Loading...
HomeMy WebLinkAbout20181033 Ver 1_Mitigation Remediation Plans_20211116LMG LAND MANAGEMENT GROUP a DAVEY# company November 16, 2021 Ms. Kim Browning United States Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Subject: Owen Farms (SAW-2018-01165) Repair Plans Ms. Browning, HDR, Inc. (HDR) has contracted Davey Resource Group, Inc. d/b/a Land Management Group (LMG) to provide monitoring services for the Owen Farms Mitigation Site (Site). The purpose of this letter is to inform you of recent flood damage observed at the Site and describe our plan for corrective action. The Site experienced an approximately 200-year storm event between August 15-17. On - site rain data recorded 16.70 inches of rain over less than a 72-hour period, with 6.07 inches falling within 3 hours on August 16. Monthly precipitation totals recorded at the site are attached. Items that we believe will require remedial action were noted during a site analysis following the floods of August 15-17. Remedial action items on West Fork of the French Broad River include addressing floodplain scour in several areas, localized erosion of two banks, and formation of a transverse bar near the upstream beginning of restoration. LMG used a drone to capture aerial imagery of the Site on September 29, 2021. Figure 1 (attached) depicts areas noted above overlain on the aerial image. Additionally, a photo log is attached that provides representative photos of the noted areas. LMG has developed a repair plan for the Site. Standard construction equipment will be used to repair noted areas (i.e. excavator and off -road hauler). Scoured areas in the floodplain will be filled with on -site material excavated from adjacent terrace slopes. Excess cobble and gravel material from the noted transverse bar between stations 10+50 and 11+50 will be removed and placed along the channel toe of repaired stream banks. Noted eroded stream banks will be graded to approximate design dimensions and matted with coir fiber matting. Approximately 50 linear feet of soil lifts will be installed between stations 18+60 and 19+10. Overall, approximately 100 linear feet of stream bank grading and 100 linear feet of substrate removal is anticipated as a result of repair activities. Disturbed areas will be seeded with a permanent, native seed mix and replanted with native species 1 www.lmgroup.net • Phone: 919.645.4350 3101 Poplarwood Court — Suite 120, Raleigh, NC 27604 LMG LAND MANAGEMENT GROUP a DAVEY# company as approved in the Mitigation Plan. A temporary seed mix consisting of rye (grass and/or grain) will also be applied to disturbed areas. Repair work will be conducted under the existing Nationwide Permit 27 and Erosion Control Permit for the Site. The Nationwide Permit 27 (and associated 401 Certification, DWR #18-1033) was issued on March 30, 2020 and expires March 18, 2022. The Erosion Control Permit was issued June 5, 2020 and expires June 5, 2023. Repair work is anticipated to begin by December 10 and be completed by December 31, 2021. Planting will be completed by March 31, 2022. LMG has spoken with the North Carolina Wildlife Resources Commission (WRC, Andrea Leslie) regarding the trout moratorium that is currently in effect at the Site. LMG will submit a written request for a waiver of the trout moratorium for purposes of completing repair work at the Site. A copy of this letter will be provided to WRC and will be included in the Year 1 Monitoring Report. Should you have any questions or concerns, please call me at 919.588.9663 or you can reach me via email at bfurr@lmgrou-P.net. Thank you, Ben Furr, PWS Land Management Group Cc: Jessica Tisdale (HDR) Paul Wiesner (NCDMS) Andrea Leslie (NCWRC) Todd Tugwell (USAGE) Erin Davis (NCDWR) Casey Haywood (USAGE) 2 www.lmgroup.net • Phone: 919.645.4350 3101 Poplarwood Court — Suite 120, Raleigh, NC 27604 S' l�{ 7 L' CV L' •1 O7 � N 01 M o co N _ Q r• Z W L � d C a 7, a r� oa = G U1 L lfl N Q CV C Cu ti r cV II [3 N a cV O Z O W CO N cA LO ,t CO N r- a ❑] W h (D V) V C7 N r 0 N r r r r r r r r r- r (ui) ulub d W Z 0 - o Q � LL w a �_ o Q � � a N w a a LL Z w 0 1 1 K 1011 _- Owen Farms Mitigation Site Photographic Documentation Repair Areas Looking downstream at stump to be removed on left bank near Station 10+75. Looking downstream at eroded right bank near station 11+00. Owen Farms Mitigation Site Photographic Documentation Repair Areas Looking upstream at excess material deposited in channel, creating transverse bar near Station 11+25. Looking upstream at scour in the right floodplain near Station 13+00. 2 Owen Farms Mitigation Site Photographic Documentation Repair Areas Looking downstream at scour hole in right floodplain near Station 15+50. Looking downstream at scour in left floodplain near station 17+50. Owen Farms Mitigation Site Photographic Documentation Repair Areas Looking at eroded right bank near station 18+75. Looking upstream at scour in the right floodplain near station 25+75. Owen Farms Mitigation Site MUM Photographic Documentation Repair Areas Looking downstream at scour in the left floodplain near station 28+50 9 From: Davis. Erin B To: Baker. Caroline D Subject: FW: [External] Owen Farms Repair Plan (SAW-2018-01165) Date: Monday, November 22, 2021 9:09:07 AM Attachments: Owen Farms Repair Plan 2021 (SAW-2018-01165).odf Laserfiche Upload: Email & Attachment DWR#: 20181033 v.1 Doc Type: Mitigation Remediation Plan From: Furr, Benjamin [mailto:bfurr@lmgroup.net] Sent: Tuesday, November 16, 2021 3:45 PM To: Kim Browning <Kimberly.D.Browning@usace.army.mil> Cc: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Wiesner, Paul <paul.wiesner@ncdenr.gov>; Miller, Vickie M. (Raleigh) <Vickie.Miller@hdrinc.com>; Tisdale, Jessica <jessica.tisdale@hdrinc.com>; Christopher Smith <csmith@lmgroup.net>; Kevin Williams <kevinwilliams@lmgroup.net>; Ryan Smith <rsmith@lmgroup.net> Subject: [External] Owen Farms Repair Plan (SAW-2018-01165) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Kim, Per our conversation in October, I have attached a letter detailing repair work that we plan to complete at the Owen Farms Mitigation Site next month. Please review and let me know if you have any questions or need additional information. We are working with Natural Balance Contractor, LLC to complete repair work. The owner of Natural Balance Contractor was the equipment operator during the original construction of this project. Thank you, Benjamin N. Furr I Senior Consultant Land Management Groupl Environmental Consultants 3101 Poplarwood Court, Suite 120 1 Raleigh, NC 27604 Cell: 919.588.9663 1 www.lmgroup net 71