Loading...
HomeMy WebLinkAbout20201245 Ver 1_More Info Received_20211013Strickland, Bev From: Camden Brunick <cbrunick@sandec.com> Sent: Wednesday, October 13, 2021 1:14 PM To: Cohn, Colleen M Cc: Deborah Shirley; Phillips, George L CIV USARMY CESAW (USA) Subject: FW: [External] RE: Horton Park Residential / Apex / Wake County / North Carolina / SAW-2019-00283 / Request for Additional Information Attachments: Buffer SOA - Horton Park Residential.pdf; Horton Park_Impact 13.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon Colleen, I hope you are doing well today. Please see our responses below in red. I have also attached an SOA for the buffer mitigation for impact 13. • Impact 13: o The proposed buffer impacts are for the road crossing/widening of Gladsong Dr, but I am having difficulties finding an existing Gladsong Dr. Is this a new road or does the existing road have a different name? Gladsong Drive is a new street (not existing). The new Gladsong Drive will generally follow the current alignment of Dezola Street (Dezola Street is a gravel access for property owners west of the proposed creek crossing for Gladsong Drive). But it is being built as a new street to Town of Apex Collector Street standards. o This does not appear to be a perpendicular road crossing. Please provide an explanation of how this fits under (y) in the Neuse River Riparian Buffer Rules Table of Uses or provide mitigation for these impacts if it are not a perpendicular crossing. The crossing is not perpendicular as the street was aligned with (1) the property boundaries by others and (2) the alignment avoids impacts to the channel (only buffer impacts). I have attached the SOA for mitigation of these buffer impacts above. Please let me know if you need anything else or have any more questions. Thank you, CAMDEN BRUNICK Environmental Consultant Soil & Environmental Consultants, PA North Quarter Office Park 8412 Falls of Neuse Road, Suite 104 Raleigh, NC 27615 (919)219-6162(cell) From: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Sent: Wednesday, October 6, 2021 3:35 PM To: Deborah Shirley <dshirley@sandec.com>; Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil> Subject: RE: [External] RE: Horton Park Residential / Apex / Wake County / North Carolina / SAW-2019-00283 / Request for Additional Information i Hi Deborah, I am beginning my review for this project and require some additional information: • Impact 13: o The proposed buffer impacts are for the road crossing/widening of Gladsong Dr, but I am having difficulties finding an existing Gladsong Dr. Is this a new road or does the existing road have a different name? o This does not appear to be a perpendicular road crossing. Please provide an explanation of how this fits under (y) in the Neuse River Riparian Buffer Rules Table of Uses or provide mitigation for these impacts if it are not a perpendicular crossing. Thank you, Colleen Cohn Environmental Specialist II North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional Office 380o Barrett Drive Raleigh, NC 27609 Office: 919-791-4258 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Deborah Shirley [mailto:dshirley@sandec.com] Sent: Wednesday, September 22, 2021 2:37 PM To: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil> Cc: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: [External] RE: Horton Park Residential / Apex / Wake County / North Carolina / SAW-2019-00283 / Request for Additional Information CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Lyle, Thank you for meeting with us to discuss the project and review your comments/questions. We have provided responses below in red and provided the attached additional information. Attachments: Proposed Site Exhibit -Rezoning Exhibit Updated Horton Park Overall Site Map -Proposed Conditions Horton Park -Partial Site Map -Proposed Conditions Please let us know if you have any additional questions or need further information to continue your review of this permit application. Thank you, DEBORAH E. SHIRLEY Project Manager -Regulatory Specialist Soil & Environmental Consultants, PA Mobile (919) 673-8793 2 This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This electronic communication may not have passed through our standard review/quality control process. Design data and recommendations included herein are provided as a matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. If you are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic communication in error, please notify the sender by return e-mail and delete the original communication from your system. Thank you. Please consider the environment before printing this email. From: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil> Sent: Wednesday, September 1, 2021 3:28 PM To: Deborah Shirley <dshirley@sandec.com> Cc: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Subject: Horton Park Residential / Apex / Wake County / North Carolina / SAW-2019-00283 / Request for Additional Information Ms. Shirley, I have reviewed the above referenced project and need the following comments/questions addressed to evaluate the proposed activities. 