Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG020994_NOI Application_20211112
Division of Energy, Mineral, and Land Resources Land Quality Section National Pollutant Discharge Elimination System NCG020000 This general permit covers STORMWA TER AND/OR WASTEWATER DISCHARGES associated with activities under SIC (Standard Industrial Classification) Code 14 [Mineral Mining Industry] except for: peat mining, coal mining, metal mining, oil and gas extraction, tourist gem mines, NCDOT borrow pits, in -stream sand mining, and discharges from mining operations which are intermixed on site with stormwater from concrete operations. You can find information on the DEMLR Stormwater Program at deq.nc.gov/SW. Directions: Print or type all entries on this application form. Send the original, signed application with all required items listed in Item (9) below to: NCDEMLR Stormwater Program, 512 N. Salisbury St., 1612 MSC, Raleigh, NC 27699-1612. The submission of this form does not guarantee coverage under the General Permit. Prior to coverage under this General Permit a site inspection will be conducted. 1. Owner/Operator (to whom all permit correspondence will be mailed): FOR AGENCY USE ONLY Date Received Year Month Day Certificate of Coverage N C G 0 2 Check # Amount Permit Assigned to Name of legal organizational entity: Legally responsible person as signed in Item (10) below: Piedmont Lithium Carolinas, Inc. Patrick Brindle Street address: City: State and zip code: 32N Main Street, Suite 100 Belmont NC, 28012 Telephone number: Email address: 704-461-8000 pbrindle@piedmontlithium.com 2. Industrial Facility (facility being permitted): Facility name: Facility environmental contact: Carolina Lithium Project Monique Parker Street address: City: State and zip code: Hephzibah Church Road Bessemer City NC, 28016 Telephone Number: Email address: 704-461-8000 mparker@piedmontlithium.com Latitude of entrance: 35.3896' Longitude of entrance:-81.2886' Parcel Identification Number (PIN) multiple - see Appendix A, Figure 3 4-digit SIC code: Facility is: Date operation is to begin or began: 1479 and 2819 ❑✓ New ElProposed ❑ Existing June 2023 Brief description of the types of minerals mined at this facility: naturally occurring spodumene mineral Is this a processing -only facility for materials mined elsewhere? Is this an inactive mine site? ❑ Yes ❑ Yes ❑✓ No ❑✓ No Does total area of this mine site include ready -mixed concrete plant and/or asphalt plant areas? ❑Yes, and has separate NPDES stormwater permits (provide permit numbers): ❑Yes, and does not have separate NPDES stormwater permits ❑✓ No Does this facility already have a valid Mining Permit from DEMLR's Land Quality Section? ❑Yes (please provide the Mining Permit Number) ❑✓ No (please indicate the status of the Mining Permit application) Mine application submitted 8/30/2021 and under review by DEMLR Page 1 of 8 Are you applying for a discharge permit in the same location as a previously permitted mine? El Yes (please provide permit number and mine name) ❑✓ No If the stormwater discharges to a municipal separate storm sewer system (MS4), name the operator of the MS4: ❑✓ N/A 3. Consultant (if applicable): 4. Name of consultant: Consulting firm: Patrick Blandford HDR Engineering, Inc. of the Carolinas Street address: City: State and zip code: 440 S. Church Street, Suite 1000 Charlotte NC, 28202 Telephone number: Email address: 704-338-6746 patrick.blandford@hdrinc.com Development Activities and Buffers Mining operation will precede development activities at this site: ❑ Yes ❑✓ No Mine is located within one of the 20 Coastal Counties, and will it add more than 10,000 ft2 of impervious surface: ❑ Yes (to both) ❑ No, this mine is within one of the 20 Coastal Counties, but will not at more than 10,000 ft2 of impervious surface ❑✓ No, this mine is not within one of the 20 Coastal Counties Mine is in the Neuse, Tar -Pamlico, or Catawba River Basins, OR in the Randleman or Jordan Water supply Watersheds? ❑✓ Yes (specify size of stream buffers) 30 feeC adherest, the Gaston County UnifedDevelopment ordinance that requires 30-foot vegetative buffers streams V development activities that are o n-residential and b0-24%imp-00 ❑ No 5. Mine Dewatering Mine dewatering will occur at this site: ❑✓ Yes ❑ No (mark N/A for the rest of this section) Mine dewatering from this facility will be discharged to: ❑Surface Waters and/or Wetlands ❑✓ Other (specify) discharged to pit discharge settling ponds outside pits from which water will be used for operational use or discharged to surface waters ❑Mine will not discharge dewatering to Surface Waters and/or Wetlands; specify how dewatering will occur and where water will be directed: [-]N/A Wetlands and/or Surface Waters are within 400' of the mine pit perimeter: 404/401 Certification permits required: ❑✓ Yes (specify distance) closest wetland is approximately 100' to a mine pit perimeter ❑✓ Yes (briefly describe) see supplemental information ❑ No ❑ No ❑ N/A ❑ N/A Have you been required to obtain a wetland delineation certified by the US Army Corps of Engineers? ❑✓ Yes (please attach to this application) ❑ No 6. Wastewater Treatment Will this facility wash mined materials? ❑✓ Yes ❑ No Will discharges of process wastewater treatment systems occur (including possible recycle system overflows) [-]Yes (please describe) ❑✓ No Page 2 of 8 Will this facility employ chemical additives to flocculate suspended solids? 0 Yes (specify name/manufacturer/quantity of daily use) Magnafloc 10/sNF or BASF/30 tonnes peryear ❑ No Note: please visit: https://files.nc.gov/ncdeg/Water+Quality/Environmental+Sciences/ATU/PAM8 30 18.pdf for list of approved PAMS Will any of the wastewater treatment facilities at this mine overflow only during rainfall events that exceed the 10-yr, 24-hr rainfall event? ❑ Yes (specify which systems) 0 No Are wastewater treatment facilities (including recycle systems) planned in the 100-year flood plain? ❑Yes 0 No Wastewater Treatment Alternative Review as required by 15A NCAC 2H.0105(c)(2) Types of wastewater this mine site will discharge: 0 Mine Dewatering ❑ Process Wastewater Types of wastewater considered for this alternative review: 0 Mine Dewatering ❑ Process Wastewater Are there existing sewer lines within a one -mile radius? ❑ Yes ❑ Wastewater treatment plant will accept wastewater ❑ Is feasible to connect (explain) ❑ Is not feasible to connect (explain) ❑ Wastewater treatment plant will not accept wastewater (please attach letter documenting this) 0 No Are you already proposing a closed -loop recycle system (CLRS) that meets design requirements of 15A NCAC 2T .10000? ❑Yes, for dewatering ❑ Yes, for process wastewater ❑ Yes, for both ❑ No, this option is technologically feasible (explain) ❑ No, this option is not technologically feasible (explain) ❑ No, this option is otherwise feasible (explain) ONo, this option is otherwise not feasible (explain) Volumes are anticipated to exceed recycle system demand per water balance. What is the feasibility of building a CLRS compared to direct surface water discharge? Surface or Subsurface Disposal System ❑ A surface or subsurface disposal system is technologically feasible (explain) ❑ A surface or subsurface disposal system is not technologically feasible (explain) 0 A surface or subsurface disposal system is otherwise feasible to implement (explain) Pit discharge basins (i.e. mine dewatering) will be discharged overland through buffers at anticipated flow rates based on water balance. El surface of subsurface disposal system is not otherwise feasible to implement (explain) What is the feasibility of employing a subsurface of surface discharge as compared to a direct discharge to surface waters? Direct Discharge to surface waters is the most environmentally sound alternative to all reasonably cost-effective options for the wastewaters being considered? nYes ❑ No Page 3 of 8 If this review included all wastewater discharge types, would excluding some types make any of the above non -discharge options feasible for some the wastewaters? ❑ Yes 0 No 7. Outfalls(s) At least one outfall is required to be eligible for coverage. 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is impaired. SDO-01 Beaverdam Creek WS-Iv ❑This watershed has a TMDL. Discharge from this outfall is from: 0 Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: 0 Only during a rainfall event ❑ Intermittently (please indicate how often) (please indicate flow in CFS) -[—]Continuously Latitude of outfall: 35.392637 Longitude of outfall:-81.308716 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Coarse Rock and Tailings Storage Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes El No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑This water is impaired. SDO-02 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: 0 Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: 0 Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.393128 Longitude of outfall:-81.304559 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Coarse Rock and Tailings Storage Do Vehicle Maintenance Activities occur in the drainage are of this outfall? 0 Yes ❑ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? approximately 100 gallons of motor oil per month 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is impaired. SDO-03 Beaverdam Creek WS-Iv ❑This watershed has a TMDL. Discharge from this outfall is from: 0 Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: 0 Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.390628 Longitude of outfall:-81.302864 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Coarse Rock and Tailings Storage Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes 0 No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? Page 4 of 8 All outfalls must be listed and at least one outfall is required. Additional outfalls may be added in the section "Additional Outfalls" found on the last page of this NOI. 8. Other Facility Conditions (check all that apply and explain accordingly): 9 ❑This facility has any other NPDES permits. If checked, list the permit numbers for all current NPDES permits: ❑ This facility has Non -Discharge permits (e.g. recycle permit). If checked, list the permit numbers for all current Non - Discharge permits: 0 This facility uses best management practices or structural stormwater control measures. If checked, briefly describe the practices/measures and show on site diagram: Concentrate Operations (i.e. Mine #1, Concentrate Plant, and Industrial Minerals Plant) will maintain land disturbances and stormwater management controls for the life of the mine. These have been designed per mining design standards. The Lithium Hydroxide Conversion Plant ut•'Y ❑This facility has a Stormwater Pollution Prevention Plan (SWPPP). Y If checked, please list date that SWPPP was implemented: ❑This facility stores hazardous waste stored in the 100-year floodplain. If checked, describe how the area is protected from flooding: ❑ This facility is a (mark all that apply) ❑ Hazardous Waste Generation Facility ❑ Hazardous Waste Treatment Facility ❑ Hazardous Waste Storage Facility ❑ Hazardous Waste Disposal Facility If checked, indicate: Kilograms of waste generated each month: Type(s) of waste: How material is stored: Where material is stored: Number of waste shipments per year: Name of transport/disposal vendor: Transport/disposal vendor EPA ID: Vendor address: ❑ This facility is located on a Brownfield or SUPERFUND site If checked, briefly describe the site conditions: 0 Facility provides appropriate secondary containment for bulk storage of liquid materials If checked, briefly describe these measures: Double walled tanks would be utilized for bulk liquid materials, and totes would be located within confinement areas (engineered design areas with grade walls) ❑ Site has an active landfill within the mining permit boundary If checked, please indicate type: a) ❑ LCID (Land clearing and Inert Debris) b) ❑ other (specify) ulred Items (Application will be returned unless all of the following items have been included): 0 Check for $100 made payable to NCDEQ 0 Copy of most recent Annual Report to the NC Secretary of State OThis completed application and any supporting documentation 0 Copy of the approved mining permit or indication of mining permit application status 0 Copy of US Army Corps — approved wetland delineation (if applicable) Page 5 of 8 ❑✓ Line drawing of the water flow through the facility or block flow diagram ❑✓ Pictorial description of the nature of any sources of water and any collection and treatment measures ❑✓ A site diagram showing, at a minimum, existing and proposed: a) outline of drainage areas b) surface waters c) stormwater management structures d) location of stormwater outfalls corresponding to the drainage areas e) runoff conveyance features f) areas where materials are stored g) impervious areas h) site property lines M 2 copies of large scale (24"x36" minimum) site plan showing: a) topographical lines b) all outfall locations c) applicable buffers and delineated wetlands d) receiving waters e) 100-year flood plain (if applicable) ❑✓ Copy of county map or USGS quad sheet with the location of the facility clearly marked If mines site is in one of the 20 Coastal Counties (if applicable) ❑ Applicant has check with the appropriate regional office to verify the need for a Coastal State Stormwater permit. a) Indicate the Regional Office Contact: ❑ Detailed list of: a) impervious surface areas and percentages b) sub -drainage areas c) total drainage area If mine is dewatering and near wetlands, or may otherwise impact surface waters or groundwater (if applicable) ❑✓ 2 copies of large scale (24"x36" minimum) plans delineating areas on the listing acreage including: a) wetlands b) ditches c) well -placements d) pits e) borrow areas f) overburden storage g) stormwater controls/BMPs h) vehicle maintenance areas i) settling basins j) product process (such as screening, stockpiles, and waste piles) k) total drainage area 1) impervious surface percentages (if state Stormwater programs apply) m) applicable buffers n) access and/or haul roads ❑✓ Pump dewatering size and information on its specifications ❑✓ Well information (design, depths, maintenance) ❑✓ Physical monitoring for the wetland areas ❑✓ Settling pond size information, if applicable ❑ Level spreader design, if applicable ❑✓ Details about dewatering method ❑✓ Cone of influence calculations Page 6 of 8 ❑✓ Description of measures to prevent erosion and flooding ❑✓ Description and information about 401/404 permits that have been obtained ❑✓ Copy of US Army Corps of Engineers wetlands delineations or approved wetland delineation (if applicable) ❑✓ I have contacted my local regional office about a Pumping Operation and Monitoring (POM) plan a) Regional Office Contact: James Moore b) Date Contacted: 9/20/2021 10. Applicant Certification: North Carolina General Statute 143-215.66 (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). 1 hereby request coverage under the referenced General Permit. Under penalty of law, I certify that: ❑ I am the person responsible for the permitted industrial activity, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. ❑ The information submitted in this N01 is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. ❑ I will abide by all conditions of the NCG02 permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. ❑ I hereby request coverage under the NCG020000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Printed Name of Person Signing: Title (Signature of Applicant) (Date Signed) Mail the entire package to: DEMLR— Stormwater Program Department of Environmental Quality 512 N. Salisbury Street, 6t" floor 1612 Mail Service Center Raleigh, NC 27699-1612 Page 7 of 8 ❑ Description of measures to prevent erosion and flooding ❑ Description and information about 401/404 permits that have been obtained ❑ Copy of US Army Corps of Engineers wetlands delineations or approved wetland delineation (if applicable) ❑ I have contacted my local regional office about a Pumping Operation and Monitoring (POM) plan a) Regional Office Contact: b) Date Contacted: 10. Applicant Certification: North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). 1 hereby request coverage under the referenced General Permit. Under penalty of law, I certify that: ® I am the person responsible for the permitted industrial activity, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information. ® I will abide by all conditions of the NCG02 permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable In the same manner as an individual permit. I hereby request coverage under the NCGO20000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an Individual permit. Printed Name of Person Signing: P&--Q,%`w_ U . 16CLI oL-fL— Title: F..xau�,r�„�. V�GE_ Pn..E'�<<`✓@.wST lAua Lu%E.F PAW.tOff_ %j-r OFF%C..S.L (Signature of Applicant) (Date Slgned) Mail the entire package to: DEMLR — Stormwater Program Department of Environmental Quality 512 N. Salisbury Street, 61h floor 1612 Mail Service Center Raleigh, NC 27699-1612 Page 7 of 8 Additional Outfalls 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-04 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.388957 Longitude of outfall:-81.301255 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Coarse Rock and Tailings Storage Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-05 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.386522 Longitude of outfall:-81.304586 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Coarse Rock and Tailings Storage Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-06 Beaverdam Creek WS-Iv ❑This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.385922 Longitude of outfall:-81.30583 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Coarse Rock and Tailings Storage Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? Page 8 of 8 Additional Outfalls 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-07 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.385107 Longitude of outfall:-81.307489 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Coarse Rock and Tailings Storage Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-08 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.385864 Longitude of outfall:-81.311904 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Coarse Rock and Tailings Storage Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-09 Beaverdam Creek WS-Iv ❑This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.387828 Longitude of outfall:-81.312447 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Coarse Rock and Tailings Storage Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? Page 8 of 8 Additional Outfalls 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-10 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.390739 Longitude of outfall:-81.312657 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Coarse Rock and Tailings Storage Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes 0 No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-11 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: 0 Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: 0 Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.390879 Longitude of outfall:-81.284713 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Topsoil Storage Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes 0 No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-12 Beaverdam Creek WS-Iv ❑This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: 0 Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.38998 Longitude of outfall:-81.281345 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Topsoil Storage Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? Page 8 of 8 Additional Outfalls 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-13 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: 0 Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: 0 Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.394263 Longitude of outfall:-81.296319 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Plant Pad Surface Do Vehicle Maintenance Activities occur in the drainage are of this outfall? 0 Yes ❑ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? approximately 400 gallons of motor oil per month 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-14 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.394125 Longitude of outfall:-81297529 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Plant Pad Surface Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-15 Beaverdam Creek WS-Iv ❑This watershed has a TMDL. Discharge from this outfall is from: OStormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.39635 Longitude of outfall:-81.299868 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Plant Pad Surface Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? Page 8 of 8 Additional Outfalls 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-16 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.39679 Longitude of outfall:-81.299519 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Plant Pad Surface Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-17 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.391702 Longitude of outfall:-81.319766 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Emulsion Storage and Bulk Truck Parking Area Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑✓ Yes ❑ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? approximately 100 gallons of motor oil per month 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-18 Beaverdam Creek WS-Iv ❑This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.397036 Longitude of outfall: -81.319371 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Lithium Hydroxide Conversion Plant Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? Page 8 of 8 Additional Outfalls 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-19 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.395832 Longitude of outfall:-81.318963 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Lithium Hydroxide Conversion Plant Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-20 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.393713 Longitude of outfall:-81.318565 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Lithium Hydroxide Conversion Plant Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-21 Beaverdam Creek WS-Iv ❑This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.394314 Longitude of outfall:-81.321136 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Lithium Hydroxide Conversion Plant Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? Page 8 of 8 Additional Outfalls 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-22 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.39691 Longitude of outfall:-81.321759 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Lithium Hydroxide Conversion Plant Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. SDO-23 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑✓ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑✓ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.396049 Longitude of outfall:-81.324137 Brief description of the industrial activities that drain to this outfall: Stormwater Runoff - Railyard Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. MDO-01 Little Beaverdam Creek WS-Iv ❑This watershed has a TMDL. Discharge from this outfall is from: ❑Stormwater ❑✓ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑ Only during a rainfall event ❑✓ Intermittently (please indicate how often) as necessary to dewaterthe east pit; maxflow rate is 1,575 gpm ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.383525 Longitude of outfall:-81.288309 Brief description of the industrial activities that drain to this outfall: Mine Dewatering Wastewater - Pumping from Pits During Operations; Stormwater Runoff - Coarse Rock and Tailings Storage upon Reclamation of Pit Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? Page 8 of 8 Additional Outfalls 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. MDO-02 Little Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑ Stormwater ❑✓ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑ Only during a rainfall event ❑✓ Intermittently (please indicate how often) as necessary to dewater the south pit; max flow rate is 975 gpm ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.383218 Longitude of outfall:-81.290202 Brief description of the industrial activities that drain to this outfall: Mine Dewatering Wastewater - Pumping from Pits During Operations; Stormwater Runoff - Coarse Rock and Tailings Storage upon Reclamation of Pit Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. MDO-03 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑ Stormwater ❑✓ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑ Only during a rainfall event ❑✓ Intermittently (please indicate how often) as necessary(o dewaterthe southern partofwest pit; maxflow rate is 475 gpm ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.387524 Longitude of outfall:-81.288938 Brief description of the industrial activities that drain to this outfall: Mine Dewatering Wastewater - Pumping from Pits During Operations Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. MDO-04 Beaverdam Creek WS-Iv ❑This watershed has a TMDL. Discharge from this outfall is from: ❑Stormwater ❑✓ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑ Only during a rainfall event ❑✓ Intermittently (please indicate how often) as necessary to dewater the northern part of west pit; max flow rate is 475 gpm ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.39172 Longitude of outfall:-81.286032 Brief description of the industrial activities that drain to this outfall: Mine Dewatering Wastewater - Pumping from Pits During Operations Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? Page 8 of 8 Additional Outfalls 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. MDO-05 Beaverdam Creek WS-Iv ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑ Stormwater ❑✓ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑ Only during a rainfall event ❑✓ Intermittently (please indicate how often) as necessary to dewater the north pit; max flow rate is 850 gpm ❑ Continuously (please indicate flow in CFS) Latitude of outfall: 35.393515 Longitude of outfall:-81.28349 Brief description of the industrial activities that drain to this outfall: Mine Dewatering Wastewater - Pumping from Pits During Operations Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑✓ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. ❑ This watershed has a TMDL. Discharge from this outfall is from: ❑ Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: Longitude of outfall: Brief description of the industrial activities that drain to this outfall: Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is on the 303(d) list. ❑This watershed has a TMDL. Discharge from this outfall is from: ❑Stormwater ❑ Mine Dewatering ❑ Process Wastewater Discharge occurs from this outfall: ❑ Only during a rainfall event ❑ Intermittently (please indicate how often) ❑ Continuously (please indicate flow in CFS) Latitude of outfall: Longitude of outfall: Brief description of the industrial activities that drain to this outfall: Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? Page 8 of 8 NCG02 Application Supplemental Information Introduction The Carolina Lithium Project (Project) consists of the Concentrate Operations (mine operations) and the Lithium Hydroxide Concentrate Plant (processing operations). The Concentrate Operations include the Piedmont Lithium Carolinas Mine #1, a Concentrate Plant, and an Industrial Minerals Plant which make up the mine operations. Marshall Miller & Associates (MMA) was the engineer of record for the Concentrate Operations and HDR Engineering Inc. of the Carolinas (HDR) was the engineer of record for the Lithium Hydroxide Conversion Plant. Piedmont Lithium Carolinas, Inc (PLCI), the applicant, proposes to mine pegmatite ores which include spodumene for the purpose of lithium extraction, as well as quartz, mica (muscovite), feldspar (albite and microcline), other mineral products, and rock products including for aggregate and other industrial or construction purposes on 1,548 acres located about 1 mile east of Cherryville, NC off/near road St. Marks Church Road, Whitesides Road, and Hephzibah Church Road in Gaston County (Appendix A, Figures 1 and 2). A figure depicting land parcels with the Project boundary is included as Figure 3 (Appendix A). A copy of PLCI's most recent Annual Report to the NC Secretary of State is included as Appendix B. An application for a North Carolina Mining Permit was submitted to the North Carolina Department of Environmental Quality (NCDEQ) Division of Energy, Mineral and Land Resources (DEMLR) Mining Program on August 30, 2021. At the date of this application for the NCG02 Notice of Intent, the review process for the mine permit is currently ongoing. DEMLR is conducting a Public Hearing on November 15, 2021 as part of the mine permit review process. Conversion Operation pit discharge will be collected in pit discharge ponds shown on the mine map prior to being released (Appendix A, Figure 4, and Appendix C). Lithium Hydroxide Conversion Plant construction stormwater will be collected in sediment basins and sediment traps shown on the mine map prior to being released (Appendix A, Figure 4, and Appendix D). Water from these sediment and erosion control measures, or the pits, will be discharged at a non -erosive rate back to surface waters or will be used as makeup water for the Concentrate Plant. See Appendix E for line drawing and pictorial description of water flow through the facility. USACE Wetland Delineation A wetland delineation was performed in June 2018, December 2018, and in April 2019. The United States Army Corps of Engineers issued a Jurisdictional Determination on February 21, 2019 and again on June 20, 2019, for the areas delineated at that time. The areas within the mine boundary that have not been verified have been delineated and are currently under review by the USACE (Appendix A, Figure 5 and Appendix F). Pump Dewatering Size and Dewatering Method Details The proposed mine dewatering plan includes pumping water from pits during excavation. As each open pit is developed, water encountered in the pit will be channeled to a low spot, or sump, within the excavation. Water will be pumped from the sumps in the pit using pumps that are adequately sized to control the water in the pit. The water from the pits will be pumped to pit discharge settling ponds outside of the pit, from which water will be either pumped out for operational use or discharged to the creek. The pit discharge ponds have been designed to provide adequate storage for expected pit dewatering activities. For pit dewatering activities, the potential size for dewatering pumps include vertical turbine, 8 stage 200 horsepower pumps 12CHC 8 stage 200 HP 3 phase 480 v 1770 rpm 1000 gpm max; however, variation in pump size may occur due to actual conditions. For pit dewatering activities, water from the pits would be discharged through sediment basins. The operation for the proposed Project involves sequenced excavation and mining of four pits. Mining is planned to begin in the South Pit, with excavation of the East Pit beginning as the South Pit is exhausted. The West Pit excavation will begin as mining in the East Pit is being completed, and mining in the North Pit will begin shortly after West Pit mining commences. The West and North pits will be mined together until the reserves are exhausted. Locations of pit discharge ponds for each pit are indicated in Appendix C and Appendix D. All pits have one planned pit discharge pond, with the exception of West Pit which has two pit discharge ponds to accommodate the location of a main access/conveyor road. Mine dewatering operations include pumping water from pits during excavation. Pit water is expected to be pumped concurrently from South Pit and East Pit during approximately the first five years of mining, with pumping from South Pit ceasing around Year 5 and pumping from only East Pit occurring in approximately Years 6 through 11. Pumping in Year 12 is expected to be from both East Pit and West Pit and pumping in Year 13 is expected to be from both North Pit and West Pit. Pumping is expected to be only from West Pit beginning around Year 14 and continuing for the remainder of the life of the mine. The pit pumping sequence may vary throughout the life of the Project. As each open pit is developed, water encountered in the pit will be channeled to a low spot, or sump, within the excavation. Pit water will be pumped from the sumps using pumps that are adequately sized to control the water in the pit. The water from the pits will be pumped to the pit discharge ponds, from which water will be either pumped out for operational freshwater use or discharged via controlled release from permitted outfalls to local surface water bodies. Settling Pond Sizing Information The pit discharge ponds have been sized to provide adequate storage for the potential combination of maximum expected pit dewatering activities (-2,300 gallons per minute or gpm) and large storm events. The pit discharge ponds are designed to store approximately 1,000,000 gallons of water from the pit area as needed during operations. The pit discharge pond spillways are designed to discharge the 100-year, 24-hour storm event and maximum pit dewatering flow as determined by groundwater modeling. Pit dewatering ponds are designed with a non -erodible riprap lined spillway to discharge water safely without erosion. Cone of Influence Calculations There is no public water system in the vicinity of the mine locale. The estimated withdrawal rate range across the life of the project (20 years) is 828,000 gpd — 3,312,000 gpd based on a groundwater modeling report prepared by HDR in 2021 (Appendix G). If mitigation for adversely impacted wells is necessary, PLCI may offer assistance to connect the affected property to municipal water supply where municipal water service has been brought to a practical distance to the affected property or, may offer to drill new, deeper residential water supply wells. PLCI is also committed to installing observation wells located around the perimeter of the pit excavation areas to monitor groundwater levels during mine operation (Appendix A, Sheet 1). Description of Measures to Prevent Erosion and Flooding Erosion and sediment control structures will be installed prior to disturbance in all areas of the operation. Detailed designs for planned sediment basins, spillways, sediment traps, conveyance ditches and flumes are included in the mine permit data package. Erosion and sediment control structures have been designed to accommodate a 25-year, 24-hour storm event. All In -Stream Culverts are designed on a 100- year, 24-hour storm event. Stormwater runoff will be captured and discharged from sediment basins in a non -erosive manner as depicted and designed in the erosion and sedimentation control design. Clean Water Act Section 404 and 401 Permits In November 2019, PLCI received a Clean Water Act (CWA) Section 404 Standard Individual Permit from the USACE. PLCI has also received a Section 401 Individual Water Quality Certification from the North Carolina Division of Water Resources (DWR). A copy of the approved Section 404 and Section 401 permits are included in Appendix H. The project as currently submitted in this Notice of Intent does not propose impacts to streams and wetlands beyond those approved in the 2019 CWA Section 404/401 permits. Pumping Operation and Monitoring Plan A pumping operation and monitoring plan is included in Appendix I. Appendix A Figures LEGEND 6M Antioch 7r i Gh Mine Boundary (1,548 ac.) Cem • •a .. sr� :'� ks: USGS 24k Quadrangles � �� �:�1 0. 1 inch = 2,000 feet Qs, 0 Feet 2,000 jut 41# lk r _ a - i.�LINCOL'NTON �I A _; _ WEST191 . i. ��' +/-.. `..jam '..s��• r•�yr -- — \' _ -- ��''`� — '� cstt cour5 *Water •. ��,, �' tiv - '�• 1 `. .'ys � Yam. jjj a• [ • % d0 11 5 • � • 5 � - .. .. 6�1ti a - _ � .. .c":.` .r. � tiff -,. �= '" w V. Ch 1 . I , + r r ea rt rdam r !. BESSEMER CITY Gaston Co u my ,— North Carolina ' i , ,' _ {• Ilk Park I � V �IN_C OLN 17 0 tee. } } £'J Park '. �j '`r �eeF rr.nct •� 446 "TankIWO ' � err •-� `'� hSpbde kipirp � `� • Para , t/i;P Applicant: Piedmont Lithium Carolinas, Inc. _ Mine Name: Carolina Lithium Project ���_• County: Gaston • 4 Date Prepared: 8/13/2021 Prepared By: KTHAMES t Preparer's Title: Sr. Environmental Project Manager ~ ■ " 4f* PIEDMONT uw� k vrvvrtHrnk�. WuHvrtHrvvLr_O LITHIUM FIGURE 1 PATH: \\CLTSMAINIGIS DATA\GIS\PROJECTS\71135_ PIEDMONTLITHIUM110263685 PLI INTEGRATED PROJECT\7.2 WORK_ IN_PROGRESS\MAP DOCS1Mk D\TASK05 MINE PERMIT102 USGS.M%D -USER KTHAMES DATE: 8I13-21 NCG02 Application I LEGEND Mine Boundary (1,548 ac.) County Boundary Municipal Boundary 1 in = 1.5 miles 0 Miles 1.5 I o Fallston 0, a 0 Cherryville� � o a O ° _ aco w 279 �- N l v ° 274 i I 3 Gaston County/° a North Carolina FN PIEDMONT I IT FII VM i a ® Stanley 279 321 ° -, ° 275 c ® Dallas o 0 �om 279 Spencer Mnii fninI, ' Applicant: Piedmont Lithium Carolinas, Inc. 275 °°( . Mine Name: Carolina Lithium Project Gastonia} County: Gaston \ Bessemer Citya Date Prepared: 8/13/2021 O Prepared By: KTHAMES 0 0 w Preparer's Title: Sr. Environmental Project Manager CAROLINA LITHIUM PROJECT NCDOT COUNTY HIGHWAY MAP FIGURE 2 PATH: \\CLTSMAIWGIS_DATA\GIMPROJECTS\T1135_PIEDMONTLITHIUM\10263685_PLI_INTEGRATED_PROJECTI].2_ WORK _IN_PROGRESSIMAP_DOCS\M%DnASK05_MINE PERMIT102_MINEPERMIT_COHWV.M%D -USER: KTHAMES-DATE:811312021 NCG02 Application LEGEND Q Mine Permit Boundary (1,548 ac.) 0 Parcels DATA SOURCE: Gaston County Parcel Data (July 2021) 0 Feet 2,000 am� 527 157922 578 159639 528 157923 579 159640 529 157925 580 159641 530 158034 581 159642 531 158037 582 159644 532 158038 583 159668 533 158061 584 159671 534 158072 585 159675 535 159118 586 159684 536 159124 587 160753 537 159139 588 160757 538 159140 589 160759 ' 539 159141 590 160760 540 159142 591 160761 541 159148 592 160762 542 159151 593 198472 543 159154 594 198919 544 159155 595 198920 545 159156 596 198928 546 159157 597 204183 547 159159 598 204184 548 159160 599 205287 549 159162 600 209087 550 159164 601 211499 551 159165 602 211500 552 159166 603 212364 553 159167 604 212365 554 159168 605 213460 555 159171 606 213461 556 159173 607 214055 557 159176 608 215730 558 159177 609 215731 559 159178 610 216006 560 159179 611 216007 561 159181 612 218191 562 159182 613 218192 563 159186 ° 614 218752 564 159187 615 223454 565 159188 616 225770 566 159190 617 226286 567 159191 618 226287 568 159194 619 226474 569 159195 620 226475 570 159196 621 227995 17� 571 159199 622 227996 572 159207 623 302445 573 159209 624 303909 574 159240 625 304329 575 159631 626 157874 576 159637 627 304327 577 159638 279 '-"A " 532 531, r1 — 534e 53Q 624 625 635 r 536 542 527 611 yer.0 edits: 1�70 605 567 566 f` 573 609 6• 572 593 612 608 574 96 599 579 586 581 577 598 578 576 597 613 582? 616 61 615 590 587 0 591 589 111� CAROLINA LITHIUM PROJECT PIEDMONT PARCELS LITHIUM FIGURE 3 PATH: XLTSMAINMIS DAWGISIPROJECTS171135 PIEDMONTLITHIUM110263685 PLI INTEGRATED PROJECT17.2 WORK IN PROGRESSIMAP DOCS\MXD\TASK07 NCG02\03 LAND ENTRYAGREEMENTS 20210818 FOR NCG02.MXD - USER: KTHAMES - DATE: 11/10/2021 NCG02 APPLICATION LEGEND Mine Permit Boundary1 ( ,548 ac.) Mine Dewatering 0 Outfall - Concentrate Operations Sediment Discharge Stormwater Outfall -,�. Concentrate Operations Sediment Discharge O Stormwater Outfall - Lithium Hydroxide Conversion Plant 0 Feet 1,250 Outfall # Control ID Location Latitude Longitude SDO-01 SB-1 Mine/Concentrator 35.392637 -81.308716 SDO-02 SB-2 Mine/Concentrator 35.393128 -81.304559 SDO-03 S13-3 Mine/Concentrator 35.390628 -81.302864 SDO-04 SB4 Mine/Concentrator 35.388957 -81.301255 SDO-05 SB-5 Mine/Concentrator 35.386522 -81.304586 SDO-06 SB-6 Mine/Concentrator 35.385922 -81.30583 SDO-07 S13-7 Mine/Concentrator 35.385107 -81.307489 SDO-08 SB-8 Mine/Concentrator 35.385864 -81.311904 SDO-09 S13-9 Mine/Concentrator 35.387828 -81.312447 SDO-10 SB-10 Mine/Concentrator 35.390739 -81.312667 SDO-11 SB-11 Mine/Concentrator 35.390879 -81.284713 SDO-12 SB-12 Mine/Concentrator 35.38998 -81.281345 SDO-13 SB-13 Mine/Concentrator 35.394263 -81.296319 SDO-14 SB-14 Mine/Concentrator 35.394125 -81.297529 SDO-15 SB-15 Mine/Concentrator 35.39635 -81.299868 SDO-16 SB-16 Mine/Concentrator 35.39679 -81.299519 SDO-17 SB-17 Mine/Concentrator 35.391702 -81.319766 SDO-18 SB-18 UGH Conversion Plant 35.397036 -81.319371 SDO-19 SB-19 LiOH Conversion Plant 35.395832 -81.318963 SDO-20 SB-20 UGH Conversion Plant 35.393713 -81.318565 SDO-21 SB-21 UGH Conversion Plant 35.394314 -81.321136 SDO-22 SB-22 LiOH Conversion Plant 35.39691 -81.321759 SDO-23 SB-23 LCH Conversion Plant 35.396049 -81.324137 North Carolina Outfall # Control ID Location MDO-01 East Pit Mine/Concentrator MDO-02 South Pit Mine/Concentrator MDO-03 West Pit Mine/Concentrator MDO-04 West Pit Mine/Concentrator MDO-05 North Pit Mine/Concentrator Latitude Longitude 35.383525-81.288309 35.383218-81.290202 35.387524-81.288938 35.39172-81.286032 35.393515-81.28349 Applicant: Piedmont Lithium Carolinas, Inc. Mine Name: Carolina Lithium Project County: Gaston Date Prepared: 11 /11 /2021 Prepared By: KTHAMES Preparer's Title: Sr. Environmental Project Manager C. moo-4 0 CAROLINA LITHIUM PROJECT FnPIEDMONT OUTFALL LOCATIONS LITHIUM FIGURE 4 PATH: 1\CLTSMAINIGIS_DATAIGIS\PROJECTS17ll35_PIEDMONTLITHIUM110263685_PLI_INTEGRATED_PROJECTV.2_WORK _IN_PROGRESS\MAP_DOC&MMTASK07_NCG02104_OUTFALL LOCATION MAPAM - USER: KTHAMES -DATE 11/1112021 NCG02 APPLICATION NEMPI 5, A W It J_ hZI Tch Rd <4 t 4\ 01, AnthOrly Grove ,J_.4_,KA,r ca- 4.- Stream 9 f q<, Stream r. 4f A-k, N 44- 111 10 v C50 _ ° O --- .��.� -Ep �' 18 p PHZIBAH CHURCH RD (fi0 ROW) _ \ 6 25 m m 'J f .. i I • i o � � : L J �.I Q" � .� III/ � � � � � � \ / 1` 100' SETBACK ° .. �•.++ .\ \ 300' SETBACK'____...., ED r .-x �r \ WETLAND AREA 3 .• \t' -- --"-- _ li „' - v •: u �� ��" ° • \ \�•-" L rACRES ,,. - i- �� i \,. ❑ ❑ -, .., , -_ �.i , WETLAND AREA i, - �:.S.t °.. \...... _ . \ \ ACRES � f..- \ ♦-V. \ I __;, " a. � � , �''_ - A 4 '.�V. , ii + f , 0 0 -� T,. \� r: - _. +. 5f_3I ° n❑-� 29 �o � ,;'., ' I L"\ \+ I ``.� ;r• �•° "� ° 8 WETLAND AREA ° I . \ e ••`` ` �'• - 0 O•` O ✓ 9 '.: \ \y \ s, o. 0.06 ACRES 16 o A 86 F « + °4 �-/ I; o - - ST-8 + '� p 300 SETBACK \� � \ 0 / \ \ ' SCREENING BERM \ 7" O \ I �' \ \ o PC30 Pc32 15 I '���\ � LAR FARM � _C18 + ,•�, PC35 C36' � � � 1 - ) 300'SETBACK /�, +'r .°\• \.+ � S� d '.:� O I \ / � '{ - I I I C ) \ ° \' .- `% \ j>° \ LANT AREA ENTRANC + WETLAND AREA, «.\ \y � \ 0 • - � � - - 8 5 0\ \ 96 51 - dC96 3 ° 'EXISTING CEMETERY SITE � � , + w CONCENTRATE PLANT AND , C52 � I ST 9- ik F 50'CEMETERV SITE BUFF 1: r, \ ,/ ' / �__, • ° x i / \ �+ /�I I I I - � // / ,/ INDUSTRIAL MINERALS PLANT � �\ 36 =; ST-6J / I ( _ SEE APPENDIX B \+ I \ \ 37 / I, ° , \ / ° m - I ' LANT AR A/E TRAN �� ❑ C41 1 I I z < or„-,o , ' I ,,_..% I' \, \;_.,_ ri I� �.-,. •x x r. \•e>«,:.'.: i :_;�i� ✓ / �r -"-\\ � ,r.__"r\ -- \ l �\•:,LINEATED ETLAN / ' - E.N.--C_ E 6 FEET HIGH LITHIUM HYDROXIDE CONVERSION PLANT SEE APPENDIX 39 10631 NEAREST OCCUPI115 . `-- -O o \ / DWELLING CHURCH D. 1,029 ft. J Los m _ �,T, - 1 t \ - 117 B s7a.o ,x - - WETLAND ARE 54 5 : 300SETBACK p ! I I I STREAM CROSSING NO. 1 -r' ,. '; i B-1 C55 SEE APPENDIX D 118 _ T 100 SETBACK ` CONDITIONAL SETBACK f'r , ` s I, + , CONCENTRATE PLANT/CONVERSION ' „-.-... __ " • I G43 CONVEYOR ACCESS ROAD NO. 1 -: �' 'Ye' .•' *' � sT-z '• �%'\, r.r -..-____. EXISTING CEMETERV SITE: -' a /p i -.._- - '1 i ✓ ,i " B . `. i / ,,. •. ,. �.I - / l ✓ - _ / ,% , C-13 ,-, ...'�., :� .::\ ---- ,� `% �, � � '� RANC rvoa,H a,c vevoa access \ • r MAINTENANCE YARD •. 3 `.� :. \ \ .'CEMETERY SITE BUFFER ,; -�- � , _- :' �" ., \ -" \ , .r -_-.; ^ c <' EARES UPIED 1s o 50 -- „ 3 _PIT PO J _ PC � O _ , ".. C 2 IN HAUL ROA ',@::DWE 'fr-s • - ' i 6 SB-2 \ -- _ -... d•dt ,--- EMULSION STORAGE AND .- ;-' 385 ' �x'*'"-"-�-''-- -+-' *- � 4+ ) r' ', ----- BULK TRUCK PARKING '� \ _ \ i ---__ AREA ACCESS AD s I. OE?.1 ' L KIN AT I r ' 0 as EI. o.o • �% ,: _ _., -y- ,, o C ° 100 SETBACK 3 - �-- . 'l :. - _ + v -14 4 - ♦ -- . lui I d i o � f " !r .. ' - _ _ _ _ - , i .. _ - /• , -, i _ \ T, . NORTH PIT HAUL ROAD J'. 48 100 \I. _. �,',1qrAR FLOOD ZONE _-. __. ., / -/. .� • � __.._- l ,_ \\ " , o� � ♦' � > WETLAND AREA B - O'i\ \ / ,s o-_- / ., .\ ,}• y, _ :/ . I WASTE ROCK PILE ,`-,. �-. - �• i WHITESIDES ROAD CROSSING . ^�, cs , r ?% >% , : 8.'- -- ' / ° , o _, r* ,. i' i ,\ / ♦ i� ��, SEE APPENDIX B SUBJECT PROPER -.. TY LINE TVP '' '.� r .1- I 8 I� \ - r � 8 WETLAND AREAT � y \ ` - ' - x , 100 YEAR FLOOD ZONE ' ' \, �• , 1.53 ACRES L1 - O l \ x 5 ] _• - t _ _,- , � .III e' ♦ � � � �� j i .` , ,ram__ �- - _�• \ � __ _ \ / - •' >k oo � WEST PIT C5 I Q U D 3 .. .\ - \ - � ,. �., �, •/ � />„;" < - � /� ��" I - ,. SEE APPENDIX D � '� 1 ._ O - a ;� \ �1 ° ° > ,i TOPSOIL EMULSION STORAGE i , ND BULK TRUCK PARKING „ _/ ., l __ , STORAGE PILE d l AREA SEE APPENDIX B .. .. j x, / � �. \ 1 - \ � �• i.: �. '' i L � � :; � ;\ I MAGAZINE LOCATION ao `� ` ,. / !/� Pc2 r..: �` ":e - EE APPENDIX B o 11 ., „ ,�+ GR ;..x�, -- f 101 LEGEND CONCENTRATE PLANT/CONVERSION PLANT » 5 b" �'.>/' �. '' \ r CONVEYOR ACCESS ROAD NO. 2 ��i / �` _12 ,. - ^. %>'r I :: i 6 i J; , ® a / :i �I'. sourH r Ac- ST-11 \ \ ;\ 1 _. L �„ �. ST,G \ - es, �. � -�- -�- �. r \ � � / \+ \ ST,f� - \\ 100 Y LAIN _. 69 •- `R FLOOD P t 114 ;I I �� *•-�- ! . ' 1 .� •.. I\ v- III , _- / __ _ � __� _ "•--. ..-.. :A.k 4�.....-.._. ., ,/ I� r. \ �._--_ ST6 / w,,.,oa T �i s; `•_ - � /. - ' t I / C4 ._ t rill � i `" -� - ��- * '• 1/ _ _ � 0,\ ' \� i � I Il ,i � MAIN HAUL ROAD ..,I • l090�o x � � � ,. � "� DELINEATED WETLANDS 1111C48 y µ 1 ' r DELINEATED WATERS 7..�- __- -- `t3 j ,\ ,. ' y• '. �� ''i a'' 'F'o- ST- 63 » , i' \ ! ; ` 7 ` �` WP-PIT �' \ S -,9 41. PON ® 83 PROPOSED CONTOURS , 59 + AN� 61 a -. % i � � ' <� '� � �° ,;,, x , �1�nll +\�� oAo,H sT-,G ''I`' -EXISTING CONTOURS -\ \ SOUTH PIT HAUL ROAD » U 'E ADJACENT PROPERTY OWNERS w r .. Q�4 » I . .-.-._. , . , F` ® SCREENING BERMS STR +M CROSSING NO. •._.. *' ` "+,,`'r. 4 ��'*' + C103 rr,AP!D PiD PJArr1E A,CRESS ?,1:.F iD FID N:r.!E ADDRESS '; f - .\ I y. �•' ! � � I �; C1 1 m �f � I II I I ` / , . *. AM. ,3 _ L LOCATIONS P O 3F,2 Lk A U.11 C.R-D.0 Er IJ.LL.vI l-I z_R,'-k_.�C2821� GROUNDWATER WELL A :,:3 D+4. K11,+ EACLF.: Pr. [; :x�::Nrr rsAr:apF:1R ° a x -' SO 1F6 ao _ _. - - - -- _ -.. .:i..'---�-� EXISTING STREAM CROSSING ,t O Cr,.kLol,- 'v' ''\ ;' / � r 3,n81 � /,' 9 �% :c \ L ",S T:Jr.,=. I: •'bL"L '-kC _�(Lk .. 2e�3' _ ' • L'f:Lv+.L CO• M1vliA�1 d L+Jr•LiL� L'l, IUlrf 2J�1 i;FY.:YCY1\ IY' 5 F, „ , r. D-..I_L�(S..nkL °r" WAS E RO�I� PI <, :.�- o.' / ' / - WELL 1..• 8.IF--,C EVES 8 PnTFiIGA i. $_A „,( Cl 1..ad5 , CF26'c'. INC 7T'31 Ck�Ii;KCk C.{.: kLU:IL yf',- "., // _. T « ,. --- _ . .. _ . tE-r s r r,!r..fzcs �.rwkrd-I Rc .�D V, I,.L ><Sr. r<RD .; ,�, ENTRA CE ' •°" ..-*" ` 15r972 DAFsrrr.aL.Arx ,_.��. K�r,$RICK•_YC1HErJ_LY - ROAD CLOSURE 3:.•Ee .C. e3..33 "%3UiISC rJ� 33JS3 - f • Q - .-. , • 57C rr 3.BAH CH.14c 7 °�, . 5G7A^: r: raY urn.E m 1 79 NEAREST' CUPIED DWELLING :_ _ 6.. ,..... rla TH.��.1Ap ,. & A oRADI F. f i - '-.- � 1�,s,r s�,a�r kEc,rtr_•r,..L1sr7IJkr6��s - .*"'* - / /-" % 318ft. O • ! -' *�» 83 � � GRa sr. ~.c zaG3a ..ram �sE rJ..26c-r_ -LINE ,r oI , , - __. _ s3 nr r. IHAH•2-, dt.r.RD F7 " FiR' I'- - :'A4Y S K� R Cd tC�•->. rRR ., _� -T ,.I Jr. n.. n.ER 4 1..8 �..F C8. .0 ., LxEBSBrr16R-I','ti-25013 - • .� - '•y_ ,-/ / -�-/ I' L/ ., - - - - CkCy..FF;.hC.e-d33 - --x-x-x- R D BERM ti?�kk'Y� ' 6 FENCE '� X X 5 157'91? CIAVDE Hk[}nkOLDT r.EiRs fi•S • .N kit RD Eo 1EDr cv RRri W. FI.iF'arR _ _ _ = - - _- ' ____/ - / �; ,y'»., LOCIbING GATE - -" CVK:71i�L rk:_'�'0 LLss-rr'F�'I-`" rt �n-"1'3 I ' 4„' ,CDNTAIN.'I STREET -X-X SILT FENCE LOCATION G 14951 DAVID & ALA B CAS14L.5 PC BOxW' cc, ,CC':Cd KAREN CARRII -ER FAY _ Fc rST „�- II �' GRa se NG7a333 GAS 10YIA � _ _� � ( SOUTH PIT 'PI.- :FS)..Se S..H.J.Y -i 7 , c,.. r r INC,,. - , r r it •. a . -ia, �l.1nC' L1F<Y, 1CC. C L-I_-f � & A,2.. f SrIJ�I 1.� BRADY ... .. .... _ "......__ -- .`.., \/ 1... .AR .� Mr, CHAl.SR IJC 7E:.'fi L'LSSzrrlLx i.l'f. 0.L. 2d,:1h \ -__-__ ... - ._ _-- � \ `•.,'- G I R 1 SEE APPENDIX D ° _�_--- o o CONVEYOR ti _.I - � 5 ,_ .. .. 23i HAY DR O I » 7 � KAReN -" SCFOr.Cr. & nfinER � b •u4 V, I,.L ><aSEn RD - - Y - Y� P" 1i�t,-.'6t', El MCA n FrVPPFR L t .. r'9n? .n 6 15 ..,. �v.; } c- .._ ,, LLSSrrdCR C.I?Y i.Y'26J1C• _ � °o --_-_ �--''� -_ raj r �f.3,.4Yv.6.), UkL.. __. NL eer..3.. --� -, �- - - - ��_.- ,.,4 �.• ,»: ', - � ; ,. ` - ,_ ; �� , ORE CONVEYOR • 1, SAN.DRA •, VRF. rsl :'IO 13Ar,H:QA YJ ' [CS LAPORATORY R:7 J 1L•Tf{.K' :E�SR=YnGX=NC�rY_ dG 18i,. ti: ... -. .. .. O o0 o y _�_- _- � _ + �/ t R•7..Gr.'rG?c:. 313 RI�siARD Lars GLrJrr,r. m ,,ac'�7 _ ;-,� ;.._, .'., �`�' ,• ! `.._ CONCENTRATE PLANT / CONVERSION ti- ER _ 3 3 STOKQ _ _- P1T POND s k_rea.l 1 wR o L -- ---- -_ _- i SP �`' 1l L.I L.- _ FCFRCfJ '� 1oG. ,,a LVIJ-✓r , rlUr f S1LT-L+ ° o CROJSE, tiC?8^33 SrFiBY Vi. DT D _„ - / \ _ .. .,r,A:FRH^. '7R �Oa" V �, --- ,-`-._ � �<'♦ �\ PLANT CONVEYOR I r,c •- .., -..- n, . 7C. E3Ux b1a ?t ,bGrf,G .%h4FS F `.'.•:A R^ S faAYF v,ICGl+.S CCIF<S _ -R - , l L D �__ '4.- ',.- _ -•4 - !'I C-.JI�•.+lf.]'..0 •,,:,�`CIr' IY•'8Gu BESS�rrlrn IY !+-:4C,� --- -/ O 6 \ � " -7% _ - Ar:FRH. TRD - ''= *' o BUILDING / STRUCTURE .. 6,1 IICP12f3A11..11JRCi+,RD ,� D] % - ® 53 ._ .. 'JSD: - F :'.'vl,R^ 8 .^.IANE v�I" -I.4 C^I . (`� o o / r 9 ti.r 1C ..,4hfc5 ^,G S a r.5 _ _ _ _ --_ --_ �f ,` i "11..n,-_L _HF..rE .XJ3fN_ufl �. n.., BESScrrl e,Z rl FY. i.0 23:.1•° ��--"\\ -.' _ "' -•-,x_ �-._ / !� 4 CRCYiSE.x , o (< C 105 ,-. "•::11 L>C Ck NL ,a , " VA,J�C LC^1 KIkDY .$ FCil2: 9 312 f ILR iiL i,l C:IJk"I.4i; u ''1 �� \ / /. \ -. i3 1.`.r L 3rsULY C &.�r,RY S K:SLI2 ... 1frd.3° . _:.� „ _ " S3 U ___ _ _ \ \ '! ; y '., _ ,G� . � .� .�.r..sL,�. LRL.,SL.rJ..2oCn, o � �_ .. � � __ . _ _ EXTENTS OF MINE PITS cRG Nc_�3_ ., i ;'' \EP_PIT POND J \'. -_ I 9; r,, n - -:-r 752f1[ P I-7.II.I1 Cl IURGrI ,"rl 74 7fr2...-d GE..R�E 6=NLETT n_Leh _. \ _'-____�.. SI ,,. \ / i a l y \'. \,� g I 1-0 . 7.., SSb FIC..Y1A^J CC r. IS B .Af•1 i_L J Ku�R .. y - \ �� / �. \ LIILkR VI_ L,rJ_ 2oE2, 0 ^ o� .---- _--------- �-�J � � .� � - ;. \ - AND EXCAVATION • \ +- PROPOSED BERM / - � .o�/ - - I �- I 3r sr c Po eOx 3%� o � b 1 F.:. rr RKS i71 :�C+ -r •r . s 2a, :k 3v[k oKr. ORO-,AY U o \ � � - ,--\ U� �- . ' EAST PIT - 15 151 Fla itli3-IAEL C:7kLsi�F,iL Ci]CYC ?i-i4L'Ktll� .. ___-- - •• :., -:. :.-: •, I. •. •. � '•- r / ;� - �. r hIJ� ,r.1L'UJKLE r•1 2:�93^ o... / -� ,' ��, 4 �� j,� _, ; . ,,, , A,.. i -, ' z�' FOR DRAINAGE AREAS (SEE SHEET 8 OF 34) ,.kY'iJSC r,C "a'3a3 •1 r]AKI Fr N �O 16 7 a1" JOHh' 9S is =.Ff] ,ss3 s r rdr.IJ�is r]{ qL, 'S 2CGSa1 LFI,^.H RM1rJ USR+'Frv7ER PRU'1-r � CIE - O a I _ �- o ;,� �--- _ � �� E D _ � --- TMA E rHUR,U21 Ao ,,I ',D \ ;\ .... .�� X .l LFcYlJ�L- •1.. _i9is3 - P - -.- n 1873 57 r.SAR.(5 �nuR.l- RCl _ f - - 1 , O __s - .` o ADJACENT PROPERTY LINE 1r 1i7•=2ti •,Rill:, AND 1HlJl-i EAI'1lSi CHV Y:S ... .. ,' 2..Dsr.o CnRLDSh & SJSnrJ D .RS1r.R,A .r-k JSE rJC 2o�ss \ _ ...�_, \ � ;� � �-% � /r ,,;/ i ' LI.'C-L^.Li•11GYr. fJ��3d:LL, .. �\ \ I '-' I ' �.., _�, �r' ' i .'ti I - �Cl S E APPENDI n l „ 3i '4 .:fJ�SiLi'J I(,Y'J H'AY 1221 .sAi•iT L1n RKa �.nURCH 1L' 7.:ir3 �! J0i-IhI Jf S8 x'ONYA'E'JS=V'dklGHi -c,-, J r \ _ _ �� I �O G „ail ! _ O CI ICRR,"J I_L 'vG 3p,3'1 78 .C2oo4 rlAA�Y CSCKA R ,A� - - r.. " VAI'J� ALLEN KIRBY 8 DEBRA S 332 HEPh'_BAH CHURL? fii CRO JSE NO 76C35 0 - - a 1 ADJACENT PROPERTY OWNER 5 71 3,4-IrSA SGI k:•,kD i G00 DIRECTION OF SURFACE FLOW KEMHS turd L'F2U.,SE. NL .,3'_-3.: I5 � 2Cc244 lirD F c C'JA S'I, LLiA.Yti „-. O `:,.\ \ ---" / ,--�� (, PC QUx,u:n6 :4C7UHL rJ:, �3J35 O. \ --? //V/ 1�35 RU1H ANL) I -Rhin BAH I IST L-HURC: -, .,,� 1a14 S r7Ait'�(S �I IUk" i kD i ,..- o \ -.,._ �' + / -`•4 - LI?SO�LJIC6'. rJ-' ;ACiS tlG 2CSJ" 1�.0 P 6 LVl. S'I:LVAA': RUUaE N-.,"`I"3 \ \ \ _.__ _ <<,, i � , r 1 �T , / � o � .,._ _, FLUME 21 1.`_ri'tl'e TFiI G'C7.:N:'Y FAkrrl SUr FL'f :fJC PHCI r. -� - s. _.,,•, 92. A:¢HrsC -if 8Cf ' .. CHy r�_CSTGv SC 2541' bi 2CG5_n L1i:A r kl„nY 8 .'nY1c., o.Fxl..'i I. LLrdac • � \. ✓ �°'.,/ �� ___________ -, r. L17d=GlrJTr'+h rd" :Bih7 i � d ' � / •� � O a � ... F. ,.-." _ , POSLA.4 J r r _ i ', ,, - I\ UNDERDRAIN e_ 7..5'.. t1 PRC. nC..L _S fA L_LL .. . v ,. , ..,c - „ - - - 52.• n,-FRH;A.i?� RD _- _ / / Ci i,. k,. p C, 9 .( S_ `[.� 8. 2L w LKL'iR rRwAr 8 :r,rrtrs 7Axrra IA BEIJkE iT / l ° �� �V ij t '' - - >\. : Clh L.LNI ei. : 28LG" /' 15Y J-' J i:8 SH„lµ ._kEvVr F?Y r 23"-ITE. N / - '° ^ ��\ r- � "� i � �•, � � UD-2 UNDERDRAIN LABEL i HEP L'f FCrr r1�. W_.N v &3 2C7&-- ., PI.keG FARM LL:• '- / / /° (/ �, ' { _ ♦ ; ,r n �fiARLJT 'Jr ,..,11 �� \.. /�'JJ/5 I / °✓ - l ___ _- "` A J ke PF,_E3AH CHL�.".7,'7 / f / _ - , Q.�_ ec 1Y L=e rn7i.1..� L. JE rA_rJJ.N111J LL."IS d lkA.L KCkNEL'Y 13 17 ., k.(S CI IUk_", RD r / (2\,\ ' - % �JrJ VFr: cRo�9D �2,J,3 /' � ,_ _.. �. �} ° - ' ,r O °.. � DRAINAGE DITCH 4<Z FILP kZF3,irl CHURC}, •ti � / 54 O -- C;� � ' _ �O L•;x t1oJ LF2U..SL ^rr'%Y 33 tl5 1lla3'x1 kL13�kfJ!R&?rliLli`-LL rt,JSLNy'JLR / ,' /r / /1 _ _ -_r... pp 9'O ^ " HLFH�B,�.r,(:HU�-�,>�' �.- - -- � , CULVERT '•5 1S5'37i ..1 Y.�i.S CHVcII l-ryd'd;-.LL rJ li,irir, f.i 1i _ _.,, -- - _ ckos-, \L2(rs bb z,Gz_4 Hr.'n'KaJ�rnRw � _ C.54 I O n-N 6R N.,as...,. , � ° ^r 1' ' er , -, .1 LX'.v I.: L.v.r�r.IIH .5 R . cimJs�.rJc2a� a. zt;et, srn,rrlr.Rh.r,Al:vEsul. _., _ . " J / I ' ' � \ � - \ %v__-- MINE PIT NSTRUCTION SEQUENCE%� ' 0 Ci � 2 CULVERT LABEL �.tiA.RLo ,� N� 202�6- F'OBGx,.-53E �- 755.., H �- _ l,.r r. Fra kI .. _ 9 . HE ,BA r,uRt.r, n .- -- .. , ° � ClRI E.Erc c� .; .... ...... " � . - - _G .., 7C r,. 1. �._ �, �� / -- --- - SEE NOTES � \ ra >w z a, 1. PD D�r<os E. A FRL. E r.u..r .1 O " o /' o o _ x RLuaE rJ _69- - ° o SB 4 SEDIMENT BASIN LABEL eJ 14r_,6 r. l,..e- e S IA r..ArtA IC W.7 .. " _ _ _. _ _ ,,. '31.1 r.A. r3kU s•kLC: - eLLSNA. cH �s_2 Bu 2,eS,o '�hB=RT t'.r..a r, �\ \ I „- - ' � _ -- - - 112 , `moo � --- 'Ji97a;,KERSSPR'N3L o; „ 'yi / -� - _ _ ,., /:_.. `� ,'...',, c ST-11 SEDIMENT TRAP LABEL CkYxJSE NC --eLY'.33 sG 21 _ni 1.1 ,r1Yn ,(i.•I'rdnf•1 , v_ i- ' \, \��� ". o ', L .n o 00 . / „ \ ' ,wr , LR_�K�rh rJ. - Jr., 1-'J RL.� S • "r EL 2 r- . - . UR \ \ o,. . ^ ® ♦ 31 155v�,S M11 :� Awl h �• Ail ik 1ST ,;b 7 , •�c KM1C.�L� ,.FZ \'..- \ , "- - -"� - �--� i' - - a � `,5 J 21_'C,f .. �� \ ° .o FLOW DIRECTION ARROW .. r. 1. rV"I I�RFa r„,I1C` LLr. �� \ \ _ rill Y.S3iiL r1C .. , I `, i'�_- / ! I _• - J - � ( / -� - i i .1_ 1.... 1..(. ..+. f, _l.-.I _ r..-rd =. NC; 1•'J.1,1,PJGrorJ,L) box r, : 7d4r 9. 21„1„ S.al,l l-IF RF. ;AINF-`� El G \, __ _ -- EROSION AND SEDIMENT L ARL�-r_ N 2&22e• - - n ,. �5N0.15, R .,3 15.110 zAPJ,.II.F,.A,S.rJi,..F>;'llPlr.v. Lkekk,'.Ii.L- r.C_Se'1 43 71:n"17 5.^,u"nrRr.;PI'vFSLi.0 � ,, ° � \-� �-\_..--- � ,. :. b CONTROL STRUCTURE _HARE T_ NC .7E^2H - o _--' �o Brix n4, NOTES: 4 5'ns, Jr,L.I.H la Nu-�I=L:.�, r aa151 r.'r �9 H R., ac / ��//�� / CHEHk,'JI L- ',L J121 °d 214'. y3 ST rlA.RKS _'V.AN.3E.1.-AL _�Tn CH i 1 ° ^I+• kkY / �_L 'a �=.^1: 1. Sequence of pit clearing to Include stripping of East Pit, South Pit, West ss 5771 :: AnL r., Ak,: Hu�H _ _ _. B.0 nLPlu-SE. 0C3 Hft Pit. Sediment/Erosion control for rt clearing stages to Involve lacement of su er silt �� GASTON COUNTY PARCEL LINES - 21o1r5 SIA'_Y Lcr•rJ',c RcEvEs P g g p p PROPERTY CORNER COORDINATES � ' \ - - ASTINGs D. -�-.� JJ LRLr-:r, tiC 7C.^-1� � 'k_1„cL IJC'2"oLl3 '� :s ,54,77 I. NIF 6 bFANI A4,"J ; Rz reL' TF3 '+35 r 4tr S • ', rr _ fence (steel piles) in downslope areas of pits. -� z,rJxku INC _3-.5 , , z rEPrJ' H CHURCH ROAD Rrf ID mrHll'p Fs- r,F R F in mri»„e av r• RP= ID vrl, ni R-asrtr'R \ '' \ I CLO ED MINE PERMIT LINE sG K. LhhkCY +a d LsA K kCr „ „ . 2. Disturbed ground during budge construction, through the use of Best Management , } Q _ �..Fr..rx- srr.F OUSL. rJ _3 z3 a -. . •- - • ,•- -'-' L 2 Practices BMP e. .sediment fences, erosion control structures, diversion ditches, silt P.�1 5037aL7.3o3n: F3iC�1,fk,79;PC4rl FD79v2 57fia1 130913C1 g.Dda;PC.79 r,07723 3756 1313f,•19 C1155 -_ _ ._. „_ ., ,. _ ,.tc,2.1 L.:NL:F.yE,t..rAA'v,N.iR$I�nFl TR ,- .._ .. c )(g ...--Tr--- _ --- ' BUFFER w L.X.kL. rJ.. eB-_o ° , -_ -. :.,, , , r . , �.., ; ; \ ', - Lo LNG GATE / 25 FT MINE PERMIT B ,I n,C.kia'ti� k, fence and reve etahon measures runoff will be interce led before It is able [o reach PL2 5C14G6G?a3] _3_L39� �074PC43 ,D7sF,99U531 13030,4.9U10,PC87 i SLCWl._3(YJ 1313HFr3 �2_.L � ° (// - , c .= -•- r .. - 9 ), p �, C:r,AkiE = E.:v',Ati Ci L• FSI=1E FF. ss-MFF" rITY. .x: 7h..1„ PT Ff137� C,� i`:5i 2C the creek. Sediment yield from disturbed areas well be managed b sediment Control -3 ... 77. 6...3�6,8 225�iPCa2 :A61d347;n 13097841384;PCfik {---_FD7y,? 9146 131a5d2 8385 ! �. ' \, \. _ -- 100 FT LOT BUFFER E.I�,� w ,ou 3.c AL�RH.. DI R�� i • r• R 1',F CAT:,Y H H : ,4-RtemporaryPC4 5U447f7.9674i 13❑967ft.; 133!PC43 ..UL� rd.vrcKS ..H..rsLi, n� •C 20'•� - R,E _ N1. ",. structures and and permanent vegetation. Drama Drainage structures alOn !. F05d374gd3 13D9R5;.7;9ftiPCft7 I 507974 g7fiR 1315fi773H93 / \, _ I.. � �' O O RIG,-LARD.A>v+Fs,c.RF�r _ r�Ess r.,ERCI-Y �o-,c P9 9 < - --- ------ ..kUJSE.rJ,.eE9.:83 .. O , •-r ---contemporaneousPCi 505055.461D 13062E-29029 pC44 6ll577L•3959 13U99383238 PL83 505747393D 1315295.6733 '-\ 200 FT STRUCTURES BUFFER ._kz_ . LCL�J,�_k n� with the and reve elation of disturbed areas are ex ected _................�..._...._.....-...........................,...i..............�. ._.�-...._ .._....... ......_......_.__ .._._�. �: „ _ .IR _ r 5G 217sCJ Ryvh1F. J E SUSAN F: SUMM.FY •" 9 p �- •--'� !-' Im-- °o _Z/ -- . _ Cn S.- rJ r.1. K.s CSIIE? :'H F?.i - - - - - - -,. - P.d9.7 7 Pr45 9dR 774l 14n n7ffi P .ftd 5;77 S i i 9 35 i y•' - - ' ^- n,: ,.55,a! r-AMr.:f,., ��r. NEss=rJra �I1 n_ 2e-,c. to prevent the contributions of suspended solids. All disturbed areas will be seeded as ry ....... 50.72. 86 ! 3.❑83 . .83, F�35. . n . , 3,0.. . . , C. � D. 371 t.75. f. i. \ \ \( r� �c\_� CR(f.SE.`. NC, 2&733 •,cr; Fr- CS -r' v P P -1 r lq 0- R 7n f r r y S" , 5 3' i ] ° -. /: \ o /� // r �- - -- - - - - - - ,I' - --- „ ,., .. _k�., P. r,t+_k. J PL. °[.3 3 ]. C. 3U .781.P -1,P _4E .A .,1....?s.8 1315)C 97.18 2,PC8, SU575li.25u9 ]31537[ 7-551 -. '' �/ - - -� ` __-- .' , �-. "CO cw kaNraC J wpN E sur.!rs_r _ , ,_ quickly as possible. Once the bridge construction is completed, disturbed areas will be 300 FT RESIDENTIAL BUFFER q Y p 9 P - - �- ,_.F 15�, SAINT r.1 r,RKS rrlUfz�N RD L-LSS rr,LR _IY ',� 2eC10 PCR 605651.548R: 130448353d7!PCa7 F,Ad56] 6678 ].310A87 6329;PCff° vLGL•98.06.6 k316332 4757 �� / ��� \_ \•� � _- _ n1 15u 14.3 {I!d i1 H-M.Ev , _ 1 =„ •H ,A , :,I, ;- reclaimed to further minimize runoff. - --- .. 1---� I---- � �-� -- -- t ---- �. - LRC+..S.,.,?rC?3•.0 vi. ll_ ItLI,'., IUk. .iv SU58.3155uf!. 33UR la, 3U.3L•k C4R !R9F H7d51 131tY.,94..29:PC87 5Q,.39H7i95 1:3, .,,R ,.3i''. \ - 3G1 21:421d RUU'f SfkC'llr rr,c[yCk:iCk PC9 , \ _ ____. r ," 40 FT PLANTING BUFFER 6Fss-h+Ea rl'Y F� 26o1G 3. Erosion and sediment control during fence installation will include BMPs as discussed in I - 7 I .. c. . - .. PC:10 5L157aa 3S11i 33U7874.5U71iPC49 6rFPt9G 7527 131sR58 s?531PCS8 5D5979.5954 1315187 9221 r J , uc _ _ ^. , !C❑ 5'I rfr=.HKS LA..kLi, kL _ ''C f!Jr?r... UE-LL.hL+C R f�., -_.. _...... ......-._.. � /-''� \ � • / d� 1,,.,a„ IGn,' Sr TT a r,,,1RD, ..+ ^�"k7� s , . „ 30.? 2,ozr r.r.,^rnv . r: VIJK. [ac:� - _ - Note 2 above. No trees will be cut where security fencing Is installed within stream „ '- r _ , l� 6E5..ErJ.Ek ..I + NU'e...G 6ESS-r LE. ITY. hf. :S,21, P..11 505933.3 k5s, I3❑7117.C7T76:PC50 5kC1:3n 5n591 1315,655585:PC.F9 I 507r>FS4. 9i80 ,3155338959 -. � l03 �' � � �' 30 FT. DELINEATED STREAM BUFFER GF DM1%2 nILL ',R buffer zones. nDu,:.17.155L- 1315952.5393 43 ,'F1s? KAY C R TH053AS I. Fri;GFR - " " - - .r. 'rG FORFS" (3E"ELiFd,FR RD PC12 G0582G.21831 1307559.41t*PC51 60797170.5E 1317418.7399 PC90 - i-,!.� ` \\\///\\\ H AH CiHURCH ?sk:'.I�LL NC']c-CJ33 1r•3 21 n210 fnR17TOf-H-R.r I. \ o I -.p - BESS-616n CITI' nr' 2501E 4. As soon as practicable after construction of sediment basins, haul roads, sediment `� \ / ' PC13 5059998792!330o9A433C+]iPC52 6D7848a537 1317313,613PC91. :0.7062673 1376s.z.a$36- E PRIVATEA EM 4rb - n: iJEP .B'n :H k _ m; :.L.. KisF ::I ', tra s, and/or an side slopes es controlled b super er silt fence, the side slope,, es will be : f / CL S o o Ali 1S51 53 Cw.'rfJv r, n-EVER.Y rvYALL EN la 22CM 19-r:v.IN R S-F v.AR• „"„ P Y P Y P P PC14 50E5996297, 130,5E26541FC53 5[1*575743 1317d3.5878! PC92 5Ri4'3.853E IM7337.4337 .,F?C.CISe fJC 7r'].7=>: �Ru..SL NO 26r°.. � j / �- p-� [ �� - 1 {�{� O f 21, DEL'n l�dr L)k �,- immediately stabilized, seeded and mulched with matting being Installed on slopes PC 15 '30783:..d9911 33IXi4D1.15703PC5d [iDE7u674d'3 I31 E839.4D481PC93 005386.8532 131763E.2E7R ; %, ° �/ o S UTHERN ENTF�ANCE d5 15&164 S1r: >rd'fi'r10'IV,i:rdES CFIrHkr...L- 117.1 1CS 22Gk320 C.ARAIACDAIRYINC r„ _- ,_ �_ steeperthan3:1. ! �--------------- ._. ---------� t � - - ' AERIAL TOPOGRAPHY = 2 FT. CONTOURS ..rcU•Jb E, h_. 2eJ.13 PCl6 6D7r>d9 SD47 1305373856C1 PC65 5D6599 5757 k316983 b8yk PC9d ) 50G9-x7 31n$ 1378f�ri4 ..r.. ._. ... .._...... .� i ._:. .. ... T. ___.-...r.� .. _ ca - _ 1'31 NEP Fi7'$AH CHUR�2 �-? !ni nOCkI i:1Li RD 5. The Carolina Lithium Protect Is composed of the following: Concentrate Operations PC 17 5UE537.d8431305147.7999.PCSS 505313.R7591 f31 E73r 3927 PC96 i n'07713.37.39 1317535.1499 ° �L'if l� ° � /� , 4" 1.".1 W ..AR . E d DEI. A B Sri,-. _AI L'kYxJSr. INC .�'3i3 ILY3 2.3'•: SL.::AN M S3 LI tANA'J r f,. ^ \,\ \ (' - _ Q O U �,10 - N� 76�2 includes Piedmont Lithium Carolinas Mine#1, Concentrate Plant, and Industrial Prix so63 42[Gx 13osW 71zi;PCs7 5053u311&s E315130.5558•PC GD7h1.9 DG 131&G27.iG87 - CKING GA O o = AERIAL MAPPING DATED JANUARY 2021 r _ , .. ....... .L. ... --- ... L _ I n.LI.P 4 ..3Crl. n �, -,Hd..kY r.F k •F>' . F?1 Crl S:nQ71, ,.CY3r kL. 'S2 HL 4+IZIL'n„ ,.r,Vki H.'�.Hydroxide.'...... ...... . 7 ...... _ . '.......... ., • \ 47 �7 1' + :a°' n- ten. • : r.rJ s rc = Minerals Plant. The Lithium Conversion Plant includes the Lthium •a'J rtYjrlF8FaG•FFa bFSSereFR CI'r NC 7a"'•f '' 2_ .19 .. M1 i E .[PL39 5D8717 i372 �305573 5353 PC�8 605547.033E I314o95 5144 P{97 oL>o028.5093 137C335 _738 0 J ,';' '- R;•SF "' �k"'' o • ®P o AND PROVIDED BY PIEDMONT LITHIUM CAROLINAS, INC. c ceFrrr.L P_ Hydroxide Conversion Plant. PCzo 092 d 5350 1306G32 1I81`P C59 DE139 19 I31Ld2 7W0 PC 4 oC E1R.I34E 132WSE 47 5 d? 155'2U3 ;ernLTTe. q rsru�Fv Ire es7nTE " $p1 HEPr?Ir+n., F,uRr,rac .. - ... _ _ .. . .._ ..-_ _ _ - ... �� NEAREST OCCUPIED 1� 2"eel-,iA ..ArJ ;W KiSFR nVFFS"FII.FR - , .-Fri^_. .SE rJ..7RC5': Pi,74 FiG3875737 :3C73F13'fA�PC60 f,051857737� 13iMi373R3 PC99 00;44339k3 k37631i 99Cd � WELLING ;�63 AOFnn0i 71 RD •D9 A4'HONY GROVF R:: SiC7349.3729, 13074RA 7857:PC69 r[M99F 175E [314561.fH']71PCirH] 50�735.7247 1373iki7 S7[]9 � e - • 4: ,5:7:i, - rota, DJ A5xF5 rAAlll'dFY I`.(x. 'i r C_1 'xP ,"` 775.2e AN H.'.N'Y GRc:IF e• - D ACREAGE PC77 _ T ❑°_ s7s ft. 1 r L r.' iST CH:)fdrl CATEGORY AFFECTE pC23 51G2318772 33074A5159;PCo2 160541D21391 13147Su7432LPC101 I 5P46921602 13213837153 ,f `11 EID c , _ , iE2• S_Nl MARKS CHiRLH RD PC74 SlO173.3713ii I3❑7"i0.7.F573.PC63 F05797.27dfi1 1319113.dn34.PC107 n[k1427.i617 13737.7.ft755 , / I hereby certify that this document was % �. .Y. 1r.'•".f..:" rJ'f.R I.s7�7 :iri [ G 47$ •Ird S I'G' 3Ox nF ' rc Ck 2CI AD I Ir .O 7ft;)1 „_ .�csn_ K,�a ..,->=n_Lr Tailings/Sediment Ponds 20 ACRES , ` - o �' r- �-KJ USL NC 73,733 � � - q-,..A:]Frir,O :11 ?U PC25 i,D5G51.S3.Y3 13WGL� E788 PCLd GD335682i,3 L31�fY I224fS PC 103 oQiGESr 7328 13213734.4571 / 51 1„ ,,�j CYAN JVFr:ArJKd Cfr1.C�EC rdLL.OFd LI:iX:LP1irVi rdC7h%.0 LG - p....... ... Lx .7... _p...... _ Tp...--- ---'---7 \!' , (� o o prepared by me or under my direct personal �,+ �► *.1 • _.,.• o \ C. _kI A'GE LN_ Waste Iles Waste Rock Pile 119 ACRES L26 509592A520 _30 753Ak39, C65 6P:287.528$ 13148fA.7389 C104 v'0.2Ck 947E k32C742.396 6J\ * [+[ti / 1'7� Hf.5T1NC5 Rp 11! 3CGSiF' SU."1f4 L, v�Slc`i&Fr.1= i+'i,l<SrdA;yl ".IC L"3Y, Ni• 2d 1`L p, ( ) PC77 S0%. FA!.47351 f:3(I757U.9P73 PC[5 Y,3F7 .46:,E]'_ 1314F.Q7.79fi7;PC105 5U2737.8298 13209:9.3407 \// ❑ ' % +� a7V� • E 57 15Gsu,, E;REF.(1,5•7lrR _ - r o ` - supervision and is correct to the best of my DEssereER,;IT': °Jc zees P o 5ox4tr: Processing Area/Haul Roads 137 ACRES -- - .., c 1. 312 3@2?3: R L'.'.fKC UL'LL .. ""„_� PC28 509053.54851 �30780.M1.2454sPC67 661121]463 I3140.1_S.C692iPC106,,, „v'D1789;0342 ••1320782.5947 \ - r. -- +L15.. CRK R,: ,A,; , ,, KC 2co,n. .-. 1.. .....- ...I .............. R- 1 L3Ez1 ,.+�_.,sr, AF.rJ r::r•,es _ _ Mine Excavation Pits 403 ACRES �� knowledge and belief and that I am a duly `p�•. AERIAL VIEW r (Pits) PC79 SOii45R.57ii31 3307fid7.7976PCBR I Sf373?9 rxwF 1317053.77RSiPCl07 nOl7R3 Rfi0R 1370H74.47d7 \ �'�`` / - G+5^•7iJt^, I'J" 7y'£j7 D rl.:nY, li•1 i.E:^ilj 3 TRr.^:E KE:!JNr Cr 1$3? �f r.!AR•f$ i1HIJf\ r f71i _ SEAL � ❑ I 11.'. 3G3SL9 PC30 50845E.44371 2308618.4559;PC69 60233G19i3 131155L3445;PC108 6L028i3961 1320359.9351 p of 1Lr ry uc^ Z" e _ .. .; .ar•. 15!,7PI E'*IURCTCIR 'CLL'•nVAIN ::RC:JSF.. Fi':2F.33 L.) under the - s 23ZCT„y.n7C CS _.... o ❑ licensed Professional Engineer and H'i:HPCiidl NC7!?CQ TSOiN'rEST.'ORS:-�� nJLfJriC�U'�' ADCIIIar Maintenance Yard and Magazine) 19ACRES - -- �� '" g _ 11a 3ia i?7 •_� N 33Cc R^.UPJC'iiiLL BOAC' y ( g ) P.^.7l SOR377.9ft55i 33❑.R617.F4R9;PC7R i Ff37577977 F. 171745J.70.R:PC109 5[X17064369 137C7fifi'S33 � "2- ,� 9 15114R'A'''XIArJ:BCR OUELL:T7E SLAIcRVI-L rJ.!a97ti3 PC.37 SU&1:36.?4']'7 53U34P7.SOC:fi PC7Y E03748.5391� I31C1i47.5778iPCilU SS4813.[215 1319E132.5632 � P � laws of the St t of No h�arolina. L14$$2i]is Z VERYA J M...._ .rvl6cR:>�sr...cJ$Yi3 ,a2,S.rIN,i1.:kKSLr3UrZFI Temporary Stockpiles (Topsoil Storage Plle) 21 ACRES 1"\ �/ � )/r}` � ' LCl� O VOO 1200 1800 iOARhV:rJ C, F. CYrd?: iy1 re I4y: 1Iy,A"J1:k0 R5",rvf•;'!_nrdC CS7 110 3Caeo ria iJ=Y CBCKA, k`^.ADt _� PC34 50 x7A5.SU54; I309571.7454, P C73 fiO3fi SO17771 131CA1 S.Fn74;PCik2 n[X]F4!]n137 I31 Rf77G FFMCL•_ +.JJ/,,,--- %Al7;Sr-. NG?[7':33 ..... CRJCSE. N, 23(3M / P \ G rN G e L35 508354.508Gi 13096�.a770iPC74 6Ut304.4117 131C650..2958!PCL13 6ff5133.5ff35 1315311.i53G / r;c : r CK:Ji.:A$ SCOiT 8 r.SELi$SA SFyAU4 15A1 R'I'.r f. NG r, 6 L.fi - " r _ _ _ _ _ 54�„9 64RGnr?.: DR .. a U / * * . 1 • 5: 1....t3> 11c °CdE.£' GnkY L._iti O•:S_LN & JGI-IFJ i.,nkK , Llnk�.Yl .. .. ..........................................i..........__............:............ ...I.................... - /.s/ �,SlCJl7 t re) :r11_LEFi CRO:& \C"'8.".33 LII rcRYyl�%� rJ 2tlL•23 PC3ri SUR37473F.7i 33❑9,10.F❑7){PC75 FDdfiS9fFi3T1 l3ilY4ftH1F[7PClfd 5[13fi7iRd3R 13155d97$74 August 30, 2021 ❑.,S. MARKSCH;FOHRD xr,A aLCJ. •acRD Total Disturbed Acreage 719 ACRES - - ° i Q o Date: 9 , C+d 1ExA4r ST. Y1A:iKS LU TIiC:Z.!•, Cl IUR.`s"I „ ,_ - ., 1,7 3L':i!8 N10t4EL 2AS(CN & PA.i:3C FH C•Crr1AN vEKJ!n, 7L 31........ 50EL333_3SJ9,�3?3�28 3972;PC7.........._-bU574D_5F44. 131CG46.7�81, PC�115 _fiD371k..0495 131SU57.7.G33 ° �1� ,I,r FtiZYv LLE JC2.11171 'N•L_n5 Y: 2cJ;.1 P.^,3A 508D3n ---- 33❑9779.9465;PC77 i 605hdfi?1371 13, 2&R1J PC, kn 605 '3 SCK19 13151F66417 ° / `"�' � SCALE 1 -600 +.,RG :r �9c A., rLB.a C:,r. RD Total Permit Acreage 1IA-1 211,,548 ACRES I\� grill i l lli t � � r 1::EW3 Rr''-XY 0:iCNr_Y & O'r1ERS lid SC=r9tv3 13HN FRFF."•fAN PC39 5❑74R3.RA56i t3fA7$7.9447;PC7R F.074'ait7$541 131739F.57571 Cl- Q O _J Z 0 0 W \ \ = J Z 0 3: \ (n \ O U M 00 Q W O ~ Z V) 0 0 � W W (-) 0 Z O U LEI J � IN Q W F Q O J 0 0 U 0 V) CL Ii ■ U u` Z Z n O W Z Q V a Z 0 = Q 0. Z Z Z W Z F- J J 0 V Z W 0 Fn V UJ AA a. '+ V SHEET NUMBER 1 OF 2 Appendix B Annual Report to Secretary of State Jet_ BUSINESS CORPORATION ANNUAL REPORT 10_2017 NAME OF BUSINESS CORPORATION: Piedmont Lithium Carolinas, Inc. SECRETARY OF STATE ID NUMBER: 1531128 STATE OF FORMATION: NC REPORT FOR THE FISCAL YEAR END: 6/30/2021 SECTION A: REGISTERED AGENT'S INFORMATION 1. NAME OF REGISTERED AGENT: CaDitol C orDOrate Services. Inc. 2. SIGNATURE OF THE NEW REGISTERED AGENT: Filing Ut ice Use Unly E - Filed Annual Report 1531128 CA202129501128 10/22/2021 02:45 ❑X Changes SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 3. REGISTERED AGENT OFFICE STREET ADDRESS & COUNTY 4. REGISTERED AGENT OFFICE MAILING ADDRESS 120 Penmarc Drive 120 Penmarc Drive, Suite 118 Raleigh, NC 27603 Wake County SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: Mining Raleigh, NC 27603 2. PRINCIPAL OFFICE PHONE NUMBER: (704) 998-2226 3. PRINCIPAL OFFICE EMAIL: Privacy Redaction 4. PRINCIPAL OFFICE STREET ADDRESS 5. PRINCIPAL OFFICE MAILING ADDRESS 32 N Main Street, Suite 100 Belmont, NC 28012 32 N Main Street, Suite 100 Belmont, NC 28012 6. Select one of the following if applicable. (Optional see instructions) ❑ The company is a veteran -owned small business ❑ The company is a service -disabled veteran -owned small business SECTION C: OFFICERS (Enter additional officers in Section E.) NAME: Keith Phillips TITLE: Pracirfanf ADDRESS: 32 N Main Street, Suite 100 Belmont, NC 28012 NAME: Bruce Czachor TITLE: Secretary ADDRESS: 32 N Main Street Suite 100 Belmont, NC 28012 NAME: TITLE: ADDRESS: SECTION D: CERTIFICATION OF ANNUAL REPORT. Section D must be completed in its entirety by a person/business entit . Kyeith Phillips 10/22/2021 SIGNATURE DATE Form must be signed by an officer listed under Section C of this form. Keith Phillips President Print or Type Name of Officer Print or Type Title of Officer This Annual Report has been filed electronically. MAIL TO: Secretary of State, Business Registration Division, Post Office Box 29525, Raleigh, NC 27626-0525 Appendix C Concentrate Operations Drawings ..... ... . w --- WATER INTAKE (fnal alignment to be determined) can lot f v MAIN JL RC 1 • SOLAR, FAR o � i ANT AREA PLANT ENTRANCE- ��' .