i�1srAL.EO 1YITi- 3� OF o BE MANHOLE WALL. METALLIC. LOCATOR TAPE 4 SHRINK , FINAL BACKFILL. PER. _., FINAL BACKFILL PER . w SHALL BE INSTALLED i a e I d 4 `°•. \ / \, " 4. .o Q• ; . 1$ BELOW FINISHED / / ., / \ 6 GROUT SERVICE LINE MAY NOT ENTER NON SPECIFICATIONS +, SPECIFICATIONS GRADE FOR ALL PVC \ \/ °.•_ \ \/\ TEE MANHOLE iHROUr;ii CONE SHRINK (9536 ;STANDARD (9596 STANDARD "�" MAINS �/ 4. . ' CAPPED END TO SECTION `OR. ANY JOINT. GROUT PROCTOR D SITY) ` "- PROCTOR DENSITY} \// ALLOW ACCESS TEE .._ \ \/ ®. t ` ..4 •: la \ \ / \\� STAINLESS. STEEL. STRAPPING ___.�_.. 1r \// I a / Q / s• SHALL BE" ?` WIDE BY 1/8- _ " 1z" 4.:4 �Jg \\ /\ THICK AND..ATTAyHED TO THE INITIAL BACKFILI. LINE SERVICE • •. �� MANHOLE WALL �1TH MASONRY " COMPACTED IN V \ o -V \ \ INITIAL 9ACKFILL \/ COMPACTED IN 8 a a d : 44 : •a :e' 4 ANCHORS. DOWNSPOUT LAYERS (MAX) LAYERS (MAX} / �// a • ® °• o o : 3 - 4+ + 9 B PIPE OA.. tE \ n is MANHOLE WoRNx°`wEiLSSllOrin --�-. MANHOLE DOWNSPOUT WALLA e MIN SIDE (xEaRArtCE PIPE a' MIN SIDE CLEARANCE. \ / \ \ / \ \ / \ \/ / \ \ / \ \ / \ / \ \ / \ \ \ \ / \ \/\ NOTES. WALL . , a o Gx 1r MAX SIDE CLEARANCE BOTTOM of PIPE o a: tY MAX SIDE CLEARANCE '� / \ / \/ / \ / \/\ \ / \ / \ /�� /i� /% • �� 1: KEYS FOR SLOPES EQUAL TO 9• ..,.. MAIN LINE OR GREATER THAN 20% ONLY. 90° BEND '`; ' ' a UNDISTURBED s�S D BEDDING CLASS C BEDDING 3000 PSI CONCRETE EARTH 2: INSTALL AT DISTANCE SHOWN 90' BEND s.TAfti'LESS. sTr EL STRAPS REQUIRED FOR DUCTILE IRON REQUIRED FOR C--900 PVC PIPE e. AT 3' D.C. MAX,.' PIPES ELEVATION ON PLANS. J INVERT' INVERT KEYING PIPES ON SLOPES MANHOLE BOTTOM MANHOLE BOTTOM NOTE: REVISION DATE - NOVEMBER 3-,2008 FOR TRENCHES REQUIRING SHORING & BRACING, DIMENSIONS REVISIONS R SIGNS SHALL BE TAKEN FROM THE INSIDE FACE OF THE SHORING de DATE IP DATE TI BRACING. CITY OF S STAID ` P STD. NO. OF BEDDING / SHEET CLASS D&C STD. NO. M 7.08 6.01A buz NO. DATE BY REVISION DESCRIPTION LU 0 a. 0 9 04 ce) C) '"61 R/W CL R/W PA _MEN DESIGU_ WAX 2" 59.58 SUPERPAVE Z-1 MAX. CUT SLOPE V ABC STONE I RoAr Lmurrt SDi RAI STRP 1. S" WALK v hill 2.1 MAX. FILL SLOPE cum RESIDENTIAL COLLE-CUR, RD 60' RIGHT OF WAY 28' ROADWAY WIDTH R R/W PAVEMENT DESIGN RGHT1 WAY t MAX. 2:1 CUT SLOPE 2' S94B SUPERPAVE 2! RO WAY W ABC STONE ul& smp WALX sn li jll; :1 1 OF,! 2:1 MAX FILL SLOPE cum LOCAL RESIDENTIAL RD 50' RIGHT OF WAY 26' ROADWAY WIDTH NOTE: 1. NORMAL CROWN OF 1/4" PER FOOT ON ROADWAY AND SHOULDER UNLESS OTHERWISE DIRECTED BY CITY .ENGINEER. REVISIONS L SUBGRADE SHALL BE COMPACTED TO 95% STANDARD -DATE DESCRIPTION PROCTOR DENSITY. 1 11 SLOPE RECOMMENDED ON BOTH CUT AND FILL SLOPES. 4,. UTILITY EASEMENTS MAY BE REQUIRED BY THE CITY OF SHELBY UTILITY DEPARTMENT AS DEEMED NECESSARY. aff OF simy STD. N 0. ffANDARD SnM SEC110N ffANDARDS 3.01 A 1/8" R 1/2" JOINT FILLER 1/8" R 6. 18" 5" 1/8" R 3"R 12.* 70 6» (7- L 24" FRONT ELEVATION SECTION A-A. TRANVERSE: EXPANSION JOINT SIDE ELEVATION COMBINATION CURB & GUTTER NOTE: 1. CONCRETE SHALL BE 3000 PSI. 2. FOR HAND POURED CURBING, CONTRACTION JOINTS SHALL BE. SPACED AT 10' INTERVALS & EXPANSION 00INTS SHALL BE PLACED AT 50,' INTERVALS. 3. FOR EXTRUDED CURBING, CONTRACTION JOINTS SHALL BE SPACED AT 15' REVISIONS INTERVALS & EXPANSION JOINTS SHALL BE PLACED AT 90' INTERVALS. DATE D s RIPTi N 4. FINISH ALL CONCRETE WITH CURING COMPOUND. 5. FOLLOW ALL APPLICABLE AC' REQUIREMENTS. 6-. CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO NORTH CAROLINA DOT STANDARD SPECIFICATONS FOR ROADS AND STRUCTURES SECTION 846. ClIff OF SHEM STD. N0. ffN D CON SEANDAM CRME CEMB AND OUT17ER ADAR S 4.01 24-!t CURB UTILITY STRIP SIDEWALK AND GUTTER SLOPE SLOPE w EXPANSION JOINT z PER FOOT TO 1, PER o � 1 �/4" PE�T�CURII, PIPE ROTES:_ it-O. I O.D. 1 > TYPI_C6 SEMM u u F= jr O :JOINTS DIVISION J NTS OR cq z DUMMY JOINTS TOOLED V DEER jra I e- -- 5 5-0" VARIES lJOINT SEALER 1/4" SIDEWALK SURFACE co 0 w 42* MIN 3. PLACE 8" OF TYPE 1 19.013 BASE COURSE IN 2 COMPACTED LIFTS, UP TO EXISTING PAVEMENT "20 A 1 le RAD JOINT FILLER LU ELAN VIEYL TRANVER.SE 4 JOINT JON1 NOTES 1. 17 EXPANSION JOINTS TO BE LOCATED A MAX. NOTES: I. TRANSVERSE EXPANSION JOINTS TO BE A MAXIMUM OF 50'. DISTANCE OF .50' APART. Z. ALL' CONCRETE TO BE FINISHED "TH CURING COMPOUND. 2. r OPEN DIVISION JOINTS OR DUMMY JOINTS 116 ALL -A . ALI, CONC,_.' SHALL. CONFORM TO. ALL APPLICABLE BE LOCATED ATV INCREMENTS. viill� RE401REUM OF THE ACI, 6. PLACE TYPE SF 9.5B SURFACE COURSE AND COMPACT. 4 WHEN 'FRONT EDGE OF WALK IS POURED TO CURB OR BACK OF WALK IS POURED ADJACENT TO A BUILDING REVISIONS OR EXISTING CONCRETE, A 1/2" EXPANSION .JOINT SHALL BE DATE AMIPTION PLACED: BETWEEN THE NEW WALK AND .EXISTING STRUCTURES 8" TYPE 1 19.013 BITUMINOUS BINDER COURSE IN TWO COMPACTED LIFTS. Z. WHERE A DRIVEW' CROSSES A WALK, THE SIDEWALK SHAU, HAVE ADEF7H OF 6' WITH 112" EXPANSION JOINT (TOP 2- TO BE MILLED) EACH SIDE OF WAUK H Z 8" MINIMUM C.A.B.C. IN TWO COMPACTED LIFTS TO WITHIN 80 M 0F%ZW OF SURFACE COMPACTED TO 100% COMPACTION - STANDARD STD. NO. u z 00 WNDARD CONCRETE SIDMIX ffANDARDS SAWCUT EXISTING PAVEMENT 4.05 Mr-L A^% Ir' k I A k I I Jf'%t C' 1 TOP TO GRADE. IMPACTED EXISTING BITUMINOUS TACK COAT -0. 