Loading...
HomeMy WebLinkAboutSW3210301_Design Calculations (Stormwater - Phase 3)_20211118Iq STORMWATER MANAGEMENT REPORT FOR: CRESSWIND WESLEY CHAPEL - PHASE 03 E A L WESLEY CHAPEL, NC PREPARED FOR: KH WESLEY CHAPEL, LLC IICA� / / THOMAS & HUTTON ENGINEERING - 00. _ ., No. F-0871 ; 41, �IlOjlllAO J - #2 7842.0003 APRIL 1, 2021 REVISED: NOVEMBER 10, 2021 Prepared by: THOMAS Sc HUTTON STORMWATER MANAGEMENT REPORT Cresswind Wesley Chapel - Phase 03 Project: Cresswind Wesley Chapel - Phase 03 T&H Job Number: J-27842.0003 Location: Potter Road Wesley Chapel, NC 28173 Date Prepared: April 1, 2021 Owner: KH Wesley Chapel, LLC Owner Address: 8913 Silver Springs Court Drive Charlotte, NC 28215 Engineer: Thomas & Hutton Engineer Address: 1020 Euclid Avenue Charlotte, NC 28203 Phone: 980-201-5505 H THOMAS & HUTTON Page 1 TABLE OF CONTENTS Section 1 -Summary of Results....................................................................................................... Page 3 Section 2 - Project Narrative...........................................................................................................Page 4 Section3 - Purpose........................................................................................................................... Page 4 Section 4 - Regulatory Summary .................................................................................................... Page 5 Section5 - Methodology.................................................................................................................Page 5 Section6 - Hydrology....................................................................................................................... Page 6 Section 7 - Runoff Calculations......................................................................................................Page 6 Section 8 - Existing Conditions........................................................................................................ Page 8 Section 9 - Post Development Conditions.....................................................................................Page 8 APPENDICES ProjectMapping...................................................................................................................... Appendix A Aerial Location Map.......................................................................................................... Exhibit A FEMAMap........................................................................................................................... Exhibit B WetlandsMap.................................................................................................................... Exhibit D SoilsMap.............................................................................................................................. Exhibit E Pre Development Drainage Map...........................................................................................Appendix B Pre Development Conditions Drainage Calculations......................................................... Appendix C Post Development Drainage Map........................................................................................ Appendix D Post Development Conditions Drainage Calculations........................................................ Appendix E Water Quality Calculations...................................................................................................... Appendix F H THOMAS & HUTTON Page 2 SECTION 1 - SUMMARY OF RESULTS Table 1 - Pre Development Runoff Rates TABLE 1 Summary of Results - Existing Conditions Storm Event Outfall 01 (cfs) 2-year 56 10-Year 122 25-Year 160 50-Year 195 Table 2- Post Development Runoff Rates TABLE 1 Summa of Results - Proposed Conditions Storm Event Outfall 01 cfs 2-year 34 10-Year 82 25-Year 110 50-Year 135 H THOMAS & HUTTON Page 3 SECTION 2 - PROJECT NARRATIVE Cresswind is a residential subdivision within Wesley Chapel, North Carolina. Phase 3 consists of approximately 129 single family detached units. The site is located in Union County along Potter Road, north of Newtown Road and south of Weddington Road. It should be noted that a portion of Phase 4 lots and impervious area is included in the post development calculations for the proposed pond. The majority of the site is currently wooded with an understory of brush. Pre -development run- off is discharged into an existing wetland system and FEMA Floodplain. The pre -development drainage basins have been delineated and are illustrated on the Pre -Development Drainage Exhibit found at the end of this report. For the purpose of this report we will compare the predevelopment runoff rates to the post development runoff rates as shown in the summary at the beginning of this report. The pre - development basin will be routed through one wet detention pond during post development conditions and outfall into the existing wetlands and floodplain. The post -development sub -basins were delineated and are illustrated on the Post -Development Drainage Exhibit found at the end of this report. All design information for ponds and associated drainage pipes and structures can be found in the appendices of this report. The soils on this site consist of type B, C and D hydrologic soil groups which are shown on the attached NRCS soils map within Appendix A. SECTION 3 - PURPOSE The purposes of this report are: 1. To delineate all pre -development basins that are within this project and determine which drainage basins will be affected by the proposed development. 2. To develop a stormwater model that will: a. Be in compliance with the NCDEQ stormwater regulations. b. Simulate the pre- and post -development conditions for the project. c. Predict water elevations for all proposed ponds. d. Demonstrate that all culverts are of adequate size for drainage under post - development conditions. e. Provide design flows (under future build out conditions) for the major drainage structures that can be used to properly size improvements, if needed. 3. To document that the stormwater management measures and equipment installed on site will be adequate for all existing and proposed development on the site. Two drainage models are included in this report; • Pre -Development: examines the drainage basin prior to any development within the site. • Post -Development: examines the drainage basin after site improvements have been installed. The model may need to be revised and updated for each phase that is permitted. H THOMAS & HUTTON Page 4 SECTION 4 - REGULATORY SUMMARY NCDEQ - Stormwater The North Carolina Department of Environmental Quality (NCDEQ) is responsible for administering the storm water management program. Development or re -development activities are required to apply for and receive a stormwater permit from NCDEQ. These permits address water quality and quantity. NCDEQ regulations require that peak post -development discharge rates from the basin shall be at or below pre -development rates for the 10 and 25-year storms events. The regulations also specify the 1-inch volume drawdown shall be released over a time of 48 to 120 hours to minimize hydrologic impacts to the receiving channel. See attached Exhibit E for post -development peak flow control calculations, and Exhibit F for water quality calculations. The stormwater treatment shall be designed to achieve average annual 85% Total Suspended Solids (TSS) removal and must apply to the volume of post -development runoff resulting from the one -inch rainfall. See attached Exhibit E for post -development peak flow control calculations, and Exhibit F for water quality and channel protection calculations. SECTION 5 - METHODOLOGY The pre- and post -development conditions of the site were analyzed using the Storm and Sanitary Analysis (SSA) program developed by Autodesk. The program is used to model rainfall and stormwater runoff and to perform hydraulic routing through the storm drainage system (including existing and proposed storage/detention features such as wetlands, ponds, and lakes) . SSA is an advanced, powerful, and comprehensive modeling package for analyzing and designing drainage systems, stormwater sewers, and sanitary sewers. The software can simultaneously model complex hydrology, hydraulics, and water quality. The SSA program is built on the highly tested and widely utilized SWMM methodologies. For this application of the SSA program, the hydrology was simulated using the NRCS (SCS) TR-55 methodology. The hydraulics was simulated utilizing hydrodynamic routing. Hydrodynamic routing solves the complete St. Venant equations throughout the drainage network and includes modeling of backwater effects, flow reversal, surcharging, looped connections, pressure flow, tidal outfalls, and interconnected ponds. The SSA program graphical user interface (GUI) allows for the input of hydrologic data for each drainage sub -basin. See the appendices for input variables including runoff curve number, rainfall distribution pattern, hydrograph peaking factor, area of each drainage sub -basin, and time of concentration. The SSA program generates runoff hydrographs for each sub -basin based on these user -specified variables. Hydrographs are generated by SSA using the NRCS Unit Hydrograph (TR-55) Method. H THOMAS & HUTTON Page 5 The model's hydraulic input data consists of a system of nodes and links. Nodes