�� � � ♦ _ DA-40 � J I � ROM PAD 870.0 � � LPL_ ENT � 'rt _QUA-4 ♦♦♦ J , �� RRNc � ♦ � C4� DA-56 -55 0 Drainage Component Summary - Waste Rock Pile Phase 1 Drainage Component Summary - Haul Road Sediment Traps Drainage Disturbed Design Q25 Required Suface Required Provided Surface Provided Volume Sediment Drainage Disturbed Design Q25 Required Suface Required Provided Surface Provided Volume Basin AreaArea Area No. (Acres) Storm Area (SF) Volume (CF) Area (SF) (CF) Trap No. Area No. (Acres) Storm Area (SF) Volume (CF) Area (SF) (CF) SB-1 2, 4, 4a, 4b 17.82 25-YR 80.58 35,053 32,076 35,187 187,744 Worst Case* 73 1.82 25-YR 36.31 3,428 3,276 3,964 7,693 SB-2 1, 3, 3a, 5, 6 23.00 25-YR 95.35 41,473 41,400 43,988 175,534 ST-1 51, 51a, 52, 53 9.09 25-YR 36.31 15,795 13,482 15,863 43,661 SB-3 6a, 7, 8, 9, 13 18.28 25-YR 79.19 34,448 32,904 35,055 119,319 ST-2 49 2.46 25-YR 10.66 4,637 4,428 4,819 10,035 SB-4 10, 11, 12, 14,15 29.97 25-YR 129.84 56,480 53,946 56,915 202,554 ST-4 64,65 4.31 25-YR 14.10 6,134 7,758 6,134 13,743 SB-5 16,17 3.92 25-YR 16.98 7,387 7,056 15,408 58,623 ST-5 55,63 4.22 25-YR 18.28 7,952 6,948 7,975 19,197 SB-6 18,19 6.82 25-YR 29.55 12,854 12,276 18,916 76,914 ST-6 67 3.23 25-YR 13.99 6,086 5,814 6,130 13,763 SB-7 20,21 15.75 25-YR 68.23 29,680 28,350 30,402 129,713 ST-10 71,72 3.22 25-YR 13.95 6,068 5,796 6,179 13,909 SB-8 22,23 11.40 25-YR 49.39 21,485 20,520 24,265 118,352 ST-13 60,61 3.83 25-YR 33.73 14,673 6,984 14,893 40,578 SB-9 24,25 11.27 25-YR 48.82 21,237 20,286 22,431 74,457 *Worst Case Sediment Trap based on largest disturbed area (DA-73 for ST-11) and largest flow for spillway (36.31 CFS for ST-1). SB-10 26, 26a, 27 14.85 25-YR 62.82 27,327 26,730 27,460 102,017 'Worst Case Sediment Trap Design utilized for ST-3, ST-7, ST-8, ST-9, ST-11, ST-12, ST-14, ST-15, ST-16, ST-17, ST-18, and ST-19. Drainage Component Summary - Waste Rock Pile Phase 2 Emulsion Storage and Bulk Truck Parking Area - Concentrate Plant/Conversion Plant Conveyor Access Road No. 2 Sediment Traps �- Drainage Disturbed Design Q25 Required Suface Required Provided Surface Provided Volume Sediment Drainage Disturbed Design Q25 Required Suface Required Provided Surface Provided Volume Basin AreaArea Area No. (Acres) Storm Area (SF) Volume (CF) Area (SF) (CF) Trap No. Area No. (Acres) Storm Area (SF) Volume (CF) Area (SF) (CF) SB-1 2,4 14.43 25-YR 62.51 27,192 25,974 35,187 187,744 ST-20 90,91 1.81 25-YR 15.77 6,860 3,258 6,866 26,495 SB-2 1, 3, 3a, 5, 6 31.87 25-YR 96.54 41,995 57,366 43,988 175,534 ST-21 84,85 2.59 25-YR 18.87 8,208 4,662 8,389 30,797 SB-3 6a, 7, 8, 13, 13a 15.22 25-YR 65.94 28,684 27,396 35,055 119,319 SB-4 10, 11, 12, 14,15 22.51 25-YR 97.52 42,421 40,518 56,915 202,554 SB-5 16,17 7.43 25-YR 32.19 14,003 13,374 15,408 58,623 Drainage Component Summary - Topsoil Stockpile Area � Drainage Disturbed Design Q25 Required Suface Required Provided Surface Provided Volume SB-6 18,19 9.02 25-YR 39.08 16,999 16,236 18,916 76,914 Basin Area Area No. (Acres) Storm Area (SF) Volume (CF) Area (SF) (CF) SB-7 20,21 15.60 25-YR 67.58 29,397 28,080 30,402 129,713 SB-11 28, 29, 30, 31, 38 7.50 25-YR 32.49 14,133 13,500 14,178 52,881 SB-8 22,23 11.40 25-YR 49.39 21,485 20,520 24,265 118,352 SB-12 32, 33, 34, 35, 36, 39 14.02 25-YR 57.96 25,213 25,236 33,943 116,762 SB-9 24,25 11.27 25-YR 48.82 21,237 20,286 22,431 74,457 Drainage Component Summary -Plant Area SB-10 26,27 14.06 25-YR 60.91 26,496 25,308 29,600 102,017 Disturbed Drainage Area Design Q25 Required Suface Required Provided Surface Provided Volume Notes: Drainage Areas for the Waste Rock Pile reflect Phase 2 final drainage areas, with the exceptions of Phase 1 Drainage Area 9 which Basin Acres Area No. Storm Area (SF) Volume (CF) Area (SF) (CF) is enveloped into Drainage Area 13a in Phase 2. See Waste Rock Pile Phase 1 (Sheet 2 of 33) and Waste Rock Pile Phase 2 (Sheet 3 of 33). (Acres) Drainage Component Summary - Emulsion Storage and Bulk Truck Parking Area SB-13 40, 43, 44 10.30 25-YR 57.98 25,221 18,540 25,697 143,857 Drainage Disturbed Design Q25 Required Suface Required Provided Surface Provided Volume SB-14 45,46 8.41 25-YR 27.56 11,989 15,138 12,505 175,534 Basin Area Area No. (Acres) Storm Area (SF) Volume (CF) Area (SF) (CF) SB-15 48 6.38 25-YR 17.24 7,500 11,484 8,617 33,916 SB-17 86 10.02 25-YR 30.22 13,146 18,036 13,883 35,129 SB-16 41, 42, 42a 13.34 25-YR 58.38 25,395 24,012 25,523 120,226 2 59+r i DA-60 IVY + DA-61 + t' DA-75 ' T W P-P T DA- ` _ + � J � h ST-6 -6 sr-s DA-79�1 i O GRo DA CROSSING NO ` e n Oa.s A-81 J EAST 0 n a GceeK DA-3 TOPSOIL S ORAGE PILE B-12 0 N C7 0 0 I hereby certify that this document was ����� GIloiloA�O���� prepared by me or under my direct personal supervision and is correct to the best of my Q OFEsS/p '•,.� knowledge and belief and that I am a duly licensed Professional Engineer under the SEAL laws of the State of North Carolina. 048820 •''•.FAG ' �= (signature) ��� '•,,, INE��''•,,,<•�Q`. 01(Date; August 25, 2021 �i-flily/ B..�lN�,,��� DRAINAGE AREA SUMMARY DRAINAGE AREA NUMBER TOTAL DRAINAGEAREA ACRES DISTURBED DRAINAGEAREA ACRES CONTROLLING STRUCTURE 1 2.96 2.96 Waste Rock Pile- Sediment Basin SB-2 2 2.15 2.15 Waste Rock Pile- Sediment Basin SB-1 3 1.80 1.80 Waste Rock Pile -Sediment Basin SB-2 3al 0.76 0.76 Waste Rock Pile -Sediment Basin SB-2 4 12.28 12.28 Waste Rock Pile -Sediment Basin SB-1 4a 2.00 2.00 Culvert C-17 and Waste Rock Pile -Sediment Basin SB-1 4b 2.00 2.00 Culvert C-17 and Waste Rock Pile- Sediment Basin SB-1 5 26.00 26.00 Waste Rock Pile Sediment Basin SB-2 6 0.35 0.35 Waste Rock Pile Sediment Basin SB-2 6a 3.78 3.78 Waste Rock Pile Sediment Basin SB-3 7 0.73 0.73 Waste Rock Pile -Sediment Basin SB-3 8 2.33 2.33 Waste Rock Pile- Sediment Basin SB-3 9 1.42 1.42 Waste Rock Pile -Sediment Basin SB 3 10 0.74 0.74 Waste RockPile-SedimentBasinSB4 11 3.74 3.74 Waste Rock Pile -SedimentBasinSB-4 12 2.41 2.41 Waste Rock Pile -Sediment Basin SB-4 13 6.39 6.39 Waste Rock Pile -Sediment Basin SB-3 13a 1.99 1.99 Waste Rock Pile -Sediment Basin SB-3 14 7.24 7.24 Waste Rock Pile -Sediment Basin SB-4 15 8.38 8.38 1 Waste Rock Pile -Sediment Basin SB-4 16 6.63 6.63 Waste Rock Pile -Sediment Basin SB-5 1/1 0.80 0.80 Waste Rock Pile- Sediment BasinSB-5 18 1.09 1.09 Waste Rock Pile - Sediment Basin SB-6 19 7.93 7.93 Waste Rock Pile- Sediment BasinSB-6 20 14.51 14.51 Waste Rock Pile Sediment Basin SB-7 21 1.09 1.09 Waste Rock Pile -Sediment Basin SB-7 22 8.61 8.61 1 Waste Rock Pile -Sediment Basin SB-8 A31 2.79 2.79 Waste Rock Pile- Sediment BasinSB-8 24 7.25 7.25 Waste Rock Pile- Sediment BasinSB-9 25 4.02 4.02 Waste Rock Pile- Sediment BasinSB-9 26 12.36 12.36 Waste Rock Pile Sediment Basin SB-10 26a 0.44 0.44 Waste Rock Pile - Sediment Basin SB-10 27 1.70 1.70 Waste Rock Pile - Sediment Basin SB-10 28 3.04 3.04 Topsoil Storage Pile- Sediment BasinSB-11 29 1.87 1.87 Topsoil Storage Pile- Sediment BasinSB-11 30 1.04 1.04 Topsoil Storage Pile - Sediment Basin SB-11 31 0.81 0.81 Topsoil Storage Pile - Sediment Basin SB-11 32 5.17 5.17 Topsoil Storage Pile - Sediment Basin SB-12 33 3.53 3.53 Topsoil StoraePile-SedimentBasinS6-12 34 1.17 1.17 Topsoil Storage Pile - Sediment Basin SB-12 351 0.22 0.22 Topsoil Storage Pile- Sediment BasinSB-12 36 2.16 2.16 Topsoil Storage Pile Sediment Basin SB-12 37 1.01 1.01 Haul Road - Sediment Trap ST-16 38 0.74 0.74 Topsoil Storage Pile- Sediment BasinSB-11 39 1.77 1.77 Topsoil StoraePile-SedimentBasinS6-12 40 8.33 0.76 PlantArea - Sediment BasinSB-13 41 8.65 2.90 PlantArea - Sediment BasinSB-16 42 9.01 7.89 PlantArea - Sediment BasinSB-16 42a 2.55 2.55 PlantArea - Sediment BasinS816 43 4.98 2.59 PlantArea - Sediment BasinS813 44 8.31 6.95 PlantArea - Sediment BasinSB-13 45 - 7.04 PlantArea - Sediment BasinSB-14 461 1.37 1.37 Plant Area - Sediment Basin SB-14 47 2.02 1.09 Plant Area - Sump C-4toCulvert C4 48 6.38 6.38 PlantArea-Sediment BasinSB-15 49 2.46 2.46 HaulRoad-SedimentTra ST-2 s0 0.64 0.64 Diverted via ditch to unnamed tributaryof Beaverdam Creek 51 3.73 3.06 Haul Road -Culvert C-2to Sediment TrapST-1 Sla 1.85 1.37 Sediment TrapST-1 52 1.57 1.57 Haul Road -Culvert C-2to Sediment Trap ST-2 53 1.49 1.49 Haul Road -Sediment Trap ST-1 54 1.32 1.32 HaulRoad-SedimentTra ST-3 55 1.60 1.60 HaulRoad-SedimentTra ST-5tolnstreamCulvert C-7 56 5.47 0.59 CulvertC-6 57 24.17 1.11 Instream Culvert C-7 58 271.00 7.82 Instream Culvert C-13 59 0.84 0.84 Haul Road -Sediment TrapST-12tolnstreamCulvertC-13 60 1.62 1.62 Haul Road - Culvert C-14toSedimentTra ST-13 61 2.21 2.21 HaulRoad- SedimentTra ST-13 62 0.65 0.65 Haul Road - Culvert C-16 to Sediment Trap ST-12to Instream Culvert C-13 63 2.62 2.62 Haul Road -Sediment Trap ST5tolnstreamCulvertC-7 64 3.63 3.63 MagazineLocation- Sediment -Er apST-4 65 0.68 0.68 HaulRoad-SedimentTra ST-4 66 1.09 1.09 Haul Road -Culvert C-9 to Sediment Trap ST-9 67 3.23 3.23 Haul Road -Culvert C-8to Sediment TrapST-6 68 1.24 1.24 Haul Road - Sediment Trap ST-7 69 0.94 0.94 Haul Road -Sediment TrapST-8 70 0.97 0.97 Haul Road -Sediment TrapST-9 71 1.62 1.62 HaulRoad-SedimentTra ST-10 72 1.60 1.60 Haul Road -Culvert C-10to Sediment Trap ST-10 73 1.82 1.82 HaulRoad-SedimentTra ST-11 to Culvert C-11 74 11.60 0.72 Culvert C-11 75 6.36 0.17 Culvert C-12 76 5.81 0.25 Haul Road Sediment TrapST-13 77 15.47 0.81 Diverted via ditch to Beaverdam Creek 78 1.36 1.36 Haul Road - SedimentTra ST-14 79 1.33 1.33 Haul Road -Sediment TrapST-15 80 0.58 0.58 Haul Road - Culvert C-15to Sediment TrapST-16 81 0.51 0.51 Haul Road - Sediment Trap ST-17 821 0.48 0.48 Haul Road - Sediment TrapST-18 83 1.72 1.72 11 Haul Road - Sediment Trap ST-19 Notes: Drainage Areas for the Waste Rock Pile reflect Phase 2final drainage areas, with the exceptions of Phase 1 Drainage Area 9 which is enveloped into Drainage Area 13a in Phase 2. See Waste Rock Pile Phase 1(Sheet 2 of 33) and Waste Rock Pile Phase 2 Sheet 3 of 33). 84 1.73 0.69 Access Road -Sediment TrapST-21 85 3.42 1.90 AccessRoad- SedimentTra ST-21 86 10.02 10.02 Future Tenant Site- Sediment Basin SB-17 88 2.87 - Clean Water Diversion Ditch 89 13.34 0.04 Underdrain UD-5 90 3.96 1.31 Culvert C-18 911 0.501 0.50 1 Access Road -Sediment TrapST-20 z o W W O N O T- = J o � 3: --1 U� O O :5 00 Q ¢` O - z o o w o U z z w w z O O w � -D n Q w I- Q O w W � = Q O IY J C� 0 1 O 0 I (n L- � PERMIT BOUNDARY ■ PIT OUTLINE ■����■ DRAINAGE AREAS DA-15 DRAINAGE AREA LABEL FLUME -, __________ , U N D E R D RA I N Z Z UD-2 UNDERDRAIN LABEL - J DRAINAGE DITCH Q a. CULVERT NAD-83 Z Q © CULVERT LABEL NC-SPCS O = � SB-4 SEDIMENT BASIN LABEL W 0 T-11 SEDIMENT TRAP LABEL V p Q W Z Z - x- x- x SILT FENCE F - FLOW DIRECTION ARROW W Z o EROSION AND SEDIMENT = Z J CONTROL STRUCTURE J Q a DIRECTION OF SURFACE FLOW H OU Z z Q SCREENING BERMS O Z p DELINEATED WETLANDS p j 30 FT. DELINEATED STREAM BUFFER W _ a < AERIAL VIEW 0 500 1000 1500 SHEET NUMBER 8OF34 SCALE 1 "= 500' POROUS BAFFLES (TYP.) (SEE SHEET 32 OF 34) CREST OF POND EL. 814.00' �B/ SILT FENCE / SEE SHEET 32 OF 34) X A *CONCENTRATE PLANT/ IL`E)NVERSION PLANT CONVEYOR ACCESS ROAD NO. 1 850 50% CLEAN OUT EL. 807.79 :11 750 0+00 i r EMERGENCY SPILLWAY CHUTE SECTION 1 I EMERGENCY SPILLWAY LEVEL CONTROL SECTION (SEE DETAILS THIS SHEET) PRINCIPLE SPILLWAY 72" SQ. RISER W/ TRASH RACK _ 83 AAl)TD 50 FT OF 36 IN. CMP NC-DSPCS \-�- 2 \ TEMPORARY BASIN ACCESS ROAD 0000, NORMAL POOL EL. 811.18 50% CLEAN O L. 807.79 OUT OTECTION SEE SHEET 34 O SUMP W/ CULVERT (C-17) i DITCH NO. 4 PLAN VIEW: SEDIMENT BASIN NO. 1 SCALE: 1" = 50' EXISTING GROUND r NORMAL POOL EL. 811.18 Q25 HWD EL. 812.28 I BOTTOM EL. 803.5 CENTERLINE CUTOFF TRENCH 0+50 1+00 1+50 2+00 2+50 3+00 Cross Section A -A' Scale: 1" = 50' 850 Q25 HWD EL. 812.28 50% CLEAN OUT EL. 807.79 800 750 0+00 FILL MATERIAL 850 NORMAL POOL EL. 811.18 EXISTING GROUND BOTTOM EL. 803.5 0+50 1+00 1+50 Cross Section B-B' Scale: 1" = 50' 2'� EMERGENCY SPILLWAY EL. 812.28 - CREST EL. 814.0 850 :11 PRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 50' OF 36" CMP 750 3+50 4+00 4+50 5+00 800 14 FT ACCESS CREST EL. 814.0 750 2+00 CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) 2' MAXIMUM IF NOT CUT TO BEDROCK IL SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CUTOFF TRENCH DETAIL CONTENT N.T.S. EMERGENCY SPILLWAY DETAIL LEVEL CONTROL SECTION N.T.S. Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 52.00 Wetted Perimeter: 55.21 Area of Wetted Cross Section: 38.30 Channel Slope: 0.1000 Manning's In of Channel: 0.0175 Discharge: 80.58 cfs Depth of Flow: 0.72 feet Velocity: 2.10 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet SEDIMENT BASIN NO. 1 PRINCIPLE SPILLWAY Outflow Total Discharge: 81.4986 cfs Water Surface Elevation: 812.28 ft Tailwater Elevation: 0.00 ft Detention Base Elevation: 0.00 ft Outlet #1: Sediment Basin 1 Principle Spillway, Drop Pipe Riser Top Elev: 811.18 ft Riser Base Elev: 803.50 ft Riser Length: 72.00 in Riser Width: 72.00 in Orifice Coefficient: 0.50 Weir Coefficient: 3.33 Culvert Length: 65.00 ft Culvert Diameter: 36.00 in Culvert Invert In: 807.28 ft Culvert Friction Coefficient: 0.02 Culvert Entrance Loss Coefficient: 0.90 Discharge: 81.50 cfs 58.87 ft. 52.00 ft. EMERGENCY SPILLWAY DETAIL CHUTE SECTION N.T.S. �I v 2 20.00 ft. 2 Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 20.00 Wetted Perimeter: 20.88 Area of Wetted Cross Section: 4.02 Channel Slope: 50.0000 Manning's n of Channel: 0.0175 Discharge: 80.60 cfs Depth of Flow: 0.20 feet Velocity: 20.03 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet RISER DETAILS 1.00ft. Freeboard 0.7 Freeboard I Stage Storage Curve SEDIMENT BASIN NO.1 815.50 813.50 811.50 809.50 807.50 805.50 ,SERGE CY SPILLW ` SPILLW Y (811.18) STRUCTURE (812.28) 803.50 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 Accumulative Storage (Acre -Ft) Storage volume computations SB-1 - ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) - 803.50 N/A N/A 0.4332 - 805.50 N/A N/A 0.5012 0.4672 2.00 0.9218 0.9218 2.00 807.50 N/A N/A 0.5709 0.5361 2.00 1.0587 1.9806 4.00 807.79 N/A N/A 0.5814 0.5762 0.29 0.1683 2.1489 4.29 809.50 N/A N/A 0.6431 0.6070 1.71 1.0318 3.1807 6.00 811.18 N/A N/A 0.7058 0.6745 1.68 1.1331 4.3138 7.68 811.50 N/A N/A 0.7178 0.6804 0.32 0.2136 4.5274 8.00 812.28 N/A N/A 0.7485 0.7331 0.78 0.5718 5.0992 8.78 813.50 N/A N/A 0.7964 0.7571 1.22 0.9267 6.0259 10.00 814.00 N/A N/A 0.8077 0.8020 0.50 0.3995 6.4254 10.50 TOP OF EMBANKMENT RISER STRUCTURE TRASH RACK EMERGENCY SPILLWAY r MIN. I(-I(Il=N1l=llll-llH=HII=HII- oQE 1111�1111�1111�1111-1111`1111=1111=1111f1111N7s�op �o F tiS� u=rill=llll=lCR=ItIl=1111=1111=IIIl=Ill1={11l�Illi- 1. NJ JIJI_E�J111=1111=11R�1111=111I=l111=1111�11JI 1111=1UI=11 llli�Illl=rill=rill=llll�IUl�I!{l�llll=llH I �N1l=llil=11Q=1111 = BARREL PIPE ANTIFL TATION BLOCK SECTIONAL VIEW CUT-OFF TRENCH ANTI -SEEP STABILIZED COLLAR 2' DEEP OUTLET 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. NOT TO SCALE TYPICAL EMBANKMENT DETAIL TRASH RACK RISER BUOYANCY CALCULATION 814.00 1' FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 times the EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 812.28 upward force. NORMAL POOL EL. 811.18 1' MIN. 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I 72" SQUARE I 1 CONCRETE I 72" Square Concrete Riser EXISTING GRADE 50% CLEANOUT EL. 807.79 RISER i i 7.78' I I Height =Approximately 8' Weight = 19120 lb I I �-----;-------- Where: Riser Weight = 19120 lb OF POND EL. 803.50 d •°• °dBOTTOM °' °• ° X• 36" DIA BARREL CMP Weight of Riser Fill = (Length x Width x Depth) x Unit Weight of Concrete °° d a • ° d ° Weight of Riser Fill = (6 ft x 6 ft x 0.5 ft) x 150 lb/ft' = 2700 lb ANTI -FLOTATION RISER FILL ANTI -FLOTATION BLOCK (IF APPLICABLE) (IF APPLICABLE) Structure Weight = 19120 lb + 2700 lb = 21820 lb ELEVATION VIEW N.T.S. Buoyancy = Displacement Volume of Riser x 62.4 lb/ft' Buoyancy = 216 ft' x 62.4 lb/ft' = 16224 lb 72" SQUARE CONCRETE RISER ANTI -FLOTATION BLOCK (IF APPLICABLE) • d 1 • Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) ° ° • ° d ° ' 9 ° d ° • a ♦ • d 21820 lb > 16224 lb x 1.25 A. ° ° d A d♦ 21820 Ib > 20280 Ib ♦° d NOTES ° s'-o" 7'-0" 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. ♦ ° ` 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with ♦ ° concrete shall be painted with a black bituminous enamel paint. PLAN VIEW N.T.S. U) 0 U N 0 N U) 0 Q 0 N (D 01 N O Z �: O cv O J Y Z Q N \ U)J (n 0 Z M 00 o w 0 LEI Li U � .. 0 Z N w a 0:� w 2 Q a U O w 0 O U 0 V) 0- li �a Z J J C Z J V O Q v 0 Z r O Z Z 0a Q m H W LU - ILL W a H J Z 0O � LU Z O UUJ Z H U) W - � w � Z J a (L (� I hereby certify that this document was %%%� GA�O���� prepared by me or under my direct personal •, supervision and is correct to the best of my Q •0F�SS1O knowledge and belief and that I am a duly Z; 4Qr•: Y licensed Professional Engineer under the _ SEAL laws of the StalIt� of North Carolina. 048820 SHEET NUMBER •.••'•FNG EEQ'`,•' Qom.~ (Signature) Date: August 25, 2021 ". '� �.`� 9 OF 34 i x _ I 50% CLEAN OUT EL. 832.21 'x POROUS BAFFLES (TYP.) (SEE SHEET 32 OF 34) CREST OF POND EL. 841.00' B� NORMAL POOL EL. 835.00 � C PRINCIPLE SPILLWAY �- 72" SQUARE CONCRETE RISER W/ TRASH RACK ��- AND 67 FT OF 36 IN. CMP i x\k k k EMERGENCY SPILLWAY k LEVEL CONTROL SECTION (SEE DETAILS THIS SHEET) \ EBOTTOM OOF P � . 829., \ CULVERT (C-1) 0 i DITCH NO. 5 EMERGENCY SPILLWAY CHUTE SECTION (SEE DETAILS THIS SHEET) A- /+ SILT FENCE / (SEE SHEET 32 OF 34) / / CONVEYOR x _ x - OUTLET PROTECTION (SEE SHEET 34 OF 34) C PLAN VIEW: SEDIMENT BASIN NO. 2 SCALE: 1" = 50' 900 EXISTING GROUND Q25 HWD EL. 837.58 NORMAL POOL EL. 835.00 50% CLEAN OUT EL. 832.21 850 800 0+00 0+50 •11 1 850 800 0+00 0+50 _ - - - - - - - - - - I _ \ BOTTOM EL. 829.00 CENTERLINE CUTOFF TRENCH 1+00 1+50 2+00 2+50 3+00 Cross Section A -A' Q25 HWD EL. 837.58 50% CLEAN OUT EL. 832.21 850 MAIN HAUL ROAD SUMP 1+00 FILL MATERIAL 1L 2'- Scale: 1" = 50' NORMAL POOL EL. 835.0 EXISTING GROUND 7 . p. BOTTOM EL. 829.0 0+50 1+00 1+50 2+00 Cross Section B-B' Scale: 1" = 50' 3.0% EMERGENCY SPILLWAY EL. 838.58 850 ��CREST EL. 841.0 800 3+50 4+00 4+50 5+00 PRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 67 FT OF 36" CMP 900 850 14 FT ACCESS CREST EL. 841.0 800 2+50 3+00 Q25 HWD EL. 837.58 50% CLEAN OUT EL. 832.21 NORMAL POOL EL. 835.0 EXISTING GROUND - - - - 1+50 2+00 2+50 3+00 3+50 DA-6 CULVERT TO SB-2 Scale: 1" = 50' (.` r`I ITr1CC T�CAIr`LJ (ABUTMENTS) - 2' MAXIMUM IF NOT CUT TO BEDROCK CUTOFF TRENCH DETAIL SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CONTENT •11 850 14 FT ACCESS CREST EL. 841.0 J0 4+00 4+50 5+00 EMERGENCY SPILLWAY DETAIL LEVEL CONTROL SECTION - ROAD CROSSING N.T.S. Approx 75 ft. 1.0� Oft. Freeboard 1.42 ft. 18 �- f: 20.00 ft. - I 8 Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 20.00 Wetted Perimeter: 26.34 Area of Wetted Cross Section: 32.35 Channel Slope: 0.1000 Manning's n of Channel: 0.0175 Discharge: 99.64 cfs Depth of Flow: 1.42 feet Velocity: 3.08 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet SEDIMENT BASIN NO. 2 PRINCIPLE SPILLWAY DESIGN INFORMATION Outflow Total Discharge: 105.4757 cfs Water Surface Elevation: 837.58 ft Tailwater Elevation: 0.00 ft Detention Base Elevation: 0.00 ft Outlet #1: Sediment Basin 2 Principle Spillway, Drop Pipe Riser Top Elev: 835.00 ft Riser Base Elev: 829.00 ft Riser Diameter: 72.00 in Orifice Coefficient: 0.50 Weir Coefficient: 3.33 Culvert Length: 67.00 ft Culvert Diameter: 36.00 in Culvert Invert In: 830.00 ft Culvert Friction Coefficient: 0.01 Culvert Entrance Loss Coefficient: 0.90 Discharge: 105.48 cfs Required Discharge: 99.64 cfs EMERGENCY SPILLWAY DETAIL CHUTE SECTION N.T.S. 15.35 ft. 1.0� Oft. Freeboard 0.34 ft. 1 1 2 � 10.00 ft.- 2 Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 10.00 Wetted Perimeter: 11.51 Area of Wetted Cross Section: 3.60 Channel Slope: 50.0000 Manning's n of Channel: 0.0175 Discharge: 99.63 cfs Depth of Flow: 0.34 feet Velocity: 27.67 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet 841.00 840.00 839.00 838.00 J 837.00 C 836.00 j 835.00 0) W 834.00 833.00 832.00 831.00 830.00 829.00 Stage Storage Curve SEDIMENT BASIN NO. 2 P OF STRUCTURE 1.00) EMERGIENCY SPILLWAY (838.58) PRINCIPAL SPILLWAY (835.00) 0.00 4.00 8.00 12.00 Accumulative Storage (Acre -Ft) Storage volume computations SEDIMENT BASIN NO. 2 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 829.00 N/A N/A 0.5738 831.00 N/A N/A 0.6427 0.6083 2.00 1.2033 1.2033 2.00 832.21 N/A N/A 0.6852 0.6639 1.21 0.8032 2.0065 3.21 833.00 N/A N/A 0.7129 0.6778 0.79 0.5388 2.5453 4.00 835.00 N/A N/A 0.7856 0.7492 2.00 1.4845 4.0297 6.00 837.00 N/A N/A 0.8605 0.8230 2.00 1.6316 5.6614 8.00 838.58 N/A N/A 0.9216 0.8910 1.58 1.4078 7.0692 9.58 839.00 N/A N/A 0.9378 0.8992 0.42 0.3755 7.4447 10.00 841.00 N/A N/A 1.0098 0.9738 2.00 1.9405 9.3852 12.00 TOP OF EMBANKMENT -- RISER STRUCTURE SEE SHT 34 OF 34 " :.,;, . TRASH RACK --1iT'-'J��TH=�1�{I-- �EMERGENCYSPILLWAY r MIN. 11=I1{l=N{1=llll=llH=llll=1111= ?o. oQE 111�11f1=1111=1111=111l=1111=111l=11B 111l� zstop tis�=1i11=llll=llli-1111=Nil=II_li=Nil=111i=11R=111i- F 4hllJlfl11�llU=lill�li11h1l1i�111l�u1l�1111�1111-11111i IIIII�lUi=1111=IUi=llli�llli�llll�llll�1111 I l�gil=Ull=lii1=11fi- BARREL PIPE T ANTIFL TATION BLOCK SECTIONAL VIEW CUT-OFF ANTI -SEEP STABILIZED TRENCH COLLAR 2' DEEP OUTLET 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. NOT TO SCALE TYPICAL EMBANKMENT DETAIL RISER DETAILS TRASH RACK RISER BUOYANCY CALCULATION CREST EL. 841.00 1' FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 000000 EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 838.58 times the upward force. NORMAL POOL EL. 835.00 1' MIN. I 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I I I I 1 F 72" Square Concrete Riser EXISTING GRADE 50% CLEANOUT EL. 832.21 I I I I 72" SQUARE �� A� \ Height = 6' Wei ht = 15,220 Ib g j CONCRETE j I RISER I Where: 6.00' � Riser Weight = 15,220 Ib ° d•° BOTTOM OF POND EL. 829.00 d < d ° ° 36" DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete ° ° a d° ° ° d ° Weight of Concrete Base = (7 ft x 7 ft x 0.5 ft) x 150 Ib/ft3 = 3675 Ib ANTI -FLOTATION BLOCK (IF APPLICABLE) Structure Weight = 15,220 Ib + 3675 Ib = 18895 Ib ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 Ib/ft3 N.T.S. Buoyancy = 216 ft' x 62.4 lb/ft' = 13,478.4 Ib 72" SQUARE CONCRETE RISER ANTI -FLOTATION BLOCK (IF APPLICABLE) Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) ° ° ° 4 ° ° 18895 Ib > 13,478.4 Ib x 1.25 18895 Ib > 16,848 Ib PLAN VIEW N.T.S. NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. 0 w c 0 N (D 01 N O Z �: O N O J Y Z Q M N \ to (n J W Q 00 Q N 0 Z I 00 o w U' 3: 0 U LEI J U � .. O Z U)a w 0:� w 2 Q a U O w 0 O U 0 V) o- L� �a Z J J Z J V Q v � 0 Z N 0 Z Z (1) Q m W W LL a = H Z 0 � W I- = 0 Z 0 H Q Z 2 o 06 w Z J IL EL (� {{{{Illlff►/! I hereby certify that this document was ,%` � CAao prepared by me or under my direct personal supervision and is correct to the best of my ; 0�•oFess/O.''��2 0 knowledge and belief and that I am a duly = �:•Q� SEAL •� licensed Professional Engineer under the SHEET NUMBER laws of the Stateof o h Carolina. ?y : 048820 pc Z tLU (Signature) • , G! N • , ,�Q Date: August 25, 2021 '�. 'F ' `r` ,.`% 10 OF 34 N.T.S. 850 EXISTING GROUND 850 EMERGENCY SPILLWAY Q25 HWD EL. 801.27 NORMAL POOL EL. 799.27 EL. 802.27 50% CLEAN OUT EL. 796.86 800 2 7 2.7 21 CREST 804.0 800 BOTTOM EL. 794.0 1.5% 750 750 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 Cross Section A-APRINCIPLE SPILLWAY Scale: 1" - 50' 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 67 FT OF 36" CMP 850 EXISTING GROUND 850 EMERGENCY SPILLWAY DETAIL LEVEL CONTROL SECTION N.T.S. 56.90 ft. 1 1.00ft. Freeboard 0.73 ft. T 2 - 50.00 ft. - 2 Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 50.00 Wetted Perimeter: 53.25 Area of Wetted Cross Section: 37.35 Channel Slope: 0.1000 Manning's In of Channel: 0.0175 Discharge: 79.19 cfs Depth of Flow: 0.73 feet Velocity: 2.12 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet SEDIMENT BASIN NO. 3 PRINCIPLE SPILLWAY Outflow Total Discharge: 90.9637 cfs Water Surface Elevation: 801.27 ft Tailwater Elevation: 0.00 ft Detention Base Elevation: 0.00 ft Outlet #1: Sediment Basin 3 Principle Spillway, Drop Pipe Riser Top Elev: 799.27 ft Riser Base Elev: 794.00 ft Riser Diameter: 72.00 in Orifice Coefficient: 0.50 Weir Coefficient: 3.33 Culvert Length: 67.00 ft Culvert Diameter: 36.00 in Culvert Invert In: 795.00 ft Culvert Friction Coefficient: 0.02 Culvert Entrance Loss Coefficient: 0.90 Discharge: 90.96 cfs EMERGENCY SPILLWAY DETAIL CHUTE SECTION N.T.S. 1 2 29.68 ft. 25.00 ft. Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 25.00 Wetted Perimeter: 25.76 Area of Wetted Cross Section: 4.33 Channel Slope: 50.0000 Manning's n of Channel: 0.0175 Discharge: 79.20 cfs Depth of Flow: 0.17 feet Velocity: 18.29 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet RISER DETAILS 0.17 fft 1 1.00ft. Freeboard 2 F 804.00 803.00 802.00 801.00 J 800.00 c O 799.00 c� O LU 798.00 797.00 796.00 795.00 794.00 Stage Storage Curve SEDIMENT BASIN NO. 3 CLEAN OUT LEVEL 00) 0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 Accumulative Storage (Acre -Ft) Storage volume computations SEDIMENT BASIN NO. 3 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. - STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 794.00 N/A N/A 0.4404 - 795.00 N/A N/A 0.4717 0.4560 1.00 0.4501 0.4501 1.00 796.00 N/A N/A 0.5031 0.4874 1.00 0.4814 0.9315 2.00 796.86 N/A N/A 0.5313 0.5172 0.86 0.4423 1.3738 2.86 797.00 N/A N/A 0.5361 0.5196 0.14 0.0711 1.4449 3.00 798.00 N/A N/A 0.5708 0.5535 1.00 0.5469 1.9918 4.00 799.00 N/A N/A 0.6072 0.5890 1.00 0.5821 2.5739 5.00 799.27 N/A N/A 0.6174 0.6123 0.27 0.1653 2.7392 5.27 800.00 N/A N/A 0.6449 0.6261 0.73 0.4535 3.1927 6.00 801.00 N/A N/A 0.6846 0.6648 1.00 0.6573 3.8500 7.00 802.00 N/A N/A 0.7256 0.7051 1.00 0.6973 4.5473 8.00 802.27 N/A N/A 0.7363 0.7310 0.27 0.1974 4.7446 8.27 804.00 N/A N/A 0.8049 0.7652 1.73 1.3245 6.0691 10.00 RISER STRUCTURE TRASH RACK TOP OF EMBANKMENT -, SEE SHT 34 OF 1' MIN. I s�°e�11=111illllliVl ti°`�111hllll�fl11=1 IIIl�1lll=llll=llll° lll1=1111=IIII�lI11�llJl=11JI=11JI 1111�1111=till=ll_q=llli=1111�= 11N�1111�1111�11JhlI1hJ111=J111 �I1N�Illi�llll�llli�ll 1Lf �Illi= EMERGENCY SPILLWAY RE BARREL PIPE T ANTIFL TATION BLOCK SECTIONAL VI EW CUT-OFF ANTI -SEEP STABILIZED TRENCH COLLAR 2' DEEP OUTLET 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. TYPICAL EMBANKMENT DETAIL Q25 HWD EL. 801.27 TRASH RACK RISER BUOYANCY CALCULATION 50% CLEAN OUT EL. 796.86 NORMAL POOL EL. 799.27 CREST EL. 804.00 1' FREEBOARD ZI Demonstrate adequate stability by showing the downward force is a minimum of 1.25 0❑❑❑❑Do❑❑1:]❑00❑❑❑❑0 0111000D❑❑❑❑00111000 + EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 802.27 times the upward force. 800 _ _ _ _ 800 NORMAL POOL EL. 799.27 0❑00000❑❑❑❑0000000 1' MIN. 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) BOTTOM EL. 794.0 I I I I I I 1 14 FT ACCESS 72" Square Concrete Riser CREST EL. 804.0 EXISTING GRADE 50% CLEANOUT EL. 796.86 I I I I �� A� A Height = Approximately 6' Weight = 15,220 lb I I 72" SQUARE � � �� 750 750 j CONCRETE j 0+00 0+50 1+00 1+50 2+00 2+50 I RISER I Where: 6.00' I_______________I li Cross Section B-B' Riser Weight = 15,220 lb Scale: 1" = 50' BOTTOM OF POND EL. 794.00 C < a •` • • • A. • 36" DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete • • a • Weight of Concrete Base = (7 ft x 7 ft x 0.5 ft) x 150 Ib/ft3 = 3675 lb ANTI -FLOTATION BLOCK (IF APPLICABLE) Structure Weight = 15,220 lb + 3675 lb = 18895 lb ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 Ib/ft3 N.T.S. Buoyancy = 216 ft3 x 62.4 Ib/ft3 = 13,478.4 lb � CUTOFF TRENCH 72" SQUARE CONCRETE RISER ANTI -FLOTATION BLOCK (IF APPLICABLE) Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) • G s EXISTING GROUND (ABUTMENTS) • • ° • a 4 • • d • • • < 18895 lb > 13,478.4 lb x 1.25 • <a • e • d 18895 lb > 16,848 Ib FILL MATERIAL--\ 2' --1 Y_ I~ 2' MAXIMUM IF NOT CUT TO BEDROCK SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CUTOFF TRENCH DETAIL CONTENT N.T.S. PLAN VIEW N.T.S. NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive Strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. NOT TO SCALE 0 I U N 0 N !1 ul > 0 .N a� :1 ON N O Z �: 0) O N O �_J JQ Y Z M N \ to (n W W Q 00 Q r7 O z 00 U) o W 0 CJ J U � .. O Z N w a W 2 F- Q a U O o' w (3a Z J J Z J V � Q v � 0 Z M O Z Z Q m W w LL � _ HO Z Q � W H Z O H Cl) Z o ots W Z J a a. (� ,ti�y�it�l�rrrl I hereby certify that this document was ``% (r,q�d���� prepared by me or under my direct personal �. ; supervision and is correct to the best of my Q OFESS�0��2 knowledge and belief and that I am a dulySEAL f � licensed Professional Engineer under the - SHEET NUMBER laws of the State of orth Carolina. 048820 z (Signature) i �5' '',,...,•'•'.�Q`� Date: August 25, 2021 '�.,�F1,jj g ����.11 OF 34 DITCH NO. 10 DITCH NO. 1 Oa FLUME 1 1 � 1 DITCH NO. 15 \ \ \ \ BASIN ACCESS ROAD \ D 1 !ET PROTECTION SHEET 34 OF 34) I BOTTOM OF POND EL. 787.50 NORMAL POOL EL. 793.02 CREST OF POND EL. 798.00' BASIN ACCESS ROAD NAD-83 TOP OF POND NC-SPCS EL. 798.00 POROUS BAFFLES (TYP.) (SEE SHEET 32 of 34) 50% CLEAN OUT EL. 790.50 (SEE SHEET 32 OF 34) I X I I X EMERGENCY SPILLWAY 1 \ LEVEL CONTROL SECTION X (SEE DETAILS THIS SHEET) X A' 42 EMERGENCY SPILLWAY CHUTE SECTION (SEE DETAILS THIS SHEET) t PRINCIPLE SPILLWAY 1 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 105 FT OF 42 IN. CMP e TEMPORARY BASIN ACCESS ROAD PLAN VIEW: SEDIMENT BASIN NO. 4 SCALE: 1" = 50' 850 EXISTING GROUND Q25 HWD EL. 795.02 NORMAL POOL EL. 793.02 50% CLEAN OUT EL. 790.50 EMERGENCY SPILLWAY EL. 796.02 c 800 CREST 798.0 I o 0 LL BOTTOM EL. 787.50 3.01/o 750 0+00 0+50 1+00 1+50 2+00 2+ Cross Section A -A' Scale: 1 " = 50' 850 :11 750 0+00 EXISTING GROUND 850 750 3+00 3+50 4+00 PRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 105 FT OF 42" CMP EMERGENCY SPILLWAY DETAIL LEVEL CONTROL SECTION N.T.S. 57.90 ft. 1 2 Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 50.00 Wetted Perimeter: 54.36 Area of Wetted Cross Section: 50.67 Channel Slope: 0.1000 Manning's n of Channel: 0.0175 Discharge: 129.84 cfs Depth of Flow: 0.98 feet Velocity: 2.56 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet SEDIMENT BASIN NO. 4 Outflow Total Discharge: 130.7449 cfs Water Surface Elevation: 795.02 ft Tailwater Elevation: 0.00 ft Detention Base Elevation: 0.00 ft Outlet #1: Sediment Basin 4 Principle Spillway, Drop Pipe Riser Top Elev: 793.02 ft Riser Base Elev: 787.50 ft Riser Length: 72.00 in Riser Width: 72.00 in Orifice Coefficient: 0.50 Weir Coefficient: 3.33 Culvert Length: 105.00 ft Culvert Diameter: 42.00 in Culvert Invert In: 787.50 ft Culvert Friction Coefficient: 0.02 Culvert Entrance Loss Coefficient: 0.90 Discharge: 130.74 cfs FILL MATERIAL 1 � � 1 2' Q25 HWD EL. 795.02 1 r NORMAL POOL EL. 793.02 50% CLEAN OUT EL. 790.50 ' BOTTOM EL. 787.50 0+50 1+00 1+50 2+00 2+50 3+00 3+50 Cross Section B-B' Scale: 1" = 50' q CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) - 2' MAXIMUM IF NOT CUT TO BEDROCK CUTOFF TRENCH DETAIL 4+00 4+50 5+00 N.T.S. 50.00 ft. EMERGENCY SPILLWAY DETAIL CHUTE SECTION N.T.S. 2 25.00 ft - I 2 0.30 ft. SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CONTENT 850 :11 14 FT ACCESS CREST EL. 798.00 750 5+50 6+00 6+50 Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 25.00 Wetted Perimeter: 26.35 Area of Wetted Cross Section: 7.74 Channel Slope: 20.0000 Manning's n of Channel: 0.0175 Discharge: 129.88 cfs Depth of Flow: 0.30 feet Velocity: 16.78 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet TRASH RACK NORMAL POOL EL. 793.02 Stage Storage Curve SEDIMENT BASIN NO. 4 i yy.Ou 797.50 1.00ft. Freeboard 0.98 ft. 795.50 793.50 791.50 789.50 787.50 STRUCTURE 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Accumulative Storage (Acre -Ft) Storage volume computations SB-4 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 787.50 N/A N/A 0.6887 789.50 N/A N/A 0.8048 0.7467 2.00 1.4730 1.4730 2.00 790.50 N/A N/A 0.8633 0.8340 1.00 0.8350 2.3081 3.00 791.50 N/A N/A 0.9216 0.8632 1.00 0.8702 3.1783 4.00 793.02 N/A N/A 1.0123 0.9670 1.52 1.4698 4.6481 5.52 793.50 N/A N/A 1.0410 0.9813 0.48 0.4711 5.1192 6.00 795.50 N/A N/A 1.1624 1.1017 2.00 2.1813 7.3005 8.00 796.02 N/A N/A 1.1955 1.1789 0.52 0.6130 7.9136 8.52 797.50 N/A N/A 1.2896 1.2260 1.48 1.8145 9.7281 10.00 1.00ft. Freeboard 798.00 N/A N/A 1.3066 1.2981 0.50 0.6467 10.3748 10.50 DoOooO 000000 0°❑❑❑000 0❑❑❑❑00❑❑❑❑00❑❑❑❑0 TOP OF EMBANKMENT --- RISER STRUCTURE 4� OFz�t�fYE� . �- TRASH RACKSEE SHT 3 ? ���� �l1T=11Y;1I(I;1IlhlI11- EMERGENCY SPILLWAY \ / 1'MIN. QIIIIIIII lil� BARREL PIPE CUT-OFF ANTI SEE t ANTIFLOTATION BLOCK SECTIONAL VIEW TRENCH COLLAR STABILIZED 2' DEEP OUTLET 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. TYPICAL EMBANKMENT DETAIL RISER DETAILS NOT TO SCALE CREST EL. 798.00 RISER BUOYANCY CALCULATION MIN. 1' FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 796.02 times the upward force. 1'FREEBOARD Z= OJ fn w am 0 T N O Z 3: 0) O U J LiQ Y Z Q :2\ :200 N � N O N U) Q J o N J o Z o w 2 ?i U LI.I J U � .. O W 0_ 2 Q U 0_ Ld J 0 0 U 0 cn 0_ L� I 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I I 1 F I I 72" Square Concrete Riser 50% CLEANOUT EL. 790.50 I I Height = Approximately 6' EXISTING GRADE I 72" SQUARE I �� A \ Weight = 15,220 Ib I I �� � � �� ��i � g j CONCRETE j I RISER I Where: 5.52' � ���� �V\��� ��II Q _______________I Riser Weight = 15,220 Ib V Z ea < d Z BOTTOM OF POND EL. 787.50 d • d a °` 42" DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete -1d Q a da ° a . d cli 0 72" SQUARE CONCRETE RISER Weight of Concrete Base = (7 ft x 7 ft x 0.5 ft) x 150 Ib/ft3 = 3675 Ib Q W W ANTI -FLOTATION BLOCK (IF APPLICABLE) Z Q Q Structure Weight = 15,220 Ib + 3675 Ib = 18895 Ib V 0 ELEVATION VIEW 0 = Z W Buoyancy = Displacement Volume of Riser x 62.4 Ib/ft3 H Z J Buoyancy = 216 ft' x 62.4 lb/ft' = 13,478.4 Ib Q � _ (n LL a ANTI -FLOTATION BLOCK (IF APPLICABLE) C� Q O 9 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) Z m 0/ � 18895 Ib > 13,478.4 Ib x 1.25 Z a 06 .d 18895 Ib > 16,848 Ib Z a . 5 2 d J 0 W Z O % NOTES Uj 0 Z Z 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. •. A 2. Where corrugated aluminum or aluminized steel pipe is used, all V/ a areas where the pipe is to be in contact with concrete shall be painted with \- LU a d A BARREL CMP a black bituminous enamel paint. �-^) V PLAN VIEW N.T.S. ,'yl{I111lfll! 1 hereby certify that this document was ,`� CA00�.i, prepared by me or under my direct personal � Q` ..,pFeSS� .,..., j supervision and is correct to the best of my 0 'O 2 knowledge and belief and that I am a duly = = 4Rl SEAL S licensed Professional Engineer under the SHEET NUMBER laws of the State of orth Carolina. 048820 piz z (Signature) • . , , , , , , •�� Date: August 25, 2021 ��i��GCfij/ B. �NI1�` ;`��� 12 OF 34 ��f111I11� Stage Storage Curve SEDIMENT BASIN NO. 5 FLUME \ / \ DITCH NO. 16 i OUTLET PROTECTION o to \ (SHEET34OF34) B 11110*0�to A"-* f NAD-83 NC-SPCS DITCH NO. 16 TEMPORARY BASIN ACCESS ROAD SILT FENCE BOTT of POND !J 45.00 (SEE SHEET 32 OF 34) CREST OF POND EL. 855.00' OUTLET PROTECTION �� 50% CLEAN OUT EL. 848.73 (SHEET 34 OF 34) f - POROUS BAFFLES (TYP.) (SEE SHEET 32 OF 34) DITCH NO. 19 NORMAL POOL EL. 851.48 B PRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER W/ TRASH RACK �l- AND 60 FT OF 30 IN. CMP EMERGENCY SPILLWAY AI CHUTE SECTION 0.19 (SEE DETAILS THIS SHEET) ION I EMERGENCY SPILLWAY 1 LEVEL CONTROL SECTION (SEE DETAILS THIS SHEET) TEMPORARY BASIN ACCESS ROAD 850 EXISTING GROUND 800 0+00 PLAN VIEW: SEDIMENT BASIN NO. 5 SCALE: 1" = 50' EMERGENCY SPILLWAY DETAIL LEVEL CONTROL SECTION N.T.S. 1 2 Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 35.00 Wetted Perimeter: 37.34 Area of Wetted Cross Section: 18.89 Channel Slope: 0.1000 Manning's n of Channel: 0.0175 Discharge: 32.19 cfs Depth of Flow: 0.52 feet Velocity: 1.70 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet Q25 HWD EL. 852.48 SEDIMENT BASIN NO. 5 PRINCIPLE SPILLWAY NORMAL POOL EL. 851.48 Outflow 900 900 Total Discharge: 45.2490 cfs 50% CLEAN OUT EL. 848.73 Water Surface Elevation: 852.48 ft EMERGENCY SPILLWAY Tailwater Elevation: 0.00 ft EL. 853.48 Detention Base Elevation: 0.00 ft 850 CREST 855.0 850 Outlet #1: Sediment Basin 5 Principle Spillway, Drop Pipe ? 7 Riser Top Elev: 851.48 ft 1.5% Riser Base Elev: 845.00 ft BOTTOM EL. 845.0 Riser Diameter: 72.00 in EXISTING GROUND Orifice Coefficient: 0.50 Weir Coefficient: 3.33 800 800 Culvert Length: 60.00 ft Culvert Diameter: 30.00 in 0+00 0+50 1+00 1+50 2+00 Culvert Invert In: 849.21 ft PRINCIPLE SPILLWAY Cross Section A -A' Culvert Friction Coefficient: 0.02 72" SQUARE CONCRETE RISER Culvert Entrance Loss Coefficient: 0.90 Scale: 1" = 50' W/ TRASH RACK AND 60 FT OF 30" CMP Discharge: 45.25 cfs FILL MATERIAL 9.54 ft. 15.00 ft. Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 15.00 Wetted Perimeter: 15.60 Area of Wetted Cross Section: 2.06 Channel Slope: 50.0000 Manning's In of Channel: 0.0175 Discharge: 32.19 cfs Depth of Flow: 0.14 feet Velocity: 15.59 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet 0.52 ft. 1.00ft. Freeboard 2 I 855.00 854.00 853.00 852.00 J 851.00 2 O 850.00 CZ > a� Lu 849.00 848.00 847.00 846.00 845.00 CLEAN OUT LFVEL (848.73) PAL SPILLWAY (851. 0.00 0.50 1.00 1.50 2.00 2.50 Accumulative Storage (Acre -Ft) Storage volume computations SEDIMENT BASIN NO. 5 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 845.00 N/A N/A 0.1480 846.00 N/A N/A 0.1669 0.1575 1.00 0.1539 0.1539 1.00 847.00 N/A N/A 0.1858 0.1763 1.00 0.1728 0.3267 2.00 848.00 N/A N/A 0.2053 0.1955 1.00 0.1919 0.5186 3.00 848.73 N/A N/A 0.2201 0.2127 0.73 0.1555 0.6741 3.73 849.00 N/A N/A 0.2255 0.2154 0.27 0.0561 0.7302 4.00 850.00 N/A N/A 0.2461 0.2358 1.00 0.2319 0.9621 5.00 851.00 N/A N/A 0.2675 0.2568 1.00 0.2528 1.2149 6.00 851.48 N/A N/A 0.2779 0.2727 0.48 0.1309 1.3458 6.48 852.00 N/A N/A 0.2891 0.2783 0.52 0.1433 1.4891 7.00 853.00 N/A N/A 0.3117 0.3004 1.00 0.2962 1.7853 8.00 853.48 N/A N/A 0.3217 0.3167 0.48 0.1520 1.9373 8.48 855.00 N/A N/A 0.3535 0.3326 1.52 0.5091 2.4464 10.00 44ff �1 f '1ft. Freeboard - T F STRUCTURE 10) .48) TOP OF EMBANKMENT RISER STRUCTURE SEE SHT 34 OF 3 ',r'':_''• �.: :.. TRASH RACK EMERGENCY 5PILLWAY i' MIN. III Ilil-�Iltii=p'�(=�ill�iltil=liii � � �Q. �irli�i1=111r�H1IIrjl�ii►1plr==;; __ js� 'oe tis� I,riiIi13illillll�T=,lilu�ljhl i!a °°£ ��=Tilt[l+l++I�i1f111111iiflifhSrf[1[I! Ifl[111! {fl[l�i� Illfll�fl �f�il11.1111�I�1 � f 1111 wllltw BARREL `■ ` PIPE 7/ \ I ANTIFLO A ION BLOCK SECTIONAL VIEW t CUT-OFF ANTI -SEEP STABILIZED TRENCH COLLAR OUTLET 2' DEEP 1,1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65, TYPICAL EMBANKMENT DETAIL NOT TO SCALE RISER DETAILS CREST EL. 855.00 RISER BUOYANCY CALCULATION 1' FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 853.48 times the upward force. 1' MIN. I 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) 800 i i 1 F 72" Square Concrete Riser 0+50 1+00 1+50 2+00 2+50 3+00 3+50 I CONCRETE I o I I Height = Approximately 7 EXISTING GRADE 50 /o CLEANOUT EL. 848.73 RISER Weight = 17170 lb I I Cross Section B-B6.48' Scale: 1" = 50' ' - --e ----- <-- i Where: --� -�- <---a - \ \ �I Riser Weight = 17170 lb BOTTOM OF POND EL. 845.00 ° . ° ° < A. ° 30" DIA BARREL CMP Weight of Riser Fill = (Length x Width x Depth) x Unit Weight of Concrete ° a ° • da ° d° a ° C <° ANTI -FLOTATION RISER FILL Weight of Riser Fill = (6 ft x 6 ft x 0.5 ft) x 150 lb/ft' = 2700 lb (IF APPLICABLE) ANTI -FLOTATION BLOCK (IF APPLICABLE) Structure Weight = 17170 lb + 2700 lb = 19870 lb ELEVATION VIEW 1 2' Q25 HWD EL. 852.48 50% CLEAN OUT EL. 848.73 , 7 NORMAL POOL EL. 851.48 BOTTOM EL. 845.0 14 FT ACCESS CREST EL. 855.00 CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) 2' MAXIMUM IF NOT CUT TO BEDROCK IL SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CUTOFF TRENCH DETAIL CONTENT N.T.S. 850 TRASH RACK NORMAL POOL EL. 851.48 72" SQUARE CONCRETE RISER 1.09 ft. 35.00 ft. EMERGENCY SPILLWAY DETAIL CHUTE SECTION N.T.S. 1� 2 0❑❑❑❑0 0❑❑❑❑0 ❑❑❑❑0 0❑❑❑❑00❑❑❑❑00❑❑❑❑0 N.T.S. PLAN VIEW N.T.S. Buoyancy = Displacement Volume of Riser x 62.4 lb/ft' Buoyancy = 252 ft' x 62.4 Ib/ft3 = 15725 Ib ...�. �. ��.�............. ,.� .........ABLE) Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) 19870 lb > 15725 lb x 1.25 19870 Ib > 19656 Ib NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. 0 0 w c 0 N a' 01 0 I 0 U 0 0 1 U) 0 Q id JI > N O Z �: O) O U J w Z Z Q Q :2 N N oo O N Q J o s' N Z J a O Z rn o w U' ?i 0 U LEI J U � .. O Z N w a a� w 2 Q a U O w 0 O U 0 V) 0- L� �a Z J J cl Z J V O Q v IOC O Z Ln O Z U) Q m W w a H � Z p � W Z O UUJ Z O H Q W � �> 3.0 W z J a I hereby certify that this document was ` � �CA+►g0F" prepared by me or under my direct personal supervision and is correct to the best of my y** 0� OF�SS/p��2 knowledge and belief and that I am a duly licensed Professional Engineer under the = = SEAL laws of the State of North Carolina. 048820 SHEET NUMBER (Signature) �, !,�, Date: August 25, 2021 13OF34 ,�i+'Y / FLUME DITCH NO. 19 OUTLET PROTECTION ►�� (SEE SHEET 34 OF 34) /i BOTTOM OF EL. 842.00 BASIN ACCESS ROAD DITCH NO. 20 CREST OF POND J� X EL. 852.00 POROUS BAFFLES (TYP.) (SEE SHEET 32 OF 34) PRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 50 FT OF 30 IN. CMP TEMPORARY BASIN ACCESS ROAD EMERGENCY SPILLWAY LEVEL CONTROL SECTION (SEE DETAILS THIS SHEET) PLAN VIEW: SEDIMENT BASIN NO. 6 SCALE: 1" = 50' DITCH NO. 19 OUTLET PROTECTION (SEE SHEET 34 OF 34) B' NAD-83 NC-SPCS TEMPORARY BASIN ACCESS ROAD SILT FENCE f (SEE SHEET 32 OF 34) �- 50% CLEAN OUT EL. 845.68 NORMAL POOL EL. 848.51 EMERGENCY SPILLWAY CHUTE SECTION (SEE DETAILS THIS SHEET) At EMERGENCY SPILLWAY DETAIL N.T.S. 1.35 ft. 0.59 ft. 1 1.00ft. Freeboard 2 2 35.00 ft. Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 35.00 Wetted Perimeter: 37.63 Area of Wetted Cross Section: 21.28 Channel Slope: 0.1000 Manning's n of Channel: 0.0175 Discharge: 39.08 cfs Depth of Flow: 0.59 feet Velocity: 1.84 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet Q25 HWD EL. 849.51 SEDIMENT BASIN NO. 6 PRINCIPLE SPILLWAY NORMAL POOL EL. 848.51 900 900 Outflow Total Discharge: 46.7834 cfs 50% CLEAN OUT EL. 845.68 Water Surface Elevation: 849.51 ft EMERGENCY SPILLWAY Tailwater Elevation: 0.00 ft -850.41 Detention Base Elevation: 0.00 ft 850 ? CREST 852.0 850 Outlet #1: Sediment Basin 6 Principle Spillway, Drop Pipe 21 1.5% Riser Top Elev: 848.51 ft BOTTOM EL. 842.0 Riser Base Elev: 842.00 ft Riser Diameter: 72.00 in EXISTING GROUND Orifice Coefficient: 0.50 Weir Coefficient: 3.33 800 800 Culvert Length: 50.00 ft 0+00 0+50 1+00 1+ 2+00 2+50 Culvert Diameter: 30.00 in PRINCIPLE SPILLWAY Culvert Invert In: 846.15 ft Cross Section A-A72" SQUARE CONCRETE RISER Culvert Friction Coefficient: 0.02 Scale: 1" = 50' W/ TRASH RACK AND 50 FT OF Culvert Entrance Loss Coefficient: 0.90 30" CMP Discharge: 46.78 cfs Q25 HWD EL. 849.51 900 NORMAL POOL EL. 848.51 900 50% CLEAN OUT EL. 845.68 EXISTING GROUND 850 850 BOTTOM EL. 842.0 1714 FT ACCESS CREST EL. 852.00 800 800 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 Cross Section B-B' Scale: 1" = 50' FILL MATERIAL - - ;�"r 2' --I (-t CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) 2' MAXIMUM IF NOT CUT TO BEDROCK IL SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CUTOFF TRENCH DETAIL CONTENT N.T.S. EMERGENCY SPILLWAY DETAIL CHUTE SECTION N.T.S. 19.61 ft. 5 ff 1 1 O'1.00tft. Freeboard 2 15.00 ft. 2 Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 15.00 Wetted Perimeter: 15.68 Area of Wetted Cross Section: 2.32 Channel Slope: 50.0000 Manning's n of Channel: 0.0175 Discharge: 39.06 cfs Depth of Flow: 0.15 feet Velocity: 16.81 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet RISER DETAILS Stage Storage Curve SEDIMENT BASIN NO. 6 852.00 851.00 850.00 849.00 J 848.00 O 847.00 co a> LL I 846.00 845.00 844.00 843.00 842.00 0.00 0.60 1.20 1.80 2.40 3.00 3.60 Accumulative Storage (Acre -Ft) Storage volume computations SEDIMENT BASIN NO. 6 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 842.00 N/A N/A 0.2034 843.00 N/A N/A 0.2248 0.2141 1.00 0.2100 0.2100 1.00 844.00 N/A N/A 0.2463 0.2355 1.00 0.2315 0.4415 2.00 845.00 N/A N/A 0.2684 0.2574 1.00 0.2532 0.6946 3.00 845.68 N/A N/A 0.2839 0.2762 0.68 0.1891 0.8837 3.68 846.00 N/A N/A 0.2911 0.2798 0.32 0.0864 0.9701 4.00 847.00 N/A N/A 0.3143 0.3027 1.00 0.2983 1.2684 5.00 848.00 N/A N/A 0.3381 0.3262 1.00 0.3217 1.5901 6.00 848.51 N/A N/A 0.3505 0.3443 0.51 0.1756 1.7657 6.51 849.00 N/A N/A 0.3625 0.3503 0.49 0.1701 1.9358 7.00 850.00 N/A N/A 0.3875 0.3750 1.00 0.3703 2.3061 8.00 850.41 N/A N/A 0.3971 0.3923 0.41 0.1608 2.4669 8.41 852.00 N/A N/A 0.4342 0.4108 1.59 0.6562 3.1231 10.00 TOP OF EMBANKMENT RISER STRUCTURE SEE SHT 34 OF 3 ; i` _ _;,•°•, ::_i TRASH RACK EMERGENCY SPILLWAY -IIT=11) 1'MIN. {I={lll=iil= 2 e� 1111 1111 1111=JUhlIJI-111l=N11=11U 1111 glsio ,,5�° il=iiil=llll=llil=ilil={1i1=Nil=11i1=NN=ilil-illl= pF 2°'�-1111=1111�1111=1HI=1111�1111�JI{I�1111�N11=1111�1111�111l�11 IIII�IIII=IIIl=1111=1111�1111�11{I=1i11 =till I l�llll=lC11=1111=1111- BARREL PIPE \/%/,\\ ANTIFL TATION BLOCK SECTIONAL VIEW CUT-OFF ANTI -SEEP STABILIZED TRENCH COLLAR 2' DEEP OUTLET 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. TYPICAL EMBANKMENT DETAIL NOT TO SCALE TRASH RACK RISER BUOYANCY CALCULATION CREST EL. 852.00 1' FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 850.41 times the upward force. NORMAL POOL EL. 848.51 1' MIN. I 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I I I I 1 F 72" Square Concrete Riser EXISTING GRADE 50% CLEANOUT EL. 845.68 CONCRETE I RISER i �V ��V �� Height Approximately 7 Weight = 17170 lb I 6.51' I I I A� ��i I I I �_____ --_ , ere: <° ° " I <---- ��` �������� �II --� -�- - Riser Weight = 17170 lb ° BOTTOM OF POND EL. 842.00 4. , ° °" ° A. ° 30" DIA BARREL CMP Weight of Riser Fill = (Length x Width x Depth) x Unit Weight of Concrete < ° a d° ° ° d ° Weight of Riser Fill = (6 ft x 6 ft x 0.5 ft) x 150 Ib/ft3 = 2700 lb ANTI -FLOTATION RISER FILL ANTI -FLOTATION BLOCK (IF APPLICABLE) (IF APPLICABLE) Structure Weight = 17170 lb + 2700 lb = 19870 lb ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 Ib/ft3 N.T.S. Buoyancy = 252 ft' x 62.4 Ib/ft3 = 15725 Ib 72 SQUARE CONCRETE RISER ANTI -FLOTATION BLOCK (IF APPLICABLE) ° d Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) ° ° ° 4 ° ! ° ° a ° 19870 lb > 15725 lb x 1.25 a 19870 Ib > 19656 Ib [-- PLAN VIEW N.T.S. NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. 0 I 0 U JI > 0 a� :1 ON PLAN VIEW N.T.S. NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. 0 I 0 U JI > 0 a� :1 ON N O Z �: O O N O JQ Y Z M N \ to to J w Q oo Q C.0 o z 00 U) o w U' ?i 0 U LEI J U � .. O Z N w a w 2 Q a U O D' w (3a Z J J cl Z J V O Q v O Z O Z Q m W w LL a H_ -1 Z Q � W Z O U Z O H Cl) W 25 25 �> W Z J a a. (� I hereby certify that this document was ,`�� � C 1,P prepared by me or under my direct personal �. supervision and is correct to the best of my 0 eSSiO"��,L'+ knowledge and belief and that I am aduly - • Q SEAL •7 licensed Professional Engineer under the SHEET NUMBER laws of the Sta"tg of N th Carolina. � 5 : 048820 pc (Signature) [+. �Gl �, �•'� �� Date: August 25, 2021 '�.,�C firj p ��11���.14 OF 34 TEMPORARY BASIN ACCESS ROAD EMERGENCY SPILLWAY DETAIL DITCH NO.20 LEVEL CONTROL SECTION OUTLET PROTECTION (SEE SHEET 34 OF 34) A N.T.S. TEMPORARY BASIN ACCESS ROAD 56.6564 gg f BOTTOM of POND 1 0�1.00tft. Freeboard T EL. 840.00 2 2 } -- NAD-83 50.00 ft. NC-SPCS DD 1 WL \ I SILT FENCE (SEE SHEET 32 OF 34) X Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes X _ X _ I Dimensions: Left Side Slope 2.00:1 CREST OF POND X X - X - X X - _ Right Side Slope 2.00:1 EL. 850.00 X X X - X - X - X _ X _ X _ + LEVEL CONTROL SECTION Base Dimension: 50.00 50% CLEAN OUT EL. 843.50 + (SEE DETAILS THIS SHEET) Wetted Perimeter: 52.97 Area of Wetted Cross Section: 34.09 POROUS BAFFLES (TYP.) + _ NORMAL POOL EL. 846.34 SEE SHEET 32 OF 34 ( ) � � Channel Slope: 0.1000 EMERGENCY SPILLWAY Manning's n of Channel: 0.0175 PRINCIPLE SPILLWAY + CHUTE SECTION 72" SQUARE CONCRETE RISER W/ TRASH RACK AI (SEE DETAILS THIS SHEET) Discharge: 68.22 cfs AND 94 FT OF 36 IN. CMP Depth of Flow: 0.66 feet Velocity: 2.00 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet PLAN VIEW: SEDIMENT BASIN NO. 7 SCALE: 1" = 50' EMERGENCY SPILLWAY DETAIL CHUTE SECTION N.T.S. Q25 HWD EL. 847.34 29.6252 900 NORMAL POOL EL. 846.34 900 gg fftt i 1 0 �1 t011.00ft. Freeboard 50% CLEAN OUT EL. 843.50 2 I 2 EMERGENCY SPILLWAY 25.00 ft. 848.34 850 ? CREST 850.00 850 2�Qr)T�Tr)Kll EL. 840.0 Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 25.00 EXISTING GROUND J 800 800 0+00 0+50 1+00 1+50 2+00 2+50 Cross Section A -A' PRINCIPLE SPILLWAY Scale: 1" - 50' 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 94 FT OF 36" CMP 900 Q25 HWD EL. 847.34 50% CLEAN OUT EL. 843.50 NORMAL POOL EL. 846.34 EXISTING GROUND 850 BOTTOM EL. 840.0 800 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 Cross Section B-B' Scale: 1" = 50' FILL MATERIAL - - ;�"r 2' --I 1-t CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) 850 14 FT ACCESS CREST EL. 850.00 800 4+00 4+50 2' MAXIMUM IF NOT CUT TO BEDROCK IL SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CUTOFF TRENCH DETAIL CONTENT N.T.S. SEDIMENT BASIN NO. 7 PRINCIPLE SPILLWAY Outflow Total Discharge: 73.6105 cfs Water Surface Elevation: 847.34 ft Tailwater Elevation: 0.00 ft Detention Base Elevation: 0.00 ft Outlet #1: Sediment Basin 7 Principle Spillway, Drop Pipe Riser Top Elev: 846.34 ft Riser Base Elev: 840.00 ft Riser Diameter: 72.00 in Orifice Coefficient: 0.50 Weir Coefficient: 3.33 Culvert Length: 94.00 ft Culvert Diameter: 36.00 in Culvert Invert In: 842.87 ft Culvert Friction Coefficient: 0.02 Culvert Entrance Loss Coefficient: 0.90 Discharge: 73.61 cfs Wetted Perimeter: 25.70 Area of Wetted Cross Section: 3.96 Channel Slope: 50.0000 Manning's n of Channel: 0.0175 Discharge: 68.24 cfs Depth of Flow: 0.16 feet Velocity: 17.25 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet RISER DETAILS tage Storage Curve SEDIMENT BASIN NO. 7 850.00 ( 50.0 849.00 848.00 '14EMERGENCSPILLWAY (848. 847.00 846.00 PRINCIPAL PILLWAY 8 6.34 C O 845.00 N W 844.00 CLEA OUT LEVEL (843.50) 843.00 842.00 841.00 840.00 0.00 0.60 1.20 1.80 2.40 3.00 3.60 4.20 4.80 5.40 Accumulative Storage (Acre -Ft) Storage volume computations SEDIMENT BASIN NO. 7 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 840.00 N/A N/A 0.3761 841.00 N/A N/A 0.4069 0.3915 1.00 0.3861 0.3861 1.00 842.00 N/A N/A 0.4374 0.4221 1.00 0.4168 0.8029 2.00 843.00 N/A N/A 0.4685 0.4530 1.00 0.4475 1.2504 3.00 843.50 N/A N/A 0.4844 0.4764 0.50 0.2381 1.4885 3.50 844.00 N/A N/A 0.5003 0.4844 0.50 0.2408 1.7293 4.00 845.00 N/A N/A 0.5326 0.5164 1.00 0.5108 2.2401 5.00 846.00 N/A N/A 0.5657 0.5491 1.00 0.5434 2.7835 6.00 846.34 N/A N/A 0.5771 0.5714 0.34 0.1943 2.9778 6.34 847.00 N/A N/A 0.5993 0.5825 0.66 0.3824 3.3601 7.00 848.00 N/A N/A 0.6336 0.6165 1.00 0.6105 3.9706 8.00 848.34 N/A N/A 0.6445 0.6390 0.34 0.2173 4.1879 8.34 850.00 N/A N/A 0.6977 0.6657 1.66 1.1085 5.2964 10.00 3F) STRUCTURE 34) TOP OF EMBANKMENT RISER STRUCTURE SEE SHT 34 OF 3 : TRASH RACK +� •r.. EMERGENCY SPILLWAY -11r= �J )IJI JI11 )I V MIN. li= i{i=li i=II i=lili=Ill=sill= 2p. eE JI1h 1mJ ill =1111=J111=1111=1111 1111 1111 IS, 2°�1S�flJf IIl111 iiIlJHllll11111111111J111111111111111N111111111111111'HI\IlJlll ll{I11111111J111=11F liii�llii=1111�i111=1iil�iiil�llil�llil�i111 i I�ilil�liii=llTi�llii� BARREL PIPE 1 ANTIFL TATION BLOCK SECTIONAL VIEW CUT-OFF ANTI -SEEP STABILIZED TRENCH COLLAR 2' DEEP OUTLET 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. NOT TO SCALE TYPICAL EMBANKMENT DETAIL TRASH RACK CREST EL. 850.00 RISER BUOYANCY CALCULATION 1' FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 848.34 times the upward force. NORMAL POOL EL. 846.34 1' MIN. I 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I I 1 I "SQUARE I I CONCRETE I 72" Square Concrete Riser EXISTING GRADE 50% CLEANOUT EL, 843.50 1 RR 6 34i \ \ Height Approximately 7 \� A�AV AV A \ �i Weight = 17,170 lb I I I I F_____ <- Where: 1 • • ° I I a • °f --- ---------I \J III Riser Weight = 17,170 lb BOTTOM OF POND EL. 840.00 d . d ° ' ° d•• 36" DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete • • d ° ANTI -FLOTATION RISER FILL ANTI -FLOTATION BLOCK (IF APPLICABLE) Weight of Concrete Base = (7 ft x 7 ft x 0.5 ft) x 150 lb/ft' = 3675 lb (IF APPLICABLE) Structure Weight = 17,170 lb + 3675 lb = 20845 lb ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 Ib/ft3 N.T.S. Buoyancy = 216 ft' x 62.4 Ib/ft3 = 13,478.4 lb 72 SQUARE CONCRETE RISER ANTI -FLOTATION BLOCK (IF APPLICABLE) Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) ° d 1 d • 9 ° • -4 • ° 20845 lb > 13,478.4 lb x 1.25 ° • °d 20845 Ib > 16,848 Ib PLAN VIEW N.T.S. NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. [-- IIIIIIIIIIIIIIIIIM -Z 0 I 0 U N 0 N U) 0 Q id JI > 0 .N a� ,1 01 N O Z � O N O JY Z Q N \ N (n J w a °o a O z I 00 0 w 0 CJ J U � O Z N w a � w 2 F- Q a U O a' w (3a Z J J Z J v Q v O Z ti O Z Z_ Q m W w a I- n Z O � W Z O ULLJ Z O H Q W � �> 3.0 W Z J a � (� ,`j111111111I/ I hereby certify that this document was %%�� CARp���. prepared by me or under my direct personal supervision and is correct to the best of my •OF�SS/p '•,. 2 knowledge and belief and that I am a duly licensed Professional Engineer under the SHEET NUMBER laws of the State f of o h Carolina. 048820 -1 - ''FNGINE��'' • - (Signature) , , , , , �Q` Date: August 25, 2021 '�i,���il/ p `1�11�;```�•`' 15 OF 34 �1�1l1II11111 ' WASTE ROCK PILE \ ACCESS ROAD OUTLET PROTECTION (SEE SHEET 34 OF 34) TEMPORARY BASIN ACCESS ROAD NAD-83 / NC-SPCS kPRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER W/ TRASH RACK B BOTTOM OF POND / AND 46 FT OF 30 IN. CMP EL. 870.00 OFFSET CHUTE SECTION TO PICK ♦ • ♦ ♦ UP PRIMARY OUTLET PIPE DISCHARGE '♦♦♦♦ ♦♦♦♦♦ + SILT FENCE ♦ ♦ ♦ ♦ r � (SEE SHEET 32 OF 34) VEGETATED EXIT CHANNEL TEMPORARY101 .r.-.-.r.-. BASIN ACCESS ROAD X X _ X _ _ X - X EMERGENCY SPILLWAY CREST OF POND LEVEL CONTROL SECTION f "r V 7� EL. 880.00 (SEE DETAILS THIS SHEET) 20 FT --- 50% CLEAN OUT EL. 874.26 /� t EMERGENCY SPILLWAY % 1� NORMAL POOL EL. 877.45 CHUTE SECTION POROUS BAFFLES (TYP.) (SEE DETAILS THIS SHEET) MINE PERMIT BOUNDARY (SEE SHEET 32 OF 34 ) PLAN VIEW: SEDIMENT BASIN NO. 8 SCALE: 1" = 50' 50% CLEAN OUT EL. 874.26 FUTURE 20 FT. BENCH NORMAL POOL EL. 877.45 900 Q25 HWD EL. 878.45 EMERGENCY SPILLWAY L. 878.45 -CREST 880.0 0--1%--- BOTTOM EL. 870.0 850 14 FT ACCESS RD. CHANNEL EXISTING GROUND 20 ft. A a c 0 n E 900 m 1_ 850 800 800 0+00 0+50 1+00 1+50 2+00 2+50 3+00 Cross Section A-APRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER Scale: 1" = 50' 50% CLEAN OUT EL. 874.26 NORMAL POOL EL. 877.45 900 Q25 HWD EL. 878.45 BOTTOM EL. 870.0 850 800 0+00 0+50 1+00 1+50 2+00 2+50 Cross Section B-B' :30" CMP Scale: 1" = 50' FILL MATERIAL--\ _1 L W/ TRASH RACK AND 46' FT OF 30" CMP 900 14 FT ACCESS CREST EL. 850.00 EXISTING GROUND 3+00 3+50 CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) 2' MAXIMUM IF NOT CUT TO BEDROCK SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CUTOFF TRENCH DETAIL CONTENT N.T.S. 850 800 4+00 EMERGENCY SPILLWAY DETAIL LEVEL CONTROL SECTION N.T.S. 56.18 v 2 50.00 ft. Channel Design (Non -Erodible) Wetted Perimeter: 52.45 Area of Wetted Cross Section: 27.97 Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Channel Slope: 0.1000 Right Side Slope 2.00:1 Manning's n of Channel: 0.0175 Base Dimension: 50.00 EMERGENCY SPILLWAY DETAIL CHUTE SECTION N.T.S. 1 2 1 24.5 20.00 ft. EXIT CHANNEL DETAIL N.T.S. 31 2 - 20.00 ft. SEDIMENT BASIN NO. 8 PRINCIPLE SPILLWAY Outflow Total Discharge: 50.3563 cfs Water Surface Elevation: 878.45 ft Tailwater Elevation: 0.00 ft Detention Base Elevation: 0.00 ft Outlet #1: Sediment Basin 8 Principle Spillway, Drop Pipe Riser Top Elev: 877.45 ft Riser Base Elev: 870.00 ft Riser Diameter: 72.00 in Orifice Coefficient: 0.50 Weir Coefficient: 3.33 Culvert Length: 46.00 ft Culvert Diameter: 30.00 in Culvert Invert In: 874.62 ft Culvert Friction Coefficient: 0.02 Culvert Entrance Loss Coefficient: 0.90 Discharge: 50.36 cfs 1 0.1.Mft. Freeboard 2 0.$�tft F board 2 Discharge: 49.39 cfs Depth of Flow: 0.55 feet Velocity: 1.77 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 20.00 Wetted Perimeter: 20.66 Area of Wetted Cross Section: 2.99 Channel Slope: 50.0000 Manning's n of Channel: 0.0175 Discharge: 49.36 cfs Depth of Flow: 0.15 feet Velocity: 16.53 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slope Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 20.00 Wetted Perimeter: 22.59 Area of Wetted Cross Section: 12.25 Channel Slope: 1.0000 Manning's n of Channel: 0.0245 Discharge: 49.38 cfs Depth of Flow: 0.58 feet Velocity: 4.03 fps Channel Lining: Vegetated Freeboard: 1.00 feet RISER DETAILS mft. Freeboard 2 880.00 879.00 878.00 877.00 J 876.00 2 c 0 875.00 CZ > a) Lu 874.00 873.00 872.00 871.00 870.00 0.00 Stage Storage Curve SEDIMENT BASIN NO. 8 EMERGENCY SPI LWAY (878.45) PRINCIPAJ SPILLWAY (877.45 Accumulative Storage (Acre -Ft) Storage volume computations SEDIMENT BASIN NO. 8 RE ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 870.00 N/A N/A 0.2648 871.00 N/A N/A 0.2922 0.2785 1.00 0.2734 0.2734 1.00 872.00 N/A N/A 0.3194 0.3058 1.00 0.3008 0.5742 2.00 873.00 N/A N/A 0.3473 0.3333 1.00 0.3283 0.9025 3.00 874.00 N/A N/A 0.3759 0.3616 1.00 0.3564 1.2589 4.00 874.26 N/A N/A 0.3836 0.3797 0.26 0.0988 1.3577 4.26 875.00 N/A N/A 0.4053 0.3906 0.74 0.2864 1.6442 5.00 876.00 N/A N/A 0.4354 0.4203 1.00 0.4148 2.0590 6.00 877.00 N/A N/A 0.4660 0.4507 1.00 0.4451 2.5041 7.00 877.45 N/A N/A 0.4801 0.4731 0.45 0.2129 2.7170 7.45 878.00 N/A N/A 0.4974 0.4817 0.55 0.2631 2.9801 8.00 878.45 N/A N/A 0.5107 0.5040 0.45 0.2268 3.2069 8.45 880.00 N/A N/A 0.5564 0.5269 1.55 0.8212 4.0282 10.00 TOP OF EMBANKMENT RISER STRUCTURE SEE SHT 34 OF 34 TRASH RACK AkEMERGENCY SPILLWAY =11Ti=`l�l� II 1 1 1' MIN. ,1=111=llll=fill=fill=fill=fill= 20. QE-1I11=11J1llJlJ1111I11=11111I11=1111=JIfl zs/ tis�° ii�Hil-fill=fill-fill-Nil-Rif=NIl-12I1=1211=1211= °'°F �.°`-11f1�1lfl�1f1l�1lfl=fill=liN�llfl�1111�1If1�1111�i111=11N�11 llll�lill=fill=fill=llR�1Pll�l2ll-fill-1211�1��llll=Mil=lull=lull- _ ANTIFL TATION BLOCK SECTIONAL VIEW CUT-OFF TRENCH 2' DEEP 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. TYPICAL EMBANKMENT DETAIL TRASH RACK RISER BUOYANCY CALCULATION + CREST EL. 880.00 V FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 EMERGENCY SPILLWAY DEPTH fEMERGENCY SPILLWAY EL. 878.45 times the upward force. NORMAL POOL EL. 877.45 1' MIN. I 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I I I I 1 F 72" Square Concrete Riser EXISTING GRADE /50-10 CLEANOUT EL. 874.26 i CONCRETE i I RISER I I 7.45' I �\ \\\\\ \� \ \ I Height = Approximately 8' Weight 19,1201b I I III I IF--7 ----- a--------1 Where: 1.. < ° °. d. ° I_----�------I Riser Weight = 19,220 Ib ° °° BOTTOM OF POND EL. 870.00 .d ° ° "° °° ° 30" DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete Weight of Concrete Base = (7 ft x 7 ft x 0.5 ft) x 150 lb/ft' = 3675 Ib ANTI -FLOTATION RISER FILL ANTI -FLOTATION BLOCK (IF APPLICABLE) (IF APPLICABLE) Structure Weight = 19120 Ib + 3675 Ib = 22795 Ib ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 Ib/ft3 N.T.S. Buoyancy = 216 ft' x 62.4 lb/ft' = 17971.2 Ib 72" SQUARE CONCRETE RISER ANTI FLOTATION BLOCK (IF APPLICABLE) d ° 9 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) ° 22795 Ib > 13,478.4 Ib x 1.25 ° A 22795 Ib > 22,464 Ib PLAN VIEW NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. BARREL PIPE ANTI SEEP STABILIZED COLLAR OUTLET NOT TO SCALE F::E Z _ J Uj c 0 T a� a- 4) v 0 0 z N O z 3 0) O 00 I N O o0 J Y Z Q M \ N \ 2 N 0 J d to w a oo a o Z o w 2Y UJ W U w .. O Z U1 a w Q o J 0 0 U 0 U d LL_ V Z Z - J V) 0 J ooa Z< v O - w 0 Z In OC Z W v O Q EL Z 00 O a Z H Z W 0 = M Z J O Z ZLU Z 0 O a o � W Q a c� 'y��llllilll��� I hereby certify that this document was ��CARO�,�� prepared by me or under my direct personal �� supervision and is correct to the best of my Q p4�S5/0M' knowledge and belief and that I am a duly : Q� `���: Y licensed Professional Engineer under the = SEAL laws of the State of o h Carolina. 048820 pc SHEET NUMBER (Signature) Date: August 25, 2021 ��i��C��ijj D. ,1,1�� ;`�16 OF 34 !1l1I1111� MINE PERMIT BOUNDARY Q WASTE ROCK PILE ACCESS ROAD OUTLET PROTECTION (SEE SHEET 34 OF 34) TEMPORARY BASIN ACCESS ROAD III EMERGENCY SPILLWAY SILT FENCE LEVEL CONTROL SECTION (SEE SHEET 32 OF 34) (SEE DETAILS THIS SHEET) EMERGENCY SPILLWAY / CHUTE SECTION (SEE DETAILS THIS SHEET) / CENTERLINE CUTOFF TRENCH TOP OF POND X - X - EL. 860.00 X PRINCIPLE SPILLWAY 72" SQUARE -� CONCRETE RISER W/ TRASH RACK AND 51 FT OF 30 IN. CMP B OUTLET PROTECTION BOTTOM (SEE SHEET 34 OF 34) NORMAL POOL EL. 856.07 50% CLEAN OUT EL. 853.51 POROUS BAFFLES (TYP.) (SEE SHEET 32 OF 34) PLAN VIEW: SEDIMENT BASIN NO. 9 SCALE: 1" = 50' OF POND EL. 850.00 B' NAD NC - EMERGENCY SPILLWAY DETAIL LEVEL CONTROL SECTION N.T.S. 1 2 27.72 20.00 ft. Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 20.00 i- Wetted Perimeter: 24.17 1.00ft. Freeboard Area of Wetted Cross Section: 20.37 0.93 ft. _T Channel Slope: 0.1000 Manning's n of Channel: 0.0175 Discharge: 48.83 cfs Depth of Flow: 0.93 feet Velocity: 2.40 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet EMERGENCY SPILLWAY DETAIL Channel Design (Non -Erodible) CHUTE SECTION Channel Type: Trapezoidal, Equal Side Slopes N.T.S. Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 10.00 14.8824 Wetted Perimeter: 10.99 Area of Wetted Cross Section: 2.30 1 1 0 .200tft. Freeboard 2 2 10.00 ft.� Channel Slope: 50.0000 Manning's n of Channel: 0.0175 Discharge: 48.81 cfs Depth of Flow: 0.22 feet Velocity: 21.19 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet 900 50% CLEAN OUT EL. 853.51 Q25 HWD EL. 857.07 NORMAL POOL EL. 856.07 EMERGENCY SPILLWAY EL. 858.07 CREST 860.0 - 850 z BOTTOM EL. 850.0 800 0+00 0+50 1+00 1+50 PRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 51 FT OF 30" CMP 0 - - __ - - - - - - - - - 2+00 2+50 3+00 3+50 Cross Section A -A' Scale: 1" = 50' 50% CLEAN OUT EL. 853.51 NORMAL POOL EL. 856.07 900 14 FT ACCESS 900 Q25 HWD EL. 857.07 CREST EL. 850.00 FUTURE 20 FT BENCH 000,00 850 ?'7 ` 850 BOTTOM EL. 850.0 800 800 0+00 0+50 1+00 1+50 2+00 Cross Section B-B' Scale: 1" = 50' RISER DETAILS TRASH RACK RISER BUOYANCY CALCULATION CREST EL. 860.00 1' FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 858.07 times the upward force. NORMAL POOL EL. 856.07 1' MIN. 1 � 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I I I I 1F 72" Square Concrete Riser EXISTING GRADE 50% CLEANOUT EL. 853.51�7 CONCRETE I RISER i 1 6.07' 1 �V ��� �V �� A� 11� I I I Height Say 6 Weight = 15,220 lb I I -----;-------- Where: 'j �� ������� �� -�- _--- - Riser Weight = 15,220 lb BOTTOM OF POND EL. 850.00 d < d °` ° , A. ° 30" DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete ° a ° ° de a d° a ° d ° Weight of Concrete Base = (7 ft x 7 ft x 0.5 ft) x 150 lb/ft'= 3675 lb ANTI -FLOTATION RISER FILL ANTI -FLOTATION BLOCK (IF APPLICABLE) (IF APPLICABLE) Structure Weight = 15,220 lb + 3675 lb = 18895 lb ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 Ib/ft3 N.T.S. Buoyancy = 216 ft' x 62.4 Ib/ft3 = 13,478.4 lb 72" SQUARE CONCRETE RISER ANTI -FLOTATION BLOCK (IF APPLICABLE) d Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) 18895 lb > 13,478.4 lb x 1.25 ° a 18895 lb > 16,848 Ib NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. PLAN VIEW N.T.S. 4+00 4+50 5+00 5+50 SEDIMENT BASIN NO. 9 PRINCIPLE SPILLWAY Outflow Total Discharge: 51.3860 cfs Water Surface Elevation: 857.07 ft Tailwater Elevation: 0.00 ft Detention Base Elevation: 0.00 ft Outlet #1: Sediment Basin 9 Principle Spillway, Drop Pipe Riser Top Elev: 856.07 ft Riser Base Elev: 850.00 ft Riser Diameter: 72.00 in Orifice Coefficient: 0.50 Weir Coefficient: 3.33 Culvert Length: 51.00 ft Culvert Diameter: 30.00 in Culvert Invert In: 853.00 ft Culvert Friction Coefficient: 0.02 Culvert Entrance Loss Coefficient: 0.90 Discharge: 51.39 cfs •11 850 800 6+00 860.00 859.00 858.00 857.00 J 856.00 U) 855.00 a) LU 854.00 853.00 852.00 851.00 850.00 Stage Storage Curve SEDIMENT BASIN NO. 9 860. EMERG NCY SPILLWAY (858. ) PRINCIPAL 3PILLWAY (856.07) 0Z CLEAN OUT LEVEL (853.51) )0 STRUCTURE D.00 0.70 1.40 2.10 2.80 3.50 Accumulative Storage (Acre -Ft) Storage volume computations SEDIMENT BASIN NO. 9 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 850.00 N/A N/A 0.1961 851.00 N/A N/A 0.2254 0.2108 1.00 0.2052 0.2052 1.00 852.00 N/A N/A 0.2546 0.2400 1.00 0.2345 0.4397 2.00 853.00 N/A N/A 0.2848 0.2697 1.00 0.2641 0.7038 3.00 853.51 N/A N/A 0.3007 0.2928 0.51 0.1502 0.8541 3.51 854.00 N/A N/A 0.3158 0.3003 0.49 0.1444 0.9985 4.00 855.00 N/A N/A 0.3479 0.3319 1.00 0.3260 1.3244 5.00 856.00 N/A N/A 0.3807 0.3643 1.00 0.3582 1.6826 6.00 856.07 N/A N/A 0.3831 0.3819 0.07 0.0267 1.7093 6.07 857.00 N/A N/A 0.4143 0.3975 0.93 0.3646 2.0739 7.00 858.00 N/A N/A 0.4488 0.4315 1.00 0.4252 2.4991 8.00 858.07 N/A N/A 0.4511 0.4499 0.07 0.0315 2.5306 8.07 860.00 N/A N/A 0.5139 0.4814 1.93 0.9249 3.4555 10.00 FILL MATERIAL 1L 2'� CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) r- 2' MAXIMUM IF NOT CUT TO BEDROCK SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CUTOFF TRENCH DETAIL CONTENT N.T.S. TOP OF EMBANKMENT RISER STRUCTURE SEE SHT 34 OF 34 TRASH RACK =JI 1�=�I I �JIJI•1111 r1111_= EMERGENCY SPILLWAY 1' MIN. 11=l111=1111=Illl=llll=llll=llll= "o Q�=1111=1111=11JI- 1111 1111 1111 1111- 1111=f1J1�'zs tis�° Il-=llll=llll=1111=1111=Illl=llll=llll=llll=llll=1111= �O'°F ti° 1111=11JI=1111=1111�11llf 1111�fill .`=1111.`=1111-=Jill 111 J111 11 ==III=Illl=1111=11ll; I11==I1N==I1ll==llll==IU1AL=llll=llll==1111==1111.- i.4i Li"i Y ANTIFLOTATION BLOCK CUT-OFF SECTIONAL VIEW t TRENCH 2' DEEP 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. TYPICAL EMBANKMENT DETAIL BARREL PIPE ANTI -SEEP STABILIZED COLLAR OUTLET r1l Q oZ �: O 0' Im J w Y Z Q Q :2N :2 N N oo O N Q J N O O J Z a- o w UJ Uj J U � .. O Z N w a 0 w 2 Q a U o J 0 0 U 0 1 N a- L� �a Z J cl Z J t� O Q U O Z � d Z Z_ Q m Cl) F- LLJ p 0 5 > H Z H J Z O 0 Z O ULLJa Z O LV Z J NOT TO SCALE LU Q `,ttt1111ffffff/ I hereby certify that this document was prepared by me or under my direct personal supervision and is correct to the best of my Q •pF�SS�O '•. 2 knowledge and belief and that I am a dulySEALS licensed Professional Engineer under the = - SHEET NUMBER laws of the Stqtg of North /Carolina. � - : 048820 C17 Z tLU (Signature) • . , , , , , , •'' Date: August 25, 2021 �*i.�GCfij/ B. WN� 17 OF 34 �fffflllltlt� EMERGENCY SPILLWAY DETAIL CONCENTRATE PLANT/CONVERSION PLANT CONVEYOR CONVEYOR ACCESS ROAD NO. 1 EMERGENCY SPILLWAY CHUTE SECTION I (SEE DETAILS THIS SHEET) NAD-83 NC-SPCS EMERGENCY SPILLWAY LEVEL CONTROL SECTION ( SHEET) SEE DETAILS THIS • 30 ft. Stream Buffer CREST OF POND EL. 819.50 POROUS BAFFLES (TYP.) (SEE SHEET 32 OF 34) DITCH NO.4b PRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 50 FT OF 36 IN. CMP t 100 ''• 1 11 •loan, • • 1\! • FI■1 NORMAL POOL EL. 815.88 I 50% CLEAN OUT EL. 813.29 �I SILT FENCE (SEE SHEET 32 OF 34) �x I I DELINEATED I ; WETLA NDS I OUTLET PROTECTION (SEE SHEET 34 OF 34) 1 I /\, A' x DITCH NO. 26 PLAN VIEW: SEDIMENT BASIN NO. 10 SCALE: 1" = 50' RISER DETAILS FLUME LEVEL CONTROL SECTION N.T.S. 58.47 ft. � g2 f �0�'f ft. Freeboard 2 2 52.00 ft. Channel Design (Non -Erodible) Channel Slope: 0.1000 Manning's n of Channel: 0.0175 Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Discharge: 62.83 cfs Right Side Slope 2.00:1 Depth of Flow: 0.62 feet Base Dimension: 52.00 Velocity: 1.91 fps Wetted Perimeter: 54.76 Channel Lining: Grouted Rock Rip Rap Area of Wetted Cross Section: 32.88 Freeboard: 1.00 feet Channel Design (Non -Erodible) EMERGENCY SPILLWAY DETAIL N.T.S. 24.68 ft. 0.17 t 1 1 1.0 ft. Freeboard 2 20.00 ft. 2 ore Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 20.00 Wetted Perimeter: 20.76 Area of Wetted Cross Section: 3.46 Channel Slope: 50.0000 Manning's n of Channel: 0.0175 Discharge: 62.85 cfs Depth of Flow: 0.17 feet Velocity: 18.18 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet 50% CLEAN OUT EL. 813.29 850 Q25 HWD EL. 816.88 NORMAL POOL EL. 815.88 EMERGENCY SPILLWAY EL. 817.88 CREST 819.50 - - - - - - - - - - - - - - 21 800 BOTTOM EL. 810.00 PRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 50 FT OF 36" CMP 750 0+00 0+50 1+00 50% CLEAN OUT EL. 813.29 850 Q25 HWD EL. 816.88 CREST 819.50 800 0+00 0+50 1+50 2+00 2+50 3+00 Cross Section A -A' Scale: 1" = 50' NORMAL POOL EL. 815.88 850 BOTTOM EL. 810.00 1+00 1+50 Cross Section B-B' Scale: 1" = 50' TRASH RACK RISER BUOYANCY CALCULATION CREST EL. 819.50 1' FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 817.88 times the upward force. NORMAL POOL EL. 815.88 1- MIN. I 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I I I 1 F SQUARE 72" Square Concrete Riser o EXISTING GRADE 50 /o CLEAN�OUTL. 813.29 CONCRETE i RISER I I �5.88'� �� , ���\ Height = Say 6' Weight = 15,220 lb -----;-------- Where: Riser Weight = 15,220 lb ° d°° BOTTOM OF POND EL. 810.00 d . a ° ° ° 36" DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete a a d e Weight of Concrete Base = (7 ft x 7 ft x 0.5 ft) x 150 Ib/ft3 = 3675 lb ANTI -FLOTATION RISER FILL ANTI -FLOTATION BLOCK (IF APPLICABLE) (IF APPLICABLE) Structure Weight = 15,220 lb + 3675 lb = 18895 lb ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 lb/ft' N.T.S. Buoyancy = 216 ft' x 62.4 lb/ft' = 13,478.4 lb 72" SQUARE CONCRETE RISER ANTI FLOTATION BLOCK (IF APPLICABLE) ° d s Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) ° ° °' ° ° 18895 lb > 13,478.4 lb x 1.25 ° ad 18895 lb > 16,848 lb NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. PLAN VIEW N.T.S. 14 FT ACCESS CREST EL. 819.50 800 2+00 2+50 3+50 4+00 4+50 SEDIMENT BASIN NO. 10 PRINCIPLE SPILLWAY C11Iii[.iR '$e 850 750 5+00 Total Discharge: 79.9200 cfs Water Surface Elevation: 816.88 ft Tailwater Elevation: 0.00 ft Detention Base Elevation: 0.00 ft Outlet #1: Sediment Basin 10 Principle Spillway, Drop Pipe Riser Top Elev: 815.88 ft Riser Base Elev: 810.00 ft Riser Diameter: 72.00 in Orifice Coefficient: 0.50 Weir Coefficient: 3.33 Culvert Length: 50.00 ft Culvert Diameter: 36.00 in Culvert Invert In: 812.21 ft Culvert Friction Coefficient: 0.02 Culvert Entrance Loss Coefficient: 0.90 Discharge: 79.92 cfs Stage Storage Curve SB-10 820.00 818.00 816.00 814.00 812.00 F STRUCTURE 10) Y (817.88) 810.00 0.00 0.90 1.80 2.70 3.60 4.50 Accumulative Storage (Acre -Ft) Storage volume computations SB-10 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 810.00 N/A N/A 0.3091 811.00 N/A N/A 0.3407 0.3249 1.00 0.3191 0.3191 1.00 812.00 N/A N/A 0.3722 0.3564 1.00 0.3507 0.6699 2.00 813.00 N/A N/A 0.4046 0.3884 1.00 0.3826 1.0525 3.00 813.29 N/A N/A 0.4141 0.4094 0.29 0.1168 1.1693 3.29 814.00 N/A N/A 0.4379 0.4213 0.71 0.2984 1.4677 4.00 815.00 N/A N/A 0.4722 0.4550 1.00 0.4489 1.9166 5.00 815.88 N/A N/A 0.5031 0.4876 0.88 0.4291 2.3457 5.88 816.00 N/A N/A 0.5073 0.4897 0.12 0.0543 2.4000 6.00 817.00 N/A N/A 0.5434 0.5253 1.00 0.5189 2.9189 7.00 817.88 N/A N/A 0.5759 0.5596 0.88 0.4925 3.4114 7.88 818.00 N/A N/A 0.5803 0.5619 0.12 0.0627 3.4741 8.00 819.50 N/A N/A 0.6304 0.6054 1.50 0.9034 4.3775 9.50 CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) FILL MATERIAL 2' MAXIMUM IF NOT CUT TO BEDROCK 1L 2' SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CUTOFF TRENCH DETAIL CONTENT N.T.S. TOP OF EMBANKMENT RISER STRUCTURE 1 1 v TRASH RACK SEE SHT 34 OF 34 .r'• t ; .;r . =111 �I LJIJI�IIJI IIJI EMERGENCY SPILLWAY 1' MIN. 1i=1111=I111=1Ui=llll=lUl=1111= Zo. Q�=JI11=1111=1111 1111=JI11=JIJI�IIJI-JIJI=Jill _ 1s� tis�-° i1=llil=llil=llll=llll=111l=IUl=llll=lUi=llll=lUi= °pF ti° -JIJI=JIJI=JIJI` fill =1111=JIJI=J111 JIJI=JIJI Jill `=JIJI=JIJI=JI =11i1=JIJI=1u1=I11��liu�lili=ll11==JIJI=1111�11�=llll=lUl=llll=llil� ANTIFLO A ION BLOCK SECTIONAL VIEW t CUT-OFF TRENCH 2' DEEP 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. TYPICAL EMBANKMENT DETAIL BARREL PIPE ANTI -SEEP STABILIZED COLLAR OUTLET c 0 T a) N Z O> O 0 N O J Z :2\ N LiQ :2oo Q 1 m O Z o .. w L U O bi Z ?i U W J � W 2 Q U J �a Z Z QO W CD Z_ toJ O Cl) v H Z O � O Z F_ ? O V � Z cn m F W 2 25 W cA H o ID Q Z J a NOT TO SCALE W_ Q `,�tiS1111ffffff/ I hereby certify that this document was prepared by me or under my direct personal supervision and is correct to the best of my Q 'pF�SS�O '•. 