Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC216440_ESC Approval Submitted_20211122
ft THECITYOF ASHEVILLE LETTER OF APPROVAL 10/26/2021 William Chambers C&B Toothland of Overlook Extension 10B Yorkshire Street Asheville, NC 28803 RE: Project Name: C&B Toothland Address: 403 Overlook Road Extension City: Asheville County: Buncombe Date Received: 9/16/2021 River Basin: French Broad Dear William Chambers and Clay Mooney, PE City of Asheville Development Services Department Site Engineering Division P.O Box 7148 Asheville, NC 28802 Phone: 828-259-5670 www.ashevillenc.gov Permit Number: 21-07117PZ PIN: 964469731700000 CiviclD: Acres Approved: 1.05 Plan Type: Digital River Classification: B The Development Services Department Site Engineering Division has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. This plan shall expire one (1) year from the date of approval, as required by the City of Asheville Unified Development Ordinance Section 7-12-2(c)(2)f. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette. lucas(a)ncdenr.gov or Paul Clark at Paul. clark(a)ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. A pre -construction meeting is required to be scheduled with the City of Asheville, at which your permits will be issued. Please bring a copy of the NCDEQ Certificate of Coverage and shop drawings to the pre -construction meeting. Contact Nancy watford at NWatford(a)ashevillenc.gov to schedule your pre -construction meeting. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Project Description: Design Professional: Clay Mooney, PE Phone: (828) 277-7410 Floodplain: N/A Flood Permit N/A Number: Description of Work: This parcel is currently in the planning stages to be developed as a medical office building. At this time we are only seeking minimal zoning and rough grading approval. An agreement between this parcels owner and the owner/developer of the adjacent development Julian Woods has been agreed to whereby the site clearing, grading, storm water and utility connections will be done by the contractor of the Julian Woods project. A copy of that signed agreement as well as copies of the Erosion and Sediment Control Plans as prepared by Bowman Consulting Group, which show and note that this project site has been accounted for in their runoff and basin sizing calculations. Plan Reviewer Permits Requested Approval Date Expiration Date Thana Alley Grading 10/26/2021 10/26/2022 Inspector Larry Williams Phone (828) 782-0382 Erosion & Sediment Control / Grading Permit Conditions: 1. The following documentation be kept on file at the job site: a. City of Asheville Permit b. The approved E&SC plan as well as any approved deviation. c. The NCG01 permit and the Certificate of Coverage. d. Records of inspections made during the previous 30 days. e. Records of third party inspections. Per Title 15A NCAC 413 .0118(a), City of Asheville UDO, and the NCG01 permit. 2. Site must stay in compliance with all federal, state and local regulations. Failure to maintain compliance for any of the agency's stated above may result in issuance of a Notice of Violation against the project or revocation of the Grading Permit. 3. If any of the minimum best management practices fail to adequately keep sedimentation or stormwater on the site, it shall be the responsibility of the professional designer of record to supply the Contractor/Owner with a correction, as well as submit correction to the Development Services Department for approval. 