represent locations where flows enter or exit the system, pipe or channel characteristics change, or where stage/storage/time relationships are provided. Links represent traditional types of hydraulic conveyance such as pipes, channels, control structures, weirs, etc. The sizes, inverts, lengths, and Manning "n" values for all pipes connecting the ponds or lakes are input into the model. In addition to pipe information, all pond, lake, and detention area stage -area information and the respective control structure information is input into the model. The node and link conditions are analyzed within the model for a given storm, and flow conditions are determined. Hydrographs for each drainage area are merged within the SSA program, and the hydrologic results are then combined with the hydraulic information to model the hydraulic interactions of the entire drainage system. The results include pond area and discharge rates and stage/storage information during the storm events. The storm drainage infrastructure onsite was modelled using the Storm Sewers program developed by Autodesk. This program utilizes the model rainfall and stormwater runoff through the storm drainage infrastructure to provide hydraulic grade line calculations and profiles for analyzing the proposed storm drain network. SECTION 6 - HYDROLOGY ■ SCS TR-55 Method was used. The rainfall distribution used for each storm event was obtained from rainfall data publicly available for Union County, NC. The following design storms are used in the model simulations: - 2-year, 24-hour Design Storm = 3.50 inches - 10-year, 24-hour Design Storm = 5.20 inches - 25-year, 24-hour Design Storm = 6.10 inches - 50-year, 24-hour Design Storm = 6.90 inches - 100-year, 24-hour Design Storm = 7.50 inches SCS Type II Statistical Rainfall Distribution was used. This distribution pattern is determined by the Soil Conservation Service comparing regional rain -gage data. Soils present on site consist of the following: - Badin channery silty clay loam, 2 to 8 percent slopes (BdB2) - HSG C - Chewacla silt loam, 0 to 2 percent slopes (ChA) - HSG B/D - Goldstone-Badin complex (GsC), 8 to 15 percent slopes - HSG C - Tarrus gravelly silty clay loam, 2 to 8 percent slopes (TbB2) - HSG B SECTION 7 - RUNOFF CALCULATIONS Peak flow rates for the watersheds were calculated by the SSA Program for each design storm. The pre- and post -development drainage basins are shown in appendicies that follow this report. Curve Numbers H THOMAS & HUTTON Page 6 Curve numbers were generated according to procedures set forth in SCS Technical Release 55. The composite curve numbers for each drainage basin were calculated using soils information from the Soil Survey of Union County, NC provided by The United States Department of Agriculture Soil Conservation Service. Curve numbers were weighted based on the land use and soil group within each basin. Time of Concentration Times of concentration were calculated according to procedures set forth in SCS technical Release (TR) 55. The travel times (Tt) for overland flow, shallow concentrated flow, and channel flow are added together for the drainage basin to get the time of concentration Tc. Basin information for the area of interest was collected for use in the SSA models. Basins were delineated using surveyed topographic information. Basins were drawn and the longest flow paths were found. The times of concentration were calculated based on the NRCS, three part travel time method documented in TR-55. The three equations used are summarized below: Sheet Flow: (hr) _ 0.007(nL)a.s t1 — P2 0.05 X S 0.4 Shallow Concentrated Flow: (hr) L _ tZ 3600 X V Channel Flow: (hr) L _ t3 3600 X V Time of Concentration: (hr) t, = t1 + tZ + t3 Symbol Dimension Units n Manning's n -- L Length of flow ft P2 2 yr event rainfall in S Slope ft/ft Symbol Dimension Units L Length of flow ft V* Velocity ft/s *Based on TR-55 velocity -slope relationship Symbol Dimension Units L Length of flow ft V* Velocity ft/s *Assumed to be 2 ft/s Appendices C and E with time of concentration information are attached. Mr. THOMAS & HUTTON Page 7 SECTION 8 - EXISTING CONDITIONS The total acreage of the drainage basins analyzed in the stormwater calculations is approximately 55 acres. The existing conditions described in this narrative will refer to the pre - development condition of the site. The pre -development conditions for the site consists predominantly of woods with an understory of brush. Stormwater runoff on the site was delineated according to the existing drainage patterns found at the site and upon the field topographic survey completed within the site. The watershed delineation was conducted to provide a comparison for pre -development and post - development flows. Outfall "01 " discharges into an existing wetland (See Pre Development Drainage Map - Appendix B) . SECTION 9 - POST - DEVELOPMENT CONDITIONS The post -development drainage basins are shown on the Post -Development conditions watershed map located in Appendix D of this report. The total post -development watershed area analyzed for this project is approximately 18 acres. This site maintains all pre -development discharge points in the post -development condition. Post -development peak flows are less than pre -development conditions for the 2-yr, 10-yr, and 25-yr storm events. See Appendices B through H for pre- and post -development SSA model input and results. See Summary of pre - development versus post -development results at the beginning of report. After development, the site will consist of approximately 76 single family lots in Phase 2 and 96 lots in a future phase, public roads, private driveways, and stormwater management features such as drainage swales and stormwater detention ponds. It should be noted that a portion of Phase 4 lots and impervious area is included in the post development calculations for the proposed pond. Stormwater runoff from site will be conveyed to a proposed wet detention pond. The detention pond will meet NCDEQ pre- and post -development flows and meet freeboard requirements for the ten (10) year, twenty-five (25) year, and fifty (50) year storm events. The proposed detention ponds were designed to meet criteria found in the NCDEQ BMP Design Manual. Additionally, the required freeboard has been provided beneath the emergency spillways and the pond embankments for the (50) year storm event. The following tables illustrate the maximum water surface elevation for the two (2) year, ten (10) year, twenty-five (25) year, and fifty (50) year storm events both ponds. H THOMAS & HUTTON Table 3 - Wet Detention Pond 04 Bottom of Pond = 562.50 Crest of Emergency Spillway = 572.75 Top of Embankment = 573.00 Wet Detention Pond 04 Storm Event Max Elevation (ft) 10-Year 570.53 25-Year 571.12 50-Year 571.62 100-Year 571.99 H THOMAS & HUTTON Page 9 STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 03 APPENDIX A PROJECT MAPPING 27842.0003 Fq THOMAS Sc HUTTON i�5 } y r2Y `� `+ r F FP i t 1F, THOMAS HUTTON 27842 CRESSWIND Aerial 02/22/2021 ■ 1%Annual Chance Flood Hazard Regulatory Floodway * i . ne Special Floodway Area of Undetermined Flood Hazard 0.2%Annual Chance Flood Hazard Future Conditions 1%Annual Chance Flood Hazard a I Area with Reduced Risk Due to Levee d. I�# •�' L + { This map was created using geothinQ I www.geothinQ.com I Mapping Smart Land Decisions ,F T THOMAS HUTTON j TP r 27842 r CRESSWIND ' FEMA 02/22/2021 } ■ 1%Annual Chance Flood Hazard Regulatory Floodway L5 03 Special Floodway Area of Undetermined Flood Hazard 0.2%Annual Chance Flood Hazard Future Conditions 1%Annual Chance Flood Hazard Area with Reduced Risk Due to Levee a ~ ! — Other Boundaries 1+ �y Limit Lines SFHA / Flood Zone Boundary This map was created using geothinQ I www.geothinQ.com I Mapping Smart Land Decisions ,F y T THOMAS HUTTON y 27842 CRESSWIND }, Wetlands oz/zz/zozl �: ■ 1%Annual Chance Flood Hazard 4PrrArl! Regulatory Floodway Special Floodway Area of Undetermined Flood Hazard 0.2%Annual Chance Flood Hazard Future Conditions 1%Annual Chance Flood Hazard Area with Reduced Risk Due to a Levee IL JIF F. 7 - t I � I I III � dp � • _ . This map was created using geothinQ I www.geothinQ.com I Mapping Smart Land Decisions T THOMAS m & H HUTTON 27842 CRESSWIND Soils oz/zz/zozl ■ 1%Annual Chance Flood Hazard 4PrArA&F ■ Regulatory Floodway FLc%'CD�4 i F� D L ■ Special Floodway Area of Undetermined Flood Hazard ■ 0.2%Annual Chance Flood Hazard ■ Future Conditions 1%Annual Chance Flood Hazard Area with Reduced Risk Due to Levee C C in 9adin 9adin B B Tarns Tarns Bad in Water n 11nch= F 1 Water t geo trail This map was created using geothinQ I www.geothinQ.com I Mapping Smart Land Decisions 529700 529800 5299M 34o 59' 16" N g Ir �� n �i r �i n �i Hydrologic Soil Group —Union County, North Carolina (SHP) 530000 530100 5.= 530300 -f,"s g n �i Soil MaN may not he valiel at this Scale. 