HomeMy WebLinkAboutNCG020946_Site Plans_20211122CATEGORY
ACREAGE
BOUNDARY AND PERMIT AREA
4.99
AC
(INCLUDING HAUL ROAD)
PROPOSED MINE AREA
3.12
AC
(EXCAVATION AREA)
PROPOSED SEDIMENT BASIN AREA
0.09
AC
PROPOSED HAUL ROAD 6 PROCESSING AREA
0.34
AC
(FROM MINE TO MILLIS ROAD)
PROPOSED STOCKPILE AREAS
0.14
AC
PROPOSED WASTE AREA
0.07
AC
UNEXCAVATED BUFFER AREA
1.23
AC
PROPOSED AFFECTED AREA
3.76
AC
CHRONOLOGICAL SEQUENCE OF LAND DISTURBANCE ACTIVITY
1.) INSTALL STONE CONSTRUCTION ENTRANCE
2.) ESTABLISH BUFFERS
3.) CLEAR GRASSES AND STOCKPILE TOPSOIL
4.) CONSTRUCT SEDIMENT BASIN
5.) DEWATERING
6.) EXCAVATE SAND MATERIAL
7.) TRUCK SAND MATERIAL OFFSITE
8.) RECLAIM MINE SITE
SEEDING SCHEDULE
SEED BED PREPARATION
LIME----------------------------- 2 TONS/AC.
10-10-20------------------------- 1,000 LBS./AC
0-20-0----------------------------- 500 LBS./AC (AFTER SEEDING)
ASPHALT TACK -------------------- 200 GAL./TON OF MULCH
SEEDING MIXTURE
(FEBRUARY 1 -APRIL 30)
TALL FESCUE---------------------- 50 LBS./AC
PENSACOLA BAHIAGRASS--------- 10 LBS./AC
KOREAN OR KOBE LESPEDEZA (SCARIFIED)---50 LBS./AC
(MAY 1 -AUGUST 31)
TALL FESCUE--------------------- 50 LBS./AC
WEEPING LOVEGRASS------------ 5 LBS./AC
KOREAN OR KOBE LESPEDEZA(SCARIFIED) ---- 50 LBS./AC
BROWNTOP MILLET--------------- 25 LBS./AC
(SEPTEMBER 1 - JANUARY 31)
TALL FESCUE---------------------- 60 LBS./AC
KOREAN OR KOBE LESPEDEZA (UNSCARIFIED)--- 60 LBS./AC
RYE (GRAIN) ----- ---- ------ - 25 LBS./AC
FOR SLOPES 2:1 OR STEEPER ADD 30 LBS./AC SERICEA LESPECEZ4
AND 15 LBS. WEEPING LOVEGRASS.
LANDSCAPING MIXTURE
(JANUARY 1 - MARCH 31)
COMMON BERMUDAGRASS (UNHULLED)----- 20LBS. LBS./AC
(APRIL 1 - JULY 31)
COMMON BERMUDAGRASS (HULLED) -------- 12 LBS./AC
MAX. SIDE SLOPE = 3:1-
RECLAIMATION POND
WATER LEVEL---t�--y- ---
I
a
a
- - - -
1 / " NO ACTIVITY PROPOSED
`-I/" \✓_ `,/- ;f. '). // IN THIS AREA -— -— -— - —-—-
' /
/
�• /' ,' 25' UNEXCAVATED BUFFER
-
--------------------------------- - - - NOTE:--- --� STOINGILE AND
DIWASTE AREA MAY BE LOWERED AS
_�1/ / /, /•/ '
PERMIT — — — — — — "
BOUNDARY � \ r I
STOCKPILE AREA
/ �• PROPOSED SILT FENCE I r n l
I G I AROUND PERIMETER OF
F 2z I STOCK d WASTE PILE
-\,]z ``�' `\\ a�� I L— ' WASTE AREA PROPOSED HAUL ROAD
` LIMIT CF EXCAVATION/
y � RECLAMATION AREA =
A ,I 3.12ACRES I "
404,WETLANDS V ` -•��, �T I I ° n °
1 �11
SUMP tt1 x /
_
II PROPOSED DEWATERING PUMP
200 GPM MAX INTO
SEDIMENT BASIN EXISTING HAUL ROAD, /
\ •, '\ I IIIIII IIIiI TO BE REMOVED /
SEDIMENT BASIN
I
80 x50' x5'POINT
OF
DISCHARGE
1, ,
I �• , I 10'x10'x2'
�\.I.!=,. �S m�° I RIP RAP /
APRON /
/ —
_ _
-- - - -- — — — — —
,
1 ----
/ •-•.f.. 25' UNEXCAVATED/UNDISTURBED BUFFER
\ J
W O
•,. I N�L O
I
X 0-)
ELLIOTT, DALE ETUX KELLY
Z
J
25' BUFFER
OR GREATER
XISTING GRADE
TOPSOIL
SAND_
CUT SLOPE X-SECTION _
N.T.S.