10-0" PIPE ROTES:_ it-O. I O.D. 1 CONTRACTOR'S PAVEMENT REPAIR SHALL BE PERFORMED ACCORDING TO THE FOLLOWING PROCEDURE, PLUS ALL OTHER u u REQUIREMENTS OF THIS DETAIL AND THE SPECIFICATIONS: BACKFILL z 1. BACKFILL TRENCH WITH SUITABLE EARTH AND COMPACT TO TRENCH SHELF AS SHOWN ON THE DETAIL z 2. PLACE CABC IN 2 COMPACTED LIFTS TO WITHIN 8" OF THE EXISTING PAVEMENT SURFACE. SURFACE. 3. PLACE 8" OF TYPE 1 19.013 BASE COURSE IN 2 COMPACTED LIFTS, UP TO EXISTING PAVEMENT 4. ALLOW SEVERAL DAYS FOR VEHICLE TRAFFIC TO FURTHER COMPACT THE REPAIR. 5. MILL TOP 2-INCHES PER DETAIL 6. PLACE TYPE SF 9.5B SURFACE COURSE AND COMPACT. 7. NOTE: UPPER 2 FEET OF BACKFIH UNDER ROADS TO BE COMPFEM9� 'SQPV'9.5B COMPACTED BITUMINOUS SURFACE COURSE 8" TYPE 1 19.013 BITUMINOUS BINDER COURSE IN TWO COMPACTED LIFTS. (TOP 2- TO BE MILLED) H Z 8" MINIMUM C.A.B.C. IN TWO COMPACTED LIFTS TO WITHIN 80 OF SURFACE COMPACTED TO 100% COMPACTION - STANDARD u z 00 00 SAWCUT EXISTING PAVEMENT z MILL EXISTING ASPHALT 2" DEPTH AND OVERLAY 2" TYPE SF 9.5B COMPACTED 0 < BITUMINOUS SURFACE COURSE TO GUTTER EDGE. TYPICAL BOTH SIDES. L 0-4 00 To GUTTER 00 EXISTING CURB z AND GUTTER 41 EXISTING BITUMINOUS TACK COAT -0. 10-0" PIPE 10-0" it-O. I O.D. 1 COMPACTED EARTH BACKFILL EXISTING 0 PLUG PIPES WITH 3000 PSI CONCRETE E&.STING PIPE TO BE ABANDONED SAWCUT AND REMOVE 1' SECTION OF EXISTING PIPE GENERAL SEWER LINE ABANDONMENT PLUG PIPES WITH 3000 PSI CONCRETE EXISTING PIPE TO BE ABANDONED FLOW SAWCUT AND REMOVE EXISTING PIPE A MINIMUM OF 2' OUTSIDE MANHOLE PIPE FLOW SEWER LINE ABANDONMENT REVISION DATE - OCTOBER 2013 NO. DATE BY REVISION DESCRIPTION 1 o' -0" 3' -6" 6' -6" DIRECTION OF RIVER FLOW w CL PIPE AND PIER PLAN CONCRETE PAD EXTENDS 1' BEYOND BASE OF PIER (TYP) I I T t'. — i r r •• r AIR FEW I DIRECTION OF RIVE - 0 #6 t 12" EACH WAY, TOP AND BOTTOM ►y ��i��i?ytl:�ti�yJ,i r • C r • - • r ►�,��I����'I CI�I ���� OIO ►�OI� � ��O- ►�� ' �i � �I�� - • • • �...►�w�IOi 'COI IOI �'�V 0I�• �� � ♦�� � � .O�O�� ,�IOI �IO� ►IOI OIO �* ►OIO1 I ��. �'� � �� ,I� r • � • �er.�I�.�O OIp IpI I �• COI I ' O � E fO�OI air OI � ►0��. COI I � p� OI �*.�� r r • • �I�►�OI��� i��I OIp,� ' �Oi ' OIO O�` COI I � �' , - I�.i.�;I .. r - . �I �IOI _ ►�I� IOI ��il EIOI IOC OI01. ��� �•�•�r' PIZ - • - • �I�! ���I4► �A�I� ►�.��=la!I:�a!��IOI�RIMEId�j,� �w���!I����.'♦Is���.'I�.w���► ....�'�a�:$�i • ••• - • r -• • • r • r r r • 'r • r r r r •-r . • r • r r • •r :r r • •r r � r r • • r r APPROX. {2' (TYP) 1 RE PIPE JOINT 4 DESIGN AND LOCATION PER PLANS. NOTE: LONG SPAN PIPE SHALL BE USED FOR UNSUPPORTED SPANS GREATER THAN 20'. SEE SPECIFCATIONS FOR LONG SPAN PIPE REQUIREMENTS. SHOP DRAWINGS FOR LONG SPAN PIPE SHALL BE SUBMITTED AND APPROVED BY ENGINEER PRIOR TO INSTALLATION. TYPICAL ELEVATED CROSSING_ REVISION DATE - NOVEMBER 3, 2008 SAND