34o 58' 53" N 529700 529800 529900 530000 530100 530200 Map Scale: 1:5,100 if printed on A landscape (11" x 8.5") sheet. Meters $ N 0 50 100 200 300 Feet 0 200 400 800 1200 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: UTM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey a M 530700 34o 59' 16" N g �i tb �i g n �i 34o 58' 53" N 530700 a M 2/22/2021 Pagel of 4 Hydrologic Soil Group —Union County, North Carolina (SHP) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Union County, North Carolina Survey Area Data: Version 20, Jun 3, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 18, 2011—Oct 30, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 2/22/2021 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Union County, North Carolina 1.9:1N Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BdB2 Badin channery silty C 28.5 51.8% clay loam, 2 to 8 percent slopes, moderately eroded ChA Chewacla silt loam, 0 to B/D 7.1 12.9% 2 percent slopes, frequently flooded GsC Goldston-Badin D 8.9 16.1 % complex, 8 to 15 percent slopes TbB2 Tarrus gravelly silty clay B 10.6 19.2% loam, 2 to 8 percent slopes, moderately eroded Totals for Area of Interest 66.1 100.0% USDA Natural Resources Web Soil Survey 2/22/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Union County, North Carolina 1.9:1N Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 2/22/2021 Conservation Service National Cooperative Soil Survey Page 4 of 4 National Flood Hazard Layer FI RMette 8Oo4O'34"W 34o59'21"N FEMA mob- e r Zone E ' FLo0D31V�4`I` Zone F rn �4REAOF MINIMAL�FL . HAZARD BEET 4 I �UDED) 1 All I LU C W -i Iw ZoneLULU W W �i3 6 s i + 8099'57W 34o58'52"N I :t7,000 0 250 500 1,000 1,500 2,000 Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020 Legend SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT Without Base Flood Elevation (BFE) Zone A, V, A99 SPECIAL FLOOD With BFE or Depth ZoneAE, AO, AH, VE, AR HAZARD AREAS Regulatory Floodway OTHER AREAS OF FLOOD HAZARD 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zonex Future Conditions 1% Annual 4 '- Chance Flood Hazard Zonex "Area with Reduced Flood Risk due to Levee. See Notes. zone " Area with Flood Risk due to Leveezone D NO SCREEN Area of Minimal Flood Hazard Q Effective LOMRs OTHER AREAS Area of Undetermined Flood Hazard GENERAL - — - - Channel, Culvert, or Storm Sewer STRUCTURES IIIIIII Levee, Dike, or Floodwall e zo.z Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation a - - - Coastal Transect —sfa— Base Flood Elevation Line (BFE) Limit of Study Jurisdiction Boundary — --- Coastal Transect Baseline OTHER _ Profile Baseline FEATURES Hydrographic Feature Digital Data Available AN 0 No Digital Data Available MAP PANELS ® Unmapped QThe pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 2/22/2021 at 6:05 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data overtime. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 03 APPENDIX B PRE -DEVELOPMENT DRAINAGE MAP 27842.0003 Fq THOMAS Sc HUTTON Ki r ' ,� i I!I\� WET DETENTI � ���` I, � .•• `•" :i� \ Y:: / \ ��� 111I1 IkIl1�/ %/1(i/— — POND / 1 )) \= _ _ _ AiJ a�illl •��=� tee-- — 1 A �JI/ `:'•-•.'-,:,..,-\-�.' � ' : � '' "��\�Irl � \ I / . .. II IIII /i \\ � \ ,,,, :;� / � i i � I I I� � , � > \v��I� � ��ii V \ 1 IIIIIIIIII IIIIIII� / vvVv✓�/, � � WET DETENTION / V I PHASE I -DEVELOPMENT �A BASIN , POND 2 1 SUB-OI AREA: I0.62 AC. \ v I;\l I \ 1 �" % 3:.•� CN: 84 Tc: 5 MIN. v � ,� � � — •'� •::� IIII % �/ > �J � \ \ �� y \ ) \ �\\ \��\l \ \ \ .•. PHASE I -DEVELOPMENT BASIN UP A. CN: 82 AREA: 57.34 AC. ::::•. --:j • T � fir . _�i V ,, � Tc: 5 MIN �) � A PHASE 2 \�— � — y\ �L /� \/y �• . :•.. � ••••••••• I I� / \Ilwl `-\— _ II�i _ PRE -DEVELOPMENT BASIN \\\ \ \\ / • 111 CNB oI A R E A: 17.12 A C . \ \ �\ \ \ 1 I // /% \ \\\y\\ �\ I:;.;• ✓' \:='=:: \Tc: 35 ` T \ /, / / \ \` \ FUTURE AMENITY .......r� CENTER / PHASE I -DEVELOPMENT �I I / - - BASIN \�\ suB-03 / i 1 vvv vy 1 c N: 67 11 l \1 \yyy v /)vv�\yvv � v \\�iA\� AREA: 2 AC. ��lA h IV 1 I 1 1 (r lI �o — f l / ( \ v v i \ I \w v. / / �� )III I I II(f(� %/ / \� Tc: 5 MIN I (IIIII�IIIIIIII� \�\ ��ram\\�\\\ / I , ` t 1/ll IIII ill III II I I I I (IIIII" y I rl ( (< v v v \ v \ �y y� y/sir \v � / /✓ / v I II II IIIII II I / II v v yvv SHEET PHASE 2 �/ / / / / / \ / \ / /r \ \\ FLOW PATH i r 1 / // ( \\\\VA i \v /// �1\ / / PRE -DEVELOPMENT BASIN \\�i/%i�\lll�ill WE PONDEQ3 SUB-o2// /l (I ����� \ \\ �— --- \\ I J� jC N: 7 6 \ i l l I�A�\,� V A .. ) AREA: 63.74 AC. Tc: 36 FLOW PATH �Vv\�/V/\//%////�/�//I \A'/N//} x � i - ......;� SHALLOW :•::.: / (/ I l l 111 // j \ , CONCENTRATED / / / I / I I� \ `\ ti \ \ �_- / �/ / l( C I � / % � �- — C.1� — r �r�l PHASE -DEVELOPMENT FLOW PATH 18 BASIN SUB-04 y V `v �\� vv �- / CN: 73 AREA: 2.1 AC. Tc: 5 MIN 0 //IIIII f �\vv\�\y \\vv y // �yA��yyy�y�AA�A o /lllrrl�//// l }Ill l/ II I�yi�� l IIII 11 '•. -�� ,AV A � — / / -- � ��VA\\\� � � ,-- ��"� 1l / // l . I , I I I I1. / l I l (/ \• � ,- /, \ � �\ I Ifl}1/fll(I � I \ // 1 I 1 1 / )j��\\�I17} 1111(llrlrl�ll\_�; �7 1� � I � ���,yyA\�`; y \/////// //J/ �% L \Z �\_� r'r1,ti � � � � � �-� a\ � � (� I �IJI I r = \/ / \ \ I �-J \\� � 1 �\ � ► - I I 1 A \ \ 1 Al 0/1 J III 1 1 l / \\�\\�— j J r� \---� \� � ✓�:_—�i/j/ _� ���-��� �...���� .. ,_\\ \\�-\��� \"� // ,�f�S 1 (1/l/ r l \ FUTURE .� ti/ �_ r\•-1�.� �".� `=�/fir �i-_ - �- - ��,'I^�"�L \ -'. -- \� \ _ \/� llrl �l{ 1 r / (I I I \\�\ �I\�� PHASE — ti x H•�� � �. 1 r� � ` \ / -'�` C � �!� I�` -� � I I�.� ." � �M\\`�� \\\ 1'=%}� III / \ I \ 1\11; 1' \ ` \\, L � I I I \ � \ _ T c5 L 1L �—Ok-1 .,rt-� C �{a��-�q`hIL''•\-'^I \\JJ --\��) SIT 2 _ 7y _ —i�, -�,y FUTURE STORMWATER I ,;,///1 - \\ \\ \� 1 MANAGEMENT \ \ FUTURE STORMWATER \ (\\\\ IMP` \ \ — IBMP POND 4 )) I MANAGEMENT �A�Als�l,r � BMP POND 5 - \� yyry i �` fl'\ i 4. � .�•:y A;,t�/ /// / �� J 1 � �� wAA\\\m 11 III 1�� ��\,\�/= ?`> — — / / � � \ _ \�\ \. � .:__�::�'::::�;::.;.: • ��� 1./r,� 51t � "•.�:.. 1I / IIII) J III' � -�i, � �� �� -- -r. � -- .—L � �_ -\\\•>:..�..;.::--�-�::•:::::�:�`�':: �o �-i- I ► w S PRE -DEVELOPMENT DRAINAGE EXHIBIT E CRESSWIND PHASE 2 MONROE, NC PREPARED FOR: KH WESLEY CHAPEL, LLC PREPARED BY: \ THOMAS HUTTON 1020 Euclid Avenue Charlotte, NC 28202 • 980.201.5505 w vw.thomasandhutton.com JOB NO: J-27842.0002 DATE: 2/16/2021 DRAWN: KSC SCALE: 1"= 180' REVIEWED: MSK SHEET: N/A STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 03 APPENDIX C PRE -DEVELOPMENT CONDITIONS DRAINAGE CALCULATIONS 27842.0003 Fq THOMAS Sc HUTTON 27842.0003 CRESSWIND WESLEY CHAPEL - PHASE 03 PRE -DEVELOPMENT BASINS MODEL Post -Development 002 - Year Page 1 Project Description File Name .................................................... 27842.0003 - PRE.SPF Project Options Flow Units --------------------------------------------------- CFS Elevation Type Elevation Hydrology Method . SCS TR-55 Time of Concentration (TOC) Method -------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes ------------ YES Skip Steady State Analysis Time Periods --- NO Analysis Options Start Analysis On . Dec 03, 2019 00:00:00 End Analysis On . Dec 04, 2019 00:00:00 Start Reporting On . Dec 03, 2019 00:00:00 Antecedent Dry Days 0 days Runoff (Dry Weather) Time Step ---------------- 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step --------------- 0 00:05:00 days hh:mm:ss Reporting Time Step ----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step -------------------------------------- 15 seconds Number of Elements Qty Rain Gages 1 Subbasins 1 Nodes 1 Junctions 0 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 0 Channels 0 Pipes 0 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-002 Intensity inches North Carolina Union 2 3.50 SCS Type II 247hr Post -Development 002 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted ID Factor Curve Number Total Total Total Peak Time of Rainfall Runoff Runoff Runoff Concentration Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 SUB-01 55.97 0.00 73.00 3.50 1.18 66.04 56.55 0 0028:45 Post -Development 002 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 OUT-01 Outfall 0.00 0.00 0.00 Post -Development 002 - Year Subbasin Hydrology Page 4 Subbasin : SUB-01 Input Data Area(ac)------------------------------------------------------------------------ 55-97 Peak Rate Factor----------------------------------------------------------- 0-00 Weighted Curve Number----------------------------------------------- 73-00 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 55-97 - 73-00 Composite Area & Weighted CN 55-97 73-00 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation : Tc = (0-007 * ((n * Lf)^0-8)) / ((P^0-5) * (Sf^0-4)) Where : Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation : V = 16-1345 * (Sf^0-5) (unpaved surface) V = 20-3282 * (Sf^0-5) (paved surface) V = 15-0 * (Sf^0-5) (grassed waterway surface) V = 10-0 * (Sf^0-5) (nearly bare & untilled surface) V = 9-0 * (Sf^0-5) (cultivated straight rows surface) V = 7-0 * (Sf^0-5) (short grass pasture surface) V = 5-0 * (Sf^0-5) (woodland surface) V = 2-5 * (Sf^0-5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation: V = (1-49 * (R^(2/3)) * (Sf^0-5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where : Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (W) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness Post -Development 002 - Year Page 5 Post -Development 002 - Year Page 6 Sheet Flow Computations Manning's Roughness Flow Length (ft) Slope (%) : 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min) : Shallow Concentrated Flow Computations Flow Length (ft) Slope (%) : Surface Type : Velocity (ft/sec) Computed Flow Time (min) : Total TOC (min) ------------------ Subbasin Runoff Results Flowpath Flowpath Flowpath A B C 3 0.00 0.00 100 0.00 0.00 4 0.00 0.00 3.50 0.00 0.00 0.13 0.00 0.00 12.36 0.00 0.00 Flowpath Flowpath Flowpath A B C 2460 0.00 0.00 2.4 0.00 0.00 Unpaved Unpaved Unpaved 2.50 0.00 0.00 16.40 0.00 0.00 Total Rainfall (in)------------------------------------------------------------ 3.50 Total Runoff (in)------------------------------------------------------------- 1.18 Peak Runoff (cfs)----------------------------------------------------------- 56.55 Weighted Curve Number----------------------------------------------- 73.00 Time of Concentration (days hh:mm:ss)------------------------ 0 0028:46 Post -Development 002 - Year Page 7 Post -Development 002 - Year Page 8 Subbasin : SUB-01 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 3 -E� 2.8 _— 2.6 2.4 2.2 Fr, 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 02 N L] Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Post -Development 002 - Year Page 9 Post -Development 010 - Year Page 1 Project Description File Name .................................................... 