SCHEDUER SEEDING
>
a
FINAL DITCH STABILIZATION DETAIL
N.T.S.
SHEET # 2 OF 2
PROJECT 9:PM823-15'--001
DESIGN FILE #:PM823-15.dgn
12 GAUGE WIRE.
MINIMUM
FILTER FABRIC
NCDOT 1056
TYPE 3. CLASS B
COMPACTED FILI
S�ppE
S\pE
\ MAX• �
NATURAL SURFACE, 2'.., ,,� , x ,ail
10' MAX. WITH WIRE
6' MAX WITHOUT WIRE
WII.R�SEAS2EDI� ONOVER
OVERBURDEN RECLAMATION AND TEMPORARY BERM DETAIL
N.T.S.
NOTE: RECLAIM MINED AREAS CONCURRENTLY WITH MINING OPERATIONS.
EMBANKMENTS ARE TO BE SLOPED AND SEEDED WHEN MINING
OPERATIONS ARE DISCONTINUED FOR 15 DAYS OR MORE IN ANY
PARTICULAR AREA.
F IL TER
FABRIC
SILT FENCE DETAIL
SCALE: NOT TO SCALE
NOTES:
1. USE WIRE A MINIMUM OF 32" IN WIDTH. AND A MINIMUM OF
6 LINE WIRES WITH 12" STAY SPACING.
2. USE FILTER FABRIC A MINIMUM OF 36" IN WIDTH AND IASTEN
ADEQUATELY TO THE WIRES.
3. PROVIDE 5' STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE.
4. USE 6" POST WITH 3" DIAMETER.
50 25 0 50 01
%%/AniiI I III 61%/%/%%/%//%%G//%/%■I I■■■■
I- co
LLI Q0
I
I I
I '
I I I I
— —
I
I I
I � I
0
I 0
O
I O
I I
O
O
O
I
li
00
N
I N
i
W(\i
i Wn
u lq-
O h'_)
I ------'
tv�
EXI
FILL SLOPE X-SECTION
S.
STONE CONSTRUCIION ENTRANCE
SCALE: NOT TO STALE
OF EXISTING
L ROAD
1 AY
AREA SHOWN
`..... .
KEY MAP
NO ACTIVITY PROPOSED
IN THIS AREA
EXISTING HAUL ROAD
PERMIT BOUNDARY
I
la~
VARIABLE
UNEXCAVATED/UNDISTURBED
-J
BUFFER
`
I! L�j t
w
I
------ Z t--
u i
(z
I_
Q O I
-
NO
�O
OO
I
O r-- I
I
O
un NI--_� _-
X 0
X O
O
I
� C\I
) C\I
I
LEGE6
NOTES:
1) THE PRIVATE WELLS WITHIN 500 FEET OF EXCAVATION
LIMITS ARE SHOWN ON MAP.
2) PERMIT BOUNDARY IS LOCATED OUTSIDE FLOOD ZONE X
AS CLASSIFIED AND SHOWN ON FEMA MAP 3720632800J.
DATED 7/16/03.
3) ALL STRUCTURES WITHIN 300' OF THE MINING SITE AREA
SHOWN WITH THEIR PROPERTY OWNERS.
4) TEMPORARY STOCKPILES AND WASTEPILES SHALL BE
REMOVED PRIOR TO RECLAMATION. ROAD WAYS AND DITCHES
NOT WITHIN EXCAVATION AREA SHALL BE MAINTAINED AND
RETURNED TO EXISTING STATE.
5) EXPLOSIVES OR BLASTING ARE STRICTLY PROHIBITED ON
MINE SITE.
6) NO FUEL TANKS OR OTHER CHEMICAL REAGENTS SHALL BE
STORED ONSITE.
7) THERE ARE NO PROPOSED OR EXISTING BUILDINGS ON THE
PROPERTY TO BE MINED.
8) THERE ARE NO PROPOSED PROCESSING PLANTS.
9) SEE SHEET 2 FOR DETAILS AND ENLARGED MINING MAP.
l �
4 y.9
= a SEAL � -•
037378
Fg M.
//0l a 110 q//
404 WETLANDS
yfi EX. HAUL ROAD
ik cl�.w
PROPOSED HAUL ROAD
— — — BUFFER LINE
sF— SILT FENCE
----- FLOOD ZONES
--20-- EXISTING CONTOURS
REVISIONS: