Loading...
HomeMy WebLinkAboutNCC201286_NOT Closeout Documents_20211122North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Martin Project: Line 204 Laydown Yard Person financially responsible: PIEDMONT NATURAL GAS COMPANY INC - SANU ODUGBESAN Address: 4720 PIEDMONT ROW DR, CHARLOTTE, NC 1. Project Location: 1108 Ranch Motel Rd, Williamston Pictures: Yes - Digital 2. Weather and soil conditions: sunny, cool, dry 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Roanoke Project #: MARTI-2020-002 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one. Title: Inspection report: Sent Report Date given/sent: November 10, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the 10. Comments: SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGOI) must be requested by the permiltee via a Notice of Termination (NOT). The NOT is available at: httns://edoes.deg.ne.mov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: James Edwards Others present: No one. Date of inspection: November 09, 2021 Time arriving on site: 9:15 AM Time leaving site: 9:30 AM CC'