2 knowledge and belief and that I am a dulySEALS licensed Professional Engineer under the - = - SHEET NUMBER laws of the Stet of orth Carolina. � 5 : 048$20 (Signature) •.,,,,,,•'��� Date: August 25, 2021 ��",ro ij/ p �`�� 18 OF 34 W �1jfflllltt��, NAD NC-' DITCH NO. 31 SILT FENCE (SEE SHEET 32 OF 34) �X X NORMAL POOL EL. 776.27 / f ? 50% CLEAN OU 773.19 x EMERGENCY SPILLWAY \ LEVEL CONTROL SECTION (SEE DETAILS THIS SHEET) i I I EMERGENCY SPILLWAY k CHUTE SECTION / (SEE DETAILS THIS SHEET) POROUS BAFFLES (TYP.) (SEE SHEET 32 OF 34) I CREST OF POND EL. 780.00 DITCH NO. 28 B � 72 FLUME i/ OUTLET PROTECTION (SEE SHEET 34 OF 34) � PRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 60 FT OF 24 IN. CMP 1 , ' 0 � J � FLUME OUTLET PROTECTION (SEE SHEET 34 OF 34) � r ry Z14AFW Sail! pum P Ap- P-map d- NAPA FLUME PLAN VIEW: SEDIMENT BASIN NO. 11 SCALE: 1" = 50' RISER DETAILS EMERGENCY SPILLWAY DETAIL LEVEL CONTROL SECTION 26.93 ft. 1 2 20.00 ft. Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 20.00 Wetted Perimeter: 23.27 1.00ft. Freeboard Area of Wetted Cross Section: 15.72 - I Channel Slope: 0.1000 Manning's n of Channel: 0.0175 Discharge: 32.48 cfs Depth of Flow: 0.73 feet Velocity: 2.07 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet EMERGENCY SPILLWAY DETAIL Channel Design (Non -Erodible) CHUTE SECTION Channel Type: Trapezoidal, Equal Side Slopes N.T.S. Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 10.00 Wetted Perimeter: 10.77 14.69 ft. 0.17 Area of Wetted Cross Section: 1.79 t 1 1 1.0 ft. Freeboard Channel Slope: 50.0000 2 I 10.00 ft.2 Manning's n of Channel: 0.0175 -1 Discharge: 32.48 cfs Depth of Flow: 0.17 feet Velocity: 18.15 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet 50% CLEAN OUT EL. 773.19 Q25 HWD EL. 777.27 EMERGENCY SPILLWAY EL. 778.27 800 CREST 780.00 ,• _*,a 750 0+00 EXISTING GROUND PRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 60 FT OF 24" CMP :M NORMAL POOL EL. 776.27 800 BOTTOM EL. 768.00 750 70+50 1+00 1+50 2+00 Cross Section A -A' Scale: 1" = 50' 50% CLEAN OUT EL. 773.19 Q25 HWD EL. 777.27 � NORMAL POOL EL. 776.27 BOTTOM EL. 768.00 750 0+00 0+50 1+00 1+50 2+00 Cross Section B-B' Scale: 1" = 50' TRASH RACK RISER BUOYANCY CALCULATION CREST EL. 780.00 1' FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 778.27 times the upward force. NORMAL POOL EL. 776.27 1' MIN. 1 7__2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I I I 1 RE 72" Square Concrete Riser ° EXISTING GRADE 50 /° CLEANOUTEL. 773.19 i CONCRETE I R8.27' �� ��� �� Height = Approximately 9' Weight = 21,070 lb � ���� I I �----- a -------- Where: 1 .` 1 1--- ��� ����� �� - ------ -- Riser Weight = 21,070 lb •� ° ° a^° BOTTOM OF POND EL. 768.00 d . , ° ° ° • 24" DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete ° a a e ° e da A a � Weight of Concrete Base = (7 ft x 7 ft x 0.75 ft) x 150 Ib/ft3 = 5,512.5 lb ANTI -FLOTATION RISER FILL ANTI -FLOTATION BLOCK (IF APPLICABLE) (IF APPLICABLE) Structure Weight = 21,070 lb + 5,512.5 lb = 26,582.5 lb ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 lb/ft' N.T.S. Buoyancy = 324 ft' x 62.4 Ib/ft3 = 20,217.6 lb 72" SQUARE CONCRETE RISER ANTI -FLOTATION BLOCK (IF APPLICABLE) Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) " 4 A e . , 26,582.5 lb > 20,217.6 lb x 1.25 ° °, 4 4 4 26,582.5 Ib > 25,272 Ib NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. PLAN VIEW N.T.S. 750 2+50 3+00 10 FT ACCESS CREST EL. 780.00 780.00 779.00 778.00 777.00 J 776.00 � 775.00 0 j 774.00 2 LLJ 773.00 772.00 771.00 770.00 769.00 768.00 0.00 ELEV (ft) 768.00 770.00 772.00 773.19 774.00 776.00 776.27 777.27 778.00 780.00 FILL MATERIAL Stage Storage Curve SEDIMENT BASIN NO. 11 I 0 ' N 0 ' N Q 0.50 1.00 1.50 2.00 2.50 • Accumulative Storage (Acre -Ft) Storage volume computations m SEDIMENT BASIN NO. 11 ' m Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) N/A N/A 0.0713 N/A N/A 0.1071 0.0892 2.00 0.1716 0.1716 2.00 N/A N/A 0.1455 0.1263 2.00 0.2450 0.4166 4.00 N/A N/A 0.1701 0.1578 1.19 0.1874 0.6039 5.19 N/A N/A 0.1869 0.1662 0.81 0.1369 0.7408 6.00 N/A N/A 0.2316 0.2092 2.00 0.4098 1.1506 8.00 N/A N/A 0.2381 0.2348 0.27 0.0634 1.2140 8.27 N/A N/A 0.2620 0.2468 1.00 0.2500 1.4640 9.27 N/A N/A 0.2794 0.2555 0.73 0.1882 1.6522 10.00 N/A N/A 0.3255 0.3024 2.00 0.6002 2.2524 12.00 C: Of CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) 2' MAXIMUM IF NOT CUT TO BEDROCK SEDIMENT BASIN NO. 11 PRINCIPLE SPILLWAY 1 Outflow 1 Total Discharge: 38.9828 cfs Water Surface Elevation: 777.27 ft 2 �_ Tailwater Elevation: 0.00 ft Detention Base Elevation: 0.00 ft SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD Outlet #1: Sediment Basin 11 Principle Spillway, Drop Pipe PROCTOR MAX. DRY DENSITY Riser Top Elev: 776.27 ft WITHIN ±2% OPTIMUM MOISTURE Riser Base Elev: 768.00 ft CUTOFF TRENCH DETAIL CONTENT Riser Diameter: 72.00 in N.T.S. Orifice Coefficient: 0.50 Weir Coefficient: 3.33 Culvert Length: 60.00 ft Culvert Diameter: 24.00 in Culvert Invert In: 771.00 ft Culvert Friction Coefficient: 0.02 0 Z o Culvert Entrance Loss Coefficient: 0.90 N O � NJ Discharge: 38.98 cfs J w Z a :2 :200 1-, V) a om Z U) 0 w U ?i 0 W J U � O Z N a U w F a o J w 0 � 2 U Q 0 U N H_ Lz TOP OF EMBANKMENT RISER STRUCTURE TRASH RACK SEE SHT 34 OF 34>. b., ::.z;;� =JI 1= I I JIJI 1111 1111_= EMERGENCY SPILLWAY 1' MIN. 11=llll=lilt=llll=llll=llll=llll= �o, Q�=JIJhJIJI-=IIJI-1111111111111111=1111=f1J1�'zSZ tis�° Il-=llll=llll=1111=111(=IIII=IIII=IIII=IIII=Illl=1111= °'°F Jill _=JIJI=JIJI=1111 Jill1111�1111.`=1111.`=1111-= Jill ]�11 ==I111=Illl=lUl=llll==llll==llH==l(II==IIII==IUI�I�L=llll=llll==llll==1111.- _ i.4i Li"i Y ANTIFLOTATION BLOCK SECTIONAL VIEW CUT-OFF TRENCH 2' DEEP 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. TYPICAL EMBANKMENT DETAIL BARREL � PIPE ANTI -SEEP STABILIZED COLLAR OUTLET 00 NOT TO SCALE (3a Z J cl Q O W � Z J V r O Cl) Q V 5 F_= Z O LU _ � Z > H O U ZO F_ Q Z Q m W M W co W 0 Z Q Z J a ��ti�tillllr!!!!!� I hereby certify that this document was `��% % C,q�O?.,� prepared by me or under my direct personal supervision and is correct to the best of my Il��•�FESSI°''•C�2'; knowledge and belief and that I am a duly = = Q� SEALr. licensed Professional Engineer under the = SHEET NUMBER laws of the Stateof o h Carolina. 04$820 (Signature) Date: August 25, 2021 l�i,�C �. `,��`� 1 9 OF 34 t!r!!l1111S��, FLUME OUTLET PROTECTION (SEE SHEET 34 OF 34) /I k k � / FLUME k / ITCH NO. 32 OUTLET PROTECTION (SEE SHEET 34 OF 34) �- B 1 'IX NAD-83 NC-SPCS + +\ l \ \ x CREST OF POND EL. 760.00 + 50% CLEAN OUT EL. 753.93 NORMAL POOL EL. 756.31 POROUS BAFFLES (TYP.) (SEE SHEET 32 OF 34) EMERGENCY SPILLWAY LEVEL CONTROL SECTION (SEE DETAILS THIS SHEET) EMERGENCY SPILLWAY CHUTE SECTION X (SEE DETAILS T IS SHEET) XI 1 X PRINCIPLE SPILLWAY 1 72" SQUARE CONCRETE RISER W/ TRASH RACK X AND 55 FT OF 36 IN. CMP X I X SILT FENCE 1 (SEE SHEET 32 OF 34) X I X 1 X I OUTLET PROTECTION (SEE SHEET 34 OF 34) �Ar DITCH NO. 35 PLAN VIEW: SEDIMENT BASIN NO. 12 SCALE: 1" = 50' RISER DETAILS EMERGENCY SPILLWAY DETAIL LEVEL CONTROL SECTION N.T.S. 1 2 46.75 ft. 40.00 ft. Channel Design (Non -Erodible) EMERGENCY SPILLWAY DETAIL Channel Type: Trapezoidal, Equal Side Slopes CHUTE SECTION Dimensions: Left Side Slope 2.00:1 N.T.S. Right Side Slope 2.00:1 Base Dimension: 20.00 Wetted Perimeter: 20.72 Area of Wetted Cross Section: 3.29 24.65 ft. 0.1 gg fft Channel Slope: 50.0000 1 1 56tit. Freeboard Manning's n of Channel: 0.0175 2 20.00 ft. 2 Discharge: 57.93 cfs Depth of Flow: 0.16 feet Velocity: 17.61 fps Channel Lining: Grouted Riprap Freeboard: 1.00 feet 50% CLEAN OUT EL. 753.93 Q25 HWD EL. 757.31 800 800 NORMAL POOL EL. 756.31 EMERGENCY SPILLWAY 2 EL. 758.31 750 ?� -CREST 760.0 750 BOTTOM EL. 751. PRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER W/TRASH RACK EXISTING GROUND AND 55' OF 36" CMP 700 700 0+00 0+50 1+00 1+50 2+00 2+50 Cross Section A -A' 800 I 750 Scale: 1" = 50' 50% CLEAN OUT EL. 753.93 Q25 HWD EL. 757.31 � NORMAL POOL EL. 756.31 BOTTOM EL. 751.0 Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 40.00 gg f Wetted Perimeter: 43.08 0 f OOtft.� board Area of Wetted Cross Section: 28.46 Channel Slope: 0.1000 Manning's n of Channel: 0.0175 Discharge: 57.97 cfs Depth of Flow: 0.69 feet Velocity: 2.04 fps Channel Lining: Grouted Riprap Freeboard: 1.00 feet SEDIMENT BASIN NO. 12 PRINCIPLE SPILLWAY Outflow Total Discharge: 79.9200 cfs Water Surface Elevation: 757.31 ft Tailwater Elevation: 0.00 ft Detention Base Elevation: 0.00 ft Outlet #1: Sediment Basin 12 Principle Spillway, Drop Pipe Riser Top Elev: 756.31 ft Riser Base Elev: 751.00 ft Riser Diameter: 72.00 in Orifice Coefficient: 0.50 Weir Coefficient: 3.33 Culvert Length: 55.00 ft Culvert Diameter: 36.00 in Culvert Invert In: 752.00 ft Culvert Friction Coefficient: 0.02 Culvert Entrance Loss Coefficient: 0.90 Discharge: 79.92 cfs 750 10 FT ACCESS CREST EL. 760.00 L EXISTING GROUND 700 700 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 Cross Section B-B' Scale: 1" = 50' TRASH RACK RISER BUOYANCY CALCULATION + CREST EL. 760.00 �E 1' FREEBO7%ERGENGY IEMERGENCY Demonstrate adequate stability by showing the downward force is a minimum of 1.25 SPILLWAY DEPTH SPILLWAY EL. 758.31 times the upward force. NORMAL POOL EL. 756.31 1' MIN. I 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I I I I 1 72" Square Concrete Riser �500/2 CLEANOUT EL. 753.93RISERWei EXISTING GRADEI CONCRETE I �� Height = Approximately 6' Weight ht - 15,220 Ib I 5.31' I I � � ��� �i 1 I I ' ----- <- i ere: .� �� �� ���� ��� --� -------- Riser Weight = 15,220 lb ° d°° BOTTOM OF POND EL. 751.00 d . d • ° ° ° 436" DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete • ° ° • d° ° d Weight of Concrete Base = (7 ft x 7 ft x 0.5 ft) x 150 lb/ft'= 3675 lb ANTI -FLOTATION RISER FILL ANTI -FLOTATION BLOCK (IF APPLICABLE) (IF APPLICABLE) Structure Weight = 15,220 lb + 3675 lb = 18895 lb ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 Ib/ft3 N.T.S. Buoyancy = 216 ft' x 62.4 Ib/ft3 = 13,478.4 lb 72" SQUARE CONCRETE RISER ANTI FLOTATION BLOCK (IF APPLICABLE) ° 1 ° Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) • ° ° • d ° • 9 • • • ° 18895 lb > 13,478.4 lb x 1.25 °.A 18895 lb > 16,848 lb NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. PLAN VIEW N.T.S. Stage Storage Curve SEDIMENT BASIN NO. 12 760.00 759.00 758.00 J 757.00 c O 756.00 CZ > a> U-1 755.00 754.00 753.00 752.00 751.00 STRUCTURE 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Accumulative Storage (Acre -Ft) Storage volume computations SEDIMENT BASIN NO. 12 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 751.00 N/A N/A 0.4071 752.00 N/A N/A 0.4457 0.4264 1.00 0.4192 0.4192 1.00 753.00 N/A N/A 0.4845 0.4651 1.00 0.4579 0.8771 2.00 753.93 N/A N/A 0.5218 0.5031 0.93 0.4699 1.3470 2.93 754.00 N/A N/A 0.5244 0.5044 0.07 0.0271 1.3741 3.00 755.00 N/A N/A 0.5654 0.5449 1.00 0.5373 1.9114 4.00 756.00 N/A N/A 0.6077 0.5865 1.00 0.5787 2.4900 5.00 756.31 N/A N/A 0.6211 0.6144 0.31 0.1905 2.6805 5.31 757.00 N/A N/A 0.6509 0.6293 0.69 0.4308 3.1113 6.00 758.00 N/A N/A 0.6954 0.6732 1.00 0.6649 3.7762 7.00 759.00 N/A N/A 0.7410 0.7182 1.00 0.7098 4.4860 8.00 760.00 N/A N/A 0.7792 0.7601 1.00 0.7566 5.2426 9.00 FILL MATERIAL 1L 2' CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) 2' MAXIMUM IF NOT CUT TO BEDROCK SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CUTOFF TRENCH DETAIL CONTENT N.T.S. TOP OF EMBANKMENT RISER STRUCTURE u v v 1 V TRASH RACK SEE SHT 34 OF 34 F . ar' : •;r ill IjI I�JIJI JIJIJIJI EMERGENCY SPILLWAY 1' MIN. 11=I111=I111=1111=1111=1111=1111= ?p. Q�=JIJI=JIJI=JIJL JIJIr=JIJI--=JIJI�=JIJI-=JI11=JI11,--�, tis�-° 1(. Ilil=llll=llil=1111=I111=IU1=1111=IU1=1111=1U1= °'°F JIJI,=JIJI=IIJI=JIJI=JIJI=JIJI_= Jill =Jill =JIJI=1111=JIll=JIJI=JI lli1=IU1�1111=IU1=1UI:=1U1=I111=IU1-1111�1�=gI1�lU1:=ll11=11i1� ANTIFLO A ION BLOCK SECTIONAL VIEW CUT-OFF TRENCH 2' DEEP 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. TYPICAL EMBANKMENT DETAIL BARREL PIPE ANTI -SEEP STABILIZED COLLAR OUTLET NOT TO SCALE 0 T a� 0 0 6 z N Z 6) O 3: O N O H J Z \ (n N w Q :2 co Q i o m Z U)o . . w U O Z C � 3ri U Li_I J 7 Ld W Of 2 Q U 0 J 0 0 U 0 (n 0- U- �a Z Z Q�O N Z_ J to O J v � H Z O W _ � O Z = O v Z Q Z cl) < W W U) H o � Z J a 1 hereby certify that this document was ����,(`' CA t?n f, prepared by me or under my direct personal supervision and is correct to the best of my Q�•pF�SS/°'••,°�2% knowledge and belief and that I am a duly = Q� SEAL{••' licensed Professional Engineer under the = = = SHEET NUMBER laws of the Sta of o h arolina. = �4$820 (Signature) Date: August 25, 2021 ���/ �. w1� �� 20 OF 34 �!!l!lllltti��, PLANT PAD AREA DA-44 NA wNC PCs UD-4 50% CLEAN OUT EL. 848.36 DA-45 PRINCIPLE SPILLWAY 72" SQUARE RISER W/ TRASH RACK AND 50 FT OF 36 IN CMP ,, EMERGENCY SPILLWAY LEVEL CONTROL SECTION (SEE DETAILS THIS SHEET) ,, POROUS BAFFLES (TYP.) (SEE SHEET 32 OF 34) -\ NORMAL POOL EL. 850.97 ''VA PLAN VIEW: SEDIMENT BASIN NO. 13 SCALE: 1" = 50' CREST OF POND EL. 854.00 B SCREENING BERM UA-4 DITCH NO. 43 PLANT ENTRANCE i SILT FENCE (SEE SHEET 32 OF 34) i i i EMERGENCY SPILLWAY DETAIL LEVEL CONTROL SECTION Channel Design (Non -Erodible) N.T.S. 856.00 Channel Type: Trapezoidal, Equal Side Slopes \ Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 20.00 28.13 ft. 1.00ft. Freeboard Wetted Perimeter: 24.61 1 T Area of Wetted Cross Section: 22.75 853.00 1.03 ft. t 2 Channel Slope: 0.1000 20.00 ft. Manning's n of Channel: 0.0175 J 07 Discharge: 57.98 cfs Depth of Flow: 1.03 feet 850.00 Velocity: 2.55 fps > Channel Lining: Grouted Rock Rip Rap W Freeboard: 1.00 feet EMERGENCY SPILLWAY DETAIL 847.00 CHUTE SECTION 65 ft. 1 I1 O'1.00ftFreeboard 2 20.00 ft. 2 •11 CREST 854.0 850 50% CLEAN OUT EL. 848.36 Q25 HWD EL. 851.97 NORMAL POOL EL. 850.97 Emergency Spillway 851.97 Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 20.00 Wetted Perimeter: 20.72 Area of Wetted Cross Section: 3.29 Channel Slope: 50.0000 Manning's n of Channel: 0.0175 Discharge: 57.99 cfs Depth of Flow: 0.16 feet Velocity: 17.61 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet 21 BOTTOM EL. 844.0 PRINCIPLE SPILLWAY EXISTING GROUND 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 50' OF 36" CMP 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 Cross Section A -A' 900 900 50% CLEAN OUT EL. 848.36 NORMAL POOL EL. 850.97 Q25 HWD EL. 851.97 850 850 2•� 2• BOTTOM EL. 844.0 800 800 0+00 0+50 1+00 1+50 Cross Section B-B' Scale: 1" = 50' RISER DETAILS TRASH RACK RISER BUOYANCY CALCULATION CREST EL. 854.00 1' FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 851.97 times the upward force. NORMAL POOL EL. 850.97 V MIN. I 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I I I72" I 1� SQU813E 72" Square Concrete Riser oCONCRETE EXISTING GRADE 50 �CLEA�NOUT�EL848.36 i I RISER I 6.97' Height = Say 7' Weight = 17,170 lb I I I I F----- ;--------- Where: Riser Weight = 17,170 lb °° ° d•° BOTTOM OF POND EL. 844.00 d . ° °' ° ° , ° 36" DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete < ° A d° A d Weight of Concrete Base = (7 ft x 7 ft x 0.5 ft) x 150 Ib/ft3 = 3675 lb ANTI -FLOTATION RISER FILL ANTI -FLOTATION BLOCK (IF APPLICABLE) (IF APPLICABLE) Structure Weight = 17,170 lb + 3675 lb = 20845 lb ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 Ib/ft3 N.T.S. Buoyancy = 216 ft3 x 62.4 Ib/ft3 = 13,478.4 lb 72 SQUARE CONCRETE RISER ANTI -FLOTATION BLOCK (IF APPLICABLE) ° d 9 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) 4 ° °a 20845 lb > 13,478.4 lb x 1.25 20845 Ib > 16,848 lb NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. PLAN VIEW N.T.S. Scale: 1" = 50' SEDIMENT BASIN NO. 13 PRINCIPLE SPILLWAY Outflow Total Discharge: 74.7720 cfs Water Surface Elevation: 851.97 ft Tailwater Elevation: 0.00 ft Detention Base Elevation: 0.00 ft Outlet #1: Sediment Basin 13 Principle Spillway, Drop Pipe Riser Top Elev: 850.97 ft Riser Base Elev: 844.00 ft Riser Length: 72.00 in Riser Width: 72.00 in Orifice Coefficient: 0.50 Weir Coefficient: 3.33 Culvert Length: 50.00 ft Culvert Diameter: 36.00 in Culvert Invert In: 847.97 ft Culvert Friction Coefficient: 0.02 Culvert Entrance Loss Coefficient: 0.90 Discharge: 74.77 cfs •11 800 5+50 Stage Storage Curve SB-13 T PRI �EMERGENGY CIPAL SPILLWAY ( SPILLWAY (851.9 50.97) CLEAJOUI LEVEL (848.36) )P OF STRUCTURE 54.00) 844.00 0.00 0.70 1.40 2.10 2.80 3.50 Accumulative Storage (Acre -Ft) Storage volume computations SB-13 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 844.00 N/A N/A 0.1346 845.00 N/A N/A 0.1763 0.1554 1.00 0.1476 0.1476 1.00 846.00 N/A N/A 0.2181 0.1972 1.00 0.1895 0.3370 2.00 847.00 N/A N/A 0.2602 0.2391 1.00 0.2312 0.5682 3.00 848.00 N/A N/A 0.3028 0.2815 1.00 0.2736 0.8419 4.00 848.36 N/A N/A 0.3187 0.3107 0.36 0.112 0.9538 4.36 849.00 N/A N/A 0.3468 0.3248 0.64 0.2048 1.1586 5.00 850.00 N/A N/A 0.3909 0.3689 1.00 0.3605 1.5191 6.00 850.97 N/A N/A 0.4345 0.4127 0.97 0.4003 1.9194 6.97 851.00 N/A N/A 0.4358 0.4133 0.03 0.0047 1.9241 7.00 851.97 N/A N/A 0.4804 0.4581 0.97 0.4444 2.3685 7.97 852.00 N/A N/A 0.4818 0.4588 0.03 0.0058 2.3743 8.00 854.00 N/A N/A 0.5679 0.5249 2.00 1.0393 3.4135 10.00 FILL MATERIAL 1L 2' t� CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) r-2' MAXIMUM IF NOT CUT TO BEDROCK SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CUTOFF TRENCH DETAIL CONTENT N.T.S. TOP OF EMBANKMENT RISER STRUCTURE SEE SHT 34 OF 34 At '�.;.;y i .; `: •s'';;��r TRASH RACK = I�If11=1111-1111-1111 'EMERGENCY SPILLWAY 1' MIN. I1=1111=1111=Illl=llll=1111=1(11= zo. Q� -1111 1111=11(I- II1I=1111`_1111`_1111 1111 It __'zs� Il=Ilil=lUi=llil=1111=I1I1=1111=1111=IlIl=ll1l WIN= z°�'-11JI.�=11JI.�11JI.�11JI=11J1.`-1111=J111.=1111.`-11JI�1111.-1111.=1111.�11 ==llll=llll=lll1=1111=Illl=ili(=llil=l(11:=111(�11�==11{(==1111:=1111:=1111.- ANTIFLO A ION BLOCK SECTIONAL VIEW CUT-OFF TRENCH 2' DEEP 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. TYPICAL EMBANKMENT DETAIL BARREL �- PIPE ANTI -SEEP STABILIZED COLLAR OUTLET NOT TO SCALE i. Z 2 J C C LU • 0 U '© N 0 ' N rn D 0) Q c 0 .N a) N Z 0)0 � O N O 't a- U) Y Q N J Z :2 V) pry O I m Z N o .. w 0 U O Z U ?i U Uj J � N a w F- a O J w 0 2 Q U �a Z J IC Z J O Q V r O J Q V 5 H zi Z O Z > H Z O U ZO Z Q m W W u) W � In Z Q Z J a ,,ti��11111!!!!!/ I hereby certify that this document was ����,�� CARp���. prepared by me or under my direct persona supervision and is correct to the best of my Si ••,. 2 knowledge and belief and that I am a dulySEAL{..' r licensed Professional Engineer under the - SHEET NUMBER laws of the State ofJN9rth Carolina. 048820 pcZ LU l mot ,/l, , •FNG I NE��'' , �:` (Signature) . , , , , , , , . �Q` Date: August 25, 2021 1ijj J7. `I,lNt 21 OF 34 !1l1I1It�� CREST OF POND EL.855 EMERGENCY SPILLWAY DETAIL 50% CLEAN OUT EL. 849.39 DA., DA-48 LEVEL CONTROL SECTION Channel Design (Non -Erodible) NORMAL POOL EL. 852.34 L EN.T.S. Channel Type: Trapezoidal, Equal Side Slopes POROUS BAFFLES (TYP.) �� Dimensions: Left Side Slope 2.00:1 (SEE SHEET 32 OF 34) Right Side Slope 2.00:1 Base Dimension: 20.00 DITCH NO. 45 A 26.67 ft. / 0 gg ft Wetted Perimeter: 22.97 T.00 (1 aoTro OF POND 1 ft. Freeboard Area of Wetted Cross Section: 14.17 OUTLET PROTECTION (SEE SHEET 34 OF 34) EL. 845.00 2 2 Channel Slope: 0.1000 _ 20.00 ft. Manning's n of Channel: 0.0175 NAD-83 \ DITCH NO. 46 Discharge: 27.56 cfs NC-SPCS FLUME - OUTLET PROTECTION Depth of Flow: 0.66 feet (SEE SHEET Velocity: 1.95 fps Channel Lining: Grouted Rock Rip Rap PRINCIPLE SPILLWAY Freeboard: 1.00 feet ♦ 72" SQUARE RISER W/ TRASH RACK ' AND 50 FT OF 36 IN CMP -B EMERGENCY SPILLWAY DETAIL EMERGENCY SPIL WAY Channel Design (Non -Erodible) 1NLE ECTION LEVEL CONTROLS CTION CHUTE SECTION (SEE DETA S THIS SHEET) N.T.S. Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 1-48 IN CMP EMERGENC SPILLWA Base Dimension: 20.00 0 Z \ CHUTE SE ION � 24.42 ft. Wetted Perimeter: 20.46 (SEE DET ILS THIS, SHE ET' Area of Wetted Cross Section: 2.10 1 1 01 Vtft. Freeboard Channel Slope: 50.0000 O ` DITCH NO. 46 2 20.00 ft. 2 7_ Manning's n of Channel: 0.0175 X ODischarge: 27.54 cfs O Depth of Flow: 0.10 feet Velocity: 13.14 fps Channel Lining: Grouted Rock Rip Rap / Freeboard: 1.00 feet DITCH NO. 46 50% CLEAN OUT EL. 849.39 Q25 HWD EL. 853.34 900 900 NORMAL POOL EL. 852.34 Emergency Spillway / CREST 855.0 853.34 / 850 850 BOTTOM EL. 845.0 INLET PROTECTION 48 IN CMP - 437' @ 2% OUTLET PROTECTION C_ + 800 UNDERDRAIN (UD-4) EXISTING GROUND 800 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 PRINCIPLE SPILLWAY Cross Section A -A' 0 72" SQUARE CONCRETE RISER W/ TRASH RACK S T FENCE AND 50' OF 36" CMP Scale: 1" = 50' (SEE SHEE 32 OF 34) � ` C 3 ., 900 900 SEDIMENT BASIN NO. 14 PRINCIPLE SPILLWAY 50% CLEAN OUT EL. 849.39 NORMAL POOL EL. 852.34 Outflow Q25 HWD EL. 853.34 Total Discharge: 74.7720 cfs 2-36 IN CMPS \ CREST 855.0 Water Surface Elevation: 853.34 ft � � ft Tailwater Elevation: 0.00 850 850 Detention Base Elevation: 0.00 ft OUTLET PROTECTION k OTTOM EL. 845.0 Outlet #1: Sediment Basin 14 Principle Spillway, Drop Pipe X Riser Top Elev: 852.34 ft (SEE SHEET 34 OF 34) Riser Base Elev: 845.00 ft SILT FENCE Riser Length: 72.00 in (SEE SHEET 32 of 34) 800 800 Riser Width: 72.00 in A \ Orifice Coefficient: 0.50 0+05 0+01 0+15 0+02 0+25 0+03 Weir Coefficient: 3.33 Cross Section B-B' Culvert Length: 50.00 ft PLAN VIEW: SEDIMENT BASIN NO. 14 Culvert Diameter: 36.00 in Scale: 1" = 50' Culvert Invert In: 849.34 ft SCALE: 1" = 50' Culvert Friction Coefficient: 0.02 Culvert Entrance Loss Coefficient: 0.90 RISER DETAILS Discharge: 74.77 cfs TRASH RACK CREST EL. 855.00 RISER BUOYANCY CALCULATION V FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 853.34 times the upward force. NORMAL POOL EL. 852.34 1' MIN. I 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I I 1 F RE I 72" Square Concrete Riser I CONCRETE i Height Approximately 8' EXISTING GRADE 50 °/o CLEANOUT EL. 849.34 I RISER 7.34' I �V ��V ��A� ��� Weight = 19,120 lb I I I I �----- a -------- Where: C . I Riser Weight = 19,220 lb / A BOTTOM OF POND EL. 845.00 dZ.4A A. ° °°° a 36"DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete d ° a ° e e de ° d e ANTI -FLOTATION RISER FILL Weight of Concrete Base = (7 ft x 7 ft x 0.5 ft) x 150 lb/ft' = 3675 lb (IF APPLICABLE) ANTI -FLOTATION BLOCK (IF APPLICABLE) Structure Weight = 19120 lb + 3675 lb = 22795 lb ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 lb/ft' N.T.S. Buoyancy = 216 ft' x 62.4 Ib/ft3 = 17971.2 lb 72" SQUARE CONCRETE RISER ANTI -FLOTATION BLOCK (IF APPLICABLE) Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) 4 A ° a a ° 22795 lb > 13,478.4 lb x 1.25 °A 22795 Ib > 22,464 lb NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. PLAN VIEW N.T.S. 857.00 854.00 851.00 848.00 845.00 Stage Storage Curve SB-14me TOP F S (855.0 ) EMERG NCY SPILLWAY (85 .34 RINCIPAL SPILLWAY (852.34) CLEAN OUT LEVEL (849.39) rRUCTURE 0.00 NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. PLAN VIEW N.T.S. 857.00 854.00 851.00 848.00 845.00 Stage Storage Curve SB-14me TOP F S (855.0 ) EMERG NCY SPILLWAY (85 .34 RINCIPAL SPILLWAY (852.34) CLEAN OUT LEVEL (849.39) rRUCTURE 0.00 0.40 0.80 1.20 1.60 2.00 Accumulative Storage (Acre -Ft) Storage volume computations SB-14 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 845.00 N/A N/A 0.0998 846.00 N/A N/A 0.1162 0.1080 1.00 0.1048 0.1048 1.00 847.00 N/A N/A 0.1328 0.1245 1.00 0.1213 0.2261 2.00 848.00 N/A N/A 0.1500 0.1414 1.00 0.1381 0.3642 3.00 849.00 N/A N/A 0.1679 0.1590 1.00 0.1555 0.5197 4.00 849.39 N/A N/A 0.1752 0.1715 0.39 0.0675 0.5872 4.39 850.00 N/A N/A 0.1864 0.1772 0.61 0.1061 0.6933 5.00 851.00 N/A N/A 0.2055 0.1959 1.00 0.1923 0.8856 6.00 852.00 N/A N/A 0.2253 0.2154 1.00 0.2117 1.0972 7.00 852.34 N/A N/A 0.2323 0.2288 0.34 0.0778 1.1750 7.34 853.00 N/A N/A 0.2458 0.2355 0.66 0.1539 1.3289 8.00 853.34 N/A N/A 0.2528 0.2493 0.34 0.0848 1.4137 8.34 855.00 N/A N/A 0.2871 0.2665 1.66 0.4414 1.8551 10.00 FILL MATERIAL 1L 2' ----I 1 �-- � CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) r-2' MAXIMUM IF NOT CUT TO BEDROCK LU SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE Z::, CUTOFF TRENCH DETAIL CONTENT N.T.S. 1 m TOP OF EMBANKMENT RISER STRUCTURE SEE SHT 34 OF 34 , • A•"`'�.;.;y .��;'`:• •�'';;��,• TRASH RACK = hI-11=llll-llll-llll-� EMERGENCY SPILLWAY 1' MIN. I1=1111=1111=Illl=llll=1111=1(11= zo. Q�-1111�1111= ill (I-II1I.=1111.`_1111.`_1111.-1111. =11JI._._'zs� ,,5�-° Il=Ilil=lUi=llil=1111=I1I1=1111=1111=IlIl=ll�l=lUl= °�°F z°�'-11JI.�=11JI.�11JI.�11JI=11JI.`-1111=J111.=1111.`-11JI�1111.-1111.=1111.�11 ==llll=llll=lll1=1111=Illl=ili(=llil=l(11:=111(�11�==11{(==1111:=1111:=1111.- N BARREL �- PIPE ANTIFLO A ION BLOCK SECTIONAL VIEW � CUT-OFF TRENCH ANTI -SEEP STABILIZED COLLAR 2' DEEP OUTLET 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. TYPICAL EMBANKMENT DETAIL NOT TO SCALE 0 a� Z O O �: O N O J N � Y Q J z :LLI 2 � N � w Q °o Q o m z o .. w 0 U O Z U' ?i U LJ J � N a w� a o J w � 2 Q U tY 0 O U 0 N a- li (3a Z J clO Z Q � r J V O Cl) °� � Z Z a Q W V Z Q m D >_ Z Q H = W Z zi O M J Z U W a O U) F_ LU _ Q ,,�y�{Illlfl1jr/ I hereby certify that this document was �%,�� �ARO1�� prepared by me or under my direct personal supervision and is correct to the best of my Q�•OF�SS10''C�2'. knowledge and belief and that I am a duly SEAL °7 licensed Professional Engineer under the - SHEET NUMBER laws of the State of Noqh Carolina. 048820 (Signature) Date: August 25, 2021 '�iG�firj B `.22 OF 34 ,,�y�{Illlfl1jr/ I hereby certify that this document was �%,�� �ARO1�� prepared by me or under my direct personal supervision and is correct to the best of my Q�•OF�SS10''C�2'. knowledge and belief and that I am a duly SEAL °7 licensed Professional Engineer under the - SHEET NUMBER laws of the State of Noqh Carolina. 048820 (Signature) Date: August 25, 2021 '�iG�firj B `.22 OF 34 NAD-83 NC-SPCS EMERGENCY SPILLWAY i CHUTE SECTION + (SEE DETAILS THIS SHEET) SILT FENCE _t_ (SEE SHEET 32 OF 34) + + EMERGENCY SPILLWAY LEVEL CONTROL SECTION (SEE DETAILS THIS SHEET) -+ A / PRINCIPLE SPILLWAY 72" SQUARE RISER W/ TRASH RACK BERM AND 67 FT OF 36 IN CMP + + B DIVERSION DITCH A- DITCH NO. 42A BOTTOM FLUME � � CREST OF POND EMERGENCY SPILLWAY DETAIL / LEVEL CONTROL SECTION - N.T.S. DITCH NO. - 42A EAST PLANT AREA BOTTOM OF P EL. 860.00 T � \ 1KJ r 50% CLEAN OUT EL. 864.58 A POROUS BAFFLES (TYP.) --- (SEE SHEET 32 OF 34) DIVERSION DITCH PLAN VIEW: SEDIMENT BASIN NO. 15 SCALE: V = 50' SEDIMENT BASIN NO. 15 PRINCIPLE SPILLWAY Outflow Total Discharge: 72.6548 cfs Water Surface Elevation: 868.50 ft Tailwater Elevation: 0.00 ft Detention Base Elevation: 0.00 ft Outlet #1: Sediment Basin 16 Principle Spillway, Drop Pipe Riser Top Elev: 867.50 ft Riser Base Elev: 860.00 ft Riser Length: 72.00 in Riser Width: 72.00 in Orifice Coefficient: 0.50 Weir Coefficient: 3.33 Culvert Length: 67.00 ft Culvert Diameter: 36.00 in Culvert Invert In: 864.50 ft Culvert Friction Coefficient: 0.02 Culvert Entrance Loss Coefficient: 0.90 Discharge: 72.65 cfs DITCH NO. 42A WEST RISER DETAILS BERM 1 2 26.01 ft. 20.00 ft. EMERGENCY SPILLWAY DETAIL CHUTE SECTION N.T.S. 1 2 24.31 20.00 ft. 50% CLEAN OUT EL. 864.58 - Q25 HWD EL. 868.50 EMERGENCY SPILLWAY EL. 868.50 900 CREST 870.00 BERM •10 850 800 0+00 Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 20.00 Wetted Perimeter: 22.25 Area of Wetted Cross Section: 10.55 50 ft 0.1.00ft. Freeboard Channel Slope: 0.1000 2 Manning's n of Channel: 0.0175 Discharge: 17.24 cfs Depth of Flow: 0.50 feet Velocity: 1.63 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 20.00 yl Wetted Perimeter: 20.35 1 0 'fpUtft. Freeboard Area of Wetted Cross Section: 1.58 2 I Channel Slope: 50.0000 Manning's n of Channel: 0.0175 Discharge: 17.23 cfs Depth of Flow: 0.08 feet Velocity: 10.92 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet NORMAL POOL EL. 867.50 900 io �. 850 BOTT M EL. 860.00 850 PRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER EXISTING GROUND W/ TRASH RACK AND 6T OF 36" CMP 800 800 0+00 0+50 1+00 1+50 2+00 Cross Section A -A' Scale: 1" = 50' BERM 50% CLEAN OUT EL. 864.58 NORMAL POOL EL. 867.50 Q25 HWD EL. 868.50 2 BOTTOM EL. 860.00 2 - EXISTING GROUND DIVERSION DITCH 0+50 1+00 1+50 2+00 Cross Section B-B' Scale: 1" = 50' TRASH RACK RISER BUOYANCY CALCULATION CREST EL. 870.00 1' FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 868.5 times the upward force. NORMAL POOL EL. 867.50 v MIN. I 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I I 1 1 E 72" Square Concrete Riser 5�16CLE�ANOU�TEL.864.58 EXISTING GRADEi I CONCRRISETEHeight 7.50' i = Approximately 8' Weight = 19,120 Ib I I , I I F----- a--------- I Where: 1--°------- - Riser Weight = 19,120 Ib °° ° d•° BOTTOM OF POND EL. 860.00 d ♦ e °' ° ° d ° °d° 36" DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete a ° ° e d° a ° e d ° Weight of Concrete Base = (7 ft x 7 ft x 0.5 ft) x 150 Ib/ft= 3675 Ib ANTI -FLOTATION RISER FILL ANTI -FLOTATION BLOCK (IF APPLICABLE) (IF APPLICABLE) Structure Weight = 19120 Ib + 3675 Ib = 22795 Ib ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 Ib/ft3 N.T.S. Buoyancy = 216 ft' x 62.4 lb/ft' = 17971.2 Ib 72 SQUARE CONCRETE RISER ANTI -FLOTATION BLOCK (IF APPLICABLE) ° Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) 22795 Ib > 13,478.4 Ib x 1.25 ° ° ♦ d 22795 Ib > 22,464 Ib NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. PLAN VIEW N.T.S. 2+50 900 900 850 850 0+00 800 3+00 850 0+50 872.00 869.00 866.00 863.00 860.00 0.00 Stage Storage Curve SB-15 -EME GENCY SPILLWAY 868.50) NCIPAL SPILLWA (867.50) EAN OUT LEVEL (1864.58) RE 0.20 0.40 0.60 0.80 1.00 1.20 1.40 Accumulative Storage (Acre -Ft) Storage volume computations SB-15 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 860.00 N/A N/A 0.0601 861.00 N/A N/A 0.0713 0.0657 1.00 0.0635 0.0635 1.00 862.00 N/A N/A 0.0828 0.0770 1.00 0.0749 0.1384 2.00 863.00 N/A N/A 0.0950 0.0889 1.00 0.0866 0.2250 3.00 864.00 N/A N/A 0.1078 0.1014 1.00 0.099 0.3240 4.00 864.58 N/A N/A 0.1156 0.1117 0.58 0.0653 0.3893 4.58 865.00 N/A N/A 0.1212 0.1145 0.42 0.0467 0.4360 5.00 866.00 N/A N/A 0.1354 0.1283 1.00 0.1257 0.5616 6.00 867.00 N/A N/A 0.1501 0.1428 1.00 0.14 0.7016 7.00 867.50 N/A N/A 0.1578 0.1540 0.50 0.077 0.7786 7.50 868.00 N/A N/A 0.1655 0.1578 0.50 0.078 0.8565 8.00 868.50 N/A N/A 0.1735 0.1695 0.50 0.0847 0.9413 8.50 870.00 N/A N/A 0.1974 0.1814 1.50 0.2729 1.2141 10.00 FILL MATERIAL 1L CUTOFF TRENCH `EXISTING GROUND (ABUTMENTS) r- 2' MAXIMUM IF NOT CUT TO BEDROCK SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CUTOFF TRENCH DETAIL CONTENT N.T.S. TOP OF EMBANKMENT RISER STRUCTURE Vu 1 TRASH RACK SEE SHT 34 OF 34 A=JIJI•I 1=1111=1111=Jill- EMERGENCY SPILLWAY 1' MIN. Il=IU1=1111=1111=IUl=llil=lUi= Q�=11IA11J1= Jill =JIJ1= fill =11JI=Jill zo. =Jljlz Iz Il--,1s� tis�° 11=1111=IUl=llll=llll=lUl=llil=lUl=llli=llli=l(Il= -1111= Jill =J111=J1J1-= Jill AIIAIIIIAIIlAl1l=llll=lllAllll=llll==lUl =JIlAJ1JlfJ111= Jill 11�IU1=I(11==IUl=1Ul =Jill _=11JIAill -JI BARREL PIPE \/ ANTIFLO A ION BLOCK SECTIONAL VIEW CUT-OFF TRENCH ANTI -SEEP STABILIZED COLLAR 2' DEEP OUTLET 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. TYPICAL EMBANKMENT DETAIL NOT TO SCALE i J Lu G_ ' N 0 ' N .1 U) 73 • Q .1 -a 2 Pr m 0 .(n a� 0 0 0 Z N O Z 3: 6) O J Z N I m 0 Z o w 2 3ri w � 0 Li -I J U 7 .. O W Of 2 Q U � Ld J 0 0 O 0 (n 0- L_ �a ZZ QO Z_ J W to LO T_ O Cl) °W v H n Z O 2 W � O Z = O v ZO Z Z cl) m W 2 W (1) a H o Z J a `,�tiS1111ffffff/ I hereby certify that this document was prepared by me or under my direct personal supervision and is correct to the best of my Q •pF�SS�O 2 knowledge and belief and that I am a duly = = Ck SEAL S licensed Professional Engineer under the = = SHEET NUMBER laws of the State of o h Carolina. 048820 � (Signature) • . , , , , , , • ,(�� Date: August 25, 2021 i��.1ij/ 23 OF 34 �fffflllltt��, EMERGENCY SPILLWAY DETAIL Channel Design (Non -Erodible) LEVEL CONTROL SECTION Channel Type: Trapezoidal, Equal Side Slopes CREST OF POND N.T.S. Dimensions: 0:1 POROUS BAFFLES (TYP.) EL. 836.00 Right Side Slopeope 2.00 1 SEE SHEET 32 OF 34) Base Dimension: 30.00 50% CLEAN OUT 37.2740 Wetted Perimeter: 33.66 EL. 830.07��<- //� Area of Wetted Cross Section: 25.89 NORMAL POOL � OUTLET PROTECTION 1.00ft. Freeboard 0.82 ft. Channel Slope: 0.1000 EL. 833.18 (SEE SHEET 34 OF 34) 2 Manning's n of Channel: 0.0175 NAD-83 SILT FENCE ' A 30.00 ft. Discharge: 58.38 cfs J � g NC-SPCS (SEE SHEET 29 OF 31) i Depth of Flow: 0.82 feet c - / Velocity: 2.25 fps -X- -X-X- -x- Channel Lining: Grouted Rock Rip Rap W /� Freeboard: 1.00 feet EMERGENCY SPILLWAY / LEVEL CONTROL SECTION k (SEE DETAILS THIS SHEET) EMERGENCY SPILLWAY CHUTE SECTION I �� (SEE DETAILS THIS SHEET X PRINCIPLE SPILLWAY OUTLET PROTECTION - 72" SQUARE RISER W/ TRASH RACK �� (SEE SHEET 34 OF34�7 AND 50 FT OF 36 IN CMP \ 01 DITCH NO.007 42A BOTTOM BOTTOM OF POND EL. 826.00 FLUME DITCH NO. 42 EAST EMERGENCY SPILLWAY DETAIL Channel Design (Non -Erodible) CHUTE SECTION Channel Type: Trapezoidal, Equal Side Slopes N.T.S. Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 20.00 Wetted Perimeter: 20.73 24.65 ft. gg ff I Area of Wetted Cross Section: 3.30 1 1 01.00tft. Freeboard Channel Slope: 50.0000 Manning's n of Channel: 0.0175 2 2 20.00 ft. Discharge: 58.35 cfs Depth of Flow: 0.16 feet Velocity: 17.66 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet FLUME PLANT AREA A_ -- ----- DITCH NO. j 900 - DITCH NO. 42A WEST 42A WEST EMERGENCY SPILLWAY 50% CLEAN OUT EL. 830.07 EL. 834.18 NORMAL POOL EL. 833.18 Q25 HWD EL. 834.18 PLAN VIEW: SEDIMENT BASIN NO. 16 CREST 836.00 850 SCALE: 1" = 50' BOTTOM EL. 826.00 800 SEDIMENT BASIN NO. 16 PRINCIPLE SPILLWAY 0+00 0+50 1+00 1+50 2+00 2+50 PRINCIPLE SPILLWAY Cross Section A -A' Outflow 72" SQUARE CONCRETE RISER Total Discharge: 74.7720 cfs W/ TRASH RACK Scale: 1" = 50' Water Surface Elevation: 834.18 ft AND 50' OF 36" CMP Tailwater Elevation: 0.00 ft Detention Base Elevation: 0.00 ft Outlet #1: Sediment Basin 18 Principle Spillway, Drop Pipe 900 900 Riser Top Elev: 833.18 ft Riser Base Elev: 826.00 ft 50% CLEAN OUT EL. 830.07 Riser Length: 72.00 in NORMAL POOL EL. 833.18 Riser Width: 72.00 in Q25 HWD EL. 834.18 Orifice Coefficient: 0.50 CREST 836.00 Weir Coefficient: 3.33 850 850 Culvert Length: 50.00 ft Culvert Diameter: 36.00 in Culvert Invert In: 830.18 ft Culvert Friction Coefficient: 0.02 BOTTOM EL. 826.00 Culvert Entrance Loss Coefficient: 0.90 EXISTING GROUND 800 800 Discharge: 74.77 cfs 0+00 0+50 1+00 1+50 2+00 Cross Section B-B' Scale: 1" = 50' RISER DETAILS TRASH RACK RISER BUOYANCY CALCULATION CREST EL. 836.00 V FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 EMERGENCY SPILLWAY DEPTH EMERGENCY SPILLWAY EL. 834.18 times the upward force. NORMAL POOL EL. 833.18 1- MIN. I 2 Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) I I 1 �� 1 1 SOL RE 72" Square Concrete Riser EXISTING GRADE/5001. CLEANOUT EL. 830.07 CONCRETE I I 1 R7.18' 1 �� ��� Height = Say 8' Weight = 19,120 lb I I ��� I I �-----;-------- Where: .� 1--� <---- �� ������ �� -�- - Riser Weight = 19,120 lb ° d^• BOTTOM OF POND EL. 826.00 a ° a ° ° A 36" DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete A e d a ^ ° n da Weight of Concrete Base = (7 ft x 7 ft x 0.5 ft) x 150 Ib/ft3 = 3675 lb ANTI -FLOTATION RISER FILL ANTI -FLOTATION BLOCK (IF APPLICABLE) (IF APPLICABLE) Structure Weight = 19120 lb + 3675 lb = 22795 lb ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 lb/ft' N.T.S. Buoyancy = 216 ft' x 62.4 Ib/ft3 = 17971.2 lb 72" SQUARE CONCRETE RISER ANTI -FLOTATION BLOCK (IF APPLICABLE) Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) " I A• • a 22795 lb > 13,478.4 lb x 1.25 A 22795 Ib > 22,464 Ib NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. PLAN VIEW N.T.S. EXISTING GROUND 3+00 3+50 850 800 4+00 838.00 835.00 832.00 829.00 Stage Storage Curve SIB-1 6 TO (83 EMER PRINCIPAL SPILL ENCY SPILLWAY AY (833.18) CLEAN UT LEVEL (830.07) 0)STRUCTURE 34.18) 411 826.00 0.00 0.90 1.80 2.70 3.60 4.50 Accumulative Storage (Acre -Ft) Storage volume computations SB-16 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 826.00 N/A N/A 0.2873 - 827.00 N/A N/A 0.3153 0.3013 1.00 0.2961 0.2961 1.00 828.00 N/A N/A 0.3430 0.3292 1.00 0.3241 0.6202 2.00 829.00 N/A N/A 0.3715 0.3572 1.00 0.3521 0.9723 3.00 830.00 N/A N/A 0.4006 0.3860 1.00 0.3807 1.3530 4.00 830.07 N/A N/A 0.4027 0.4016 0.07 0.0283 1.3814 4.07 831.00 N/A N/A 0.4302 0.4154 0.93 0.3817 1.7630 5.00 832.00 N/A N/A 0.4606 0.4454 1.00 0.4399 2.2029 6.00 833.00 N/A N/A 0.4916 0.4761 1.00 0.4704 2.6734 7.00 833.18 N/A N/A 0.4973 0.4944 0.18 0.089 2.7624 7.18 834.00 N/A N/A 0.5232 0.5074 0.82 0.4126 3.1750 8.00 834.18 N/A N/A 0.5288 0.5260 0.18 0.0947 3.2697 8.18 836.00 N/A N/A 0.5859 0.5545 1.82 1.0052 4.2749 10.00 FILL MATERIAL � CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) r-2' MAXIMUM IF NOT CUT TO BEDROCK SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CUTOFF TRENCH DETAIL CONTENT N.T.S. TOP OF EMBANKMENT RISER STRUCTURE SEE SHT 34 OF 34 , • A•t'"'�.;.;y i .��;�;:�s'';;��r TRASH RACK = I�I-��11=1111-1111-1111-� 'EMERGENCY SPILLWAY 1' MIN. I1=1111=1111=Illl=llll=1111=1(11= zo. Q�-1111�1111=flit -II1I.=1111.`_1111.`_1111.-1111. =11JI._._'zs� ,,5�-° Il=Ilil=lUi=llil=1111=I1I1=1111=1111=IlIl=ll�l=lUl= °�°F Jill .�=11JI.�11JI:�fill = fill .`-1111=fill .=1111.`-11JI�fill .-1111.=1111.�11 ==llll=llll=lll1=1111=Illl=ili(=llil=l(11:=111(�11�==11{(==1111:=1111:=1111.- . L ANTIFLO A ION BLOCK SECTIONAL VIEW � CUT-OFF TRENCH 2' DEEP 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. TYPICAL EMBANKMENT DETAIL BARREL �- PIPE ANTI -SEEP STABILIZED COLLAR OUTLET NOT TO SCALE Z::, (3 N O Z �: O O N O Y Q N � J C.0 w Q :2 °o Q m o N Z o w U' ?i LLLI d U LJ J U � .. O Z N w Q � w H Q O J 0 O U 0 N 0- li Z \X/ a J Z J Q V O Cl) °� Q V � H J Z 00 W _ � Z � = 0 U � Q Z Z Q m W M W U) a W Z Q Z J a ��ti�tillllr!!�!!� I hereby certify that this document was `�.�� \ CA�g0�.,� prepared by me or under my direct personal ��� Q` , , . • . j supervision and is correct to the best of my Q •OFESSIp''•,. 2 knowledge and belief and that I am a duly SEALr• licensed Professional Engineer under the = SHEET NUMBER laws of the St t of o h Carolina. Ty : 04$820 � �: (Signature) �iNGI�e' • Q`+� Date: August 25, 2021 'etC1$. t.`� 24 OF 34 SILT FENCE (SEE SHEET 32 OF 34) I . EMERGENCY SPILLWAY �- LEVEL CONTROL SECTION (SEE DETAILS THIS SHEET) PRINCIPLE SPILLWAY 72" SQUARE CONCRETE RISER W/ TRASH RACK / AND 304 FT OF 30 IN. CMP / X I n CLEAN WATER DITCH DA-88 PLAN VIEW: SEDIMENT BASIN NO. 17 SCALE: 1" = 50' B' CREST OF POND EL. 854.00 50% CLEAN OUT EL. 848.39 FBOTTNORMAL POOL EL. 850.30 OM F POND EL. 846.00 POROUS BAFFLES (TYP.) (SEE SHEET 32 OF 34) OUTLET PROTECTION (SEE SHEET 34 OF 34) DITCH DA-86 950 950 900 50% CLEAN OUT EL. 848.39 900 EMERGENCY SPILLWAY Q25 HWD EL. 851.30 NORMAL POOL EL. 850.30 EMERGENCY SPILLWAY EXISTING GROUND EL. 852.30 850 2io ST 854.0 11--- r- 850 PRINCIPAL SPILLWAY 72" SQUARE CONCRETE RISER W/ TRASH RACK AND 304 FT OF 30 IN CMP 800 0+00 0+50 1+00 1+50 2+00 2+50 Cross Section A -A' Scale: 1" = 50' 900 50% CLEAN OUT EL. 848.39 Q25 HWD EL. 851.30 NORMAL POOL EL. 850.30 EXISTING GROUND 850 CREST 854.0 BOTTOM EL. = 846.0 BOTTOM EL. = 84610 1 800 3+00 3+50 4+00 EMERGENCY SPILLWAY DETAIL LEVEL CONTROL SECTION N.T.S. 1� 2 6.81 ft. 20.00 ft. Channel Design (Non -Erodible) Channel Type: Trapezoidal, Equal Side Slopes Dimensions: Left Side Slope 2.00:1 Right Side Slope 2.00:1 Base Dimension: 20.00 Wetted Perimeter: 23.14 Area of Wetted Cross Section: 15.01 Channel Slope: 0.1000 Manning Is n of Channel: 0.0175 Discharge: 30.22 cfs Depth of Flow: 0.70 feet Velocity: 2.01 fps Channel Lining: Grouted Rock Rip Rap Freeboard: 1.00 feet J_ 1.00ft. Freeboard ft. 854.00 852.00 850.00 848.00 Stage Storage Curve SB-17 EMERGENC TOP OF (854.00) SPILLWAY (852.30) PRINCIPAL SPILLWAY (850.30) CLEAN OUT LEVEL(848.39) STRUCTURE 846.00 0.00 0.40 0.80 1.20 1.60 2.00 Accumulative Storage (Acre -Ft) Storage volume computations SB-17 ELEV. Width LENGTH AREA AVG. INTERVAL STORAGE ACC. STAGE (ft) (ft) (ft) (ac) AREA (ft) (ac-ft) STORAGE INTERVAL (ac) (ac-ft) (ft) 846.00 N/A N/A 0.1480 847.00 N/A N/A 0.1678 0.1579 1.00 0.1541 0.1541 1.00 848.00 N/A N/A 0.1879 0.1778 1.00 0.1741 0.3282 2.00 848.39 N/A N/A 0.1960 0.1920 0.39 0.0753 0.4034 2.39 849.00 N/A N/A 0.2086 0.1983 0.61 0.1190 0.5225 3.00 850.00 N/A N/A 0.2300 0.2193 1.00 0.2152 0.7377 4.00 850.30 N/A N/A 0.2366 0.2333 0.30 0.0700 0.8077 4.30 851.00 N/A N/A 0.2521 0.2410 0.70 0.1669 0.9746 5.00 852.00 N/A N/A 0.2748 0.2634 1.00 0.2592 1.2337 6.00 852.30 N/A N/A 0.2818 0.2783 0.30 0.0835 1.3172 6.30 853.00 N/A N/A 0.2983 0.2865 0.70 0.1987 1.5159 7.00 854.00 N/A N/A 0.3187 0.3085 1.00 0.3062 1.8221 8.00 c 0 0 Outflow Total Discharge: 34.9664 cfs Water Surface Elevation: 851.30 ft 0 Taltwater Elevation 0.00 ft v Detention Base Elevation: 0.00 ft o Outlet #1: SEDIMENT BASIN 17, Drop Pipe 6 Riser Top Etev, 850.30 ft TOP OF EMBANKMENT z Riser Base Elev: 846.00 ft RISER STRUCTURE Riser Length: Riser Width: Orifice Coefficient: 72,00 72.00 0.50 in in TRASH RACK SEE SHT 34 OF 34 ;i ;_: ` ":: * •. =+r-_L` EMERGENCY SPILLWAY IITI=I1�=Tf1-Jill=(!J!- 1' MIN. 11=1111=Illi=lilt=111l=lilt=llii= zLZ Weir Coefficient: Culvert Length: 3.33 304.00 ft E IJI=lf11�1111=1111=1111=1111=1111=11111111 Is Il�lUi=fill=llN=lll1=N11=Ills=llli=llli=N11 1111- �OpF ti5�oe Culvert Diameter: 30.00 in ti°` 1lfhllll Ifll=1111=1111�11JI=Jill=11Jh11{I=1111�Ni1 Jill-=JI Culvert Invert In 847.50 ft =llli llll=lfll=fill=li11 111i�111I 111i 111i I i�I1f1=1111=1i11=111i- Culvert Friction Coefficient: 0.02 BARREL Culvert Entrance Loss Coefficient: 0.90 � PIPE Discharge: 34.97 cfs7\11 W/\ ANTIFL TATION BLOCK SECTIONAL VIEW CUT-OFF ANTI -SEEP STABILIZED TRENCH COLLAR 2' DEEP OUTLET 1.1 RISER DETAILS NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. TYPICAL EMBANKMENT DETAIL TRASH RACK CREST EL. 854.00 RISER BUOYANCY CALCULATION 900 V FREEBOARD Demonstrate adequate stability by showing the downward force is a minimum of 1.25 ❑❑❑❑��❑❑❑❑��❑❑❑❑� + EMERGENCY SPILLWAY DEPTH t EMERGENCY SPILLWAY EL. 852.30 times the upward force. 01110110 0❑❑❑❑0100000 NORMAL POOL EL. 850.30 0000❑00000❑00❑❑❑❑0 1' MIN I I f 2 Downward Force (structure weight) > 1.25 x upward Force (buoyancy) I I 1 I I 72" Square Concrete Riser 850 50% CLEANOUT EL. 848.39 I I Height = 6' EXISTING GRADE I I \ \ \ W ' ht = 15 220 Ib 800 800 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 BOTTOM OF POND EL. 846.00 Cross Section B-B' Scale: 1" = 50' FILL MATERIAL-\ 1 L 1 2' CUTOFF TRENCH EXISTING GROUND (ABUTMENTS) 7--- 2' rMAXIMUM IF NOT CUT TO BEDROCK CUTOFF TRENCH DETAIL N.T.S. SUITABLE EARTHEN MATERIAL COMPACTED TO 95% OF STANDARD PROCTOR MAX. DRY DENSITY WITHIN ±2% OPTIMUM MOISTURE CONTENT 72" SQUARE CONCRETE RISER 72" SQUAREelg j CONCRETE j I RISER I Where: 4.00' I_______________I �� A��\�� � � Riser Weight = 11,320 lb ° . d d ° 30" DIA BARREL CMP Weight of Concrete Base = (Length x Width x Depth) x Unit Weight of Concrete ° < d, ° d A Weight of Concrete Base = (7 ft x 7 ft x 0.5 ft) x 150 lb/ft' = 3675 lb ANTI -FLOTATION BLOCK (IF APPLICABLE) Structure Weight = 11,320 lb + 3675 lb = 14995 lb ELEVATION VIEW Buoyancy = Displacement Volume of Riser x 62.4 Ib/ft3 N.T.S. Buoyancy = 144 ft3 x 62.4 Ib/ft3 = 8985 lb .ABLE) Downward Force (structure weight) > 1.25 x Upward Force (buoyancy) 18895 lb > 8985 lb x 1.25 14995 Ib > 11,231 Ib d . - ° d a A a d ° a ° d a ^° A ° d A, a d° A .a PLAN VIEW N.T.S. NOTES 1. Portland cement concrete (type II recommended) for the inlet base shall have a minimum compressive strength of 4,000 psi. 2. Where corrugated aluminum or aluminized steel pipe is used, all areas where the pipe is to be in contact with concrete shall be painted with a black bituminous enamel paint. NOT TO SCALE �o 0 w _0 m Z Y Q N N O N H J �� m wQ�0Q 0 Z w Z w Y LJ W O Z v7 Q w Q O J (3a Z Z - J J aW �F_ Z_ Q W V J 0 Z J Q Z [-L V Z Q W 2 Z Z H LU = J W 0 U � Z W 00 Cl)a a o � LLI Q a 0 I hereby certify that this document was AfRO�.�� prepared by me or under my direct personal supervision and is correct to the best of my Q 'pF�SS�O 2 knowledge and belief and that I am a dulySEALS ° licensed Professional Engineer under the - = - SHEET NUMBER laws of the State f Tojh Carolina. 048820 (Signature) % ' NG! NE�. • �Q`` Date: August 25, 2021 i 25 OF 34 B. W`�`;�'� Appendix D Lithium Hydroxide Conversion Plant Drawings PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES CA►►►O R•. PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA LITHIUM HYDROXIDE CONVERSION PLANT- PLAN VIEW PHASE 2 FILENAME - OOC-02 SHEET SCALE I - 1" = 200' 2 OF 18 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES C A O 0 2 �a,n, n u►a� PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 19 PLAN VIEW & PROFILE DETAIL FILENAME I - OOC-04 SCALE I - 1" = 50' SHEET 4 OF 18 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES IJI°�•cz�N CAROK 27/2011 �'• PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 29 PLAN VIEW & PROFILE DETAIL FILENAME I - OOC-05 SCALE I - 1" = 50' SHEET 5 OF 18 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES C A RO 0 0 2 K PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 39 PLAN VIEW & PROFILE DETAIL FILENAME I - OOC-06 SCALE I - 1" = 50' SHEET 6 OF 18 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 4, PLAN VIEW & PROFILE DETAIL FILENAME I - OOC-07 SCALE I - 1" = 50' SHEET 7 OF 18 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES °�•cz�N CAR IJI �'• K 27/2011 PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 59 PLAN VIEW & PROFILE DETAIL FILENAME I - OOC-08 SCALE I - 1" = 50' SHEET PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES C A R� 0 0 2/E K F/27/2011 ihln m u►at PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 69 PLAN VIEW & PROFILE DETAIL FILENAME I - OOC-09 SCALE I - 1" = 50' SHEET 9 OF 18 1 2 3 5 7 z co J O NATURAL GRADE W2 3 �i�v yr rlrrwi� PI AN MIN. ELEVATION TYPE 2 GEOTEXTILE FILTER FABRIC LAP (IF NEEDED) RIP RAP T (THICKNESS) NOTE: LAYER OF TYPE 2 MINIMUM H=2/3 PIPE DIAMETER GEOTEXTILE FILTER FABRIC NOTES: 1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE SHOWN ON EROSION CONTROL PLANS. 2. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 3. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 4. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1 5. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% MAXIMUM DRY DENSITY PER ASTM D-1557 OR GREATER. 6. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 7. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON UNLESS OTHERWISE SHOWN. 8. TYPE 2 GEOTEXTILE FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO PLACEMENT OF RIPRAP AND TRIMMED AFTER RIPRAP PLACEMENT SO THAT NO FABRIC IS VISIBLE. 9. FOR PIPE 2 RIP RAP OUTLET PROTECTION, THE DIMENSIONS BELOW ARE A MINIMUM REQUIREMENT. SHAPE RIPRAP AS SHOWN ON SHEET BUKOC-CV-C-GR.PL-01. RIPRAP OUTLET PROTECTION NOT TO SCALE P I E DAAON T PROVIDE A MINIMUM OF THREE POROUS BAFFLES PER SKIMMER SEDIMENT TRAP F/0w low PROVIDE A MINIMUM 8' WIDE x 16 LONG CLASS 1 RIP -RAP 15" DEEP ON LAYER OF NON -WOVEN GEOTEXTILE FABRIC (MIRAFI 140N OR APPROVED EQUAL) AT DITCH CONVEYANCE DROP ENTRY POINTS INTO THE SEDIMENT TRAPS. MAINTENANCE NOTES INLET ZONE 35% FIRST CHAMBER 25% OF SURFACE AREA OF SURFACE AREA SECOND CHAMBER 25% OF SURFACE AREA _ OUTLET ZONE 15% /OF SURFACE AREA 5'STEEL (TYPICAL) 4'-0" MAX SPACING FLOW 8"DX6"W TRENCH BACKFILL AND COMPACT FENCE AND FABRIC BURIED IN TRENCH 1. INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL, TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE BAFFLES. 4. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT, AND REPLACE IF DAMAGED. 5. DURING CLEANOUT OPERATIONS. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. 6. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT GENERAL NOTES: 1. BAFFLE FABRIC SHALL CONSIST OF 700 G/M COIR EROSION CONTROL BLANKET OR APPROVED SUBSTITUTE. A SINGLE CONTINUOUS LENGTH OF FABRIC SHALL EXTEND ACROSS THE FULL WIDTH OF THE BASIN. 2. POSTS SHALL BE STEEL, MINIMUM 5 FEET LONG, AND OF THE SAME GENERAL TYPE AS THOSE SPECIFIED FOR SILT FENCE CONSTRUCTION. 3. THE TOP EDGE OF THE BAFFLE FABRIC SHALL BE SUPPORTED BY A TENSIONED CABLE OR ROPE EXTENDING ACROSS THE WIDTH OF THE BASIN AND ANCHORED ON EACH END. 4. THE BOTTOM EDGE OF THE BAFFLE FABRIC SHALL BE EMBEDDED IN A TRENCH EXCAVATED ALONG THE BASIN BOTTOM AND SIDE SLOPES. 5. BAFFLE FABRIC SHALL BE ATTACHED TO SUPPORT POSTS WITH HEAVY-DUTY PLASTIC CABLE TIES, OR SIMILAR MEANS. 6. BAFFLES SHALL BE SPACED IN THE DIRECTION OF FLOW TO PROVIDE THE SURFACE AREAS SHOWN. 7. THE BASIN SLOPES SHALL BE SEEDED AND THE SLOPES SHALL BE MATTED IMMEDIATELY AFTER THE BASIN IS CONSTRUCTED. 8. SEE THIS SHEET FOR ADDITIONAL BASIN INFORMATION. 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION POROUS BAFFLES NOT TO SCALE 6-FT WIRE FENCE NOT TO SCALE 1 PROJECT MANAGER V. HAYNES / C\ 00 �t N O M N MIN. 14 GAUGE GALVANIZED WIRE - FENCE WITH MAX. 6" MESH SPACING 4%4" REINFORCED SAFETY POST CAP (TYP. ALL POSTS) M N O F_ 00 z 00 - N NOTE: 1. SILT FENCE IS TO BE SECURELY FASTENED TO EACH STEEL SUPPORT POST OR TO WOVEN WIRE FENCE WHICH IS IN TURN IS ATTACHED TO THE STEEL FENCE POST. 2. INSPECT FREQUENTLY AND REPAIR OR REPLACE PROMPTLY AS NEEDED. 3. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE. UNIFORMLY DISTRIBUTE ON THE SOURCE AREA PRIOR TO TOPSOILING. 4. ALTERNATIVELY, THE CONTRACTOR MAY USE EXTRA STRENGTH SILT FENCE FABRIC WITHOUT WIRE FENCE. MAXIMUM SPACING BETWEEN POST SHALL BE 6-0". NOTE: 8'-0" MAXIMUM 8" DOWN & 4" FORWARD ALONG THE TRENCH FRONT VIEW 4%4" REINFORCED SAFETY POST CAP (TYP. ALL POSTS) SILT FENCE NOT TO SCALE co It N N O H 00 1- - z ao � 1. SEE PROJECT SPECIFICATIONS FOR DITCH LINING REQUIREMENTS. TYPICAL DITCH SECTION NOT TO SCALE PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SYNTHETIC FILTER FABRIC (CERTIFIED TO MEET THE REQUIREMENTS OF ASTM D 6461) 5' PAINTED OR GALVANIZED STEEL POST (1.25 LB/LF) ATTACH TO POSTS WITH >KlvWIRE OR PLASTIC ZIP TIES (MIN. 50 LBS TENSILE STRENGTH) r--- GRADE 5' PAINTED OR GALVANIZED STEEL POST (1.25 LB/LF) MIN. 14 GAUGE GALVANIZED WIRE FENCE WITH MAX. 6" MESH SPACING SYNTHETIC FILTER FABRIC (CERTIFIED TO MEET THE REQUIREMENTS OF ASTM D 6461) TRENCH IN SILT FENCE. BACKFILL AND COMPACT THOROUGHLY AFTER PLACEMENT. FLOW 4" MIN. SIDE VIEW GRADE EROSION CONTROL DETAILS FILENAME - OOC-14 SCALE - N.S. SHEET 14 OF 18 C r` 0 1 2 3 CONSTRUCTION NOTES El 5 Al 7 N. GENERAL EROSION CONTROL NOTES 1. THE CONTRACTOR SHALL INSTALL ALL EROSION AND SEDIMENTATION CONTROL MEASURES AND DEVICES NECESSARY TO COMPLY WITH THE STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) AND APPLICABLE STATE AND LOCAL LAWS AND ORDINANCES, AND PREVENT STANDING WATER WITHIN PROJECT LIMITS, UNLESS OTHERWISE DIRECTED. 2. INSTALL CONSTRUCTION ENTRANCES AND ACCESS ROADS IN ACCORDANCE WITH STATE STANDARDS AND WITH MINIMAL DISTURBANCE TO SURROUNDING VEGETATION AND TREES. CONTRACTOR SHALL RECEIVE PRIOR APPROVAL FROM ENGINEER BEFORE TREE REMOVAL FOR ACCESS ROAD CONSTRUCTION. WITHIN 30 DAYS AFTER CONSTRUCTION IS COMPLETED FOR WHICH ACCESS ROAD IS USED, AND UNLESS OTHERWISE APPROVED, CONTRACTOR SHALL REMOVE ALL REMNANTS OF THE ACCESS ROADS AND RETURN AREA TO AS GOOD AS OR BETTER CONDITION. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BASED ON CONTRACTOR'S PRACTICES AND WILL BE EMPLOYED WHERE DETERMINED NECESSARY BY ACTUAL SITE CONDITIONS. 3. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLE OR SITE ONTO PUBLIC ROADWAY OR INTO STORM DRAIN MUST BE REMOVED. 4. ALL DITCH LINES DISTURBED DURING CONSTRUCTION SHALL BE STABILIZED BY THE CONTRACTOR. ON ALL NEW OR DISTURBED, UNPAVED DITCHES INSTALL A SOIL STABILIZATION MEASURES AS APPROPRIATE AND IN ACCORDANCE WITH PROJECT SPECIFICATIONS. 5. PROVIDE SILT FENCE ADJACENT TO DITCHES AND AT THE TOE OF FILL SLOPES. ALSO, PROVIDE ADEQUATE MEASURES IN AREAS WHERE NATURAL VEGETATION DOES NOT PROVIDE A SUFFICIENT BUFFER AND AS DIRECTED BY THE ENGINEER. 6. PROVIDE INLET SEDIMENT FILTER AT ALL NEW STORM INLETS. INLET PROTECTION MAY BE REQUIRED AT EXISTING INLETS IN THE EVENT SEDIMENT WILL RUN DOWNSTREAM TO AN EXISTING INLET. 7. PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITY: a. THE LIMITS OF LAND DISTURBANCE SHALL BE CLEARLY AND ACCURATELY DEMARCATED WITH STAKES, FENCING, OR OTHER APPROPRIATE MEANS. THE LOCATION AND EXTENT OF ALL AUTHORIZED LAND DISTURBANCE ACTIVITY SHALL BE DEMARCATED FOR THE DURATION OF THE CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE SHALL OCCUR OUTSIDE THE APPROVED LIMITS INDICATED ON THE APPROVED PLANS. b. ALL TREE PROTECTION FENCING SHALL BE INSTALLED, INSPECTED AND APPROVED BY THE INSPECTOR. TREES WITHIN THE PROTECTION AREAS MAY ONLY BE REMOVED WITH APPROVAL BY THE INSPECTOR. 8. COMPLY WITH THE FOLLOWING CONSTRUCTION SEQUENCE FOR EACH CONSTRUCTION PHASE: a. GRUBBING SHALL BE PERFORMED DURING PREDICTED PERIODS OF DRY WEATHER. b. EROSION CONTROL DEVICES AND STORMWATER MANAGEMENT DEVICES SHALL BE INSTALLED PRIOR TO ANY OTHER CONSTRUCTION AND WITHIN 24 HOURS OF GRUBBING. THIS MAY REQUIRE GRUBBING IN STAGES TO ENSURE EROSION CONTROL MEASURES ARE PUT IN PLACE PRIOR TO RAIN EVENT. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE APPROVED PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. ANY DIFFICULTY IN CONTROLLING EROSION DURING ANY PHASE OF CONSTRUCTION SHALL IMMEDIATELY BE REPORTED TO THE ENGINEER. c. SILT FENCE SHALL BE INSTALLED WITHIN 24 HOURS OF GRUBBING. THE CONTRACTOR SHALL REMOVE ACCUMULATED SILT WHEN THE SILT IS WITHIN 12" OF THE TOP OF THE SILT FENCE UTILIZED FOR EROSION CONTROL. 9. THE CONSTRUCTION OF THE SITE WILL COMMENCE WITH INSTALLATION OF EROSION CONTROL MEASURES SUFFICIENT TO CONTROL SEDIMENT DEPOSITS AND EROSION. ALL SEDIMENT CONTROL WILL BE MAINTAINED UNTIL ALL UPSTREAM GROUND WITHIN THE CONSTRUCTION AREA HAS BEEN COMPLETELY STABILIZED WITH PERMANENT VEGETATION. 10. FAILURE TO INSTALL, OPERATE OR MAINTAIN ALL EROSION CONTROL MEASURES WILL RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE JOB SITE UNTIL SUCH MEASURES ARE CORRECTED TO NORTH CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS. 11. A COPY OF THE APPROVED LAND DISTURBANCE PLAN AND PERMIT SHALL BE PRESENT ON THE SITE WHENEVER LAND DISTURBANCE ACTIVITY IS IN PROGRESS. 12. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED DAILY AND ANY DEFICIENCIES NOTED WILL BE CORRECTED BY THE END OF EACH DAY. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON -SITE INSPECTION. 13. ON -SITE STOCKPILING OF SOIL IS ALLOWED WITHIN THE LIMITS OF DISTURBANCE SUBJECT TO PLACING APPROPRIATE EROSION CONTROL DEVICES TO PREVENT SOIL LOSS DURING RAIN EVENTS. LOCATIONS SHALL BE PRE -APPROVED BY THE INSPECTOR. 14. PROVIDE NOTIFICATION TO ALL AFFECTED PROPERTY OWNERS PRIOR TO CONSTRUCTION, AS APPLICABLE. 15. ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. [15A NCAC 4B .0110] MINIMUM 12" #57 WASHED STONE ON FACE /---SEDIMENT STORAGE VOLUME 7 2'X2' KEYWAY 2' KEYWAY GEOTEXTILES P I E DAAON T ✓�r MINIMUM 8 OZ./SY NON -WOVEN EROSION MAINTENANCE REQUIREMENTS 1. SEDIMENT FENCE (SILT FENCE): a. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND IMMEDIATELY FOLLOWING A RAIN EVENT WHICH EXCEEDS 1.0 INCHES IN A 24-HOUR PERIOD. MAKE ANY REQUIRED REPAIRS BY THE END OF EACH DAY. b. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. c. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. d. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. e. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE. STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 2. WATTLES: a. INSPECT CHANNELS FOR DAMAGE IMMEDIATELY FOLLOWING A RAIN EVENT WHICH EXCEEDS 1.0 INCHES IN A 24-HOUR PERIOD. b. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE WATTLE AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE WATTLE. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN WATTLES, INSTALL A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL. c. REMOVE SEDIMENT ACCUMULATED BEHIND THE WATTLES AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STRAW WATTLE AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE WATTLE. 3. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT: a. INSPECT ON LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. 4. ROCK OUTLET PROTECTION: a. INSPECT STONE ARRANGEMENT EVERY 7 CALENDAR DAYS AND IMMEDIATELY FOLLOWING A RAIN EVENT WHICH EXCEEDS 1.0 INCHES IN A 24-HOUR PERIOD. b. MAINTAIN SPECIFIED DIMENSIONS AND REMOVE SEDIMENT BUILDUP WHEN THE SEDIMENT LEVEL IS THE HEIGHT OF THE ROCKS. 5. INLET PROTECTION: a. INSPECT STONE ARRANGEMENT EVERY 7 CALENDAR DAYS AND IMMEDIATELY FOLLOWING A RAIN EVENT WHICH EXCEEDS 1.0 INCHES IN A 24-HOUR PERIOD. b. REPLACE STONE AS NEED TO MAINTAIN SPECIFIED DIMENSIONS c. REMOVE SEDIMENT BUILDUP WHEN THE SEDIMENT LEVEL IS'/2 THE HEIGHT OF THE ROCKS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL 6. TEMPORARY DIVERSIONS: a. INSPECT EVERY 7 CALENDAR DAYS AND IMMEDIATELY FOLLOWING A RAIN EVENT WHICH EXCEEDS 1.0 INCHES IN A 24-HOUR PERIOD. REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGES. ALSO CHECK AND MAINTAIN OUTLETS. b. WHEN THE PROTECTED AREA IS PERMANENTLY STABILIZED, REMOVE THE RIDGES AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE SITE. 7. CHECK DAM: a. INSPECT CHECK DAMS AND CHANNELS FOR DAMAGE IMMEDIATELY FOLLOWING A RAIN EVENT WHICH EXCEEDS 1.0 INCHES IN A 24-HOUR PERIOD. b. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, INSTALL A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL. c. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. u- Iq N CLASS A OR B EROSION CONTROLSTONE OUTLET PROTECTION SEDIMENT TRAP DETAIL NOT TO SCALE 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION SUPPORT ROPE Tn 411 TO PREVENT SAGGING 700 g/m2 COIR EROSION BLANKET, COIR MESH OR SIMILAR, TRENCHED INTO BOTTOM OR SIDE SECTION A -A' INLET OUTLET PLAN PROJECT MANAGER V. HAYNES BOTTOM OR SIDE " INITn �I STAKE TO SUPPORT WIRE Q...••....Ro 0 002 IN "I'nnnn0`, TEMPORARY STREAM CROSSING CONSTRUCTION DETAIL PERSPECTIVE VIEW TIMBER MAT APPROACH\ SURFACE FLOW DIVERSION TO TRAP ---� /-1 -4-- INSTALL SIDEBOARDS OR COMPOST FILTER SOCKS, OR OTHER MATERIAL TO PREVENT SEDIMENT FROM EXITING THE TEMPORARY SIDES THE SPAN BRIDGE.. / BRIDGE CROSSING STREAM BED --- LONGITUDINAL SECTION SURFACE FLOW DIVERSION TO TRAP 1. TO BE USED FOR TEMPORARY ACCESS DURING CONSTRUCTION ONLY. 2. EROSION AND SEDIMENT CONTROL MEASURES, AS SHOWN ON PLANS AND SPECIFIED BY NCDEQ, MUST BE IMPLEMENTED PRIOR TO INSTALLATION OF A TEMPORARY CROSSING. 3. TEMPORARY CROSSINGS SHALL BE REMOVED AFTER PERMANENT CROSSINGS ARE COMPLETE. MAINTENANCE: • TEMPORARY STREAM CROSSINGS SHALL BE INSPECTED ON A DAILY BASIS. • DAMAGED CROSSINGS SHALL BE REPAIRED WITHIN 24 HOURS OF THE INSPECTION AND BEFORE ANY SUBSEQUENT USE. • SEDIMENT DEPOSITS ON THE CROSSING OR ITS APPROACHES SHALL BE REMOVED WITHIN 24 HOURS OF THE INSPECTION. • AS SOON AS THE TEMPORARY CROSSING IS NO LONGER NEEDED, IT SHALL BE REMOVED. ALL MATERIALS SHALL BE DISPOSED OF PROPERLY AND DISTURBED AREAS STABILIZED. • GEOTEXTILE FABRIC TO BE WRAPPED AROUND UNDERSIDE OF TEMPORARY SPAN BRIDGE. SEDIMENT TRAP SIZING SEDIMENT TRAP NO. DRAINAGE AREA(ac.) Q25 (cfs) REQUIRED SURFACEAREA(sf) REQU I RED STORAG E VOLUME (cf) PROVIDED SURFACE AREA (sf) PROVIDEDSTORAGE VOLUME (d) ST-1 050 2.45 1,067 1,800 1,355 2,190 ST-2 0.40 1.96 854 1,440 1,088 1,713 ST-3 0.65 3.19 1 1,388 2,340 1,640 2, 704 ST-4 1.50 7.36 3,202 5,4-00 3,296 5,762 ST-5 1.75 8.59 3,736 6,300 3,966 7, 018 ST-6 1.50 7.36 3,202 5,400 3,296 .5, 762 ST-7 0.70 3.44 1,494 2,520 1,640 2,704 ST-8 0.80 3.93 1,768 2,880 1,808 3,010 ST-9 1.50 7.36 3, 202 5,400 3.296 5,762 ST-10 2.25 11.04 4,804 8,100 4,821 8,631 ST-11 0.60 2.94 1,281 2,160 1,640 2,704 ST-12 0.80 3.93 1,708 2,880 1,SO8 3,010 ST-13 1.15 5.64 2,455 4,140 2,670 4,596 ST-14 0.50 2.45 1,067 1,8DO 1,640 2,704 ST-15 0.25 1.23 534 904 621 902 5T-16 (Ph 1) 2.80 13.74 5,978 10,080 6,071 10,712 ST-17 (Ph1) 1.60 7.85 3,416 5,760 3,966 7,018 5T-18 (Phi) 1 050 2.45 1,067 1,8Da 1,224 1,926 5T-19 (Ph1) 1 3.20 1 15.71 6,832 11,520 7,059 12,637 PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA EROSION CONTROL NOTES FILENAME I - OOC-15 SCALE I - N.S. SHEET 15 OF 18 X 0 Appendix E Water Balance Line Drawing and Pictorial Description PIEDAAONT Stream and Wetlands LITHIUM Water Balance Flow Chart 115 aam (165.6k Waste ock Stockpile 50 gpm (72k gpd) Wastewater Effluent Discharge 150 gpm (216k gpd) Wastewater Effluent Treatment System Waste Water Pump Station Concentrator Plant CL CD to I- CVi T o m p � V) Ln N 4 gpm (5.8k gpd) Potable Water Demand 2.5 gpm (3.6k gpd) Freshwater Demand 150 gpm (216k gpd) Wastewater Effluent (option) Fire Water 1 Single Fill of 90k gal Sewer Water Conversion Plant Discharge Water Intake (Temporary/ Emergency) Total Freshwater Demand 240 gpm (345.6k gpd) Concentrator Plant + Mining In -Pit Crushing and Belt Dust Control 60 gpm (86.4k gpd) Road Dust Control 30 gpm (43.2k gpd) -------------------------------------------------------------- Total Mining 90 gpm (129.6k gpd) 1.5 gpm (2.2k gpd) Fire Potable Water Demand Water 1.5 gpm Single Fill (2.2k gpd) of 90k gal Sewer Water Dis, 2 gpm (2.9k g Municipal Demand 300 gpm (432k gpd) e Freshwater Discharge avg. Discharge = 1060 gpm (1526.4k gpd) min. Discharge = 360 gpm (518.4k gpd) max. Discharge = 2060 gpm (2966.4k gpd) it Discharge Ponds Pits IFreshwater Inflow avg. Inflow = 1300 gpm (1872k gpd) min. Inflow = 600 gpm (864k gpd) max. Inflow = 2300 gpm (3312k gpd) I L _ As Required Potable Water Demand 4 gpm (5.8k gpd) + 180k gal Fire Water Note: Difference between freshwater demand in and wastewater out is water loss due to evaporation, water loss to tailings, and instantaneous demand for feed process requirements. Mining Personnel Municipal Water Supply (Potable) [Total Required 306 gpm (441k gpd) + 180k gal Fire Water] Potable Water Demand 2 gpm (2.9k gpd) Appendix F Jurisdictional Delineation Verification U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-25018-01129 County: Gaston U.S.G.S. Quad: NC- Lincolnton West NOTIFICATION OF JURISDICTIONAL DETERMINATION Requestor: Piedmont Lithium, Inc Patrick Brindle Address: 5706 Dallas-Cherryville Highway Bessemer City, NC 28016 Telephone Number: 412-818-0376 E-mail: pbrindle(a)niedmontlithium.com Size (acres) 537 Nearest Town Crouse Nearest Waterway Beaverdam Creek River Basin Santee USGS HUC 03050102 Coordinates Latitude: 35.387869 Longitude:-81.286758 Location description: The review area is located 0.5 miles South of the intersection of Hephzibah Church Road and Whitesides Road in Gaston Co. PIN(s): 215731. 213460. 213461. 159240.215730. 198928. 198472.205287. 159640. 159641. 159642. 159638. 159639, 159637, 218192, 216007, 218191. Indicate Which of the Following Apply: A. Preliminary Determination ® There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated 12/6/2018. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. ❑ There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters, including wetlands at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are waters, including wetlands on the above described project area/property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ We recommend you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. SAW-25018-01129 ❑ The waters, including wetlands on your project area/property have been delineated and the delineation has been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ❑ The waters, including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on DATE. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Catherine M. Janiczak at 704-510-1438 or Catherine.M.Janiczaknusace.armv.mil. C. Basis For Determination: Basis For Determination: See the preliminary jurisdictional determination form dated 02/21/2019. D. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. **It is not necessary to submit an RFA form to the Division Office ifyoby udo not object to the determination in this correspondence.Dig** JANICZAK.CATHERINE.MARIE.15 DNI-USIo=U.S. Governmentt,ouHDoD, uAPK1,1ou=USA, 66 Corps Regulatory Official: 35587066—JANICZAK.CATHERINE.MARIE.1535587066 Co s Re ulato Date: 2019.02.21 15:33:37 -05'00' Date of JD: 02/21/2019 Expiration Date of JD: Not applicable SAW-25018-01129 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://cofpsmapu.usace.army.mil/cm_apex/Vp=136:4:0 Copy furnished: Agent: HDR Thomas Blackwell Address: 440 S. Church Street, Suite 1000 Charlotte, NC 28202 Telephone Number: 704-338-6720 E-mail: Thomas.blackwell(&hdrinc.com NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL FAA licant: Piedmont Lithium, Inc, Patrick Brindle File Number: SAW-25018-01129 Date: 02/21/2019 tached is: See Section below PROFFERED PERMIT Standard Permit or Letter of permission)A RED PERMIT Standard Permit or Letter of permission)B DENIAL LAPPROVED C JURISDICTIONAL DETERMINATION D INARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.q=.mil/Missions/CivilWorks/Re ugulatoryProgramandPermits.aspx or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the fixture. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Jason Steele, Administrative Appeal Review Officer Attn: Catherine M. Janiczak CESAD-PDO Charlotte Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 10M15 8430 University Executive Park Drive, Suite 615 Atlanta, Georgia 30303-8801 Charlotte, North Carolina 28262 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportuni to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Catherine M. Janiczak, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 02/21/2019 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Piedmont Lithium, Inc, Patrick Brindle, 5706 Dallas- Cherryville Highway,Bessemer City, NC 28016 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Piedmont Lithium JD, SAW-25018- 01129 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The review area is located 0.5 miles South of the intersection of Hephzibah Church Road and Whitesides Road in Gaston Co. PIN(s): 215731, 213460, 213461, 159240, 215730, 198928, 198472, 205287, 159640, 159641, 159642, 159638, 159639, 159637, 218192, 216007, 218191. (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: Gaston City: Crouse Center coordinates of site (lat/long in degree decimal format): Latitude: 35.387869 Longitude:-81.286758 Universal Transverse Mercator: Name of nearest waterbody: Beaverdam Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ® Field Determination. Date(s): 08/29/2018 & 10/24/2018 TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Estimated amount of Geographic authority to Type of aquatic aquatic resources in which the aquatic resource Latitude (decimal Longitude (decimal resources (i.e., Site Number review area (acreage "may be" subject (i.e., degrees) degrees) wetland vs. non- and linear feet, if Section 404 or Section wetland waters) applicable 10/404) Stream 1 35.386835 -81.285924 10,269 linear feet Non -wetland Sec. 404 Stream 2 35.393311 -81.258815 1,762 linear feet Non -wetland Sec. 404 Stream 3 35.394279 -81.283198 1,122 linear feet Non -wetland Sec. 404 Stream 4 35.393179 -81.281303 435 linear feet Non -wetland Sec. 404 Stream 5 35.38626 -81.277881 2,438 linear feet Non -wetland Sec. 404 Stream 6 35.3884 -81.284461 465 linear feet Non -wetland Sec. 404 Stream 7 (Little 35.383906 -81.28861 2,848 linear feet Non -wetland Sec. 404 Beaverdam Creek) Site Number Latitude (decimal degrees) Longitude (decimal degrees) Estimated amount of aquatic resources in review area (acreage and linear feet, if applicable Type of aquatic resources (i.e., wetland vs. non - wetland waters) Geographic authority to which the aquatic resource "may be" subject (i.e., Section 404 or Section 10/404) Stream 8 35.384698 -81.285579 1,131 linear feet Non -wetland Sec. 404 Stream 9 35.384005 -81.286911 252 linear feet Non -wetland Sec. 404 Stream 10 35.388701 -81.291907 797 linear feet Non -wetland Sec. 404 Stream 11 35.388608 -81.291743 30 linear feet Non -wetland Sec. 404 Stream 12 35.394342 -81.296986 917 linear feet Non -wetland Sec. 404 Stream 13 35.396914 -81.300055 1,155 linear feet Non -wetland Sec. 404 Stream 14 35.395466 -81.30229 1,085 linear feet Non -wetland Sec. 404 Wetland 1 35.391017 -81.285861 0.28 acres Wetland Sec. 404 Wetland 2 35.384414 -81.278923 0.15 acres Wetland Sec. 404 Wetland 3 35.38938 -81.279634 3.19 acres Wetland Sec. 404 Wetland 4 35.388252 -81.283946 0.66 acres Wetland Sec. 404 Wetland 5 35.386738 -81.283946 2.21 acres Wetland Sec. 404 Wetland 6 35.384078 -81.287736 0.09 acres Wetland Sec. 404 Wetland 7 35.382078 -81.289641 0.38 acres Wetland Sec. 404 Wetland 8 35.384223 -81.288806 0.23 acres Wetland Sec. 404 Wetland 9 35.397122 -81.297864 0.18 acres Wetland Sec. 404 Wetland 10 35.396872 -81.299514 0.12 acres Wetland Sec. 404 Pond 1 35.391462 -81.285825 0.14 acres Non -wetland Sec. 404 Estimated amount of Geographic authority to Type of aquatic Latitude (decimal Longitude (decimal aquatic resources in resources (i.e., which the aquatic resource Site Number review area (acreage "may be" subject (i.e., degrees) degrees) wetland vs. non - and linear feet, if wetland waters) Section 404 or Section applicable 10/404) Pond 2 35.387424 -81.284275 0.39 acres Non -wetland Sec. 404 Pond 3 35.395618 -81.296819 0.08 acres Non -wetland Sec. 404 Pond 4 35.396979 -81.298363 0.07 acres Non -wetland Sec. 404 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: Figure 6A, Figure 6B, Figure 6C, Figure 6D, Figure 6E, and Figure 6F (Dated 12/06/201 ® Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ® USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name: 1":24,000' Lincolnton West, NC (1993) ® Natural Resources Conservation Service Soil Survey. Citation: NRCS Soils Survey of Gaston Co. (2017)_ ® National wetlands inventory map(s). Cite name: USFWS NWI (2018)_ ❑ State/local wetland inventory map(s): ® FEMA/FIRM maps: FEMA FIRM Panels 3710361000J and 3710362000J_ ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ®Aerial (Name & Date): Bing Aerial Imagery, dated 2017 or ®Other (Name & Date): Site photographs, dated March 15 and 2; April 3-4, 2018; August 17, 2018_ ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Digitally signed by JANICZAK.CA JANICZAK.CATHERINE.MARIE.153 5587066 THERINE.MARI DN:c=US,o=U.S.Government, ou=DoD, ou=PKI, ou=USA, E.1535587066 153558 066K.CATHERINE.MARIE. Date: 2019.02.21 15:34:03-05'00' Signature and date of Regulatory staff member completing PJD 02/21 /2019 Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)1 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. Figure 6F Figure 613 d This portion of Beaverdam Creek outside the Project Area boundary is not included with this submission 11 Figure 6E Approximate Total Jurisdictional RPW Tributary: 24,706 linear feet Approximate Total Jurisdictional Wetlands: 7.49 acres Approximate Total Jurisdictional Pond: 0.68 acre Approximate Total Uplands: 597.63 acres r' Approximate Total Site Acreage: 614 acres Figure 6D F)l P I E DJwi1,C� N T �IIHIUM PATH: \\CLTSMAINIGIS_DATA%GIS%PROJECTS%71135_PIEDMONTLITHIUM1100896A0_PIEDMONTLITHIUM17.2_WORK _ IN_PROGRESS\MAP_DOCS1MXDUD120181205_JDPKGMAPUPDATES106A_PIEDMONTLITHIUM_JD.MXD - USER: KTHAMES - DATE: 1215I2018 Figure,6C LEGEND Project Area (614 ac.) Culverts Potential Jurisdictional Waters of the U.S. Delineated Streams ® Delineated Wetlands Delineated Ponds DATA SOURCE: http://www.bing.com/maps GPS POINTS WERE COLLECTED USING TRIMBLE GE07X AND POST -PROCESSED 0 Feet 800 .1 i� �r Name: Piedmont Lithium Project Applicant: Piedmont Lithium, Inc Location: 2.8 miles north of the Hephzibah Church Road and Dallas Cherryville Highway - intersection in Gaston County, NC Gaston County PID #: See Figure 3 Date: 12/5/2018 Project Area: 614 acres Center Coordinates:-81.286758D, 35.387869' SAW #: 2018-01129 PIEDMONT LITHIUM PROJECT POTENTIAL JURISDICTIONAL WATERS OF THE U.S. - OVERVIEW FIGURE 6A PRELIMINARY JURISDICTIONAL DETERMINATION VERIFICATION LEGEND Project Area (614 ac.) # Photographs Upland Data Points ® Wetland Data Points - Culverts Potential Jurisdictional Waters of the U.S. Delineated Streams - Delineated Wetlands Delineated Ponds DATA SOURCE: http://www.bing.com/maps GPS POINTS WERE COLLECTED USING TRIMBLE GE07X AND POST -PROCESSED 0 Feet 350 Stream 1 - Potential Non - Wetland Waters of the U.S. 9,196 linear feet Pond 1 - Potential Non - Wetland Waters of the U.S. 0.14 ac. Wetland 1 - Potential Wetland Waters of the U.S. 0.28 ac. Stream 2 - Potential Non - Wetland Waters of the U.S. 1,762 linear feet Approximate Total Jurisdictional RPW Tributary: 24,706 linear feet Approximate Total Jurisdictional Wetlands: 7.49 acres Approximate Total Jurisdictional Pond: 0.68 acre Approximate Total Uplands: 597.63 acres Approximate Total Site Acreage: 614 acres Stream 3 - Potential Non - Wetland Waters of the U.S. 1,122 linear feet Stream 4 - Potential Non - Wetland Waters of the U.S. 435 linear feet Name: Piedmont Lithium Project Applicant: Piedmont Lithium, Inc. Location: 2.8 miles north of the Hephzibah Church Road and Dallas Cherryville Highway intersection in Gaston County, NC Gaston County PID #: See Figure 3 Date: 4/27/2018 Project Area: 614 acres Center Coordinates:-81.286758D, 35.387869' SAW #: 2018-01129 PIEDMONT LITHIUM PROJECT Fn PIEDMONT POTENTIAL JURISDICTIONAL WATERS OF THE U.S. I II H iijM FIGURE 613 PATH: \\CLTSMAINIGIS_DATA\GISTPROJECTS\71135_PIEDMONTLITHIUM110089640_PIEDMONTLITHIUM17.2_ WORK_ IN_PROGRESS\MAP_DOCSIMXDU=0181205_JDPKGMAPUPDATES106B_PIEDMONTLITHIUM_JD.MXD - USER: KTHAMES - DATE: 12ISI2018 PRELIMINARY JURISDICTIONAL DETERMINATION VERIFICATION PATH: %%CLTSMAINIGIS_DATA\GISTPROJECTS\T1135_PIEDMONTLITHIUM1100896A0_PIEDMONTLITHIUMIT.2_ WORK_ IN_PROGRESS\MAP_DOCSIM%DU=0181205_JDPKGMAPUPDATES106C_PIEDMONTLITHIUM_JD.M%D - USER: KTHAMES - DATE: 12ISI2018 PRELIMINARY JURISDICTIONAL DETERMINATION VERIFICATION LEGEND Project Area (614 ac.) # Photographs Upland Data Points ® Wetland Data Points ---- Culverts Potential Jurisdictional Waters of the U.S. Delineated Streams - Delineated Wetlands Delineated Ponds DATA SOURCE: http://www.bing.com/maps GPS POINTS WERE COLLECTED USING TRIMBLE GE07X AND POST -PROCESSED 0 Feet 300 Approximate Total Jurisdictional RPW Tributary: 24,706 linear feet Approximate Total Jurisdictional Wetlands: 7.49 acres Approximate Total Jurisdictional Pond: 0.68 acre Approximate Total Uplands: 597.63 acres Approximate Total Site Acreage: 614 acres Wetland 8 - Potential Wetland Waters of the U.S. 0.23 ac. Stream 7 - Potential Non - Wetland Waters of the U.S. 2,848 linear feet Wetland 5 - Potential Wetland Waters of the U.S. See Figure 6C Stream 8 - Potential Non - See Figure 6C Stream 9 - Potential Non - Wetland Waters of the U.S. See Figure 6C Wetland 6 - Potential Wetland Waters of the U.S. 0.09 ac. Wetland 7 - Potential Wetland Waters of the U.S. 0.23 ac. Name: Piedmont Lithium Project Applicant: Piedmont Lithium, Inc. Location: 2.8 miles north of the Hephzibah Church Road and Dallas Cherryville Highway intersection in Gaston County, NC Gaston County PID #: See Figure 3 Date: 12/6/2018 Project Area: 614 acres Center Coordinates:-81.286758D, 35.387869' SAW #: 2018-01129 PIEDMONT LITHIUM PROJECT Fn PIEDMONT POTENTIAL JURISDICTIONAL WATERS OF THE U.S. LITHIUM FIGURE 6D PATH:\1CLTSMAINIGIS_DATAIGIS\PROJECTS171135_PIEDMONTLITHIUM110089640_PIEDMONTLITHIUMIT-ORK IN_PROGRESSIMAP_ DOCSIMXDWD120181205_JDPKGMAPUPDATES106D_PIEDMONTLITHIUM_JD.MXD - USER: KTHAMES -DATE: 12I612018 PRELIMINARY JURISDICTIONAL DETERMINATION VERIFICATION LEGEND Project Area (614 ac.) Photographs Upland Data Points ® Wetland Data Points ---- Culverts Potential Jurisdictional Waters of the U.S. �r Delineated Streams - Delineated Wetlands Delineated Ponds DATA SOURCE: http://www.bing.com/maps frpt� GPS POINTS WERE COLLECTED USING TRIMBLE GE07X AND POST -PROCESSED 0 Feet 300 Stream 10 - Potential Non - Wetland Waters of the U.S. 797 linear feet HE �� eater Al Wetland 8 - Potential Wetland Waters of the U.S. See Fiqure 6D Stream 7 - Potential Non - Wetland Waters of the U.S. 2,848 linear feet Approximate Total Jurisdictional RPW Tributary: 24,706 linear feet Approximate Total Jurisdictional Wetlands: 7.49 acres Approximate Total Jurisdictional Pond: 0.68 acre Approximate Total Uplands: 597.63 acres Approximate Total Site Acreage: 614 acres 1 1k. ]Wetland 5 - Potential Wetland Waters of the U.S. see Figure 6C Name: Piedmont Lithium Project Applicant: Piedmont Lithium, Inc. Location: 2.8 miles north of the Hephzibah Church Road and Dallas Cherryville Highway intersection in Gaston County, NC Gaston County PID #: See Figure 3 Date: 12/6/2018 Project Area: 614 acres Center Coordinates:-81.286758D, 35.387869' SAW #: 2018-01129 _ PIEDMONT LITHIUM PROJECT 01 PIEDMONT POTENTIAL JURISDICTIONAL WATERS OF THE U.S. LITHIUM FIGURE 6E PATH:\1CLTSMAINIGIS_DATAIGIS\PROJECTS171135_PIEDMONTLITHIUM110089640_PIEDMONTLITHIUM17-ORK IN_PROGRESSIMAP_ DOCSIMXDUD120181205_JDPKGMAPUPDATESIO6E_PIEDMONTLITHIUM JD.MXD - USER: KTHAMES - DATE: 12I612018 PRELIMINARY JURISDICTIONAL DETERMINATION VERIFICATION LEGEND Project Area (614 ac.) # Photographs Upland Data Points ® Wetland Data Points ---- Culverts Potential Jurisdictional Waters of the U.S. Delineated Streams - Delineated Wetlands Delineated Ponds DATA SOURCE: http://www.bing.com/maps GPS POINTS WERE COLLECTED USING TRIMBLE GE07X AND POST -PROCESSED 0 Feet 300 Stream 13 - Potential Non - Wetland Waters of the U.S. 1,155 linear feet Stream 14 - Potential Non - Wetland Waters of the U.S. 1,085 linear feet Stream 1 - Potential Non - Wetland Waters of the U.S. 1,073 linear feet on site Approximate Total Jurisdictional RPW Tributary: 24,706 linear feet Approximate Total Jurisdictional Wetlands: 7.49 acres Approximate Total Jurisdictional Pond: 0.68 acre Approximate Total Uplands: 597.63 acres Approximate Total Site Acreage: 614 acres ��� F I E DMLITHIUM O N T Wetland 9 - Potential Wetland Waters of the U.S. 0.18 ac. Pond 4 J Stream 13 0 Feet 200 Wetland 10 - Potential Wetland Waters of the U.S. 0.12 ac. Pond 3 - Potential Non - Wetland Waters of the U.S. 0.08 ac. Stream 12 - Potential Non - Wetland Waters of the U.S. 917 linear feet Name: Piedmont Lithium Project Applicant: Piedmont Lithium, Inc. Location: 2.8 miles north of the Hephzibah Church Road and Dallas Cherryville Highway intersection in Gaston County, NC Gaston County PID #: See Figure 3 Date: 12/6/2018 Project Area: 614 acres Center Coordinates:-81.286758D, 35.387869' SAW #: 2018-01129 PIEDMONT LITHIUM PROJECT POTENTIAL JURISDICTIONAL WATERS OF THE U.S. _ FIGURE 6F PATH:\1CLTSMAINIGIS_DATAIGIS\PROJECTS171135_PIEDMONTLITHIUM110089640_PIEDMONTLITHIUM17-ORK IN_PROGRESSIMAP_ DOCSIMXDUD120181205_JDPKGMAPUPDATESIO6F_PIEDMONTLITHIUM_JD.MXD - USER: KTHAMES-DATE:12I6I2018 PRELIMINARY JURISDICTIONAL DETERMINATION VERIFICATION U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2018-01129 County: Gaston U.S.G.S. Quad: NC- Lincolnton West NOTIFICATION OF JURISDICTIONAL DETERMINATION Requestor: Piedmont Lithium, Inc Patrick Brindle Address: 5706 Dallas-Cherrvville Highway Bessemer City, NC 28016 Telephone Number: 412-818-0376 E-mail: pbrincleAyiedmontlithium.com Size (acres) 537 Nearest Town Crouse Nearest Waterway Beaverdam Creek River Basin Santee USGS HUC 03050102 Coordinates Latitude: 35.387869 Longitude:-81.286758 Location description: The review area is located 0.5 miles South of the intersection of Hephzibah Church Road and Whitesides Road in Gaston Co. PIN(s): 215731. 213460. 213461. 159240.215730. 198928. 198472.205287. 159640. 159641. 159642. 159638. 159639, 159637, 218192, 216007, 218191. Indicate Which of the Following Apply: A. Preliminary Determination ® There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated 4/1/2019. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. ❑ There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters, including wetlands at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are waters, including wetlands on the above described project area/property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ We recommend you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. SAW-2018-01129 ❑ The waters, including wetlands on your project area/property have been delineated and the delineation has been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ❑ The waters, including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on DATE. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (LAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Catherine M. Janiczak at 704-510-1438 or Catherine.M.Janiczaknusace.armv.mil. C. Basis For Determination: Basis For Determination: See the preliminary jurisdictional determination form dated 6/20/2019. D. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not avi licable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: MON Date of JD: 6/20/2019 Expiration Date o JD: Not applicable SAW-2018-01129 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://cofpsmapu.usace.army.mil/cm_apex/Vp=136:4:0 Copy furnished: Agent: HDR Thomas Blackwell Address: 440 S. Church Street, Suite 1000 Charlotte, NC 28202 Telephone Number: 704-338-6720 E-mail: Thomas.blackwell(i ,hdrinc.com NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL AL FAplicanti.:Stfiedmont Lithium, Inc, Patrick Brindle File Number: SAW-2018-01129 Date: 6/20/2019 ached : See Section below PROFFERED PERMIT Standard Permit or Letter of ermission A RED PERMIT Standard Permit or Letter of ermission B DENIAL LAPPROVED C JURISDICTIONAL DETERMINATION D INARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.q=.mil/Missions/CivilWorks/Re ug latoryProgramandPermits.aspx or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the fixture. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMITJd REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Jason Steele, Administrative Appeal Review Officer Attn: Catherine M. Janiczak CESAD-PDO Charlotte Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 10M15 8430 University Executive Park Drive, Suite 615 Atlanta, Georgia 30303-8801 Charlotte, North Carolina 28262 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunit to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Catherine M. Janiczak, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 6/20/2019 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Piedmont Lithium, Inc, Patrick Brindle, 5706 Dallas- Cherryville Highway,Bessemer City, NC 28016 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Piedmont Lithium Project PJD, SAW-2018-01129 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The review area is located 0.5 miles South of the intersection of Hephzibah Church Road and Whitesides Road in Gaston Co. PIN(s): 215731, 213460, 213461, 159240, 215730, 198928, 198472, 205287, 159640, 159641, 159642, 159638, 159639, 159637, 218192, 216007, 218191. (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: Gaston City: Crouse Center coordinates of site (lat/long in degree decimal format): Latitude: 35.387869 Longitude:-81.286758 Universal Transverse Mercator: Name of nearest waterbody: Beaverdam Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ❑ Field Determination. Date(s): TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Estimated amount of Geographic authority to Type of aquatic Latitude (decimal Longitude (decimal aquatic resources in resources (i.e., which the aquatic resource Site Number review area (acreage "may be" subject (i.e., degrees) degrees) wetland vs. non- and linear feet, if Section 404 or Section wetland waters) applicable 10/404) Perennial 35.386835 -81.285924 13,799 linear feet RPW Stream 1 Non wetland Sec. 404 (Beaverdam Creek) Perennial 35.393311 -81.258815 4,237 linear feet Sec. 404 RPW Stream 2 Non -wetland Seasonal RPW 35.394279 -81.283198 1,403 linear feet Sec. 404 Stream 3 Non -wetland Perennial 35.393179 -81.281303 2758 linear feet Sec. 404 RPW Stream 4 Non -wetland Perennial 35.38626 -81.277881 2,438 linear feet Sec. 404 RPW Stream 5 Non -wetland Seasonal RPW 35.3884 -81.284461 465 linear feet Sec. 404 Stream 6 Non -wetland Perennial 35.383906 -81.28861 2,848 linear feet Sec. 404 RPW Stream 7 Non -wetland (Little Beaverdam Estimated amount of Geographic authority to Type of aquatic aquatic resources in which the aquatic resource Latitude (decimal Longitude (decimal resources (i.e., Site Number review area (acreage "may be" subject (i.e., degrees) degrees) wetland vs. non - and linear feet, if Section 404 or Section wetland waters) applicable 10/404) Creek) Perennial 35.384698 -81.287308 583 linear feet Sec.404 RPW Stream 8 Non -wetland Seasonal RPW 35.383761 -81.285579 548 linear feet Sec.404 Stream 8 Non -wetland Seasonal RPW 35.384005 -81.286911 252 linear feet Sec.404 Stream 9 Non -wetland Seasonal RPW 35.388701 -81.291907 797 linear feet Sec.404 Stream 10 Non -wetland Seasonal RPW 35.388608 -81.291743 30 linear feet Sec.404 Stream 11 Non -wetland Seasonal RPW 35.394342 -81.296986 2444.5 linear feet Sec.404 Stream 12 Non -wetland Seasonal RPW 35.396914 -81.300055 1,155 linear feet Sec.404 Stream 13 Non -wetland Perennial 35.395466 -81.30229 1,085 linear feet Sec.404 RPW Stream Non -wetland 14 Seasonal RPW 35.391424 -81.299202 1,126 linear feet Sec.404 Stream 15 Non -wetland Seasonal RPW 35.391083 -81.294203 492 linear feet Sec.404 Stream 16 Non -wetland Perennial 35.389092 -81.295376 744 linear feet Sec.404 RPW Stream Non -wetland 16 Perennial 35.375392 -81.287237 1,822 linear feet Sec.404 RPW Stream Non -wetland 17 Seasonal RPW 35.395133 -81.288709 141 linear feet Sec.404 Stream 18 Non -wetland Wetland 1 35.391017 -81.285861 0 Sec.404 Wetland Wetland 2 35.384414 -81.278923 0.15 Sec.404 Wetland Wetland 3 35.38938 -81.279634 3.19 Sec.404 Wetland Wetland 4 35.388252 -81.283946 0.66 Sec.404 Wetland Estimated amount of Geographic authority to Type of aquatic aquatic resources in which the aquatic resource Latitude (decimal Longitude (decimal resources (i.e., Site Number review area (acreage "may be" subject (i.e., degrees) degrees) wetland vs. non - and linear feet, if Section 404 or Section wetland waters) applicable 10/404) Wetland 5 35.386738 -81.285098 Sec. 404 2.21 acres Wetland Wetland 6 35.384078 -81.287736 Sec. 404 0.09 acres Wetland Wetland 7 35.382048 -81.289641 Sec. 404 0.38 acres Wetland Wetland 8 35.384223 -81.288806 Sec. 404 0.23 acres Wetland Wetland 9 35.397122 -81.297864 Sec. 404 0.18 acres Wetland Wetland 10 35.396872 -81.299514 Sec. 404 0.12 acres Wetland Wetland 11 35.387835 -81.295506 Sec. 404 0.04 acres Wetland Wetland 12 35.388107 -81.296558 Sec. 404 0.06 acres Wetland Wetland 13 35.38911400 -81.29803800 Sec. 404 0.09 acres Wetland Wetland 14 35.39095000 -81.29925500 Sec. 404 5.45 acres Wetland Wetland 15 35.39945900 -81.29168200 Sec. 404 0.04 acres Wetland Wetland 16 35.39539700 -81.28823100 Sec. 404 0.08 acres Wetland Pond 1 35.39146200 -81.28582500 Sec. 404 0.14 acres Non -wetland Pond 2 35.38742400 -81.28427500 Sec. 404 0.39 acres Non -wetland Pond 3 35.39561800 -81.29681900 Sec. 404 0.08 acres Non -wetland Pond 4 35.39697900 -81.29836300 Sec. 404 0.07 acres Non -wetland 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: Figure 6A, Figure 6B, Figure 6C, Figure 6D, Figure 6E, Figure 6F, & Figure 6G (Dated 04/01 /201 ® Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ® USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name: 1:24,000' Lincolnton West, NC (1993) ® Natural Resources Conservation Service Soil Survey. Citation: NRCS Soils Survey of Gason Co. (2017)_ National wetlands inventorymap(s). Cite name: USFWS NWI (2018)_ ❑ State/local wetland inventory map(s): ® FEMA/FIRM maps: FEMA FIRM Panels 3710361000J and 3710362000J_ ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ®Aerial (Name & Date): Bing Aerial Imagery, dated 2017 or ®Other (Name & Date):Site photographs, dated March 15 and 2; April 3-4, 2018; August 17, 2018; April 1, 2019. ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Si mature and dateWAu ato stall- member completing PJD 6/20/2019 Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)1 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. Total Jurisdictional RPW Tributary: 39,167.5 linear feet Total Jurisdictional Wetlands: 13.25 acres Total Jurisdictional Pond: 0.68 acre Total Uplands: 936.96 acres Total Site Acreage: 963 acres M PIEDMONT A�hw LEGEND IP Project Boundary (963 ac.) Previous Verification (614 ac.) Culverts Potential Jurisdictional Waters of the U.S. Delineated Streams _ Delineated Wetlands Delineated Ponds Desktop Streams Desktop NWI Wetland DATA SOURCE: httpJ/w ,.bi,g.,,,/,,p, GPS POINTS WERE COLLECTED USING TRIMBLE GE07X AND POST -PROCESSED 0 Feet PIEDMONT LITHIUM PROJECT POTENTIAL JURISDICTIONAL WATERS OF THE U.S. - OVERVIEW FIGURE 6A LEGEND Wetland 15 - Potential Wetland Waters of the U.S. IP Project Boundary (963 ac.) 0.04 ac. Previous Verification (614 ac.) Photographs Upland Data Points ,4$ ® Wetland Data Points J Feet Culverts Potential Jurisdictional Waters of the U.S. Delineated Streams SI - Delineated Wetlands ® Delineated Ponds Desktop Streams Stream 2 - Potential Non - DATA SOURCE: hhp:/�.bhg—m/maps Wetland Waters of the U.S. GPS POINTS WERE COLLECTED USING TRIMBLE GE07X AND 4,237linear feet POST -PROCESSED 0 Feet 450 Pond 1 - Potential Non - Wetland Waters of the U.S. 0.14 ac. Stream 12 see Figure 6F Wetland 1 - Potential Wetland Waters of the U.S. Stream 16 0.28 ac. a 1 )J PIEDMONT LITNIVM 3' Approximate Total Jurisdictional RPW Tributary: 39,167.5 linear feet Approximate Total Jurisdictional Wetlands: 8.19 acres Approximate Total Jurisdictional Pond: 0.68 acre Approximate Total Uplands: 943.02 acres Approximate Total Site Acreage: 963 acres Wetland 16 - Potential Wetland Waters of the U.S. 0.07 ac. Stream 2 Stream 18 - Potential Non - Wetland Waters of the U.S 141 linear feet Stream 3 - Potential Non - Wetland Waters of the U.S. 1,403 linear feet (1,122 If delineated; 284 If desktop) Stream 4 - Potential Non - Wetland Waters of the U.S. 2,758 linear feet (435 If delineated; 2,323 If c Stream 1 - Potential Non - Wetland Waters of the U.S. 13,799 linear feet Name: Piedmont Lithium Project Applicant: Piedmont Lithium, Inc. Location: 2.8 miles north of the Hephzibah Church Road and Dallas Cherryville Highway intersection in Gaston County, NC Date: 4/1/2019 Project Area: 963 acres Center Coordinates: -81.286758°,35.387869' SAW #: 2018-01129 PIEDMONT LITHIUM PROJECT POTENTIAL JURISDICTIONAL WATERS OF THE U.S. FIGURE 6B PRELIMINARY JURISDICTIONAL DETERMINATION VERIFICATION LEGEND Stream 1 - Potential Non - Wetland Waters of the U.S. IP Project Boundary (963 ac.) 13,799 linear feet Previous Verification (614 ac.) Lop, Photographs Upland Data Points Stream 6 -Potential Non - Wetland Waters of the U.S. ® Wetland Data Points 465 linear feet Culverts r Potential Jurisdictional Waters of the U.S. 8 Delineated Streams - Delineated Wetlands ? �l I%�iii�IVllll��l IIII/�IIIV i Jp01i Delineated Ponds i3. d Wetland 4 -Potential Wetland DATA SOURCE: http://w .1mg.—/M ps Waters of the U.S. 0.66 ac. GP S POINTS WERE COLLECTED USING TRIMBLE GE07X AND POST -PROCESSED t. Ci r� m 0 300 aaF - Pond 2 - Potential Non- Feet �d - Wetland Waters of the U.S. m 0.39 ac. ro / Wetland 5 Wetland 5 - Potential Wetland Waters of the U.S. 2.21 ac. Wetland 8 -Potential Wetland as Waters of the U.S. met 0.23 ac.3da �► e Stream 7 -Potential Non- e Wetland Waters of the U.S. 2,848 linear feet Stream 8 - Potential Non - Wetland Waters of the U.S. 1,131 linear feet Wetland 6 - Potential Wetland Stream 9 - Potential Non - Waters of the U.S. Wetland Waters of the U.S. 0.09 ac. 252 linear feet 1 )J �'`- PIEDMONT LITNIVM Approximate Total Jurisdictional RPW Tributary: 39,167.5 linear feet/ Approximate Total Jurisdictional Wetlands: 8.19 acres Approximate Total Jurisdictional Pond: 0.68 acre Approximate Total Uplands: 943.02 acres Approximate Total Site Acreage: 963 acres J etland 3 - Potential Wetland aters of the U.S. 19 ac. Stream 5 - Potential Non - Wetland Waters of the U.S. 2,438 linear feet Wetland 2 - Potential Wetland Waters of the U.S. 0.15 ac. Name: Piedmont Lithium Project Applicant: Piedmont Lithium, Inc. Location: 2.8 miles north of the Hephzibah Church Road and Dallas Cherryville Highway intersection in Gaston County, NC 1 Date: 4/1/2019 Project Area: 963 acres Center Coordinates: -81.286758°,35.387869' SAW #: 2018-01129 PIEDMONT LITHIUM PROJECT POTENTIAL JURISDICTIONAL WATERS OF THE U.S. FIGURE 6C IffffllAfffr _%V1 LEGEND IP Project Boundary (963 ac.) Previous Verification (614 ac.) I Photographs ® Upland Data Points 4 e 0# Wetland Data Points Wetland 8 - Potential Wetland Waters of the U.S. Culverts 0.23 ac. c Potential Jurisdictional Waters of the U.S. G` Delineated Streams Stream 7 - Potential Non- Wetland Waters the U.S. F of - Delineated Wetlands 2,848 linear feet m {� m� EA Delineated Ponds DATA SOURCE: http://w .bi,g.,,,imaps GPS POINTS WERE COLLECTED USING TRIMBLE GE07%AND POST -PROCESSED �� A 0 Feet 300 imate Total Jurisdictional RPW Tributary: 39,167.5 linear feet imate Total Jurisdictional Wetlands: 8.19 acres imate Total Jurisdictional Pond: 0.68 acre imate Total Uplands: 943.02 acres imate Total Site Acreage: 963 acres M PIEDMONT i 5 - Potential Wetland ofthe U.S. ure 6C 8 - Potential ure 6C 9 - Potential Non - Waters of the U.S. ure 6C and 6 - Potential Wetland rs of the U.S. ac. and 7 - Potential Wetland rs of the U.S. ac. Name: Piedmont Lithium Project Applicant: Piedmont Lithium, Inc. Location: 2.8 miles north of the Hephzibah Church Road and Dallas Cherryville Highway intersection in Gaston County, NC Date: 4/1 /2019 Project Area: 963 acres Center Coordinates: -81.286758°,35.387869° SAW #: 2018-01129 PIEDMONT LITHIUM PROJECT POTENTIAL JURISDICTIONAL WATERS OF THE U.S. FIGURE 6D Wetland 14 - Potential Wetland Waters of the U.S. 5.45 ac (0.39 ac. delineated; 5.06 ac. desktoo NWI) ;rn 0 F� e�9 .:. Stream 12 - Potential Non - Wetland Waters of the U.S. 2,444.5 linear feet (1,2881 If delineated; 1,164If Stream 16 - Potential Non - Wetland Waters of the U.S. 492 linear feet /etland 13 - Potential Wetland /aters of the U.S. .09 ac. /etland 12 - Potential Wetland /aters of the U.S. .06 ac. t�t'I Stream 15 - Potential Non - Wetland Waters of the U.S. 1,870 linear feet Wetland 11 - Potential Wetland Stream 1 - Potential Non - Waters of the U.S. Wetland Waters of the U.S. 0 Feet so \7"0.04 ac. 13,799 linear feet P I E DMO LITHIUM LEGEND = IP Project Boundary (963 ac.) Potential Jurisdictional Waters of the U. Delineated Streams Previous Verification (614 ac.) Wetlands PhotographsDelineated - Delineated Ponds Upland Data Points Desktop Streams ® Wetland Data Points Desktop NWI Wetland Culverts DATA SOURCE: Mp:l1w bing,/maps GP S POINTS WERE COLLECTED USING TRIMBLE GE07X AND POST -PROCESSED 0 Feet 300 Stream 10 - Potential N- on797 Wetland Waters of the U.S. Stream 11 - Potential Non- linear feet dWatersofthe U.S. �30'11inearfeet -. 0 Name: Piedmont Lithium Project Applicant: Piedmont Lithium, Inc Location: 2.8 miles north of the Hephzibah Church Road and Dallas Cherryville Highway intersection in Gaston County, NC Date: 4/1/2019 Project Area: 963 acres Center Coordinates: -81.2867580,35.387869° SAW #: 2018-01129 Approximate Total Jurisdictional RPW Tributary: 39,167.5 linear feet Approximate Total Jurisdictional Wetlands: 13.25 acres Approximate Total Jurisdictional Pond: 0.68 acre Approximate Total Uplands: 936.96 acres Approximate Total Site Acreage: 963 acres PIEDMONT LITHIUM PROJECT POTENTIAL JURISDICTIONAL WATERS OF THE U.S. FIGURE 6E LEGEND IP Project Boundary (963 ac.) Previous Verification (614 ac.) Photographs ® Upland Data Points ® Wetland Data Points -�� Culverts Potential Jurisdictional Waters of the U.S. �— Delineated Streams - Delineated Wetlands Delineated Ponds Desktop Streams Desktop NWI Wetland DATA SOURCE: Wp:/A—.bm,g mJmps GPS POINTS WERE COLLECTED USING TRIMBLE GE07X AND POST -PROCESSED r— — — — — — -- — 0 Feet 300 Stream 1 - Potential Non - Wetland Waters of the U.S. 13,799 linear feet 15 `; Wetland 9 -Potential \°p Wetland Waters ofthe U.S. 0.18 ac. Stream 13 Stream 13 - Potential Non- > `" Wetland Waters of the U.S. 1,155 linear feet n 14 - Potential Non - id Waters of the U.S. linear feet SFr Pond 4 - Potential Non - Wetland Waters of the U.S. 0.07 ac. Wetland 10 - PotentiaWetland l Waters u ofthe U.S. 'Ey2?i / . S 0.12 ac. 1 Pond 3 - Potential Non - Wetland Waters the U.S. of 0.08 ac. 4 ! r' Stream 12 - Potential Non- Wetland Waters of the U.S. 2,444.5 Imear feet Ix ! yik (1,2881 Ifdelineated; 1,164lfdesktop) � 3 - n m x ! e !mate Total Jurisdictional RPW Tributary: 39,167.5 linear feet imate Total Jurisdictional Wetlands: 13.25 acres !mate Total Jurisdictional Pond: 0.68 acre !mate Total Uplands: 936.96 acres !mate Total Site Acreage: 963 acres r)J PIEDMONT LITHIUM Netland 14 - Potential Wetland Naters of the U.S. >ee Figure 6E /Jf Name: Piedmont Lithium Project Stream 16 -Potential Non- Applicant: Piedmont Lithium, Inc. Wetland Waters of the U.S. /�JJ/// Location: 2.8 miles north of the Hephzibah Church see Figure 6E Road and Dallas Cherryville Highway intersection in Gaston County, NC Stream 15 - Potential Non- Date: 4/1/2019 Wetland Waters of the U.S. Project Area: 963 acres see Figure 6E Center Coordinates:-81.286758°, 35.387869' SAW #: 2018-01129 PIEDMONT LITHIUM PROJECT POTENTIAL JURISDICTIONAL WATERS OF THE U.S. FIGURE 6F Appendix G Technical Memorandum — Groundwater Model JI2NVA[! Technical Memorandum Groundwater Model Piedmont Lithium Carolinas Inc. Gaston County, North Carolina August 30, 2021 This page intentionally left blank. Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Contents Contents 1 Introduction......................................................................................................................... 1 2 Conceptual Site Model/Groundwater Model Framework ..................................................... 1 2.1.1 Mine Pits............................................................................................................... 1 2.1.2 Temporal Constraints............................................................................................ 2 2.1.3 Dewatering and Water Handling........................................................................... 2 3 Transient Model Set-up....................................................................................................... 3 3.1 Modeling Software.............................................................................................................. 3 3.2 Discretization...................................................................................................................... 3 4 Dewatering Simulations...................................................................................................... 3 4.1 Dewatering Effect on Water Supply Wells........................................................................... 4 4.2 Dewatering Effect on Wetlands........................................................................................... 5 4.3 Dewatering Effect on Streams............................................................................................ 9 5 Model Limitations...............................................................................................................10 6 Summary and Conclusions................................................................................................10 7 References........................................................................................................................11 Figures Figure 1 — Groundwater Model Domain Figure 2 — Site and Receptor Well Location Map Figure 3 — Revised Model Grid Figures 4A — 4J — Model Predicted Drawdown from Dewatering Figure 5 — HDR Delineated Wetlands Figure 6 — Location of Stream Reaches Tables Table 1 - Transient model sequence of mine pits....................................................................... 2 Table 2 - Model predicted dewatering withdrawal rates.............................................................. 4 Table 3 - Model Predicted Drawdown in Local Wells.................................................................. 5 Table 4 - Model predicted changes in groundwater flow to wetlands(gmp)................................ 7 Table 5 - Changes in base flow to streams that cross the site .................................................... 9 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Contents This page intentionally left blank. Piedmont Lithium Carolinas, Inc. i Technical Memorandum — Groundwater Model ��� Introduction 1 Introduction Piedmont Lithium Carolinas, Inc. (PLCI) is proposing to construct an open pit mine in the Carolina Tin-Spodumene Belt (TSB) of North Carolina where lithium -bearing pegmatites have been identified. The Concentrate Operations and the Lithium Hydroxide Conversion Plant (the Site) is in the TSB of the Piedmont physiographic province in south-central North Carolina. The approximately 1,548-acre Site is in an unincorporated area of Gaston County, on private land surrounding portions of Hephzibah Church Road, Whitesides Road, and St. Mark's Church Road, approximately 1 mile east of Cherryville, North Carolina. The overall Concentrate Operations are composed of three components: the Piedmont Lithium Carolinas Mine #1, a Concentrate Plant, and an Industrial Minerals Plant. The Piedmont Lithium Carolinas Mine #1 (Figure 1) will consist of four open pits of varying sizes, a waste rock disposal area, topsoil stockpiles areas, haul roads, and other mine support areas. Mining will occur through open pit excavations which will require dewatering. On behalf of PLCI, HDR Engineering, Inc. of the Carolinas (HDR) performed groundwater modeling to estimate the rate of water withdrawal during pit dewatering and evaluate possible effects pit dewatering may have on local water resources and water users. The base groundwater model was developed by HDR for PLCI and documented in a Technical Memorandum Groundwater Model dated July 2, 2019 (HDR, 2019). The groundwater model updates include a refined model grid, revised pit shell geometries, and transient simulations of pit dewatering. 2 Conceptual Site Model/Groundwater Model Framework The groundwater flow model domain includes the southern portion of Indian Creek watershed, Beaverdam Creek watershed, and a reach of the South Fork Catawba River. The 32.5 square mile (mil) model domain and Site boundary are shown in Figure 1. Model input parameters were, in part, derived from hydrogeologic data obtained during an aquifer test conducted in 2018; however, those data have been manipulated during calibration of the groundwater flow model. The conceptual model, model framework, and model calibration for natural state conditions are described in the 2019 Technical Memorandum (HDR, 2019). 2.1.1 Mine Pits PLCI plans to remove resource from four mine pits (North, South, East, and West pits) within the permitted mine boundary. The current mining operations plan calls for no more than two pits to be actively mine at the same time, as shown in Table 3. PLCI intends to dewater mine pits to facilitate removal of the resource. Groundwater removed from the pits during dewatering will be pumped to settling ponds throughout the permitted area prior to discharge through outfalls monitored via National Pollutant Discharge Elimination System (NPDES) permitting and compliance. PLCI's most recent estimate of resource extent was used to establish the potential extents of pit excavation used in the transient model (see Figure 2). The mine pit geometries over time were Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Conceptual Site Model/Groundwater Model Framework estimated by the mining engineer, Marshall Miller & Associates (MMA), in 2021 and provided as 3-dimensional shapefiles of topography for each year. MMA used MiningMath SimSched software to optimize pit geometries and Maptek's Vulcan Evolution software to establish the mine operations schedule (MMA, 2021)1. The differences in yearly topography were used in the model to represent transient change in mine pit geometry (newly mined volume for each year). Mine pits were simulated in the transient models as water -filled, high conductivity cells. Mine pit extents for model layers were based on contours from the pit excavation geometries that coincide with model layers. Seepage into cells was accounted for with drain return package boundary conditions set to the bottom of lowest layers of the mine pits. Water collected by the drains was returned to model cells at the discharge locations provided by MMA where pumped water may discharge to a stream or wetland or infiltrate to groundwater. 2.1.2 Temporal Constraints The calibrated steady state model of natural state conditions provided the initial conditions for the transient modeling. Pit dewatering operations were simulated with a series of transient models to account for temporal variation. The transient models represent mine pit extents at various points in time with portions of different pits open at the same time. Drawdown due to dewatering is greatest when the mine pits have been excavated to the designed terminal depth. After completion of mining, pits may be allowed to fill with water or be filled by native waste rock material, native mine tailings, and the non -hazardous residue created by the Lithium Hydroxide Conversion Plant. The mine pit dewatering sequence for predictive simulations is shown in Table 1. Table 1 - Transient model sequence of mine pits Pits with Dewatering Model Year South Pit East Pit West Pit North Pit 1 Mining 2 Mining Mining 3 Mining Mining 4 Filling Mining 5 Filling Mining 6-10 Filling Mining 11 Filling Mining 12 Filling Mining Mining 13 Filling Filling Mining Mining 14-20 Fillina Fillina Minina Minina 2.1.3 Dewatering and Water Handling Water is assumed to be pumped from the lowest levels of the mine pit into settling basins prior to discharge to adjacent streams or wetlands. Dewatering is simulated with a MODFLOW drain cell (water level controlled by a conductance value at a specified elevation) to estimate the amount of water removal necessary to achieve dewatering of the mine pits. The water removed by drain cells is returned to the model at discharge locations identified by MMA (Figure 2). Water from mine pit dewatering returned to the model infiltrates to groundwater or flows out of The mine pit geometries are resource -based and in some locations extend beyond the mine permit boundaries. For this reason, the effects of dewatering are conservative and at some places reflect greater dewatering than is currently envisioned. Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Transient Model Set-up the model domain through streams and wetlands. Returning water from dewatering operations to the model provides a better representation of aquifer recovery after dewatering ceases. 3 Transient Model Set-up The set-up and calibration of the steady state model, which provides the initial conditions for the transient groundwater flow models, is described in the Technical Memorandum Groundwater Model dated July 2, 2019 (Tech Memo) (HDR, 2019). The model layers and boundary conditions were not modified (including how wetlands and surface water bodies were simulated). This section describes the revisions and updates required for the transient models. 3.1 Modeling Software Transient groundwater modeling was performed using the United States Geological Survey (USGS) groundwater model software MODFLOW-2005 (Harbaugh, 2005). MODFLOW-2005 is an enhanced version of the USGS modular groundwater flow model, MODFLOW. MODFLOW- 2005 allows for enhanced management of internal data. Aquaveo's 2021 Groundwater Modeling System, GMS, (Aquaveo, 2021) was used to manage data to develop the groundwater flow models and to evaluate model simulations. GMS's graphic interface and data handling functions were used develop and update the base conceptual model and the hydrogeologic framework described in the previous Tech Memo. GMS was used to display and evaluate transient model results. 3.2 Discretization The model grid was refined to focus on the area near the Site, allowing for increased resolution in the vicinity of the mine pits. The refined portion of the model grid was expanded to the south and west from the original steady state model to include the pit extents used for this transient model. Cells in the model for the previous and current modeling efforts range in size from 50 feet on a side in refined areas in the vicinity of the Site to 500 feet on a side in remote areas. The revised model grid is shown in Figure 3. 4 Dewatering Simulations Mine pit dewatering was simulated by changing model cells within the horizontal and vertical extent of the pit to a high conductivity material. Drains cells were placed at the base of the lowest layers and the elevations of the drains adjusted to the bottom elevation of the pit coincident with the timeframe being simulated. Water seeping out of the cells surrounding the pit was removed by the drains. The water removed by all drains used to simulate dewatering was summed to estimate dewatering volumes and rates needed to dewater the pits. The water removed from the pits by the drains was returned to the model at locations identified as discharge from settling ponds by MMA. Stream cells connected to the stream network were placed in the same cell and given large conductance values so the water would be simulated to be returned to the streams. Drawdown of the water table resulting from dewatering was calculated based on the total change in water level between the initial steady state non -pumping model and the mine -year simulated (model year). The estimated withdrawal rates are presented in Table 2. Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Dewatering Simulations Table 2 - Model predicted dewatering withdrawal rates Pumping Rate (gpm) Model Year South Pit East Pit West Pit North Pit Total 1 525 50 575 2 975 1,225 2,300 3 725 775 1,500 4 25' 1,025 1,050 5 75' 950 1,025 6-10 N/A2 1,250 1,250 11 N/A2 1,575 1,575 12 N/A2 1,050 950 2,000 13 N/A2 0 500 850 1,350 14-16 N/A2 N/A2 10753 1,075 Pumping to maintain drawdown while filling pit with excavated material 2 No dewatering modeled. 3 West and North Pits are merged. 4.1 Dewatering Effect on Water Supply Wells Predicted drawdown in wells within the Site boundary, which will be decommissioned by PLCI during mine development, ranged from 0 feet to 17.8 feet and averaged approximately 1.9 feet. Predicted drawdown in wells outside the Site boundary ranged from 0 feet to 21.5 feet and averaged approximately 4.0 feet. Within the Site boundary, four wells are expected to experience significant loss of water column (available drawdown) during dewatering of East, West, and North Pits. Outside the site, two wells are expected to experience significant loss of water column during dewatering of West and North Pits. Estimated drawdown in wells in the vicinity of the Site are shown in Table 3 and on Figures 4A, though 4J. Note that the excavation extents used in the models are based on the extent of the resources and not necessarily the extent of planned mining activities, specifically along the southern permit boundary where the resource is estimated to extend beyond the permit boundary (MMA, 2021). The greatest extent of drawdown is simulated to occur in years 14 through 20 when the West Pit is being dewatered and the East Pit is filling. The drawdown shown in Figure 4 represents dewatering to the extent of the resource boundaries rather than the permit boundaries of the pits, providing a worst -case estimate of drawdown that may occur. Piedmont Lithium Carolinas, Inc. I Technical Memorandum - Groundwater Model ��� Dewatering Simulations Table 3 - Model Predicted Drawdown in Local Wells South Pit Pumping East Pit Pumping West Pit Pumping North Pit Pumping Receptor Well Drawdown (ft) Well Year 1 Year 2 Year 3 Year 4 Year 5 Year6- 10 Year 11 Year 12 Year 13 Year14- 20 Wells Within Site Boundary 1523 R W McLamb Dr. DRY DRY DRY DRY DRY DRY 12.1 13.1 13.4 12.5 819 Whitesides Rd. 0.0 0.0 0.2 0.4 0.4 0.4 0.4 0.5 1.0 1.4 1121 He hzibah Church Rd. 3.1 1.8 1.2 1.0 0.8 0.7 0.7 10.6 16.9 17.8 901 Whitesides Rd. 0.0 0.0 0.0 0.1 0.1 0.1 0.3 0.1 0.2 1.1 921 Whitesides Rd. 0.0 0.1 0.1 0.2 0.2 0.3 0.3 0.3 0.8 2.4 1266 He hzibah Church Rd. 0.5 0.7 1.1 2.9 3.4 5.2 5.2 7.6 13.3 17.5 1021 He hzibah Church Rd. 1.3 1.1 0.0 0.7 0.6 0.6 0.5 0.5 0.6 1.3 633 Aderholdt Rd. 2 0.0 0.0 0.0 0.1 0.3 0.5 0.5 0.5 0.6 8.5 1029 He hzibah Church Rd. 2.3 1.3 0.7 0.4 0.3 0.2 0.1 0.4 1.1 2.4 Wells Outside of Site Domain 732 Whitesides Rd. 8.5 13.7 21.5 18.9 15.0 15.6 12.4 11.1 11.4 11.2 129 George Pa seur Rd. 0.3 0.5 0.9 2.0 2.2 3.3 3.4 3.4 3.5 4.2 663 Aderholdt Rd. 1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 1.2 20.4 534 Whitesides Rd. 0.0 0.0 0.0 0.1 0.2 0.3 0.3 0.3 0.5 0.8 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Dewatering Simulations 4.2 Dewatering Effect on Wetlands Potential changes to groundwater flow into wetlands during dewatering operations were evaluated by comparing flow into wetlands in the steady state model with the dewatering predictive simulations. Dewatering of the South Pit caused Wetland 2 to go dry and it remains dry during the remainder of the 20-year mining operation. Dewatering of the South Pit also results in drying of Wetlands 11 and 12, although they are restored when dewatering operations shift to the East Pit and dry up again when dewatering commences in the West Pit. Dewatering of the East Pit results in drying of Wetlands 4 through 8; these wetlands remained dry for the remainder of the 20-year mining operation. Simulated West Pit dewatering resulted in drying of Wetland 16 prior to its elimination by mining operations when the West Pit and North Pit merge. Note that pit dewatering water discharged near wetlands helps maintain flow in some of those wetlands; routing of additional flow into wetlands may help mitigate the drying predicted by the model. Wetlands 6, 7, and 8 maintain some flow from groundwater while discharge from the South Pit is occurring nearby. Changes to predicted groundwater discharge to wetlands are presented in Table 4. The location of wetlands in the vicinity of the Site are shown in Figure 5. Note that although the model returns water removed from the pits to the simulated streams, this return only marginally influences the impacts on the wetlands. Piedmont Lithium Carolinas, Inc. I Technical Memorandum - Groundwater Model ��� Dewatering Simulations Table 4 - Model predicted changes in groundwater flow to wetlands (gmp) Model Year 1 Model Year 2 Model Year 3 Model Year 4 Model Year 5 Model Year 6 - 10 Model Year 11 Model Year 12 Model Year 13 Model Year 14 - 20 Pits D watering S S, E S, E E E E E E, W W, N W, N Wetland Wetland Size Acres Steady State Flow m Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change ' Flow Ft3/d Percent Change' Wetland 1 0.28 1,327 1328 -0.03 1330 -0.20 1323 0.36 1262 4.92 1204 9.33 1104 16.79 1103 16.88 486 63.41 0 Dry 0 Dry Wetland 2 0.15 6,330 4634 26.79 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry Wetland 3 3.19 11,519 11517 0.02 11730 -1.83 7261 36.97 5282 54.15 4485 61.06 4424 61.59 6204 46.14 5737 50.19 4597 60.09 0 Dr Wetland 4 0.66 1,703 1671 1.88 1670 1.94 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dr Wetland 5 2.21 5,483 5270 3.89 5269 3.92 1706 68.88 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry Wetland 6 0.09 2,061 2197 -6.62 2014 2.26 1190 42.25 130 93.71 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dr Wetland 7 0.38 3,752 3233 13.83 2968 20.90 2698 28.08 35 99.06 0 Dry 0 Dry 351 90.64 0 Dry 0 Dry 0 Dry Wetland 8 0.23 2,559 535 79.07 432 83.10 481 81.21 320 87.50 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dr Wetland 9 0.18 660 1028 -55.67 1002 -51.79 1000 -51.50 1001 -51.63 1005 -52.29 1010 -52.99 1019 -54.42 1021 -54.74 1011 -53.22 0 Dr Wetland 10 0.12 1,796 1785 0.62 1783 0.72 1781 0.85 1780 0.87 1780 0.87 1781 0.85 1782 0.78 1783 0.73 1782 0.79 0 Dr Wetland 11 0.04 1,930 693 64.09 427 77.87 0 Dr 0 Dry 0 Dry 147 92.40 351 81.82 0 Dry 0 Dry 0 Dr Wetland 12 0.06 1,930 0 Dry 0 Dry 380 80.31 395 79.53 442 77.10 653 66.15 830 57.01 0 Dry 0 Dry 0 Dr Wetland 13 0.09 2,007 1939 3.38 1824 9.10 1741 13.26 1707 14.95 1703 15.16 1720 14.31 1768 11.90 1555 22.54 1269 36.79 0 Dr Wetland 14 5.45 5,310 5296 0.27 5279 0.58 5252 1.09 5223 1.65 5204 2.00 5194 2.19 5194 2.18 5165 2.73 4964 6.52 0 Dry Wetland 15 0.04 2,147 2086 2.86 2085 2.89 2085 2.88 2088 2.77 2090 2.68 2094 2.47 2100 2.22 2099 2.23 2086 2.86 0 Dr Wetland 16 0.08 76 70 8.52 69 9.74 69 10.25 55 27.66 61 20.60 68 11.62 73 4.68 0 Dry 0 Dry 0 Dry ' Negative indicates an increase in flow to the wetland from groundwater. Positive indicates a decrease in flow to the wetland from groundwater. Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Dewatering Simulations This page intentionally left blank. Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Dewatering Simulations 4.3 Dewatering Effect on Streams Mine pit dewatering alters stream base flow by reducing the contribution of groundwater to streamflow. Change in stream baseflow was assessed by comparing stream baseflow estimated by the steady state model with stream baseflow in the dewatering predictive simulations. Baseflow was evaluated for three streams crossing the Site (Figure 6). Decreases in simulated baseflow to Beaverdam Creek up stream of Little Beaverdam Creek ranged from 2.2 percent in model year 11 (when dewatering in East Pit occurs) to 5.9 percent in model year 12 (when dewatering occurs in East Pit and West Pit). Simulated baseflow in Beaverdam Creek downstream of the confluence with Little Beaverdam Creek ranges from 3.1 percent in model year 1 (when dewatering occurs in South Pit) to 9.0 percent at the end of plan year 20 (when West Pit is dewatered). Decreases in simulated baseflow to Little Beaverdam Creek ranged from 0.1 percent in model year 1 (when South Pit is dewatered) to 6.9 percent in model year 13 (when East Pit is being filled and West Pit is dewatered). An unnamed tributary to Beaverdam Creek (Stream 3) exhibited baseflow decreases ranging from 0.4 percent during model year 2 (when South Pit is dewatered) to 3.1 percent (when West Pit is dewatered). Model -predicted changes in stream baseflow are presented in Table 5. Table 5 - Changes in base flow to streams that cross the site Beaverdam Creek Above Confluence' Little Beaverdam Creek Beaverdam Creek Below Confluence' Unnamed Tributary Model Flow2 Percent Flow' Percent Flow' Percent Flow' Percent Year (Ft3/d) Change (Ft3/d) Change (Ft3/d) Change (Ft3/d) Change Steady -569,356 -435,255 -1,681,833 -163,653 State 1 -545,113 4.3 -434,660 0.1 -1,631,117 3.0 -162,320 0.8 2 -541,563 4.9 -433,446 0.4 -1,622,721 3.5 -162,917 0.4 3 -538,616 5.4 -431,440 0.9 -1,609,935 4.3 -162,797 0.5 4 -538,716 5.4 -428,394 1.6 -1,608,281 4.4 -160,529 1.9 5 -541,270 4.9 -418,435 3.9 -1,600,251 4.9 -162,576 0.7 6-10 -548,891 3.6 -418,899 3.8 -1,615,812 3.9 -161,519 1.3 11 -556,696 2.2 -419,820 3.5 -1,629,960 3.1 -160,985 1.6 12 -535,792 5.9 -414,010 4.9 -1,580,594 6.0 -161,027 1.6 13 -536,719 5.7 -405,337 6.9 -1,553,419 7.6 -159,911 2.3 14-20 -539,972 5.2 -406,888 6.5 -1,530,283 9.0 -158,582 3.1 Confluence is with Little Beaverdam Creek. 2 Negative sign indicates stream baseflow from groundwater. Groundwater removed from the pits during dewatering will be pumped to settling ponds throughout the permitted area prior to discharge through outfalls monitored via NPDES permitting and compliance. In the transient model simulations, water lost from stream baseflow due to pit dewatering was recycled back to the streams through the settling basins and discharge points shown in Figure 6. Note that there is a stream that flows into the West Pit starting in about Year 14 once the West Pit and the North Pit merge. The model estimated that this stream will still receive about 13,000 9 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model Model Limitations cubic feet per day of base flow, which then flows towards the pit and is not accounted for in the dewatering estimates. The water from this stream will either be re-routed to Beaverdam Creek or will be included in water pumped from the West Pit to Beaverdam Creek. Either way, this water, which is not accounted for in Table 5, will be included in the flow of Beaverdam Creek. When it is included, the greatest percent reduction in flow, which occurs in Year 20, is reduced from 9.0 percent to 8.2 percent. 5 Model Limitations Groundwater flow models are generalizations of complex groundwater flow systems that cannot be reasonably simulated without extensive data, detailed inputs, and large computational requirements. The complexity is contained in the generalization, but local effects may influence real world outcomes. Other limitations of the groundwater model of the Site are described in the Tech Memo. 6 Summary and Conclusions Transient groundwater flow modeling was used to estimate the rate of groundwater withdrawal required to dewater four planned mine pits and evaluate potential impacts on adjacent water resources due to dewatering. The transient groundwater model was developed from the calibrated, steady state model for natural conditions described in the Tech Memo and refined to capture currently planned resource extents and sequencing, as provided by PLCI and MMA. • Model -predicted dewatering rates ranged from 525 gpm for the South Pit to 1,575 gpm for East Pit. The total dewatering rate in any given year ranged from 575 to 2,300 gpm, with the greatest amount of pumping occurring in year 2. Predicted drawdowns for wells located within the Site, which will be decommissioned by PLIC during mine development, ranged from 0 to 17.8 feet and averaged about 1.9 feet. Predicted drawdowns for wells outside the Site ranged from 0 to 21.5 feet with an average of approximately 4.0 feet. Four wells within the site are predicted to have significant loss of available drawdown (water column) during dewatering of the East, West, and North Pits. Beyond the permit boundary, two wells are predicted to experience significant reduction of available drawdown during dewatering. One well was predicted to experience significant water column loss throughout most of the 20-year mine operation, while another is predicted to experience significant water column loss during dewatering of the combined West and North Pits in years 14 to 20. • Predicted impact to wetlands were most significant during the East and West/North Pit dewatering simulations, indicating drying of 7 and 10 wetlands, respectively. Three wetlands are predicted to dry up during dewatering of South Pit. Note that routing of additional flow into wetlands may help mitigate the drying predicted by the model. The contribution of groundwater to stream flow (baseflow) to the three streams crossing the Site decreases between 0.1 to 9.0 percent based on the location of the stream relative to the pit which is being dewatered. The largest predicted decrease in baseflow occurred in Beaverdam Creek at the very end of the last year simulated after the West Pit merged with the North Pit. Adding flow from a stream that is disconnected from the stream network would decrease this impact to 8.2 percent. 10 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model References • PLCI will return water withdrawn during dewatering to streams at NPDES permitted discharge points to reduce potential pumping effects due to mine operation. Some water withdrawn due to dewatering may be diverted to wetlands to offset potential impacts to wetlands. 7 References Aquaveo, 2021, Groundwater Modeling System (GMS) Harbaugh, A.W., 2005, MODFLOW-2005, The U.S. Geological Survey modular ground -water model —the Ground -Water Flow Process: U.S. Geological Survey Techniques and Methods 6- A16, variously p. HDR, 2019, Technical Memorandum Groundwater Model. Prepared for Piedmont Lithium. Marshall Miller & Associates (MMA), 2021, Estimated Mine Pit Extent with optimization using MiningMath's SimSched program and scheduling using Maptek's Vulcan Evolution program. 11 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model References This page intentionally left blank. 12 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Figures Figures F 1 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Figures This page intentionally left blank. aC. <,,,r °r�,�i' .-U-'Ouseources: Esri, HERE, Garmin, termap, increment P Corp., -VIIEBCO, USGS, FAO, NPS, Rnr bkk, Rd s� �as¢rn_svRn �� q NRCAN, GeoBase, IGN, os Cie 8 C h6 1. 4p\ F' o > Dd X _- LEGEND �a it W ��� No Flow Boundary Site 1n I r ;•;rlle F Sunbeam Aar �' �. ® Receptor Wells �y tits°9eavprd$^�h ® Planned Pits South Fork Catawaba River Dewater Discharge Locations t�i .yG? yP ya Q Streams r'•7�k . 1227N s Carry.' t;:• c L' DATA SOURCES: State Plane Coordinate System, � a ❑ v ^+ Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet Ramp ytio m a she cf F a @p4 <q"o • . `���° yirdl$ ,, GROUNDWATER MODEL DOMAIN ` r�S , ke, ftd � • 3 s`�n W \,0 G� Al.r °❑`� 0 1 2 Rd, p� MILES Sun"15'de S1gdy Rest 1{a l L- Sr�4�O DhwcnRa s� Sources: Esri, HERE, Garmin, Intermap, increment P Corp.., GEBCO, PIEDMONT USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance �trH�uM Survey, Esri Japan, METI, Esri China (Hong Kong ), swisstopo, OpenStreetMap contributors, and the GIs User Community FIGURE 1 PATH: H:%PLI\ANALYSIS\FIGURE 2.MXD - USER: JTROYER -DATE: 8/17/2021 lerholdt kderholdt Rd Grp' Q1fD % .1 Rd 0 Sources: Esri, HERE Garmin, Infermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, OpenStreetMap contributors, and the GIs User Community ources: Esri, HERE, Garm.in, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, LEGEND 0 Model Domain Site ® Receptor Wells - Known Well Depths O Possible Domestic Well - No Known Data ® Planned Pits { Dewatering Discharge Locations 0 Simulated Mined Pit Area DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet SITE AND RECEPTOR WELLS LOCATION MAP N 0 0.2 0.4 MILES P I E D/AQ. N T FN � trHw Iu FIGURE 2 PATH: HAPLI\ANALYSISOGU RE 1.MXD - USER: JTROYER -DATE: 08/27/2021 ny� y' } � Ru �a tizn s m� a •r:sK rc .r LEGEND 1119h Sho 0 Domain Site 0 Grid Sources: Esri, HERE, Garm.in, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet ,,Paka, c b REVISED MODEL GRID Hatch (y.S4 ftd � la � 4 C fty � •f �e Sun+ys"�-�`M1.-Y R r a C 0 2 MILES cw,°ty ` Perk II FN °% 5` Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, PIEDMONT _ USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance 4 IrHiuM Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, °"g "e« OpenStreetMap contributors, and the GIS User Community FIGURE 3 PATH: H:1PLI\ANALYSIS%FIGU RE 3.MXD - USER: JTROYER - DATE: 81512021 0 NORTH WEST io, - MJ/,/ I "Weller ' OPI EAST IS ® C Little r, "rd�� CrecK r 6aV� 5� x Sources) Esri;;'HERE,,Garmin, Intermap, increment P Corp., GEE USGS, FAO,;"NPS, NRCAN, GeOBaSe), IGN, Kadaster NL, Ordna Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, OpenStreetMap contributors, and the GIS User Community Ir liI tGeoBase, E, Garm.in, t P Corp., O, NPS, , IGN, Legend Domain Drawdown (ft) Site 1 - 3 Planned Pits 3-7 Simulated Mined Pit Area 7- 11 ® Receptor Wells 11 -15 O Possible Domestic Well 15 - 21 Streams DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet MODEL PREDICTED DRAWDOWN FROM DEWATERING YEAR 1 N 0 0.25 0.5 MILES P I E D/AQ. N T FN I,trHwM FIGURE 4A PATH: C:%USERS%JTROYER\DESKTOP\PROJECTS%PLI\FIGURES\FIGURE 4A.MXD - USER: JTROYER - DATE: 811912021 0 n NORTH EVEM00001,14"A •_ )i 1A -- o LiWe r, ti,r ECK [• O � ® O m Q • ,(0) • oSources) EsrNERE,4Garmin, Intermap, increment P Corp., GEE �r USGS, FAOl J;NPS, NRCAN, GeoBas'D, IGN, Kadaster NL, Ordna Survey, Esrapan, METI, Esri China (Hong Kong), swlsstopo, OpenS " etMap contributors, and the GIS User Community I! ;NRCAN, ources: Esri, HERE, Garm,li, termap, increment P CorpEBCO, USGS, FAO, NPSGeoBase, IGN, Legend Domain Drawdown (ft) Site 1 - s FM Planned Pits 3-7 Simulated Mined Pit Area 7- 11 ® Receptor Wells 11 - 15 O Possible Domestic Well 15 - 21 Streams DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet MODEL PREDICTED DRAWDOWN FROM DEWATERING YEAR 2 N 0 0.25 0.5 MILES PIEDMONT FN lYiHlllM FIGURE 4B PATH: CAUSERSWTROYE RID ESKTOPWROJECTSWLOFIGURES\FIGURE 4B.MXD -USER: JTROYER-DATE: 8/19/2021 0 ... .. ••. Sya�IDle R,S �r 0 \ of e� rP7 NORTH V/ • WEST q :• SOUTH LIIUe ge /�/ J O 6a�� 54 Q oSources) EsOi ERE,4Garmin, Intermap, increment P Corp., GEE USGS, FA0l J1NPS, NRCAN, GeoBas'D, IGN, Kadaster NL, Ordna Survey, Esrapan, METI, Esri China (Hong Kong), swisstopo, OpenStrreetMap contributors, and the GIS User Community I! ources: Esri, HERE, Gamnin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend Domain Drawdown (ft) Site 1 - 3 VM Planned Pits 3-7 Simulated Mined Pit Area 7 - 11 ® Receptor Wells 11 - 15 • Possible Domestic Well 15 - 21 Streams DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 19832011, feet MODEL PREDICTED DRAWDOWN FROM DEWATERING YEAR 3 N 0 0.25 0.5 MILES PIEDMONT FN lYiHlllM FIGURE 4C PATH: C:\USERS\JTROYER\DESKTOPWROJECTSWLOFIGURES\FIGURE <C.MXD- USER: JTROYER-DATE: 8/19/2021 0 ... .. ••. Sya�IDle R,S �r NORTH EAST LIIUe ge �� - Dap'. 54 ."•. ��,' u • x Sources) Esri;;.HERE, Garmin,, Intermap, increment P Corp., GEE USGS, FAO,;"NPS, NRCAN, GeOBasD, IGN, Kadaster NL, Ordna Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, OpenStr etMap contributors, and the GIS User Community I'. I ources: Esri, HERE, Garm.in, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend Domain Drawdown (ft) Site 1-3 VM Planned Pits 3-7 Simulated Mined Pit Area 7 - 11 ® Receptor Wells 11 - 15 • Possible Domestic Well 15 - 21 Streams DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 19832011, feet MODEL PREDICTED DRAWDOWN FROM DEWATERING YEAR 4 N 0 0.25 0.5 MILES P I E D/AQ. N T FN I, trHw lu FIGURE 4D PATH: C:\USERS\JTROYERZESKTOPWROJECTSW LOFIGURES\FIGURE <D.MXD -USER: JTROYER -DATE: 8/19/2021 0 Fa r T% fG>r �* ources: Esri, HERE, Garm,in, Intermap, increment P Corp., NORTH GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend ® Domain Drawdown (ft) WEST q Site 1-3 VM Planned Pits 3 Simulated Mined Pit Area 7 - 11 \\ /�►' ` ® Receptor Wells 11 - 15 J • Possible Domestic Well 15 - 21 ®I SOUTH Streams _ CCar1e ,�.•. o DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 19832011, feet EAST ar 1 — ® MODEL PREDICTED DRAWDOWN FROM DEWATERING YEAR 5 LIIUe gP ` • as ♦ s r r N e 6a�5 g 1-up vim` / • 0 0.25 0.5 -�, MILES '(0) .0(0) G FNSources? Esri¢HERE, Garmi�ln ermap, increment P Corp., GEBCO, P I E DJ�1 ON T �m t USGS, FAO;;NPS, NRCAN, GeOBas"D, IGN, Kadaster NL, Ordnance �?tHiuM ^ Survey, Esrl Japan, METI, Esri China (Hong Kong), swisstopo, OpenSt�eetMap contributors, and the GIS User Community FIGURE 4E BE.MXD -USER: JTROYER. DATE: 811912021 0 F° r `r°' fear 2 rYa I• ,I. ources: Esri, HERE, Gamnin, Intermap, increment P Corp., NORTH GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend ® Domain Drawdown (ft) WEST q Site 1-3 Planned Pits 3-7 i Simulated Mined Pit Area 11 Receptor Wells 11 - 15 ® O SOUTH Possible Domestic Well 15 - 21 / Streams •• `�"`r� ��"' • DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet EAST MODEL PREDICTED DRAWDOWN FROM DEWATERING YEARS 6-10 Little ad ary+Cr ecK 0 0.25 0.5 '-�,�� • MILES FN3 Sources) Esri;; HERE,4Garmin,, Intermap,ip�c ement P Corp., GEBCO, P I E DJ�1 ON T �m t USGS, FAO,;"NPS,�RCAN GeoBaaol rGN, Kadaster NL, Ordnance �irHtuM Survey, Esri Japan, ME-TI-Esri-Glilna (Hong Kong), swisstopo, inn OpenSt�/eetMap contributors, and the GIS User Community FIGURE 4F PATH: C:%USERS%JTROYER\DESKTOP\PROJECTS%PLI\FIGURES\FIGURE 4F.MXD -USER: JT ROYER - DATE: 811912021 0 F° r `r°' fear 2 rYa I• ,I. ources: Esri, HERE, Gamnin, Intermap, increment P Corp., NORTH GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend ® Domain Drawdown (ft) WEST Site 1 - 3 Planned Pits 3-7 �t Simulated Mined Pit Area 11 1 ® Receptor Wells 11 -15 ®� O Possible Domestic Well 15 - 21 SOUTH �( T) Streams •• `�"`�� ( DATA SOURCES: State Plane Coordinate System, - Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet EAST MODEL PREDICTED DRAWDOWN FROM DEWATERING YEARS 11 Little �', 6a�� 54 '��• ,L �O O 0 0.25 0.5 MILES FNV x Sources) Esri H'ERE,4Garmin, Intermap, increment P Corp., GEBCO, PIEDMONT m 4-, USGS, FAO; NPS NRCAN, GeOBaS"(%16 , Kadaster NL, Ordnance kIiHtuM Survey, Esn Japan, M•E—TI., Esri China ((Hong Kong), swisstopo, inn OpenSt/ etMap contributors, and the GIS User Community FIGURE 4G PATH: C:%USERS%JTROYER\DESKTOP\PROJECTS%PLI\FIGURES\FIGURE 4G.MXD -USER: JTROYER -DATE: 811912021 0 NORTH • O x Sources Esr ¢HERE, Garmin, Intermap, incr ent P Corp., GEE �m 4- USGS, FAOINF � RCAN, GeoBas'D,GN Kadaster NL, Ordna Survey, Esn Japan, METI, Esri C iIR ong Kong), swisstopo, inn OpenStreetMap contributors, and the GIS User Community V ources: Esri, HERE, Garm,n, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend Domain Drawdown (ft) Site 1 - 3 Planned Pits 3-7 Simulated Mined Pit Area 7 - 11 ® Receptor Wells 11 - 15 O Possible Domestic Well 15 - 21 Streams DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet MODEL PREDICTED DRAWDOWN FROM DEWATERING YEAR 12 N 0 0.25 0.5 MILES PIEDMONT FN lYiHlllM FIGURE 4H PATH: C:%USERS%JTROYER\DESKTOP\PROJECTS%PLI\FIGURES\FIGURE 4H.MXD -USER: JTROYER. DATE: 812012021 ¢a 'venters Sci'01e R'S � Ct,grue ' 4e� C 1 NORTH I EAST ':61 .r° Q • Sources) Esri;, HERE, Garmin Intermap, increment P Corp., GEE USGS, FAO,,,-NP.S, NRCAN, GeoBas0l, IGN!Kadaster NL, Ordna a Survey, Esri Japan\, M`ETI,, Esri Chna•(H nog Kong), swisstopo, " OpenStreetMap contributors and the GIS User Community ources: Esri, HERE, Garm.in, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend Domain Drawdown (ft) Site 1 - 3 vm Planned Pits 3-7 Simulated Mined Pit Area 7 - 11 ® Receptor Wells 11 - 15 • Possible Domestic Well 15 - 21 Streams DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 19832011, feet MODEL PREDICTED DRAWDOWN FROM DEWATERING YEAR 13 N 0 0.25 0.5 MILES P I E D/AQ. N T FN �trHw M FIGURE 41 PATH: C:\USERS\JTROYERZESKTOPWROJECTSW LOFIGURES\FIGURE CI.MXD - USER: JTROYER - DATE: 8QO12021 ¢a c,:,� r. g �r .D 1 WEST I. NORTH LIWe 0Pav�y, d�hr �rcck `f • Sources) Es i¢HER E?Garmin0� Into map, increment P Corp GEE USGS, WA0, PS, NRCAN, GeOBaS�, IGN, Kadaster NL, Ordna Survey, Esri J \pan, METI, Esri China (Hong Kong) s isstopo, Open St�eetMap�co tributors, and the 9.> User Community EAST tGeoBase, !E, Gar..m.in, nt P Corp., O, NPS, , IGN, Legend Domain Drawdown (ft) Site 1 - 3 Planned Pits 3-7 Simulated Mined Pit Area 7- 11 ® Receptor Wells 11 - 15 O Possible Domestic Well 15 - 21 Streams DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet MODEL PREDICTED DRAWDOWN FROM DEWATERING YEARS 14-20 N 0 0.25 0.5 MILES PIEDMONT FN � trHw Iu FIGURE 4J PATH: C:%USERS%JTROYER\DESKTOP\PROJECTS%PLI\FIGURES\FIGURE 4K.MXD -USER: JTROYER -DATE: 812012021 4a Wetland 15 Wetland 10 Wetland 9 Wetland 14 Wetland 13 =� Calmnters Sou3` Fd s � r Little seat" '74+h Cr eo' 9. l� MIS Da v5 yv` INSw"61 \ SOUTH etland and 7 EAST Ind 1 Wetland 3 �a a� Sources: Esri, HERE, Garmin'; Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METE_Esri China (Hong Kong), swisstopo, OpenStreetMap contributors, and the GIs User Community oil, ,4 a Sources: Esri, HERE, Garm.in, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, LEGEND 0 Domain Site 0 Deliniated Wetlands ® Planned Pits 2 I DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet HDR Delineated Wetlands N 0 0.25 0.5 MILES P I E D/AQ. N T FN � trHw Iu FIGURE 5 PATH: HAPLI\ANALYSISOGU RE S.MXD - USER: JTROYER -DATE: 8/19/2021 A- Cro use % a° r` Rn Crouaa Crouse er c, �' s0 IFo R6,be Cask, R-WebW- G - Qo F� Che dle ' Y GO`rti V a �+ Go and y'+� 1 �{�.• h 1j f Gf7'S � ��� �. s� i.. Sunbeam. Rd co � �N,�eav�a�' da../ ds•Gerry ��./ B0 a4 erd ato Sources: Esri, HER Garm.in, Intermap, incremen IP Corp., GEBCO, USGS, FAQ NPS, NRCAN, GeoBase, GN, LEGEND 0 Domain Site ® Planned Pits Total Flow Measurements Beaverdam Creek Above Confluence Little Beaverdam Creek Unnamed Tributary Beaverdam Creek Below Confluence DATA SOURCES: State Plane Coordinate System, - Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet LOCATION OF STREAM REACHES N 0 0.5 1 MILES Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, PIEDMONT I A USGS, FAO, NPS, NRCAN, GeoBase, IGN;=Kadaster NL, Ordnance 4tTH41JIM Survey, Esri Japan, METI, Esri China (Hong ,Kong), swisstopo, OpenStreetMap_contributors, and the GIs User Community FIGURE 6 PATH: HAPLI\ANALYSIS\FIGURE 6.MXD - USER: JTROYER -DATE: 8/19/2021 FN 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 (704) 338-6700 hdrinc.com © 2021 HDR, Inc., all rights reserved Appendix H Clean Water Act Section 404 and 401 Permit Approvals DEPARTMENT OF THE ARMY PERMIT Permittee Piedmont Lithium, Incorporated Permit No. SAW-2018-01129 Issuing Office CESAW-RGC NOTE: The tern "you" and its derivatives, as used in this permit, means the pennittee or any future transferee. The term "this office" refers to the appropriate district or division office of the Corps of Engineers having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the commanding officer. You are authorized to perform work in accordance with the terms and conditions specified below. Project Description: This permit authorizes the placement of fill material in 1,48.1 linear feet of perennial tributary, 4,904.5 linear feet of intermittent tributary, 0.18 acre of wetlands, and 0.16 acre of impounded waters of the United States for the construction of a hard rock lithium mine. This permit also authorizes potential indirect impacts to 7.46 acres of wetlands associated with mine pit construction and dewatering. Project Location; The proposed Piedmont Lithium mine is centered around 1501 Hephzibah Church Road in Bessemer City, North Carolina. From ❑S-321 N, take Exit 12B for NC-275 W/NC-279 W. Take aright onto NC-275 W, then continue onto NC-279 W fnr 7.3 miles. Take a right onto Hepbzibah Church Road and continue to follow Hephzibah Church Road for 0.9 miles, then turn left to stay on Hephzibah Church Road for another 1.5 miles. Permit Conditions: General Conditions: 1. The time limit for completing the work authorized ends on December 31, 2030. If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached. 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit, you must obtain the signature of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization. LNG FORM 1721, NOV 86 EDITION OF 5EP 82 IS OBSOLETE (33 CFR 325 (Appendix A)) 1 5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions. 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit, Special Conditions: SEE ATTACHED SPECIAL CONDITIONS Further Information. I. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to: () Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.G. 403). (X} Section 404 of the Clean Water Act (33 U.S.C. 1344). (} Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413). 2. Limits of this authorization. a. This permit does not obviate the need to obtain other Federal, state, or local authorizations required by law. b. This pen -nit does not grant any property rights or exclusive privileges. c. This pennit does not authorize any injury to the property or rights of others. d. This permit does not authorize interference with any existing or proposed Federal project. 3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume. any liability for the following: a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes, b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d. Design or construction deficiencies associated with the permitted work_ e. Damage claims associated with any future modification, suspension, or revocation of this permit. 4. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided, Re-evaluation of Permit Decision. This office may reevaluate its decision on this permit at any time the circumstances warrant, Circumstances that could require a reevaluation include, but are not limited to, the following.- a- You fail to comply with the terms and conditions of this permit. b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (See 4 above). c. Significant new information surfaces which this office did not consider in reaching the original public interest decision. Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you to comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive., this office may in certain situations (such as those specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost. 6. Extensions. General condition 1 establishes a time limit for the completion of the activity authorized by this permit. Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision, the Corps will normally give favorable consideration to a request for an extension of this time limit. Your signature below, as pernuttee, indicates that you accept and agree to comply with the terms and conditions of this permit. fl Ali (FERMITTEE) WEDONT LITHIUM, I CORPORATED (DATE) This permit becomes effective when the Federal official, designated to act for the Secretary of the Army, has signed below, (DISTRICT COMMANDER) RO T.I. CLA (DATE) COLONEL, U.S. ARMY DISTRICT COMMANDER When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this pemtiit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below. (TRANSFEREE) (DATE) `U.S. GOVERNMENT PRINTING GFFICE: 1986--717-425 NOTIFICATION OF ATlMINISTRATIVE APPEAL OPTIONS ANVD PROCESS AND REQUEST FOR APPEAL Applicant: Piedmont Lithium, Incorporated File Number: SAW-2018-01129 Date: 11/22/2019 Attached is: See Section below ®I INITIAL PROFFERED PERMIT (Standard Permit or Letter ofpermission) A LJ1 PROFFERED PERMIT Standard Permit or Letter ofpermission) g ❑ PERMIT DENIAI, C ❑ APPROVED RJRISDICTIONAL DETERMINATION ❑ F11 PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION T - The following identifies your rights ftnd options regarding an administrative appeal of the above decision. Additional information may be found at hLp:llwww.usace.army.miUinet/functions/gw/cecwo/reg or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. ■ ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer wili send you a proffered permit for your reconsideration, as indicated in Section B below. B. PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. ■ APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This fotrn. must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. ■ APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section If of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the: Corps district for furthm instiuciiva. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION Il - REQUEST FOR APPEAL or_OBJECTION S TO AN INITIAL.PROF FI RED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR 17NFORM.ATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: Mr. Philip Shannin, Administrative Appeal Review Officer District Engineer, Wilmington Regulatory Division, CESAD-PDO Attn: Mr. David Shaeffer U.S. Army Corps of Engineers, South Atlantic Division US Army Corps of Engineers 60 Forsyth Street, Room 1 OM15 151 Patton Avenue, Room 208 Atlanta, Georgia 30303-8801 Asheville, NC 28801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunito participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: David Shaeffer, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Philip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 552-5137 SPECIAL CONDITIONS Action ID: SAW-2018-01129 1. All work authorized by this permit shall be performed in strict compliance with the attached permit plans Sheets 1-32 dated May 24, 2019, which are a part of this permit. The Permittee shall ensure that the construction design plans for this project do not deviate from the permit plans attached to this authorization. Any modification to the attached permit plans must be approved by the U.S. Army Corps of Engineers (Corps) prior to any active construction in waters or wetlands. Rationale: This condition ties the permittee's project plans to the permit. 2. Except as authorized by this permit or any Corps -approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. Rationale: This condition clarify that only the impacts to waters of the US specified by the project plans are approved by this permit. 3. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters and/or wetlands. Rationale: This condition clarify that the project cannnot impound waters or reduce the reach of waters without being specifically authorized by the permit. 4. All mechanized equipment shall be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the Permittee shall immediately report it to the N.C. Division of Water Resources at (919) 733-3300 or (800) 858-0368 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act shall be followed. Rationale: This condition addresses potential indirect impacts to waters of the U.S. from mechanized equipment fluids. 5. The Permittee shall implement all necessary measures to ensure the authorized activity does not kill, injure, capture, harass, or otherwise harm any federally -listed threatened or endangered species. While accomplishing the authorized work, if the Permittee discovers or observes an injured or dead threatened or endangered species, the U.S. Army Corps of Engineers, Wilmington District, Charlotte Field Office, Attn*. David L. Shaeffer at 704-510-1437, or david.i.shaeffer@usace.army.mil will be immediately notified to initiate the required Federal coordination. Rationale: This special condition ensures continued compliance with the Endangered Species Act. 6. The Permittee shall notify the U.S. Army Corps of Engineers in writing prior to beginning the work authorized by this permit and again upon completion of the work authorized by this permit. Rationale: This condition facilitates timely inspections for Section 404 CWA compliance. 7. The Permittee shall conduct an onsite preconstruction meeting between its representatives, the contractor's representatives and the appropriate U.S. Army Corps of Engineers Project Manager prior to undertaking any work within jurisdictional waters and wetlands to ensure that there is a mutual understanding of all terms and conditions contained within the Department of the Army permit. The Permittee shall schedule the preconstruction meeting for a time frame when the Corps; NCDCM, and NCDWR Project Managers can attend. The Permittee shall invite the Corps, NCDCM, and NCDWR Project Managers a minimum of thirty (30) days in advance of the scheduled meeting in order to provide those individuals with ample opportunity to schedule and participate in the required meeting. The thirty (30) day requirement can be waived with the concurrence of the Corps. Rationale: This condition gives the Corps and agencies the opportunity to meet with the contractors and applicant to dicuss permit conditions and to answer questions. B. The Permittee shall use only clean fill material for this project. The fill material shall be free of items such as trash, construction debris, metal and plastic products, and concrete block with exposed metal reinforcement bars. Soils used for fill shall not be contaminated with any toxic substance in concentrations governed by Section 307 of the Clean Water Act. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source. Rationale: This condition addresses potential indirect impacts to waters of the U.S. from contaminated fill material. 9. The Permittee shall take measures necessary to prevent live or fresh concrete, including bags of uncured concrete, from coming into contact with any water in or entering into waters of the United States. Water inside coffer dams or casings that has been in contact with concrete shall only be returned to waters of the United States when it no longer poses a threat to aquatic organisms (concrete is set and cured)_ Rationale: This condition addresses potential indirect impacts to waters of the U.S. 2 from live concrete. 10. The Permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions and drawings shall be available at the project site during construction and maintenance of this project. Rationale: This condition specifies that the permittee is responsible for discharges of dredged or fill material in waters of the United States done by their contractors. 11. Special condition 11: 1) During the clearing phase of the project, heavy equipment shall not be operated in surface waters or stream channels. Temporary stream crossings will be used to access the opposite sides of stream channels. All temporary diversion channels and stream crossings will be constructed of non -erodible, materials. Grubbing of riparian vegetation will not occur until immediately before construction begins on a given segment of stream channel. 2) No fill or excavation impacts for the purposes of sedimentation and erosion control shall occur within jurisdictional waters, including wetlands, unless the impacts are included on the plan drawings and specifically authorized by this permit. This includes, but is not limited to, sediment control fences and other barriers intended to catch sediment losses. 3) The Permittee shall remove all sediment and erosion control measures placed in waters and/or wetlands, and shall restore natural grades on those areas, prior to project completion. 4) The Permittee shall use appropriate sediment and erosion control practices which equal or exceed those outlined in the most recent version of the "North Carolina Sediment and Erosion Control Planning and Design Manual" to ensure compliance with the appropriate turbidity water quality standard. Erosion and sediment control practices shall be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to ensure compliance with the appropriate turbidity water quality standards. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project shall remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). Adequate sedimentation and erosion control measures shall be implemented prior to any ground disturbing activities to minimize impacts to downstream aquatic resources. These measures shall be inspected and maintained regularly, especially following rainfall events. All fill material shall be adequately stabilized at the earliest practicable date to prevent sediment from entering into adjacent waters or wetlands. Rationale: This condition documents the permittees responsbility to employ appropriate sediment and erosion control practices to avoid potential indirect impacts to jurisdicitonal waters. 12.The Permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of the work will, without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct, restore the water or wetland to its pre -project condition. Rationale: This condition documents the permittee's responsibility to restore permitted impacts to their pre -project condition. 13.All reports, documentation and correspondence required by the conditions of this permit shall be submitted to the following address: U.S. Army Corps of Engineers, Regulatory Division, Charlotte Regulatory Field Office, c/o David L. Shaeffer, 151 Patton Avenute, Room 208, Asheville, North Carolina 28801, and by telephone at: 704-510-1437. The Permittee shall reference the following permit number, SAW- 2018-01129, on all submittals. Rationale: This provides contact information for the project manager. 14. Violation of these permit conditions ❑r violation of Section 404 of the Clean Water Act shall be reported to the Corps in writing and by telephone at: 828-271-7980 within 24 hours of the Permittee's discovery of the violation. Rationale: This condition specify compliance reporting contacts and requirements. 15. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this farm, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit. Rationale: This permit condition was added to document compensatory mitigation requirements for the project, to ensure compliance with the 404(b)(1) guidelines, and to ensure that project impacts were not more than minimal. 16. No activity may substantially disrupt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area. All discharges of dredged or fill material within waters of the United States shall be designed and constructed to maintain low flows to sustain the movement of aquatic species. 4 Rationale: This condition addresses potential issues associated with the installation of improperly designed and/or installed culverts. 17. Special Condition 17 1} Unless otherwise requested in the application and depicted on the approved permit plans, culverts greater than 48 inches in diameter shall be buried at least one foot below the bed of the stream. Culverts 48 inches in diameter and less shall be buried or placed on the stream bed as practicable and appropriate to maintain aquatic passage, and every effort shall be made to maintain existing channel slope. The bottom of the culvert shall be placed at a depth below the natural stream bottom to provide for passage during drought or low flow conditions. Culverts shall be designed and constructed in a manner that minimizes destabilization and head cutting. 2] Measures shall be included in the culvert construction/installation that will promote the safe passage of fish and other aquatic organisms. The dimension, pattern, and profile of the stream above and below a culvert or pipe shall not be modified by widening the stream channel or by reducing the depth of the stream in connection with the construction activity. The width, height, and gradient of a proposed opening shall be such as to pass the average historical low flow and spring flow without adversely altering flow velocity. Spring flow should be determined from gauge data, if available. In the absence of such data, bankfull flow can be used as a comparable level. 3) The Permittee shall implement all reasonable and practicable measures to ensure that equipment, structures, fill pads, work, and operations associated with this project do not adversely affect upstream and/or downstream reaches. Adverse effects include, but are not limited to, channel instability, flooding, and/or stream bank erosion. The Permittee shall routinely monitor for these effects, cease all work when detected, take initial corrective measures to correct actively eroding areas, and notify this office immediately. Permanent corrective measures may require additional authorization by the U.S. Army Corps of Engineers. Rationale: This condition documents the permittee's responsibility as it relates to the installation of culverts. 18.If previously undiscovered cultural resources are encountered while condcuting grading within the project area, the Corps shall be immediately notified in writing and by telephone at: 828-271-7980 within 24 hours of the Permittee`s discovery of the resources so that coordination can be initiated with the Cherokee Nation and North Carolina State Historic Preservation Office. Rationale: This is to address the Cherokee Nations concern regarding the potential for the discovery of cultural resources during the grading operations. 5 RH¢ e,use RFcxort woo w.e ,1059E1 daw .�t �I- pR11110., --- �.o IwF reF awe .wa ewe e•w wee `a�w ,..o ,ewe ,s. -- - a.w ,ewa - — ,—ne ,ewe---,.;w - �� - -- -ems — f Tao .,.a Free ,e.w a>..F rwo m w•o no-« WYNe SECTION lFD. 1 eR:T3sia,vea osmgu uK i aEW��iiwn++ -- - ------- la[d • _ � 5 B00 1 � f I _ Bnn ,e.� � 17- VMR SECTKM NO.2 �—� PROPOSES] 1NWR DISPOSAL AREA SECTION NO. 1 AND NO.2 PIEDMONT LITHIUM iJ. SNpFT Ion—u 0 plEpMpHT rve P N ll num.lnt W 32 PgaP O aueuu�is mcry G�sim Lnvily. HC r , I�CKIINDENDlWN DEUL UNCHl &LOPE DUAL MIGL wS,E Fhy F!AULROk09ET+lll K*% yFA ScSb A. 5¢ , ,o_ on low I� I. d•m E carrov or c,�u. WM FLIM[E NQ-R 5m I. A� SCALE• ,' ^ 5@ � I _ . eoo l 80O C owo e•s, ,wt• ,�[a xwa aged i�o d� .wo a•m sKa ewso •m oroo t•m t•w dwo Add. a.do dew �-rc t•m d.ne—_- Obl NM7i FLAME NO, , MR FLUME ND. 8 SCALE: i' • W SCALE: I- W 9C0 5w ooac c,•..p I R7J BOT,oNvf�uMe �+ � 10c0 i ,OM e•eo otao gyres t.w xw '� _ - - i ,p5p 1'op Pd Rduc wwAFLUAAE No, SCALE: 1-517 F ai56 f YdQ tux I .. id00 AYJ Yq� ,e 900 d5] '� ms=o .�• 9D7 £ pw am ,•d0 ,•m iWs >ww a,vo d✓a • ca a• s x VYWR FLUME ND. 2 TMICAL FLUMEC AdL WNpy FLUME NO.7 ,aov ,mo ,WA food S!,ALE: 1'�50• �„ w. c,u•� - HOBS: 9A z 90 B!0 � � Irnx wu[ A ,�N00�n�G��F�r[croYGWT>�a�smu[Fo S�MI�JdN W Ism edcu w.�a..>,s.a dxmec,r so„'�n,[w- - ,'Arvrtv CW[ n<. d[u�gcd[nwr„tiID &•w9nR +j i 1801,dlOF P.Wxs � EC dLLtlH4F�%n���ns �GM��01Y1 � n� mo eso durewwd ddd w.Fn. PROPOSED VWYR FLUME NO. i —NO. I WWR OISPOSAL AREA PIEDMONT LITHIUM ±MR FLUME NQ.3 is0 on sc,ku: ,' 50' dwd v30 t•w ,•Jp roe ms dMd 1w awi a•w s.m I VAVR FLUMe F1Q-4 .n PIEWAOldX Frd+rom LIO. , Iz. SCALE-. I— ' (Mdldn Courp. HL iw.d solve. w]+„ irI pN11'AEL WOlE4T1]M 30 'mwOGVAeuI w..a evrr� xd. d .usp YD.� Od0u,8odcVtPdnM wnasGa O.MM>•odccddne,d yy p(Wispfgx dwrow yn 6dcuri➢iDCstll',sw eA odourto KfM>w.d 1U50 �� x010 1oM; iv �_ 1KA 1:E0. _ _ f,W none — nv]0 � 1W7 _ 1DJ0 1J50 _ ' I Tpgv -F-F moa0 SCALE: 1' • 50' Dwl 0w1 1.eo 1.,e hc0 eof,aY ti , %VVR F_LYPAE NO- :3 ma _ aco SCALE, 1' • SN m � euo i 10Y0 � a.m Irpt ,•a ,.m xw fA0 arts use Ipt >MO a.n [a, AqD m�orrurS 860 11 WWI:FWME H0.9 I$p SCALE: 1' • S& � 8i]0 E e eA0 F A30 pM1 = I I IC iH0 TW '� 1M0 � ,qp � � Fw ,we nm f•m ,ro, I.m w a � mmrs FLUME NO, to 1RG vOvl[KW SCALE; 1'=SV ,OCa ww pu I,m Iq0 s�eo VAgR FLUME NO.10 SCALE: 1—w - Sftpwtt — m•o.hu,E ! P!CALFLLIMEbETHL I sev N�rFs: KTA nAo,`En awrteE+v:ca.r.m.eae.,ne wr.Auceeecww.a°em"E'�z'�rnwPOi•co�"r�r�'w °e a.a%m+nm � =�_- _J._ ,� q rre 0.wwFM•�e0nuu�ew[s C/1nEC �inEi. r'e -�-- _ Aoc[vrt.weaF,wei m'vnECFux rmwA UE[wl pLyiSgw a,E OFStvI P.¢ at WTfu,ciRv,E I +'�Frt o,��[anC51WR..rcw![u�pWl1„�xAC.9 T[ o. _ 0. NFAXN `�i�eEi`aroureowmu arueAvo aAn""`ir`�`r�n,�ar .— —. 1 sa �. o`A" �" PROPOSED WWR FLUME NO- B - NO. 14 WWR DISPOSAL AREA PIEDMONT LITHIUM oxo P.p 1N0 I.w fwe x:es a.m w Ism MMEL U E HO-ll Td SCALti: r=�a• PIBpAtiON7 Pllan•nM �lin�m. i�[. Sale Aa SI,gpA ll l Ian � Fra � wm Hors ras snou+m Hoc+nvr,.n � cloi„rerbc..ra.m 1�E WA„ OrgNivrax�Pws wra nweMo.�s w W 6r4PE0A00Clwiw l Tao L •w r:m x.m :wv -pia —1� ►we r a+a e•m iwm n� ,sw n•m raoo 1 ---- ---- ------------------- WWR DITCH NO..1 SCALE: 1- IM I � p eoi - - ffitiu - a�hu „ F � 4 WO __ ".. _. II £ 94C �� �o'r � 9a0 x�ae(er•tf• IYCO 9'A ian61, uru, •� I SppON Often S _ eon � oOTfnGiVrd, p[],TQN tr O•mOf 1 Tw eo wa �o-ae woo m ee o0 o roa o rsa ca 1 no MR DITCH NO, 2 WWR OITCH NO" 3 WWR DITCH NC. 4 WVVR DITCH NO. SC.eLE: 1'e 1W E- 1"=lw SCAM 1-alwSCALE'" 1' 1 aMrn,e�rnmc�uv pryplp, aYnllkr dvn cw wtlrn owml�gr[elion ><nflW Der ae,xP, P�=pq,ecrcrry JePn u.� arm dIJ � Fri ro aTar ertJ Pr,n em n.1 r »cxro �+ r rq r�J �eewNur weKx•,ur ,mdcnrx•. ve.� ra,u+• � PW _.- ow Y7a TcvoFw - 900 806� ru eiOncX i ro. cPo� eao em 'o_ law emTes - - r� '� � em-rc.,v�men em � d � eor•o o,rp. W ouaeJ' uo�n n'`cmpeie.+ „rear" - =-rr ore�a »rt s I � mosoewrier��ew, ee e„aelmr�v ron.�auwiar fOF �a cw� iCQ' _ _ +�rw x00 , w x•m S.m .m rw .9%wu'ts naasv[C�lee r.,[•nL . � i.ee �•W aim a'°O s'e0 SSS Nw ..m a.00 e'er W PopfPwL•�-wPAc>"K�awai aE[r U/+7rMx w•.eT wosoc" Pr xri[pura�u. nE rm[avu e[ n euue+xn oWal nr xY�aE [.a r _ 1WVVR DITCH NO.6 � pw.n.wormio.. �e,nrJmr �' �ncn• a.x woe Nrna Y 900 ,mnrmw� � soo dJo„ow or e[2n d NNlR DITCH NO. SCALE: "• tW emwMOin a�JsrawmlCTM R I 6rJ rpG[eNw� WWR DITCH HO. 7 WWR DITCH HO. B o.uare rnoxxrvr Dorn uo,�w,.wreem• nocler+u>• am .. Ta a•aru sm eao f - I i soo n R DITCH No.1C SCALE' • 1 tr oiwwe�moxicnov V'J PTa On�4Pour¢p qxx W^1U � WJ'[n Yrn[5 TYPICAL WWR CTTCH xeO.1- NO.O DETAILS SrG Dior+ MJ� prxoYwpn, iF1a pgMla wmleeigH arnr W. r i1 sn aoMin K+� �IAIP ep +N.r pIW Op• OnOnr®neol w wKi prG n0.a �dJ,W WCx w.w wxn a[d W.e Sa wOineP IOO,rwPu' 6,P AO41rmF]o[wM1V+ xYw grwn¢e ww groreno Ra awn grp•am,,a OnOJr�µ KlYfvlV ...� � io-ixm�nornc noevwu eeo�we `� nimnwesl.e •.e,eu,awre+rnx>w surn•nv +re�0i°6a,m nw.ww o[!°Isur�ndw �c:sw.� an.x„rn:cr'a`wr w�a.�'.+wuw a,ro, ecA0C5.�e'� x1 wrww w,.e,re n.nm wau xa ,.r nwa A.vauw"�`r ��Porra+u�mgoo°ee ��e"� In om n�-i—,w.rte rro- xa cem. moll PLAN VIEW : PRCPOSED MM1VR SEDIMENT PON]]HO.+ Y u: ,••sv [1Mori mvlM *NN tYtaaLe.iYTl/rrtif S50 gbp k-7— — i4 Lid.{ a �e�.�ecW➢ � � ?�� — � ivwnw �r¢`auy p jla L CUTOFF SREWCFi o IL S� ON SE' casrH] 1f T I III pee ,Ma t•ea +•M x• am Mi HN eee SECTION A -A• awe r,w Sw sbo- PROPOSED EMERGENCY SPILLWAY LmnFwm.m "arP P.ri•uAN.I nice°wnm. Qom PROPOSED EitlT CHANNEL TV;MCAL DROP MLE7 DETAG STAGE STORAGE Ci1RVE » BL TP I , i�N F,3 cnwe I tm n. rw rmw�.yL.svpp sen.rn srcewe oculaE carvr.r..�rs .vp. 6 Acc. WiaC.�k PA M1i {ef K! .•rv� w �► y.r0 aCnenc e.n ye+u M1I Tr•.m wn o.. q1 Aela s °e° uiy'� q� � y ! A+e ua�ia nm �T os�i , xoTua .m r�0.�iw ssp Iw�w wn osA6, � ua� r�rvir 66a k�lA ]e,a oaCle Ail u'm ae+e r�eeo u f.T•5T .mi, rm �w u,1•�e AAA, ise uw i,w � RTN. 6Ao ,Mw n,Omie a0.Ni s, � �.+P 0.Tm A� oAAl1 L]ie] v-90 1uN mr�oe o,ax.s � o.am amr w.n rei�m � �� i�ixa aao�ia3 nm 1 � aL,w ate' e.rA i�,m aww nun ux�n AnN�i quo .rA� �iwm R.ne teiyp P1Tr• ILOo mnm wr. +w ew•• eJip afe aw.x tii.x, ,Fw lead rrw.oelhr.Y ��,A,.gx.pCr• i:,y:.;.-x•:7 .—frAMv .n�'4w .cuw i]PdN[No F V xYiYNwe .rr+n prwe[r SECnGlML VIEW L r � rypmj s W CN+ IA Nom '+�' •Im,rw�l,+A+iNGLo0.Cw>DoxearyrA[X ON pilfiGeiwo Gliwi]pyyprly 1 LWMsiuWL • vn•viu M1. 3 LOe,1 iPA 1N{IILS Nr MC9APHICL MIN Ii.1['llCt 1lWOAAG L.6p. xiintNl.Ay�Cph'IWGiO FVASTiYC0.IR DIMIf[iRi,TOlMAW[Whilri (apll pripu MAW,!^ i TIl MM W[at1Cu Icwi•MRnna.Y Nhtt,%p ifr i[rAvrn.lii'mMACAA FAAIfd,TIMo DT—PW RtM!![MENTDETAIL - ��PLyAffihu?r � �II Nn.r- - - � �NiQ�IIHL CffTOFA ENUI +� r. '-tF+NOYT ELI •K WX9t9�RRM[PDND X0.2 �' � I r • � : �,EAIEFDENC�"J rypp 47 - �._• - NDRUFL P.Nn E15 iY} .f ' Ph0N0.9i0 aI�kFL Pvwnnccs�3aAc-- . CHAIN LINK PEN f'' .• fl ' PLAN VIEW: pROPOEED W SEDIMENT POND ND.2 gpulPR � J+D. A6a B`� FgirnP oaounpanw.Ts) = Ppeln— raLW*lJNL e�aon[ bF IaHr cL•ro�p � x ww:+orcw. � aix 5 �r}�wn WpR�aFa�x x� � 1� x^`• �� L wz au ,Ka t�eo roo rlc[E�iO�GSr�ivawa �rol9�iuRE sEcTlou ea CifTOPF TRENCH DETAIL CO1RPM !SO 95tl ��r'Ei�e an I Ptm :inn . ❑ rFYaT ,GGu'K F Bfq• I ets�E.[}lpnu *mo / — B� � LJ � I cjrleeCn vnv Ms0 1W6 �•® xM0 2.w ] w r�wwnnwaP,e, ww.r mm.:a,mo „pd,nya.a+e[Auri w PROP= EME RD ENCY SPILLWAY a a. aeemP.xox, w'«scm.amov ,,,,,r,•,dv.,w om� vr�br. a> YN blc 121n 1q ,..vre lm bu um Rc/w PRg,-Pogm un CHANNEL TYPIW DROP ftln WA& STAGE$ST�OR M,,p-2CIJ E IGa�: ��r r� m.•.:rr�Giim�� 7u•-�Efr�i i :cl'l4-�1 ,v,m[w.�. sti,r,Pe Pw.nl arow,iF rpiFrK/,�Wr�nd,a wMLaeoexFM wwKo.s � w [errx urcw arrem..� me vn m src«.ac .ow .rc. srnec amuu wlFm� 0.� m a aee [AO n.,00F rAa Ablri an 4m rmm oNee >Ifi] Y� 0.N�e ue¢c ,m �>e ryi Xm o�, «aw •m amaR aawT ,gym �ll1�RS1u1P i-,�ra [[.Hv�,� NI�'15 ]'77* WL�]` Nmiw [LN iY% ���iREiW a,�N [. rai�� Isowmra t�SIr5g0u�]R/�[Nu[we wx[nvYON[o.e[[C�tiNil[IINw[My[[I[NVRYGIWnLi y Pnrn,[�wvN-McftlwcT-, IWw•c[ DT+1tr.f,III,[[r{I%i-Lgw Afih. 1 MTA1l an�ECu>[WGT[iHRSTaIl01 r.1xf.[1[rI— FL,s1 Waisrt ln1lr; Mie0,10[MLW •.r1acFH IVY'+�[rweavwwx[ew'*�G/Ef'R"'x�xmrw 5cbveRa111i[Maviue AaS 1s w— YVpr—&EMHA MEHr Ile urnwl..wlN.l STAGE 37p1;g3E CURVE � '^wA aem.�N.rwoNv,a 6Erka. �{�, � � .ea. s•m. ��'�� /.•' j ,.. ,w.ve awoa..wn sam �r Aucru.! - e R ~- y PROPOSED EMERGENCY SPILLWAY ' 'T.�1�IECUO.s�lalc r 1 � M.iL. ^+�M�^ • r x a NpR•hL PODL EL 1gTa �`� I 1 auac PaxC uMilr a. xxR �al..prr roRo Fr�.s � � * 1 �' -- a�.rtr,m rta-[mow, Vim+: v � m at.� rt �u � enTM iwi hau en wnr g*nwvE [Marva STCI.E EHt:ilDY 9/SSPATIXt + ASueSNw tax u�i tA'V i4 • _ W 66.0 _ _� NA .i"�,�� � rvu w.erdW�e.m dxn 9..+c'0..v Niac H1[D >f 0.MN m rMm 0.r,% rm ua9ctl aft•o ale6, gyro 0.•y�ig Daf[c � ROPOEEb WAIF DUCH ND. wrrhq.nxopwtir.rpu. �' 0.,N. F tm um prpy _ _ l . •so 1 FROPosEpwAw [LwENp.e �" wmY. nx.4. a,mr PROPOSED IAKNEL rw °g°[' a P�10 xoRD � \ 11 rm xeoss t.m . _ I LAN VIEW: PROPORC! W WR SEDIMrWF POND RO.S gdnDn rwr(n eso esF . � I Dl n,6 •�xA•� i � Fu uAremAl� `�xuwnuwtvrgiM'+oa�no5e B00 i iaf — d DW � _'� txur..:TF.O iC �%CF AiM�.CrAn OrinF>•«ute,wa SECTIONS-k' CIfIOFF TREPJCH DEYA�L aC.AG t••an r+,T.S A60 aR•tq.o � 80a l I PFD Dew w(. t.to w rwa �.aa :.ro wF SECTION A.N aC.uE: -W TYPICAL CROP 41 LET DUAL I.1[r meOf rntM.rDIr.4T� IM SrAu.[e \ +IrwlrAl ter`• 1�11 �[[tfMkNd'Sw.MW tWSiTfFM a1Y / w:..rrFN� „tnF ar Fran SECTIOM.A VIEW r.Pn. roar met Roils .en rua MAttpe Ion uosmrc mvr[ce vu en;�h Fro u � unH sauxuns L+nrgyAhtxrxhwnµ.WRik[rlar:L(S WIORb-CT,i wr ttlSW NTI6.F 3 Sim iwmr.tFh hxn(Prioln{; ip;w0.51Na[ .".rcri�iir r —rr.wN1I Y+. m0•r mwd L6•! MmriH P,ur nw[.Min�r,ur,IltNrtrnvlerS a[rwrrn[H[5lihvnrt wNpttryrtrup. yDi tp ncu[: TYPICAL EMIR a uRNT p@TAR ..gym nxEss Rono�, ---- i 41 Pkupwo 1'.a MKi.rA.6 ri• rsxrou. M+,.Sa dr+P+ ¢I} x m o�•ewm yy � crnr3k[INe ClfroFF rR:nGM + S�'MEHr'P�HG Nb-e r ,•'w�PAws.rmr nH CwwB1A. a,PP N�.. ,,.,.r5ynufd.u.lanlYd pft-MLLWAY IuClaAl-- Lw�•,[[ [� a E-utp� OISSNATDR PROPOSW EWEitG EML'Y SPILLWAY n�RNK PM i- 6FrAf� A. !li I 41ii i ,S k[5. �r.ypri .mn,Ms ice' , h$ I � 'l l4 Sl �•i5 � S �� t �e . �co=os6oeva:xcrr.ry __� 'F ' ' '.� , '.i� H•..e�. +s:�..: w-ro . �le[:tG':l'J Bx�f �r•nnN_, �' I � , �� it m u ,m Bm x 4POPOsm ExiTCHANNEL N. l� IN 1 nores[nvn}.auuc o.++J eLAH VIEW : PROP26E0 W WR SEDIMENT POND NO,4 c�rbrwr [..raw . � enEi�o2,n[ � LaneBU.[. Me[F� cu �. Wu wx v,fB ,wc 1A[ rm a,04 f.m a,f0 ..m sECTMN B-& @urrwv r wig �ccvnnt,.a+*seNrBr [++r'�'�+ p wnwr n u0e nn roe[aRov� m�x'�M�1A� u�m' o[1bn=uwun CUTOFF TRENCH DETAILB'n oPrnx•.,arWu MO ABB [nb3r RnE„➢ I �v - r-eAro«ei uxn' aw �m��wK W Ke B•se ,wc [. �•m TYMCAL DROP INLET LMML. n18 STAGES 7R�Af�CL— y �nacaa[ Y C s�evw�C m�iaE���lBxs sioe..0 rwE mas sa P�.l ems• " un o-,•r n� BrN rtprcd C� •.rb 0� 0.Hn....r� �,RB Pa,n •'+sa 0.M1. .sa Fo� 1m 0.;p� MffS em R 6,pS fS�B ,Ax aria en H 0.w •ele anw .im, ,,m pP•nhn� m.of v.M1[ ei� ,14W'wxI I - - �.ii.-.r ;.'. #M1 - ea4C'19NNwr .q.t.,�. fi. 11 ir'_ �• r��x __'YOni I•. . i f�`��' %:off. } /.'• f` [rxr ri wa[1 x.n nn. SEC$WMVIEW L �rps• n.�ma ran •anrt s :e,nx[o.uce [o.IA wNco.*.nnw.n�rI•S/s as[u.es :. wsrAl, . Mx.MW-, sa.3 anx I+sa wn's�a w. �[o,ax-rwm, Pw �.:� sw.[�uo a n j. tisTlu scyylRugByunav5 ioeemslnu.1 � Oi[f[llvmoxB,wuw[k Iii4.OrI q[I?IOF a�sf ..r��A•TI[,e[auAufwlAkWIMBNIDIGHrVloe[[[,wuH,w, fKMMlaaFJ[OWI— InP>[tl X/a[I TYPIC4 EMI AWMENT DETAIL m PLAN VIEW : PROPOSED W W R SEDIMENT POW n NO, 5 uo aon.Ltivawra exn� w - aeo 1f em o•a e.aa i.ei f.w s.0 rW l'iro� �•w .wo SECTIOA• BA' 9AA 8A0 ry 9. W Enanq1 ew e•de w e•se � f.pp SECTION A -A' - r.w iM01. TAANLR �sur eurtfAW wWirP nuwArCci�w[ CUTOFF TRENCH DETAIL cw•n GwVFYm TiMKK.lExW 9bF t+was n�gexeb� xseee�.aK[.ox1 ew dwNa+a ta,W A.. etww.e CwF.'r�w fir.•, •aq aiem ew�p. nnfGrm:0.wn � •i•aom Irtp+fp�ta N.i ooeRpAa Frnrt iu mL+ PROPOSED EYEx.EWOY SPILLWAY w.+a I L Lama 7 rx.XGhrPlx»imew} Oa+alFmw un &w54 Y�R maw �>389br xm., �••. AF�s� 1Aw •w tivrypt Caw Ssao•: sAe sYps��em[a PW. • d Cnm•t 0.wxa wdarnr. �aLisy. nand NvY wsNn Y � lamp. 1ms teFM Rm rop,sFA Fr..ee`s: ,m MN PROPOSED EM CHANNEL -_rMCAL DROP IK OETAIL vdA innrAluwWexr ..-L rn� rIe[ rr.. f--�nriyP.fru4xm I SpuI p.3EALVIEW z�°" �Ww%v I CIN cmEi 1. STAGE STORAGE CURVE vmn sE KwP w.6 wNe eE�nTt•Dxorns NrGTN F. iwa:a pr ml PI {w N N n++AIA A*dun[ wh.W,•A W �y N Pw W •� evm Arpr ef,oi �yr�r ayy a'1r offii Aka. Mrul sAe obfrl w40o Aare /m ner•0 Nr•Oo e,at� oLeis a>b15 NCm vn xr aAws 0.arse rm ALwee 5.15a t•Ap MOTES eEfn nxnnMF NhitlnG rp/[Af944 fUrvTAt1 [m NrFnrylAMO r[r[AeK �dil nOA11. 9. ip51,t l • ae.x vurt, sa a [mR NSEs eui:ss iH sneCM+I.,CF AwrK iwrercE se+.ti�rw CJs. 'x wsuu susO.rrt nkA [Cw,P�C 1� i�#s s*R:r[rusF w wn[i,v 1Kr� r NaYr xYY[ S FN". Morn aG>•1[W p McKs, ei,K'MY,,�h S,ues•wnnu��v-u_wuu.r•ipr e�•0[rnxv, fir[x�xuartnKu[oWrtuW >1p r05C LL; TYPICAL EMSANKWENT DETAIL = BOO 090 i5O TOO �w taO xee Yee �q/ J t TYP,CAL WASTE FILL RAMROA MA[L Ym[iniiG #mY�. TOO nwneO� � plMmm 9Eflt•3178LOPE OETNL !M Iun£e m wiCH Pwo Oeaop UWR SECTION NO.1 9�0 OSO 8OY l50 TOO FW eNe !•0� YW �i �W ...ao MR SCUM NO.2 muiE r.ov euaoeee w�amanne a,wl.LONI ,y w,,.,� , m>rosw i-arr+. owP rnucewr+a orc.u"e TYP�CALnra1 ❑ESRIL I—t's.N�q itr rourmw PROPOSED LOW WATER ❑ROSSIN(i EWR FLUME WO. t SCALE: I =w EWR FLUME N0. 3S $Cw.e 1-=SW ors 41. eso I EWR FLUME NO-Y SCALE: IL.5p1 EWR FLAME NO 3 SCALE! P-6v NDTES v W ietn�. yyay ee,,pepNp�o er xne oaanm `s w+M ee�*nox uo� eA nsiK6�a.1HE P:u Nut e[ A c�BntA. v,� Wn.l" a pnGe ixi„ N wawx BLv i+.00e, he x�s[wc vuu �Tayy,W wm NaxNrtvrvoawnvmuneON s,+.� eE.,lx oRJ RT�nTM p14HEl PMR1nl NLt, P'� RwAE Na i MA 4wlE No -a B/i011TC0ADCN �ws ew�a a OWYma eocK wsW AAM rtNiq i+Ge uo .w EWRFLVME NOA SCALE: 1' a 50' � 9LCpWR Y �rlwe anweeo+cu nrcun MICA, F UME DETAIL ni t, yY mo & xa oroXd•u� � emroxvMzH � � ' roB ��ao— s.la -- aNn r.� ewo aKe EWR DMIA Ma 1 SCALE: 1' � 1 p.11Cv1 eonarAonr [.V.•eEL rcortcnoX To ir] 1R] wcx wrne Bm w'titi� fBC . w f v aW �•x e.m o a •Bi W oio iwc ••Nn xwn •.].w EWR orrC:h 00. d srA,nu rnd! *9 pTV anrmureo P*I TM raavcrn rnTBEcnorr a, yr BxifwNNp p1 N1 4C up 4Nn'I�CD>nCN1eY41P uF M�1e•nv 4 .rino�am 7aa c.ca �.m-- x�oe - a.m .•m 8CRLE: 1' = JW aM*ON [enn eortLw WG9N c.geilamoiYGiv1 =o ma vra w �vc.eww c mo 5 7 � '�' w Oxw•�W Sul>� C vARiE 5'TICAL E'YRi G{fCH H0.1 • HD-6 aE-rNLS Boa I I o Ci Xl ru oe mo � a�giaD iG�a I� x•oo ]� i•ea e� B.m ! w e•ee wo] uu V1nn lx m fa•m i�•b ts.ee a•ot i}.m Il.W •e•oa EKR ilq. ow ro opVX ma WmwNrarN w 6]a puvBa vBvr[crw N-k bW[[OfUrN1YR1' n.ri c[]` Glbs� RUCN�W wo of n. �. fl ai ¢ar*uM or m•o• l _ W o x �..� r on ].� i•n f.eo wo M1se !•w ua y ! w EWR DITCH HDI & inOYiAiw,i npyMpeX _ chueVammlCfA]B 6*� eLLK BIBBVv POCYWeU Bn0 eoo ]a.b gruo eoo Boncw � I ma oNe — r•m ano MR DiTC ND. B sCAL . r=� oo++o+wa• awavEr. �sr.inr'G FfJ i"r] as IJJSES �i�na�weO cWm�MS1�gM�S�am ar Oul�ARF mpxergN....eE ni ¢Amunv tanAusS.Tc mo*Ecttw s �Y' 11W.iGldWRS Pa99PIFelEe ll[mTC�.•� r.] POCt � eV-iN[�E nxcca6��ee V.e iYHlnt'M QNKtT spe-+es nrtdw+¢t-+rr;morxxL el x IEvix�oSSVia+Ee �lvrne.•E I•sl W. 1r,PrM1 �V Van nNEiTXeYMUNp dAS�lEn uoal:�ftd1[NL IwB�. iIEB�Aati?wsiVOrVwls•[[•ai �POEr1fYeLec q4 �wT�(nK mrWSVN.p of sas+YervY� Wlw:i w04�CElNn!•� �Xm.�noria�5!Wt P ®PUr��-ltn uen.•r.wrElE w`[TSoIS P�iI�rt•O1u�w'FL-l1E µ �gpp[.VrtX n •EIXW oc C�Apo owNu+/I+•.]�1 en¢ �Bi� a�w� �tM�YA1vr•LIHI• xru ans HN>•+eeewu •# 0e uxv. of =YxuronSNEGr•'r0 o�EKhIwN. \�Y�ul�L1LEL PEAEr+ �! Y • AEU LT]W xJI PLAN VIEW, PROPOSED EWReS EDIMEW POND NO.I ZQ Sonar' gm ] pprx417 )y� WD{�. pp{{ w p.n IM ,•W ,.ce two Pw ••sv "O _ _ awP wsv ,Ka -,Hv s.w aeL ArA g curer mcrr_�� aish.G Gu0.tip P�rt,[Hrs, ru x.+e aL1 •.�wwrwr ur. ro aaao�x z� �eur uT+nae.wTeNe. CLRCFF TREYCN DETAIL °OHS u-4. L card � nv-0oiw. e.y Pm•wn.xm Hwx..aw o.,.� xex vww`m.Acw� aysf Ceusp. �inN o.vnaer,.. anlr ..e uwv�+e rwxwy. PrU DSED EMERGENCY SPILLWAY T� '�EatR�q liml �..Isr.q�llA+n•e<aex, rp.�Ynw•mJl Wda."9Kn a+a '��rv,n�a [a�[LAwry � =- PROPOSED E1tIT CHANNEL STAGE S-CRAG E CURVE a W wPOND aY., �a1xeClulrr nY pp.p� ml Ra m rn srp"aE xCa,A� CMHRnT— ewa i.Pn4Hr=pHPNI.I nux. npL a*we P, ILI Wnl ,n, apw � An u a1..W aTf..,at6E NeEm/µ n,m iyp A,b, A,[e, xxY txepe 0.0.me �m amT mop arse eao.v 'm +.nrn rae nIm ni pl ab�[ axiom ,-00 felm PbPe TYPICAL DROP 6LETEIETA14 "TInk �uAl..n q� .----.Polccm.eirr -• �-,T „ n ;2^i aF2k a �[xrrl•ul"I .a, xno[x SECTIONAL VIEW �, �rgw sTAVRIn �.SHrtNap/FF MmWC fO.In[151pn [imrM PVYne}XJx nAlO fxryxM so{sLpops f.ia:4":{xa.Nurnor ssn Pae. aLnllF w,,[caeWeaz wernn ACaa fISVMIn{.s. x AN�pWxa„ ro ipyy s,Lu[— AWe epN WI[ILfnWjNN xj x e,.fAPLx.O,i, ,, [.rq MNF•151,.,1Nnv[•Lrlhtx,yN tlKi111 t%e el. -wy. 514�aLL�N,�(Lu•uw type rpyWL TYPICAL EA B WKNENT DETAIL b ,11`j�1iky11 �A �fITCH -�•f �e !'rI •� f - Pnc�os LEspl nncn'N0.a. ��'r�•+ .gyp A , ■\ �, _ _ S •yyncaHOlfrSl. 1 II '. �y,5 , , g•. - - f1 1 , � `� � 612NE�lERGYq p� 1- R .-AT � r k 7 a�.y� n'f :Nf HkG.2 f a II , 1 dp J��•r 1. PLAN VIEW; PROPaSEo EVlR SE 7lNfNT PpHo NC.2 YhE �'•ep gpn F Tecrw L5p _ .... --�� eoernam[pwGiRRN�.RPi cai,:drw.ne �r4,.µ as 1° �'�' Rww.P,mcurmnmrf.. --�Y j L TW - � r, �gl[onmEhcN TEO nquNi VPmww.Rxw a,4° pqp .ye tye x.[a xNiP t:alPxcfeOro�pFaiAloYm pplpA lax.pP[oENFm O'iYY YIHaTUK 3EC[]Did.@•g' CIICOFF TRENCH OErAI� 990 - 950 4a •if.2n Tgo i I oSUF[��pKali�R � T�0 o�W E•Fe w t•Bl i•R ]f-0 ]we SEGTiaNR-A• — 1•-aP M c�rlix.�i �.�aVe s.Mr om[• d n�.° u�a. vaw. ax w i..m e� m`ne�anr� PFMPOSEO EMERGENCY SPILLWAY N.rA Lm Axxb L neon prripw]n[wvonuel ip. A�aWfLfwn C[.�wC Lmnnw: uA mw ebNx°af NRdWHW tRaw�ewYm�mxw remeo v�,rp•i. a u,..w aa[za Rx..v.: M.Ipm wk°�eed• saama"["� crer�wvS 1�u�NN Asa a[fmp PPpi O Uw%FCHANNEL TYPICAL DROP IIYLO OETAFL _ S7A s 57�0'R►. CURVE sigrvw YJL1Rre CZ�Rm'c FxA s]uPeRf iC.x Pa x nN. � RnG au�i IP m Ni al nAFn f4'u aiovRp! V]iRPdRv yr, Cass PS 1 °°.wle W Pe,(Y9xF 1 m Aede:a am 1m ¢e*n AteF° earn os.n a[o pAea% [Ap O.dN F.a6 ere�x n,w a � 1�eN [m uwM • •xe 1L°n W wr fw ¢Tiw E FM . FeR Axel [IlSvuxPll-� - F4fGftt'1 PI[++rr .. - • . - _ _ - _.'g'-^_- •-r.—gip,... [vn t1HetlPane nae n tv[m P.FN] u won SErnON0.L VKW �.-„[„p, �,,. vwhirR..,n inn• ' ptmsna91+nf1 M1 •h [no5i0n [6NAd b+d+ifP�4N �R'+TF3[b!4 umM 1 WYl FiyF eRxiFe ue R[NROA%[ilKw/ hTLF SUNOMnYFi F bi41 W[neP aup�wFlrFw[o RAIA YI eue'NFPF OA[minm uNeNN.IFNI I[Crllpw WlmFi pl Sxw r.+K. Rxa niPL xIALL furl • wwxVel wwlP of a ti. FEIYrtIN f•L SliMulauw [pwNc. I �' � •�F . TYPICAL FMB&%KMEM G� STYE =RArE CARVE Erin EePPp�pNp1 Arrrrpw.Pipieea r i � xlj r /C° rnruut- EL TTI�P _ _ wpm+.c �wo-uas, xe ' OPa WILLWAY L1AMS.aSERCY �L £IROPMED EMEROENCT SRLLP7AY r� / ,.� _ - - - �/ /� _ PROPOSED EINT L,IArlNEl - nab �mA...wrn I•'' v s r x a , f / l STWEENFRGYWSSrsaT 1 ,` it "a"^w'�a'°"R'sd"�I /ff � I• N PRDP06EDFEN �M - SPIL�i4nY �axM1 � siuR.estiwul[(ywaa„Rpyg 1 I - - _ _ _ _ I PROPOSED • • - - , M w.h• Iwrvewty DGv. EwN.tu.�rtyqup,a isimrr, _ u 5ir�6e ��' � q solsc was• - - _ _ _ I _ _ _ nww�. [.n �x�ml�� .�.. &en. ie°Dao' �JxwPw a«.' w iu im PO 4ci ,fix N: arwAAE iM �u r..., aI m sn•.e _ _ i _ _ - - - ?R_PO }FAO oA1c1 s s,.Fmo 0 ]rtP 3 g � .I _ _ - P,M YSIw wa ka v,.ope „1,p aim eb,�e agar � awes ,ns r� S.Of'a aelm ��� _ _ - \ CENfERL6JE GRCPP rA61R71 CkILI Wx F'ER M+emr¢ wwaRp.py PROPOSED EDIT CHANNEL raam Pk.W Nw srom 1 v,an xoc E'M! rwME Na s PLAN VIEW: PROPOND EWR 9EI?pM R POND N0.7 p G.[ow rraw, LW gpp aoasrn papAelwpaq�Pn OvF�IA]11rCCT}sri— RL.. ,u. � +alrn. a-.avn.uu uus,u� SECTNkJ E-e' RMrF TREtJCN DETAIL overt no cwr wR.arpexN SECTM AN TYPICAL DROP INLET DETAIL .nu Pns,Me :e.n wun, m-1 2 sun- I,'Ltx,'Rln.1 axrFRsn[ $ecTPixrai,aEw L � ... ..RIP "n.aV16 ,. sctwvti+rvu Avrnxc Ia IMSOn ro"r.oLorwRinzi nno nnlamn susunx L.lm,.Anlw.ai.lsr,00. rmu.Asrus.r A[Cnow.n-iwrrJ P rcrKrsnNcwPasa ,..ml[L,mra. A.o<wrive tunnel R,uenrwE a. allrnr nida 1ur.mleNr ,:x ILew1 rcr.weor nvw. ..,nP Aaannauv.N.rrnwnr.ua sssmnnleoLlnvHlNnnvon.er sn000u.,vc TYPJ= EMOAWMENRDETAIL T 41. — — T ��__ .� •-=fit k` si��. Al j 1iAULROAOT¢NURTH.Pd1++ . �, PLAN VIM r PROPOSED SEO W ENT mN D HO SB 1 e rw _ --�� e�ss•vW 0v[c ew _ ipvE .OVRM16f iNuo pyuuavSwer+4.Ww --�����—�_ vA 0.2o O.49 Ort0 e•sr. ,•pp [•20 [•.c [•5� 1,Aa 2•oP a•m E•[C 2•EC secnox Aa wuY r.� .zo _ r �vo0a0.•eet q �+�i0.•ew ____ . .eerrc..:;oecu ,dl iBP ]•M 0•E] b[e ps0 A•80 1.Oo [•po 1•.0 [•66 1•ee PwC 2.20 2•.v E•60 r ..r•iub PROPOSED EYEROFkOY SPILLWAY (corm ,ulyd• €WTwO CAbunO V�r[�/re, ruw.rFina r wrwwr.orcwmeEORorY CLITOFF TRENCH DETAIL TyPr-M nROP JNLUT DETAIL �. V. �1 —Aar • amiRaAc.v } . . . 1P1!'l."Yka A{[n rtN�A'. if%EM&I VIEW cru�� rm. u I WID 1F�GMfir M M.C?. [nx 111.W tNT4•V vM1ealEmF�.vary pF NREYM1YS 1-AN- ,MR MFLUIMInti,D,lYr!!W[THy plPkrnT W10lNpANM(YI :Ir Kt(NA w[tlNV E.LM. .4 11�aaMl[ycnle.erty�t'µnl;yWµ[n..E [awuc I m� *TW71L lHMIt .. S.apo sm� Curve Ww+rFl.e..y A]u � r ts.,pa.].� ,r. ]rPrl�irrwF Pwsr :h,. ww" —n n—� Hwy» yy lww� 1nP'] CMUIETE FLIWIE CESKW Po,.'sn wr•nf.se, [. "- a..M..sv rw.9rrnrn.xso•reotmwv.,«�.n; rw•'l T].Y: nap,nveA ryeK9p ]AY., GonY rq� r.�acF c�iq sro akp. R�sM �>pP�r Hy1•Jue Oyefm:t e.wo�ee�: ,aao u�•-...y1�]ur.,�it[CL.86 u.�wp•..dC�0.wtt Mxi�d Fd X"N' eW, wF,� µDay. o.o*drw aw,.ei Wtal� .ft•b PROPOSED SEDIMENT POND S63 PRELIMINARY ;atEEr P.ven,mi WYuna 3nc. 23032 �Belm Coeny, NC ••'• 0.RSHALI� LLE` FS 7ga STONE ENERGY DISSIPATQR$ 30' H.D.P.E. EMMGENCY SPILLWAY'.. Cfi i , I 1 15" C-td.A- 113GA�VL SPILLWAY 7 -W.,, ' PkOPOSF,D §APPLES". OF 3 F a-; PLAN VIEW : PROPOSED 6EaMENT POND NO. SEP e[v B20 mw B°E �• � nvN,pwm rve .m v-r. wo e.av o.ea i•vo i.zv o-�E �.cv o-ea e.w :•ra z../ e•u e.ee DNO PRDRLEAW y;•,f r.sv K:�L LL iYLao rav ' rm vlo o.n a..l a.sv o.®o �wv �-ea �•.1 �.w SECTION B$• PROPOSED N-a P E. PIPE EMERGRICY LLWAY �Wa u[Np wm.•1. ^ vas. sm x _ sii/e,evi . I>an•.u^Po. v.� e TYPICAL DROP MET DETAIL H.T�1.S.— Slage storege Curve sas aA0 A62 ADI QAL AAa i i rW.Nw�sp.�� ec n a w -- — a^ vauorCcw I.w ww t—$Ikd Eolv.n n+cwnn• r—n .v C.WwE+w.t •4ti•iryn! •Ilge Iyy.µl.r 1..•-n• /14 1 i h4` �• �A •= 1 1 ••j ++ IL1 j I �` I � �1 ••• + 1it � I CPO NALILROAPro'xDnTN 1 1, •,\ }.. 1 B T8 5B3 PRDpt3S BAFF Ea A� {TYP�OF3� A1� 1 -�� '•� E Y, DiS$IPA �c�`,t PL,4N VIE: PROPOSED SEOIYEN POND NO. 903 Boo 910 -- �w� o� e.eo o.so !,m I.io I.eo 1.co PRO=ILE AA' ec•uf: r.ar ii 61G lx. Mo I.IC ].20 0..0 0.65 e.� i,Ltl IK! sl=�rloN a -a• it ef,w na.•...d_.._ti. PROPOSED ENFROENCY SPILLWAY 4curar, TM ormuwo PDUNRNrm ��swewue.wre=kNe.aeui o�wuuolelwe con�"`�rclir" 900FF ITCH DETAIL TYPICAL DROP INLET DETAIL N.T•S, a.Os nart wp t /%om�,, }T '•5SECTIONAL VIEW lrilc�il raN,a vr. n, rsJ ham 1 !F=T atilFase Ylflu!-KN !f/SO.1']rl14'1t 011{iN.C>•4VT, n'ICsid. WN1111MS f a5.4t� MI'wt1 Cf's •Ie1tiA11M�S� •CColmv[L 1wAl.MCIN! Si/MYIO{� f M1el.lLM�N4[aMl�6 R}.Yi.fty[ryel,plNICT,YSYIOyY{sMNE'/�:IT IPGN W:tWO a he wwrn��xlalW+Ln MrvNcta utcn•er s.t+_1tsHlCftn�IpNssseun[a{1VF �to - AL I.rnw m CYf. saMRi. }.ryl op01 NwrwRy(�1+. asl iM..fern W>rl {I e ly m Anr�ca.xlr. em. rewr n....a.. 1wr01d CNr{R ..Iltn• aY!'p. Tlwh cawwe, ray •ta, =h PROPOSED SEDIMENT POND SB3 PRELIMINARY �l IEEE m.weere. �5 of 37 Pednmt saypp, l+c [iuxn Cawy, KC ..•• � $.We As Shown Lri a AI➢lE RDF �l..E . C9 j' SB4 1 PROPOSED BAFF"S I— STONE ENERGY L115 PATOR B {TYP. OF 3 EA.} 1 1 PLAR VIM: PROPOSED SEDIU, POND RA GD4 wPL IJ K1m 140.A AR.11l:.E I.ee rrs e•oa o•r- o.o �-.a o.aE ,.PP o-z. ,�w SECTION e-e' MM - M PROMSEU E1/EHDERCY SPILLWAY Fuer� wpwol^dPr.,Ew�3i ray euxuvi �.wnwn Ic ror cr]+n e�uro�r E� ��S+.fln&.E Ew],xxruru,uL w.n.uw ro �s'c or acururRo WTWF TRENCH DETAe. -4. TYPICAL DRDP INLET DETAIL N,T,$ .ee• iw rRryuww.r � zig I mmysawt.- awwnwwfw pVgE1r�1[MO { Y'Irl:'NNr Mn fNK4. C[r` ui110RAl ow rnm r� n+.na ur unrur xw nrxw Horn nerrrra.�e nmavwramrs x ra�i.�w.uM u e can �,rn Hi rurR.vaerwxernn rRfnKe Lrrows�a ]ryp,V�H-M�Rr�L uN' u'IIRY-+:r CrW4 L10Rn;v MtltlJYWHE'Ir:R HWa W�r%fl'151Y. � lEw�n„v rauiKx Cr ex e[Ty{urnlbhfMD�NC WYIL/R: rPTM P[]iu i�P{�. fFAt�AHN5�4��� sw9e size. curve aD. our nFa a,on o.ai 1 PLAN VIEW: PROP06m !�IBIENT POND NO. SBS eor C.al� nr� fBo rott [L �er�e /Bv •m o.zo v� o.eo a-eo :•oo i:m �-lo -l:u —...1� P00 a.m e.+v -E:60 PROFILE A-k ecu4. >7 B0� _ em eescR. Y. [rOW eN�.-0CviR11wY O�m 0.2� 0�10. Orcp O.B. I�P1 Ilia I��i lean I-M 2-M SEMON B-g e�-vl: r• • iP we^+•hB�nla+r N..Nr.• uuw E•q•rr..ml AROPOSM ENEHO VWY SPRLWAV n.,A eu. w,leek4� r,nnln.,. rn.cNmnewx. i� ��9UTMBEivlmevwliw� ErtrlI ci v-1ais" lm�. rYxarnrnrucnnYre CONrtur C�[QpP TRENCH FIE'EN�C TYPICAL DROP IN LEE DEfA11 N•T,S, .IlnlsalK'+vk ""l"ivM r.vrnr--. •Y j�fj� n ,...urc. rnrv.. y _ _ R �iiplf Oil ■�'�� � I Al epr 1. a Ni .rm nax.pCx S1.CI101YA1 WEW °" u.so. rtan is IIOflf 1 S[!O.M rrMBUCru[IN Srf(d['B[rB•J, RVNR[[11 Ave hTO�[f. Pv1Tl0.Fi s mnua nNm wyi a swl mre wnurB+amcFNce wen.w.yiu r,.x. ,�e eed 1 n41W SrM1FlNS COW �6 21BrSE.:IIy(TYIEp Rk[1:Tnr0 W6WFNE'M :1 [ �Rlxtltllr7A1� Gfi. a Mllxmr.RWaffHtannMuttwGMi'.ir'-r[wefirne vCWel. �r�p[Wptfy prrP Wy TYPI:ALEUB►gK�gBT pE*, /1 1y lvw � � ��- PutiR Y w 1 - r.rf. v.. q rrl terglll el CCv*rr • r......Irr.e .w.,�.u.r •ne � Y w..r.....n. ens • - ,rw er � � wr... i a..rw ,rrva ,000 i000 HALPL ROAD- MOTH PIT r6cue r ,OYO 1W0 fdl0 uuo Wa..—.—aim �D00 �Fw mwo syW ,W00 wain ROAo-PuiJimH RTN PIr my ioav _ i000 o � aaa euv � J eoo �-- goo vwe wm wm u.m rse zMo ao.w KAUL ROAD-AWMLNE ROAD enpr� reWl �• n• W= 0.lvEAi ac vest pMCn+[R MAUL RQAD JYMAL xrn frrewamon.n r -- RAULR g.C&CMAL Pr TO EAST PIr M?CIL1: r:� 1000 Ippp r NAUL ROAD - PLAM TpR1J CENTRAL PIT S �! - J i. r - FL I':J OVrN W- 0 :n.. ♦.:121 .k HAUL *�i4o z'C17 h ) 7f EROS" CONTROLMSJSIIRESjrSS E NO7E) .F --t Fk•. ��` pfiOPOSEDHRIDGE- 'Ep . ` DF$OF STREAM 1 + "I ICT PLANyrEW : PROPOSED 6AI➢GE eeo PROFILE Ad' EGEND J=_ 10 0 YR. FLOOD PLAIN DELINEATED 1NETLOMS 0EUNEATED PONDS DELINEATED STREAMS ,. HALIL ROAD CONTOtJRS SILT FENCE CULVERTS O SUMPS -x - ZOMLNG FENCE eeo BRIDGE NOTES: 1. Through um usa or Ees1 Managemeni Practices MMP} (e.g. awimem Tenses. erosion ooen 1 structures. diversion ditches, slh renew, and revegelarron ma—rm), umir from 654lrbed ground during bridge ov,v+ tion Wir he intert'epled bafo II is able Id leash the —sk. Sedimem yeld from dim rbod araas will ae...egad by sedimenl control s.mcwrgs and temporary and pbrme.ant vageta'br , auoh that any gddod aedlmeri gad;. the re-Mrq stream is expxtbe to ha minimal during —tr clic adamles. Drelnage giant of simcr r . a" wIh the wnmmpo:srreoas tegmmag and levegewla of cl ulurued areas are axr)Wed b prevent ar ml•+lm4ze tha nvalvlbdlions or suspended wilds. Ml divurbed areas till be seeded as quickly as poasib'e. Onoa the bridge co-u.. on Is cornpleked. clsxirbed areas MQ be tedal med to fu Aber minln'dae WAC4. J PROP06E�Wu]'JLL m •o. .. ORKiN�LP NNP TYPICAL SOUTH PIT IIKKFLLL §WT ON = HeGSLL k S� o�+awK pacrr�o ... .. ... .� a. .Iw �•s e.. .xe Nm TYPICAL EAST SQUTH PI 7 BACKFILL SECTION � Inpnp9m eruve� ,m ea .A •-. ..., ax e.w .-_ ru rr r>, .+ ,.+ r.n ..w rm �----I����� we,RCrcaa WE*M OPNINiL w�OVNO TYPIM FAST NFORTH PIT BACIffR1, SFXTIO@4 TEMPORARY HIGHWALL BERM . a+ ea�A m BEnu •+i�i1aY IxB�x T 4� ".., I •i �T1HEIKYICF www^--� � 6 FEET HIGH WIRE FENCE DETAIL TYPICAL PIT BACKFILL SECTION qHIGH PEN, E—\ ,T NOR=14TP TO 1 VFRTMX OF 1'IN& SLOPES OPENINGS I PLIOAT@B MA'fYeRIAL��',"�'G .. ..... . SAFETY BEHC}ES �� FR o� IRE. d 1I $ lm 7TP. ` ' r YP".._ EARTHEN SCP�EN 7L RM SECTION + 1 I 1 4 f 7 � mecuour raar><Xxrr �s4 i I Ir4 w 7S FEET IRIEp6EFFER 1`Er�T a1R-T LT BUFFER DETAILS 56CTION NEWS TYPICAL PIT CROSS SECTION TYPICAL RECLAMATiON PIT CROSS SECTION PIEDMONT LITHIUM, INC. PIEDMONT LVrHIUM '� aR.r+n1 R I E D/IAONT 32 d V WkC.OLNTON WEST QUADRANGLE GASTON COUNTY, NORTH CAROLINA LITHIUM ROY COOPER Governor MICHAEL S. REGAN secrrfary LINDA CULPEPPER Director Piedmont Lithium, Inc Attn: Patrick Brindle 5706 Dallas-Cherryville Highway Bessimer City NC 28016 NORTH CAROLINA Environmental Quality October 21, 2019 DWR 1120190035 Gaston County Subject: Approval of Individual 401 Water Quality Certification with Additional Conditions Piedmont Lithium Project USACE Action ID. No. SAW-2018-01129 Dear Mr. Brindle: Attached hereto is a copy of Certification No. WQC004201 issued to Mr. Patrick Brindle and Piedmont Lithium, Inc., dated October 21, 2019. Please note that you should get any other federal, state or local permits before proceeding with the subject project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: � & North Carolina Department of Environmental Quality I Division of Water Resources 52 North Salisbury Street 1 1617 Mall Service Center I Ralef h, North Carolina 27699/617 rH 919.707.9000 Piedmont Lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 2 of 10 If sending vio US Postal Service: if sending via delivery service (LIPS, FedFx, etc): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Unless such a petition is filed. this Certification shall be final and binding. This certification completes the review of the Division under section 401 of the Clean Water Act and ISA NCAC 02H ,0500. Contact Sue Homewood at 336-776-9693 orsue.homewood@)ncdenr.gov if you have any questions or concerns. Sincerely, Mac Haupt, Acting Supervisor 401 & Buffer Permitting Branch cc: Kelly Thames, HDR (via email) David Shaeffer, USACE Charlotte Regulatory Field Office (via email) Byron Hamstead, LISFWS (via email) Olivia Munzer, NC WRC (visa email) Todd Bowers, EPA, (via email) DWR MRO 401 file DWR 401 & Buffer Permitting Branch file Filename: 20190035PiedmontLithiumProject(GAston)_IP.docx Piedmont Lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 3 of 10 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION CERTIFICATION #WQC004201 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15 NCAC 02H .0500, to Mr. Patrick Brindle and Piedmont Lithium, Inc., who have authorization for the impacts listed below, as described within your application received by the N.C. Division of Water Resources (Division) on January 4, 2019 and subsequent information on May 31, 2019, July 3, 2019, and September 5, 2019 and by Public Notice issued by the U. S. Army Corps of Engineers and received by the Division on January 17, 2019. The State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval requires you to follow the conditions listed in the certification below. Conditions of Certification: 1. The following impacts are hereby approved. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b) and/or (c)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Stream Impact 1— Stream 2* 178 (linear feet) 0 (linear feet) Impact 2 — Stream 3 1,090 (linear feet) 0 (linear feet) Impact 3 —Stream 8* 249 (linear feet) 0 (linear feet) Impact 4 — Stream 8 549 (linear feet) 0 (linear feet) Impact 5 — Stream 9 77 (linear feet) 0 (linear feet) Impact 6 — Stream 10 520 (linear feet) 0 (linear feet) Impact 7 — Stream 11 30 (linear feet) 0 (linear feet) Impact 8 — Stream 15 1,126 (linear feet) 0 (linear feet) Impact 9 —Stream 15* 81 (linear feet) 0 (linear feet) Impact 11—Stream 12 917 (1inearfeet) 0 (linear feet) Impact 12 — Stream 12* 700 (linear feet) 6 (linear feet) Impact 13 —Stream 12* 55 (Iinear feet) 0 (linear feet) Impact 15 —Stream 1213 240 (linear feet) 0 (Iinear feet) 404/401 Wetlands Impact 14—Wetland 9 0.18 (acres) 0 (acres) Indirect Impacts: Wetlands 1-8, 11-13, 16 7.46 (acres) 0 (acres) Open Waters Impact 10— Pond 3 0.08 (acres) 0 (acres) Impact 15 -- Pond 4 0.08 (acres) 0 (acres) * Indicates perennial stream, mitigation required Piedmont Lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 4 of 10 Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received an acceptance letter from the NC Division of Mitigation Services (DMS) to meet this mitigation requirement. Until the DMS receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to the DM5 to meet the following compensatory mitigation requirement [15A NCAC 02H OS06 (b)(6)]: Compensatory Mitigation River & Sub -basin Number Required Stream 1,263 (linear feet) Catawba 03050102 Wetlands 7.64 [acres] Catawba 03050102 3. The Permittee shall conduct surveys for state -listed mussel and crayfish species within the project limits prior to project commencement in accordance with recommendations from North Carolina Wildlife Resource Commission. Survey results shalt be supplied to the NCWRC prior to project commencement. [15A NCAC 02H .0506(b)(2) and 15A NCAC 046.0125] 4. Streams within the project limits that have been avoided by direct impacts from the project shall be monitored for surface Flow by the Permittee to establish any loss of hydrologic fun ctionlflow and to determine if the streams continue to provide aquatic life propagation and biological integrity per required in North Carolina Administrative Code 15A NCAC 2B .0211]1). Continuous flow measurement shall occur through gauges installed at the locations identified as 401-1 through 401-5 as shown on the attached Monitoring Location Map: Background flow measurements shall be conducted for a minimum of 1 year prior to the commencement of pit dewatering activities and shall continue until a it can be demonstrated that all possible pit dewate ring conditions have been realized for a sufficient period of time to document flow trends during each season, and any hydrologic function/flow impacts have been sufficiently monitored. Annual reports of monitoring shalt be submitted to the Winston-Salem Regional Office on June 1 of each year. If monitoring of stream flow indicates a reduction of flow of greater than 10% at any sampling location, then the Permittee shall submit a report to the Division which includes an analysis of of hydrologic and aquatic function of the stream. If the Division determines that there has been a loss of functioning accordance with 15A NCAC 2B .0211(1) the Permittee shall submit a mitigation plan to the Division. 5. Upon the start of pit dewatering activities, groundwater levels shall be continuously monitored in observation wells OB-1 through OB-13 as shown on the Mine Map provided with the July 3, 2019 supplement provided to the Division. Groundwater levels in the observation wells shall be recorded a minimum of 24 hours prior to the start of pit dewatering. The Permittee shall provide a minimum of 1 year of baseline monitoring from previously estahlished monitoring lnratinnc [MW-1 to MW-5, Piedmont Lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 5 of 10 OW-2S, OW-2D, PW-1, OW -IS and OW-113J to represent groundwater elevations across the site prior to the commencement of pit dewatering. Annual reports of monitoring results shall be submitted to the Winston-Salem Regional Office on June 1 of each year. If observation well show lowering of the groundwater table below that predicted by the technical memo submitted to the Division on July 3, 2019 then the Permittee shall provide an updated report that addresses impacts to surrounding public water supply wells. 6. A copy of the stormwater outfaii/surface water monitoring plan, as approved by the Division of Energy, Mineral and Land Resources NPDES Permit and/or Mining Permit shall he submitted to the Division prior to the commencement of mining activities. Additional surface water monitoring requirements may be added by the Division upon review of the surface water monitoring plan(s) approved by the Division of Energy, Mineral and Land Resources. [15A NCAC 02H .OS06(b)(5)] 7. Stormwater runoff from impervious surfaces throughout the entire project site shall be addressed in one or more of the regulated programs: an approved Sediment and Erosion Control Plan, a NPDES stormwater permit, a NPDES wastewater permit, a Division approved Stormwater Management Plan. [15A NCAC 02H .0506(b)(5)]] S. This approval is for the purpose and design described in your application and as described in the Public Notice and as amended in supplemental information supplied to the Division. The plans and specifications for this project are incorporated by reference and are an enforceable part of the Certification. Any modifications to the project require notification to DWR and may require an application submittal to DWR with the appropriate fee. [15A NCAC 02H .0501 and .0502] 9. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the footprint of the impacts (including temporary impacts) as authorized under this Certification. [15A NCAC C2H .0501 and .0502] 10. All construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973). 11. Sediment and erosion control measures shall not be placed in wetlands or waters except within the footprint of temporary or permanent impacts authorized under this Certification. 115A NCAC 02H .0501 and .0502] 12. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be used along streambanks or within wetlands. [15A NCAC 02B .0201] 13. An NPDES Construction Stormwater Permit (NCG010000) is required for construction projects that disturb one (1) or more acres of land. The NCG010000 Permit allows stormwater to be discharged during land disturbing construction activities as stipulated in the conditions of the permit. If the project is covered by this permit, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self -monitoring, record keeping and reporting requirements is required. [15A NCAC 02H .0506(b)(5) and (c)(5)] Piedmont Lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 6 of 10 14. All work in or adjacent to streams shall be conducted so that the flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. [15A NCAC 02H .0506(b)(3) and (c)(3)] 15. Culverts shall be designed and installed in such a manner that the original stream profiles are not altered and allow for aquatic life movement during low flows. The dimension, pattern, and profile of the stream above and below a pipe or culvert shall not be modified by widening the stream channel or by reducing the depth of the stream in connection with the construction activity. The width, height, and gradient of a proposed culvert shall be such as to pass the average historical low flow and spring flow without adversely altering flow velocity. 115A NCAC 02H .0506(b)(2) and (c)(2)]. Placement of culverts and other structures in streams shall be below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20% of the culvert diameter for culverts having a diameter less than or equal to 48 inches, to allow low flow passage of water and aquatic life. If multiple pipes or barrels are required, they shall be designed to mimic the existing stream cross section as closely as possible including pipes or barrels at flood plain elevation and/or sills where appropriate. Widening the stream channel shall be avoided. If bedrock is discovered during construction, then DWR shall be notified by phone or email within 24 hours of discovery. Installation of culverts in wetlands shall ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. When roadways, causeways, or other fill projects are constructed across FEMA-designated floodways or wetlands, openings such as culverts or bridges shall be provided to maintain the natural hydrology of the system as well as prevent constriction of the floodway that may result in destabilization of streams or wetlands. The establishment of native woody vegetation and other soft stream bank stabilization techniques shah be used where practicable instead of rip -rap or other bank hardening methods. 16. Application of fertilizer to establish planted/seeded vegetation within disturbed riparian areas and/or wetlands shall be conducted at agronomic rates and shall comply with all other Federal, State and Local regulations. Fertilizer application shall be accomplished in a manner that minimizes the risk of contact between the fertilizer and surface waters. [15A NCAC 02B .0200 and 15A NCAC 02B .0231] 17. If concrete is used during construction, then all necessary measures shall be taken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state. [15A NCAC 026.0200] Piedmont Lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 7 of 10 18. No temporary impacts are allowed beyond those included in this Certification. All temporary fill and culverts shall be removed, and the impacted area shall be returned to natural conditions within 60 calendar days after the temporary impact is no longer necessary. The impacted areas shall be restored to original grade, including each stream's original cross -sectional dimensions, planform pattern, and longitudinal bed profile, All temporarily impacted sites shall be restored and stabilized with native vegetation. [15A NCAC 02H .0506(b)(2) and (c)(2)1 19. All proposed and approved temporary pipes/culverts/rip-rap pads etc. in streams shall be installed as outlined in the most recent edition of the North Carolina Sediment and Erosion Control Planning and Design Manual or the North Carolina Surface Mining Manual or the North Carolina Department of Transportation Best Management Practices for Construction and Maintenance Activities so as not to restrict stream flow or cause dis-equilibrium during use of this Certification. [15A NCAC 02H .0506(b)(2) and (c)(2)1 20. Any riprap required for proper culvert placement, stream stabilization, or restoration of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction activity. All riprap shall be buried and/or "keyed in" such that the original stream elevation and streambank contours are restored and maintained. Placement of riprap or other approved materials shall not result in de -stabilization of the stream bed or banks upstream or downstream of the area. [15A NCAC 02H .0506(b)(2)] 21. This Certification does not relieve the applicant of the responsibility to obtain all other required Federal, State, or Local approvals before proceeding with the project, including those required by, but not limited to Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. 22. All mechanized equipment operated near Surface waters shall be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, or other toxic materials. Construction shall be staged in order to minimize the exposure of equipment to surface waters to the maximum extent practicable. Fueling, lubrication and general equipment maintenance shaft not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuels and oils. [15A NCAC 02H .0506(b)(3) and (c)(3) and 15A NCAC 02B .0211(12)] 23. Heavy equipment working in wetlands shall be placed on mats or other measures shall be taken to minimize soil disturbance. [15A NCAC 02H .0506(b)(3) and (c)(3)] 24. In accordance with 143-215.85(b), the applicantshall report any petroleum spill of 25 gallons or more; any spill regardless of amount that causes a sheen on surface waters; any petroleum spill regardless of amount occurring within 100 feet of surface waters; and any petroleum spill less than 25 gallons that cannot be cleaned up within 24 hours. Piedmont lithium Project DWR Project #20190035 individual Certification #WRC004201 Page 8 of 10 25, Mr. Patrick Brindle and Piedmont Lithium, Inc. shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. [15A NCAC 02B .02001 If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification. Before modifying the Certification, the Division shall notify Mr. Patrick Brindle and Piedmont Lithium, Inc. and the U.S. Army Corps of Engineers, provide public notice in accordance with 15A NCAC 02H .0503 and provide opportunity for public hearing in accordance with 15A NCAC 02H .0504. Any new or revised conditions shall be provided to Mr. Patrick Brindle and Piedmont Lithium, Inc. in writing, shall be provided to the U.S. Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. 26. Upon completion of all permitted impacts included within the approval and any subsequent modifications, the applicant shall be required to return a certificate of completion (available on the DWR website https://edocs.deu.nc.poy/Forms/Certificate-of-Completion). [15A NCAC 02H .0502(f)] 27. If the property or project is sold or transferred, the new Perm ittee shalt be given a copy of this Certification (and written authorization if applicable) and is responsible for complying with all conditions. [15A NCAC 02H .0501 and .0502] 28. This Certification neither grants nor affirms any property right, license, or privilege in any waters, or any right of use in any waters. This Certification does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person and this Certification does not create any prescriptive right or any right of priority regarding any usage of water. This Certification shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Certification to possess any prescriptive or other right of priority with respect to any other consumptive user regardless of the quantity of the withdrawal or the date on which the withdrawal was initiated or expanded. 29. This certification grants permission to the director, an authorized representative of the Director, or D E N R staff, upon the presentation of proper credentials, to enter the property during normal lousiness hours. [15A NCAC 02H .0502(e)] 30. Non-compliance with or violation of the conditions herein: set forth by a specific project may result in revocation of this General Certification for the project and may also result in criminal and/or civil penalties. Piedmont lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 9 of 10 31. The permittee shall report to the Mooresville Regional Office any noncompliance with this certification, any violation of stream or wetland standards E15A NCAC 02B .02001 including but not limited to sediment impacts, and any violation of state regulated riparian buffer rules f 15A NCAC 02B .02001. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided within 5 business days of the time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case -by -case basis. This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. 115A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506] This the 215t day of October 2019 A��K; M4 Haupt, Acting Supervisor 401 & Buffer Permitting Branch SLH WQC004201 IL CLilt,AL A LEGEND ip IF Project Boundary (9B3 ac.) HDR Delineated - Streams HDR Delineated Pond y ' - HDR Delineated Wetlands MYV=S jjhj LO I Desktop Streams j Desktop NVVI Wetland `. 109-Year FEMA Floodplain Culverts r 0 Feet 1,800 - e Mt t"C?Mu l Frr �1—v (y Srtpxg W.. St. i.lL" .. I[T.IY�W.3 401-5 SM. a FNl '� - ►"L- C1 =3 601.5 $1. 7 _ _ _ - J Q. ea1.� Sm. FMa - C 401.0 W S ,� Q- C d PRSVIOUSLY ESTABLISHED GROUNDWATER LEVEL MONITORING LOCATIONS n ■ Pumping Well V ro � Observation Well � 3 0 PROPOSED FLOW MONITORING AND MINE MAP GROUNDWATER LEVEL LOCATIONS 0 Proposed 401 Flow Monitoring Locations Iineb1=xooirH Q 061-0813 Wells from Mine Map {713119) y 0 Feet 200 a 3 - Ca o � a 0 F` Q W n Compensatory Mitigation Responsibility Transfer Form Permittee: Piedmont Lithium, Incorporated, Patrick H. Brindle Action ID: SAW-2018-01129 Project Name: Piedmont Lithium Mine County: Gaston Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitlgation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USAGE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in mare than one 8-digit Hydrologic Unit Cade (HUQ multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03050107_ Catawha Rivar Racin Stream impacts (linear feet) Wetland Impacts acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 6,385.5 7.64 rr more inan one mit! gatron sponsor will be used for the permit, only include ianpacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 030501n2. Catawha R;Uar Racan Stream Mitigation (credits) Wetland Mitigation (credits) -- Warm Cool Cold Riparian Riverine Riparian Non- Riverine Non -Riparian Coastal 12,007 7_9 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifles a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand -that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: ■ once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. ■ Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. ■ Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/iLF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. ■ If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios maybe applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from NCDM5 confirming their willing and able to accept the applicants compensatory mitigation responsibility, dated 12/2112018was included with t_he preronstruction notification. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated hnnkledger to: I j the Permittee. 2] the USAGE Project Manager at the address below, and 3] the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest, NC Z7587 (email.- todd.tugwell@usuce.army.mil), Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: David L. Shaeffer USACE Field Office. Asheville Regulatory Office U5 Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 Email,, david.Lshaeffer@usace.army.mil iJlg igned by JDMESMIE5.MICFiAEAEL5C4TT.125831 4073 Datr.2019.11.2211:25:09 -05-00- USAC E Project Manager Signature 11 22 2019 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.arrny.mil DocuSign Envelope ID: 709076B0-A31 F-40B6-B404-CF5A22A7F1 B9 ROY COOPER Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality November 10, 2021 DWR # 20190035 Gaston County Piedmont Lithium, Inc Attn: Patrick Brindle 5706 Dallas-Cherryville Highway Bessimer City, NC 28016 Subject: Individual 401 Water Quality Certification revised condition Piedmont Lithium Project USACE Action ID. No. SAW-2018-01129 Dear Mr. Brindle: On November 5, 2021 the Division received correspondence from Kelly Thames of HDR on your behalf regarding the Individual 401 Certification for the Piedmont Lithium Project. The correspondence was a request for reconsideration and clarification of Condition 3 regarding surveying for state listed species. Upon recent consultation with the NCWRC, the surveys required per Condition 3 are no longer necessary. Please note that all other Conditions of Certification # WQC004201 remain valid. Contact Sue Homewood at 336-776-9693 or sue.homewood@ncdenr.gov if you have any questions or concerns. Sincerely, DocuSigned by: 949D91BA53EF4E0... Paul Wojoski, Supervisor 401 & Buffer Permitting Branch cc: Kelly Thames, HDR (via email) Bryan Roden -Reynolds, USACE Charlotte Regulatory Field Office (via email) Olivia Munzer, NC WRC (via email) DWR MRO 401 file DWR 401 & Buffer Permitting Branch file D E Q�� North Carolina Department of Environmental Quality j Division of Water Resources 512 North Salisbury Street 1 1650 Mail Service Center I Raleigh, North Carolina 27699-1650 NOFIHCAHOLINA rIMA vI /"� 919.707.9000 Appendix Pumping Operation and Monitoring Plan Pumping Operations and Monitoring (POM) Plan PIEDMONT Piedmont Lithium Carolinas, Inc. LITHIUM Gaston County, North Carolina November 12, 2021 Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan Contents Contents Contents ............ 1 Purpose.............................................................................................................................. 3 2 Background Studies and Reference Documents................................................................. 3 2.1 Mine Layout and Operation.......................................................................................... 4 2.2 Individual 401 Water Quality Certification..................................................................... 5 2.3 Water Quality Testing.................................................................................................. 6 2.4 Groundwater Modeling................................................................................................. 7 2.5 Evaluation of Mine Pit Operations on Water Quality Technical Memo.........................11 3 Mine Site Water Balance....................................................................................................12 4 Monitoring and Reporting...................................................................................................13 4.1 Groundwater Monitoring..............................................................................................13 4.2 Stream Flow Monitoring..............................................................................................14 5 Mitigation Strategies..........................................................................................................14 5.1 Residential Water Supply Wells..................................................................................14 5.2 Streams and Wetlands................................................................................................15 6 Reporting and Monitoring Summary...................................................................................16 Tables Table 1 — Pit mining sequence................................................................................................... 5 Table 2 — Model predicted dewatering withdrawal rates............................................................. 8 Table 3 — Model predicted changes in groundwater flow to wetlands(gpm)..............................10 Table 4 — Changes in base flow to streams that cross the site..................................................11 Table5 — Monitoring Summary.................................................................................................16 Appendices Appendix A - Background Studies and Reference Documents A.1 Approval of Individual 401 Water Quality Certification with Additional Conditions A.2 Technical Memorandum — Water Quality Testing A.3 Technical Memorandum — Groundwater Model A.4 Technical Memorandum — Evaluation of Mine Pit Operations on Water Quality Appendix B — Site/Mine Map Appendix C — Mine Water Balance Appendix D — Monitoring Well Layout Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Contents This page intentionally left blank. Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Purpose 1 Purpose This Pumping Operation and Monitoring (POM) Plan has been developed for Piedmont Lithium Carolinas, Inc. (PLCI) in the operation of the proposed Carolina Lithium Project (the Project) in Gaston County, North Carolina. The Project consists of open pit mining in the Carolina Tin- Spodumene Belt (TSB) of North Carolina where lithium -bearing pegmatites have been identified. Four open pits of varying sizes, a waste rock disposal area, topsoil stockpile areas, haul roads, and other mine support areas will be developed and maintained over the life of the Project. The open pit excavations will require dewatering that has the potential to affect surface and groundwater resources on and nearby the Project site. The purpose of the POM plan is to guide PLCI in balancing anticipated mining operations with the protection of surface and groundwater resources in the area. In particular, mine dewatering has the potential to impact both residential water supply wells and stream and wetlands, based on existing modeling. In addition, the POM plan is required as a supporting document for permit coverage under General Permit NCG020000 to discharge stormwater and mine dewatering under the National Pollutant Discharge Elimination System (NPDES). Permit coverage is issued by the North Carolina Department of Environmental Quality's (NCDEQ) Division of Energy, Mineral and Land Resources (DEMLR). PLCI has conducted a number of supporting studies to understand the abundance and quality of surface and groundwater resources on the site, as well as to estimate the potential dewatering rates and volumes to be associated with the proposed mining operations. This POM plan details PLCI's: • pumping plan to dewater pits in support of its mining operation, • current understanding of the mining and dewatering activities and their potential impact to groundwater, streams and wetlands, • groundwater and stream monitoring strategies for demonstrating compliance with the POM, and • plans to mitigate the potential effects of dewatering. The POM plan is dynamic document subject to update and revision as new information is gathered, and the current understanding is refined. 2 Background Studies and Reference Documents As part of the Project development and permitting, a number of studies were performed that facilitated the development of the POM plan. These documents include: North Carolina Department of Environmental Quality Application for a Mining Permit and Associated Data Package; permit submitted by Piedmont Lithium Carolinas, Inc. on August 30, 2021 "Approval of Individual 401 Water Quality Certification with Additional Conditions — Piedmont Lithium Project, USACE Action ID. No. SAW-2018-01129", approval letter issued to Mr. Patrick Brindle and Piedmont Lithium, Inc. on October 21, 2019, Piedmont Lithium, Inc. i Pumping and Operations Maintenance Plan ��� Background Studies and Reference Documents completing the review of the North Carolina Department of Environmental Quality; Certification No. WQC004201 (Appendix A-1). "Technical Memorandum — Water Quality Testing — Piedmont Lithium — Gaston County, North Carolina" submitted by HDR, Inc. on March 19, 2020 (Appendix A-2) "Technical Memorandum — Groundwater Model — Piedmont Lithium — Gaston County, North Carolina" submitted by HDR, Inc on August 20, 2021 (Appendix A-3). "Technical Memorandum — Evaluation of Mine Pit Operations on Water Quality — Piedmont Lithium — Gaston County, North Carolina" submitted by HDR, Inc. on August 30, 2021. (Appendix A-4) Relevant supporting information and findings from these studies and reference documents used in the development of the POM are summarized below. 2.1 Mine Layout and Operation The Application for a Mining Permit submitted to NCDEQ by PLCI includes detailed site plans and design drawings for the Project, in addition to information regarding the planned pit excavation sequence and resultant pit dewatering. The mining permit application developed collaboratively by HDR and Marshal Miller and Associates provides information for all of the main components of the POM Plan. The Site/Mine Map from the mining permit application is included in this POM Plan as Appendix B. The map illustrates the locations of key components of the mining operations as they relate to POM plan implementation, including the mining pits, the pit discharge ponds, the streams and wetlands, the sediment erosion and control structures, and the proposed observation wells. The operation for the proposed Project involves sequenced excavation and mining of four pits. Mining is planned to begin in the South Pit, with excavation of the East Pit beginning as the South Pit is exhausted. The West Pit excavation will begin as mining in the East Pit is being completed, and mining in the North Pit will begin shortly after West Pit Mining commences. The West and North pits will be mined together until the reserves are exhausted. Locations of pit discharge ponds for each pit are indicated on the Site/Mine Map. All pits have one planned pit discharge pond, with the exception of West Pit which has two pit discharge ponds to accommodate the location of a main access/conveyor road. The pit discharge water is intended to be repurposed as a freshwater supply to be used in other Project activities, such as dust control and water demand at the Concentrator Plant. This is discussed in more detail in Section 3 Mine Site Water Balance. Mine dewatering operations include pumping water from pits during excavation. Pit water is expected to be pumped concurrently from South Pit and East Pit during approximately the first five years of mining, with pumping from South Pit ceasing around Year 5 and pumping from only East Pit occurring in approximately Years 6 through 11. Pumping in Year 12 is expected to be from both East Pit and West Pit and pumping in Year 13 is expected to be from both North Pit and West Pit. Pumping is expected to be only from West Pit beginning around Year 14 and continuing for the remainder of the life of the mine. Table 1 below illustrates the currently anticipated mining sequencing. Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Background Studies and Reference Documents Table 1 — Pit mining sequence Pits Year South Pit East Pit West Pit North Pit 1 Mining 2 Mining Mining 3 Mining Mining 4 Filling Mining 5 Filling Mining 6-10 Filling Mining 11 Filling Mining 12 Filling Mining Mining 13 Filling Filling Mining Mining 14-20 Fillina Fillina Minina Minina The pit pumping sequence may vary throughout the life of the Project. As each open pit is developed, water encountered in the pit will be channeled to a low spot, or sump, within the excavation. Pit water will be pumped from the sumps using pumps that are adequately sized to control the water in the pit. The water from the pits will be pumped to the pit discharge ponds, from which water will be either pumped out for operational freshwater use or discharged via controlled release from permitted outfalls to local surface water bodies. The pit discharge ponds have been sized to provide adequate storage for the potential combination of maximum expected pit dewatering activities (-2,300 gallons per minute or gpm) and large storm events. The pit discharge ponds are designed to store approximately 1,000,000 gallons of water. The pit discharge pond spillways are designed to discharge the 100-year, 24-hour storm event and maximum pit dewatering flow as determined by groundwater modeling. By design, the pit dewatering activities are flexible and can be modified as necessary for stream or wetland mitigation purposes during operation. The mine layout and proposed operations influence the need for pit dewatering and the potential effects on groundwater and surface water resources. The studies discussed below were completed to gain an understanding of the current groundwater and surface water systems, to facilitate the evaluation of potential effects from mining, and to assist with development of mitigation strategies. 2.2 Individual 401 Water Quality Certification In November 2019, PLCI received a Clean Water Act (CWA) Section 404 Standard Individual Permit from the USACE. PLCI has also received a Section 401 Individual Water Quality Certification from the North Carolina Division of Water Resources (DWR). The Section 401 Individual Water Quality Certification includes two conditions that relate to the POM: one for monitoring stream flows of streams avoided by direct mining impacts, and one for monitoring groundwater levels. The Project proposes open pit mining in order to extract the lithium -bearing pegmatites and construct support facilities, therefore direct and permanent impacts to federally regulated streams and wetlands located within the project boundary would be necessary. In 2018 PLCI Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Background Studies and Reference Documents engaged the U.S. Army Corps of Engineers (USACE) and the North Carolina Division of Water Resources (DWR) to begin the Clean Water Act (CWA) Section 404 and 401 permit process. During the CWA Section 404/401 permit process, a National Environmental Policy Act (NEPA) Environmental Assessment (EA) review was performed for portions of the Project under the USACE jurisdiction. The NEPA EA included an extensive off -site and on -site alternatives analysis to identify the least environmentally damaging site alternative and layout. A Public Notice was issued for review of the EA in January 2019 to obtain comments from the public as well as participating agency stakeholders. Comments from DWR during the Public Notice period resulted in PLCI providing a groundwater model supported by a year's work of baseline data on groundwater levels and quality, as well as surface water quality within the site. In October 2019, PLCI received a Section 401 Individual Water Quality Certification from DWR, followed by the USACE approval for the CWA Section 404 Standard Individual Permit in November 2019. The NEPA EA review resulted in a Finding of No Significant Impact (FONSI). Per the approved Section 404/401 permits, PLCI would be required to pay the North Carolina Division of Mitigation Services for stream and wetland credits on a ratio -based amount to offset the proposed direct impacts to streams and wetlands. Stream and wetland mitigation payment is required to be paid prior to approved impacts being made. Additionally, for those potential, indirect impacts to streams and wetlands (i.e. potential drawdown of remaining streams and wetlands), DWR issued the Section 401 Individual Water Quality Certification with Conditions that include requirements for the monitoring of stream surface flows and groundwater levels at least one year prior to the commencement of pit dewatering activities. Reports summarizing this monitoring would be required to be submitted to DWR June 1st of each year. 2.3 Water Quality Testing The 2020 Water Quality Testing Memo includes a summary of the groundwater monitoring network intended to provide an understanding of existing background groundwater quality and to provide geologic/hydrogeologic data for use in a three-dimensional groundwater flow model for the site. In June and July 2018, HDR installed five monitoring wells (MW-1 through MW-5), one aquifer test pumping well (PW-1), and four aquifer test observation wells (OW-1 S, OW-1 D, OW-2S, and OW-2D). Between August 2018 and February 2020 HDR conducted 17 groundwater gauging events, twelve groundwater sampling events, two surface water flow monitoring events, and twelve surface water sampling events. During the 17 groundwater level gauging events, depths to water ranged from 2.15 feet below top of casing (BTOC) in PW-1 (June 2019) to 55.62 feet BTOC in MW-3 (July 2018). Based on the data, groundwater generally mimicked topography and flowed from southwest to northeast across the site. Two surface water flow measurement events occurred during May and June 2019 at 15 locations around the site. Six flow measurements were taken on larger streams and nine flow measurements were taken on smaller tributaries. Flow measurements ranged from 24.15 cubic feet per second (cfs) in FM-1 to 0.065 cfs in Weir-1. Piedmont Lithium, Inc. i Pumping and Operations Maintenance Plan ��� Background Studies and Reference Documents Water quality was evaluated for groundwater during 12 sampling events between August 2018 and February 2020 and for surface water monthly from February 2019 to January 2020. Groundwater samples were analyzed for metals, alkalinity, total dissolved solids (TDS), nitrogen/nitrate/nitrite, chloride, fluoride, sulfate, and cyanide by a North Carolina -certified analytical testing laboratory. Concentrations of arsenic, chromium, lead, manganese and fluoride that exceeded the NCDEQ groundwater quality standards (2L Standards) were reported in wells MW-2, MW-5, OW-1 D, OW-2S, and PW-1. Additionally, pH field measurements were observed above and below the 2L Standard range of 6.5-8.5 standard units (SU) in each of the wells during the monitoring period. The pH was consistently above 8.5 SU in MW-1, MW-5 and PW-1. Note that the presence of naturally occurring metals above 2L Standards is common in the Piedmont Physiographic Provence of North Carolina and does not necessarily constitute groundwater contamination. Surface water samples were analyzed for similar constituents as the groundwater samples, but also for ammonia, chlorophyll -A, and phosphorus. Six of the twelve surface water sampling events were collected during ambient conditions and six were collected during non -ambient conditions. Non -ambient conditions are considered when precipitation in the area is greater than 0.1 inch in the 72 hours prior to sampling. Precipitation amounts were monitored using the Community Collaborative Rain, Hail, and Snow (CoCoRaHS) Network. There were neither organic nor inorganic exceedances in the surface water samples collected from Beaverdam Creek and Little Beaverdam Creek. HDR prepared a separate technical memorandum (dated January 25, 2019) to summarize the results of the aquifer pumping test conducted between October 8 and 10, 2018. The aquifer test was scoped for 72-hours, but was shortened to 30 hours because Hurricane Michael was approaching and the rainfall was predicted to be significant starting on October 11, 2018, which would skew the drawdown effects making analysis unfeasible and the drawdown had stabilized in the pumping well. The results of the aquifer test provide a baseline understanding of hydrogeologic properties beneath the project site and show connection between the regolith and fractured bedrock geologic units. Further, drawdown was observed in shallow observation wells, as far as 200 feet from the pumping well, and in deep observation wells, as far as 550 feet from the pumping well. Water flow and aquifer test data were used as the basis for a three-dimensional groundwater flow model initially completed in July 2019, and updated in August 2021, and described in the next section. Groundwater and surface water quality testing was initially used to document existing conditions at the site but this data was evaluated again in the context of pit water discharge to surface waters. This is discussed in Section 2.5 Evaluation of Mine Pit Operations on Water Quality Technical Memo. 2.4 Groundwater Modeling In 2019, HDR developed a three-dimensional groundwater flow model to estimate dewatering rates and evaluate whether these rates have the potential to increase or decrease groundwater supply in the surrounding area. HDR used data from site -specific resource and hydrogeologic investigations; design -level mine plans; local United States Geologic Survey (USGS) gauging Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Background Studies and Reference Documents stations; and published regional geologic and hydrogeologic data to develop a six -layered groundwater flow model. Simulations were conducted to assess the amount of withdrawal necessary to dewater the mine pits and to assess potential impacts of pit dewatering on local water resources (i.e. groundwater wells, streams and wetlands). The modeling was conducted in multiple scenarios where dewatering of the pits (i.e. North, West, South and East Pits) was simulated individually. In 2020, the modeling was complete and a Groundwater Model memo was drafted. Modeling demonstrated that shallow wells in the vicinity of the site may experience water column loss during pit dewatering. Predicted drawdown in wells within the site boundary ranged from 0 feet to 137 feet with an average of approximately 11 feet. Predicted drawdown in wells beyond the site boundary ranged from 0 feet to 39.5 feet with an average of 6 feet. Predicted impacts to wetlands were primarily observed during simulated dewatering of the East and West Pits with six and seven wetlands going dry, respectively. The South and North Pits each have a single wetland that is predicted to go dry during dewatering. Base flow to three streams crossing the site decreases between 0.1 and 9 percent, depending on the proximity of the stream to the pit being dewatered, with the greatest decrease being in Little Beaverdam Creek when the West Pit is dewatered. Subsequent to changes in planned mine site acreage, permit boundaries, and pit geometries, HDR revised the groundwater flow model in 2021 and summarized the revised model in a technical memorandum dated August 30, 2021. The groundwater model updates include a refined model grid, revised pit shell geometries, and transient simulations of pit dewatering. Transient groundwater flow modeling was used to estimate the rate of groundwater withdrawal required to dewater the four mine pits and evaluate potential impacts on adjacent water resources due to dewatering. Model -predicted dewatering rates ranged from 525 gpm for the South Pit to 1,575 gpm for East Pit. The total dewatering rate in any given year ranged from 575 to 2,300 gpm, with the greatest amount of pumping occurring in year 2. Table 2 - Model predicted dewatering withdrawal rates Pumping Rate (gpm) Model Year South Pit East Pit West Pit North Pit Total 1 525 50 575 2 975 1,225 2,300 3 725 775 1,500 4 25' 1,025 1,050 5 75' 950 1,025 6-10 N/A2 1,250 1,250 11 N/A2 1,575 1,575 12 N/A2 1,050 950 2,000 13 N/A2 0 500 850 1,350 14-16 N/A2 N/A2 10753 1,075 Pumping to maintain drawdown while filling pit with excavated material 2 No dewatering modeled. 3 West and North Pits are merged. Predicted drawdowns for wells located within the site, which will be decommissioned by PLCI during mine development, ranged from 0 to 17.8 feet and averaged about 1.9 feet. Predicted Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Background Studies and Reference Documents drawdowns for wells outside the site ranged from 0 to 21.5 feet with an average of approximately 4.0 feet. Four wells within the site are predicted to have significant loss of available drawdown (water column) during dewatering of the East, West, and North Pits. Beyond the permit boundary, two wells are predicted to experience significant reduction of available drawdown during dewatering. One well was predicted to experience significant water column loss throughout most of the 20-year mine operation, while another is predicted to experience significant water column loss during dewatering of the combined West and North Pits in years 14 to the end of the mine life. Predicted impact to wetlands were most significant during the East and West/North Pit dewatering simulations, indicating drying of seven and ten wetlands, respectively. Three wetlands are predicted to dry up during dewatering of South Pit. Dewatering discharges were returned to model cells at the dewatering basin locations, which have the potential to discharge to stream or wetland or infiltrate back into groundwater. Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Background Studies and Reference Documents Table 3 - Model predicted changes in groundwater flow to wetlands (gpm) Model Years 1 2 3 4 5 6-10 11 12 13 14 - 20 Pits Dewatering South South, East South, East East East East East East, West West, North West, North Wetland Wetland Size Acres Steady State Flow pm Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow (Ft3/d) Percent Change' Wetland 1 0.28 1,327 1,328 -0.03 1,330 -0.20 1,323 0.36 1,262 4.92 1,204 9.33 1,104 16.79 1,103 16.88 486 63.41 0 Dry 0 Dr Wetland 2 0.15 6,330 4,634 26.79 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dr Wetland 3 3.19 11,519 11,517 0.02 11,730 -1.83 7,261 36.97 5,282 54.15 4,485 61.06 4,424 61.59 6,204 46.14 5,737 50.19 4,597 60.09 0 Dr Wetland 4 0.66 1,703 1,671 1.88 1,670 1.94 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dr Wetland 5 2.21 5,483 5,270 3.89 5,269 3.92 1,706 68.88 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dr Wetland 6 0.09 2,061 2,197 -6.62 2,014 2.26 1,190 42.25 130 93.71 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dr Wetland 7 0.38 3,752 3,233 13.83 2,968 20.90 2,698 28.08 35 99.06 0 Dry 0 Dry 351 90.64 0 Dry 0 Dry 0 Dr Wetland 8 0.23 2,559 535 79.07 432 83.10 481 81.21 320 87.50 0 D 0 Dry 0 Dry 0 Dry 0 Dry 0 Dr Wetland 9 0.18 660 1,028 -55.67 1,002 -51.79 1,000 -51.50 1,001 -51.63 1,005 -52.29 1,010 -52.99 1,019 -54.42 1,021 -54.74 1,011 -53.22 0 Dr Wetland 10 0.12 1,796 1,785 0.62 1,783 0.72 1,781 0.85 1,780 0.87 1,780 0.87 1,781 0.85 1,782 0.78 1,783 0.73 1,782 0.79 0 Dr Wetland 11 0.04 1,930 693 64.09 427 77.87 0 Dry 0 Dry 0 Dry 147 92.40 351 81.82 0 Dry 0 Dry 0 Dr Wetland 12 0.06 1,930 0 Dry 0 Dry 380 80.31 395 79.53 442 77.10 653 66.15 830 57.01 0 Dry 0 Dry 0 Dr Wetland 13 0.09 2,007 1,939 3.38 1,824 9.10 1,741 13.26 1,707 14.95 1,703 15.16 1,720 14.31 1,768 11.90 1,555 22.54 1,269 36.79 0 Dr Wetland 14 5.45 5,310 5,296 0.27 5,279 0.58 5,252 1.09 5,223 1.65 5,204 2.00 5,194 2.19 5,194 2.18 5,165 2.73 4,964 6.52 0 Dr Wetland 15 0.04 2,147 2,086 2.86 2,085 2.89 2,085 2.88 2,088 2.77 2,090 2.68 2,094 2.47 2,100 2.22 2,099 2.23 2,086 2.86 0 Dr Wetland 16 1 0.08 76 1 70 8.52 69 1 9.74 1 69 10.25 1 55 27.66 61 20.60 68 11.62 73 4.68 0 Dry 0 Dry 0 Dr ' Negative indicates an increase in flow to the wetland from groundwater. Positive indicates a decrease in flow to the wetland from groundwater. 10 Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Background Studies and Reference Documents The contribution of groundwater to stream flow (baseflow) to the three streams crossing the site decreases between 0.1 to 9.0 percent based on the location of the stream relative to the pit which is being dewatered. The largest predicted decrease in baseflow occurred in Beaverdam Creek at the very end of the last year simulated after the West Pit merged with the North Pit. Adding flow from a stream that is disconnected from the stream network would decrease this impact to 8.2 percent. Table 4 — Changes in base flow to streams that cross the site Beaverdam Creek Above Confluence' Little Beaverdam Creek Beaverdam Creek Below Confluence' Unnamed Tributary Model FIow2 Percent Flow' Percent Flow' Percent Flow' Percent Year (Ft3/d) Change (Ft3/d) Change (Ft3/d) Change (Ft3/d) Change Steady -569,356 -435,255 -1,681,833 -163,653 State 1 -545,113 4.3 -434,660 0.1 -1,631,117 3.0 -162,320 0.8 2 -541,563 4.9 -433,446 0.4 -1,622,721 3.5 -162,917 0.4 3 -538,616 5.4 -431,440 0.9 -1,609,935 4.3 -162,797 0.5 4 -538,716 5.4 -428,394 1.6 -1,608,281 4.4 -160,529 1.9 5 -541,270 4.9 -418,435 3.9 -1,600,251 4.9 -162,576 0.7 6-10 -548,891 3.6 -418,899 3.8 -1,615,812 3.9 -161,519 1.3 11 -556,696 2.2 -419,820 3.5 -1,629,960 3.1 -160,985 1.6 12 -535,792 5.9 -414,010 4.9 -1,580,594 6.0 -161,027 1.6 13 -536,719 5.7 -405,337 6.9 -1,553,419 7.6 -159,911 2.3 14-20 -539,972 5.2 -406,888 6.5 -1,530,283 9.0 -158,582 3.1 Confluence is with Little Beaverdam Creek. 2 Negative sign indicates stream baseflow from groundwater. The groundwater model provides PLCI with the current understanding of groundwater withdrawal based on the proposed mining operation and its effect on groundwater and surface water resources in the area. 2.5 Evaluation of Mine Pit Operations on Water Quality Technical Memo The 2021 Evaluation of Mine Pit Operations on Water Quality memo builds on the Water Quality Testing memo data for the purposes of developing and implementing a baseline groundwater and surface water monitoring program to evaluate naturally -occurring conditions and evaluating the potential impact of pit water discharges (i.e. mostly groundwater) on surface waters. In addition, PLCI plans to dry -stack non -hazardous mine refuse of native overburden, concentrator tails, and analcime tailings and/or use the refuse to backfill mine pits for reclamation. As such, tailings from the lithium hydroxide conversion were also evaluated for their potential as a reclamation material. The memo provides an understanding of the potential impacts to surface water features and groundwater as a result of the discharge of pit water or use of tailings for reclamation. 11 Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Mine Site Water Balance Using the data collected in the 2020 Water Quality Testing memo, HDR compared groundwater quality data with surface water quality data in conjunction with anticipated dewatering rates and periods to evaluate potential effects of mine pit dewatering on water quality within the mine pit boundaries. Characteristics of the groundwater (dissolved oxygen, turbidity, pH, temperature, and constituent concentrations) may change depending on the length of time water is retained in the pit discharge ponds. Thus, comparison of the average and range of concentrations for selected constituents with detections in both groundwater and surface water is appropriate to evaluate if groundwater discharge to surface water may affect surface water quality. The primary findings of this comparison are that discharge of groundwater to steams is not expected to raise concentrations of manganese, barium, chloride, or sulfate in the streams. Lithium concentrations are lower in surface water compared to groundwater. Discharge of groundwater directly into streams would not raise lithium levels above the standards. Arsenic, chromium, lead, and fluoride were detected in a few groundwater samples, but were not detected in any surface water samples. The number of detections for chromium, lead, and fluoride were also small relative to the number of samples collected. Discharging groundwater to streams is not likely to raise concentrations of arsenic, chromium, lead, and fluoride in stream water. In order to evaluate the potential impact of Analcime tailings on groundwater and surface waters, PLCI commissioned a third -party contractor to replicate ore concentrate conversion methods to be undertaken by PLCI during operation of the proposed Lithium Hydroxide Conversion Plant through bench -scale testing to convert spodumene concentrate into battery - grade lithium hydroxide (LiOH). One sample of the Analcime tailings produced by this study was obtained and tested to characterize the material via Toxicity Characteristic Leaching Procedures (TCLP). The results of the TCLP analysis indicate that the analcime tailings do not qualify as toxic hazardous waste. TCLP testing did not result in mobilization of arsenic. Precipitation and native groundwater will fill the porous space around refuse used to backfill mine pits. Native groundwater has a higher pH than the fluid used in the TCLP analysis. Geochemical reactions may differ from reactions that occurred in the TCLP analysis. This evaluation documents that while there were a minimal amount exceedances of water quality standards on site, the discharge of pit water to surface water is unlikely to lead to additional exceedances or contribute to water quality degradation beyond existing conditions. 3 Mine Site Water Balance A water balance for the Project has been compiled to illustrate the anticipated supply, demand and discharge of water throughout the mine and associated Concentrator and Conversion Plants. Water flows illustrated in the flow chart are presented as gpm to approximate workday operational needs but do not include reductions that may be applied on an annual basis to some of the processes. The water balance accounts for anticipated variations in groundwater inflow to the mining pits but an average is used for total freshwater demand. The water balance flow chart is included in Appendix C. As illustrated in the flow chart, groundwater inflow to the pit(s) is pumped to the pit discharge pond(s), from which part of the water may be pumped out for operational freshwater use at the 12 Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Monitoring and Reporting Concentrator Plant and for dust control. Groundwater inflow to the pits and subsequent pumping may range from 600 to 2,300 gpm with an average estimated to be 1,300 gpm. Freshwater demand as described is estimated to be 240 gpm. The balance of the groundwater pumped to the pit discharge pond will be discharged to local surface water features. Freshwater supply for Concentrator Plant operation and dust control will be provided primarily from the pit discharge ponds and supplemented from municipal water supply as necessary. In the first year of mining, the freshwater available from groundwater flow into the pits is expected to be minimal (based on groundwater table elevation versus anticipated excavation rate), and water supply for Concentrator Plant operation and dust control requirements is expected to be more dependent upon a raw water intake from the stream, groundwater wells, municipal water supply or from some combination of the three sources. 4 Monitoring and Reporting The POM plan includes a collection of monitoring activities focused on observing effects of groundwater drawdown on residential water supply wells, and streams and wetlands. These proposed monitoring activities are the result of decisions put in place by PLCI and regulatory conditions imposed as part of the Project. Collectively, the proposed monitoring plan serves to continuously evaluate the effects of mining operations on groundwater and surface water resources. 4.1 Groundwater Monitoring The proposed mine site plan includes observation wells that will be strategically positioned to enable measurement of groundwater levels in order to evaluate potential mine dewatering effects. Proposed locations of the seventeen observation (OB) wells are shown on the Site/Mine Map included in Appendix B. The wells, often referred to as "sentinel wells" will provide a means for PLCI to observe changes in groundwater levels that may occur around the edges of the site due to mine dewatering. PLCI proposes to monitor groundwater levels in all the wells on a quarterly basis, with monitoring switching to monthly when mining comes to within 500 feet of an observation well. The wells will provide background data to assist with evaluation of potential effects to residential water supply wells. In addition, PLCI will conduct groundwater monitoring in accordance with permit conditions incorporated as part of Condition of Certification No. 5 of the Individual 401 Water Quality Certification approval letter issued to PLCI on October 21, 2019. The conditions require groundwater levels to be monitored continuously upon the start of pit dewatering activities in observation wells OB-1 through OB-18 as shown in Appendix D. Groundwater levels in the observation wells shall be recorded a minimum of 24 hours prior to the start of pit dewatering. PLCI shall provide a minimum of one year of baseline monitoring from previously established monitoring locations (MW-1 to MW-5, OW-2S, OW-21D, PW-1, OW-1 S, and OW-1 D) to represent baseline groundwater elevations across the site as noted in the Individual 401 Water Quality Certification approval letter. If observation wells show lowering of the groundwater table below that predicted by the Groundwater Modeling memo then the Permittee shall provide an updated report that evaluates potential impacts to surrounding public water supply wells. 13 Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Mitigation Strategies 4.2 Stream Flow Monitoring Streamflow monitoring will be conducted as required in the Individual 401 Water Quality Certification with Additional Conditions approval letter issued to PLCI on October 21, 2019. As stated in the 401 approval letter, in the event that the streamflow monitoring system indicates a non -natural reduction of baseflow in a stream, PLCI will submit a report to the division assessing the hydrologic and aquatic function of the stream. In the event that DWR determines there has been a loss of stream function, PLCI will provide a mitigation plan. Continuous streamflow will be measured through gauges (401-1 through 401-8) installed on various streams shown on Appendix D. PLCI is responsible for establishing baseline flow conditions for a minimum of one year prior to the commencement of pit dewatering activities and continuing monitoring through the life of the mine to realize all pit dewatering conditions. This effort will assist in documenting flow trends during each season, and ensure that any hydrologic function/flow impacts from mining are identified. Per the Section 401 Individual Water Quality Certification approval, if a reduction of flow greater than 10 percent at any sampling location occurs, then PLCI shall submit a report to the DWR which includes an analysis of hydrologic and aquatic function of the stream. To define a 10 percent reduction in streamflow, streamflow measurements taken during dewatering activities in a certain month will be compared to baseline flow measurements taken in that same month and preceding months. The USACE's Antecedent Precipitation Tool' will be utilized as an evaluation measure during baseline and dewatering measurements to assist in determining whether observations are representative of normal climatic conditions (i.e., normal, wet, or dry period). If DWR determines that there has been a loss of function in accordance with 15A NCAC 2B .0211(1)2 PLCI will submit a mitigation plan to DWR. 5 Mitigation Strategies Strategies for mitigating the effects of mine dewatering on surface and groundwater resources may be collectively or individually administered both for the protection of existing water supply wells, and streams and wetlands depending on the location and quantitative impact. 5.1 Residential Water Supply Wells The groundwater modeling completed for the Project provides estimates of drawdown due to dewatering through the life of the mine, and potential effects to residential water supply wells may be predicted based on the model results. While effects to these wells are expected to be minimal, PLCI has developed a strategy for evaluation and mitigation of groundwater well effects that may require action. An actionable effect on a residential water supply well is considered to be a long-term change in water level which negatively impacts the ability of the well to provide adequate water to the resident. In the event that an actionable water level decline in a residential water supply well is reported, PLCI will conduct an assessment of the 1 https://www.epa.gov/wotus/antecedent-precipitation-tool-apt 2 httlol/reports.oah. state. nc.us/ncac/title%2015a%20-%20environmental %20guality/chapter%2002%20- %20environmental %20management/subchapter%20b/15a%20ncac%2002b%20.0211.pdf 14 Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Mitigation Strategies reported decline to include comparison of the well location to the location of ongoing mining activities and to predicted groundwater level drawdown contours from the groundwater model, as well as comparison to groundwater level observations from the aforementioned observation wells. The assessment will also include examination of the condition of the well and measurement(s) of the groundwater level in the well by a PLCI representative and/or a qualified hydrogeologist or well repair/installation specialist. Additional or supplemental monitoring or testing of the observation well may be done if recommended by the hydrogeologist or specialist designated by PLCI. If the reported decline in groundwater level is determined by PLCI and/or the hydrogeologist/specialist to be unrelated to mining activities, PLCI will notify NCDEQ and PLCI's mitigation plan (described below) will not be initiated. In the event that the assessment determines that the reported groundwater level decline is a direct result of mining and dewatering activities, and that the decline is an effect that will result in long-term change in groundwater level which negatively impacts the ability of a residential water supply well to provide adequate water to the resident, PLCI will initiate the following mitigation plan in successive order. 1. Where municipal water service has been brought to a practical distance from the affected property, PLCI may offer assistance to connect the affected property to municipal water supply. PLCI will pay for the cost of connection; however, ongoing utility expense will be the responsibility of the affected property owner. 2. Where municipal water service is not at a practical distance to the affected property, PLCI may mitigate by drilling a deeper residential water supply well. 3. If a deeper residential water supply well will not yield a reliable source of water, PLCI may either: a. Continue to work with municipal water providers to extend water service to the area; or, b. Negotiate in good faith to acquire the affected property Depending on the time required to provide mitigation for the affected water supply, PLCI may provide a short-term water supply replacement in the form of a clean water tank or container that is refilled, as necessary, by delivery truck or some other means (e.g. bottled water). The short-term water supply must be provided by a licensed and reputable water distributor. The result of the mitigation activities must meet the minimum water volume used or needed by the resident prior to the groundwater level decline. The activities required to fulfill the requirements of mitigation will be completed at PLCI's expense and PLCI will determine the outside vendors to be used for these tasks. 5.2 Streams and Wetlands Where streamflow monitoring indicates a reduction of baseflow greater than 10 percent at any sampling location based on the aforementioned analysis in Section 4.2 Stream Flow Monitoring, PLCI will conduct an analysis to determine if loss of hydrologic and aquatic function of the stream has occurred. The analysis will include a determination of the contributing factors to the 15 Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Reporting and Monitoring Summary loss. If mining and dewatering activities are determined to be contributing factors, PLCI will devise a mitigation plan to include but not be exclusive to the following strategies. 1. The primary mitigation activity will involve the use of pit discharge pond water to supplement baseflows in affected stream reaches or hydrate wetlands depending on current volumes in pit discharge ponds and proximity to affected areas. a. If pit discharge ponds are currently not discharging through principal spillways, then pumping operations will be implemented to withdraw stored volumes of surface water for discharge to nearby affected streams and wetlands. b. If pit discharge ponds are currently discharging but it is evident that discharges are not sufficiently close to affected streams and wetlands, i. Temporary pumping operations will be implemented to pump surface water to affected areas for evaluation and subsequent monitoring. ii. For longer term operation, discharge points from pit ponds may be relocated, or additional pit discharge ponds may be constructed in new locations to support permanent discharge of surface water to affected stream sections or wetlands. 2. Where discharge of pit discharge pond water is not possible, operational changes to mining limits and dewatering rates may be adjusted to reduce the effect on streams and wetlands. 3. Depending on the demand at the time and utilization of the various water supplies (e.g. stream withdrawal or municipal water supply), other operational changes may be made to reduce the demand on various sources or supplement freshwater supply from other sources 6 Reporting and Monitoring Summary As required by Section 401 Individual Water Quality Certification approval, PLCI will prepare and submit annual reports of monitoring results to NCDEQ's Winston-Salem Regional Office on June 1 of each year. These reports will consist of the monitored parameters at the required frequencies. Table 5 — Monitoring Summary Groundwater Streams Locations OB-1 - OB-18 401-1 —401-8 Frequency Quarterly/Monthly Continuous Baseline 1 year prior to dewatering 1 year prior to activities dewatering activities Initiation 24 hours prior to n/a dewatering activities 16 Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Appendix A - Background Studies and Reference Documents Appendix A - Background Studies and Reference Documents Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Appendix A - Background Studies and Reference Documents This page intentionally left blank. Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Appendix A - Background Studies and Reference Documents A.1 Approval of Individual 401 Water Quality Certification with Additional Conditions ROY COOPER Governor MICHAELS.REGAN Secretary LINDA CULPEPPER Director Piedmont Lithium, Inc Attn: Patrick Brindle 5706 Dallas-Cherryville Highway Bessimer City NC 28016 NORTH CAROLINA Environmental Quality October 21, 2019 DWR # 20190035 Gaston County Subject: Approval of Individual 401 Water Quality Certification with Additional Conditions Piedmont Lithium Project USACE Action ID. No. SAW-2018-01129 Dear Mr. Brindle: Attached hereto is a copy of Certification No. WQC004201 issued to Mr. Patrick Brindle and Piedmont Lithium, Inc., dated October 21, 2019. Please note that you should get any other federal, state or local permits before proceeding with the subject project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: D_E Q;� North Carolina Department or Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 ifa�w w.m 919.707.9000 Piedmont Lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 2 of 10 If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Unless such a petition is filed, this Certification shall be final and binding. This certification completes the review of the Division under section 401 of the Clean Water Act and 15A NCAC 02H .0500. Contact Sue Homewood at 336-776-9693 or sue.homewoodPncdenr.eov if you have any questions or concerns. Sincerely, Mac Haupt, Acting Supervisor 401 & Buffer Permitting Branch cc: Kelly Thames, HDR (via email) David Shaeffer, USACE Charlotte Regulatory Field Office (via email) Byron Hamstead, USFWS (via email) Olivia Munzer, NC WRC (via email) Todd Bowers, EPA, (via email) DWR MRO 401 file DWR 401 & Buffer Permitting Branch file Filename: 20190035PiedmontLithiumProject(Gaston)_IP.docx Piedmont Lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 3 of 30 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION CERTIFICATION #WQC004201 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15 NCAC 02H .0500, to Mr. Patrick Brindle and Piedmont Lithium, Inc., who have authorization for the impacts listed below, as described within your application received by the N.C. Division of Water Resources (Division) on January 4, 2019 and subsequent information on May 31, 2019, July 3, 2019, and September 5, 2019 and by Public Notice issued by the U. S. Army Corps of Engineers and received by the Division on January 17, 2019. The State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval requires you to follow the conditions listed in the certification below. Conditions of Certification: 1. The following impacts are hereby approved. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b) and/or (c)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Stream Impact 1— Stream 2* 178 (linear feet) 0 (linear feet) Impact 2 — Stream 3 1,090 (linear feet) 0 (linear feet) Impact 3 — Stream 8* 249 (linear feet) 0 (linear feet) Impact 4— Stream 8 549 (linear feet) 0 (linear feet) Impact 5 — Stream 9 77 (linear feet) 0 (linear feet) Impact 6 — Stream 10 520 (linear feet) 0 (linear feet) Impact 7 — Stream 11 30 (linear feet) 0 (linear feet) Impact 8 — Stream 15 1,126 (linear feet) 0 (linear feet) Impact 9 — Stream 15* 81(linear feet) 0 (linear feet) Impact 11— Stream 12 917 (linear feet) 0 (linear feet) Impact 12— Stream l2* 700 (linear feet) 0 (linear feet) Impact 13—Stream l2* SS (linear feet) 0 (linear feet) Impact 15—Stream 1213 240 (linear feet) 0 (linear feet) 404/401 Wetlands Impact 14 — Wetland 9 0.18 (acres) 0 (acres) Indirect Impacts: Wetlands 1-8, 11-13, 16 7.46 (acres) 0 (acres) Open Waters Impact 10 — Pond 3 0.08 (acres) 0 (acres) Impact 15 — Pond 4 0.08 (acres) 0 (acres) * Indicates perennial stream, mitigation required Piedmont Lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 4 of 10 2. Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received an acceptance letter from the NC Division of Mitigation Services (DMS) to meet this mitigation requirement. Until the DMS receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to the DMS to meet the following compensatory mitigation requirement [15A NCAC 02H .0506 (b)(6)]: Compensatory Mitigation River & Sub -basin Number Required Stream 1,263 (linear feet) Catawba 03050102 Wetlands 7.64 (acres) Catawba 03050102 3. The Permittee shall conduct surveys for state -listed mussel and crayfish species within the project limits prior to project commencement in accordance with recommendations from North Carolina Wildlife Resource Commission. Survey results shall be supplied to the NCWRC prior to project commencement. [15A NCAC 02H .0506(b)(2) and 15A NCAC 04B .0125] 4. Streams within the project limits that have been avoided by direct impacts from the project shall be monitored for surface flow by the Permittee to establish any loss of hydrologic function/flow and to determine if the streams continue to provide aquatic life propagation and biological integrity per required in North Carolina Administrative Code 15A NCAC 2B .0211(1). Continuous flow measurement shall occur through gauges installed at the locations identified as 401-1 through 401-8 as shown on the attached Monitoring Location Map: Background flow measurements shall be conducted for a minimum of 1 year prior to the commencement of pit dewatering activities and shall continue until a it can be demonstrated that all possible pit dewatering conditions have been realized for a sufficient period of time to document flow trends during each season, and any hydrologic function/flow impacts have been sufficiently monitored. Annual reports of monitoring shall be submitted to the Winston-Salem Regional Office on June 1 of each year. If monitoring of stream flow indicates a reduction of flow of greater than 10% at any sampling location, then the Permittee shall submit a report to the Division which includes an analysis of of hydrologic and aquatic function of the stream. If the Division determines that there has been a loss of functioning accordance with 15A NCAC 2B .0211(1) the Permittee shall submit a mitigation plan to the Division. S. Upon the start of pit dewatering activities, groundwater levels shall be continuously monitored in observation wells OB-1 through OB-13 as shown on the Mine Map provided with the July 3, 2019 supplement provided to the Division. Groundwater levels in the observation wells shall be recorded a minimum of 24 hours prior to the start of pit dewatering. The Permittee shall provide a minimum of 1 year of baseline monitoring from previously established monitoring locations (MW-1 to MW-5, Piedmont Lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 5 of 10 OW-2S, OW-2D, PW-1, OW -IS and OW-11)) to represent groundwater elevations across the site prior to the commencement of pit dewatering. Annual reports of monitoring results shall be submitted to the Winston-Salem Regional Office on June 1 of each year. If observation well show lowering of the groundwater table below that predicted by the technical memo submitted to the Division on July 3, 2019 then the Permittee shall provide an updated report that addresses impacts to surrounding public water supply wells. 6. A copy of the stormwater outfall/surface water monitoring plan, as approved by the Division of Energy, Mineral and Land Resources NPDES Permit and/or Mining Permit shall be submitted to the Division prior to the commencement of mining activities. Additional surface water monitoring requirements may be added by the Division upon review of the surface water monitoring plan(s) approved by the Division of Energy, Mineral and Land Resources. [15A NCAC 02H .0506(b)(5)] 7. Stormwater runoff from impervious surfaces throughout the entire project site shall be addressed in one or more of the regulated programs: an approved Sediment and Erosion Control Plan, a NPDES stormwater permit, a NPDES wastewater permit, a Division approved Stormwater Management Plan. [15A NCAC 02H .0506(b)(5)]j 8. This approval is for the purpose and design described in your application and as described in the Public Notice and as amended in supplemental information supplied to the Division. The plans and specifications for this project are incorporated by reference and are an enforceable part of the Certification. Any modifications to the project require notification to DWR and may require an application submittal to DWR with the appropriate fee. [15A NCAC 02H .0501 and .0502] 9. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the footprint of the impacts (including temporary impacts) as authorized under this Certification. [15A NCAC 02H .0501 and .0502] 10. All construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973). 11. Sediment and erosion control measures shall not be placed in wetlands or waters except within the footprint of temporary or permanent impacts authorized under this Certification. [15A NCAC 02H .0501 and .0502] 12. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be used along streambanks or within wetlands. [15A NCAC 02B .0201] 13. An NPDES Construction Stormwater Permit (NCG010000) is required for construction projects that disturb one (1) or more acres of land. The NCG010000 Permit allows stormwater to be discharged during land disturbing construction activities as stipulated in the conditions of the permit. If the project is covered by this permit, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self -monitoring, record keeping and reporting requirements is required. [15A NCAC 02H .0506(b)(5) and (c)(5)] Piedmont Lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 6 of 10 14. All work in or adjacent to streams shall be conducted so that the flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NCSediment and Erosion Control Manual, or the NC DOTConstruction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. [15A NCAC 02H .0506(b)(3) and (c)(3)] 15. Culverts shall be designed and installed in such a manner that the original stream profiles are not altered and allow for aquatic life movement during low flows. The dimension, pattern, and profile of the stream above and below a pipe or culvert shall not be modified by widening the stream channel or by reducing the depth of the stream in connection with the construction activity. The width, height, and gradient of a proposed culvert shall be such as to pass the average historical low flow and spring flow without adversely altering flow velocity. [15A NCAC 02H .0506(b)(2) and (c)(2)]. Placement of culverts and other structures in streams shall be below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20% of the culvert diameter for culverts having a diameter less than or equal to 48 inches, to allow low flow passage of water and aquatic life. If multiple pipes or barrels are required, they shall be designed to mimic the existing stream cross section as closely as possible including pipes or barrels at flood plain elevation and/or sills where appropriate. Widening the stream channel shall be avoided. If bedrock is discovered during construction, then DWR shall be notified by phone or email within 24 hours of discovery. Installation of culverts in wetlands shall ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. When roadways, causeways, or other fill projects are constructed across FEMA-designated floodways or wetlands, openings such as culverts or bridges shall be provided to maintain the natural hydrology of the system as well as prevent constriction of the floodway that may result in destabilization of streams or wetlands. The establishment of native woody vegetation and other soft stream bank stabilization techniques shall be used where practicable instead of rip -rap or other bank hardening methods. 16. Application of fertilizer to establish planted/seeded vegetation within disturbed riparian areas and/or wetlands shall be conducted at agronomic rates and shall comply with all other Federal, State and Local regulations. Fertilizer application shall be accomplished in a manner that minimizes the risk of contact between the fertilizer and surface waters. [15A NCAC 02B .0200 and 15A NCAC 02B .0231] 17. If concrete is used during construction, then all necessary measures shall be taken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state. [15A NCAC 02B .02001 Piedmont Lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 7 of 10 18. No temporary impacts are allowed beyond those included in this Certification. All temporary fill and culverts shall be removed, and the impacted area shall be returned to natural conditions within 60 calendar days after the temporary impact is no longer necessary. The impacted areas shall be restored to original grade, including each stream's original cross -sectional dimensions, planform pattern, and longitudinal bed profile. All temporarily impacted sites shall be restored and stabilized with native vegetation. [15A NCAC 02H .0506(b)(2) and (c)(2)] 19. All proposed and approved temporary pipes/culverts/rip-rap pads etc. in streams shall be installed as outlined in the most recent edition of the North Carolina Sediment and Erosion Control Planning and Design Manual or the North Carolina Surface Mining Manual or the North Carolina Department of Transportation Best Management Practices for Construction and Maintenance Activities so as not to restrict stream flow or cause dis-equilibrium during use of this Certification. [15A NCAC 02H .0506(b)(2) and (c)(2)] 20. Any riprap required for proper culvert placement, stream stabilization, or restoration of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction activity. All riprap shall be buried and/or "keyed in" such that the original stream elevation and streambank contours are restored and maintained. Placement of riprap or other approved materials shall not result in de -stabilization of the stream bed or banks upstream or downstream of the area. [15A NCAC 02H .0506(b)(2)] 21. This Certification does not relieve the applicant of the responsibility to obtain all other required Federal, State, or Local approvals before proceeding with the project, including those required by, but not limited to Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. 22. All mechanized equipment operated near surface waters shall be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, or other toxic materials. Construction shall be staged in order to minimize the exposure of equipment to surface waters to the maximum extent practicable. Fueling, lubrication and general equipment maintenance shall not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuels and oils. [15A NCAC 02H .0506(b)(3) and (c)(3) and 15A NCAC 02B .0211 (12)] 23. Heavy equipment working in wetlands shall be placed on mats or other measures shall be taken to minimize soil disturbance. [15A NCAC 02H .0506(b)(3) and (c)(3)] 24. In accordance with 143-215.85(b), the applicant shall report any petroleum spill of 25 gallons or more; any spill regardless of amount that causes a sheen on surface waters; any petroleum spill regardless of amount occurring within 100 feet of surface waters; and any petroleum spill less than 25 gallons that cannot be cleaned up within 24 hours. Piedmont Lithium Project D W R Project #20190035 Individual Certification #WQ0004201 Page 8 of 10 25. Mr. Patrick Brindle and Piedmont Lithium, Inc. shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. [15A NCAC 02B .0200] If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification. Before modifying the Certification, the Division shall notify Mr. Patrick Brindle and Piedmont Lithium, Inc. and the U.S. Army Corps of Engineers, provide public notice in accordance with i5A NCAC 02H .0503 and provide opportunity for public hearing in accordance with 15A NCAC 02H .0504. Any new or revised conditions shall be provided to Mr. Patrick Brindle and Piedmont Lithium, Inc. in writing, shall be provided to the U.S. Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. 26. Upon completion of all permitted impacts included within the approval and any subsequent modifications, the applicant shall be required to return a certificate of completion (available on the DWR website https://edocs.deg.nc.gov/Forms/Certificate-of-Completion). [15A NCAC 02H .0502(f)] 27. If the property or project is sold or transferred, the new Permittee shall be given a copy of this Certification (and written authorization if applicable) and is responsible for complying with all conditions. [35A NCAC 02H .0501 and .0502] 28. This Certification neither grants nor affirms any property right, license, or privilege in any waters, or any right of use in any waters. This Certification does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person and this Certification does not create any prescriptive right or any right of priority regarding any usage of water. This Certification shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Certification to possess any prescriptive or other right of priority with respect to any other consumptive user regardless of the quantity of the withdrawal or the date on which the withdrawal was initiated or expanded. 29. This certification grants permission to the director, an authorized representative of the Director, or DENR staff, upon the presentation of proper credentials, to enter the property during normal business hours. [15A NCAC 02H .0502(e)) 30. Non-compliance with or violation of the conditions herein set forth by a specific project may result in revocation of this General Certification for the project and may also result in criminal and/or civil penalties. Piedmont Lithium Project DWR Project #20190035 Individual Certification #WQC004201 Page 9 of 10 31. The permittee shall report to the Mooresville Regional Office any noncompliance with this certification, any violation of stream or wetland standards [15A NCAC 02B .0200] including but not limited to sediment impacts, and any violation of state regulated riparian buffer rules [15A NCAC 02B .0200]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided within 5 business days of the time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case -by -case basis. This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506] This the 21'` day of October 2019 MkE Haupt, Acting Supervisor 401 & Buffer Permitting Branch 449.1 WQC004201 IP Project Boundary DocuSign Envelope ID: 709076B0-A31 F-40B6-B404-CF5A22A7F1 B9 ROY COOPER Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality November 10, 2021 DWR # 20190035 Gaston County Piedmont Lithium, Inc Attn: Patrick Brindle 5706 Dallas-Cherryville Highway Bessimer City, NC 28016 Subject: Individual 401 Water Quality Certification revised condition Piedmont Lithium Project USACE Action ID. No. SAW-2018-01129 Dear Mr. Brindle: On November 5, 2021 the Division received correspondence from Kelly Thames of HDR on your behalf regarding the Individual 401 Certification for the Piedmont Lithium Project. The correspondence was a request for reconsideration and clarification of Condition 3 regarding surveying for state listed species. Upon recent consultation with the NCWRC, the surveys required per Condition 3 are no longer necessary. Please note that all other Conditions of Certification # WQC004201 remain valid. Contact Sue Homewood at 336-776-9693 or sue.homewood@ncdenr.gov if you have any questions or concerns. Sincerely, DocuSigned by: 949D91BA53EF4E0... Paul Wojoski, Supervisor 401 & Buffer Permitting Branch cc: Kelly Thames, HDR (via email) Bryan Roden -Reynolds, USACE Charlotte Regulatory Field Office (via email) Olivia Munzer, NC WRC (via email) DWR MRO 401 file DWR 401 & Buffer Permitting Branch file D E Q�� North Carolina Department of Environmental Quality j Division of Water Resources 512 North Salisbury Street 1 1650 Mail Service Center I Raleigh, North Carolina 27699-1650 NOFIHCAHOLINA rIMA vI /"� 919.707.9000 Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Appendix A - Background Studies and Reference Documents A.2 Technical Memorandum — Water Quality Testing n u Technical Memorandum Water Quality Testing Piedmont Lithium Gaston County, North Carolina March 19, 2020 Piedmont Lithium I Technical Memorandum — Water Quality Testing ��� Contents Contents 1 Introduction............................................................................................................................1 2 Methods.................................................................................................................................1 2.1 Groundwater...................................................................................................................1 2.1.1 Groundwater Flow...................................................................................................3 2.1.2 Groundwater Sampling Procedures ........................................................................3 2.2 Surface Water.................................................................................................................3 2.2.1 Flow Measurements................................................................................................3 2.2.2 Surface Water Quality.............................................................................................4 3 Water Quality.........................................................................................................................4 3.1 Groundwater...................................................................................................................4 3.2 Surface Water.................................................................................................................4 4 Conclusions...........................................................................................................................5 4.1 Groundwater...............................................................................................................5 4.2 Surface Water.............................................................................................................5 Figure Figure 1 — Sample Location Map..................................................................................................2 Tables Table 1 - Monitoring Well Construction Summary and Groundwater Elevation Table 2 - Summary of Stream Flow Measurements Table 3 - Summary of Groundwater Quality Data Table 4 — Summary of Surface Water Quality Data Piedmont Lithium I Technical Memorandum — Water Quality Testing ��� Introduction 1 Introduction HDR Engineering, Inc. of the Carolinas (HDR) has completed baseline groundwater and surface water monitoring at the planned Piedmont Lithium, Inc. (PLI) mine site (Site) between August 2018 and February 2020. Subsequent to installation of monitoring and observation wells in 2018, HDR conducted 17 groundwater gauging events, 12 groundwater sampling events, 2 surface water flow monitoring events, and 12 surface water sampling events. 2 Methods 2.1 Groundwater The groundwater monitoring network consists of five monitoring wells (MW-1 through MW-5), one aquifer test pumping well (PW-1), and four aquifer test observation wells (OW-1 S, OW-1 D, OW-2S, and OW-21D). Monitoring wells were installed in June and July 2018 to support monthly monitoring of groundwater levels and to provide baseline groundwater quality data prior to operation of the planned mine. The pumping and observation wells were installed in June and July 2018 to facilitate a planned 72-hour aquifer test for evaluation of hydrogeologic properties on the northeastern portion of the Site. Well construction details for the wells installed in 2018 are presented in Table 1 Well locations are shown on Figure 1. LEGEND Pumping Well Monitoring Well ,5� Observation Well Surface Water Collection Sites Stream Flow Measurements OIP Project Boundary (963 ac.) © 0 Miles 0.25 r �h 4 F)J P I E D/1A LITN TLem .. ;N 'ram• a . �� � •� � to ; SAMPLE LOCATION MAP PIEDMONT LITHIUM FIGURE 1 TECHNICAL MEMORANDUM: WATER QUALITY TESTING Piedmont Lithium I Technical Memorandum — Water Quality Testing ��� Methods 2.1.1 Groundwater Flow Seventeen groundwater level gauging events were conducted from July 2018 to February 2020. Depth to water from the top of well casing was recorded using an electronic water level meter. Depths to water have ranged from 2.15 feet below top of casing (BTOC) in PW-1 (June 2019) to 55.62 feet BTOC in MW-3 (July 2018). Historic groundwater elevations are shown in Table 1. Based on the data, groundwater generally mimics topography and flows from southwest to northeast across the Site. 2.1.2 Groundwater Sampling Procedures Groundwater samples were collected by HDR during 12 sampling events between August 2018 and February 2020. Purging was conducted via low -flow methods and was considered complete when the water table and field parameters had stabilized in accordance with the targets specified below. Field measurements were obtained using a calibrated water quality meter. • Turbidity (10% for values greater than 5 NTU (if three turbidity values are less than 5 NTU, the values are considered stabilized) • DO (10% for values greater than 0.5 mg/L, if three DO values are less than 0.5 mg/L, the values are considered stabilized) • Specific conductance (3%) • Temperature (3%) • pH (± 0.1 unit) • ORP (± 10 millivolts) The water level meter and pump were decontaminated in the field with a distilled water rinse, Alconox® wash, and a distilled water rinse, prior to and following sampling at each monitoring well. Purge water was discharged to the ground surface adjacent to each well. Samples were transferred under Chain of Custody (COC) procedures to Pace Analytical Services, LLC (Pace) of Huntersville, North Carolina (NC Certification #37706) for analysis of constituents, as specified in Section 3.1. Sample handling and custody were performed according to the EPA Guidance for Field Samplers. 2.2 Surface Water 2.2.1 Flow Measurements Two surface water flow measurement events occurred during May and June 2019 at 15 locations around the Site (Figure 1). Six flow measurements were taken on larger streams (FM- 1 through FM-6) and nine flow measurements were taken on smaller tributaries (Weir-1 through Weir-9). Stream flow was measured using Swoffer Model 3000 Current Velocity Flowmeters in the larger streams and the float method in the smaller tributaries. The Swoffer uses a propeller driven rotor that produces electronic pulses that are directly proportional to flow velocity. Flow measurements ranged from 24.15 cubic feet per second (cfs) in FM-1 to 0.065 cfs in Weir-1 (Table 2). Piedmont Lithium I Technical Memorandum — Water Quality Testing ��� Water Quality 2.2.2 Surface Water Quality HDR established seven surface water sampling locations (SITE-1 through SITE-7) along Beaver Dam Creek and Little Beaver Dam Creek to evaluate surface water quality across the Site. Grab samples were collected from each surface water sampling location monthly from February 2019 to January 2020. Prior to sample collection, field parameters (including temperature, conductivity, pH, ORP, and DO) were measured with a water quality meter. Surface water sampling locations are shown on Figure 1. 3 Water Quality 3.1 Groundwater Groundwater samples were analyzed for the following suite of inorganic constituents: • Metals using USEPA Method 6010D • Alkalinity using Standard Method (SM) 2320B • Total dissolved solids (TDS) using SM 2540C • Total Kjeldahl nitrogen using USEPA Method 351.2 • Nitrate and nitrite using USEPA Method 353.2 • Total nitrogen (calculation) • Chloride, fluoride, sulfate using USEPA Method 300.0 • Cyanide using SM 4500-CN Following the initial August 2018 sampling event, the samples were analyzed for the RCRA 8 metals and the constituents listed above (Table 3). Concentrations of arsenic, chromium, lead, manganese and fluoride that exceeded the North Carolina Department of Environmental Quality (NCDEQ) groundwater quality standards (21- Standards) were reported in MW-2, MW-5, OW- 1 D, OW-2S, and PW-1. Additionally, pH field measurements were observed above and below the 2L Standard range of 6.5-8.5 standard units (SU) in each of the wells during the monitoring period. The pH was consistently above 8.5 SU in MW-1, MW-5 and PW-1. Note that the presence of naturally occurring metals above 2L Standards is common in the Piedmont Physiographic Provence of North Carolina and does not necessarily constitute groundwater contamination. 3.2 Surface Water Surface water samples collected were analyzed for the following: • Metals using USEPA Method 6010D • Alkalinity using Standard Method (SM) 2320B • Total dissolved solids (TDS) using SM 2540C • Total Kjeldahl nitrogen using USEPA Method 351.2 • Nitrate and nitrite using USEPA Method 353.2 Piedmont Lithium I Technical Memorandum — Water Quality Testing ��� Conclusions • Total nitrogen (calculation) • Chloride, fluoride, sulfate using USEPA Method 300.0 • Cyanide using SM 4500-CN • Ammonia using USEPA Method 350.1 • Chlorophyll -A using SM 10200-H • Total suspended solids using SM 2540D • Phosphorus using USEPA Method 365.1 Six of the twelve surface water sampling events were collected during ambient conditions and six were collected during non -ambient conditions. Non -ambient conditions are considered when precipitation in the area is greater than 0.1 inch in the 72 hours prior to sampling. Precipitation amounts were monitored using the Community Collaborative Rain, Hail, and Snow (CoCoRaHS) Network. Samples collected were compared to the 15A NCAC 02B Standards and no exceedances were observed during the sampling events. A summary of the surface water quality data is presented in Table 4. 4 Conclusions 4.1 Groundwater The results of monthly groundwater level gauging indicate typical seasonal fluctuations of water levels across the Site. Further, groundwater elevations mimic topography, which is consistent with the regolith-fractured crystalline rock aquifer system of the Piedmont Physiographic Province of North Carolina. Concentrations of naturally -occurring inorganic constituents were detected in each monitoring well within the sampling network. The number of constituents detected and the magnitude of concentrations detected in the samples collected from MW-5 exceeded observations in other wells sampled and this condition is likely due to natural variability or other conditions (e.g. anthropogenic source). 