HomeMy WebLinkAbout20131100 Ver 1_USACE Permit_20131125U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW- 2013 -02203 County: Watauga U.S.G.S. Quad: NC -VALLE CRUCIS GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Pennittee: NC DOT DIV 11 Heath Slaughter Address: 801 Statesville Rd. North Wilkesboro, NC 28659 Telephone Number: (336) 903 -9202 Size (acres) 0_1 Nearest Town Valle Crucis Nearest Waterway Lost Branch River Basin Watauga, North Carolina, Tennessee. USGS HUC 6010103 Coordinates Latitude: 36.21 Longitude: - 81.7637 Location description: The project site is located along SR 1114 (Dewitt Barnett Road), East of Lucky Leaf Lane, in Watauga County, North Carolina. Description of projects area and activity: This authorization is for the permanent discharge of clean fill material including a 60' retaining wall and rip rap for 145 linear feet of stream bank stabilization. This authorization is also for the temporary discharge of clean fill material within 40 linear feet of jurisdictional stream associated with dewatering activities. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Pen-nit Number or Nationwide Pennit Number: NWP 13 Bank Stabilization. SEE ATTACHED R 6 or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information received on October 15, 2013. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and /or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide pennit authorization is reissued and /or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide pen-nit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide pennit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide pen-nit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone 919- 807 -6300) to detennine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Morehead City, NC, at (252) 808 -2808. This Department of the Anny verification does not relieve the pennittee of the responsibility to obtain any other required Federal, State or local approvals/pen-nits. If there are any questions regarding this verification, any of the conditions of the Pennit, or the Corps of Engineers regulatory program, please contact Andrew Williams at 919- 554 -4884 x26 or Andrew .E.Williams2(i�usace.armv.mil. E�o��,�o —N ANT-- X35 -2-1 P>�RHpA �� EPEl­ Corps Regulatory Official: ��� � Date: 11/25/2013 Expiration Date of Verification: 03/18/2017 Determination of Jurisdiction: A. ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary detennination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ® There are waters of the US and /or wetlands within the above described project area subject to the pen-nit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued . Action ID: SAW- Basis For Determination: Lost Branch is a relatively permanent water (RPW) and a tributary to the the Watauga River, a traditionally navigable water (TNW). The Watauga River is a tributary to the South Fork of the Holston River, a TNW, which is a tributary to the Holston River, a navigable water of the United States. The Holston River is a tributary of the Tennessee River, a navigable water of the United States. The Ordinary High Water Mark (OHWM) of the unnamed tributary was indicated by the following physical characteristics: clear natural line impressed on the bank, shelving, and the destruction of terrestrial vegetation. This jurisdictional determination is only for the stream proposed for impacts associated with this Nationwide Permit verification and does not include any other waters that may be located on the property /project site. Remarks: None E. Attention USDA Program Participants This de line ation/detennination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland detennination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B and C above). This correspondence constitutes an approved jurisdictional detennination for the above described site. If you object to this detennination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this detennination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303 -8801 Phone: (404) 562 -5137 In order for an RFA to be accepted by the Corps, the Corps must detennine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by January 24, 2014. * *It is not necessary to submit an RFA form to the Division Office if you do not object to the detennination in this correspondence. ** Ej1jibim1j111 I!I, X MJINTBCESl 123556727661 pv >V VT-!p >V/i/! BNT/ n foWpv >EpE672766,1! • C7 pv >ViB- !do >X,t�fdBNTBOESFX /F2355672766! Corps Regulatory Official: E !xf;!312422/36!21;65,66!.16(11( Andrew Williams Date of JD: 11/25/2013 Expiration Date of JD: 11/25/2018 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our customer Satisfaction Survey online at hqp:/ /per2.nwp.usace.arM.mil /surve.y.1-itml . Copy furnished: Sue Homewood North Carolina Department of Natural Resources Division of Water Quality 585 Waughtown Street Winston-Salem, NC 27107 Action ID Number: SAW- 2013 -02203 County: Watauga Permittee: NC DOT DIV 11 Heath Slaughter Project Name: NCDOT /SR1114 /110.095028 /Divisionl1 Date Verification Issued: 11/25/2013 Project Manager: Andrew Williams Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Andrew Williams 3331 Heritiage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date Applicant: NC DOT DIV 11 File Number: SAW - 2013 -02203 Date: 11/25/2013 Heath Slaughter Attached is: I See Section below "I INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A ❑ PROFFERED PERMIT (Standard Permit or Letter of permission) B ❑ PERMIT DENIAL C ® APPROVED JURISDICTIONAL DETERMINATION D F-1 PRELIMINARY JURISDICTIONAL DETERMINATION E `SEC'��0� i 'T�o �`n�lq�?v�g:?��etttis �QU�r rzghl� end opltzoxxs re�rd�n'a� �c�SUhastr0ti�e ������ �?� the a1ai��e dec��'iot: A�tiopal Ixt�`or�0fi�ctn �r�ray b� �au� Ott httplli�iv. sac. iy. �i� /i�iettdtitiiisfici� /+�ec'�o /xe� o` Coxp� egul�ti��s ht F'P�'ParC 1 °, A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. If you have questions regarding this decision and /or the appeal process you may contact: District Engineer, Wilmington Regulatory Division, Attn: Andrew Williams 3331 Heritiage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 If you only have questions regarding the appeal process you may also contact: Mr. Jason Steele, Administrative Appeal Review Officer CESAD -PDO U.S. Army Corps of Engineers, South Atlantic Division 60 Forsyth Street, Room 1OM15 Atlanta, Georgia 30303 -8801 Phone: (404) 562 -5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: I Telephone number: of appellant or For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD -PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303 -8801 Phone: (404) 562 -5137