4. For sites with greater than 25,000 square feet of disturbance, a contract is required between the person financially responsible and a licensed professional for the initial inspection ensuring erosion and sediment control measures have been installed consistent with the approved plan. A notarized certificate of inspection agreement on a form has been received and approved by 2 the Stormwater administrator and a copy is included as part of this grading and stormwater permit is issued. a. The initial and signed inspection report must be filed with the DSD Site Engineering Division prior to the commencement of any land disturbing activity. b. A licensed professional shall conduct weekly inspections for all sites where Hillside, Steep Slope and/or Mountain Top Protection regulations apply and bi-weekly for all other sites. c. All weekly inspections and bi-weekly inspections must be kept on inspection logs and retained at the site. 5. For constructed slopes with a grade of 50% (2:1) and greater than five feet in height, inspection and submittal of a Slope Stability Certificate are required by a North Carolina registered professional engineer with geotechnical expertise sufficient to perform the inspection and stability analysis. 6. Please note that Temporary Ground Cover must be established, prior to release of grading approval for issuance of a Temporary Certificate of Occupancy. Permanent Ground Cover must be established, prior to grading approval for the issuance of a Certificate of Occupancy. 7. Contractor must provide proof of active grading permits for any offsite borrow or waste areas. 8. Inspection request should be called into 828-259-5946, or can be scheduled via web at www.develop.ashevillenc.gov 9. Grading Permit expires in one (1) year from date of permit issuance. A one-time, one-year extension can be granted. Please drop off or mail the extension application form at the Permit Application Center, 161 S. Charlotte Street, Asheville NC 28801, within 60 days prior to permit expiration. See Permit for additional Stormwater, Flood and Grading Conditions. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Sincerely, Thana Alley, CFM Plan Reviewer Development Services Department Site Engineering Division 3 PROJECT SUMMARY VICINITY MAP GROUND CO\/ER GRADING GUT 4 FILL 1/OLUMES NOTES: SEDIMENT CONTROL SITE WORK SEQUENCE PIN NUMBERS: All perimeter dikes, swales, ditches, perimeter slopes and Approximate Gut = 466 GY +/- I. Gontroctor responsible for erosion control of off -site borrow NOTE: Gontractor may request minor modifications which will facilitate g644-ba-7317 OWNER /CONTACT: all slopes steeper than 3:1 shall be- provided temporary Approximate Fill = 4,470 GY +/- pits 4 disposal areas unless released of responsibility by work without sacrificing erosion control and sediment control G$B TOOTHLAND OF cover or permanent stabilization with ground cover as soon These calculations are approximate and do not owner. 1. OVERLOOK EXT LLG as practicable but in any event within 7 calendar days from reflect stripping and or compaction rates. 2. A location and copies of grading permit for any offsite waste 1.1. Install temporary mud mat construction entrance PROJECT ADDRE-55: IOB Yorkshire Street the last land -disturbing activity. All other disturbed areas Gontroctors should not use these volumes when or borrow sites must be provided to the City of Asheville 1.2. Install temporary silt fence as indicated 403 Overlook Road Extension Asheville, NG 28803 shall be provided temporary cover or permanent bidding the project. The intent of the project is to Stormwater Services Division, Design Associates and Owners 1.3. Install temporary sediment basin Asheville, NG stabilization with ground cover as soon as practicable but in balance the grading volumes on site. If required, the 3. Grass all areas not paved, built upon or landscaped LANDSCAPE ARCHITECT: any event within 14 calendar days from the last contractor is responsible for obtaining the proper 4. Water site to control dust during periods of dry weather. 