Loading...
HomeMy WebLinkAbout20211669 Ver 1_Mitigation Information_20211104From: Davis, Erin B To: Baker, Caroline D Subject: FW: [External] RE: [Non-DoD Source] Re: Clarification for the Neuse 01 UMBI - Lowlands site and Promise Land Bank Date: Monday, November 22, 2021 8:08:37 AM Laserfiche Upload: Email DWR#: 20211669 v.I Doc Type: Mitigation Information -----Original Message ----- From: Tugwell, Todd J CIV USARMY CESAW (USA)[mailto:Todd.J.Tugw�.usace.ar=.mil] Sent: Thursday, November 4, 2021 2:05 PM To: Kevin Yates<clearwatermitigation(ogmail.com> Cc: Kim Browning <Kimberly.D.Browning@usace.army.mil>; Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>; Davis, Erin B <erin.davis&cdenr.gov>; Grant Lewis <glewis(oaxiomenvironmental.org>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood(ousace.army.mil>; Bowers, Todd <bowers.todd@epa.gov> Subject: [External] RE: [Non-DoD Source] Re: Clarification for the Neuse 01 UMBI - Lowlands site and Promise Land Bank CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.<mailt0:rel2ort.si2amnnc.gov> Also, just to clarify, the Promise Land site (formerly Lowgrounds) will now be the Clearwater Promise Land Mitigation Bank. We can send out on Public Notice when you have the Final Prospectus updated and submitted. Thanks, Todd -----Original Message ----- From: Tugwell, Todd J CIV USARMY CESAW (USA) Sent: Thursday, November 04, 2021 1:59 PM To: 'Kevin Yates'<clearwatermitigation(ogmail.com> Cc: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning(ousace.army.mil>; Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey(ousace.army.mil>; Erin Davis <erin.davis&cdenr.gov>; Grant Lewis <glewis(oaxiomenvironmental.org>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Todd Bowers <bowers.todd@epa.gov> Subject: RE: [Non-DoD Source] Re: Clarification for the Neuse 01 UMBI - Lowlands site and Promise Land Bank Yes, I think that makes sense. Just call that the Clearwater Neuse 01 UMBI and the site will be the Lowlands Mitigation Site. If you are good with that, I will change in RIBITS. Thanks, Todd -----Original Message ----- From: Kevin Yates<clearwatermitigation(ogmail.com> Sent: Wednesday, November 03, 2021 8:56 PM To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil> Cc: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning(ousace.army.mil>; Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey(ousace.army.mil>; Erin Davis <erin.davis&cdenr.gov>; Grant Lewis <glewis@axiomenvironmental.org>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood(ousace.army.mil>; Todd Bowers <bowers.todd@epa.gov> Subject: [Non-DoD Source] Re: Clarification for the Neuse 01 UMBI - Lowlands site and Promise Land Bank Hey Todd, Thank you for the recap. Yes, that is exactly as discussed. Only question, the Lowlands Site was advertised on Public Notice as the "Clearwater Neuse 01 Lowlands UMBI", if we're going to have one Clearwater Neuse 01 UMBI, should we go ahead and remove "Lowlands" from the UMBI name? It's up to ya'll, if you'd like to discuss internally, doesn't matter to me. We'll get the revised Promise Land Prospectus turned around and back to you for review. Thanks! Kevin On Wed, Nov 3, 2021 at 11:09 AM Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil<mailto:Todd.J.Tugw�.usace.army.mil> > wrote: Kevin, Per our conversation yesterday, I just wanted to clarify how you would like to move forward with the Lowlands Bank and Promise Land Bank. In order to avoid having two UMBIs in the same watershed that would have the same credit types, etc. we can process one site as a standard bank, and the other as an UMBL Based on where the two sites are in the review process, it makes the most sense for the Lowlands site (former PRM) to be the UMBI because it has already gone out on public notice this way. The Promise Land site would then be a stand -along bank. Depending on the how the processing of the two banks proceeds, it may be possible to revise the Promise Land site at a later date (after this upcoming public notice) and include it in the Neuse 01 UMBI (with the Lowlands site). If this were done, we would have to readvertise it on a new public notice. Otherwise, it could stand alone as a bank. Given this approach, I will get you comments on the Lowlands PN this week. As we discussed, the draft Mit Plan for this will be a bit different because it is an existing, constructed PRM site that will be converted to bank. We can work through that later. For the Promise Lands Bank, I will need an updated Prospectus that indicates the bank is a single -site bank as opposed to an UMBI, then we can start the review for that site. Let me know if this matches your understanding or if you have any questions in the meantime. I've copied some of the IRT with this message or their awareness. Thanks, Todd Tugwell Mitigation Project Manager Wilmington District, US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 (919)210-6265 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://urldefense.com/v3/ https://regulatory.ops.usace.army.mil/customer-service- survey/_: ! ! HYmSToo1IbnSjt4C78klDfxOUNMjtD8m-p7rMIej 6-7bKLrLtg90iKdOlhj 3l I Q3HzOWixm4e 18$ <Blockedhttps://regulatory.ops.usace.anny.mil/customer-service-survey/> Thank you for taking the time to visit this site and complete the survey.