27842.0003 - PRE.SPF Project Options Flow Units --------------------------------------------------- CFS Elevation Type Elevation Hydrology Method . SCS TR-55 Time of Concentration (TOC) Method -------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes ------------ YES Skip Steady State Analysis Time Periods --- NO Analysis Options Start Analysis On . Dec 03, 2019 00:00:00 End Analysis On . Dec 04, 2019 00:00:00 Start Reporting On . Dec 03, 2019 00:00:00 Antecedent Dry Days 0 days Runoff (Dry Weather) Time Step ---------------- 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step --------------- 0 00:05:00 days hh:mm:ss Reporting Time Step ----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step -------------------------------------- 15 seconds Number of Elements Qty Rain Gages 1 Subbasins 1 Nodes 1 Junctions 0 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 0 Channels 0 Pipes 0 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-010 Intensity inches North Carolina Union 10 520 SCS Type II 247hr Post -Development 010 - Year Page 2 Subbasin Summary SIN Subbasin Area Peak Rate Weighted ID Factor Curve Number Total Total Total Peak Time of Rainfall Runoff Runoff Runoff Concentration Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 SUB-01 55.97 0.00 73.00 5.20 2.44 136.45 122.70 0 00:28:45 Post -Development 010 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 OUT-01 Outfall 0.00 0.00 0.00 Post -Development 010 - Year Subbasin Hydrology Page 4 Subbasin : SUB-01 Input Data Area(ac)------------------------------------------------------------------------ 55-97 Peak Rate Factor----------------------------------------------------------- 0-00 Weighted Curve Number----------------------------------------------- 73-00 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 55-97 - 73-00 Composite Area & Weighted CN 55-97 73-00 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation : Tc = (0-007 * ((n * Lf)^0-8)) / ((P^0-5) * (Sf^0-4)) Where : Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation : V = 16-1345 * (Sf^0-5) (unpaved surface) V = 20-3282 * (Sf^0-5) (paved surface) V = 15-0 * (Sf^0-5) (grassed waterway surface) V = 10-0 * (Sf^0-5) (nearly bare & untilled surface) V = 9-0 * (Sf^0-5) (cultivated straight rows surface) V = 7-0 * (Sf^0-5) (short grass pasture surface) V = 5-0 * (Sf^0-5) (woodland surface) V = 2-5 * (Sf^0-5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation: V = (1-49 * (R^(2/3)) * (Sf^0-5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where : Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (W) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness Post -Development 010 - Year Page 5 Post -Development 010 - Year Page 6 Sheet Flow Computations Manning's Roughness Flow Length (ft) Slope (%) : 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min) : Shallow Concentrated Flow Computations Flow Length (ft) Slope (%) : Surface Type : Velocity (ft/sec) Computed Flow Time (min) : Total TOC (min) ------------------ Subbasin Runoff Results Flowpath Flowpath Flowpath A B C 3 0.00 0.00 100 0.00 0.00 4 0.00 0.00 3.50 0.00 0.00 0.13 0.00 0.00 12.36 0.00 0.00 Flowpath Flowpath Flowpath A B C 2460 0.00 0.00 2.4 0.00 0.00 Unpaved Unpaved Unpaved 2.50 0.00 0.00 16.40 0.00 0.00 Total Rainfall (in)------------------------------------------------------------ 520 Total Runoff (in)------------------------------------------------------------- 2.44 Peak Runoff (cfs)----------------------------------------------------------- 122.70 Weighted Curve Number----------------------------------------------- 73.00 Time of Concentration (days hh:mm:ss)------------------------ 0 0028:46 Post -Development 010 - Year Page 7 Post -Development 010 - Year Page 8 Subbasin : SUB-01 7.5 7 6.5 6 5.5 5 4.6 4 3.5 Fr, 3 2.5 2 1.5 0.5 125 120 115 110 105 100 95 90 85 80 75 N 70 65 0 60 55 50 45 40 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Post -Development 010 - Year Page 9 Post -Development 025 - Year Page 1 Project Description File Name .................................................... 27842.0003 - PRE.SPF Project Options Flow Units --------------------------------------------------- CFS Elevation Type Elevation Hydrology Method . SCS TR-55 Time of Concentration (TOC) Method -------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes ------------ YES Skip Steady State Analysis Time Periods --- NO Analysis Options Start Analysis On . Dec 03, 2019 00:00:00 End Analysis On . Dec 04, 2019 00:00:00 Start Reporting On . Dec 03, 2019 00:00:00 Antecedent Dry Days 0 days Runoff (Dry Weather) Time Step ---------------- 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step --------------- 0 00:05:00 days hh:mm:ss Reporting Time Step ----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step -------------------------------------- 15 seconds Number of Elements Qty Rain Gages 1 Subbasins 1 Nodes 1 Junctions 0 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 0 Channels 0 Pipes 0 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-025 Intensity inches North Carolina Union 25 6.10 SCS Type II 247hr Post -Development 025 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted ID Factor Curve Number Total Total Total Peak Time of Rainfall Runoff Runoff Runoff Concentration Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 SUB-01 55.97 0.00 73.00 6.10 3.17 177.54 160.63 0 0028:45 Post -Development 025 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 OUT-01 Outfall 0.00 0.00 0.00 Post -Development 025 - Year Subbasin Hydrology Page 4 Subbasin : SUB-01 Input Data Area(ac)------------------------------------------------------------------------ 55-97 Peak Rate Factor----------------------------------------------------------- 0-00 Weighted Curve Number----------------------------------------------- 73-00 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 55-97 - 73-00 Composite Area & Weighted CN 55-97 73-00 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation : Tc = (0-007 * ((n * Lf)^0-8)) / ((P^0-5) * (Sf^0-4)) Where : Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation : V = 16-1345 * (Sf^0-5) (unpaved surface) V = 20-3282 * (Sf^0-5) (paved surface) V = 15-0 * (Sf^0-5) (grassed waterway surface) V = 10-0 * (Sf^0-5) (nearly bare & untilled surface) V = 9-0 * (Sf^0-5) (cultivated straight rows surface) V = 7-0 * (Sf^0-5) (short grass pasture surface) V = 5-0 * (Sf^0-5) (woodland surface) V = 2-5 * (Sf^0-5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation: V = (1-49 * (R^(2/3)) * (Sf^0-5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where : Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (W) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness Post -Development 025 - Year Page 5 Post -Development 025 - Year Page 6 Sheet Flow Computations Manning's Roughness Flow Length (ft) Slope (%) : 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min) : Shallow Concentrated Flow Computations Flow Length (ft) Slope (%) : Surface Type : Velocity (ft/sec) Computed Flow Time (min) : Total TOC (min) ------------------ Subbasin Runoff Results Flowpath Flowpath Flowpath A B C 3 0.00 0.00 100 0.00 0.00 4 0.00 0.00 3.50 0.00 0.00 0.13 0.00 0.00 12.36 0.00 0.00 Flowpath Flowpath Flowpath A B C 2460 0.00 0.00 2.4 0.00 0.00 Unpaved Unpaved Unpaved 2.50 0.00 0.00 16.40 0.00 0.00 Total Rainfall (in)------------------------------------------------------------ 6.10 Total Runoff (in)------------------------------------------------------------- 3.17 Peak Runoff (cfs)----------------------------------------------------------- 160.63 Weighted Curve Number----------------------------------------------- 73.00 Time of Concentration (days hh:mm:ss)------------------------ 0 0028:46 Post -Development 025 - Year Page 7 Post -Development 025 - Year Page 8 Subbasin : SUB-01 8.5 8 7.5 7 6.5 6 5.5 5 4.5 4 3.5 3 2.5 2 1.5 0.5 180 170 160 150 140 130 120 110 100 0 90 80 70 60 50 40 30 20 10 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Post -Development 025 - Year Page 9 Post -Development 050 - Year Page 1 Project Description File Name .................................................... 