2. Mr. Glay Mooney land -disturbing activity. permits and performing erosion control for any off 5. project will be completed in one phase with and estimated 2.1. Glear and grub site within construction area PROJECT INFORMATION: Design Associates site borrow pits $ disposal areas unless released of construction period of 3 months from the issuance of a 2.2. Install diversion ditches and begin earthwork Current Zoning = GBII 12G3 Hendersonville Rd. CONDITIONS: responsibility by owner. grading permit 2.3. Install storm water system Asheville, NG 28803 • Extensions of time ma be a roved b the ermittin 6. Compaction reports must be provided to the Gity of Asheville 2.4. Install inlet protection measures Sp6ngslde Rd, 0 SITE Overlook Rd Ext, y pp y r- g Proposed Use = Medical Office (628) 277-7410 / 277-7413 fax authority based on weather or other site -specific Stormwater Services Division that fill has been has been conditions that make compliance impracticable. compacted to not less than a5% maximum density (Standard 3. 3.1. As earthwork progresses, adjust diversions to fit changed Total Size of Property = O.GBa Al +/- • All slopes 50' in length or greater shall apply the Procter) p g � g ground cover within 7 days except when the slope is 7. All fill slopes shall be compacted full depth to not less than slope conditions Disturbed Area = 46,123 SF / 1.05 AG flatter than 4:1. a3.2. At the end of each work daily, percent maximum density (Standard Proctor), shall be y, construct earthen berms and • Slopes less than 50' shall apply cover within 14 days laced on a surface cleared of rowth and debris, and be temporary diversions ditches to direct runoff into the proper p pp y y p g erosion control measure or device as indicated on the PRE -DEVELOPMENT IMPERVIOUS AREA = 0.082 ACRES / 8% OF SITE AREA except when slopes steeper than 3:1, the 7 day properly benched and drained. PRE -DEVELOPMENT PERVIOUS AREA = OAO8 ACRES / a2% OF THE SITE AREA requirement applies. 8. Acceptable fill material shall be free of organic- or other drawing. q' pp p g 3.3. maintain temporary silt fence, silt its and basins b cleaning POST -DEVELOPMENT IMPERVIOUS AREA: 0.000 ACRES / O% OF THE SITE AREA • Any sloped area flatter that 4:1 shall be exempt from degradable materials, masonry, concrete and brick in sizes p y p y g POST -DEVELOPMENT PERVIOUS AREA.- O.Ci8ci ACRES / 100% OF THE SITE AREA the 7 day ground cover requirement. exceeding 12 inches, and any materials that would cause the out when 1v2 full. • Although stabilization is usually specified as ground site to be regulated as a landfill by the state of North SOIL TYPES: cover, other methods, such as chemical stabilization may Carolina. 4. GkG2 Clifton cloyloam, 8 to 15 percent slopes, moderately eroded be allowed on a case b case basis. 4.1. Begin establishment of temporary vegetative cover in finished y GkD2 Clifton clayloam IS to 30 percent slopes, moderatelyeroded • For portions of projects within the Sediment Gontrol graded areas p p p P J � "High Quality Water Zone" (ISA NGAG rcent UhE Udorthents-Urban land complex, 2 to 50 eslopes Commission -defined 4.2. Remove silt fence and complete fine grading 3i' .� __. 04A. 0105), stabilization with round cover shall be / 4.3. Complete permanent vegetative cover. gZ� /nvert ou Permit Application Number = TDB achieved as soon as practicable but in any event on all ��� areas of the site within 7 calendar days from the last , �, ; 11 6.2 C land disturbing act. _ Q \e�'3 - -1 _ _ 78 rem • Portions of a site that are lower in elevation than J _ -` ' ^- J - #` --- - j adjacent discharge locations during construction may be -016' s7 Fef w s• exempt from the gtemporary ground cover requirementsif LONG SHOALS ROAD , l identified on the approved Erosion 4 Sediment Gontrol !