BAG TEMPORARY PIPE (SIZED TO CARRY NORMAL FLOW) ,GS STREAM BED ii/.11..1\ WIN J{— ii�.l� LINE NOW REVISION DATE - NOVEMBER 24, 2009 RE -SLOPE EXISTING STREAM BANK TO ORIGINAL CONTOURS. STABILIZE WITH MATTING PER DETAIL AND 1— NATIVE PLANT SEED MIX PER EROSION CONTROL NOTES. f- -I I=1 I —III— NORMAL STREAM LEVEL ANCHOR FABRIC 6" INTO EAtRTH FILL 1I- =1 '— III — III -111— 2' MAX. �'— Ill -1I1 —I - -1 ARIES 6 " -12" —I 11 —I 12" - 18" CLASS B RIPRAP -1111 I {11111 11 I I t FILTER FABRIC (MIRAFI 14ON OR EQUAL) -I li �I 1� iI liii Y � Td m m NOTE: CONCRETE SHALL BE 3060 PSI. CONCRETE ENCASEMENT NOT REQUIRED WHEN PIPE IS AT LEAST THREE (3) FEET UNDER THE CENTERUNE OF CREEK BOTTOM. SEWER SERVICES SHALL BE CONSTRUCTED OF C.I:&P. ANY PIPE RUN REQUIRING A CREEK CROSSING SHAD. BE CONSTRUCTED Of A: CONSISTENT MATERIAL. TRANSITIONS ANDL FERNCO COUPLINGS SHALL NOT BE PERMITTED THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO ENSURE UNCURED CONCRETE DOES NOT CONTACT SURFACE WATERS. PIPE DIA 12" 12" D.I.P. o •, I L 2" 1 1 NA. BOLT 10" If 3" ---� BOLT DIA. + 1/16" -� NOTES: 1. ANCHOR BOLTS AND STRAPS SHALL BE GALVANIZED OR STAINLESS STEEL. 2. GALVANIZED STEEL OR IRON CAN BE USED. 3. FOR PIPE 24" AND LARGER USE 1" DIA. BOLTS. 4. HOLES TO BE DRILLED IN STRAP. 5. PROVIDE WASHERS UNDER STRAP SUCH THAT STRAP IS PULLED DOWN TIGHT. 171, A rt"I"PE STrx/-%P FOR PIERS. NO. DATE BY f d� N 1 i Y 12 d ♦ e q. sd -4,' w C3 � Ul w M Lo Z CONCRETE ENCASEMENT NOTE: CONCRETE SHALL BE 3060 PSI. CONCRETE ENCASEMENT NOT REQUIRED WHEN PIPE IS AT LEAST THREE (3) FEET UNDER THE CENTERUNE OF CREEK BOTTOM. SEWER SERVICES SHALL BE CONSTRUCTED OF C.I:&P. ANY PIPE RUN REQUIRING A CREEK CROSSING SHAD. BE CONSTRUCTED Of A: CONSISTENT MATERIAL. TRANSITIONS ANDL FERNCO COUPLINGS SHALL NOT BE PERMITTED THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO ENSURE UNCURED CONCRETE DOES NOT CONTACT SURFACE WATERS. PIPE DIA 12" 12" D.I.P. o •, I L 2" 1 1 NA. BOLT 10" If 3" ---� BOLT DIA. + 1/16" -� NOTES: 1. ANCHOR BOLTS AND STRAPS SHALL BE GALVANIZED OR STAINLESS STEEL. 2. GALVANIZED STEEL OR IRON CAN BE USED. 3. FOR PIPE 24" AND LARGER USE 1" DIA. BOLTS. 4. HOLES TO BE DRILLED IN STRAP. 5. PROVIDE WASHERS UNDER STRAP SUCH THAT STRAP IS PULLED DOWN TIGHT. 171, A rt"I"PE STrx/-%P FOR PIERS. NO. DATE BY f d� N 1 i 0 ~ w C3 � Ul w M Lo Z LD 0 Cn Z M 2 In .( gQ _ �-, W � Q A w n 0 r\ -� �° v I. 4 r I: i '1 Q J w O a_ M 0 CD M N M N 0 0 0 LO 0 0 N C 0 3 a} m .N N M 0 0 N a u EXTRA STRENGTH. FILTER FABRIC Ni:EDED WITHOUT WIRE MESH SUPPORT CONSTRUCTION SPECIFICATIONS STEEL POST 1 CONSTRUCTION MATERIAL 1. Use synthetic filter fabric or pervious sheet of polypropylene, nylon, polyester, or polyethylene yam, which Is certified by the manufacturer or supplier as �... -- having a minimum filtering efficiency of 85 7 a tensile strength of 30 lb/In (standard) or 50 lb/in (extra strength) at 20X elongation, and a slurry flow rote _.