27842.0003 - PRE.SPF Project Options Flow Units --------------------------------------------------- CFS Elevation Type Elevation Hydrology Method . SCS TR-55 Time of Concentration (TOC) Method -------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes ------------ YES Skip Steady State Analysis Time Periods --- NO Analysis Options Start Analysis On . Dec 03, 2019 00:00:00 End Analysis On . Dec 04, 2019 00:00:00 Start Reporting On . Dec 03, 2019 00:00:00 Antecedent Dry Days 0 days Runoff (Dry Weather) Time Step ---------------- 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step --------------- 0 00:05:00 days hh:mm:ss Reporting Time Step ----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step -------------------------------------- 15 seconds Number of Elements Qty Rain Gages 1 Subbasins 1 Nodes 1 Junctions 0 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 0 Channels 0 Pipes 0 Pumps 0 Orifices 0 Weirs 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-050 Intensity inches North Carolina Union 50 6.90 SCS Type II 247hr Post -Development 050 - Year Page 2 Subbasin Summary SIN Subbasin Area Peak Rate Weighted ID Factor Curve Number Total Total Total Peak Time of Rainfall Runoff Runoff Runoff Concentration Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 SUB-01 55.97 0.00 73.00 6.90 3.85 215.43 195.04 0 00:28:45 Post -Development 050 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 OUT-01 Outfall 0.00 0.00 0.00 Post -Development 050 - Year Subbasin Hydrology Page 4 Subbasin : SUB-01 Input Data Area(ac)------------------------------------------------------------------------ 55-97 Peak Rate Factor----------------------------------------------------------- 0-00 Weighted Curve Number----------------------------------------------- 73-00 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 55-97 - 73-00 Composite Area & Weighted CN 55-97 73-00 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation : Tc = (0-007 * ((n * Lf)^0-8)) / ((P^0-5) * (Sf^0-4)) Where : Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation : V = 16-1345 * (Sf^0-5) (unpaved surface) V = 20-3282 * (Sf^0-5) (paved surface) V = 15-0 * (Sf^0-5) (grassed waterway surface) V = 10-0 * (Sf^0-5) (nearly bare & untilled surface) V = 9-0 * (Sf^0-5) (cultivated straight rows surface) V = 7-0 * (Sf^0-5) (short grass pasture surface) V = 5-0 * (Sf^0-5) (woodland surface) V = 2-5 * (Sf^0-5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation: V = (1-49 * (R^(2/3)) * (Sf^0-5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where : Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (W) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness Post -Development 050 - Year Page 5 Post -Development 050 - Year Page 6 Sheet Flow Computations Manning's Roughness Flow Length (ft) Slope (%) : 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min) : Shallow Concentrated Flow Computations Flow Length (ft) Slope (%) : Surface Type : Velocity (ft/sec) Computed Flow Time (min) : Total TOC (min) ------------------ Subbasin Runoff Results Flowpath Flowpath Flowpath A B C 3 0.00 0.00 100 0.00 0.00 4 0.00 0.00 3.50 0.00 0.00 0.13 0.00 0.00 12.36 0.00 0.00 Flowpath Flowpath Flowpath A B C 2460 0.00 0.00 2.4 0.00 0.00 Unpaved Unpaved Unpaved 2.50 0.00 0.00 16.40 0.00 0.00 Total Rainfall (in)------------------------------------------------------------ 6.90 Total Runoff (in)------------------------------------------------------------- 3.85 Peak Runoff (cfs)----------------------------------------------------------- 195.04 Weighted Curve Number----------------------------------------------- 73.00 Time of Concentration (days hh:mm:ss)------------------------ 0 0028:46 Post -Development 050 - Year Page 7 Post -Development 050 - Year Page 8 Subbasin : SUB-01 9.5 9 8.5 8 7.5 7 6.5 6 5.5 5 ° 4.5 4 3.5 3 2.5 2 1.5 0.5 210 200 190 180 170 160 150 140 130 N 120 110 100 90 80 70 60 50 40 30 20 10 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time (hrs) Post -Development 050 - Year Page 9 STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 03 APPENDIX D POST -DEVELOPMENT DRAINAGE MAP ►�:�►��I�I�Ii3 A THOMAS Sc HUTTON -• ::fie:. / < / / / < / / � ' _ _ / __/ _/ " _ / WET DETEN ••::��w\_� �'e" .. :. •-:I•-,-L LI-- / POND I VIA OUTFALL 02 WET DETENTIO POND SHALLOW CONCENTRATED/ FLOW: 1102' \ SHEET FLOW: -�\\r 100' �v I I -_ - vLOW PATH v v HATCH LEGEND PHASE 2 BUA TO POND 03 A <\ / A `�.A �� A<,�� EXISTING /�� / \ ('•' h/ PHASE I / / PHASE 3 BUA TO POND 03 / � -:.•:/ �---: - - `----��'--� ' _ 4 PHASE 3 BUA TO POND 04 _ ' \ I — — I• / _ _ SHEET FLOW / PHASE 4 BUA TO POND 04 / :'/ t �' , — — — L BMP ACCESS EASEMENT EX \ \ �L __— _ TEND OUT TO EXISTING \ / ' UNDISTURBED POTTER ROAD RIGHT OF WAY \ �\� _ y AREA: 13.14 AC. \ .. _—_ I _ OUGHBY ROA _ �• : \ _�...... MIN. - '• "' \ \WILL RIW o / --� :;...: , y� - \I �_— II II'I I'I I'I ;'I lil / �' A RAINTED HEVRON PATH -_ -_ -_ - — II pl 1, / / \ // \ \. \ \ / % IN INTRSE TION ;.: �3� j / / - - - - - - L � L _j J L J L J L J � JI'l \� / FUTURE / \ // II WITH PK NAIL) ' - i L - :x ' .:...................... /% / �/ \ AMENITY /\ ' ELEV. s31. / :i: _ - - - i •• •• •••••••••••••• ` /r �C PROJECTBENMARK /� - / \ < > CENTER y �% < I L — — I ICI \/i •� �/ y 1- �� - - - �I _ 1. ��. PHASE 2 BASIN TO POND 03 < \/ �,/��•_ / \\ \\\ / \ / I / / y i - _ = SUB-03 SHALLOW /yI-i - - - - _ AREA. 45.3 AC. /,'/ �// �•� / / \ -- y / CONCENTRATED _ _ _ - �� -' CN: 86 G/ \, / ;� ' � i/'\ - I ,,, / FLOW: 1370;i_ / Tc: 5 MIN. - � E �T/ING // e.<.::'i < - - •I J�J�� // / \ \.\ / /i ./ ��_ \ \ PHASE I r \ --� 1r / / •�:... _- - i- - - �f • ICI � l v�v' _�. < /, i �,vyv \\, ��� i .\� / pl Iq � �-- '"" � / vv 4 \ — IWET DETENTION UNDISTURBED BASIN POND 03 SUB-02 ry�/ ry / / \ \ / J AREA: 23.79 AC. �I Tc: 37 MIN. i l \ r l•l �\ \ \ \ / , I I,I II `II \1 \`\ / \ / \ \ / II 1...,..n,: IA �NN ' r < v / 2_ \ UNDISTURBED BASIN / \: SUB-05 AREA: 43.5 AC. c. _ CN: 73 FUTURE •/ / � \/ �AyA�_"' �"y/ � VAS � < � . 1 \ _ �' V �v�� � Tc: 32 MIN. PHASE 7k / 000 < VA VA �AV A ✓'" ' � \ PHASE 3 BASIN TO POND 04-- � AREA:-- CN: 86 Tc: 5 MIN.T\\ \\\ \ • - - - - / -- \ I -- WET DETENTION POND 04 / IT - I - FUTURE I FUTURE _ - - -E- _ PHASE- ---T- - f � , \ \ -i FUTURE STORMWATER MANAGEMENT \� FUTURE ST MWA R I BMP \ MANAGEM T \ \ \ BMP - I POND 4 I ��- � POND 5 � �= OUTFACE 03 — `' --- -- GRAPHIC SCALE 200 0 100 2 10 400 � ( IN FEET ) � I inch = 200 ft. , 800 N W m F- N Q o OD Y r m z 0 w cr a U � - o z O U� Z Lq o E Q 0 0 0 00 N �` O O > • Q (y) c � 2 -90 L r w u E 07 CV O � O � 3 _c U Q � U J w � Q w Z W U) Q Q z Q - = � 0 _a. Z ? UQ 1 o w z z � z 0 J U) U) U) w W 3 W 0,-, w i Y U) a - JOB NO: J-27842.0003 DATE: 4/5/21 DRAWN: KSC DESIGNED: DAC REVIEWED: MSK APPROVED: MSK SCALE: I" = 200' C3*30IIIIIIIIIIIIIIIIIII STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 03 APPENDIX E POST -DEVELOPMENT CONDITIONS DRAINAGE CALCULATIONS 27842.0003 Fq THOMAS Sc HUTTON 27842.0003 CRESSWIND WESLEY CHAPEL - PHASE 03 POST -DEVELOPMENT BASINS MODEL Post -Development 002 - Year Page 1 Project Description File Name .................................................... 27842.0003 - POST.SPF Project Options Flow Units --------------------------------------------------- CFS Elevation Type Elevation Hydrology Method . SCS TR-55 Time of Concentration (TOC) Method -------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes ------------ YES Skip Steady State Analysis Time Periods --- NO Analysis Options Start Analysis On . Dec 03, 2020 00:00:00 End Analysis On . Dec 04, 2020 00:00:00 Start Reporting On . Dec 03, 2020 00:00:00 Antecedent Dry Days 0 days Runoff (Dry Weather) Time Step ---------------- 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step --------------- 0 00:05:00 days hh:mm:ss Reporting Time Step ----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step -------------------------------------- 15 seconds Number of Elements Qty Rain Gages 1 Subbasins 2 Nodes 4 Junctions 1 Outfalls 2 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 5 Channels 0 Pipes 1 Pumps 0 Orifices 2 Weirs 2 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-002 Intensity inches North Carolina Union 2 3.50 SCS Type III 24-hr Post -Development 002 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted ID Factor Curve Number Total Total Total Peak Time of Rainfall Runoff Runoff Runoff Concentration Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 SUB-04 17.91 0.00 88.62 3.50 2.32 41.60 42.47 0 00-05-00 2 SUB-05 43.54 0.00 73.00 3.50 1.18 51.38 33.54 0 0028:45 Post -Development 002 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) 1 CONTROL -STRUCTURE Junction 567.00 573.00 0.00 0.00 1.00 2.65 567.84 0.00 9.66 0 00:00 0.00 2 Emergency-Outffall Outffall 560.00 0.00 560.00 3 Out-02 Outffall 560.00 33.60 560.00 4 Pond-04 Storage Node 562.50 573.50 567.00 1.00 41.94 569.51 0.00 Post -Development Total Time Flooded (min) 0.00 0.00 002 - Year Page 4 Post -Development 002 - Year Page 5 Link Summary SN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) ( % ) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 Outlet -Pipe Pipe Out-02 CONTROL -STRUCTURE 89.00 567.00 566.64 0.4000 36.000 0.0150 2.65 1.94 1.37 224 0.67 022 0.00 > CAPACITY 2 CS -RIM Orifice Pond-04 CONTROL -STRUCTURE 562.50 567.00 60.000 0.00 3 WQ-Orifice-04 Orifice Pond-04 CONTROL -STRUCTURE 562.50 567.00 3.000 0.32 4 Spillway-04 Weir Pond-04 Emergency-Outffall 562.50 560.00 0.00 5 Weir-04 Weir Pond-04 CONTROL -STRUCTURE 562.50 567.00 2.33 Post -Development 002 - Year Subbasin Hydrology Page 6 Subbasin : SUB-04 Input Data Area(ac)------------------------------------------------------------------------ 17-91 Peak Rate