-- _� - - s%� `��- �1 RIGHT OF WAY VARIES \ SW \ / Plan or added by h e permitting authority. - NG � , \. ° o ODI ED M E RY/ v TEMPORARY SEEDING : ' a`�` �4-- , \ _ - D e P o�tn iE^ a�na t isr�-- , Z / - \ / -D C/ GRAPHIC kALE N o Temporary Seeding is the use of rapid growing annual l`` r0) A '�� Q-- _ DedTk-Einkp35i�,tEt r,491 �J � / N o rases, small rains or le umes to provide. initial Q� ` "L_I'ne=22126 1°=10 _ �� _ O g g g p Deed Book 3573 Page _ 2 2 7 4, in=-22(3f 0 V) temporary cover for erosion control on disturbed areas ' - - - g I 1 p y ( �o- Invert in=2199 3 - - - r' - - - - - - Flo I I for less than twelve (12) months. Seed bed preparations O O S \ In out-2199.J' ; - - _ Invert I 1 and soil amendments shall be in accordance with the �` S�� �-- %'�� _ 1�1 1. / I I 11 11 art • - I methods described under SEEDING AND MULGHIN6. ` / - - - - In - I �PV r1�jQc ' - MH#32-28741 - 1 _ _ _ \ ` conc. sN \ - t I I o� _ - - _ PERMANENT GROUND COVER: \ - _ - �- ��Q1��INE s o - TS -t- - After construction is complete, all disturbed areas shall �I� - - \ \ \street"i n l ole and 1 I p �� g ��\4 c �- o N tr fi c Light receive a permanent ground cover in accordance with the. - l - _ - IDE AND, ACCE S \ .,\ 66, - g methods described under "SEEDING AND MULGHIN6". - _ / '-cJ -�' r �%- - = \ \ ASE�T \� �+, "''• o W arpC yp) i I S. / I v line=2209.3 Permanent Ground Gover is the establishment of perennial wt in=2202.6(W) vegetation cover for periods longer than twelve (12) rrt in=2200.6(SW) / months. Seed bed preparations and soil amendments shall ?rt out=2200.5' .� �� = PROPOSED I PORARY \ �W N N II be in accordance with the "SEEDING AND MULGHIN6" �'� _ - \ ' \�C�RAD`hN EASE ENT \ \ 1\ 1 o I section. As a part of permanent seeding, maintenance may i 11 \ \ ( be required to maintain vegetative growth for twelve (12) I \ 8 months. This maintenance shall be considered a part of �� = i_ \ \ \ \ - �, �- © NGT o establishing permanent ground cover. �'rc I - \ \ \ �� r6pp21 1 ° z In vert in 06.1 ' NOTE: REFER TO JULIAN WOODS RETIREMENT SEEDING AND MULCHING: / • \ v� \ v �i �� II Seeding and Mulching shall be done immediately behind COMMUNITY E SG DRAWINGS SHEETS G2.0I \ I construction. All disturbed areas shall be dressed to a LIMITS OF DISTURBANCE � 62.1 PREPARED BY BOWMAN CONSULTING % �, / depth of 5 inches. The to 2 inches shall be pulverized to ) ' -- 2206 -_ \ \j _ 1 I AND INCLUDED IN THIS SUBMITTAL AS p p p / 94.7 6 -\\ \\ `� c+� Z W I SUPPLEMENTAL INFORMATION FOR EROSION provide an uniform seed bed. Agricultural lime shall be I � � isti P • 3180 94.3 rc \ ``�- ` � �� 00 c� � � Z I CONTROL MEASURES AND CONTINUATION OF applied at the rate of a5 lbs./1000 sq. ft. immediately 4 / / cement 4+ 4.3 rc i �\ �� °' N a- i iJ I PROPOSED GRADING before plowing. Grass seed shall be applied at the rates %" - '',,�'� s4. ��\ .\ \ - o \ `\ ( Z C �I I outlined in tables 4.1 and 4.2 s3.7P�'"y-- 3•�Q4 22s \ I W O c I �avel driveway [Z - � a II r 4.1v } V I 5-10-10 fertilizer shall be applied to all disturbed areas at I 8 T '- \ \ I LU = 11 a rate of 21 Ibs./1000 sq. ft. mulching shall consist of small r I \ \ ,, \ \ I ` \ X K grain straw applied at o rate of 7sa $ w 0 Ibs./1000 sq. ft. f , / \ \ \ 2 , LW Mulched areas shall be tacked with asphalt or other / \ s \`\ �\ \\ \ Q BLUE RIb6E RX / HOLDINGS L> G I approved method sufficient to hold the straw in place, 200 to 400 gallons per acre. ZONING = GBII \ \ v v S 8 i4" E -V I j � g _ \ O C & B TOOthland-ol- - tJSE VACANT TABLE 4.1 / // / / / 2 \ \ \ 18 \ \%�\ 2 - -I O O \ _ 4ong Shoals !SHOULDERS SIDE DITGHES SLOPES Maximum 3:1 slo es .a2Ri \ \ L L ( p ) \ \1 ed Book 5258 Page Dates Type Planting Rate 8/15 - II/1 Tall Fescue 3001bs./acre II/1 - 3/1 Tall Fescue, Abruzzi Rye 3001b5./acre 3/1 - 4/15 Tall Fescue 3001b5./acre 4/15 - 6/30 Hulled Common Bermudagrass 7/15 - 8/15 Tall Fescue � * Browntop Millet or * Sorghum - Sudan Hybrids 35 Ibs./acre /// / - JULIAN WOODS RETIREMENT Mutti-sti brick 1 GOMMUNITY LLG �Al`NG ,�K��1NY 90 G644-6G-5161 ZONING = GBII USE = VACANT � I i /metal steps 29, Gonsult Soil Gonservation Service for additional information \ / 9 0sw - 94 sS.21 / concerning other alternatives for vegetation of denuded 1 /1 areas. The above vegetation rates are those which do well under local conditions, other seeding rate combinations _ / sw 94,.7 are possible. 