-- -- �'- of 0.3 got /sq ft. Synthetic fabric should contain uttra- - •" a Fr MW SPAOM WIN violet ray inhibitors and stabilizers to provide min. 6 anRE SUPPORT FENCE e Fr wtx:sPACB+a wmlour NOTE: DO NOT months expected usable life at 0 -120 deg. F. "" suPPa �1±ce ATTACH FABRIC 2. Ensure that posts are 1.33 lb /ft steel with a minimum TO EXISTING length of 4 feet. TREES, 3. Use min. 14. gauge wire fence with max mesh spacing of 6 ". CONSTRUCTION PONDiNG Hr paHawa FIT, 1. Ensure height of fence does not exceed 18" above ground surface. /Y 2. Construct fabric from continuous roll out to length F MAX .�'/ O of barrier to avoid joints. When joints are necessary, securely. fasten the filter cloth only at a support RUNOFF R� uNO post with overlap to the next p ost. 3. Support standard fabric t aX fastened securely strength side of posts, using mesh heavy duty. wire staples at least 1" long. Extend wire mesh to bottom of trench. 18" MIN. t2" MINI "A6 NOTE 1. INSPECT AND REPAIR FENCE AFTER EACH STANDARD DETATi, ALTERNATE DETAIL STORM EVENT AND REMOVE SEDIMENT WHEN TRENCH WITH "NATIVE BACXFILL TRENCH WITH GRAVEL NECESSARY. 2. REMOVED SEDIMENT SHALL BE DEPOSITED To AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF -SITE AND CAN BE PERMANENTLY STABILIZED. 3. FILTER FABRIC SHALL BE REPLACED WHEN IT REVISIONS HAS DETERIORATED TO SUCH EXTENT THAT IT DATE DESCRIPTION REDUCES THE EFFECTIVENESS OF THE SILT FENCE._ EFFECTIVENESS OF THE SILT FENCE. My OF � Y STD. Nfl. T X[p o'� ARDS . SILT FENCE DECAIL 2.01 carry r7 up aides_ of 0 Tway tM of berm #5 washed stone, 2 -t� BTeW�a�O�a�QTWO�ef r falimi l _,,.j i 1..x_ maximum lewsi of p -Top J sediment collected. key kr,bottam layer dean basin when 1//2 OeI -rap depth level is reached SBCT ON THROUGH BA32N ANO FII,TEFt carry rip-r up eldes of ep iwoy 4W . 9' TIP -roP. 1' freeboard m IY \° MIN. #3 washed atone • I1•'1. j QN SPECIFlGA'IIOUS , 1. Place two concrete blocks on their, sides perpendicular to the curb at either end of the Inlet opening. These will. serve as space blocks: 2. Place concrete blocks on their sides across the front of the Inlet and abutting the :spacer blocks. The openings In the blocks should face outward, not upward. 3. Cut a 2- by 4 -inch stud the length of the curb inlet plus the width of the two. spacer blocks. Place the .stud through the outer hole of each spacer block to help keep the front blocks in place. 