1) Per general conditions 15, the activity must be a single and complete project. The same NWP cannot be used more than once for the same single and complete project. a. Independent utility is a test to determine what constitutes a single and complete non -linear project in the Corps Regulatory Program. A project is considered to have independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a multi -phase project that depend upon other phases of the project do not have independent utility. Phases of a project that would be constructed even if the other phases were not built can be considered as separate single and complete projects with independent utility. b. For non -linear projects, the term "single and complete project" is defined at 33 CFR 330.2(i) as the total project proposed or accomplished by one owner/developer or partnership or other association of owners/developers. A single and complete non -linear project must have independent utility (see definition of "independent utility"). Single and complete non -linear projects may not be "piecemealed" to avoid the limits in an NWP authorization. Based on a review of current property owners for PODs 1-8 and the "Proposed Site Exhibit" attached it is unclear if the proposed project is "single and complete". i. Please provide information to support the proposed activities being a "single and complete project" and having independent utility from the additional PODS 1-4 depicted on the "Proposed Site Exhibit" attached. PODS 2 & 4 would be considered part of this project. The project is providing sanitary sewer to these areas however there are no anticipated additional stream or wetland impact for the future development of PODS 2 & 4. Note that POD 2 is proposed Tech/Flex and POD 4 is proposed multi -family. POD 1 was not a part of this rezoning and is proposed to be Industrial and Office Employment development. POD 3 is zoned residential but is separated by Jesse Drive, a Major Thoroughfare Road and it not anticipated to have shared amenities/utilities/access. 2) Please provide an explanation as to why the proposed sewer infrastructure north of the proposed development is necessary to service the downgradient proposed subdivision? Please see attached updated Overall Site plan showing the POD 4 future development. This future development has been designed to avoid wetland, stream and/or riparian buffer impacts. 3) Please describe the need for Impact 14. Based on the scale of the proposed subdivision please describe how the activity has been designed to avoid and minimize adverse effects, to the maximum extent practicable in compliance with NWP general conditions 23 (a) and (b). Per the project engineer: In an effort to minimize and avoid impacts to the 928 SF wetland pocket identified as "Wetland 'W12'" (page 24 of 24 in the Horton Park Impact Maps), Peak took another look at the design of the surrounding roadway infrastructure and the impact 'W12'. The design of the streets in the area were established with two requirements in mind: (1) the elevation of Horton Park Drive at the connection with Resteasy Drive, 3 and (2) the requirement to direct stormwater runoff to the proposed constructed wetland in the NW corner of POD 5 West. First, the elevation of Horton Park Drive — a major collector within the Town's adopted Master Transportation Plan — is established using certain vertical and horizontal design guidelines. These guidelines established the location and elevation of Horton Park Drive for any future connections to this public collector street. Second is the requirement to treat the stormwater runoff from Horton Park Drive, Resteasy Drive, Pinecone Court, and the residential homes. The elevation of Pinecone Court and Resteasy in the vicinity of Wetland 'W12' is required to direct runoff to a proposed Constructed Stormwater Wetland in the NW corner of POD 5 West. Based upon residential street designs standards and accepted design standards for stormwater conveyances, to lower Pinecone Court and Resteasy Drive to avoid impacts to 'W12' would result in substandard roadway designs and the need for a new stormwater control measure located near 'W12'. In summary, the grading of the surrounding roadway infrastructure (Horton Park Drive, Resteasy Drive and Pinecone Court) along with the existing elevations in the vicinity of the proposed constructed wetland have resulted in the encroachment into the 928 SF 'W12' wetland pocket. Please let me know if you have questions/concerns. We can set up a time for a phone call or virtual meeting if necessary. Lyle Phillips Regulatory Specialist US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 25. Fax: (919) 562-0421 Email: George.L.Phillips@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at https://regulatory.ops.usace.army.mil/customer-service-survey/ . Thank you for taking the time to visit this site and complete the survey. 4