93.5' P .52 SW 94. 81TQ l •94.94 SW ray 1 o * Temporary Reseed according too optimum season for 9P ' TC 45 S p y - g p .� A. '% kb es s Ch ric desired permanent vegetoion. Do not allow temporary _� °� A. e Book 1 cover to grow over 12 inches in height before mowing to keep fescue from being shaded out 9-3:97 0 0 41r T, , i 9`� 4.. _ TABLE 4.2 9 z -- .j- n C ' ' x 93.88 9� 60 W r SHOULDERS, SIDE DITGHES, SLOPES (3.-1 and 2:1 slopes) _ 93.48 TC k / 4.04 93.37 TC ( ��• c� / 4.36 SW� 1 51 /✓ 2998-- �94.34 EP �94. 7 SW SW 59 94.40 EP 7 MA`�iiI�L)I�) s oli ess Dates T e Plantin Rate p ( ) 3/1 - 4/15 Add Tall Fescue or 1201bs./acre 3/1 - 6/30 Add Weeping Lovegrass or 3/1 - 6/30 Add Hulled Gommon Bermuda grass 6/1 - GO * Tall Fescue 4 120 Ibs./acre * Browntop Millet 25 Ibs./acre * or Sorghum - Sudan Hybrids 30 Ibs./acre Cl/I - 3/1 Sericea Lespedezo (unhulled) 70 Ibs./acre 4 Tall Fescue 120 Ibs./acre Add Abruzzi Rye 25 Ibs./acre 3/I - 6/I Sericea Les edeza scarified 4 SOlbs./acre € SEE SHEET 05.2 i \ 3� IN PfN: 9644699325 1 O c- � 22CD 0 � 5.88 �-:, o � 1 \ 5.61 TC EROSION CiOl `l l 1�OL LE�7END I C �v \ 20 ���• r � � 11 � v� II �I■I■I■I� DIISTURBANGE 9 0• \ � 3. 5 FLl1S F � 4 TC, i z � I > O I APPROVED FOR ROUGH GRADING. _� b� TC 6 TC � L -4' $W / .n 1 � K9, - r ® `4.6l11VY 2 4. i m� _ gg p 2p8 TC 9�5 47 C99�60 9. TC / 0.4 TC 5.01j 9 Ti / 0.26 ° li 1 ' � /� 1 si7 ° R • � TCO'�95.8 965 0 8,4,V" E I �I Kok 1945 Page C 358 9644694238 9 o t / •I�/ O , \ // Existing private right of wad Gonsult Soil Gonservation Service for additional information O ` / / Existing 20' Permanent \ \ / (20'nor�iinalwidth) / / /� / of •r / Sanitary Sewer Easement O / Plat Boo /6 Page 26 and concerning other alternatives for vegetation of denuded / / Deed Book 5333 Page 646 \ \ �/ Plat Bok 20 Page 1(�5 / �/ • I I areas. The above vegetation rates are those which do ` / / , mailbo J y- well under local conditions, other seeding rate combinations grass �// // \\ \ / \ j /\ j• are possible. PARCEL 7 * - Y / / AREA O Temporary Reseed according to optimum season for , / / 9529.1 t sq. feet or r O desired permanent ve etoion. Do not allow temporary MH#32-28744 / y 0.219tacre o \ / /�gQ /o� s cover trow over 1 2inches in height before mowin yto / Linda M. Gipson 1 �' / / a 9 9 g Existing 20' Permanent / -_ _ / _ I keepfescue from beingshaded out SanitarySewer Easement ( / Deed Book 5642 Page ° -I ' J/ Deed Book 1626 Page 783 , 1 1776% / • / ° I II ss� Addre9r c4 WA141Rd C1786 J J �e, //• J/ i I �xtension o_� - o L2 ej /• ° �\ ,C5 _ a pp� V p /� i• / I disk, OS' bg A "� ie ASHEVILLE YOUTH ROWING ASSOCIATION 10021 1 Qatof box g644-65-1854 0924 20 ZONING = N/A C5.1 La Julial. , USE =PARK planter Rebar with EHA cap set Northing:649143,72' Easting946831,97' NAD 83(2011) N 69°3951" W 20.98' Tie i�i�iz0\�AL BL-OGK THECITYOF ASHEVILLE Engineering Approval Grading Only 21-07117PZ 403 OVERLOOK ROAD EXT ROUGH GRADING AND ESC PLAN thanaalley 10/26/2021 10:21:51 AM This certificate of approval provides notice of the right to inspect by the City of Asheville, to ensure compliance with NC G.S.113A Article 4. NORTH -C c00 o00 cC) 0 a M `l� o 0 � M d' � O � c iJ I o Z I N CO v) Q c0 li =w UZ �Z O QZ W J FINAL DRAWING FOR REVIEW PURPOSES ONLY DSCAA� LOU 399 FINAL DRAWING FOR REVIEW PURPOSES ONLY W .v o � • cn E: O w - U �z N L V � ( O `''v M V / O r V Rough Grading & Erosion Control Plan L3 9-14-21