4. Place wire mesh over the outside vertical face (open ends) of the concrete blocks to prevent stone. from being woshed through the blocks. Use chicken wire, hordwire cloth with 1/2 inch openings, or filter fabric. 5. Place 3/4 Inch to 1 -1/3 Inch .graven against the wire to the top of the barrier. 3rd: min a' ,-IT, CONSTRUCTION SPECIFICATIONS 1. Clear, grub, and strip area of ail vegetation and root material. Remove oil objectionable material. 2. Ensure fill material Is free of objectionable material. Place fill in 6" lifts and machine compact. 3. Protect connection between riprop and soil by using filter fabric. Extend fabric across spillway foundation cnd sides to top of dam. 4. Clear pond area below dam for sediment cleonout. 5: All cut and fill slopes should be 2:1 or flatter. 6. Ensure stone section has min. bottom width of 3' with max side slopes of 2:1. 7. Ensure weir is level and constructed to grade. S. Material used In stone section should be well - graded mixture of stone with d50 size of 9" and max. size of 14 ". 9. Ensure spillway extends past toe of embankment until stable conditions are reached. Keep edges of stone outlet flush with surrounding ground and shape center to confine outlet stream. 10. Direct emergency bypass to natural, stable areas. 11. Stabilize embankment and all disturbed areas immed- iately after construction, including embankment, emergency spillway, above the sediment pool and downstream. 12. Mark cleonout level in field. OF SIDENAK r- A -I - CATCH BASIN 2X4 WOOD STUD BACK OF C1R$ CONCRETE OLD" CURB W= • a� �1 �V_," . WOOD STUD SECTION A - A �Ir 1 i NEW LiNE POST AS REQUIRED (TYP. BOTH SIDE! Lll•I n AI 1 IniAITC (TYP.) DIRECTION OF _ RIVER FLOW r-7 -v-) �_ 1-1/2" METAL STAPLE Z to Milk MODIFIED FOR THIS PROJECT 3" MIN. O NOTES: 1. INSTALLATION OF MATTING SHALL CONFORM TO MANUFACTURER'S REQUIREMENTS, OR AS SPECIFIED BY ENGINEER, WHICHEVER IS MORE STRINGENT. 2. MATTING SHALL BE NORTH AMERICAN GREEN SC150, AMERICAN EXCELSIOR EROSION CONTROL BLANKET, OR EQUAL, INSTALL ON ALL DDSTURBED SLOPES (CHOSEN PRODUCT MUST BE RATED FOR SLOPES 2 :1 TO 1:1). 3. ALLOW 3" MIN. OVERLAP BETWEEN PARALLEL STRIPS, OR AS SPECIFIED BY MANUFACTURER, WHICHEVER IS MORE STRINGENT. 4. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP'S), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. 