4.2 Surface Water Surface water flow measurements were used to develop a 3-Dimensional flow model to establish baseline flow across the Site prior to mine operations. There were neither organic nor inorganic exceedances in the surface water samples collected from Beaver Dam Creek and Little Beaver Dam Creek. Piedmont Lithium I Technical Memorandum — Water Quality Testing ��� Tables Tables TABLE 1 SUMMARY OF MONITORING WELL CONSTRUCTION AND GROUNDWATER ELEVATION DATA PIEDMONT LITHIUM, INC. GASTON COUNTY, NORTH CAROLINA Well ID Northing (feet) Easting (feet) Well Diameter (inches) Total Dpeth (ft bgs) Screened Interval (ft bgs) Top of Casing Elevation (feet) Date of Water Level Measurement DTW (ft bTOC) GW Elevation (ft msl) MW-1 605465.4409 1319945.982 6 110 Open Hole Interval (60-110) 762.49 7/16/2018 21.33 741.16 8/7/2018 19.73 742.76 10/4/2018 20.15 742.34 11/16/2018 17.56 744.93 12/21/2018 17.50 744.99 1/25/2019 18.11 744.38 2/27/2019 17.47 745.02 4/24/2019 18.02 744.47 6/24/2019 18.96 743.53 7/22/2019 19.45 743.04 8/20/2019 19.64 742.85 9/23/2019 20.04 742.45 10/28/2019 20.10 742.39 11/18/2019 20.11 742.38 12/17/2019 19.68 742.81 1/27/2020 19.35 743.14 2/25/2020 18.48 744.01 MW-2 605494.2222 1316921.051 6 110 Open Hole Interval (60-110) 864.12 7/16/2018 47.99 816.13 8/7/2018 47.88 816.24 10/4/2018 47.37 816.75 11/16/2018 47.02 817.10 12/21/2018 46.25 817.87 1/25/2019 45.29 818.83 2/27/2019 44.03 820.09 4/24/2019 41.85 822.27 6/24/2019 40.44 823.68 7/22/2019 40.19 823.93 8/20/2019 40.10 824.02 9/23/2019 42.03 822.09 10/28/2019 40.84 823.28 11/18/2019 41.01 823.11 12/17/2019 41.22 822.90 1/27/2020 41.30 822.82 2/25/2020 40.80 823.32 MW-3 603244.8572 1315463.542 6 170 Open Hole Interval (117-170) 840.39 7/16/2018 55.62 784.77 8/7/2018 55.13 785.26 10/4/2018 54.96 785.43 11/16/2018 54.30 786.09 12/21/2018 52.95 787.44 1/25/2019 51.02 789.37 2/27/2019 49.22 791.17 4/24/2019 46.70 793.69 6/24/2019 46.58 793.81 7/22/2019 47.16 793.23 8/20/2019 47.91 792.48 9/23/2019 48.69 791.70 10/28/2019 49.75 790.64 11/18/2019 50.09 790.30 12/17/2019 50.46 789.93 1/27/2020 50.41 789.98 2/25/2020 49.08 791.31 MW-4 601127.1718 1319231.618 6 153 Open Hole Interval (102-153) 884.97 7/16/2018 40.72 844.25 8/7/2018 40.46 844.51 10/4/2018 39.40 845.57 11/16/2018 38.05 846.92 12/21/2018 36.08 848.89 1/25/2019 34.59 850.38 2/27/2019 33.18 851.79 4/24/2019 32.39 852.58 6/24/2019 33.05 851.92 7/22/2019 33.65 851.32 8/20/2019 34.39 850.58 9/23/2019 35.07 849.90 10/28/2019 36.09 848.88 11/18/2019 36.44 848.53 12/17/2019 36.50 848.47 1/27/2020 35.30 849.67 2/25/2020 33.83 851.14 TABLE 2 SUMMARY OF STREAM FLOW MEASUREMENTS PIEDMONT LITHIUM, INC. GASTON, NORTH CAROLINA Location ID Date Flow (cfs) Flow (gpm) FM-1 5/13/2019 24.15 10839.2 6/11/2019 20.40 9156.1 FM-2 5/13/2019 20.95 9403.0 6/11/2019 20.60 9245.9 FM-3 5/13/2019 8.00 3590.6 6/11/2019 8.40 3770.2 FM-4 5/13/2019 12.15 5453.3 6/11/2019 12.05 5408.4 FM-5 5/15/2019 0.35 157.1 6/12/2019 0.30 134.6 FM-6 5/15/2019 9.05 4061.9 6/12/2019 8.65 3882.4 Weir-1 5/15/2019 0.065 29.2 6/12/2019 0.34 152.9 Weir-2 5/15/2019 0.60 269.3 6/13/2019 0.53 238.3 Weir-3 5/15/2019 NM >11* 6/12/2019 0.088 39.7 Weir-4 5/15/2019 0.42 188.5 6/13/2019 0.15 68.0 Weir-5 5/15/2019 0.25 112.2 6/13/2019 0.15 66.1 Weir-6 5/15/2019 0.82 365.8 6/13/2019 0.37 166.1 Weir-7 5/15/2019 0.10 44.9 6/12/2019 0.097 43.6 Weir-8 5/15/2019 0.03 13.5 6/13/2019 0.04 18.9 Weir-9 5/15/2019 0.07 31.4 6/13/2019 0.10 45.2 Notes: cfs - cubic feet per second gpm - gallons per minute NM - not measured * A temporary weir was used at this location TABLE 3 SUMMARY OF GROUNDWATER QUALITY DATA PIEDMONT LITHIUM, INC. GASTON COUNTY, NORTH CAROLINA Field Measurements Alkalinity Nitrogen Location Date Turbidity (NTU) DO (mg/L) pH (SU) Specific Conductivity (Ps/cm) Temperature (°C) Arsenic (ug/L) Barium (ug/L) Cadmium (ug/L) Chromium (ug/L) Lead (ug/L) Lithium (ug/L) Mercury (ug/L) Manganese (ug/L) Selenium (ug/L) Silver (ug/L) Bicarbonate ( (mg L) Carbonate ( (mg L) Total (mg L) Total �mgg) Total Keldahl Nitrogen Nitrogen, N (mg/L) Total Dissolved Solids (mg/L) Chloride (mg/L) Fluoride (mg/L) Sulfate (mg/L) Cyanide (mg/L) 8/10/2018 4.91 5.97 11.73 675.0 17.0 <10.0 16.6 <1.0 6.1 <5.0 NS NS NS <10.0 <5.0 <5.0 140 160 <0.52 <0.50 0.17 233 3.3 0.32 12.9 <0.0080 3/27/2019 NM NM NM NM NM <10.0 19.1 <1.0 <5.0 <5.0 84.2 NS <5.0 <10.0 <5.0 <5.0 88.0 168 <0.52 <0.50 0.25 224 2.0 0.18 7.3 <0.0080 4/24/2019 1.27 3.36 11.75 737.0 16.6 <10.0 18.7 <1.0 <5.0 <5.0 78.2 <0.20 <5.0 <10.0 <5.0 <5.0 51.0 178 0.87 0.62 0.25 256 1.9 0.18 6.8 <0.0080 6/24/2019 1.66 4.63 11.46 636.0 17.1 <10.0 19.50 <1.0 <5.0 <5.0 73.0 <0.20 <5.0 <10.0 <5.0 <5.0 58.70 161.00 <0.52 <0.50 0.27 212.00 2.00 0.16 6.90 <0.0080 7/22/2019 1.45 4.78 11.68 624.0 16.8 <10.0 17.0 <1.0 <5.0 <5.0 71.4 NS <5.0 <10.0 <5.0 <5.0 67.7 146 <0.52 <0.50 0.27 181 2.0 0.17 6.7 <0.0080 8/23/2019 20.4 3.85 11.39 634.0 17.8 <10.0 20.1 <1.0 <5.0 <5.0 81.8 <0.20 14.1 <10.0 <5.0 <5.0 71.3 154 0.58 <0.50 0.29 195 2.2 0.27 7.5 <0.0080 MW-1 9/24/2019 1.5 3.71 11.26 581.4 16.6 <10.0 16.8 <1.0 <5.0 <5.0 80.3 <0.20 <5.0 <10.0 <5.0 <5.0 80.3 153 <0.52 <0.50 0.30 186 2.1 0.17 6.6 <0.0080 10/28/2019 2.06 4.21 11.56 597.7 15.1 <10.0 15.4 <1.0 <5.0 <5.0 81.2 <0.20 <5.0 <10.0 <5.0 <5.0 40.1 141 0.52 <0.50 0.31 214 1.9 0.26 7.2 <0.0080 11/18/2019 1.01 4.19 11.54 450.7 14.7 <50.0' 13.1 <5.0* <25.0' <25.0` 91.6 <0.20 <25.0* <50.0 <25.0* <5.0 64.9 108 0.60 <0.50 0.40 142 2.0 0.20 5.2 <0.0080 12/17/2019 0.40 5.02 10.41 124.6 15.0 <10.0 7.2 <1.0 <5.0 <5.0 97.1 <0.20 <5.0 <10.0 <5.0 <5.0 39.3 40.6 0.53 <0.50 0.46 71.0 2.0 0.11 2.9 <0.0080 1/27/2020 0.60 5.58 10.44 140.4 14.7 <10.0 9.1 <1.0 <5.0 <5.0 97.0 <0.20 5.0 <10.0 <5.0 16.5 19.3 35.8 0.69 <0.50 0.51 76.0 2.0 <0.10 2.2 <0.0080 2/25/2020 1.47 2.56 11.57 500.7 14.7 <10.0 9.1 <1.0 <5.0 <5.0 76.6 <0.20 <5.0 <10.0 <5.0 <5.0 64.6 120 <0.52 <0.50 0.33 140 2.2 0.36 7.1 <0.0080 8/9/2018 8.20 0.95 7.80 184.6 17.5 <10.0 <5.0 <1.0 <5.0 <5.0 NS NS NS <10.0 <5.0 79.1 <5.0 79.1 1.30 <0.50 0.91 135 2.5 <0.10 8.2 <0.0080 3/27/2019 NM NM NM NM NM <10.0 1 <5.0 <1.0 <5.0 <5.0 1 180.0 NS 33.6 <10.0 <5.0 1 95.4 <5.0 95.4 1.40 <0.50 1.10 139 2.3 <0.10 5.4 <0.0080 4/24/2019 4.79 0.15 7.98 203.9 16.6 <10.0 <5.0 <1.0 <5.0 <5.0 167 <0.20 31.1 <10.0 <5.0 97.3 <5.0 97.3 1.4 <0.50 1 1.1 165 2.3 <0.10 5.3 <0.0080 6/24/2019 1.24 1.61 7.37 184.2 18.6 <10.0 <5.0 <1.0 12.80 <5.0 99.3 <0.20 21.4 <10.0 <5.0 86.50 <5.0 86.50 1.90 <0.50 1.70 145.00 2.50 <0.10 3.30 <0.0080 7/22/2019 1.09 0.31 8.10 203.0 16.7 <10.0 <5.0 <1.0 <5.0 <5.0 129 NS 21.7 <10.0 <5.0 98.2 <5.0 98.2 1.3 <0.50 1.2 133 2.4 <0.10 4.9 <0.0080 MW-2 8/22/2019 2.79 0.29 7.58 214.0 16.8 <10.0 <5.0 <1.0 11.4 <5.0 145 <0.20 19.4 <10.0 <5.0 106 <5.0 106 1.4 <0.50 1.3 163 2.6 <0.10 5.7 <0.0080 9/24/2019 0.64 4.18 5.87 138.2 15.9 <10.0 5.2 <1.0 1 <5.0 <5.0 70.4 <0.20 17.6 1 <10.0 <5.0 57.1 <5.0 57.1 2.0 <0.50 2.0 103 2.5 <0.10 1.5 <0.0080 10/28/2019 0.63 6.30 7.07 189.7 16.4 <10.0 1 <5.0 <1.0 <5.0 <5.0 93.6 1 <0.20 21.4 <10.0 <5.0 1 79.0 <5.0 1 79.0 2.2 <0.50 2.0 1 146 2.4 <0.10 3.1 <0.0080 11/18/2019 0.46 4.02 1 6.75 147.0 15.9 <10.0 <5.0 <1.0 <5.0 <5.0 82.9 <0.20 12.7 <10.0 <5.0 57.2 <5.0 57.2 2.3 <0.50 2.1 113 2.6 <0.10 1.9 <0.0080 12/17/2019 0.63 5.69 6.30 112.8 16.0 <10.0 6.8 <1.0 <5.0 <5.0 72.0 <0.20 12.6 <10.0 <5.0 44.0 <5.0 44.0 2.3 <0.50 2.2 74.0 2.6 <0.10 1.1 <0.0080 1/28/2020 1.72 0.85 7.75 213.2 15.5 <10.0 <5.0 <1.0 <5.0 <5.0 141 <0.20 19.2 <10.0 <5.0 106 <5.0 106 1.6 <0.50 1.5 129 2.4 <0.10 4.8 <0.0080 2/25/2020 0.32 3.24 7.00 171.3 15.4 <10.0 <5.0 <1.0 <5.0 <5.0 82.8 <0.20 17.8 <10.0 <5.0 74.1 <5.0 74.1 2.0 <0.50 1.9 98.0 2.6 <0.10 2.5 1 <0.0080 8/9/2018 8.70 5.59 9.06 106.9 17.7 <10.0 <5.0 <1.0 1 <5.0 <5.0 NS NS NS <10.0 <5.0 46.1 <5.0 46.1 0.88 <0.50 0.65 94.0 1.3 1 <0.10 2.9 <0.0080 3/27/2019 NM NM NM NM NM <10.0 <5.0 <1.0 <5.0 <5.0 185.0 1 NS 12.5 <10.0 <5.0 1 47.9 <5.0 1 47.9 0.90 <0.50 0.76 85.0 1.3 <0.10 1.5 <0.0080 4/24/2019 3.21 6.39 1 8.77 102.0 16.1 <10.0 5.2 <1.0 <5.0 <5.0 185 <0.20 5.5 <10.0 <5.0 46.4 <5.0 48.2 0.99 <0.50 0.70 112 1.3 <0.10 1.6 <0.0080 6/24/2019 1.60 5.35 8.97 103.4 18.1 <10.0 9.70 <1.0 <5.0 <5.0 172 <0.20 <5.0 <10.0 <5.0 45.20 <5.0 48.90 0.89 <0.50 0.72 84.00 1.30 <0.10 1.60 <0.0080 7/23/2019 1.43 6.14 7.86 97.1 18.1 <10.0 <5.0 <1.0 <5.0 <5.0 155 NS 6.0 <10.0 <5.0 43.6 <5.0 43.6 0.9 <0.50 0.72 50.0 1.4 <0.50 1.5 <0.0080 8/23/2019 1.08 5.98 7.66 101.8 16.5 <10.0 <5.0 <1.0 <5.0 <5.0 184 <0.20 <5.0 <10.0 <5.0 48.8 <5.0 48.8 0.90 <0.50 0.72 83.0 1.5 <0.10 2.1 <0.0080 MW-3 9/23/2019 1.75 6.87 6.86 96.6 16.5 <10.0 <5.0 <1.0 1 <5.0 <5.0 179 <0.20 <5.0 1 <10.0 <5.0 47.5 <5.0 47.5 0.86 1 <0.50 0.82 83.0 1.5 <0.10 1.5 <0.0080 10/28/2019 1.44 7.10 8.03 105.1 16.4 <10.0 <5.0 <1.0 <5.0 <5.0 186 1 <0.20 <5.0 <10.0 <5.0 1 46.0 <5.0 46.0 0.96 <0.50 0.82 98.0 1.3 <0.10 1.4 <0.0080 11/20/2019 0.90 5.71 1 7.77 104.4 14.5 <10.0 <5.0 <1.0 <5.0 <5.0 204 <0.20 5.6 <10.0 <5.0 45.0 <5.0 45.0 1.00 <0.50 0.87 1 87.0 1.5 <0.10 1.5 <0.0080 12/17/2019 2.74 5.28 8.35 111.4 15.6 <10.0 <5.0 <1.0 <5.0 <5.0 194 <0.20 <5.0 <10.0 <5.0 53.5 <5.0 53.5 0.81 <0.50 0.81 82.0 1.5 <0.10 1.5 <0.0080 1/27/2020 3.01 6.79 7.86 102.1 14.6 <10.0 <5.0 <1.0 <5.0 <5.0 199 <0.20 <5.0 <10.0 <5.0 50.4 <5.0 50.4 1.0 <0.50 0.81 78.0 1.4 <0.10 1 1.4 <0.0080 2/27/2020 4.69 5.81 8.20 108.8 15.4 <10.0 <5.0 <1.0 <5.0 <5.0 186 <0.20 <5.0 <10.0 <5.0 53.6 <5.0 53.6 0.78 <0.50 0.75 65.0 1.5 <0.10 1.4 <0.0080 8/7/2018 13.10 7.11 9.20 120.5 18.4 <10.0 5.2 <1.0 25.7 <5.0 NS NS NS <10.0 <5.0 44.2 <5.0 49.1 1.2 <0.50 1.10 93.0 1.0 1.1 4.1 <0.0080 3/27/2019 NM NM NM NM NM <10.0 5.4 <1.0 <5.0 <5.0 222 NS 23.4 <10.0 <5.0 39.6 11.7 51.3 1.4 <0.50 1.2 93.0 <1.0 <0.10 1.3 <0.0080 4/25/2019 2.23 6.15 9.08 113.0 16.5 <10.0 <5.0 <1.0 <5.0 <5.0 228 <0.20 11.9 <10.0 <5.0 40.3 15.0 55.2 1.6 <0.50 1.2 127 <1.0 <0.10 1.1 <0.0080 6/25/2019 1.61 5.75 8.52 105.4 17.5 <10.0 5.50 <1.0 <5.0 <5.0 190 <0.20 11.2 <10.0 <5.0 49.70 <5.0 49.70 1.30 <0.50 1.20 105.00 <1.0 <0.10 1.00 <0.0080 7/24/2019 1.22 5.64 8.25 98.2 18.8 <10.0 5.5 <1.0 <5.0 <5.0 159 NS 16.2 <10.0 <5.0 46.1 <5.0 46.1 1.4 <0.50 1.1 58.0 1.0 <0.10 1.0 <0.0080 MW-4 8/23/2019 2.48 6.61 7.57 98.3 17.5 <10.0 6.4 <1.0 <5.0 <5.0 172 <0.20 12.0 <10.0 1 <5.0 46.1 <5.0 1 46.1 1.3 <0.50 1.1 86.0 <1.0 I <0.10 1.3 1 <0.0080 9/24/2019 3.03 6.36 6.99 93.4 16.4 <10.0 5.3 <1.0 <5.0 <5.0 161 <0.20 19.6 <10.0 <5.0 46.2 <5.0 46.2 1.2 <0.50 1.1 89.0 <1.0 <0.10 <1.0 <0.0080 10/30/2019 0.87 7.57 7.58 96.7 16.5 <10.0 1 5.6 <1.0 <5.0 <5.0 163 1 <0.20 10 <10.0 <5.0 41.4 <5.0 41.4 1.4 1 <0.50 1.2 1 79.0 <1.0 <0.10 <1.0 <0.0080 11/19/2019 1.74 6.08 1 7.82 103.2 15.7 <10.0 <5.0 <1.0 <5.0 <5.0 187 <0.20 17.4 <10.0 <5.0 44.0 <5.0 44.0 1.3 0 1.2 94.0 <1.0 <0.10 1.2 <0.0080 12/19/2019 1.81 5.98 7.16 91.5 14.6 <10.0 <5.0 <1.0 23.2 <5.0 158 <0.20 8.5 <10.0 <5.0 41.0 <5.0 41.0 1.3 0 1.2 83.0 <1.0 <0.10 <1.0 <0.0080 1/29/2020 0.58 7.29 7.55 91.3 15.6 <10.0 8.8 <1.0 <5.0 <5.0 155 <0.20 <5.0 <10.0 <5.0 43.6 <5.0 43.6 1.3 0 E10 1.2 68.0 <1.0 <0.10 <1.0 <0.0080 2/27/2020 1.90 6.18 7.12 91.9 16.6 <10.0 6.8 <1.0 <5.0 <5.0 145 <0.20 5.9 <10.0 <5.0 41.4 <5.0 41.4 1.2 0 1.1 55.0 <1.0 <0.10 <1.0 <0.0080 TABLE 3 SUMMARY OF GROUNDWATER QUALITY DATA PIEDMONT LITHIUM, INC. GASTON COUNTY, NORTH CAROLINA Field Measurements Alkalinity Nitrogen Location Date Turbidity (NTU) DO (mg/L) pH (SU) Specific Conductivity (Ps/cm) Temperature (°C) Arsenic (ug/L) Barium (ug/L) Cadmium (ug/L) Chromium (ug/L) Lead (ug/L) Lithium (ug/L) Mercury (ug/L) Manganese (ug/L) Selenium (ug/L) Silver (ug/L) Bicarbonate ((mg L) Carbonate ((mg L) Total (mg L) Total �mgg) Total Keldahl Nitrogen Nitrogen, N (mg/L) Total Dissolved Solids (mg/L) Chloride (mg/L) Fluoride (mg/L) Sulfate (mg/L) Cyanide (mg/L) 8/8/2018 14.7 4.04 11.97 169.7 20.4 221 485 1.3 328 39.9 NS NS NS 26.7 <5.0 1530 1800 3330 <0.52 <0.50 0.081 520 2.4 0.28 19.4 <0.0080 3/27/2019 NM NM NM NM NM <10.0 14.6 <1.0 6.2 <5.0 70.9 NS <5.0 <10.0 <5.0 <5.0 88.0 193 <0.52 <0.50 <0.040 271 1.8 0.15 13.5 <0.0080 4/25/2019 2.93 3.11 11.19 276.4 19.3 <10.0 12.9 <1.0 <5.0 <5.0 151 <0.20 <5.0 <10.0 <5.0 <5.0 35.8 70.0 <0.52 <0.50 0.091 108 <1.0 <0.10 2.1 <0.0080 6/25/2019 4.39 5.83 10.99 228.0 18.1 10.40 13.60 <1.0 <5.0 <5.0 147 <0.20 <5.0 <10.0 <5.0 12.30 86.30 98.60 <0.52 <0.50 0.089 80.00 <1.0 0.10 2.00 <0.0080 7/24/2019 3.22 3.22 10.97 183.7 18.2 <10.0 9.7 <1.0 <5.0 <5.0 130 NS <5.0 <10.0 <5.0 <5.0 48.9 54.0 <0.52 <0.50 0.088 56.0 <1.0 <0.10 1.9 <0.0080 MW-5 8/21/2019 6.18 2.75 10.72 185.5 20.5 <10.0 9.7 <1.0 <5.0 <5.0 143 <0.20 6.0 <10.0 <5.0 <5.0 47.0 50.3 <0.52 <0.50 0.077 74.0 1.2 0.13 3.5 <0.0080 9/24/2019 17.40 6.81 10.73 184.3 18.5 <10.0 9.6 <1.0 <5.0 <5.0 146 <0.20 8.2 <10.0 <5.0 17.1 54.0 71.2 <0.52 <0.50 0.087 79.0 1.1 <0.10 3.0 <0.0080 10/29/2019 4.47 3.40 10.71 141.4 17.5 <10.0 8.2 <1.0 1 <5.0 <5.0 158 <0.20 1 <5.0 <10.0 <5.0 <5.0 24.4 40.1 <0.52 <0.50 0.087 63.0 <1.0 <0.10 2.0 <0.0080 11/20/2019 8.23 0.23 11.58 515.5 16.9 <10.0 6.7 <1.0 <5.0 <5.0 80.1 <0.20 <5.0 <10.0 <5.0 <5.0 62.5 125 <0.52 <0.50 <0.040 168 1.6 0.20 1 10.4 <0.0080 12/18/2019 7.19 2.71 10.08 88.9 15.0 14.3 8.2 <1.0 <5.0 <5.0 169 <0.20 7.5 <10.0 <5.0 42.5 11.9 54.4 <0.52 <0.50 0.078 44.0 1.1 0.10 2.3 <0.0080 1/28/2020 4.77 2.85 10.86 169.1 15.6 <10.0 9.6 <1.0 <5.0 <5.0 158 <0.20 7.2 <10.0 <5.0 <5.0 48.1 50.3 <0.52 <0.50 0.068 64.0 1.1 <0.10 2.9 <0.0080 2/26/2020 3.58 5.65 9.66 82.9 15.1 13.9 <5.0 <1.0 <5.0 <5.0 156 <0.20 <5.0 <10.0 <5.0 30.1 6.7 36.9 <0.52 <0.50 0.069 44.0 1.1 <0.10 2.8 <0.0080 8/9/2018 12.3 6.70 6.78 124.6 15.9 <10.0 <5.0 <1.0 <5.0 <5.0 NS NS NS <10.0 <5.0 64.5 <5.0 64.5 <0.52 <0.50 0.16 103 <1.0 <0.10 <1.0 <0.0080 3/27/2019 NM NM NM NM NM <10.0 <5.0 1 <1.0 <5.0 <5.0 108 NS 12.8 <10.0 <5.0 69.6 <5.0 69.6 <0.52 <0.50 0.19 103 <1.0 <0.10 <1.0 <0.0080 4/26/2019 5.71 6.40 6.92 127.9 14.9 <10.0 <5.0 <1.0 <5.0 <5.0 109 <0.20 34.9 <10.0 <5.0 73.2 <5.0 73.2 <0.52 <0.50 0.17 157 <1.0 <0.10 I <1.0 <0.0080 6/26/2019 9.63 5.52 7.01 128.4 15.7 <10.0 <5.0 <1.0 <5.0 <5.0 97.8 <0.20 14.9 <10.0 <5.0 69.60 <5.0 69.60 <0.52 <0.50 0.22 104.00 <1.0 <0.10 <1.0 <0.0080 7/23/2019 5.15 6.37 6.92 122.4 15.9 <10.0 <5.0 <1.0 <5.0 <5.0 85.8 NS 23.2 <10.0 <5.0 64.8 <5.0 64.8 <0.52 <0.50 0.16 104 <1.0 <0.10 <1.0 1 <0.0080 ow 8/22/2019 8.49 5.10 6.77 126.6 17.3 <10.0 <5.0 <1.0 <5.0 <5.0 98.0 <0.20 1 30.8 <10.0 <5.0 69.5 <5.0 69.5 <0.52 <0.50 0.16 100 <1.0 0.12 <1.0 <0.0080 -is 9/26/2019 9.73 6.32 6.06 119.0 16.2 <10.0 <5.0 <1.0 1 <5.0 <5.0 95.5 <0.20 32.0 <10.0 <5.0 68.3 <5.0 68.3 <0.52 <0.50 0.16 100 1.1 <0.10 <1.0 <0.0080 10/30/2019 7.24 6.77 6.92 125.0 15.6 <10.0 <5.0 <1.0 <5.0 <5.0 103 <0.20 19.1 <10.0 <5.0 62.7 <5.0 62.7 <0.52 <0.50 0.17 106 <1.0 <0.10 <1.0 <0.0080 11/21/2019 2.06 6.00 6.84 127.6 15.2 <10.0 <5.0 <1.0 <5.0 <5.0 106 <0.20 <5.0 <10.0 <5.0 63.6 <5.0 63.6 <0.52 <0.50 0.19 1 109 <1.0 <0.10 <1.0 <0.0080 12/19/2019 9.98 5.30 6.85 125.6 13.8 <10.0 <5.0 <1.0 <5.0 <5.0 105 <0.20 31.4 <10.0 <5.0 67.4 <5.0 67.4 <0.52 <0.50 0.17 115 <1.0 <0.10 <1.0 <0.0080 1/28/2020 12.80 6.40 6.80 120.1 13.9 <10.0 <5.0 <1.0 <5.0 <5.0 112 1 0.33 23.0 <10.0 <5.0 65.2 <5.0 65.2 <0.52 <0.50 0.16 93.0 <1.0 <0.10 I <1.0 <0.0080 2/26/2020 4.29 6.75 6.69 133.4 13.8 <10.0 <5.0 <1.0 <5.0 <5.0 98.4 <0.20 5.9 <10.0 <5.0 71.9 <5.0 71.9 <0.52 <0.50 0.16 75.0 <1.0 <0.10 <1.0 <0.0080 8/7/2018 13.20 5.94 7.21 187.7 17.6 <10.0 5.5 <1.0 1 6.9 <5.0 NS NS NS <10.0 1 <5.0 93.8 <5.0 93.8 <0.52 1 <0.50 0.26 132 1.7 0.16 1.2 <0.0080 3/27/2019 NM NM NM NM NM <10.0 <5.0 <1.0 <5.0 <5.0 184 NS 63.9 <10.0 <5.0 100 <5.0 100 <0.52 <0.50 0.31 137 1.6 0.12 1.1 <0.0080 4/26/2019 1.17 4.93 6.85 165.4 14.4 <10.0 <5.0 <1.0 <5.0 <5.0 161 <0.20 <5.0 <10.0 <5.0 92.6 <5.0 92.6 1.0 0.75 0.27 1 155 1.5 <0.10 <1.0 <0.0080 6/26/2019 3.69 4.08 6.93 181.3 16.4 <10.0 <5.0 <1.0 <5.0 <5.0 163 <0.20 49.3 <10.0 <5.0 100.00 <5.0 100.00 <0.52 <0.50 0.29 117.00 1.60 <0.10 1.00 <0.0080 7/23/2019 6.37 4.58 6.93 176.8 16.8 <10.0 <5.0 <1.0 <5.0 <5.0 145 1 NS 50.1 <10.0 <5.0 93.6 <5.0 93.6 <0.52 <0.50 0.27 101 1.7 <0.10 1 1.0 <0.0080 8/22/2019 2.68 4.48 6.84 172.3 16.2 <10.0 <5.0 <1.0 <5.0 <5.0 154 <0.20 6.9 <10.0 <5.0 90.4 <5.0 90.4 <0.52 <0.50 0.27 122 1.9 <0.10 1.0 <0.0080 OW-1 D 9/25/2019 4.36 4.22 6.19 167.5 15.9 <10.0 1 <5.0 <1.0 1 <5.0 <5.0 158 <0.20 22.0 1 <10.0 <5.0 94.7 <5.0 94.7 <0.52 1 <0.50 0.31 130 1.8 <0.10 <1.0 <0.0080 10/30/2019 5.69 5.34 6.93 171.6 15.6 <10.0 <5.0 <1.0 <5.0 <5.0 166 <0.20 8.0 <10.0 <5.0 87.2 <5.0 1 87.2 <0.52 <0.50 0.30 120 1.7 <0.10 <1.0 <0.0080 11/21/2019 2.18 2.98 6.95 180.1 15.4 <10.0 <5.0 <1.0 <5.0 5.5 163 <0.20 5.1 <10.0 <5.0 94.2 <5.0 94.2 <0.52 <0.50 0.30 1 132 1.7 <0.10 <1.0 1 <0.0080 12/19/2019 2.31 4.50 6.87 172.3 14.2 <10.0 <5.0 <1.0 <5.0 <5.0 172 <0.20 9.7 <10.0 <5.0 92.3 <5.0 92.3 <0.52 <0.50 0.30 130 1.8 <0.10 <1.0 <0.0080 1/29/2020 13.0 4.43 7.03 162.9 12.0 <10.0 <5.0 <1.0 <5.0 30.1 1 162 <0.20 6.2 <10.0 <5.0 90.7 <5.0 90.7 <0.52 <0.50 0.27 92.0 1.6 <0.10 <1.0 <0.0080 2/27/2020 8.10 4.12 6.75 170.1 12.7 <10.0 <5.0 <1.0 <5.0 22.5 152 <0.20 5.6 <10.0 <5.0 90.4 <5.0 90.4 <0.52 <0.50 0.29 101 1.8 <0.10 <1.0 <0.0080 8/8/2018 49.4 5.68 6.42 113.8 18.9 <10.0 9.7 <1.0 <5.0 <5.0 NS NS NS <10.0 <5.0 56.1 <5.0 56.1 <0.52 <0.50 0.094 123 1.3 <0.10 <1.0 <0.0080 3/27/2019 NM NM NM NM NM <10.0 <5.0 <1.0 <5.0 <5.0 36.7 NS 8.1 <10.0 <5.0 61.1 <5.0 61.1 <0.52 <0.50 0.097 114 <1.0 <0.10 <1.0 <0.0080 4/26/2019 9.26 5.18 6.54 113.8 16.0 <10.0 5.8 <1.0 <5.0 <5.0 38.3 <0.20 19.3 <10.0 <5.0 61.9 <5.0 61.9 0.72 0.63 0.092 139 1.0 <0.10 <1.0 <0.0080 6/25/2019 6.34 4.92 6.70 114.8 18.3 <10.0 9.70 <1.0 <5.0 <5.0 37.2 <0.20 37.9 <10.0 <5.0 62.30 <5.0 62.30 <0.52 <0.50 0.091 99.00 1.30 0.10 <1.0 <0.0080 7/24/2019 28.30 5.47 6.73 114.0 17.7 <10.0 5.1 <1.0 <5.0 <5.0 30.5 NS 17.5 <10.0 <5.0 58.3 <5.0 58.3 <0.52 <0.50 0.082 84.0 1.0 <0.10 <1.0 <0.0080 OW-2S 8/21/2019 45.0 4.93 6.45 116.1 20.5 <10.0 14.1 <1.0 <5.0 <5.0 40.4 <0.20 65.5 <10.0 <5.0 58.3 <5.0 58.3 <0.52 <0.50 <0.087 107 1.2 0.12 <1.0 <0.0080 9/25/2019 9.02 4.65 6.12 11.2 18.0 <10.0 <5.0 <1.0 <5.0 <5.0 33.7 <0.20 15.4 <10.0 <5.0 62.0 <5.0 62.0 <0.52 <0.50 0.087 106 1.1 <0.10 <1.0 <0.0080 10/29/2019 9.86 6.38 6.56 114.8 18.3 <10.0 <5.0 <1.0 <5.0 <5.0 37.1 <0.20 11.1 <10.0 <5.0 55.9 <5.0 55.9 <0.52 <0.50 0.100 99.0 <1.0 <0.10 <1.0 <0.0080 11/21/2019 64.6 7.41 6.67 119.9 18.6 <10.0 7.8 <1.0 <5.0 <5.0 44.7 <0.20 38.1 <10.0 <5.0 62.8 <5.0 62.8 <0.52 <0.50 0.094 118 1.0 <0.10 <1.0 <0.0080 12/18/2019 9.95 4.87 6.47 115.8 16.9 <10.0 8.7 <1.0 <5.0 <5.0 43.0 <0.20 51.2 <10.0 <5.0 60.3 <5.0 60.3 <0.52 <0.50 0.073 116 1.1 <0.10 <1.0 <0.0080 1/28/2020 7.52 5.82 6.65 109.3 16.0 <10.0 <5.0 <1.0 <5.0 <5.0 38.8 <0.20 10.3 <10.0 <5.0 58.7 <5.0 58.7 <0.52 <0.50 0.089 91.0 1.0 <0.10 <1.0 <0.0080 2/26/2020 8.30 5.03 6.21 115.0 15.6 <10.0 <5.0 <1.0 <5.0 <5.0 38.7 <0.20 12.4 <10.0 <5.0 58.3 <5.0 1 58.3 <0.52 <0.50 0.086 87.0 1.1 <0.10 <1.0 <0.0080 TABLE 3 SUMMARY OF GROUNDWATER QUALITY DATA PIEDMONT LITHIUM, INC. GASTON COUNTY, NORTH CAROLINA Field Measurements Alkalinity Nitrogen Location Date Turbidity (NTU) DO (mg/L) pH (SU) Specific Conductivity (PS/cm) Temperature (°C) Arsenic (ug/L) Barium (ug/L) Cadmium (ug/L) Chromium (ug/L) Lead (ug/L) Lithium (ug/L) Mercury (ug/L) Manganese (ug/L) Selenium (ug/L) Silver (ug/L) Bicarbonate ( (mg L) Carbonate ( (mg L) Total (mg L) Total �mgg) Total Keldahl Nitrogen Nitrogen, N (mg/L) Total Dissolved Solids (mg/L) Chloride (mg/L) Fluoride (mg/L) Sulfate (mg/L) Cyanide (mg/L) 8/8/2018 2.63 9.09 7.56 173.5 17.3 <10.0 <5.0 <1.0 <5.0 <5.0 NS NS NS <10.0 <5.0 89.1 <5.0 89.1 <0.52 <0.50 0.1 128.0 1.1 0.1 <1.0 <0.0080 3/27/2019 NM NM NM NM NM <10.0 <5.0 <1.0 <5.0 <5.0 108.0 NS 7.8 <10.0 <5.0 89.2 <5.0 89.2 <0.52 <0.50 0.2 125.0 1.1 <0.10 <1.0 <0.0080 4/26/2019 0.96 5.14 1 7.28 166.2 15.7 <10.0 1 <5.0 <1.0 <5.0 1 <5.0 100.0 1 <0.20 <5.0 <10.0 1 <5.0 93.3 <5.0 1 93.3 <0.52 1 <0.50 0.2 139.0 1.1 <0.10 <1.0 <0.0080 6/25/2019 1.47 4.69 7.16 163.1 16.5 <10.0 <5.0 <1.0 <5.0 <5.0 92.5 <0.20 <5.0 <10.0 <5.0 91.3 <5.0 91.3 <0.52 <0.50 0.2 119.0 1.1 <0.10 <1.0 <0.0080 7/24/2019 1.75 5.12 7.21 164.4 16.8 <10.0 <5.0 <1.0 <5.0 <5.0 90.2 NS 18.5 <10.0 <5.0 88.9 <5.0 88.9 <0.52 <0.50 0.14 106 1.1 <0.10 <1.0 <0.0080 8/21/2019 3.88 5.10 7.09 165.2 19.8 <10.0 <5.0 <1.0 <5.0 <5.0 102.0 <0.20 9.8 <10.0 <5.0 86.2 <5.0 86.2 <0.52 <0.50 0.14 113 1.3 0.1 <1.0 <0.0080 OW-21D 9/25/2019 0.84 4.93 6.41 161.5 17.0 <10.0 <5.0 <1.0 <5.0 <5.0 96.4 <0.20 <5.0 <10.0 <5.0 93.0 <5.0 93.0 <0.52 <0.50 0.14 109 1.1 <0.10 <1.0 <0.0080 10/29/2019 0.81 6.05 7.19 164 17 <10.0 <5.0 <1.0 <5.0 <5.0 102 <0.20 <5.0 <10.0 <5.0 85.1 <5.0 85.1 <0.52 <0.50 0.14 117 1.1 <0.10 <1.0 <0.0080 11/21/2019 2.83 5.24 7.77 165.5 15.6 <10.0 <5.0 <1.0 <5.0 <5.0 107 <0.20 5.8 <10.0 <5.0 88.4 <5.0 88.4 <0.52 <0.50 0.15 122 1.1 <0.10 <1.0 <0.0080 12/18/2019 0.54 4.54 7.16 166.6 15.3 <10.0 <5.0 <1.0 <5.0 <5.0 109 <0.20 <5.0 <10.0 <5.0 89.5 <5.0 89.5 <0.52 <0.50 0.14 111 1.1 <0.10 <1.0 <0.0080 1/29/2020 0.39 5.72 7.22 158.1 14.6 <10.0 <5.0 <1.0 <5.0 <5.0 110 0.28 <5.0 <10.0 <5.0 88.3 <5.0 88.3 <0.52 <0.50 0.14 107 1.1 <0.10 <1.0 <0.0080 2/26/2020 0.49 5.25 7.31 167.0 15.0 <10.0 <5.0 <1.0 <5.0 <5.0 97.4 <0.20 <5.0 <10.0 <5.0 90.4 <5.0 90.4 <0.52 <0.50 0.13 102 1.1 <0.10 <1.0 <0.0080 8/9/2018 1.83 5.49 6.56 166.0 16.8 <10.0 <5.0 <1.0 <5.0 <5.0 NS NS NS <10.0 <5.0 82.5 <5.0 82.5 <0.52 <0.50 0.3 121.0 1.7 <0.10 <1.0 <0.0080 3/27/2019 NM NM NM NM NM 26.0 <5.0 <1.0 <5.0 <5.0 1060 NS 17.1 <10.0 <5.0 72.4 <5.0 72.4 <0.52 <0.50 <0.040 110.0 1.3 2.3 8.7 <0.0080 4/25/2019 0.28 0.19 8.66 158.1 15.5 20.5 <5.0 <1.0 <5.0 <5.0 1000 <0.20 9.2 <10.0 <5.0 68.8 <5.0 68.8 0.6 0.6 <0.040 122.0 1.2 2.5 8.9 <0.0080 6/26/2019 0.28 0.36 8.54 150.5 15.9 13.0 <5.0 <1.0 <5.0 <5.0 1070 <0.20 6.4 <10.0 <5.0 64.0 <5.0 64.0 <0.52 <0.50 <0.040 101.0 1.2 2.8 8.8 <0.0080 7/23/2019 0.26 0.47 8.69 147.0 18.8 10.2 <5.0 <1.0 <5.0 <5.0 1100 NS 6.2 <10.0 <5.0 60 <5.0 60 <0.52 <0.50 <0.040 74.0 1.3 2.9 8.7 <0.0080 8/22/2019 0.23 0.33 8.62 151.5 18.2 <10.0 <5.0 <1.0 <5.0 <5.0 1190 <0.20 5.8 <10.0 <5.0 62.2 <5.0 62.2 <0.52 <0.50 <0.040 87.0 1.4 3.1 10.0 <0.0080 PW-1 9/25/2019 1.36 0.97 7.63 144.5 16.4 <10.0 <5.0 <1.0 <5.0 <5.0 1220 <0.20 6.5 <10.0 <5.0 64.1 <5.0 64.1 <0.52 <0.50 <0.040 110 1.3 2.7 9.1 <0.0080 10/29/2019 0.17 0.24 8.75 152.6 16.1 <10.0 <5.0 <1.0 <5.0 <5.0 1220 <0.20 5.3 <10.0 <5.0 60.7 <5.0 60.7 <0.52 <0.50 <0.040 102 1.2 2.8 9.7 <0.0080 11/20/2019 0.67 0.38 8.64 156.0 15.6 <10.0 <5.0 <1.0 <5.0 <5.0 1370 <0.20 5.1 <10.0 <5.0 62.5 <5.0 62.5 <0.52 <0.50 <0.040 115 1.3 2.9 9.4 <0.0080 12/18/2019 0.38 0.14 8.66 157.0 14.7 <10.0 <5.0 <1.0 <5.0 <5.0 1350 <0.20 5.2 <10.0 <5.0 66.2 <5.0 66.2 <0.52 <0.50 <0.040 97.0 1.2 2.4 8.9 <0.0080 1/29/2020 0.20 2.40 8.66 150.0 13.7 <10.0 <5.0 <1.0 <5.0 <5.0 1320 0.27 5.0 <10.0 <5.0 65.9 <5.0 65.9 <0.52 <0.50 <0.040 98.0 1.2 2.8 9.7 0.010 2/27/2020 0.38 0.77 8.69 157.7 13.6 <10.0 <5.0 <1.0 <5.0 <5.0 1210 <0.20 5.2 <10.0 <5.0 69.9 <5.0 69.9 <0.52 <0.50 <0.040 74.0 1.2 2.6 9.2 <0.0080 NCAC 2L Standards -- -- 6.5-8.5 -- I 10 700 2 10 15 -- -- 50 20 20 -- -- -- -- -- 11 -- 250 2 250 70 Notes: NTU - nephelometric turbidity units mg/L - miligrams per liter SU - standard units pS/cm - microsiemens per centimeter NM - not measured NS - not sampled -- - no established NCAC 2L Standard for analyte 8.75 - Result is above NCAC 2L Standards Sample diluted due to the presence of high levels of non -target analytes or other matrix interference Aluminum, Antimony, Beryllium, Calcium, Copper, Iron, Potassium, Sodium, Thallium and Zinc were analyzed in August 2018; Refer to Technical Memorandum from March 1, 2019 TABLE 4 SUMMARY OF SURFACE WATER QUALITY DATA PIEDMONT LITHIUM, INC. GASTON COUNTY, NORTH CAROLINA Field Measurements Metals Alkalinity Chlorophyll & Pheopytin Nitrogen Location Date Total Preci itation P in Past72 Hours Turbidity (NTU) DO (mg/L) pH Specific Conductivity (�/cm) ORP (mv) Temperature (°C) Arsenic (pg/L) Barium (pg/L) Cadmium (pg/L) Chromium (pg/L) Lead (pg/L) Lithium (pg/L) Manganese (pg/L) Selenium (pg/L) Silver (pg/L) Mercury (pg/L) Bicarbonate (CaCO3) (mg/L) Carbonate (CaCO3) (mg/L) Total CaCO3 (mg/L) Chlorophyll a (mg/m^3) Chlorophyll b (mg/m^3) Chlorophyll c (mg/m^3) Chlorophyll a (Corrected) (mg/m^3) Pheophytin (mg/m^3) Total Nitrogen (mg/L) Nitrogen, Ammonia (mg/L) Total Kjeldahl Nitrogen (mg/L) Nitrogen, NO2+NO3 (mg/L) Total Suspended Solids (mg/L) Total Dissolved Solids (mg/L) Chloride (mg/L) Fluoride (mg/L) Sulfate (mg/L) Phosphorus (mg/L) Cyanide (mg/L) 2/14/2019 0.72 8.52 15.55 6.17 61.3 298.1 6.1 NS NS NS NS NS NS NS NS NS NS NS NS NS 10.4 <7.7 <7.7 <7.7 14.9 NS <0.10 NS NS 4.1 NM NM NM NM <0.050 NM 3/21/2019 0.00 NM 12.50 6.55 147.8 179.7 9.8 <10.0 12.4 <1.0 <5.0 <5.0 10.8 24.9 <10.0 <5.0 <0.20 21.7 <5.0 21.7 <5.0 <5.0 <5.0 <5.0 72.2 0.79 <0.10 <0.50 0.53 4.4 52.0 3.5 <0.10 2.6 <0.050 <0.0080 4/23/2019 1.69 10.30 9.82 7.31 68.5 41.3 13.6 <10.0 17.3 <1.0 <5.0 <5.0 12.4 44 <10.0 <5.0 <0.20 22.7 <5.0 22.7 <5.0 <5.0 <5.0 <5.0 <5.0 0.87 <0.10 <0.50 0.56 7.9 80 3.4 <0.10 2.6 <0.050 <0.0080 5/23/2019 0.00 NM 8.24 7.40 69.7 35.5 18.6 <10.0 15.3 <1.0 <5.0 <5.0 17.8 47 <10.0 <5.0 <0.20 21.2 <5.0 21.2 <5.0 <5.0 <5.0 <5.0 <5.0 1.10 <0.10 <0.50 0.65 9.0 71.0 3.8 <0.10 1.7 0.06 <0.0080 6/13/2019 1.11 15.4 15.16 8.67 70.6 121.8 17.1 <10.0 16.3 <1.0 <5.0 <5.0 15.2 42.9 <10.0 <5.0 <0.20 22.7 <5.0 22.7 5.2 <5.0 <5.0 <5.0 <5.0 0.83 <0.10 <0.50 0.53 4.9 59.0 3.7 <0.10 2.0 <0.050 <0.0080 7/2/2019 0.02 9.8 7.89 6.99 76.6 -61.9 21.5 <10.0 15.0 <1.0 <5.0 <5.0 16.9 52.0 <10.0 <5.0 <0.20 27.2 <5.0 27.2 <5.2 <5.2 <5.2 <5.2 7.7 1.0 <0.10 <0.50 0.64 6.2 51.0 3.7 <0.10 1.5 0.054 <0.0080 Site-1 8/20/2019 0.00 21.3 1 7.55 7.57 72.2 24.0 21.9 <10.0 17.3 <1.0 <5.0 <5.0 16.6 75.2 <10.0 <5.0 <0.20 26.9 <5.0 26.9 3.1 NM NM NM <2.0 0.85 <0.10 <0.50 0.42 12.7 80.0 1 3.2 <0.10 2.1 0.083 <0.0080 9/23/2019 0.00 6.3 7.59 7.37 71.0 47.0 18.0 <10.0 11.2 <1.0 <5.0 <5.0 25.0 49.7 <10.0 <5.0 <0.20 31.5 <5.0 31.5 <2.0 NM NM NM <2.0 <0.52 <0.10 <0.50 0.36 3.0 65.0 3.6 <0.10 1.0 0.054 <0.0080 10/21/2019 1.56 8.22 9.29 7.11 70.4 134.7 14.1 <10.0 11.8 <1.0 <5.0 <5.0 17.5 41.1 <10.0 <5.0 <0.20 1 26.0 <5.0 26.0 <2.0 NM NM NM <2.0 <0.52 <0.10 <0.50 1 0.32 4.6 73.0 4.0 <0.10 1.9 0.069 <0.0080 11/19/2019 0.03 3.22 10.97 7.50 1 74.7 36.5 1 9.1 <10.0 1 11.4 <1.0 1 <5.0 <5.0 19.3 28.4 <10.0 1 <5.0 NM 28.9 <5.0 28.9 2.1 1 NM NM NM <2.0 0.56 <0.10 <0.50 0.33 <2.5 65 4.2 <0.10 1.6 <0.050 <0.0080 12/16/2019 1.60 12.1 10.72 7.01 70.8 -145.6 8.2 <10.0 16.6 <1.0 <5.0 <5.0 13.4 45.1 <10.0 <5.0 <0.20 21.4 <5.0 21.4 <2.0 NM NM NM <2.0 1.0 <0.10 <0.50 0.68 5.8 78.0 3.9 <0.10 3.6 0.055 <0.0080 1/27/2020 1.22 11.50 13.05 7.83 61.3 103.5 6.9 <10.0 16.1 <1.0 <5.0 <5.0 11.3 31.1 <10.0 <5.0 <0.20 19.4 <5.0 19.4 4.7 NM NM NM <2.0 0.96 <0.10 <0.50 0.65 6.9 42 3.6 <0.10 3.4 <0.050 <0.0080 2/14/2019 0.72 7.91 19.04 6.59 55.8 251.7 7 NS NS NS NS NS NS NS NS NS NS NS NS NS <5.0 <5.0 <5.0 <5.0 66.5 NS <0.10 NS NS <2.5 NM NM NM NM <0.050 NM 3/21/2019 0.00 NM 1 12.19 6.93 145.6 108.9 10.6 <10.0 11.0 <1.0 <5.0 <5.0 26.3 13.1 <10.0 <5.0 <0.20 23.1 <5.0 23.1 <5.0 <5.0 <5.0 <5.0 88.0 0.58 <0.10 <0.50 0.39 4.3 57.0 2.7 <0.10 1 1.2 <0.050 <0.0080 4/23/2019 1 1.69 9.40 10.70 7.21 64.4 7.5 13.5 <10.0 15.7 <1.0 <5.0 <5.0 32.2 29.4 <10.0 <5.0 <0.20 25 <5.0 25 <5.0 <5.0 <5.0 <5.0 1 <5.0 0.72 <0.10 <0.50 0.47 5.5 107 2.7 <0.10 1.2 0.051 <0.0080 5/23/2019 0.00 NM 8.11 7.15 65.9 36.4 17.7 <10.0 18.1 <1.0 <5.0 <5.0 37.5 28.4 <10.0 <5.0 <0.20 23.4 <5.0 23.4 <5.0 <5.0 <5.0 <5.0 7.0 0.91 <0.10 <0.50 0.54 9.1 85.0 2.7 <0.10 <1.0 0.066 <0.0080 6/13/2019 1.11 13.3 15.96 8.07 63.9 1 46.0 16.5 <10.0 15.8 1 <1.0 <5.0 <5.0 35.8 24.8 1 <10.0 <5.0 <0.20 23.2 <5.0 23.2 <5.0 <5.0 <5.0 <5.0 <5.0 0.71 <0.10 <0.50 0.44 4.1 58.0 2.8 <0.10 1.2 <0.050 <0.0080 7/2/2019 0.02 12.1 8.09 6.62 68.1 -52.0 19.8 <10.0 15.0 <1.0 <5.0 <5.0 38.2 27.2 <10.0 <5.0 <0.20 27.0 <5.0 27.0 <5.0 <5.0 <5.0 <5.0 <5.0 0.86 <0.10 <0.50 0.51 7.9 42.0 2.5 <0.10 <1.0 0.052 <0.0080 Site-2 8/20/2019 0.00 16.9 8.05 7.55 68.5 33.3 20.5 <10.0 18.3 <1.0 <5.0 <5.0 37.9 36.2 <10.0 <5.0 <0.20 28.4 <5.0 28.4 2.8 NM NM NM <2.0 0.57 <0.10 <0.50 0.32 11.6 84.0 2.5 <0.10 <1.0 0.072 <0.0080 9/23/2019 0.00 4.51 7.61 7.21 61.5 49.3 16.9 <10.0 12.4 <1.0 <5.0 <5.0 45.9 20.0 <10.0 <5.0 <0.20 30.0 <5.0 30.0 <2.0 NM NM NM <2.0 <0.52 <0.10 <0.50 0.25 2.8 63.0 2.2 <0.10 <1.0 <0.050 <0.0080 10/21/2019 1.56 9.83 1 9.81 7.57 56.4 109.6 14.0 <10.0 12.9 <1.0 <5.0 <5.0 39.5 9.9 <10.0 <5.0 <0.20 28.4 1 <5.0 28.4 <2.0 NM NM NM <2.0 <0.52 <0.10 <0.50 0.28 2.8 53.0 2.6 <0.10 1.1 0.054 <0.0080 11/19/2019 0.03 4.15 10.46 7.26 66.1 41.2 9.8 <10.0 14.0 <1.0 <5.0 <5.0 40.8 6.5 <10.0 <5.01 NM 28.9 <5.0 28.9 <2.0 1 NM NM NM <2.0 <0.52 <0.10 <0.50 0.24 3.1 57.0 2.7 <0.10 <1.0 <0.050 <0.0080 12/16/2019 1.60 7.93 10.09 7.12 1 63.6 -173.2 9.4 <10.0 1 14.2 <1.0 <5.0 <5.0 37.6 11.7 <10.0 <5.0 <0.20 22.9 <5.0 22.9 <2.0 NM NM NM <2.0 0.89 1 <0.10 <0.50 0.65 3.1 72.0 3 <0.10 1.5 0.056 <0.0080 1/27/2020 1.22 7.51 12.48 7.54 57.4 88.4 1 7.5 <10.0 17.6 <1.0 I <5.0 <5.0 32.0 13.7 <10.0 <5.0 <0.20 22.4 <5.0 22.4 <2.0 NM NM NM <2.0 0.82 <0.10 <0.50 0.63 3.2 42.0 2.8 <0.10 1.4 <0.050 <0.0080 2/14/2019 0.72 9.89 26.75 7.05 61.1 221.7 6.5 NS NS NS NS NS NS NS NS NS NS NS NS NS 10.5 <5.0 <5.0 <5.0 15.7 NS <0.10 NS NS 5.6 NM NM NM NM <0.050 NM 3/21/2019 0.00 NM 11.80 6.97 151.3 132.2 10.2 <10.0 12.1 <1.0 <5.0 <5.0 10.2 27.3 <10.0 <5.0 <0.20 21.5 <5.0 21.5 <5.0 <5.0 <5.0 <5.0 91.0 0.86 <0.10 <0.50 0.53 4.8 57.0 3.5 <0.10 2.7 <0.050 <0.0080 4/23/2019 1.69 10.8 9.60 6.92 68.0 45.2 13.9 <10.0 170.0 <1.0 <5.0 <5.0 12.4 53.4 <10.0 <5.0 <0.20 22.9 <5.0 1 22.9 <5.0 <5.0 <5.0 <5.0 <5.0 0.92 <0.10 <0.50 1 0.57 12.3 120 3.4 <0.10 2.7 <0.050 <0.0080 5/23/2019 1 0.00 NM 1 7.65 6.94 69.3 34.2 18.9 <10.0 22.5 <1.0 <5.0 <5.0 19.2 161.0 <10.0 1 <5.0 <0.20 21.7 <5.0 21.7 <5.0 <5.0 <5.0 <5.0 23.5 2.20 <0.10 1.5 0.66 27.9 74.0 3.7 <0.10 1.7 1 0.089 <0.0080 6/13/2019 1.11 13.4 15.96 8.07 63.9 46.0 16.5 <10.0 16.6 <1.0 <5.0 <5.0 13.9 49.3 <10.0 <5.0 <0.20 23.3 <5.0 23.3 <5.0 1 <5.0 <5.0 <5.0 <5.0 0.80 <0.10 <0.50 0.55 5.9 59.0 3.9 <0.10 2.3 <0.50 <0.0080 7/2/2019 0.02 8.15 6.83 7.04 77.0 -79.8 21.4 <10.0 14.5 <1.0 <5.0 <5.0 17.0 55.3 <10.0 <5.0 <0.20 26.5 <5.0 26.5 <5.3 <5.3 <5.3 <5.3 7.1 1.10 <0.10 <0.50 0.64 4.9 61.0 3.7 <0.10 1.4 0.055 <0.0080 Site-3 8/20/2019 0.00 12.2 7.90 7.37 73.3 38.3 1 21.9 <10.0 19.4 <1.0 <5.0 <5.0 17.0 112 <10.0 <5.0 <0.20 28.2 <5.0 28.2 4.5 NM NM NM 4.9 0.83 <0.10 <0.50 0.44 56.6 69.0 3.5 <0.10 1.6 0.087 <0.0080 9/23/2019 0.00 7.4 7.19 7.14 70.1 52.8 17.7 <10.0 10.9 <1.0 <5.0 <5.0 22.9 51.8 <10.0 <5.0 <0.20 30.5 <5.0 30.5 <2.0 NM NM NM <2.0 0.61 <0.10 <0.50 0.39 <2.5 70.0 3.5 <0.10 1.2 0.051 <0.0080 10/21/2019 1.56 10.5 8.27 7.23 72.5 110.8 14.2 <10.0 11.6 <1.0 <5.0 <5.0 17.4 36.6 <10.0 <5.0 <0.20 26.7 <5.0 26.7 <2.0 NM NM NM <2.0 0.71 <0.10 <0.50 0.32 1 8.1 54.0 4.2 <0.10 1.8 0.059 <0.0080 11/19/2019 0.03 3.98 9.58 7.47 75.2 34.6 9.4 <10.0 12.1 <1.0 <5.0 <5.0 17.9 34.2 <10.0 <5.01 NM 28.5 1 <5.0 28.5 2.0 NM NM NM <2.0 0.6 <0.10 <0.50 0.33 <2.5 1 68.0 5.5 <0.10 2.3 <0.050 <0.0080 12/16/2019 1.60 12.8 1 10.83 7.07 71.2 -160.6 8.6 <10.0 16.2 <1.0 <5.0 <5.0 12.5 43.4 <10.0 <5.0 <0.20 20.6 <5.0 20.6 3.6 NM NM NM <2.0 1.1 <0.10 <0.50 0.69 7.1 76.0 4 <0.10 3.6 1 0.052 <0.0080 1/27/2020 1.22 11.1 13.34 7.39 61.3 98.2 7.1 <10.0 17.5 <1.0 <5.0 <5.0 11.1 35.0 <10.0 <5.0 <0.20 19.3 <5.0 19.3 4.7 NM NM NM <2.0 1.0 1 <0.10 <0.50 0.68 6.2 47.0 3.7 <0.10 3.5 0.051 <0.0080 2/14/2019 0.72 7.06 14.10 6.73 67.8 232.8 7.0 NS NS NS NS NS NS NS NS NS NS NS NS NS 16.0 <5.0 <5.0 <5.0 64.4 NS <0.10 NS NS 4.8 NM NM NM NM <0.050 NM 3/21/2019 0.00 NM 12.80 7.03 156.5 119.51 10.6 <10.0 13.7 <1.0 <5.0 <5.0 8.7 21.2 <10.0 <5.0 <0.20 24.8 <5.0 24.8 7.9 <5.9 <5.9 <5.9 107 0.90 <0.10 <0.50 0.54 5.4 66.0 3.6 <0.10 2.9 <0.050 <0.0080 4/23/2019 1.69 9.91 10.10 6.83 74.7 66.3 14.4 <10.0 20.3 <1.0 <5.0 <5.0 10.1 39.1 <10.0 <5.0 <0.20 25.9 <5.0 25.9 <5.0 <5.0 <5.0 <5.0 20.5 0.95 <0.10 <0.50 0.61 8 75 3.4 <0.10 2.9 0.053 <0.0080 5/23/2019 0.00 NM 7.94 7.00 78.9 25.2 18.8 <10.0 17.8 <1.0 <5.0 <5.0 14.3 37.0 <10.0 1 <5.0 <0.20 28.0 <5.0 28.0 <5.0 <5.0 <5.0 <5.0 19.4 1.2 <0.10 <0.50 0.78 5.8 875 3.6 <0.10 1.9 0.064 <0.0080 6/13/2019 1 1.11 11.60 7.79 7.34 78.5 88.9 17.4 <10.0 20.2 <1.0 <5.0 <5.0 12.0 36.0 <10.0 <5.0 <0.20 27.2 <5.0 27.2 <5.0 <5.0 <5.0 <5.0 <5.0 0.87 <0.10 <0.50 0.58 4.6 76.0 3.8 <0.10 2.4 <0.050 <0.0080 7/2/2019 0.02 11.4 7.54 7.00 82.9 -84.1 21.7 <10.0 17.5 <1.0 <5.0 <5.0 14.3 50.2 <10.0 <5.0 <0.20 30.1 <5.0 30.1 5.7 <5.3 <5.3 <5.3 9.1 1.20 <0.10 <0.50 0.73 7.0 70.0 3.7 <0.10 1.6 0.07 <0.0080 Site 4 8/20/2019 0.00 9.79 8.53 7.34 80.6 33.3 22.0 <10.0 20.1 1 <1.0 <5.0 1 <5.0 13.0 57.3 <10.0 <5.0 <0.20 31.9 <5.0 31.9 7.1 NM NM NM <2.0 0.81 <0.10 <0.50 0.48 10.7 78.0 3.6 <0.10 1.9 0.11 <0.0080 9/23/2019 0.00 3.54 7.65 6.93 81.6 57.6 18.1 <10.0 12.6 <1.0 <5.0 <5.0 20.6 32.7 <10.0 <5.0 <0.20 35.1 <5.0 35.1 <2.0 NM NM NM <2.0 0.77 <0.10 <0.50 0.57 <2.5 72.0 3.7 <0.10 1.3 0.073 <0.0080 10/21/2019 1.56 4.34 8.83 6.74 70.7 102.E 14.4 <10.0 13.4 <1.0 <5.0 <5.0 14.4 23.4 <10.0 <5.0 <0.20 30.4 <5.0 30.4 <2.0 NM NM NM <2.0 0.73 <0.10 <0.50 0.41 2.7 69.0 4.3 <0.10 2.3 0.066 <0.0080 11/19/2019 0.03 3.31 11.46 7.18 61.0 42.2 9.6 <10.0 13.8 <1.0 <5.0 <5.0 15.3 18.4 <10.0 <5.0 NM 33.8 <5.0 33.8 <2.0 NM NM NM <2.0 0.68 <0.10 <0.50 0.38 <2.5 70.0 4.4 <0.10 1.7 0.055 <0.0080 12/16/2019 1.60 8.35 10.21 6.86 78.3 -205.7 9.0 <10.0 18.1 <1.0 <5.0 <5.0 10.3 36.0 <10.0 <5.0 <0.20 25.3 <5.0 25.3 3.3 NM NM NM <2.0 1.1 <0.10 <0.50 0.72 6.7 73.0 4.1 <0.10 3.6 0.063 <0.0080 1/27/2020 1.22 9.99 13.18 6.91 67.6 104.4 7.5 <10.0 19.2 <1.0 <5.0 <5.0 9.9 27.7 <10.0 <5.0 <0.20 22.5 <5.0 22.5 6.7 1 NM NM NM <2.0 1.1 <0.10 <0.50 0.70 7.7 55.0 3.7 <0.10 1 3.5 0.067 <0.0080 2/14/2019 0.72 10.22 1 14.41 6.32 50.7 190.9 6.8 NS NS NS NS NS NS NS NS NS NS NS NS NS 6.6 <5.0 <5.0 <5.0 61.0 NS <0.10 NS NS 3.2 NM NM NM NM <0.050 NM 3/21/2019 0.00 NM 12.18 6.61 140.4 122.4 10.3 <10.0 9.4 <1.0 <5.0 <5.0 1 10.3 33.3 <10.0 <5.0 <0.20 13.7 <5.0 13.7 <6.4 <6.4 <6.4 <6.4 172 0.79 <0.10 <0.50 0.53 <3.3 48.0 3.6 <0.10 2.4 <0.050 <0.0080 4/23/2019 1.69 10.2 9.92 6.71 1 57.0 45.6 14.2 <10.0 13.1 <1.0 <5.0 <5.0 13.8 61.9 <10.0 <5.0 <0.20 15.3 <5.0 15.3 <5.0 <5.0 <5.0 <5.0 <5.0 0.84 <0.10 <0.50 0.55 4.8 102 3.5 <0.10 2.4 <0.050 <0.0080 5/23/2019 0.00 NM 7.43 7.01 52.1 38.9 1 18.8 <10.0 11.7 <1.0 <5.0 <5.0 18.2 58.9 <0.50 <0.40 <0.20 16.6 <5.0 16.6 <5.6 <5.6 <5.6 <5.6 12.9 0.98 <0.10 <0.50 0.57 7.7 160 3.6 <0.10 1.4 <0.050 <0.0080 6/13/2019 1.11 11.2 8.08 7.28 50.1 96.6 17.3 <10.0 11.2 <1.0 <5.0 <5.0 16.8 55.7 1 <10.0 <5.0 <0.20 15.6 <5.0 15.6 <5.0 <5.0 <5.0 <5.0 <5.0 0.80 <0.10 <0.050 0.54 5.0 47.0 4.0 <0.10 2.1 <0.050 <0.0080 7/2/2019 0.02 10.8 7.77 6.78 63.2 -66.7 21.5 <10.0 10.5 <1.0 <5.0 <5.0 19.4 65.1 <10.0 <5.0 <0.20 21.4 <5.0 21.4 <5.0 <5.0 <5.0 <5.0 <5.0 0.87 <0.10 <0.50 0.53 6.9 45.0 3.8 <0.10 1.2 <0.05 <0.0080 Site-5 8/20/2019 0.00 6.18 8.11 7.36 61.4 31.4 21.8 <10.0 10.9 <1.0 <5.0 <5.0 19.2 79.2 <10.0 <5.0 <0.20 23.0 1 <5.0 23.0 2.0 NM NM NM <2.0 0.71 <0.10 <0.50 0.36 3.0 52.0 3.5 <0.10 <1.0 <0.050 <0.0080 9/23/2019 0.00 5.59 1 7.48 7.01 54.6 42.9 17.9 <10.0 8.0 <1.0 <5.0 <5.0 24.2 49.4 <10.0 <5.0 <0.20 23.1 <5.0 23.1 <2.0 NM NM NM <2.0 0.53 <0.10 <0.50 0.22 4.3 55.0 3.5 <0.10 1.1 <0.050 1 <0.0080 10/21/2019 1.56 6.93 9.93 6.74 59.9 126.1 14.3 <10.0 8.9 <1.0 <5.0 1 <5.0 1 18.7 33.8 <10.0 <5.0 <0.20 21.5 <5.0 21.5 <2.0 NM NM NM <2.0 <0.52 <0.10 <0.50 0.25 <2.5 45.0 4.2 <0.10 1.3 <0.050 <0.0080 11/19/2019 0.03 3.04 11.941 7.42 11 60.5 39.0 9.7 <10.0 8.9 <1.0 <5.0 <5.0 21.2 45.4 <10.0 <5.01 NM 21.7 <5.0 21.7 <2.0 NM NM NM <2.0 <0.52 <0.10 <0.50 0.26 <2.5 54.0 4.1 <0.10 1.6 <0.050 <0.0080 12/16/2019 1.60 14.4 1 9.62 1 6.69 1 58.9 -199.7 8.7 <10.0 13.8 <1.0 <5.0 <5.0 14.1 51.0 <10.0 <5.0 <0.20 14.7 <5.0 14.7 <2.0 NM NM NM <2.0 0.91 <0.10 <0.50 0.66 5.2 52.0 4.0 <0.10 3.7 <0.050 <0.0080 1/27/2020 1.22 13.5 13.13 7.12 46.3 99.7 7.2 <10.0 13.4 <1.0 <5.0 <5.0 12.6 43.4 <10.0 <5.0 <0.20 14.3 <5.0 14.3 <2.0 NM NM NM <2.0 0.98 <0.10 <0.50 0.62 5.0 47.0 3.7 <0.10 3.3 <0.050 <0.0080 TABLE 4 SUMMARY OF SURFACE WATER QUALITY DATA PIEDMONT LITHIUM, INC. GASTON COUNTY, NORTH CAROLINA Field Measurements Metals Alkalinity Chlorophyll & Pheopytin Nitrogen Location Date Total P Preci st 72n nPast72 Hours Turbidity (NTU) DO (mg/L) pH Specific Conductivity (/cm) ORP (mv) Temperature (°C) Arsenic (pg/L) Barium (pg/L) Cadmium (pg/L) Chromium (pg/L) Lead (pg/L) Lithium (pg/L) Manganese (pg/L) Selenium (pg/L) Silver (pg/L) Mercury (pg/L) Bicarbonate (CaCO3) (mg/L) Carbonate (CaCO3) (mg/L) Total CaCO3 (mg/L) Chlorophyll a (mg/m^3) Chlorophyll b (mg/m^3) Chlorophyll c (mg/m^3) Chlorophyll a (Corrected) (mg/m^3) Pheophytin (mg/m^3) Total Nitrogen (mg/L) Nitrogen, Ammonia (mg/L) Total Kjeldahl Nitrogen (mg/L) Nitrogen, NO2+NO3 (mg/L) Total Suspended Solids (mg/L) Total Dissolved Solids (mg/L) Chloride (mg/L) Fluoride (mg/L) Sulfate (mg/L) Phosphorus (mg/L) Cyanide (mg/L) 2/14/2019 0.72 7.04 23.62 7.00 67.8 247.2 7.9 NS NS NS NS NS NS NS NS NS NS NS NS NS 20.7 <5.0 <5.0 <5.0 52.1 NS <0.10 NS NS 5.6 NM NM NM NM <0.050 NM 3/21/2019 0.00 NM 12.43 6.82 157.1 148.8 11.0 <10.0 15.0 <1.0 <5.0 <5.0 7.5 24.0 <10.0 <5.0 <0.20 24.2 <5.0 24.2 8.9 <5.6 <5.6 <5.6 167 0.94 <0.10 <0.50 0.57 5.9 66.0 3.6 <0.10 2.9 <0.050 <0.0080 4/23/2019 1.69 10.1 9.62 7.05 74.5 80.8 16.1 <10.0 20.9 <1.0 <5.0 <5.0 8.3 43 <10.0 <5.0 <0.20 25.2 <5.0 25.2 <5.0 <5.0 <5.0 <5.0 <5.0 1 <0.10 <0.50 0.63 9.6 101 3.4 <0.10 3.0 0.058 <0.0080 5/23/2019 0.00 NM 7.35 7.04 76.1 26.3 19.2 <10.0 18.7 <1.0 <5.0 <5.0 12.0 54.7 <10.0 <5.0 <0.20 26.2 <5.0 26.2 <5.0 <5.0 <5.0 <5.0 <5.0 1.2 <0.10 <0.50 0.73 6.1 33.0 3.7 <0.10 2.0 0.068 <0.0080 6/13/2019 1.11 11.6 7.88 7.22 78.8 91.1 17.8 <10.0 20.0 <1.0 <5.0 <5.0 9.4 45.7 <10.0 <5.0 <0.20 26.0 <5.0 26.0 <5.0 <5.0 <5.0 <5.0 6.7 0.98 <0.10 <0.50 0.61 5.6 72.0 4.0 <0.10 2.4 <0.050 <0.0080 7/2/2019 0.02 13.8 6.23 7.08 82.6 -85.6 21.9 <10.0 18.7 <1.0 <5.0 <5.0 10.7 73.0 <10.0 <5.0 <0.20 29.4 <5.0 29.4 9.5 <5.0 <5.0 <5.0 5.7 1.40 <0.10 0.63 0.73 8.9 60.0 3.8 <0.10 1.6 0.081 <0.0080 Site-6 8/20/2019 0.00 11.0 1 8.59 7.32 84.9 34.9 22.0 <10.0 19.9 <1.0 <5.0 <5.0 10.8 70.9 <10.0 <5.0 <0.20 33.7 <5.0 33.7 7.6 NM NM NM <2.0 0.93 <0.10 <0.50 0.51 8.4 79.0 3.7 1 <0.10 1.8 0.081 <0.0080 9/23/2019 0.00 4.66 7.29 7.17 80.1 45.9 18.1 <10.0 12.7 <1.0 <5.0 <5.0 15.0 58.4 <10.0 <5.0 <0.20 34.3 <5.0 34.3 <2.0 NM NM NM <2.0 0.89 <0.10 <0.50 0.56 <2.5 79.0 3.7 <0.10 1.3 0.075 <0.0080 10/21/2019 1.56 7.87 8.06 6.82 79.0 98.8 14.9 <10.0 1 15.8 <1.0 <5.0 <5.0 11.7 59.8 <10.0 <5.0 <0.20 31.6 <5.0 31.6 2.6 NM NM NM <2.0 0.79 <0.10 <0.50 0.44 5.3 70.0 4.3 <0.10 2.1 0.080 <0.0080 11/19/2019 0.03 6.20 11.01 7.41 85.5 39.7 10.1 <10.0 15.3 <1.0 <5.0 <5.0 12.4 41.6 <10.0 <5.0 NM 33.3 <5.0 33.3 5.3 NM NM NM <2.0 0.93 <0.10 0.5 0.43 <2.5 75.0 4.6 <0.10 1.9 0.062 <0.0080 12/16/2019 1.60 7.93 9.48 6.82 1 79.3 -201.9 9.7 <10.0 19 <1.0 1 <5.0 <5.0 1 9.5 1 42.3 <10.0 1 <5.0 <0.20 1 25.0 <5.0 1 25.0 6.7 1 NM NM NM <2.0 1.2 1 <0.10 0.51 0.71 4.9 62.0 4.1 <0.10 3.7 0.064 <0.0080 1/27/2020 1.22 9.70 12.66 6.91 67.6 103.5 8.0 <10.0 20.0 <1.0 <5.0 <5.0 8.4 31.3 <10.0 <5.0 <0.20 22.2 <5.0 22.2 8.1 NM NM NM <2.0 1.2 <0.10 <0.50 0.71 7.6 50.0 3.7 <0.10 3.5 0.070 <0.0080 2/14/2019 0.72 6.64 19.03 6.91 66.4 221.8 9.1 NS NS NS NS NS NS NS NS NS NS NS NS NS 19.7 <5.0 <5.0 14.6 7.5 NS <0.10 NS NS 7.2 NM NM NM NM <0.050 NM 3/21/2019 0.00 NM 1 11.56 6.74 156.1 113.9 11.5 <10.0 16.3 <1.0 <5.0 <5.0 6.4 23.3 <10.0 <5.0 <0.20 23.3 <5.0 23.3 10.2 <5.3 <5.3 <5.3 150 0.92 <0.10 <0.50 <0.55 6.5 1 65.0 3.7 1 <0.10 3.1 <0.050 <0.0080 4/23/2019 1.69 9.65 9.44 6.91 71.6 88.8 17.0 <10.0 21 <1.0 <5.0 <5.0 6.8 39.5 <10.0 <5.0 <0.20 24.2 <5.0 24.2 11.0 7.5 13.0 14.8 1 <5.0 1.1 <0.10 <0.50 1 0.62 10.8 84 3.5 <0.10 3.1 0.056 <0.0080 5/23/2019 1 0.00 NM 7.48 7.03 77.0 27.4 19.1 <10.0 19.5 <1.0 <5.0 <5.0 9.9 70.9 <10.0 <5.0 <0.20 25.8 <5.0 25.8 <5.0 <5.0 <5.0 <5.0 <5.0 1.4 <0.10 0.67 0.71 13.7 <25.0 3.8 <0.10 2.1 0.059 <0.0080 6/13/2019 1.11 9.00 7.73 6.97 79.3 84.8 18.3 <10.0 19.7 <1.0 <5.0 <5.0 7.8 50.3 <10.0 <5.0 <0.20 24.7 <5.0 <24.7 5.1 <5.0 <5.0 <5.0 <5.0 0.92 <0.10 <0.50 0.64 4.1 69.0 4.8 <0.10 2.6 <0.050 <0.0080 7/2/2019 0.02 8.86 7.08 6.73 79.7 -84.1 21.9 <10.0 18.5 <1.0 <5.0 <5.0 8.2 78.1 <10.0 <5.0 <0.20 27.4 <5.0 27.2 9.4 <5.0 <5.0 <5.0 <5.0 1.10 <0.10 <0.50 0.68 7.7 66.0 3.9 <0.10 1.7 0.069 <0.0080 Site-7 8/20/2019 0.00 11.2 8.61 7.52 84.7 33.6 21.9 <10.0 22.0 <1.0 <5.0 <5.0 8.0 112 <10.0 <5.0 <0.20 33.4 <5.0 33.4 9.5 NM NM NM <2.0 1.5 <0.10 1 0.45 13.4 69.0 4.0 <0.10 1.9 0.170 <0.0080 9/23/2019 0.00 8.5 7.96 6.84 77.6 60.7 18.8 <10.0 16.0 <1.0 <5.0 <5.0 10.8 115 <10.0 <5.0 <0.20 33.4 <5.0 33.4 3.1 NM NM NM <2.0 0.69 <0.10 <0.50 0.40 5.1 81.0 3.9 <0.10 1.5 0.075 <0.0080 10/21/2019 1.56 8.49 1 8.39 6.31 79.9 121.2 14.6 <10.0 17.8 <1.0 <5.0 <5.0 8.2 103 <10.0 <5.0 <0.20 29.9 <5.0 29.9 <2.0 NM NM NM <2.0 0.59 <0.10 <0.50 0.39 1 9.6 1 66.0 5.7 <0.10 2.3 0.078 <0.0080 11/19/2019 0.03 4.14 9.96 7.09 84.6 46.2 10.0 <10.0 16.5 <1.0 <5.0 <5.0 9.2 63.9 <10.0 <5.0 NM 31.9 <5.0 31.9 2.4 NM NM NM 1 <2.0 0.95 <0.10 0.55 0.41 <2.5 76.0 5.0 <0.10 2.2 0.057 I<0.0080 112/16/20191 1.60 6.90 9.34 6.68 68.4 -227.2 10.1 <10.0 19.8 <1.0 <5.0 <5.0 7.6 52.5 <10.0 <5.0 <0.20 25.0 <5.0 25.0 2.4 NM NM NM <2.0 1.2 <0.10 0.5 0.72 4.6 93.0 4.3 <0.10 3.9 0.062 <0.0080 1/27/2020 1.22 9.85 12.30 6.72 59.5 92.6 8.3 <10.0 19.8 <1.0 <5.0 <5.0 6.7 31.5 <10.0 <5.0 <0.20 21.3 <5.0 21.3 13.8 NM NM NM <2.0 1.2 <0.10 <0.50 0.69 7.6 50.0 3.8 <0.10 3.8 0.069 <0.0080 NCAC 2B Standards <50 6.0 - 9.0 10.0 170 NA 11 NA 5 NA 0.012 40 -- 10 500 250 1.8 250 5 Notes. NTU - nephelometric turbidity units mg/L - miligrams per liter SU - standard units pS/cm - microsiemens per centimeter my - milivolt mg/m^3 - miligram per meter cubed NM - not measured NS -not sampled NA - not applicable; surface water standards for these constituents are hardness dependent -- - no established NCAC 2L Standard for analyte 0.72 - non -ambient; Precipitation in the 72 hours prior to sampling was greater than 0.1 inch Precipitation amonutswere taken from CoCoRaHS Piedmont Lithium I Technical Memorandum — Water Quality Testing ��� Tables FN 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 704.338.6700 hdrinc.com © 2020 HDR, Inc., all rights reserved Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Appendix A - Background Studies and Reference Documents A.3 Technical Memorandum — Groundwater Model JI2NVA[! Technical Memorandum Groundwater Model Piedmont Lithium Carolinas Inc. Gaston County, North Carolina August 30, 2021 This page intentionally left blank. Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Contents Contents 1 Introduction......................................................................................................................... 1 2 Conceptual Site Model/Groundwater Model Framework ..................................................... 1 2.1.1 Mine Pits............................................................................................................... 1 2.1.2 Temporal Constraints............................................................................................ 2 2.1.3 Dewatering and Water Handling........................................................................... 2 3 Transient Model Set-up....................................................................................................... 3 3.1 Modeling Software.............................................................................................................. 3 3.2 Discretization...................................................................................................................... 3 4 Dewatering Simulations...................................................................................................... 3 4.1 Dewatering Effect on Water Supply Wells........................................................................... 4 4.2 Dewatering Effect on Wetlands........................................................................................... 5 4.3 Dewatering Effect on Streams............................................................................................ 9 5 Model Limitations...............................................................................................................10 6 Summary and Conclusions................................................................................................10 7 References........................................................................................................................11 Figures Figure 1 — Groundwater Model Domain Figure 2 — Site and Receptor Well Location Map Figure 3 — Revised Model Grid Figures 4A — 4J — Model Predicted Drawdown from Dewatering Figure 5 — HDR Delineated Wetlands Figure 6 — Location of Stream Reaches Tables Table 1 - Transient model sequence of mine pits....................................................................... 2 Table 2 - Model predicted dewatering withdrawal rates.............................................................. 4 Table 3 - Model Predicted Drawdown in Local Wells.................................................................. 5 Table 4 - Model predicted changes in groundwater flow to wetlands(gmp)................................ 7 Table 5 - Changes in base flow to streams that cross the site .................................................... 9 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Contents This page intentionally left blank. Piedmont Lithium Carolinas, Inc. i Technical Memorandum — Groundwater Model ��� Introduction 1 Introduction Piedmont Lithium Carolinas, Inc. (PLCI) is proposing to construct an open pit mine in the Carolina Tin-Spodumene Belt (TSB) of North Carolina where lithium -bearing pegmatites have been identified. The Concentrate Operations and the Lithium Hydroxide Conversion Plant (the Site) is in the TSB of the Piedmont physiographic province in south-central North Carolina. The approximately 1,548-acre Site is in an unincorporated area of Gaston County, on private land surrounding portions of Hephzibah Church Road, Whitesides Road, and St. Mark's Church Road, approximately 1 mile east of Cherryville, North Carolina. The overall Concentrate Operations are composed of three components: the Piedmont Lithium Carolinas Mine #1, a Concentrate Plant, and an Industrial Minerals Plant. The Piedmont Lithium Carolinas Mine #1 (Figure 1) will consist of four open pits of varying sizes, a waste rock disposal area, topsoil stockpiles areas, haul roads, and other mine support areas. Mining will occur through open pit excavations which will require dewatering. On behalf of PLCI, HDR Engineering, Inc. of the Carolinas (HDR) performed groundwater modeling to estimate the rate of water withdrawal during pit dewatering and evaluate possible effects pit dewatering may have on local water resources and water users. The base groundwater model was developed by HDR for PLCI and documented in a Technical Memorandum Groundwater Model dated July 2, 2019 (HDR, 2019). The groundwater model updates include a refined model grid, revised pit shell geometries, and transient simulations of pit dewatering. 2 Conceptual Site Model/Groundwater Model Framework The groundwater flow model domain includes the southern portion of Indian Creek watershed, Beaverdam Creek watershed, and a reach of the South Fork Catawba River. The 32.5 square mile (mil) model domain and Site boundary are shown in Figure 1. Model input parameters were, in part, derived from hydrogeologic data obtained during an aquifer test conducted in 2018; however, those data have been manipulated during calibration of the groundwater flow model. The conceptual model, model framework, and model calibration for natural state conditions are described in the 2019 Technical Memorandum (HDR, 2019). 2.1.1 Mine Pits PLCI plans to remove resource from four mine pits (North, South, East, and West pits) within the permitted mine boundary. The current mining operations plan calls for no more than two pits to be actively mine at the same time, as shown in Table 3. PLCI intends to dewater mine pits to facilitate removal of the resource. Groundwater removed from the pits during dewatering will be pumped to settling ponds throughout the permitted area prior to discharge through outfalls monitored via National Pollutant Discharge Elimination System (NPDES) permitting and compliance. PLCI's most recent estimate of resource extent was used to establish the potential extents of pit excavation used in the transient model (see Figure 2). The mine pit geometries over time were Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Conceptual Site Model/Groundwater Model Framework estimated by the mining engineer, Marshall Miller & Associates (MMA), in 2021 and provided as 3-dimensional shapefiles of topography for each year. MMA used MiningMath SimSched software to optimize pit geometries and Maptek's Vulcan Evolution software to establish the mine operations schedule (MMA, 2021)1. The differences in yearly topography were used in the model to represent transient change in mine pit geometry (newly mined volume for each year). Mine pits were simulated in the transient models as water -filled, high conductivity cells. Mine pit extents for model layers were based on contours from the pit excavation geometries that coincide with model layers. Seepage into cells was accounted for with drain return package boundary conditions set to the bottom of lowest layers of the mine pits. Water collected by the drains was returned to model cells at the discharge locations provided by MMA where pumped water may discharge to a stream or wetland or infiltrate to groundwater. 2.1.2 Temporal Constraints The calibrated steady state model of natural state conditions provided the initial conditions for the transient modeling. Pit dewatering operations were simulated with a series of transient models to account for temporal variation. The transient models represent mine pit extents at various points in time with portions of different pits open at the same time. Drawdown due to dewatering is greatest when the mine pits have been excavated to the designed terminal depth. After completion of mining, pits may be allowed to fill with water or be filled by native waste rock material, native mine tailings, and the non -hazardous residue created by the Lithium Hydroxide Conversion Plant. The mine pit dewatering sequence for predictive simulations is shown in Table 1. Table 1 - Transient model sequence of mine pits Pits with Dewatering Model Year South Pit East Pit West Pit North Pit 1 Mining 2 Mining Mining 3 Mining Mining 4 Filling Mining 5 Filling Mining 6-10 Filling Mining 11 Filling Mining 12 Filling Mining Mining 13 Filling Filling Mining Mining 14-20 Fillina Fillina Minina Minina 2.1.3 Dewatering and Water Handling Water is assumed to be pumped from the lowest levels of the mine pit into settling basins prior to discharge to adjacent streams or wetlands. Dewatering is simulated with a MODFLOW drain cell (water level controlled by a conductance value at a specified elevation) to estimate the amount of water removal necessary to achieve dewatering of the mine pits. The water removed by drain cells is returned to the model at discharge locations identified by MMA (Figure 2). Water from mine pit dewatering returned to the model infiltrates to groundwater or flows out of The mine pit geometries are resource -based and in some locations extend beyond the mine permit boundaries. For this reason, the effects of dewatering are conservative and at some places reflect greater dewatering than is currently envisioned. Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Transient Model Set-up the model domain through streams and wetlands. Returning water from dewatering operations to the model provides a better representation of aquifer recovery after dewatering ceases. 3 Transient Model Set-up The set-up and calibration of the steady state model, which provides the initial conditions for the transient groundwater flow models, is described in the Technical Memorandum Groundwater Model dated July 2, 2019 (Tech Memo) (HDR, 2019). The model layers and boundary conditions were not modified (including how wetlands and surface water bodies were simulated). This section describes the revisions and updates required for the transient models. 3.1 Modeling Software Transient groundwater modeling was performed using the United States Geological Survey (USGS) groundwater model software MODFLOW-2005 (Harbaugh, 2005). MODFLOW-2005 is an enhanced version of the USGS modular groundwater flow model, MODFLOW. MODFLOW- 2005 allows for enhanced management of internal data. Aquaveo's 2021 Groundwater Modeling System, GMS, (Aquaveo, 2021) was used to manage data to develop the groundwater flow models and to evaluate model simulations. GMS's graphic interface and data handling functions were used develop and update the base conceptual model and the hydrogeologic framework described in the previous Tech Memo. GMS was used to display and evaluate transient model results. 3.2 Discretization The model grid was refined to focus on the area near the Site, allowing for increased resolution in the vicinity of the mine pits. The refined portion of the model grid was expanded to the south and west from the original steady state model to include the pit extents used for this transient model. Cells in the model for the previous and current modeling efforts range in size from 50 feet on a side in refined areas in the vicinity of the Site to 500 feet on a side in remote areas. The revised model grid is shown in Figure 3. 4 Dewatering Simulations Mine pit dewatering was simulated by changing model cells within the horizontal and vertical extent of the pit to a high conductivity material. Drains cells were placed at the base of the lowest layers and the elevations of the drains adjusted to the bottom elevation of the pit coincident with the timeframe being simulated. Water seeping out of the cells surrounding the pit was removed by the drains. The water removed by all drains used to simulate dewatering was summed to estimate dewatering volumes and rates needed to dewater the pits. The water removed from the pits by the drains was returned to the model at locations identified as discharge from settling ponds by MMA. Stream cells connected to the stream network were placed in the same cell and given large conductance values so the water would be simulated to be returned to the streams. Drawdown of the water table resulting from dewatering was calculated based on the total change in water level between the initial steady state non -pumping model and the mine -year simulated (model year). The estimated withdrawal rates are presented in Table 2. Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Dewatering Simulations Table 2 - Model predicted dewatering withdrawal rates Pumping Rate (gpm) Model Year South Pit East Pit West Pit North Pit Total 1 525 50 575 2 975 1,225 2,300 3 725 775 1,500 4 25' 1,025 1,050 5 75' 950 1,025 6-10 N/A2 1,250 1,250 11 N/A2 1,575 1,575 12 N/A2 1,050 950 2,000 13 N/A2 0 500 850 1,350 14-16 N/A2 N/A2 10753 1,075 Pumping to maintain drawdown while filling pit with excavated material 2 No dewatering modeled. 3 West and North Pits are merged. 4.1 Dewatering Effect on Water Supply Wells Predicted drawdown in wells within the Site boundary, which will be decommissioned by PLCI during mine development, ranged from 0 feet to 17.8 feet and averaged approximately 1.9 feet. Predicted drawdown in wells outside the Site boundary ranged from 0 feet to 21.5 feet and averaged approximately 4.0 feet. Within the Site boundary, four wells are expected to experience significant loss of water column (available drawdown) during dewatering of East, West, and North Pits. Outside the site, two wells are expected to experience significant loss of water column during dewatering of West and North Pits. Estimated drawdown in wells in the vicinity of the Site are shown in Table 3 and on Figures 4A, though 4J. Note that the excavation extents used in the models are based on the extent of the resources and not necessarily the extent of planned mining activities, specifically along the southern permit boundary where the resource is estimated to extend beyond the permit boundary (MMA, 2021). The greatest extent of drawdown is simulated to occur in years 14 through 20 when the West Pit is being dewatered and the East Pit is filling. The drawdown shown in Figure 4 represents dewatering to the extent of the resource boundaries rather than the permit boundaries of the pits, providing a worst -case estimate of drawdown that may occur. Piedmont Lithium Carolinas, Inc. I Technical Memorandum - Groundwater Model ��� Dewatering Simulations Table 3 - Model Predicted Drawdown in Local Wells South Pit Pumping East Pit Pumping West Pit Pumping North Pit Pumping Receptor Well Drawdown (ft) Well Year 1 Year 2 Year 3 Year 4 Year 5 Year6- 10 Year 11 Year 12 Year 13 Year14- 20 Wells Within Site Boundary 1523 R W McLamb Dr. DRY DRY DRY DRY DRY DRY 12.1 13.1 13.4 12.5 819 Whitesides Rd. 0.0 0.0 0.2 0.4 0.4 0.4 0.4 0.5 1.0 1.4 1121 He hzibah Church Rd. 3.1 1.8 1.2 1.0 0.8 0.7 0.7 10.6 16.9 17.8 901 Whitesides Rd. 0.0 0.0 0.0 0.1 0.1 0.1 0.3 0.1 0.2 1.1 921 Whitesides Rd. 0.0 0.1 0.1 0.2 0.2 0.3 0.3 0.3 0.8 2.4 1266 He hzibah Church Rd. 0.5 0.7 1.1 2.9 3.4 5.2 5.2 7.6 13.3 17.5 1021 He hzibah Church Rd. 1.3 1.1 0.0 0.7 0.6 0.6 0.5 0.5 0.6 1.3 633 Aderholdt Rd. 2 0.0 0.0 0.0 0.1 0.3 0.5 0.5 0.5 0.6 8.5 1029 He hzibah Church Rd. 2.3 1.3 0.7 0.4 0.3 0.2 0.1 0.4 1.1 2.4 Wells Outside of Site Domain 732 Whitesides Rd. 8.5 13.7 21.5 18.9 15.0 15.6 12.4 11.1 11.4 11.2 129 George Pa seur Rd. 0.3 0.5 0.9 2.0 2.2 3.3 3.4 3.4 3.5 4.2 663 Aderholdt Rd. 1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 1.2 20.4 534 Whitesides Rd. 0.0 0.0 0.0 0.1 0.2 0.3 0.3 0.3 0.5 0.8 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Dewatering Simulations 4.2 Dewatering Effect on Wetlands Potential changes to groundwater flow into wetlands during dewatering operations were evaluated by comparing flow into wetlands in the steady state model with the dewatering predictive simulations. Dewatering of the South Pit caused Wetland 2 to go dry and it remains dry during the remainder of the 20-year mining operation. Dewatering of the South Pit also results in drying of Wetlands 11 and 12, although they are restored when dewatering operations shift to the East Pit and dry up again when dewatering commences in the West Pit. Dewatering of the East Pit results in drying of Wetlands 4 through 8; these wetlands remained dry for the remainder of the 20-year mining operation. Simulated West Pit dewatering resulted in drying of Wetland 16 prior to its elimination by mining operations when the West Pit and North Pit merge. Note that pit dewatering water discharged near wetlands helps maintain flow in some of those wetlands; routing of additional flow into wetlands may help mitigate the drying predicted by the model. Wetlands 6, 7, and 8 maintain some flow from groundwater while discharge from the South Pit is occurring nearby. Changes to predicted groundwater discharge to wetlands are presented in Table 4. The location of wetlands in the vicinity of the Site are shown in Figure 5. Note that although the model returns water removed from the pits to the simulated streams, this return only marginally influences the impacts on the wetlands. Piedmont Lithium Carolinas, Inc. I Technical Memorandum - Groundwater Model ��� Dewatering Simulations Table 4 - Model predicted changes in groundwater flow to wetlands (gmp) Model Year 1 Model Year 2 Model Year 3 Model Year 4 Model Year 5 Model Year 6 - 10 Model Year 11 Model Year 12 Model Year 13 Model Year 14 - 20 Pits D watering S S, E S, E E E E E E, W W, N W, N Wetland Wetland Size Acres Steady State Flow m Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change' Flow Ft3/d Percent Change ' Flow Ft3/d Percent Change' Wetland 1 0.28 1,327 1328 -0.03 1330 -0.20 1323 0.36 1262 4.92 1204 9.33 1104 16.79 1103 16.88 486 63.41 0 Dry 0 Dry Wetland 2 0.15 6,330 4634 26.79 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry Wetland 3 3.19 11,519 11517 0.02 11730 -1.83 7261 36.97 5282 54.15 4485 61.06 4424 61.59 6204 46.14 5737 50.19 4597 60.09 0 Dr Wetland 4 0.66 1,703 1671 1.88 1670 1.94 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dr Wetland 5 2.21 5,483 5270 3.89 5269 3.92 1706 68.88 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry Wetland 6 0.09 2,061 2197 -6.62 2014 2.26 1190 42.25 130 93.71 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dr Wetland 7 0.38 3,752 3233 13.83 2968 20.90 2698 28.08 35 99.06 0 Dry 0 Dry 351 90.64 0 Dry 0 Dry 0 Dry Wetland 8 0.23 2,559 535 79.07 432 83.10 481 81.21 320 87.50 0 Dry 0 Dry 0 Dry 0 Dry 0 Dry 0 Dr Wetland 9 0.18 660 1028 -55.67 1002 -51.79 1000 -51.50 1001 -51.63 1005 -52.29 1010 -52.99 1019 -54.42 1021 -54.74 1011 -53.22 0 Dr Wetland 10 0.12 1,796 1785 0.62 1783 0.72 1781 0.85 1780 0.87 1780 0.87 1781 0.85 1782 0.78 1783 0.73 1782 0.79 0 Dr Wetland 11 0.04 1,930 693 64.09 427 77.87 0 Dr 0 Dry 0 Dry 147 92.40 351 81.82 0 Dry 0 Dry 0 Dr Wetland 12 0.06 1,930 0 Dry 0 Dry 380 80.31 395 79.53 442 77.10 653 66.15 830 57.01 0 Dry 0 Dry 0 Dr Wetland 13 0.09 2,007 1939 3.38 1824 9.10 1741 13.26 1707 14.95 1703 15.16 1720 14.31 1768 11.90 1555 22.54 1269 36.79 0 Dr Wetland 14 5.45 5,310 5296 0.27 5279 0.58 5252 1.09 5223 1.65 5204 2.00 5194 2.19 5194 2.18 5165 2.73 4964 6.52 0 Dry Wetland 15 0.04 2,147 2086 2.86 2085 2.89 2085 2.88 2088 2.77 2090 2.68 2094 2.47 2100 2.22 2099 2.23 2086 2.86 0 Dr Wetland 16 0.08 76 70 8.52 69 9.74 69 10.25 55 27.66 61 20.60 68 11.62 73 4.68 0 Dry 0 Dry 0 Dry ' Negative indicates an increase in flow to the wetland from groundwater. Positive indicates a decrease in flow to the wetland from groundwater. Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Dewatering Simulations This page intentionally left blank. Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Dewatering Simulations 4.3 Dewatering Effect on Streams Mine pit dewatering alters stream base flow by reducing the contribution of groundwater to streamflow. Change in stream baseflow was assessed by comparing stream baseflow estimated by the steady state model with stream baseflow in the dewatering predictive simulations. Baseflow was evaluated for three streams crossing the Site (Figure 6). Decreases in simulated baseflow to Beaverdam Creek up stream of Little Beaverdam Creek ranged from 2.2 percent in model year 11 (when dewatering in East Pit occurs) to 5.9 percent in model year 12 (when dewatering occurs in East Pit and West Pit). Simulated baseflow in Beaverdam Creek downstream of the confluence with Little Beaverdam Creek ranges from 3.1 percent in model year 1 (when dewatering occurs in South Pit) to 9.0 percent at the end of plan year 20 (when West Pit is dewatered). Decreases in simulated baseflow to Little Beaverdam Creek ranged from 0.1 percent in model year 1 (when South Pit is dewatered) to 6.9 percent in model year 13 (when East Pit is being filled and West Pit is dewatered). An unnamed tributary to Beaverdam Creek (Stream 3) exhibited baseflow decreases ranging from 0.4 percent during model year 2 (when South Pit is dewatered) to 3.1 percent (when West Pit is dewatered). Model -predicted changes in stream baseflow are presented in Table 5. Table 5 - Changes in base flow to streams that cross the site Beaverdam Creek Above Confluence' Little Beaverdam Creek Beaverdam Creek Below Confluence' Unnamed Tributary Model Flow2 Percent Flow' Percent Flow' Percent Flow' Percent Year (Ft3/d) Change (Ft3/d) Change (Ft3/d) Change (Ft3/d) Change Steady -569,356 -435,255 -1,681,833 -163,653 State 1 -545,113 4.3 -434,660 0.1 -1,631,117 3.0 -162,320 0.8 2 -541,563 4.9 -433,446 0.4 -1,622,721 3.5 -162,917 0.4 3 -538,616 5.4 -431,440 0.9 -1,609,935 4.3 -162,797 0.5 4 -538,716 5.4 -428,394 1.6 -1,608,281 4.4 -160,529 1.9 5 -541,270 4.9 -418,435 3.9 -1,600,251 4.9 -162,576 0.7 6-10 -548,891 3.6 -418,899 3.8 -1,615,812 3.9 -161,519 1.3 11 -556,696 2.2 -419,820 3.5 -1,629,960 3.1 -160,985 1.6 12 -535,792 5.9 -414,010 4.9 -1,580,594 6.0 -161,027 1.6 13 -536,719 5.7 -405,337 6.9 -1,553,419 7.6 -159,911 2.3 14-20 -539,972 5.2 -406,888 6.5 -1,530,283 9.0 -158,582 3.1 Confluence is with Little Beaverdam Creek. 2 Negative sign indicates stream baseflow from groundwater. Groundwater removed from the pits during dewatering will be pumped to settling ponds throughout the permitted area prior to discharge through outfalls monitored via NPDES permitting and compliance. In the transient model simulations, water lost from stream baseflow due to pit dewatering was recycled back to the streams through the settling basins and discharge points shown in Figure 6. Note that there is a stream that flows into the West Pit starting in about Year 14 once the West Pit and the North Pit merge. The model estimated that this stream will still receive about 13,000 9 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model Model Limitations cubic feet per day of base flow, which then flows towards the pit and is not accounted for in the dewatering estimates. The water from this stream will either be re-routed to Beaverdam Creek or will be included in water pumped from the West Pit to Beaverdam Creek. Either way, this water, which is not accounted for in Table 5, will be included in the flow of Beaverdam Creek. When it is included, the greatest percent reduction in flow, which occurs in Year 20, is reduced from 9.0 percent to 8.2 percent. 5 Model Limitations Groundwater flow models are generalizations of complex groundwater flow systems that cannot be reasonably simulated without extensive data, detailed inputs, and large computational requirements. The complexity is contained in the generalization, but local effects may influence real world outcomes. Other limitations of the groundwater model of the Site are described in the Tech Memo. 6 Summary and Conclusions Transient groundwater flow modeling was used to estimate the rate of groundwater withdrawal required to dewater four planned mine pits and evaluate potential impacts on adjacent water resources due to dewatering. The transient groundwater model was developed from the calibrated, steady state model for natural conditions described in the Tech Memo and refined to capture currently planned resource extents and sequencing, as provided by PLCI and MMA. • Model -predicted dewatering rates ranged from 525 gpm for the South Pit to 1,575 gpm for East Pit. The total dewatering rate in any given year ranged from 575 to 2,300 gpm, with the greatest amount of pumping occurring in year 2. Predicted drawdowns for wells located within the Site, which will be decommissioned by PLIC during mine development, ranged from 0 to 17.8 feet and averaged about 1.9 feet. Predicted drawdowns for wells outside the Site ranged from 0 to 21.5 feet with an average of approximately 4.0 feet. Four wells within the site are predicted to have significant loss of available drawdown (water column) during dewatering of the East, West, and North Pits. Beyond the permit boundary, two wells are predicted to experience significant reduction of available drawdown during dewatering. One well was predicted to experience significant water column loss throughout most of the 20-year mine operation, while another is predicted to experience significant water column loss during dewatering of the combined West and North Pits in years 14 to 20. • Predicted impact to wetlands were most significant during the East and West/North Pit dewatering simulations, indicating drying of 7 and 10 wetlands, respectively. Three wetlands are predicted to dry up during dewatering of South Pit. Note that routing of additional flow into wetlands may help mitigate the drying predicted by the model. The contribution of groundwater to stream flow (baseflow) to the three streams crossing the Site decreases between 0.1 to 9.0 percent based on the location of the stream relative to the pit which is being dewatered. The largest predicted decrease in baseflow occurred in Beaverdam Creek at the very end of the last year simulated after the West Pit merged with the North Pit. Adding flow from a stream that is disconnected from the stream network would decrease this impact to 8.2 percent. 10 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model References • PLCI will return water withdrawn during dewatering to streams at NPDES permitted discharge points to reduce potential pumping effects due to mine operation. Some water withdrawn due to dewatering may be diverted to wetlands to offset potential impacts to wetlands. 7 References Aquaveo, 2021, Groundwater Modeling System (GMS) Harbaugh, A.W., 2005, MODFLOW-2005, The U.S. Geological Survey modular ground -water model —the Ground -Water Flow Process: U.S. Geological Survey Techniques and Methods 6- A16, variously p. HDR, 2019, Technical Memorandum Groundwater Model. Prepared for Piedmont Lithium. Marshall Miller & Associates (MMA), 2021, Estimated Mine Pit Extent with optimization using MiningMath's SimSched program and scheduling using Maptek's Vulcan Evolution program. 11 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model References This page intentionally left blank. 12 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Figures Figures F 1 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Groundwater Model ��� Figures This page intentionally left blank. .T V aG.1 ;., Q,knP ✓2� K;,11 Crep{ 3 y ci l• -- - - - -- - -- � TM b. d �= 'Clse{•s y 7 �°e crouee rouse der C L'� n ources: Esri, HERE, Gar..m.in, F - _ Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, ��sarn-:vrnc� NRCAN, GeoBase, IGN, r. o x Cry v o �e` nd X v_ 7CY LEGEND . _ rya it iu °' No Flow Boundary `�- urcnst ❑� E-Cft Site ® Receptor Wells ."� .Ltd°8eaverdsl"-T y� h� ®Planned Pits _ 4 South Fork Catawaba River Dewater Discharge Locations Streams , 1227R DATA SOURCES: State Plane Coordinate System, v ^+ Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet pME��o3yC` o lKafry! 8 C� � �f� I �y � L•re <Q"o• 'q tn",t'dlkhti GROUNDWATER MODEL DOMAIN \ r +trr ftd 3 c� ' N i e Rd ar 0 1 2 ''I Rdr Qr, MILES Sun�s'� 51c3aY lieu c�� O�r�v 1-, Sr � Ra Cpq } �4�C c+rwcnRa a2 sr Sources: Esri, HERE, Garmin, Intermap, increment P Corp; , GEBCO, PIEDMONT FN USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance :i rr. I u.Y. Survey, Esri Japan, METI, Esri China (Hong Kong ), swisstopo, © FIGURE 1 v� OpenStreetMap contributors, and the GIs User Community PATH: H:%PLI\ANALYSIS%FIGU RE 2.MXD - USER: JTROYER - DATE: 8/17/2021 r. ources: Esri, HERE, Gar..m.in, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, lerholdt LEGEND kderholdt Rd 0 Model Domain Site ® Receptor Wells - Known Well Depths O Possible Domestic Well - No Known Data Rd ® Planned Pits { Dewatering Discharge Locations 0 Simulated Mined Pit Area DATA SOURCES: State Plane Coordinate System, O Zone: North Carolina (PIPS 3200) NAD 1983 2011, feet - - O Sources: Esri, HERE Garmin, Infermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, OpenStreetMap contributors, and the GIs User Community SITE AND RECEPTOR WELLS LOCATION MAP kc N 0 0.2 0.4 MILES PIEDMONT FN IITp iuPA FIGURE 2 PATH: HAPLI\ANALYSISOGU RE 1.MXD - USER: JTROYER -DATE: 08/27/2021 kcrY_ q+ w • yid 1 p y �# P c1e�'F t �S: Wye Rv r 'r a 76 Rd, CAU'w' r ntt ,,I%VW f- a coye.e�tin s rre NU I �n v� c ;n •CSN .T :4 �5 a�' L, High ShC F� iw c� LEGEND 0 Domain 0 Site Grid Sources: Esri, HERE, Garm.in, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet �F,xfk$p REVISED MODEL GRIn Rd �µy1 01 croaY- �`F 0 1 2 + ywr MILES Ce fy - Perk II C ��� f Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, PIEDMONT USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, o,�r FIGURE 3 -��,� OpenStreetMap contributors, and the GIS User Community I PATH: HAPMANALYSISOGU RE 3.MXD -USER: JTROYER -DATE: 815=21 Qa '(1E r1t@rs S(i�le R�1 '4 NORTH WEST �IIS ` �'� 0i M/Al I - I I Weller i EAST Q I ff ® o O r Sources, Esri;;'HERE,4Garmin, Intermap, increment P Corp., GEE a �m USGS, FAO;"NPS, NRCAN, GeOBas&, IGN, Kadaster NL, Ordna Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, OpenStreetMap contributors, and the GIS User Community tGeoBase, .yE, Gar..min, nt P Corp., O, NPS, , IGN, Legend Domain Drawdown (ft) Site 1 - 3 Planned Pits 3-7 Simulated Mined Pit Area 7- 11 ® Receptor Wells 11 -15 O Possible Domestic Well 15 - 21 Streams DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (PIPS 3200) NAD 1983 2011, feet MODEL PREDICTED DRAWDOWN FROM DEWATERING YEAR 1 N 0 0.25 0.5 MILES PIEDMONT FN LITH i u m FIGURE 4A PATH: C:%USERS%JTROYER\DESKTOP\PROJECTS%PLI\FIGURES\FIGURE 4A.MXD -USER: JTROYER. DATE: 811912021 0 Q' apt � •r`� • Nr � ources: Esri, HERE, Garm. in, NORTH Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCANLegend ® Domain Drawdown (ft) WEST q Site 1 - 3 Planned Pits 3-7 Simulated Mined Pit Area 11 Receptor Wells 11 - 15 Possible Domestic Well 15 - 21 SOUTH i/ Streams dent rs a �_ DATA SOURCES: State Plane Coordinate System, � ��{fi1E l' 1 • - Zone: North Carolina (PIPS 3200) NAD 1983 2011, feet EAST o MODEL PREDICTED DRAWDOWN ��%►%�� FROM DEWATERING YEAR 2 I r .o ® o _ N Q 0 0.25 0.5 MILES .O Sources) EsriNERE,4Garmin, Intermap, increment P Corp., GEBCO, PIEDMONT FN USGS, FAOSNPS, NRCAN, GeoBas'�, IGN, Kadaster NL, Ordnance - �. �� Survey, Esrl Japan, METI, Esri China (Hong Kong), swisstopo, OpenSt/ etMap contributors, and the GIS User Community FIGURE 4B PATH: C:%USERS%JTROYER\DESKTOP\PROJECTS%PLI\FIGURES\FIGURE 4B.MXD - USER: JTROYER - DATE: 811912021 Qa 1 WEST L SOUTH 'PL nters SciLol` • NORTH g. EAST Ldt! / e BPa. / ® � J .l.7yr+Gj4 • co Sources) Esri¢HERE,4Garmin, Intermap, increment P Corp., GEE kr. USGS, FAOSNPS, NRCAN, GeOBaS'6, IGN, Kadaster NL, Ordna Survey, Esrl Japan, METI, Esri China (Hong Kong), swisstopo, �o OpenStrreetMap contributors, and the GIS User Community I. II ources: Esri, HERE, Garm.in, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend Domain Drawdown (ft) Site 1 - 3 Planned Pits 3-7 Simulated Mined Pit Area 7 - 11 ® Receptor Wells 11 - 15 • Possible Domestic Well 15 - 21 Streams DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 19832011, feet MODEL PREDICTED DRAWDOWN FROM DEWATERING YEAR 3 N 0 0.25 0.5 MILES PIEDMONT FN FIGURE 4C PATH: C:\USERS\JTROYER\DESKTOPWROJECTSWLOFIGURES\FIGURE <C.MXD- USER: JTROYER - DATE: 8/19/2021 Qa ___l IPL'rter5 SciLol` R'r NORTH EAST X/ Ldtfe ge � '.i y J � Sources) ESri" ERE, Garmin Intermap, increment P Corp., GEE USGS, FAO;°'NPS, NRCAN, GeOBasD, IGN, Kadaster NL, Ordna Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, OpenStr etMap contributors, and the GIS User Community I. II ources: Esri, HERE, Gar..m.in, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend Domain Drawdown (ft) Site 1 - 3 Planned Pits 3-7 Simulated Mined Pit Area 7 - 11 ® Receptor Wells 11 - 15 • Possible Domestic Well 15 - 21 Streams DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 19832011, feet MODEL PREDICTED DRAWDOWN FROM DEWATERING YEAR 4 N 0 0.25 0.5 MILES PIEDMONT FN L ITH iulA FIGURE 4D PATH: C:\USERS\JTROYERZESKTOPWROJECTSW LOFIGURES\FIGURE <D.MXD -USER: JTROYER -DATE: 8/19/2021 0 Qa �.i e' 2 ources: Esri, HERE, Gar..m.in, NORTH Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend ® Domain Drawdown (ft) WEST Site 1 - 3 Planned Pits s \ _ ' Simulated Mined Pit Area 11 Receptor Wells 11 - 15 " • Possible Domestic Well 15 - 21 ®� SOUTH Streams venters scs °�e R ti G � G� :Ic ,�,.•. o DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 19832011, feet EAST ar 1 — ® MODEL PREDICTED DRAWDOWN FROM DEWATERING YEAR 5 Ldtfe Be,3r ♦� ♦ •.a 0 0.25 0.5 • MILES O FN r Sources' EsriPIEDMONT ;; HERE, Garmiln ermap, increment P Corp., GEBCO, USGS, FAO;"NPS, NRCAN, GeOBas&, IGN, Kadaster NL, Ordnance UTH lupu ^ Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, () '" OpenSt�eetMap contributors, and the GIS User Community FIGURE 4E PATH: C:IUSERSIJTROYERID ESKTOP%PROJECTSW LRFIGURES\FIGURE BE.MXD -USER: JTROYER. DATE: 811912021 G O Qa �.i e' 2 ources: Esri, HERE, Gar..m.in, NORTH Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend ® Domain Drawdown (ft) WEST Site 1 - 3 Planned Pits 3-7 Simulated Mined Pit Area 7 - 11 ® Receptor Wells 11 - 15 • Possible Domestic Well 15 - 21 SOUTH / Streams 'lJenters S0.�1` R,y • DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 19832011, feet EAST \ o MODEL PREDICTED DRAWDOWN }' • FROM DEWATERING YEARS 6-10 Little � eav i � N c�P� 54 �� • 0 0.25 0.5 �� . O • MILES FNI `� r Sources) Esri;; HERE, Garmin, Intermap, c ement P Corp., GEBCO, PIEDMONT o �m USGS, FAO„`'NPS,�RCAN GeoBa�se�fGN, Kadaster NL, Ordnance LITH Iuld Survey, Esri Japan, ME-TI-Esri-GFiina (Hong Kong), swisstopo, OpenStr/eetMap contributors, and the GIS User Community FIGURE 4F PATH: C:\USERSIJTROYERZESKTOPWROJECTSW LOFIGURES\FIGURE CF.MXD -USER: JT ROYER - DATE: 811912021 G O l ....+ .... i.r Qa 1 r Yq fe6r ources: Esri, HERE, Gar..m.in, NORTH Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend ® Domain Drawdown (ft) WEST Site 1 - 3 Planned Pits 3-7 Simulated Mined Pit Area 11 i Receptor Wells 11 - 15 • Possible Domestic Well 15 - 21 ® SOUTH / �) Streams 'lJenters S0.`.61e Fth 'C - DATASOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 19832011, feet EAST r � — MODEL PREDICTED DRAWDOWN • FROM DEWATERING YEARS 11 Little N SP ij/ 0 0.25 0.5 . O MILES O r Sources. Esri;; H'ERE,4Garmin, Intermap, in5Xement P Corp., GEBCO, PIEDMONT a �m USGS, FAO„'NPS-„ NRCAN, GeOBasV IGN, Kadaster NL, Ordnance Wi,, i um Survey, Esri Japar ME—TI., Esri China ((Hong Kong), swisstopo, OpenStr/eetMap contributors, and the GIS User Community FIGURE 4G PATH: C:\USERSIJTROYERZESKTOPWROJECTSW LOFIGURES\FIGURE BG.MXD. USER: JTROYER -DATE: 811912021 Qa Ldtle�g "aw,. \�71 Cr eck r 'A SOUTH r ources: Esri, HERE, Garm.in, Intermap, increment P Corp., NORTH GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend Domain Drawdown (ft) WEST 1-3 Site r� 3 7 Planned Pits Simulated Mined PitArea 1 - 11 ® Receptor Wells 1 - 15 • Possible Domestic Well 15-21 Streams r DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 19832011, feet EAST MODEL PREDICTED DRAWDOWN FROM DEWATERING YEAR 12 '• 0 0.25 0.5 �:. MILES CSP o Sources, EEssri; HERE,4Garmin, Intermap, incr ent P Corp., GEBCO, P I E V ! 1�1 T 01 a kr. USGS, FA01NF , NRCAN, GeoBas'6�GN Kadaster NL, Ordnance Survey, Esrl Japa�METI, Esri Chip Hong Kong), swisstopo, 'Po OpenStreetMap contributors, and the GIS User Community FIGURE 4H PATH: CAUSERSWTROYE RID ESKTOPWROJECTSWLOFIGURES\FIGURE <H.MXD- USER: JTROYER-DATE: 8/20/2021 Qa C Ldt7e gPavcr aV/11 (;I CCK Do,, 1 NORTH I ►:. Sources) Esri;; HERE, Garmin, Intermap, increment P Corp., GEE USGS, FAO„`'NP.S, NRCAN, GeoBasD, IGN!Kadaster NL, Ordna Survey, Esri Japan\, METI, Esri China-(H nog Kong), swisstopo, OpenSt�eetMap contributors and the GIS User Community I. II ources: Esri, HERE, Gar..m.in, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Legend Domain Drawdown (ft) Site 1 - 3 Planned Pits 3-7 Simulated Mined Pit Area 7 - 11 ® Receptor Wells — 11 -15 • Possible Domestic Well 15 - 21 Streams DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 19832011, feet — MODEL PREDICTED DRAWDOWN FROM DEWATERING YEAR 13 N 0 0.25 0.5 MILES PIEDMONT FN L ITH iulA FIGURE 41 PATH: C:\USERS\JTROYERZESKTOPWROJECTSW LOFIGURES\FIGURE CI.MXD - USER: JTROYER - DATE: 8QO12021 Qa a 1 ® SOUTH 'venters Sci�l` R1t Q EAST I : _ o Q r Sources) Es ¢HEREGarmin�lnte�map, i ent P Corp., GEE �o USGS, FAO,NPS, NRCAN, GeOBas&, IGN, Kadaster NL, Ordna Survey, Esrl Japan, METI, Esri China (HongKog.�isstopo, " OpenS " etMa�c`ntributors, and the User Community • tGeoBase, .yE, Gar..min, nt P Corp., O, NPS, , IGN, Legend Domain Drawdown (ft) Site 1 - 3 Planned Pits 3-7 Simulated Mined Pit Area 7- 11 ® Receptor Wells 11 - 15 O Possible Domestic Well 15 - 21 Streams DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (PIPS 3200) NAD 1983 2011, feet MODEL PREDICTED DRAWDOWN FROM DEWATERING YEARS 14-20 N 0 0.25 0.5 MILES PIEDMONT FN L ITH iuPA FIGURE 4J PATH: C:%USERS%JTROYER\DESKTOP\PROJECTS%PLI\FIGURES\FIGURE 4K.MXD - USER: JTROYER - DATE: 8/2012021 ¢a Wetland 15 Wetland 10 Wetland 9 Wetland 14 Wetland 13 =� ��PF rxe rs 5c1�je R�1 t m C�st1e r•' Little $ears adrn Crsek y. MIS Da y5 yQ INS iIN \ �M1 SOUTH etland and 7 EAST Ind 1 Wetland 3 MAI �a a® Y Sources: Esri, HERE, Garmin', Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METE_Esri China (Hong Kong), swisstopo, OpenStreetMap contributors, and the GIs User Community ro- ources: Esri, HERE, Garrnin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, LEGEND 0 Domain Site 0 Deliniated Wetlands ® Planned Pits 2 I DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (FIPS 3200) NAD 1983 2011, feet HDR Delineated Wetlands N 0 0.25 0.5 MILES PIEDMONT FN L1Tp iuPA FIGURE 5 PATH: HAPLI\ANALYSISOGU RE S.MXD - USER: JTROYER -DATE: 8/19/2021 Crouse RG Gef Crouse Crouse o, V o Robe Ra Sr C4sto r}-weber C� a� ¢� Cho yv ille Go and CL t tryclu ..� RoA 15D � •" {off r a Cr t 4hurGh'St ojF ~L �� Sunbeam Gas CrsS am 6 J Sources: Esri, HER Garmin, Intermap, incremen P Corp., GEBCO, USGS, FAQ NPS, NRCAN, GeoBase, IGN, LEGEND 0 Domain Site ® Planned Pits Total Flow Measurements Beaverdam Creek Above Confluence Little Beaverdam Creek Unnamed Tributary Beaverdam Creek Below Confluence DATA SOURCES: State Plane Coordinate System, Zone: North Carolina (PIPS 3200) NAD 1983 2011, feet LOCATION OF STREAM REACHES N 0 0.5 1 MILES / Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, PIEDMONT rjl( USGS, FAO, NPS, NRCAN, GeoBase, IGN,-Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hon91 'Kong), swisstopo, © FIGURE 6 OpenStreetMap contributors, and the GIS User Community S. PATH: HAPLI\ANALYSIS\FIGURE 6.MXD - USER: JTROYER -DATE: 8/19/2021 FN 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 (704) 338-6700 hdrinc.com © 2021 HDR, Inc., all rights reserved Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Appendix A - Background Studies and Reference Documents A.4 Technical Memorandum — Evaluation of Mine Pit Operations on Water Quality DAAONT Technical NEMemorandum Evaluation of Mine Pit Operations on Water Quality Piedmont Lithium Carolinas, Inc. Gaston County, North Carolina August 30, 2021 This page intentionally left blank. Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Evaluation of Mine Pit Operations on Water Quality Contents Contents 1 Introduction....................................................................................................................... 1 2 Data Comparison.............................................................................................................. 1 2.1 Groundwater..............................................................................................................1 2.1.1 Groundwater Levels.......................................................................................................... 2 2.1.2 Groundwater Quality......................................................................................................... 2 2.1.3 Leaching Potential of Tailings........................................................................................... 3 2.2 Surface Water............................................................................................................ 4 2.2.1 Surface Water Flow.......................................................................................................... 4 2.2.2 Surface Water Quality....................................................................................................... 5 2.3 Comparison of Groundwater and Surface Water Quality ............................................ 5 3 Conclusions...................................................................................................................... 7 4 References....................................................................................................................... 8 Tables Table 1. Well construction details............................................................................................... 2 Table 2. Model Predicted Dewatering Withdrawal Rates (HDR, 2021 a) ..................................... 5 Table 3. Comparison of groundwater and surface water samples .............................................. 6 Figures Figure 1 — Sample and Measurement Points Location Map Figure 2 — Plots of Groundwater Elevations Over Time Figure 3 — Box and Whisker of Groundwater Elevations Figures 4a through 4n — Box and Whisker of Groundwater and Surface Water Quality Data Figure 5 — Measured and Modeled Stream Flow Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Evaluation of Mine Pit Operations on Water Quality ��� Contents List of Acronyms 2L NCDEQ 15A NCAC 02L .0202 groundwater standards DWM Division of Waste Management HDR HDR Engineering, Inc. of the Carolinas IMAC Interim Maximum Allowable Concentrations UGH Lithium hydroxide MCC Maximum Concentration of Contaminants MO Metso-Outotec NCDEQ North Carolina Department of Environmental Quality PACE Pace Analytical Services, LLC PCB polychlorinated biphenyls PSRG Preliminary Soil Remediation Goals PLCI Piedmont Lithium Carolinas, Inc. RCRA Resource Conservation and Recovery Act SVOC Semi -volatile Organic Compounds TCLP Toxicity Characteristic Leaching Procedures TSB Tin-Spodumene Belt USEPA Environmental Protection Agency VOC Volatile Organic Compounds Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Evaluation of Mine Pit Operations on Water Quality ��� Introduction 1 Introduction Piedmont Lithium Carolinas, Inc. (PLCI) is proposing to construct an open pit mine in the Carolina Tin-Spodumene Belt (TSB) of North Carolina where lithium -bearing pegmatites have been identified. The approximately 1,548-acre Site is in an unincorporated area of Gaston County, on private land surrounding portions of Hephzibah Church Road, Whitesides Road, and St. Mark's Church Road, approximately one mile east of Cherryville, North Carolina. Planned mine operations will consist of the Piedmont Lithium Carolinas Mine #1, a Concentrate Plant, an Industrial Minerals Plant, and a Lithium Hydroxide Conversion Plant. This process will produce native overburden and dry -stacked concentrator tails at the Concentrator Plant as well as inert analcime residue from the Lithium Hydroxide Conversion Plant. PLCI is proposing to dry -stack the co -mingled mine refuse streams (native overburden, concentrator tails, and analcime residue) in the waste rock disposal area and/or use the refuse for reclamation to backfill the mine pits. In advance of mine development Piedmont Lithium Carolinas, Inc. (PLCI) commissioned HDR Engineering, Inc. (HDR) to develop and implement a baseline groundwater and surface water monitoring program to evaluate naturally -occurring conditions. In addition, HDR obtained one sample of analcime tailings produced in a microcosm study that mimicked potential lithium hydroxide conversion operations, for the purpose of testing to evaluate use of tailings as reclamation material. The analcime tailings were characterized as non -hazardous per Toxicity Characteristic Leaching Procedure (TCLP) testing. 2 Data Comparison 2.1 Groundwater HDR compared groundwater elevation and quality data, surface water quality data, and toxicity testing data, in conjunction with anticipated dewatering rates and periods to evaluate potential effects of mine pit dewatering on water quality within the mine pit boundaries. Between June 2018 and February 2020, PLCI implemented a baseline groundwater and surface water flow and quality monitoring program to assess existing conditions prior to potential development of the mine site. These activities consisted of the installation of five monitoring wells (MW-1 through MW-5), one aquifer test pumping well (PW-1), and four aquifer test observation wells (OW-1 S, OW-1 D, OW-2S, and OW-21D). Subsequent to installation of monitoring and observation wells in 2018, HDR conducted 17 groundwater gauging events, 12 groundwater sampling events, 2 surface water flow monitoring events, and 12 surface water sampling events, and 1 aquifer pumping test. Construction and geologic details for monitoring wells installed during this program are presented in Table 1. Piedmont Lithium Carolinas, Inc. i Technical Memorandum — Evaluation of Mine Pit Operations on Water Quality ��� Data Comparisons Table 1. Well construction details Well ID Top of Casing (Feet msl) Depth (Feet) Geologic Material PW-1 756.75 500 Amphibolite MW-1 762.49 110 Amphibolite/Pegmatite MW-2 864.49 110 Amphibolite/Pegmatite MW-3 840.39 170 Amphibolite MW-4 884.97 153 Biotite Gneiss MW-5 756.75 152 Amphibolite OW-1S 760.63 60 Unconsolidated Regolith OW-1 D 761.14 302 Amphibolite OW-2S 755.87 30 Unconsolidated Regolith OW-2D 755.05 300 Amphibolite 2.1.1 Groundwater Levels Groundwater levels were measured, and groundwater elevations were calculated, in each well during 17 well gauging events conducted between August 2018 and February 2020. Water levels collected during this time indicate that seasonal fluctuations in groundwater elevations were evident throughout the monitoring period. In general, groundwater elevations increased in fall and winter months, and decreased in spring and summer months, as would be expected in the Piedmont Region of North Carolina. Based on these data, well MW-3 exhibited the widest range of groundwater elevation fluctuation (about 10 feet), while well MW-1 exhibited the smallest range of fluctuation (less than 4 feet). Groundwater elevations across the Site ranged from approximately 850 feet mean sea level (msl) at MW-4 to about 740 feet msl in MW-1. Groundwater elevations were plotted by month for each well and are shown on Figures 2a and 2b. Box and whisker plots for bedrock and overburden wells were generated to show the range of groundwater elevations in each well (Figures 3a and 3b). 2.1.2 Groundwater Quality Monitoring wells were purged and sampled during 12 sampling events between August 2018 and February 2020. Additionally, pH field measurements were observed above and below the North Carolina Department of Environmental Quality (NCDEQ) groundwater quality standard (21- Standard) range of 6.5-8.5 standard units (SU) in each of the wells during the monitoring period (Figure 4a). Baseline groundwater and surface water monitoring is documented in the Technical Memorandum - Water Quality Testing (HDR, 2020). Concentrations of arsenic, chromium, lead, manganese, and fluoride that exceeded the 2L Standards were reported in wells MW-2, MW-5, OW-1 D, OW-2S, and PW-1 during the monitoring period. Box and whisker plots for each constituent that exceeded 2L Standards were generated and are presented in Figures 4b, 4c, 4d, 4e, and 4f, respectively. Barium, cadmium, lithium, mercury, selenium, chloride, and sulfate were detected in at least one sample above the laboratory reporting limit, but below the respective regulatory standards during the monitoring period, as shown in Figures 4g, 4h, 4i, 4j, 4k, 41, and 4m, respectively. Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Evaluation of Mine Pit Operations on Water Quality ��� Data Comparisons 2.1.3 Leaching Potential of Tailings As documented in the Technical Memorandum — Toxicity Testing of Lithium Hydroxide Conversion Plant Tailings (HDR, 2021), PLCI commissioned Metso-Outotec (MO) to replicate ore concentrate conversion methods to be undertaken by PLCI during operation of the proposed Lithium Hydroxide Conversion Plant through bench -scale testing to convert spodumene concentrate into battery -grade lithium hydroxide (LiOH). On behalf of PLCI, HDR obtained one sample of the Analcime tailings produced by the MO study to characterize the material via Toxicity Characteristic Leaching Procedures (TCLP). The pH of the fluid used for the TCLP analysis had an initial pH of 5.45 Standard Units (SU) and a final pH of 2 SU. Aluminum and calcium leached from the MO sample at concentrations above the laboratory reporting limit; however, neither constituent has a 2L Standard or United States (U.S.) Environmental Protection Agency (EPA) Maximum Concentration of Contaminants (MCC) for toxicity characteristic testing. Arsenic, barium, beryllium, copper, magnesium, manganese, strontium, titanium, and zinc leached at estimated concentrations (J-values) above the method detection limit established by USEPA, but below the laboratory reporting limit. For this Technical Memorandum, TCLP results for select constituents were plotted on the box and whisker plots for arsenic (Figure 4b) and barium (Figure 4g). 2.1.3.1 ARSENIC A total of 120 groundwater samples were analyzed for arsenic during the monitoring period; arsenic was detected 8 times, each time at a concentration that exceeded the 2L Standard. Arsenic exceedances occurred in samples obtained from MW-5 and PW-1 during the monitoring period. Arsenic was detected in the granular material (MO sample) used for the TCLP testing, but at an estimated concentration of 0.96J mg/kg. Arsenic leached from the granular sample at a concentration 0.22J Ng/L. Both concentrations were below the laboratory reporting limits. Arsenic is mobile under reducing conditions and rock type and high pH can contribute to elevated concentrations of arsenic in groundwater (USGS, 2021). Groundwater samples from MW-5 and PW-1 had pH levels above the 2L Standard (range of 6.5 to 8.5) in sampling events that corresponded to elevated concentrations of arsenic, indicating that while arsenic may be naturally occurring at the Site, it also may be biased high by high pH in the groundwater. Arsenic was not detected in any of the surface water samples collected from the Site. Well MW-5 was completed as a Type III well with a 2-inch diameter well set within a 6-inch diameter outer casing. The outer casing was set into the top of competent bedrock and grouted in place to reduce vertical migration of groundwater from the regolith aquifer into fractured bedrock. One possible explanation for the outlier concentrations reported in the August 2018 sample is that the sample was affected by high pH grout, causing concentrations of inorganic constituents to be biased high. Well PW-1 also exhibited high concentrations of arsenic. The four samples collected from PW-1 with high arsenic concentrations occurred in the first 5 sampling events after the well was constructed, possibly indicating that samples were affected by high pH grout in PW-1 as well. 3 Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Evaluation of Mine Pit Operations on Water Quality ��� Data Comparisons Note that arsenic is a naturally occurring element in bedrock, unconsolidated overburden soils, groundwater, and surface water within the Piedmont Physiographic Province of North Carolina. The USEPA has established a standard, called the maximum contaminant level (MCL), for arsenic in water of less than 10 tag/L for public water systems; however, naturally -occurring arsenic is present in groundwater throughout North Carolina at concentrations from 1 pg/L to 800 tag/L (NCDEQ, 2021). Thus, the concentrations of arsenic detected during periodic groundwater monitoring conducted between August 2018 and February 2020 are consistent with naturally -occurring conditions in North Carolina. 2.1.3.2 FLUORIDE Fluoride exceedances occurred in groundwater samples from PW-1 and detections occurred it samples from other monitoring wells (MW-1, MW-4, MW-5, OW-1 S, OW-1 D, OW-2S, and OW- 2D) (Figure 4f). The presence of fluoride indicates that fluoride may be naturally occurring in bedrock at the Site and mobile in the aquifer. Fluoride occurs naturally in groundwater through dissolution of fluoride bearing minerals like amphibolite (Kumar, 2017). Alkalinity (high pH) is a factor for dissolution of fluoride (Kumar, 2017). Groundwater samples from MW-1, MW-3, MW- 4, MW-5, and PW-1 had pH levels above the 2L Standards (range of 6.5 to 8.5). Fluoride was not detected in the TCLP leachate testing or in surface water at the Site. 2.1.3.3 MANGANESE The granular material from the TCLP analyses contained iron and manganese at levels above the Protection of Groundwater PSRGs, but the concentrations are typical of naturally occurring soils in the Piedmont Physiographic Province (HDR, 2021 a). The concentration of manganese in the leachate was at an estimated concentration (J-value) but does fall inside the range of concentrations detected in groundwater samples (Figure 4e). 2.1.3.4 BARIUM The granular material from the TCLP analyses contained barium at a concentration of 4.8 mg/kg. Barium was detected in the leachate sample at an estimated concentration of 43J tag/L. The concentration of barium in the TCLP leachate is similar to or an order of magnitude higher than the concentrations observed in groundwater samples (Figure 4g). 2.2 Surface Water 2.2.1 Surface Water Flow Surface water flow was measured at 15 locations within the mine permit boundary in May and June 2019 (Figure 1). Measured stream flow ranged from more than 10,000 gallons per minute (gpm) to less than 1,000 gpm on larger streams (FM-1 through FM-6) and smaller tributaries (Weir-1 through Weir-9), respectively (Figure 5). Rainfall occurred prior to and/or during both measurement periods, thus, neither of the measurement events appear to represent baseflow conditions. Dewatering for removal of resource from mine pits intercepts water that would naturally enter nearby streams and may cause or increase the flow of water from the streams to groundwater. Groundwater removed from mine pits during dewatering will be discharged to settling ponds prior to controlled release through permitted outfalls. After release, the water may flow out Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Evaluation of Mine Pit Operations on Water Quality Data Comparisons through streams or wetlands or infiltrate into the groundwater system. The current operations plan has no more than two pits actively mined simultaneously. Dewatering discharge will be monitored through National Pollutant Discharge Elimination System (NPDES) permitting and compliance. Dewatering rates were estimated with groundwater modeling described in the Technical Memorandum — Groundwater Model (HDR, 2021 b) and are shown in Table 2. Dewatering rates range from 575 gpm in the first year South Pit is operating to 2,000 gpm in year 12 when both East and West Pits are being mined. Table 2. Model Predicted Dewatering Withdrawal Rates (HDR, 2021a) Pumping Rate (gpm) Model Year South Pit East Pit 50 West Pit North Pit Total 1 525 575 2 975 1,225 2,300 3 725 775 1,500 4 25' 1,025 1,050 5 751 950 1,025 6-10 N/A2 1,250 1,250 11 N/A2 1,575 1,575 12 N/A2 1,050 950 2,000 13 N/A2 0 500 850 1,350 14-16 N/A2 N/A2 1,0753 1,075 2.2.2 Surface Water Quality There were no exceedances of NCDEQ surface water standards 15A NCAC 02B (213 Standards) during surface water sampling events between August 2018 and February 2020. The range of concentrations of constituents in surface water samples are shown in box and whisker plots (Figures 2a through 4n). Phosphorus, lithium, and manganese concentrations shown in Figures 4n, 4i, and 4e, respectively, were generally higher during the warm season (May 2019 through October 2019). Chloride concentrations oscillated with the highest concentrations occurring in November 2019 (Figure 41). Sulfate concentrations were highest during the cold months with the highest concentrations occurring in December 2019 (Figure 4m). The highest pH values occurred in June 2019 and the lowest in February 2019 (Figure 4a). Arsenic and fluoride were not detected in any of the surface water samples. 2.3 Comparison of Groundwater and Surface Water Quality PLCI anticipates pumping groundwater from the mine pits to settling ponds prior to release to streams through permitted outfalls. Characteristics of the groundwater (dissolved oxygen, turbidity, pH, temperature, and constituent concentrations) may change depending on the length of time water is retained in the settling ponds. Thus, comparison of the average and range of concentrations for selected constituents with detections in both groundwater and surface water is appropriate to evaluate if groundwater discharge to surface water may affect surface water quality (Table 3). Piedmont Lithium Carolinas, Inc. I Technical Memorandum - Evaluation of Mine Pit Operations on Water Quality Data Comparisons Table 3. Comparison of groundwater and surface water samples Average Maximum Minimum Constituent Groundwater Water Surface Groundwater Water Surface Groundwater Surface Water Turbidity (NTU) 5.62 9.21 64.60 21.30 0.17 3.04 DO (mg/L) 4.58 10.47 9.09 26.75 0.14 6.23 pH 8.12 7.08 11.97 8.67 5.87 6.17 Temperature (°C) 16.38 14.18 20.50 22.00 12.00 6.10 Manganese (pg/L) 16.92 46.78 65.50 161.00 5.00 6.50 Lithium (pg/L) Chloride m /L 229.05 16.73 1370.00 3.30 45.90 5.70 30.50 6.40 1.58 3.70 1.00 2.20 Sulfate (mg/L) 4.65 2.22 19.40 3.90 1.00 1.00 Box and whisker plots comparing constituents that were detected in both groundwater and surface water samples are shown in Figures 4a through 4n. Comparison of these data indicate the following: • Manganese and barium concentrations are typically higher in surface water compared to concentrations in groundwater (Figure 4e and 4g, respectively). The concentration of manganese in most groundwater samples is below the 2L Standard. Barium concentrations are well below the 2L Standard. Discharge of groundwater to steams is not expected to raise concentrations of manganese or barium in the streams. • Lithium concentrations are lower in surface water compared to groundwater (Figure 4i). Discharge of groundwater directly into streams would not raise lithium levels above the standards. However, dewatering of mine pits will intercept groundwater that would naturally discharge to streams and may cause or increase water to flow out of the streambed into the ground. • Chloride concentrations are similar for both groundwater and surface water and are below the 2L Standard (Figure 41). • Sulfate is also present in both the groundwater and surface water at concentrations well below the 2L Standard. Groundwater has a higher range of concentrations of sulfate extending both above and below the range of sulfate concentrations in surface water samples. • Arsenic, chromium, lead, and fluoride were detected in a few groundwater samples but were not detected in any surface water samples (Figures 4b, 4c, 4d, and 4f, respectively). Some groundwater samples exhibited concentrations of arsenic, chromium, lead, and fluoride above the 2L Standards. Eight out of 120 samples had detections of arsenic. The number of detections for chromium, lead, and fluoride were also small relative to the number of samples collected. Groundwater is naturally discharging to streams on the Site and does not cause elevated levels of these constituents in the stream water. Discharging groundwater pumped during dewatering is not likely to raise concentrations of arsenic, chromium, lead, and fluoride in stream water. • Cadmium, mercury, and selenium were detected in groundwater samples but were not detected in any surface water samples (Figures 4h, 4j, and 4k, respectively). Cadmium Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Evaluation of Mine Pit Operations on Water Quality Conclusions concentrations in all groundwater samples were below the 2L Standards. Selenium was only detected in the one sample collected from MW-5 after well construction (August 2018 event) and is likely not a constituent of concern at the Site. Mercury was only detected in three groundwater samples during one sampling event and is likely not a constituent of concern. • The average pH and the range of values of pH of groundwater samples is higher than that of the surface water samples. 3 Conclusions Comparison of groundwater and surface water quantity and quality data, as well as TCLP testing results, yield the following conclusions regarding potential effects of mine pit operation on water quantity and quality within the mine permit boundaries: • Groundwater levels appear to have a seasonal variation with fluctuations ranging up to 10 feet. Groundwater geochemistry also fluctuates and loosely follows a seasonal pattern. o Phosphorus, lithium, and manganese concentrations were generally higher during the warm season (May 2019 through October 2019). Chloride concentrations oscillated with the highest concentrations occurring in November 2019. Sulfate concentrations were highest during the cold months with the highest concentrations occurring in December 2019. The highest pH values occurred in June 2019 and the lowest in February 2019. • Based on modeled dewatering rates, the maximum decrease in baseflow is predicted to occur in Beaverdam Creek below the confluence with Little Beaverdam Creek during dewatering plan years 14 through 20 (end of year 20) when the combined West and North Pit is being dewatered and groundwater is flowing back into East Pit (HDR, 2021 b). Groundwater is naturally discharging to streams on the Site and does not cause elevated levels of naturally -occurring constituents in the stream water. Discharging groundwater pumped during dewatering is not likely to raise concentrations of arsenic, chromium, lead, and fluoride in stream water. Comparison of groundwater and surface water quality indicates the following. o Discharge of groundwater to steams is not expected to raise concentrations of manganese, barium, chloride, or sulfate in the streams. o Lithium concentrations are lower in surface water compared to groundwater. Discharge of groundwater directly into streams would not raise lithium levels above the standards. However, dewatering of mine pits intercepts groundwater that would naturally discharge to streams and may cause or increase water to flow out of the streambed into the ground. o Arsenic, chromium, lead, and fluoride were detected in a few groundwater samples, but were not detected in any surface water samples. Eight out of 120 samples had detections of arsenic. The number of detections for chromium, lead, and fluoride were also small relative to the number of samples collected. Discharging groundwater to streams is not likely to raise concentrations of arsenic, chromium, lead, and fluoride in stream water. Piedmont Lithium Carolinas, Inc. I Technical Memorandum — Evaluation of Mine Pit Operations on Water Quality References PLI plans to dry -stack non -hazardous mine refuse streams of native overburden, concentrator tails, and analcime tailings and/or use the refuse to backfill mine pits for reclamation (MMA, 2019). The results of the TCLP analysis indicate that the analcime tailings do not qualify as toxic hazardous waste (HDR, 2021 a). TCLP testing did not result in mobilization of arsenic. Precipitation and native groundwater will fill the porous space around refuse used to backfill mine pits. Native groundwater has a higher pH than the fluid used in the TCLP analysis. Geochemical reactions may differ from reactions that occurred in the TCLP analysis. 4 References HDR, 2019. Technical Memorandum Groundwater Model. Prepared for Piedmont Lithium. July 2, 2019. HDR, 2020. Technical Memorandum Water Quality Testing. Prepared for Piedmont Lithium. March 20, 2020. HDR, 2021 a. Technical Memorandum Toxicity Testing of Lithium Hydroxide Conversion Plant Tailings. Prepared for Piedmont Lithium Carolinas, Inc. August 26, 2021. HDR, 2021 b. Technical Memorandum Groundwater Model. Prepared for Piedmont Lithium Carolinas, Inc. August 27, 2021. MMA, 2019. Summary of Waste Rock and Process Tailings Geochemical Assessment and Addendum Report: Result of Humidity Cell Leaching Tests. Prepared for Piedmont Lithium, Inc. December 2019. North Carolina Department of Environmental Quality. Arsenic — Naturally occurring Arsenic in Groundwater. https:Hdeg.nc.gov/about/divisions/energy-mineral-land-resources/north- carolina-geological-survey/geologic-hazards/radon-arsenic PJ Sajil Kumar, 2017. Fluoride in Groundwater — Sources, Geochemical Mobilization and Treatment Options. February 20, 2017. United States Geologic Survey, 2021. https://www.usgs.gov/mission-areas/water- resources/science/arsenic-and-drinking-water?qt-science center objects=0#gt- science center objects F Site-7 North Pit I' ..I jim t - PIEDMONT LiTHIVM y. East Pif iatw-a" LEGEND Concentrate Operations Boundary (1260 ac.) Planned Pits Y * Dewatering Discharge Pond ❑ Model Predicted Flow Locations o Pumping Well Monitoring Well Observation Well ,5� Surface Water Collection Sites C. Stream Flow Measurements Tributary Beaverdam Creek Little Beaverdam Creek 0 Feet 2,500 s s _I� u SAMPLE LOCATION MAP PIEDMONT LITHIUM FIGURE 1 TECHNICAL MEMORANDUM: WATER QUALITY TESTING Piedmont Lithium I Technical Memorandum — Toxicity Testing ��� Figures. This page intentionally left blank. MW-1 MW-2 MW-3 752 N E 750 V c 748 0 M> 746 w ■ ■ ■ v 744 ■ m■ � � a ss � 3 742 -a ■ c 0 740 V 738 �,\ �19 b\T ��19 ��ti titi�� yeti M W-4 854 Ln E 852 ■ ■ 0 V� c $50 • ■ ■ ■ 0 } 848LU ■ ■ v 846 ■ 3 844 ■ ■ c 0 842 0 C7 840 (11 O,$ O�� (�, oti d, 0 O� O,, O3, OHO C50,�ti�y _x 826 N E 824 V ■■■ ■■ c 822 ■ • 0 T 820 • a3 W 818 v • • 3816•� 0 814 — (0 V 812 \,Y C�\' �\N ti\ti 14,11 4,11, \ti gK� ti\ti M W-5 011; Ln E 754 rf 752 0 } 750 LU - 748 746 ■ �r 0 744 • ■ 742 IV Is,- 6T 6'ti �\ti b\I b\" 6" b\'ti JT �\ti ��� ,\Nti �\N y��� -,\"Y h\ti \\ti q\'y ,�\N ti�ti PIEDMONT ►IT"JUM F)I 796 0 E 794 ■ c 792 • ■ • GVVElevation v_ ■ fit mslJ m> 790 # ■ Mean v ■ W 788 Plus One Standard deviation v � 786 • Minus One Standard devotion c # v ■■ 784 (0 Y 782 e e 0 &01 OHO " ti C5 titi�y yeti 11104\\ C)\ti ti11\y _1 P-1 ►6V Ln E 754 ■ c 752 ■ } 750 • v w ■ `a 748 ■ # 3 746 0 744 (7 742 Is, oti� oOtis Otis Otis oti 61c, 6'v ��� �� ��� b\" KV �KV \'' CS',b\" Groundwater Elevations August 2021 Figure 2a ow -is OW-11D 756 756 LA E 754 • FA E 754 0 • • GVVElevation C ! fit msl) = 752 o = o 752 Mean � 750 v 750 � � Plus One Standard deviation • w 74$ w 748 a`I a` Minus One Standard deviation av 3 746 to 3 746 c 0 744 c 2 744 L 0 0 742 742 IZ Q� O+y fl;I QNy Qti� ZN) QNy Qry� Q-y� Qy`� IS, Q11 oti� (SI, Qs� Qom, Qti� Q'4Ci S9 �����'i, ������ ����'L � �����ti��y��-�,��y��-r,������.�����ti�����'L y��i. ti ���ti �����ti �����ti y��������ta��L�����ti������ � �����`L �����ti �����`L ti OW-2S Fir.. 754 = 752 750 13� i LU " 748 ■ 3 746 _ = 744 c C7 742 �°�`��°'�411 's ii~(° OW-2 D 756 N 754 = 752 0 } 750 LU L 748 3 746 _ 744 t� 742 e bti O, Q� Q0 PIEDMONT LITHIUM F)I Groundwater Elevations DA7E August 2021 FICAA;E Figure 2b PLI Groundwater Monitoring Wells (Bedrock) c;40 Median 1 1 %, ff CC L511/6,7.] % 9%-91 % }� V outliers so U 780 760 Elm l)'i•;-ID O -2D IYIYV-1 IYIYV-C M V-J IYIYV-4 M V-5 Groundwater Elevation � � Box and Whisker of Groundwater Elevations in August 2021 PIEDP►Ntlwiv F)I the Bedrock Wells Figure 3a PLI Groundwater Monitoring Wells (Overburden) 755 — Median 9%-91 % D outliers 750 Q ,4 r A V 40 ow -IS OW-2S Groundwater Elevation �� Box and Whisker of Groundwater Elevations in August 2021 PIEDP►INIU F)I the Overburden Wells Figure 3b 12 10 c 9 7 5 5 pH in Groundwater and Surface Water I 0 0 o o � T T G + T I 0 T I 1 1 I 1 1 I I T T I 1 1 I 1 1 I I 4 I 1 I 1 I T FI FI FI I 1 I 1 I I I I 1 I 1 i I I I 1 I 1 I I I I 1 I I I I + + + + + 0 I Groundwater Surface Water Aug Apr Jun Jul Aug Sept Oct Nov Dec Jan Feb Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan 201E 2019 2019 2019 2019 2019 2019 2019 2019 2020 2020 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 Date PIEDMONT ►Ntl IUM F)R Box and Whisker of pH Levels in All Wells or All Stream Sampling Locations for Each Sampling Event J Median T !� 5 °14-75 % 9%-91 % O outliers NDAD Standard August 2021 Figure 4a 103 102 10° Arsenic Concentration in Groundwater and Surface Water MW-5 Groundwater T I I I I I T I I O I + + I x x x x x x x x x x Surface Water Arsenic was not detected in any surface water samples. Aug Mar Apr Jun Jul Aug Sept act Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan 2018 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 2020 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 Date PIEANT ►NtHIUM F)I Box and Whisker of Arsenic Concentration in All Wells or All Stream Sampling Locations for Each Sampling Event Median + I]}, ff ff %-91 % outliers X TCLP NCAC Standard August 2021 Figure 4b U 1os 102 10' 100 MW-5 Groundwater Chromium Concentration in Groundwater and Surface Water Surface Water Chromium was not detected in any surface water samples. Aug Mar Apr Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan 2018 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 2020 2019 2019 2D19 2019 2019 2019 2D19 2019 2019 2019 2020 Date PIEDMONT ►Ntl IUM F)I Box and Whisker of Chromium Concentration in All Wells or All Stream Sampling Locations for Each Sampling Event Median 25 °14-75 % 9%-91 % outliers — NOAO Standard August 2021 Figure 4c 4(1 020i 0 ivi vv-.-) l 1 1 1 1 Groundwater Lead Concentration in Groundwater and Surface Water X Surface Water Lead was not detected in any surface water samples. Aug Mar Apr Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan 2018 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 2020 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 Date Median + it, 5 °10-75 % 9%-91 % outliers NCAC Standard DATE Box and Whisker of Lead Concentration in All Wells August 2021 PIEDMONT FDIor All Stream Sampling Locations for Each Sampling F' LITHIUM Figure 4d Event Manganese Concentration in Groundwater and Surface Water 180 i I 160 Groundwater � Surface Water — Median + it, 5'/o--75 % 10 L outliers X TDLP — NOAO Standard 120 L L D 4 � T J 100 L I I 0 L ! I 1 g0 L L ! ! I 1 I 1 — 0 L ! I 1 O 0 ! ! I 1 1 1 0 60 L � T 0 I I O I + I I + 1 1 40 T 0 I 0 I 4- 4— 0 I I T I 1 20 I I + F IF- I 0+ 1 I-V7 H0 F x F F i = -4�-j Mar Apr Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan 2D19 2D19 2019 2019 2019 2019 2019 2019 2019 2020 202D 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 Date PIEDMONT LITHIUM F)2 DA7E Box and Whisker of Manganese Concentration in All August 2021 Wells or All Stream Sampling Locations for Each FIU'` Figure 4e Sampling Event U 2._ 0.5 0 Fluoride Concentration in Groundwater and Surface Water O Groundwater ❑ ❑ G O O O r I T 1 I I I T 1 I T I I I 1 I I T I I I I 1 I I I I I I I 1 I I I I T I I I 1 I I I I 1 1 1 1 i i 1 I I I + f f f 1 I I I I Surface Water Fluoride was not detected in any surface water samples. Aug Mar Apr Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan 201E 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 2020 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 Date PIEDMONT ►Ntl IUM F)3 Median T �f 25 %- 75 % 9%-91 % outliers NOAO Standard Box and Whisker of Fluoride Concentration in All August 2021 Wells or All Stream Sampling Locations for Each Figure 4f Sampling Event Barium Concentration in Groundwater and Surface Water 10 MW-5 Groundwater Surface Water Median r �f i 5%-75% i 9%-91% i O Q outliers TLP NCAC Standard 10 i i _ J `ax ! i 3 i i c ! p o O 10 i i + + i I0 4— 4- + + + + 10� Aug Mar Apr Jun Jul Aug Sept Cct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Cc[ Nov Dec Jan 2018 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 2020 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 Date Box and Whisker of Barium Concentration in All August 2021 PIEDPAONT 1NIMr���t F)3 Wells or All Stream Sampling Locations for Each Figure 4g Sampling Event Cadmium Concentration in Groundwater and Surface Water 2 Median Groundwater Surface Water + it, 51/o--75 % 9%-91 % outliers NCAC Standard J MW-5 � 0 p c 0 T I I I Cadmium was not detected in any surface water samples. I I I 0, Aug Mar Apr Jun Jul Aug Septr Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan 2018 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 2020 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 Date PIEDMONT LITHIUM F)I DA7E Box and Whisker of Cadmium Concentration in All August 2021 Wells or All Stream Sampling Locations for Each F' Figure 4h Sampling Event Lithium Concentration in Groundwater and Surface Water gn 1Qs D 0 0 0 T T I I ! TI I I T I i I I I I I I i ! ! I Surface Water I I I I I I ! I —Median I I ! I I I I I I ! I T {r I I ! I II I I I I I 5%-75% I + I [ I ! !0 outliers J �7 C D 102 c I I I I G O p O O Q D O O 0 D T I T I 0 I 0 D O G. ! i I I ] ! T Q a Groundwater 1 � I ! I I 1 � 101 Mar Apr Jun Jul Aug Sept Oct Nav Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nav Dec Jan 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 2020 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 Date Box and Whisker of Lithium Concentration in All August 2021 PIEDMONT Wells or All Stream Sampling Locations for Each FIG_= 111CM1i1�1 Figure 4i Sampling Event 0.35 0.3 L 0.25 @N 0.15 0.1 Mercury Concentration in Groundwater and Surface Water 0 Groundwater Surface Water Mercury was not detected in any surface water samples. Apr Jun Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Dec Jan 2019 2019 2019 2019 2019 2019 2019 2020 2020 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 Date PIEDMONT LITHIUM FDI Box and Whisker of Mercury Concentration in All Wells or All Stream Sampling Locations for Each Sampling Event Median + !L 25 °10-75 % 9%-91 % outliers DA7E August 2021 FICAA;E Figure 4j 30 25 J 20 U 15 10 Selenium Concentration in Groundwater and Surface Water MW-5 Groundwater Surface Water T I I I I I I I Selenium was not detected in any surface water samples. I I I I I Aug Mar Apr Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan 2018 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 2020 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 Date PIEDMONT ►NtHIUM F)I Box and Whisker of Selenium Concentration in All Wells or All Stream Sampling Locations for Each Sampling Event Median + IL 25 °1�-75 % 9%-91 % outliers NCAC Standard August 2021 Figure 4k Chloride Concentration in Groundwater and Surface water 10 Median Groundwater Surface Water + ff 5%-75% %-91 % outliers NOAO Standard 10` J E C D C 0 C f_7 101 Q• I 10 �L 1 I R f 1 11 1- 1 -1 Aug Mar Apr Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan 2018 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 2020 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 Date Box and Whisker of Chloride Concentration in All August 2021 PIEDMONT 111rIMri�1 Wells or All Stream Sampling Locations for Each Figure 41 Sampling Event Sulfate Concentration in Groundwater and Surface Water Median Groundwater Surface Water + !], 5 % A51/1w-.7 7%-9 1 1 % outliers NCAC Standard 102 J E - / MW-5 c 0 0 U 101 1 D 0 0 O T Q T 1 Q 0 + 1 + , + 1 I 1 1 + + + + + + I I + 1 1 I 1 17 + 1 0 0 G 1 100 1 I I 1 1 Aug Mar Apr Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan 2015 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 2020 2019 2019 2019 2019 2019 2019 2019 2019 2019 2019 2020 Date PIED�� Box and Whisker of Sulfate Concentration in All August 2021 111rIMri�1 Wells or All Stream Sampling Locations for Each Figure 4m Sampling Event Phosphorus Concentration in Surface Water CIA G O T I I Median '-' ..I 4 I + pt 9%-91 % outliers c.I2 J E 0.1 c 0 C O c cD 4.48 I 0 I 4.46 I I I I - I T + I I I 1 0.44 I I I I + 1 Q Q O 0 0 0.02 February March April May June July August September October November December January 2019 2D19 2D19 2419 2019 2019 2019 2019 2019 2019 2019 2020 Date PIEDMONT ►Ntl IUM F)l Box and Whisker of Surface Water Quality Data August 2021 Figure 4n 12000 10000 8000 CL° 6000 : 4000 2000 0 (a) Measured Surface Water Flow 1111111- -- 11 - -- - - -- ■ 5f 15f2019 - 5/15/2019 0 6/11/2019 - 6f 15f2019 PIEDMONT ►IT"JUM F)I 12,000 10, 000 8,000 CL ° 6,000 0 ,i 4,000 (b) 2,000 0 Model Predicted Baseflovwr in Streams IIIIIIII Steady 1 2 3 4 5 State Model Year 6-10 11 12 13 14-20 ■ Beaverdarn Creek above Confluence ■ Little Beaverdam Creek ■ Beaverdam Creek Below Confluence ■ Unnamed Tributary Measured and Modeled Stream Flow August 2021 Figure 5 Piedmont Lithium I Technical Memorandum — Toxicity Testing ��� Figures. This page intentionally left blank. This page intentionally left blank. FN 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 704.338.6700 hdrinc.com © 2021 HDR, Inc., all rights reserved Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Appendix B — Site/Mine Map Appendix B — Site/Mine Map Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Appendix B — Site/Mine Map This page intentionally left blank. 0 _ CU & /I I a _ - - ° ` o °° �1 �! A� �� 11 , � 'D f \ �� /� � � 9. off. e� ° o / `.� �� \�,\ I \�, C3 ° C50 /' i / 1 �` °° J J ! - O � � �_ � 'I /1 o �� °�° 1,21��' 1 11 10 V'I O � % / 777,\11 �\ �1 v� fl ��� � I �o -11 �� \� - a - - _ 'I o �� �� V IenH cf+uRCH Ro (so howl - -- -- .� - • - T_ AI 11 i"� -_ � ` % �� o �! - ,� � -� V ��� I \ ° 18rrA�PHZ - - - - 1 - t / / m / ` / ° O 0 �� \� v o - -- O v J/ % 2 ( �� � 100'SETBACK '-, 2 �.` \t_ 300' SETBACK i , / � X ) -4� ---: / fy� � �' O ° \\ `.. - -.// � �(�__/, % -' ° ��\ _,,,_ /r-\_- � / / / �� I\.`.'R I I , \, "' �\'/ A3 � -O / 1�l /I \\ �\ I , 1: C'Jo v� o � L - /�_-- _ _ -- I i / / /l { \_v_ .` / 0.09 ACRES- o-_ ° - 1 �... !I '1, I G �' l\ -- -- ° �'� ° �/ \ / / , -� / WETLAND AREA2� `j' f \ ♦ C \. \ 07 , - '4 J I A \' � \ / � J '� `IJ� i / /l I l� \� �\ C2 0 \ / I - r 0.01 ACRES N'� - � - - \ I � 1, � \ � ° ❑m k \ ti ° e I, \ ° , 1, -\, -,� /I �- o i • `! _ 91 s / o \ i t /� mot,, - sT_z / -- -0 - L L I'- \ . e G R \ .....D 1 �' _�--� - �. - �� r -- >.. 92 - __. - �- ° ° % "y....� --- ---- _ ---- O �_ //, s, w � : ° WETLAND AREA4 1L \ I V ; / % % � �- �'� �� �''I ,,� �V '; 'TA \\ ,�0' 1 1 °., f 0.06 ACRES •) \ � I � ! 7 \ � L_ / 1 \o ° \\ \ _-// i �S'�_f/ 1 t sT-,f o- " oo sETBncK ° / SCREENING BERM \L i - /- o � f 4 ° I �, --- PC I I Q _v_ o AP �' / o Pcs '� v PC3515 = LAR FARM -� �// // ! ! >-� - - - _ 3 L -_- \ I� I/ 1 ! 1 l �� F 8 a o \ '1 300' SETBACK ,1� � , 'O \\ v , fl _ � , 1� • , ° LANT AREA ENTRANCE` WETLANDAREAI _ \ 0 • '1- v 1 0.52 ACRES :+ 85�� i ,\Y 3 / I �6 .� � \ \'Ni OB-s �_- , C51 l - \ _ •. \ EXISTING CEMETERY SITE J 1 `5T 83 +-+ ° \ ° ` `- �� CONCENTRATE PLANT AND V ,; C52" \��- / I '-��.-�_ 50 CEMETERY SITE BUFFE \,, / ° \ 36 * , \\e \. \ ll I I �I \ � INDUSTRIAL SEE APPENDIX BPLANT \��l /� l � � a ®' j I' 3 3T� h 1 i 8 0 133 \ r - + \ _ - ❑ °- ,,•, \\� \, � -Al_:�L``�'=> a i,, ^. � - LANT AREA �ENTRAN�_E \ �- 1 \ _ � � I `. PL T � I � ., / sr-10 --- ROM PAD;;�_®�'1. \ g \ I se- _ ? /; r N c o�1 O \\ i ® � s E z o , T _ /� -- . \ I LITHIUM HYDROXIDE CONVERSION PLAN �� _% ! '' +, \ ENCE 6 FEET HIG , f / - i, , �. SEE APPENDIX C i - EATED eNETLAN I/ E \ % < ST-13 -- % _ r`.� sT-11 ( I - - / . o ..,., a A +* r� '+. . .. I I J WATER INTAKE /- ' +.F 'I 31 - ® 1I °zlalgnmen,i°6e C95 - 106 0 s>'. Y ♦ / ° - V ae,ermioea) _ x._.._....i �.', NEAREST OCCUPf ..,+ o - �. 11 S ° \ { BERM FOR ROM PAD - o. is � y <LL/// _ n a , 3 � r � �. � i� � DWELLING -mot \ - - 1,029 ft. o J' ., - /.� �_ i �,.. � ` CH CLOSED 7 � \ �\ � e / 0 1 L k ¢ ** I 1 �', i 4 � 117 1 � B-9 s7o.o Dl / \L C54 .i- - -/- --- f - - _.-__ - � - WETLAND AREA 5 I I ! '.__ i - -��''� `',.r� , _ I 1 / � I 1 0.11 ACRES �� \ -- -_-.. ��`- - J^J t \ \ m "I - -_ - ,--- ' 6;L NORTH PIT �✓ pl aoo's6r6ACK -' \?I _ / -- PC7 STREAM CROSSING NO. 1 - a✓ h `` C55 +\ / L 11 100-SETBACK 5n-a% i 118'` ,� �', s -� SEE APPENDIX D + / �, 1 1 \ CONDITIONAL SETBACK (I`IP ,, y _n +, -� / t b ,1, / + - - - v I CONCENTRATE PLANT/CONVERSION PLANT v ° C92 + + ,++ +v+ G43 CONVEYOR ACCESS ROAD NO. 1 + ''' sr-z i / , EXISTING CEMETERY SITE . \ / `�" ro -. ° 31 I _. .� r \ ?,'�' .x- y Q .. ,.a nc �s ST 12 _C-12 - - 'f"\ -�^ -, 'Y-- 00 1 3 - MAINTENANCE YARD w o °R93 } % CEMETERY SITE BUFFER , ,; Os J`- o _r I ,'�'� ess \ t ++ \ ____ __, r / 1 � �c - L � ARE UPIED ,°a°� 16 ,, ..,{++++ c,3 ++++ -_ � l a' a �/ ALOO P ,� DYVE ' IVP-PIT PC) u+.� ° 7V I r 46 / t S E3-2 C-2 os JO IN H R ,� 4�, ', , . r , 3i - .a-•-t om . +- _ ;� "f"- ' ,,. ♦ } ��; / --_ _- - - a ,.. __ .., _ _- EMULSION STORAGE AND ,' ' 388 9 . / \ f • z�_. - ,� BULK TRUCK PARKING ' + ___'___+_ i \ - _ AREA ACCESS AD ,.,.,.\ C ,L 1 .. \ C +y +r �. _�-� zoo - `.••� _ _ `\ / x - OB 1 LOCKING GAT + 9 ._�__ _ r c-1 , c� � x °� zs oo - � -- C- _ cT' a 4411 /i C , l I 100' SETBACK ( � .p -. � � - i +- � / -14 +�+_ - ?- . CJ _ � SS,r1- ,- � III � ,� I I II � � � � I t y w !/u/ Tr r / ; �s�`- - - -.-.. .. � +. / '. f ', h.'` . ,�����,,, _ NORTH PIT HAUL ROAD �.. .� ` � .. _ A-X+ WETLAND AREA6 �� ....-___ ,�j V / / �s o__ _... ....., - �I ,' , , _ +. AR FLooD zoNE _ B WASTE ROCK PILE V� ' �� / WHITESIDES ROAD CROSSING cs ,y - + 98 OO� - .;,1.13ACREs _ t ! I SEE APPENDIX B µ\, - 4 I 'I o v-/- �` C_ I- -_ -1 V� / \ - ! i o _ SUBJECT PROPERTY LINE (TVP)- _-..�� �� / - a �,.� '�i / )C ❑/ }}t t 5 C58�1� / sT-z0 ,1. _ _ • . / r '' • � l C-18 WETLAND AREA? � , 1 a ++ ,,� _, ` �� \ `... ,, � 1, A WP PIT POND , / ...+a _;;-':,.-- + \ I . 100 VEARFLOOD ZONE � ^318 \, � � ' 1.53 ACRES - , OB-15. �-•'j e I �G. &� :e ,.- v, �_ _ [ / ' C, 16- c-7 /� a.. + �. --'/ - - , �. w p � �j �y 0 SB-1 I I /. 1 ♦ U L ? \ o V - - , " j I 63 v % .�I r/ WEST PIT -;� B 11 \ / _ > o _ o ° v \ k CS a i C717t ,, v' ,. / .. � , �l .. _ �4 o �� _. SEE APPENDIX D v L,� � �� �, �A i �, = •; �� 1 32 I i' 61 o w v / I EMULSION STORAGE „ i _ . , III III �� OB-10 - - III - i • / ND BULK TRUCK PARKIN - „ „ ? i /" S ' TOPS .` � ' /, I :: X " J , / i l i , �� STORAGEOIPILE - .� ~� a AREA SEE APPENDIX B / � `� MAGAZINE LOCATION � '` `� 1\1F / \ o / --�., _ 101 LEGEND .� Pc2,� II „� `v� L Ga yv -;� EE APPENDIX B CONCENTRATE PLANT/CONVERSION PLANT r - ���� CONVEYOR ACCESS ROAD NO. 2 � � �, / �" ", e' � ! � ` � k P � � , �'+_, + �_, �� ��� � �� \ -1 2 1 _. -.-_- \ � _ ., o mil, � . ..� I I \ / u.xa ncc - � � � - ST-14 \\ _-- M 1 � o L r v;, �; ST-,H+ ST_\ I A 100 Y LAIN C4 I� --� / I / -,� �a �� C10 I Ii -5 v�� - ���.�_ x- DELINEATEOD WETLANDS 1090'0 X' * e „ -- C 9 MAIN HAUL ROAD k1' - A 11 v 4 7 v ' i „ o - - - - o ziii c _ O . I \ - � : i ,J/ o1 d it q .� "` soo - f � � / DELINEATED WATERS 1 ,• :: �� �- �� a 9 , , ,/ P i t C67 ' '' �� v `` +. �, as"+a•++++ WP-PIT PONQ,` :;ill ST-1 , �_ 41. T¢" a ST-19 � R s I _ y+ PROPOSED CONTOURS _ _ �� s �;i v 61 - - 59 / v. j :�. _ >, ..� moo; �R°A°I,� Er,.° ��; ST-,6 --, �' EXISTING CONTOURS 6 sourH PIT HnuL Rono�! g U` i�� / 1 > F3 / � a I ADJACENT PROPERTY OWNERS 1 ( /' - + }\ >li :��, % SING 'y.,,- a° �� 103 _ y' _ / izsTR +M cRos No. c ,Pi ` I ®� SCREENING BERMS MAP ID PID NAME ADDRESS MAP ID PID NAME ADDRESS \ / �� 'i ,.�� - \� \ I i / /�,/� / Dt I r 1L/ - lr �/�- \: /..= y ® GROUNDWATER WELL LOCATIONS P.OBOX1578 60 159648 LINDA CCOTONGHAM&DONALDDWIGHT 2331 CROYDON RD 'I I I t � i , - `µ r +++1, EXISTINGSTREAMCROSSING ,e � it O A n!a DR. KIM EAGLE, Ph. D., COUNTY MANAGER ` �-. 318 j // - 1 / : a, y c GASTONTA, NC 28053 CROCKER CHARLOTTE NC 28207 I, ,�' ,' ' \ � / ! 7 c ( � f ! � % � I / S} � \ 160 WILL KISER RD 61 159649 LINDA C COTTINGHAM & DONALD DWIGHT 2331 CROYDON RD WAS E R06R P I ,-'� I ( --- .✓ > ,,. - � r. / � - / - /' � I 1 i I �/� I , . OBSERVATION WELL 1 157871 REEVES & PATRICIA L BLACK DOUSE, NC 28033 CROCKER CHARLOTTE, NC 28207 < f, --- �;, ` - ' " -' I ./ ! I---- ') ? 5 Jc ++ r - - , / / ,�-° • 150 WILL KISER RD 1527 ST MARKCHURCH RD ENTR CE r - ----__ . a a - ___ / ' �° /` II, 1 ,�, _/ _ +__a �\ CROUSE NC28033 CROUSE,' NC28033 �� ., � �c ` " • Q ''•a � „' �� / 0 ROAD CLOSURE 2 157872 CANNY R BLACK 62 159683 KIM & RICKEY D HENLEY- - ' � a / � ,. _ 970 HEPHZIBAH CHURCH RD 607 ANTHONY GROVE RD _ '�--�y7� 7 - _ I - -a'a / __ / _ NEAREST � CUPIED DWELLING - ! _ __83 3 157876 STACEY L REEVES C/O ALISON REEVES 63 159785 THOMAS L & IVA C BRADLEY CROUSE, NC 28033 V _ - / O '�''" >� _ _ �� / X X -FOOT FENCE LINE cRousE, NC zao33 �_ �� - *"_' / / ,/ _ 318 ft. S /�� 210 WILL KISER RD 1733 HEPI-IZIBAH CHURCH RD - - - -- _-,'/ _ _ _ y - ^• _ / ° - -- _ . ,I, -' -- _ - I� / / �� 4 157877 BRUCE E & GARY S KISERNC , _�_ " ` "-` - - / - . _ -^' _ + .� .,a, a a a �� .-_ .. - - ! �/ �/ yy CROUSE,6100ENTAIL BESSEMER CITY, NC 28018 LO ING GATE __ __ r - _ '" �_ -- _z -, a a �+ �� V , / - t I ,�-X-X-/X� ROM PAD BERM 5 157917 CLAUDE H ADERHOLDT HEIRS K RI PINTAIL RD 65 160763 BRENDA HOPPER 1E HAY DR -- - -. / / - - + t- 64 160752 TERRY SCOTT LINEBERGER 4117 MOUNTAINVIEW STREET �� __ � _. _ \',. 11 � \� A ,� �� � / � X-/ �_ SILT FENCE LOCATION OAK RIDGE, NC 27310 6 157933 DAVID P & ADA B CABANISS --- - V - _ . . . ,. , " p t TY, NC PO BOX361 � _ __ GROUSE, NC 28033 66 160764 KARENCARRINGER HAY LIFE EST BEGASMONIA�NC205616 �,.� _ -- _�� _ __A -�- - _° /J �' ! 1• - -- SOUTH PIT a + '"'" - _ _ { \ / �� �. 7 157945 GAR -MAC DAIRY INC 3548 CROUSE SCHOOL RD 67 160765 BILLY D 8 DOROTHY SANSING BRADY 207 HAY DR �� \ - - \ -- - �,,------_--_ _/ �/ I 0 . • SEE APPENDIX D - "L /� � '- , f `., b , ' R CROUSE, NC 28033 BESSEMERCIN, NC28016 \\\ -_ _ .. - --- - - '' / \ - - i /f KAREN H SCRONCE & ROBERT B 104 WILL KISER RD 213 HAY DR o _ I -- _ 68 160766 BRENDA H HOPPER _ _ _ �-� I CONVEYOR WASTE ROCK CO a 157947 - - � �� _ r i I l �% ' f/- \ ORE CONVEYOR RICHARGSON GROUSE, NC 28033 BESSEMER GIN, NC 28016 -. ` ° o--. - J � __-_ \\_ - 1 _\�/ I, � ,a,a. M * _..• { / ,. / .. ° � \\, $ i l � � �I c \ I / 9 157950 JEFFREY A OXENDINE 114 WILL KISER RD SANDRA H WRENN CIO SANDRA W 1408 LABORATORY RD o "-� -�-_ ' - * /�� ' 69 ,60767 ° \ -- r -- �� f,-_ ----��-----"- > ' ' ° i I _ CONCENTRATE PLANT /CONVERSION GROUSE, NC 28033 RICHARD LI399411 FALOSTON RD ,/� a° _ _ _�__ _ L _ SP-PIT POND ++ ++++ `_', - ' L \ �I 1 _ �r' ' \ 10 157961 MICHAEL J HERREN 825 HEPHZIBAH CHURCH RD 70 160794 LYNDA H HUFFSTETLER O i ° v �r :.- --�-�r� \ -- -� �- / i/ I. X QrS, _ \ �\ SHELBY, NC DT R � t -� y GROUSE, NC 28033 175ADERHOLDTRD �' 7 //" '�/ ..`+++ - - / \\, \ < PLANT CONVEYOR PO BOX 824 71 160800 JAMES EDWARD & DIANE WIGGINS GOINS CZ . 0 -.I _ - 1�L. -� \ - �____ _ __ _--_-_ ......�°..... '-'�,, '.` 'r'1 -x + . J i \ �J-_ r 11 157962 DAVID HOWE BESSEMER GIN, NC 26016 - 68. / ' } •^_ - / '`'"'.-\ MAIDEN NC28650 - - __ _ O --- ____ \�.__---- .::I • 53 ! , ,_ �' f I � o BUILDING / STRUCTURE 175 ADERHOLDT RD _ ' _ 917 HEPHZIBAH CHURCH RD 72 160802 JAMES EDWARD & DIANE WIGGINS GOINS _ o o �' _ 12 157963 MICHAELSHANETHOMPSON BE ., �\ --� \ `' (, - �� 104 GROUSE, NC 28033 _ - � ' , �-. �� . . 73 198233 - - _-. ++., . -? /'1 r _ o 1 \ . 13 157985 BRUCE E & GARY S KISER 210 WILL KISER RD VANCE ALLEN KIRBY & DEBRA S 312 HEPHZIBAH CHURCH RD '�� ---- a ° � � �,, � � � � �---- � � V� \! CROUSE, NC 28033 - '^._ �., `•...,- ��_ -. 1 ;� -. -- .:� EP-PIT POND , , _ - - ,; .0. \\ / � I � , ® EXTENTS OF MINE PITS 14 157989 HERMAN DENNIS & JANICE D KISER 752 HEPHZIBAH CHURCH RD KEMPSTON GROUSE, NC 28033 \ ` �.., \ CROUSE, NC 28033 ; ' ,,, •o _ /;; AND EXCAVATION 74 198234 GEORGE BENNETT ALLEN 2552 LINCOLNTON HWY ° >\ M / r CHERRYVILLE, NC 28021 J I l 6 �\ \ PO Box 32s �� -- o o j' - 1835ST MARKS CH RD 75 199245 GROVER BRADFORD HAY < o '\ PROPOSEDBERM - 0T( i, I 15 157990 MICHAEL CARL & GAIL COOK BRACKETi KINGS MOUNTAIN, NC 28086 Q - - --- \\ - _ I' // __4 _ `� \ \.. _ FOR DRAINAGE AREAS SEE SHEET 8 OF 34 GROUSE, NC 28033 111 OAKLEY LN o ---- - --- / _ -` ---___ / \ , 4 t: .. , // / _ `, ( ) EAST PIT / 1843 ST MARKS CH RD 76 200341 LEIGH ANN CARPENTER PRUITi �� *- _ O \ -,'' ' / ' ' 1 ! SEE APPENDIX D - \\ - - - *, -� 16 157993 JOHN B HOLLAND CHERRYVILLE, NC 28021 y ' GROUSE, NC 28033 - o __ i \ \ \ _ a i \ . \.. , / O 1 17 15BO26 TRUTH AND TRUTH BAPTIST CHURCH GROUSE, NC 28033 1823 ST MARKS CHURCH RE)\ ADJACENT PROPERTY LINE LINCOLNTON, NC 28093 2724 LOCO NTBOX ON HWY 77 200506 CARLOS A & SUSAN D TRAVERIA 1821 SAINT MARKS CHURCH \ ,� / , � 'I _ -___-» \ - - -- ,` -,'- +0/ / - „� - , 15 18 158031 JOHNNY S & TONYA DENIE WRIGHT 78 202854 NANCY CSOKA ROAD ' ' ADJACENT PROPERTY OWNER CHERRYVILLE NC 28021USE, NC 28033 (' o I � '' .. 1 19 158033 VANCE ALLEN KIRBY & DEBRA S 312 HEPHZIBAH CHURCH RD 1314 SRT MARKS CHURCH RD /,� ---___�-_ I \� i \� i�- '"" =� �'` / a+ `\ 1, " �/ I �' / E �0 DIRECTION OF SURFACE FLOW KEMPSTON RPO BOX11698 79 205244 TAD F & EVA S TILLMAN ° O `�, \ � \ / �i,' .1 �� 000 GROUSE, NC 28033 20 158035 TRUTH AND TRUTH BAPTIST CHURCH 1314 ST MARKS CHURCH RD - , _ FLUME LINCOLNTOX NC 28093 80 205453 TAD F & EVA S TILLMAN I \ \ \ ( 1 P O BOX 30008 GROUSE, NC CDT R ° '' \ \ \ t \ \ `� - ;� .� ; �/ I _- __ _ __ _ i\ , II .:� - 21 158049 TRI COUNTY FARM SUPPLY INC PRO 925 ADERHOLDT RD - -, \ O D - e , - --` -- _ • !' / CHARLESTON, 45 29417 81 206528 LINDA FRIDAY &JAMES BAXTER III BENNETT , _ \ - -- 1-----------1 PO BOX 2450 LINCOLNTON, NC 28092 O p ti � �> � t + 1� 1 - , - UNDERDRAIN 22 158058 PRO REAL ESTATE LLC /�y \ -� -- PAWCAH KY 42002 82 206529 LINDA FRIDAY &JAMES BAMER III BENNETT 925 ADERHOLDT RD � / , \ � �I // � - 0 . , �� � \ �_____..___. _+ UNCOLNTON, NC 28092 1 I I ( I t , \ S)''%�%- `..1 23 158060 J C& SHEILA DREWERY P O BOX 1276 830 LINDA LN r \ i \ J % I" \ \�--•-= ' / ' i j I - ® - -- _ --- p LINCOLNTON, NC 28092 83 207977 5 PINES FARM LLC CHARLOTTE, NC 28211 - UD-2 UNDERDRAIN LABEL 419 HEPHZIBAH CHURCH RD J I / � _ _ ` i . - 24 158062 LEE THOMAS CLINE BENJAMIN LEWIS & TRACIE KENNEDY 1817 ST MARKS CHURCH RD i-/ I I -- - / _ l DRAINAGE DITCH i v i � ppp���p GROUSE NC 28033 84 209200 -O� DUNIVAN GROUSE, NC 28033 \ 412 HEPHZIBAH CHURCH RD I 1 \\_ - --- p _- 54 p / /' 25 158063 DEANA G JONES PO E, X C 28 GROUSE NC 28033 85 209893 ROBERTJJR& MICHELLE M HASENAUER /1 nL \ �% 1 I / / \� O 530 HEPHZIBAH CHURCH RD GROUSE, NC 28033 r I' 26 158071 MYRA PRUETT HOWELL 3638 N HIGHWAY 16 `` � ---- --_ _/" - - 54 ��� � / !�. � ,'! I� GROUSE, NC 28033 86 210224 HAWKINS FARMS LLC �, / � \ � � - � L ) o � /� o \ \^ \ / 7 ° <% CULVERT DENVER NC28037 If - f l ° 27 158073 DAVID DEAN SMITH 1040 BAKERS SPRING LN SCHARLFIVE OTTErNC 28246 �"� - \ 0 ,/, �,, � -_ ---- lye _ - ' ' - ) �' �"` l,�_) 1 �-+ GROUSE, NC 28033 87 212611 SOUTHERN GAINES LLc /.'' \ MINE PIT NSTRUCTION SEQUENCE , / t'� '"; C-12 CULVERT LABEL PO BOX 1569 _ _ __ 28 15BO75 RUTHERFORD ELECTRIC MEM CORP 920 HEPHZIBAH CHURCH RD ''I �' \`.,� �_ ^" SEE NOTES C'1 %t ' I « N - /\ C+ FOREST GIN, NC 28043 88 212612 PONDEROSA E & ERIC E CUTSHAW 033 o 1 / /------- _ - - ,, - / \ ° Q \, o J B-4 SEDIMENT BASIN LABEL 7929 NUNTr ROAD 219ACROUSEED -. - - /' _ - ,c 29 158076 MICHAEL E & TA MARA K COOL 1314 EAST N, N STREET [ % ! yam' `-`q<\ � / � 1030 BAKERS SOH PRING LN CELINA,22 89 212613 GILBERT DEWAR B O419 E 73RD8T C 11 \ °` o� �o l _- - 1" -'-" 0 112 , "< - \ k ° I _ �, ° S_._ ST-11 SEDIMENT TRAP LABEL 30 158077 CALVIN SHAW 2419E 73RD ST -, ..\ o ,, ,; _k-,......- - Y ` ° ', / -' o BROOKLYN, M/ 11234 J \ ` - �l ` ° /----..- l (-�-- 31 159098 MICHAEL N BEAM TRUST 8C CONCORD, ST 80CROUSE, NC 2 90 212614 ZOYASOUTHERN GAINES 5�RLIIVE KNOLLSDR6 O / I \ - �� -c I - _ O O ° �®., � _ ! o.'�, CONCORD, NC 28025 91 212615 SOUhiERN GAINES LLC / 11 � '�� ; / - �� �-��` \ � `' FLOW DIRECTION ARROW 32 159109 CATHI ELAINE F PUTNAM 4505 COVE 5577 FIVE KNOLLS DR \ �\_-' o - / WILMINGTON NC 28405 92 212616 SOUTHERN GAINES LLC � ��- � - --' ' !' � � �/' ��/ ` -- CHARLOTTE, NC 28226 - - _ � '' � T ,c �52 EROSION AND SEDIMENT 33 159118 R-ANELLHOUSING GROUP LLC CHERRWBILOLE,INC28021 93 212617 SOUTHERN GAINES LLC 5577 FIVE KNOLLS DR a� -� c ° �_ ©- ( ® ;l / '� / CONTROL STRUCTURE PO ILLS,BOX N 3 NOTES: A, _ - ..,. ; , i --_-`/ \/ 34 159119 R-ANELL HOUSING GROUP LLC 1203 ST MARKS CHURCH RD q P 9 stripping - 'c 0 r CHERRYVILLE, NC 28021 94 214150 ST MARKS EVANGELICAL LUTE CH CHARLOTTE, NC 28226" o J A ,/ 4 - - O CHERRYVILLE, C 2ao21 1. Sequence of d clearing to include stri in of East Pit, South Pit, West Pit, and North ,, y Q,� v, z15 A OUSE,THONy GROVE RD c RD Pit. Sediment/Erosion control for pit clearing stages to involve placement of super silt PROPERTY CORNER COORDINATES I,NA I ES � � V �� GAJTO N COUNTY PARCEL LINES 35 159121 CHARLES EWVARD BUSH 970 HEPI-IZIBAH GROUSE, NC28033 95 215159 STAGY LEANNE REEVES GROUSE, N ,c U ASTINGS D. 36 159122 LINDA B BEAM AMND RSTD REV TR 868 CHURCH ST N FL 2 fence (Steel piles) in downSlOpe areas Of pits. ' _� " \-,,.� i " 11 ,, �� O ! CLO ED MINE PERMIT C R A I T LINE 972 HEPH➢BAH' UR O Ref ID Northing Eastin Ref ID Northing Eastin Ref ID N rthin Eastin - - C l Vl CONCORD, NC 28025 g6 215160 JEFFREY M & LISA K REYNOLDS 2. Disturbed ground during bridge construction, through the use of Best Management _ 8 B _ B g ._ B g I I � ,;-p� 868 CHURCH ST N FL 2 GROUSE C 280 a_`-` PC1 6037403636 1310415.0679 PC40 607962.5264 1309110.5044 P - / ' _ " (�_ 37 159123 LINDA B BEAM AMND RSTD REV TR Practices (BMP) (e.g. sediment fences, erosion control structures, diversion ditches, silt ,, 7723.3766 13 19.0155 , ---- , - i p , o .4R_1 /, _ !� ` W 25 FT MINE PERMIT BUFFER CONCORD, NC 28025 b LO ING GATE d 3n AD oLor RD fence, and reve elation measures runoff will be intercepted before it is able to reach ° o y I --- o 9711 228TH PLACE SW 97 216652 RANDY CHARLES HASTINGS 9 �+ P / - - - 38 159126 CHARLES EDWARD GILLESPIE BESSEM ITY, INC 28016 the creek. Sediment geld from disturbed areas will be managed b Sediment control "' _ r - ' / ,-�__ . _. 'v- ,, � / -� ' 1 00 FT LOT BUFFER 325 A CLOT RD 1 __ 9 \ / O O EDMNCS, WA 98020 Y 9 Y 9 1706 ST MARKS CHURCH RD 9e 216654 CATHY H HOUSER structures and temporary and permanent vegetation. Drainage control structures along - - BESSEM CITY, NC P ry P 9 9 9 � � �`"' _ �" --- n _ I 39 159136 RICHARD JAMES KISER � ' i � l �--� � _.. ______ - CROUSE, NC 28033 256 FOREST DELLINGER RD with the contemporaneous regrading and revegetatlon of disturbed areas are expected - i 1 - o . \, - �-- .� "- 1 .I ,, �J =c 200 FT STRUCTURES BUFFER 1705 SAINT MARKS CHURCH RD 99 217859 RONNIE J & SUSAN E SUMMEY C6 605223-8678 1308349.2823 PC45 606948.0724 1310396.0706 PC84 505777.5321 1315319. I-1 � 'E A ---- '- - n -- 40 159137 PAMELA J WRSA BESSEMER CITY, NC 28016 to prevent the contnbu4ons of suspended solids. All disturbed areas wl,l be seeded as o�. - .i "^ GROUSE, NC 28033 256 FOREST DELLINGER RD 7 605343A776 1308281.8701 PC46 606152.0858 1310652.1842 PC85 1 605750.2569 1315370.2955 \ --- ` t -" // " - - --- - `,. ' LJ , - 300 FT RESIDENTIAL BUFFER 100 217863 RONNIE J & SUSAN E SUMMEY quickly as possible. Once the bridge construction is completed, disturbed areas will be ^ - �- I 1527 SAINT MARKS CHURCH RD BESSEMER CITY, NC 28016 P 605651.6ass 1308483.5347 PC47 604661.6678 1310487.4329 PC86 !, 6066J8:0p56 13163 .4751 ,� s ` 40 FT PLANTING BUFFER 41 159143 KIM M HENLEY 1805 HEPHZIBAH CHURCH RD reclaimed t0 further minimize runoff. %I 606395.7595 Z3i 82.6530 �, '// / _ \� -t- CROUSE, NC 28033 101 218014 RUBY STROUP LINEBERGER PC9 605831.6586 1308247.3032 PC48 604296.8749 1310594.7729 PC87 ° ' - - BESSEMER CITY, NC 28016 3. Erosion and sediment control during fence installation will include BMPs as discussed in 116 PC10 605744.3812 1307874.6071 PC49 609496.7527 1314868.4753 PC88 605979.6954 1316181.72 ✓ _ ___ __ __ _ 743 ST MARKS CHURCH RD 170 FOREST DELLINGER RD �j ` 42 159146 TONY SCOTT & MARLA M CODY BESSEMER GIN, NC 28016 102 218217 TIMOTHY E CRUNKLETON Note 2 above. No trees will be cut where security fencing is installed within stream - •._ - / ---1 - - ®� - - I FT. DELINEATEDSTREAM BUFFER BESSEMER GIN, NC 28016 PC11 605933.1164 1307111.0296 PC50 61OD3Q6069 1315545.5586 PC89 ' 6D5589.9180 -----3.--- ° , \ 30 43 159147 KAY C & THOMAS L FINGER 57 CEDAR ILLS, HILL DR buffer zones. '-- 103 218216 CHRISTOPHERWLOEHR 150FORESTDELLINGERRD PC12 60-Z6.2183 1307559.4168PC51 607971.74rA 1317418.7399PC90 / 606047.1556 1316962.6493 ° �• H AH CHURCH RD. j A36 HEPHZIBAH LE, AH CH R BESSEMER CITY, NC 28016 4. As soon as practicable after construction Of sediment basins, haul roads, sediment / PC13 06999.8292 1306984.3300 PC52 607848. 31 1317313.5643 PC91 � 606106.2673 1316912.2836 _ I --' J 44 159153 DANNY & BEVERLY LEWALLEN 1136 HEPHZIBAH CH RD 103 WILL KISER RD traps, and/Or any side slopes Controlled by super silt fence, the side slopes will be ---- '-'- --- - - C� E (PRIVATE EMS o -�" CROUSE, NC 28033 104 220919 EDWIN R STEWART PC14 6999-8292 1305582.8541 PC53 607575.7499 13 7543-5878 PC92' 606499.8538 1317337-4337 - / � - 0 - azousE, Nczao33-=-___ `- °X � � S UTHERN ENNCE) 64 1, ,. 6 I 217 DELVIEW DR 3848 GROUSE SCHOOL RD ° immediately stabilized, seeded and mulched with matting being installed on slopes PC15 6 833.4991 1306401.1570 PC54 606766.7443 1 39.4048 PC93 606384.8632 1317438.2878 `p ro 45 159184 STEPHENTIMOTHYJONES CHERRYVILLE, NC28021 105 220920 GAR -MAC DAIRY INC CROUSE,NC28033 steeper than3:1. PC16 60749.5047 1305313.SS60PC55 606599.57 "T1 6854PC94 606958.3168 1318064.3909 1 ' �_-- �'\ i" --�\ - c`� AERIAL TOPOGRAPHY = 2 FT. CONTOURS 1131 HEPHZIBAH CHURCH RD 761 ADERHOLT RD 5. The Carolina Lithium PfO eCt is coin 08ed Of the follOwin : Concentrate O eratiOnB ; , a, // o • - - ! ° \" � �"+. ,�,, ?; � ` 1 P 9 P 46 159192 GARY E & DELTA B SHEALY 106 223135 SUSAN M BUCHANAN PC17 6085 .4fi43 1305142.7999 PC56 60 .8765 1316735. ,� PC95 607113.3739 1317936.1995 ,I g6�' , _ ,I p �-- CROUSE, NC28033 LINCOLNTON, NC28 ,, includes Piedmont Lithium Carolinas Mine #1, Concentrate Plant, and Industrial PC18 6083 2668 1305604.7127 PC57 5363.1185 1315130.594 96 607951.9506 1318627.3687 �/ / ! , , -li CKING GA ' O I- .. o AERIAL MAPPING DATED JAN UARY 2021 47 159205 PHILLIP B WRIGHT &OTHERS & MARY BETH 166 TRYN SCHOOL LOOP RD 107 224399 HERMAN DENNIS KISER 752 HEPHZI CHUR RD Minerals Plant. The Lithium Hydroxide Conversion Plant includes the Lithium 0 ,' �.O \ Y PC19 608717 1322 1305573.5353 PC58 605547.0316 1314695.5144 P 606028.5093 1320335.2738 - WFRONEBERGER BESSEMER GIN, NC 280,E cRousE,Nc2803�} / ; ,� ,/ /,. - �' Oo: �''� �`ml;,,l ;; -; 101 7/// • ,,� \ AND PROVIDED BY PIEDMONT LITHIUM CAROLINAS INC. 105 CENTRAL PIE 861 HEPHZIBAH CHURI; RD . Hydroxide Conversion Plant. Pc2o 6092 5350 1306632.1181 PC59 606139.5819 1314426. C98` 605618.1348 1320058.4755 -III NEAREST OCCUPIED i 48 159206 JEANETTE B MAUNEY LIFE ESTATE SHELBY, NC 28152 108 224400 WANDA KISER HUFFSTETLER ROUSE, NC 28033 PC21 61038 .6731 1307361.3700 PC60 605155.2111 1314033-1384 PC99 6D5443.3913 1320313.9904 � ° _ _ ' ° �, _// ° ° WELLING /,' 663 ADERHOLDT RD 100 ANTHONY GROVE RD CATEGORY AFFECTED ACREAGE PC22 61034 .17291307484.2867 PC61 604959.1266 1314541.0902 PC100 605735.2241 1321067.5709 I ° I 1 0& O ® • 378 ft. 49 159592 RONALETGRIG MAUNEY 109 225126 ANTHONY GROVE BAPTIST CHURCH o � 1/1111111 LINCOLNTON, NC2&192 GROUSE, NG�8033 10 PO BOX 431 PC23 61 .8772 1307402.5159 PC62 605410.2139 1314786.7432 PC101 - 604692.1602 1321388.7153 •�- ¢.,� , °_: � °� '� 50 159592 MARGARETGRIGGHASTINGS CHERRYVILLE,NC28021 110 226549 KIMMHENLEY 1527SAINT MARKS CHURL6RD PC24 10123.3705 1307580.4673PC63 605292.2246 1315113.4634PC10 609427.1512 1321272.8169 o �' � _ ° � ° ° / ° C - r-- ° I hereby certify that this document was ♦♦♦,< CAQ � ".'� GROUSE, NC28033 Tailings/Sediment Ponds 20 ACRES -o %/ a , r 429 ADERHOLDT RD P 609661.1309 1307608.6788 PC64 604356.8263 1315001.224E PC10 - 603668.7328 1321384.4971 4 1 / # , _ ----- d • ° prepared by me or Linder my direct personal �♦ Q�`�. � • � � � . � O /� 51 159598 RYAN W FRANK & EMILIE E NELSON UNCOLNTON, NC28092 47 HERITAGE LN p Waste Iles Waste Rock Pile 119 ACRES PC26 609592-D52D 1307253.0139 PC65 604287.5288 1314500, PC104 02264.9476 1320742.3967 , TTTT \ rO 111 300506 SONYA G WESTER & ANNE G WHISNANT p ( ) 1LJ° 0 p� a -- i� , GS _ 52 159599 BRENDASLAUER 125HASTI' RD SHELB� 28151 PC27 609050.4235 1307520.9093PC66 603875.4690 1114602.2967PC105 2237.8298 1320979.3407 '/ ---- II -o - e.7 � Y supervision and is correct to the best of my •••�� �� 2 _ AERIAL VIEW BESSEMER CITY, NC 28016 P ox4a, Processing Area/Haul Roads 137 ACRES - 1 - 1 , ti �• 112 302337 R LOCKE BELL PC28 609053.5495 1307804.2454 PC67 604121.7463 1314015.0692 PC106 6 780.0942 1320782.5947 / s/n 53 159621 MELISSA ANN JONES 28T5SYORK 80 GST MARK C URC �, • - p� 1 II knowledge and belief and that I am a dLll\/ : Q� ��•� : GASTONW, NC 28052 BENJAMIN LEWIS & TRACIE KENNEDY 1817 ST MARKS CHURCH RD Mine Excavation (Pits) 403 ACRES PC29 608456.6783 1307542.7916 PC68 602379.0946 1312053.2785 PC107 60 S3.Sfi06 1320824.4247 0 '" , � _, J C SEAL 1507 PINEHURST DR 113 303909 DUNIVAN CROU-�.,�1yy''C 28033 PC30 608468.4437 1308618.4659 PC69 602336.2913 1311551.3445 PC108 600kl,..3961 1320369.9361 - sS. F U O / �J licensed Professional Engineer under the J A 54 159623 ELIZABETH WHITESIDES-�4,3''° AncillaryMaintenance Yard and Magazine) 19 ACRES ° 0 ;.. : ; o 'I g _ _ HIGH POINT, -A E DR TBO INVESTORS C/o GWENDOLYN 3365 ROUND HILL ROAD ( g ) PC31 608427.9858 1308613.8189 PC70 603527.9316 1311452.---_ P ____ 6002 .4369 13202_6.7--- I- _ 55 159628 VERNAJMCLAMB 1514RWMCLAMBDR 114 304327 OUELLETTE SOMERVILLE, NJ 88763 PC32 608436.7499 1309407.5066PC71 603248.5391 1310942.5718PC110 59881.215 1319682.5632 R g d 9 laws of the St/�''t,//yp� of I fo h/��'..;{/((/(/]yy,/A'rolina. ��,- .� 048820A �� O 600 1200 1 Q00 GROUSE, NC 28033 1821 TNT MARKS CHURCH Temporary Stockpiles (Topsoil Storage Pile) 21 ACRES PC33 609074.6400 1309513.5507 PC72 603182.4979 1309947.0692 PClll 599665. 10 1317500.2312 `�..� * ` U 4 I J�t`��V"� ,�•.��y^ `- a• �� v 1506 R W MCLAMB DR 115 304328 NANCY CSOKA ROAD o A' 56 159634 MARVIN D & CYNTHIA M HYLEMAN PC34 609085.5054 1309591.2464 PC73 50365Q1771 1310438.6614 PC112 600640. 1 1318020.8608 0 O I " V N�� • ` CROUSE, NC 28033 OUSE, NC28033 \ / / / L7 N DOl1GLAS SCOTT 8 MELISSA SHAUN 1515 R W MCLAMB DR JHR RBA DR PC35 608384.6086 1309605.4770 PC74 604304.4117 13106542955 PC113 603133. 1315311.7510 " "�,,`.//11 / \ (Signature) % 57 159635 116 304499 GARY DON QUEEN & JOHN MARK FURROW O,- / ° � 11") - } ° o ( g � ° ' r ... • ���� MILLER CROUSE, NC 28033 LE, 28021 PC3_-----.7362 1309510.6022 PC75 604659.0530 1310548.6060 PC114 6 20.8438 -149.7824 • , 1203 ST MARKS CHURCH RD W D RD %�� Total Disturbed Acreage 719 ACRES ° ,. '. 0 . , � = ' -� o° � % Date: Augus 3Q 2021 �i F � �I`,� ♦♦ 58 159645 STMARKSLUTHERANCHURCH CHERRYVILLE, NC28021 117 305079 MICHAELJASON&PAIGEFREEMANODOM PC37 608033.3809 1309528.3902PC76 W5740.580D 1310646.7581 115 6 00 "94 131 33 �,. ., _ y/.oOO ",°" - ° - o �I�'•Y B Vy````�� ��- -AS,NC28034 II / SCALE 1 -600 1527 ST MARKS CHURCH RD WOOD RD Total Permit Acreage 1 ,548 ACRES PC35 608030.6926 1309779.9465 PC77 608646.2137 1312689.2966 PC116 ° 39.6009 1315186.6 a ° o / - - :�11 / 1 1 1 1 1 1 l 1 59 159W RICKY D HENLEY &OTHERS 118 305080 JOHN FREEMAN g PC39 607983.8856 1309782,9442 PC78 t0703&7864 1312396.5252 1 Y/" PC2 604666.2331 1310395.2074 PCA1 607469.9083 1309054.9010 P 80� 1.1300 131 64.6250 PC3 604709.2255 1309658.2253 PC42 606143.9257 1309284.1384 PCS \\ 6 9G7.9145 1314542.8385 PC4 604420.9629 1309678.5133 PC43 606437.4943 1309955.2598 PC>} T� 7974.9758 1315621.3553 PCS 605065.4610 1308262.9029 PC44 606776.3969 1309918.3238 PC83', '�� 606747.3930 1316296.6733 D- Z Q - o w � � � = Z 0 0 � � t) ow � Z fn p W 6 LJ � U .. O U LLI J � Z la Z J C 0 W za U O = Q < Q III a- (.) 0 z � a 2 - Q M >- 2 2 2 Z W Z M M L) U) a F- Z Z `W 1 O � CO c C/ LU IL SHEET NUMBER 1 OF 2 Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Appendix C — Mine Water Balance Appendix C — Mine Water Balance Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Appendix C — Mine Water Balance This page intentionally left blank. PIEDAAONT ImrrIlllol►vil Water Balance Flow Chart 115 aam (165.6k Waste ock Stockpile 50 gpm (72k gpd) Wastewater Effluent Discharge 150 gpm (216k gpd) Wastewater Effluent Treatment System I 4 gpm J (5.8k gpd) CL Im Y to E Ln N C Concentrator Plant Waste Water Pump Station Potable Water Demand 2.5 gpm (3.6k gpd) Freshwater Demand 150 gpm (216k gpd) Wastewater Effluent _ (option) Fire Water 1 Single Fill of 90k gal Sewer Water Discharge 1.5 gpm (2.2k gpd) Fire Stream and Wetlands Conversion Plant Single Fill of 90k gal Water Intake (Temporary/ Emergency) Total Freshwater Demand 240 gpm (345.6k gpd) Concentrator Plant + Mining In -Pit Crushing and Belt Dust Control 60 gpm (86.4k gpd) Road Dust Control 30 gpm (43.2k gpd) -------------------------------------------------------------- Total Mining 90 gpm (129.6k gpd) f Potable Water Demand 1.5 gpm (2.2k gpd) Sewer Water Dis, 2 gpm (2.9k g Municipal Demand 300 gpm (432k gpd) e Freshwater Discharge avg. Discharge = 1060 gpm (1526.4k gpd) min. Discharge = 360 gpm (518.4k gpd) max. Discharge = 2060 gpm (2966.4k gpd) Pit Discharge Ponds Pits IFreshwater Inflow avg. Inflow = 1300 gpm (1872k gpd) min. Inflow = 600 gpm (864k gpd) max. Inflow = 2300 gpm (3312k gpd) I L _ As Required Potable Water Demand 4 gpm (5.8k gpd) + 180k gal Fire Water Note: Difference between freshwater demand in and wastewater out is water loss due to evaporation, water loss to tailings, and instantaneous demand for feed process requirements. Mining Personnel Municipal Water Supply (Potable) [Total Required 306 gpm (441k gpd) + 180k gal Fire Water] Potable Water Demand 2 gpm (2.9k gpd) Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Appendix D — Monitoring Well Layout Appendix D — Monitoring Well Layout Piedmont Lithium, Inc. I Pumping and Operations Maintenance Plan ��� Appendix D — Monitoring Well Layout This page intentionally left blank. AVIV r r.J y A tC`�`' v � I i yephn r _pow T •t , ' li �. ..10 1 � i % to I.Ak 0BA4A401 t OB-15 0� OB-1 7r�0 t - >1 O ' i4- a ,.4'OB-17 Anthony Grove ,R cf. Legend ,^� • - Uare Rati. Mine Permit Observation Surface Water 5 � Flow Monitoring LocationsDelineated Streams Delineated Ponds -• • +Yy D- D �!i�Sp�F 11 •••• Qo mil ', 1 1 cr