5. BEGIN AT THE TOP' OF THE SLOPE BY ANCHORING THE RECP'S IN A 4" DEEP X 4" WIDE TRENCH WITH APPROXIMATELY 12" OF RECP'S EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP'S WiTH A ROW OF STAPLES/STAKES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE THE "NCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" PORTION OF RECP'S BACK OVER SEED AND COMPACTED SOIL. SECURE RECP'S OVER COMPACTED SOIL WiTH A ROW OF STAPLES /STAKES `SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE RECP'S. 6. ROLL THE RECP'S DOWN OR HORIZONTALLY ACROSS THE SLOPE. RECP'S WiLL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP'S MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING AND SPACING STAPLES /STAKES IN A DIAMOND PATTERN AT 12" ON CENTER, OR AS RECOMMENDED BY THE MANUFACTURER, W' IICHEVER IS MORE STRINGENT. 7. RECP'S SHALL BE AT TRENCH ANCHORED AS SHOWN IN THE DETAIL AT THE TOP OF SLOPE AS WELL AS ALONG THE EDGE OF THE FURTHEST UPSTREAM MATTING. MATTING CONFIGURATION SHALL PREVENT BOTH STORMWATER RUNNING DOWNSLOPE TO THE RIVER, AS WELL AS FLOODWATERS MOVING DOWNSTREAM, FROM ENTERING UNDER THE MATTING AND INDUCING SCOURING CONDITIONS. 8. CONSECUTIVE RECF1 "S SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" C)VERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART ACROSS ENTIRE RECP'S WIDTH. GEOTEX11LE FILTER FABRIC 6 " #5i GEOTEXTILE FILTER BAG SIZED FOR PUMP DISCHARGE (MIN. 10'X15') GEOTEXTiLE FILTER FABRIC 1 _ SEWN -iN PiPE DISCHARGE SLEEVE PUMP DISCHARGE HOSE w� 0 v_ WZW �W ATTACHMENT POINT F-i TOR PUMP DISCHARGE w c- H cv 00 N u Z ^ 00 Z x ATTACHMENT POINT FOR PUMP DISCHARGE a ►,� 10 1& C> 00 rr^^ N V 1 00 rr Z V1Za IL B VAMW t� PW,AP DISCHARGE /- HOSE W W Cy7 0 Z W � i I `tt(tttil � y RELEASED 1 _Ue� cb Wok { CONSTRUCTION W A. 14, SEWN -iN PiPE DISCHARGE SLEEVE PUMP DISCHARGE HOSE Omni 0 Z U. ATTACHMENT POINT Uj TOR PUMP DISCHARGE :D > ATTACHMENT POINT FOR PUMP DISCHARGE 10 1& J IL B VAMW U PW,AP DISCHARGE /- HOSE \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ "' `" \ \ \// / \ \ \ \ \ \ \ \ \ \ \ \ \ \ / \ \ \ \ \ \ \ \/ / \ \ / \ \ / \ \ / / \ / / \ //\ N INSTALL ON LESS Q W j w w THAN 5% SLOPE r Vj 0 W W W Ur 6"#57 STONE ' Q W m Z W 2� SEOTION Z lLi Z o N UNDISTURBED EARTH' m Z W o C13 H V7 0 � +- NOTES: O O U D 0U U. D 1. FILTER BAG SHALL BE CONSTRUCTED OF NON -WOVEN FILTER FABRIC WITH A MIN. 8 OZ /SQUARE YARD WEIGHT 2. FiLTER BAG FABRIC SHALL HAVE A FLOW RATE OF 80 GPM /S.F. Vj OR SIZED FOR PUMP DISCHARGE 3. SILT BAG SHALL HAVE SLEEVE SEWN -IN SLEEVE FOR RECEIVING THE PUMP DISCHARGE AND PUMP HOSE SHALL BE SECURELY ATTACHED TO SILT BAG 4. SILT BAG SHALL BE REPLACED WHEN HALF FULL OR PUMP Uj DISCHARGE RATE iS REDUCED ENOUGH TO CAUSE OVERFLOW. CONTRACTOR SHALL PROVIDE ADDITIONAL BAGS AS REQUIRED. 5. BOTH FILTER BAG AND SILT WITHIN SHALL BE DISPOSED OF IN A PROPER MANNER AFTER MATERIAL INSIDE IS DRY, RESULTING IN NO DISCHARGE TO THE STREAM DEWATERING SILT BAG 1_ 11 REVISION 1. #i°