Factor----------------------------------------------------------- 0-00 Weighted Curve Number----------------------------------------------- 88-62 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking & roofs 12.08 B 98-00 Future -Paved parking & roofs 1.29 B 98-00 > 75 % grass cover, Good 4.54 B 61-00 Composite Area & Weighted CN 17.91 88-62 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation : Tc = (0-007 * ((n * Lf)^0-8)) / ((P^0-5) * (Sf^0-4)) Where : Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation : V = 16-1345 * (Sf^0-5) (unpaved surface) V = 20-3282 * (Sf^0-5) (paved surface) V = 15-0 * (Sf^0-5) (grassed waterway surface) V = 10-0 * (Sf^0-5) (nearly bare & untilled surface) V = 9-0 * (Sf^0-5) (cultivated straight rows surface) V = 7-0 * (Sf^0-5) (short grass pasture surface) V = 5-0 * (Sf^0-5) (woodland surface) V = 2-5 * (Sf^0-5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation: V = (1-49 * (R^(2/3)) * (Sf^0-5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where : Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 5 Subbasin Runoff Results Total Rainfall (in)------------------------------------------------------------ 3-50 Total Runoff (in)------------------------------------------------------------- 2-32 Peak Runoff (cfs)----------------------------------------------------------- 42-47 Weighted Curve Number----------------------------------------------- 88-62 Time of Concentration (days hh:mm:ss)------------------------ 0 00-05-00 Post -Development 002 - Year Page 7 Post -Development 002 - Year Page 8 Subbasin : SUB-04 3 2.9 2.8 2.7 2.6 2.5 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 1.6 1.5 -E 1.4 � 1.3 1.2 1.1 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 02 0.1 44 42 40 38 36 34 32 30 28 26 � 24 v 22 0 20 18 16 14 12 10 8 6 4 2 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Post -Development 002 - Year Page 9 Post -Development 002 - Year Subbasin : SUB-05 Page 10 Input Data Area(ac)------------------------------------------------------------------------ 43.54 Peak Rate Factor----------------------------------------------------------- 0.00 Weighted Curve Number----------------------------------------------- 73.00 RainGage ID----------------------------------------------------------------- Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 43.54 - 73.00 Composite Area & Weighted CN 43.54 73.00 Time of Concentration Sheet Flow Computations Manning's Roughness Flow Length (ft) Slope (%) : 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min) : Shallow Concentrated Flow Computations Flow Length (ft) Slope (%) : Surface Type : Velocity (ft/sec) Computed Flow Time (min) : Total TOC (min) ------------------ Subbasin Runoff Results Flowpath Flowpath Flowpath A B C 3 0.00 0.00 100 0.00 0.00 4 0.00 0.00 3.50 0.00 0.00 0.13 0.00 0.00 12.36 0.00 0.00 Flowpath Flowpath Flowpath A B C 2460 0.00 0.00 2.4 0.00 0.00 Unpaved Unpaved Unpaved 2.50 0.00 0.00 16.40 0.00 0.00 Total Rainfall (in)------------------------------------------------------------ 3.50 Total Runoff (in)------------------------------------------------------------- 1.18 Peak Runoff (cfs)----------------------------------------------------------- 33.54 Weighted Curve Number----------------------------------------------- 73.00 Time of Concentration (days hh:mm:ss)------------------------ 0 0028:46 Post -Development 002 - Year Page 11 Post -Development 002 - Year Page 12 Subbasin : SUB-05 3.1 3 2.9 2.8 2.7 2.6 2.5 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 v 1.6 1.5 1.4 1.3 1.2 1.1 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 36 34 32 30 28 26 24 22 20 v 18 0 16 14 12 10 8 6 4 2 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Post -Development 002 - Year Page 13 Post -Development 002 - Year Page 14 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) ( % ) (in) (in) (cfs) 1 Outlet -Pipe 89.00 567.00 7.00 566.64 -0.36 0.36 0.4000 CIRCULAR 36.000 36.000 0.0150 0.5000 0.5000 0.0000 0.00 No Post -Development 002 - Year Page 15 No. of Barrels Post -Development 002 - Year Page 16 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Outlet -Pipe 2.65 0 1420 1.94 1.37 224 0.66 0.67 022 0.00 > CAPACITY Post -Development 002 - Year Page 17 Storage Nodes Storage Node : Pond-04 Input Data Invert Elevation (ft)-------------------------------------------------------------------- 562-50 Max (Rim) Elevation (ft)------------------------------------------------------------ 573-50 Max (Rim) Offset (ft)----------------------------------------------------------------- 11-00 Initial Water Elevation (ft)---------------------------------------------------------- 567-00 Initial Water Depth (ft)--------------------------------------------------------------- 4-50 Ponded Area (ft) ----------------------------------------------------------------------- 1-00 Evaporation Loss----------------------------------------------------------------------- 0-00 Outflow Weirs SIN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-04 Trapezoidal No 572-75 1025 20-00 0-75 3-33 2 Weir-04 Rectangular No 569-00 6-50 2-00 4-00 3-33 Outflow Orifices SIN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS -RIM Bottom Rectangular No 60-00 60-00 573-00 0-63 2 WQ-Orifice-04 Side CIRCULAR No 3-00 567-00 0-61 Output Summary Results Peak Inflow (cfs)------------------------------------------------------------------------ 41-94 Peak Lateral Inflow (cfs)------------------------------------------------------------ 41-94 Peak Outflow (cfs)--------------------------------------------------------------------- 2-65 Peak Exfiltration Flow Rate (cfm)---------------------------------------------- 0-00 Max HGL Elevation Attained (ft)------------------------------------------------ 569-51 Max HGL Depth Attained (ft)----------------------------------------------------- 7-01 Average HGL Elevation Attained (ft)----------------------------------------- 56828 Average HGL Depth Attained (ft)---------------------------------------------- 5-78 Time of Max HGL Occurrence (days hh:mm)--------------------------- 0 14-19 Total Exfiltration Volume (1000-ft3)------------------------------------------- 0-000 Total Flooded Volume (ac-in) - 0 Total Time Flooded (min) 0 Total Retention Time (sec) -------------------------------------------------------- 0-00 Post -Development 010 - Year Page 1 Project Description File Name .................................................... 27842.0003 - POST.SPF Project Options Flow Units --------------------------------------------------- CFS Elevation Type Elevation Hydrology Method . SCS TR-55 Time of Concentration (TOC) Method -------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes ------------ YES Skip Steady State Analysis Time Periods --- NO Analysis Options Start Analysis On . Dec 03, 2020 00:00:00 End Analysis On . Dec 04, 2020 00:00:00 Start Reporting On . Dec 03, 2020 00:00:00 Antecedent Dry Days 0 days Runoff (Dry Weather) Time Step ---------------- 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step --------------- 0 00:05:00 days hh:mm:ss Reporting Time Step ----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step -------------------------------------- 15 seconds Number of Elements Qty Rain Gages 1 Subbasins 2 Nodes 4 Junctions 1 Outfalls 2 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 5 Channels 0 Pipes 1 Pumps 0 Orifices 2 Weirs 2 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-010 Intensity inches North Carolina Union 10 520 SCS Type III 24-hr Post -Development 010 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted ID Factor Curve Number Total Total Total Peak Time of Rainfall Runoff Runoff Runoff Concentration Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 SUB-04 17.91 0.00 88.62 520 3.92 7028 69.61 0 00-05-00 2 SUB-05 43.54 0.00 73.00 520 2.44 106.15 72.31 0 0028:45 Post -Development 010 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) 1 CONTROL -STRUCTURE Junction 567.00 573.00 0.00 0.00 1.00 11.05 568.63 0.00 8.87 0 00:00 0.00 2 Emergency-Outffall Outffall 560.00 0.00 560.00 3 Out-02 Outffall 560.00 81.52 560.00 4 Pond-04 Storage Node 562.50 573.50 567.00 1.00 68.94 570.53 0.00 Post -Development Total Time Flooded (min) 0.00 0.00 010 - Year Page 4 Post -Development 010 - Year Page 5 Link Summary SN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) ( % ) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 Outlet -Pipe Pipe Out-02 CONTROL -STRUCTURE 89.00 567.00 566.64 0.4000 36.000 0.0150 11.05 1.94 5.70 3.61 1.34 0.45 0.00 > CAPACITY 2 CS -RIM Orifice Pond-04 CONTROL -STRUCTURE 562.50 567.00 60.000 0.00 3 WQ-Orifice-04 Orifice Pond-04 CONTROL -STRUCTURE 562.50 567.00 3.000 0.33 4 Spillway-04 Weir Pond-04 Emergency-Outffall 562.50 560.00 0.00 5 Weir-04 Weir Pond-04 CONTROL -STRUCTURE 562.50 567.00 10.71 Post -Development 010 - Year Subbasin Hydrology Page 6 Subbasin : SUB-04 Input Data Area(ac)------------------------------------------------------------------------ 17-91 Peak Rate Factor----------------------------------------------------------- 0-00 Weighted Curve Number----------------------------------------------- 88-62 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking & roofs 12.08 B 98-00 Future -Paved parking & roofs 1.29 B 98-00 > 75 % grass cover, Good 4.54 B 61-00 Composite Area & Weighted CN 17.91 88-62 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation : Tc = (0-007 * ((n * Lf)^0-8)) / ((P^0-5) * (Sf^0-4)) Where : Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation : V = 16-1345 * (Sf^0-5) (unpaved surface) V = 20-3282 * (Sf^0-5) (paved surface) V = 15-0 * (Sf^0-5) (grassed waterway surface) V = 10-0 * (Sf^0-5) (nearly bare & untilled surface) V = 9-0 * (Sf^0-5) (cultivated straight rows surface) V = 7-0 * (Sf^0-5) (short grass pasture surface) V = 5-0 * (Sf^0-5) (woodland surface) V = 2-5 * (Sf^0-5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation: V = (1-49 * (R^(2/3)) * (Sf^0-5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where : Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 5 Subbasin Runoff Results Total Rainfall (in)------------------------------------------------------------ 520 Total Runoff (in)------------------------------------------------------------- 3-92 Peak Runoff (cfs)----------------------------------------------------------- 69-61 Weighted Curve Number----------------------------------------------- 88-62 Time of Concentration (days hh:mm:ss)------------------------ 0 00-05-00 Post -Development 010 - Year Page 7 Post -Development 010 - Year Page 8 Subbasin : SUB-04 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 75 70 65 60 55 50 45 40 0 � 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Post -Development 010 - Year Page 9 Post -Development 010 - Year Subbasin : SUB-05 Page 10 Input Data Area(ac)------------------------------------------------------------------------ 43.54 Peak Rate Factor----------------------------------------------------------- 0.00 Weighted Curve Number----------------------------------------------- 73.00 RainGage ID----------------------------------------------------------------- Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 43.54 - 73.00 Composite Area & Weighted CN 43.54 73.00 Time of Concentration Sheet Flow Computations Manning's Roughness Flow Length (ft) Slope (%) : 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min) : Shallow Concentrated Flow Computations Flow Length (ft) Slope (%) : Surface Type : Velocity (ft/sec) Computed Flow Time (min) : Total TOC (min) ------------------ Subbasin Runoff Results Flowpath Flowpath Flowpath A B C 3 0.00 0.00 100 0.00 0.00 4 0.00 0.00 3.50 0.00 0.00 0.13 0.00 0.00 12.36 0.00 0.00 Flowpath Flowpath Flowpath A B C 2460 0.00 0.00 2.4 0.00 0.00 Unpaved Unpaved Unpaved 2.50 0.00 0.00 16.40 0.00 0.00 Total Rainfall (in)------------------------------------------------------------ 520 Total Runoff (in)------------------------------------------------------------- 2.44 Peak Runoff (cfs)----------------------------------------------------------- 72.31 Weighted Curve Number----------------------------------------------- 73.00 Time of Concentration (days hh:mm:ss)------------------------ 0 0028:46 Post -Development 010 - Year Page 11 Post -Development 010 - Year Page 12 Subbasin : SUB-05 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 so 75 70 65 60 55 5o 45 v 40 0 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Post -Development 010 - Year Page 13 Post -Development 010 - Year Page 14 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) ( % ) (in) (in) (cfs) 1 Outlet -Pipe 89.00 567.00 7.00 566.64 -0.36 0.36 0.4000 CIRCULAR 36.000 36.000 0.0150 0.5000 0.5000 0.0000 0.00 No Post -Development 010 - Year Page 15 No. of Barrels Post -Development 010 - Year Page 16 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Outlet -Pipe 11.05 0 12:40 1.94 5.70 3.61 0.41 1.34 0.45 0.00 > CAPACITY Post -Development 010 - Year Page 17 Storage Nodes Storage Node : Pond-04 Input Data Invert Elevation (ft)-------------------------------------------------------------------- 562-50 Max (Rim) Elevation (ft)------------------------------------------------------------ 573-50 Max (Rim) Offset (ft)----------------------------------------------------------------- 11-00 Initial Water Elevation (ft)---------------------------------------------------------- 567-00 Initial Water Depth (ft)--------------------------------------------------------------- 4-50 Ponded Area (ft) ----------------------------------------------------------------------- 1-00 Evaporation Loss----------------------------------------------------------------------- 0-00 Outflow Weirs SIN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-04 Trapezoidal No 572-75 1025 20-00 0-75 3-33 2 Weir-04 Rectangular No 569-00 6-50 2-00 4-00 3-33 Outflow Orifices SIN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS -RIM Bottom Rectangular No 60-00 60-00 573-00 0-63 2 WQ-Orifice-04 Side CIRCULAR No 3-00 567-00 0-61 Output Summary Results Peak Inflow (cfs)------------------------------------------------------------------------ 68-94 Peak Lateral Inflow (cfs)------------------------------------------------------------ 68-94 Peak Outflow (cfs)--------------------------------------------------------------------- 11-05 Peak Exfiltration Flow Rate (cfm)---------------------------------------------- 0-00 Max HGL Elevation Attained (ft)------------------------------------------------ 570-53 Max HGL Depth Attained (ft)----------------------------------------------------- 8-03 Average HGL Elevation Attained (ft)----------------------------------------- 568-69 Average HGL Depth Attained (ft)---------------------------------------------- 6-19 Time of Max HGL Occurrence (days hh:mm)--------------------------- 0 12-39 Total Exfiltration Volume (1000-ft3)------------------------------------------- 0-000 Total Flooded Volume (ac-in) - 0 Total Time Flooded (min) 0 Total Retention Time (sec) -------------------------------------------------------- 0-00 Post -Development 025 - Year Page 1 Project Description File Name .................................................... 27842.0003 - POST.SPF Project Options Flow Units --------------------------------------------------- CFS Elevation Type Elevation Hydrology Method . SCS TR-55 Time of Concentration (TOC) Method -------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes ------------ YES Skip Steady State Analysis Time Periods --- NO Analysis Options Start Analysis On . Dec 03, 2020 00:00:00 End Analysis On . Dec 04, 2020 00:00:00 Start Reporting On . Dec 03, 2020 00:00:00 Antecedent Dry Days 0 days Runoff (Dry Weather) Time Step ---------------- 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step --------------- 0 00:05:00 days hh:mm:ss Reporting Time Step ----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step -------------------------------------- 15 seconds Number of Elements Qty Rain Gages 1 Subbasins 2 Nodes 4 Junctions 1 Outfalls 2 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 5 Channels 0 Pipes 1 Pumps 0 Orifices 2 Weirs 2 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-025 Intensity inches North Carolina Union 25 6.10 SCS Type III 24-hr Post -Development 025 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted ID Factor Curve Number Total Total Total Peak Time of Rainfall Runoff Runoff Runoff Concentration Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 SUB-04 17.91 0.00 88.62 6.10 4.79 85.79 83.90 0 00-05-00 2 SUB-05 43.54 0.00 73.00 6.10 3.17 138.11 94.59 0 0028:45 Post -Development 025 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft2) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) 1 CONTROL -STRUCTURE Junction 567.00 573.00 0.00 0.00 1.00 16.53 569.00 0.00 8.50 0 00:00 0.00 2 Emergency-Outffall Outffall 560.00 0.00 560.00 3 Out-02 Outffall 560.00 109.58 560.00 4 Pond-04 Storage Node 562.50 573.50 567.00 1.00 8324 571.12 0.00 Post -Development Total Time Flooded (min) 0.00 0.00 025 - Year Page 4 Post -Development 025 - Year Page 5 Link Summary SN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) ( % ) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 Outlet -Pipe Pipe Out-02 CONTROL -STRUCTURE 89.00 567.00 566.64 0.4000 36.000 0.0150 16.53 1.94 8.53 4.15 1.65 0.55 0.00 > CAPACITY 2 CS -RIM Orifice Pond-04 CONTROL -STRUCTURE 562.50 567.00 60.000 0.00 3 WQ-Orifice-04 Orifice Pond-04 CONTROL -STRUCTURE 562.50 567.00 3.000 0.35 4 Spillway-04 Weir Pond-04 Emergency-Outffall 562.50 560.00 0.00 5 Weir-04 Weir Pond-04 CONTROL -STRUCTURE 562.50 567.00 16.18 Post -Development 025 - Year Subbasin Hydrology Page 6 Subbasin : SUB-04 Input Data Area(ac)------------------------------------------------------------------------ 17-91 Peak Rate Factor----------------------------------------------------------- 0-00 Weighted Curve Number----------------------------------------------- 88-62 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking & roofs 12.08 B 98-00 Future -Paved parking & roofs 1.29 B 98-00 > 75 % grass cover, Good 4.54 B 61-00 Composite Area & Weighted CN 17.91 88-62 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation : Tc = (0-007 * ((n * Lf)^0-8)) / ((P^0-5) * (Sf^0-4)) Where : Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation : V = 16-1345 * (Sf^0-5) (unpaved surface) V = 20-3282 * (Sf^0-5) (paved surface) V = 15-0 * (Sf^0-5) (grassed waterway surface) V = 10-0 * (Sf^0-5) (nearly bare & untilled surface) V = 9-0 * (Sf^0-5) (cultivated straight rows surface) V = 7-0 * (Sf^0-5) (short grass pasture surface) V = 5-0 * (Sf^0-5) (woodland surface) V = 2-5 * (Sf^0-5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation: V = (1-49 * (R^(2/3)) * (Sf^0-5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where : Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 5 Subbasin Runoff Results Total Rainfall (in)------------------------------------------------------------ 6-10 Total Runoff (in)------------------------------------------------------------- 4-79 Peak Runoff (cfs)----------------------------------------------------------- 83-90 Weighted Curve Number----------------------------------------------- 88-62 Time of Concentration (days hh:mm:ss)------------------------ 0 00-05-00 Post -Development 025 - Year Page 7 Post -Development 025 - Year Page 8 Subbasin : SUB-04 5.2 5 4.0 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 2.6 2.4 ry 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 90 85 80 75 70 65 60 55 50 v 45 0 40 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Post -Development 025 - Year Page 9 Post -Development 025 - Year Subbasin : SUB-05 Page 10 Input Data Area(ac)------------------------------------------------------------------------ 43.54 Peak Rate Factor----------------------------------------------------------- 0.00 Weighted Curve Number----------------------------------------------- 73.00 RainGage ID----------------------------------------------------------------- Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 43.54 - 73.00 Composite Area & Weighted CN 43.54 73.00 Time of Concentration Sheet Flow Computations Manning's Roughness Flow Length (ft) Slope (%) : 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min) : Shallow Concentrated Flow Computations Flow Length (ft) Slope (%) : Surface Type : Velocity (ft/sec) Computed Flow Time (min) : Total TOC (min) ------------------ Subbasin Runoff Results Flowpath Flowpath Flowpath A B C 3 0.00 0.00 100 0.00 0.00 4 0.00 0.00 3.50 0.00 0.00 0.13 0.00 0.00 12.36 0.00 0.00 Flowpath Flowpath Flowpath A B C 2460 0.00 0.00 2.4 0.00 0.00 Unpaved Unpaved Unpaved 2.50 0.00 0.00 16.40 0.00 0.00 Total Rainfall (in)------------------------------------------------------------ 6.10 Total Runoff (in)------------------------------------------------------------- 3.17 Peak Runoff (cfs)----------------------------------------------------------- 94.59 Weighted Curve Number----------------------------------------------- 73.00 Time of Concentration (days hh:mm:ss)------------------------ 0 0028:46 Post -Development 025 - Year Page 11 Post -Development 025 - Year Page 12 Subbasin : SUB-05 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 3 28 2.6 F, 2.4 2.2 2 1.8 1.6 14 1.2 1 0.8 0.6 0.4 0.2 100 95 90 85 80 75 70 65 60 55 v 50 0 45 40 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Post -Development 025 - Year Page 13 Post -Development 025 - Year Page 14 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) ( % ) (in) (in) (cfs) 1 Outlet -Pipe 89.00 567.00 7.00 566.64 -0.36 0.36 0.4000 CIRCULAR 36.000 36.000 0.0150 0.5000 0.5000 0.0000 0.00 No Post -Development 025 - Year Page 15 No. of Barrels Post -Development 025 - Year Page 16 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Outlet -Pipe 16.53 0 12:36 1.94 8.53 4.15 0.36 1.65 0.55 0.00 > CAPACITY Post -Development 025 - Year Page 17 Storage Nodes Storage Node : Pond-04 Input Data Invert Elevation (ft)-------------------------------------------------------------------- 562-50 Max (Rim) Elevation (ft)------------------------------------------------------------ 573-50 Max (Rim) Offset (ft)----------------------------------------------------------------- 11-00 Initial Water Elevation (ft)---------------------------------------------------------- 567-00 Initial Water Depth (ft)--------------------------------------------------------------- 4-50 Ponded Area (ft) ----------------------------------------------------------------------- 1-00 Evaporation Loss----------------------------------------------------------------------- 0-00 Outflow Weirs SIN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-04 Trapezoidal No 572-75 1025 20-00 0-75 3-33 2 Weir-04 Rectangular No 569-00 6-50 2-00 4-00 3-33 Outflow Orifices SIN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS -RIM Bottom Rectangular No 60-00 60-00 573-00 0-63 2 WQ-Orifice-04 Side CIRCULAR No 3-00 567-00 0-61 Output Summary Results Peak Inflow (cfs)------------------------------------------------------------------------ 8324 Peak Lateral Inflow (cfs)------------------------------------------------------------ 8324 Peak Outflow (cfs)--------------------------------------------------------------------- 16-53 Peak Exfiltration Flow Rate (cfm)---------------------------------------------- 0-00 Max HGL Elevation Attained (ft)------------------------------------------------ 571-12 Max HGL Depth Attained (ft)----------------------------------------------------- 8-62 Average HGL Elevation Attained (ft)----------------------------------------- 568-88 Average HGL Depth Attained (ft)---------------------------------------------- 6-38 Time of Max HGL Occurrence (days hh:mm)--------------------------- 0 12-36 Total Exfiltration Volume (1000-ft3)------------------------------------------- 0-000 Total Flooded Volume (ac-in) - 0 Total Time Flooded (min) 0 Total Retention Time (sec) -------------------------------------------------------- 0-00 Post -Development 050 - Year Page 1 Project Description File Name .................................................... 27842.0003 - POST.SPF Project Options Flow Units --------------------------------------------------- CFS Elevation Type Elevation Hydrology Method . SCS TR-55 Time of Concentration (TOC) Method -------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes ------------ YES Skip Steady State Analysis Time Periods --- NO Analysis Options Start Analysis On . Dec 03, 2020 00:00:00 End Analysis On . Dec 04, 2020 00:00:00 Start Reporting On . Dec 03, 2020 00:00:00 Antecedent Dry Days 0 days Runoff (Dry Weather) Time Step ---------------- 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step --------------- 0 00:05:00 days hh:mm:ss Reporting Time Step ----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step -------------------------------------- 15 seconds Number of Elements Qty Rain Gages 1 Subbasins 2 Nodes 4 Junctions 1 Outfalls 2 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 5 Channels 0 Pipes 1 Pumps 0 Orifices 2 Weirs 2 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-050 Intensity inches North Carolina Union 50 6.90 SCS Type III 24-hr Post -Development 050 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted ID Factor Curve Number Total Total Total Peak Time of Rainfall Runoff Runoff Runoff Concentration Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 SUB-04 17.91 0.00 88.62 6.90 5.57 99.70 96.54 0 00-05-00 2 SUB-05 43.54 0.00 73.00 6.90 3.85 167.59 114.94 0 0028:45 Post -Development 050 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) 1 CONTROL -STRUCTURE Junction 567.00 573.00 0.00 0.00 1.00 2095. 56927 0.00 823 0 00:00 0.00 2 Emergency-Outffall Outffall 560.00 0.00 560.00 3 Out-02 Outffall 560.00 134.76 560.00 4 Pond-04 Storage Node 562.50 573.50 567.00 1.00 95.95 571.62 0.00 Post -Development Total Time Flooded (min) 0.00 0.00 050 - Year Page 4 Post -Development 050 - Year Page 5 Link Summary SN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) ( % ) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 Outlet -Pipe Pipe Out-02 CONTROL -STRUCTURE 89.00 567.00 566.64 0.4000 36.000 0.0150 2095.1.94 10.81 4.52 1.87 0.62 0.00 > CAPACITY 2 CS -RIM Orifice Pond-04 CONTROL -STRUCTURE 562.50 567.00 60.000 0.00 3 WQ-Orifice-04 Orifice Pond-04 CONTROL -STRUCTURE 562.50 567.00 3.000 0.37 4 Spillway-04 Weir Pond-04 Emergency-Outffall 562.50 560.00 0.00 5 Weir-04 Weir Pond-04 CONTROL -STRUCTURE 562.50 567.00 2058. Post -Development 050 - Year Subbasin Hydrology Page 6 Subbasin : SUB-04 Input Data Area(ac)------------------------------------------------------------------------ 17-91 Peak Rate Factor----------------------------------------------------------- 0-00 Weighted Curve Number----------------------------------------------- 88-62 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking & roofs 12.08 B 98-00 Future -Paved parking & roofs 1.29 B 98-00 > 75 % grass cover, Good 4.54 B 61-00 Composite Area & Weighted CN 17.91 88-62 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation : Tc = (0-007 * ((n * Lf)^0-8)) / ((P^0-5) * (Sf^0-4)) Where : Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation : V = 16-1345 * (Sf^0-5) (unpaved surface) V = 20-3282 * (Sf^0-5) (paved surface) V = 15-0 * (Sf^0-5) (grassed waterway surface) V = 10-0 * (Sf^0-5) (nearly bare & untilled surface) V = 9-0 * (Sf^0-5) (cultivated straight rows surface) V = 7-0 * (Sf^0-5) (short grass pasture surface) V = 5-0 * (Sf^0-5) (woodland surface) V = 2-5 * (Sf^0-5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation: V = (1-49 * (R^(2/3)) * (Sf^0-5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where : Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 5 Subbasin Runoff Results Total Rainfall (in)------------------------------------------------------------ 6-90 Total Runoff (in)------------------------------------------------------------- 5-57 Peak Runoff (cfs)----------------------------------------------------------- 96-54 Weighted Curve Number----------------------------------------------- 88-62 Time of Concentration (days hh:mm:ss)------------------------ 0 00-05-00 Post -Development 050 - Year Page 7 Post -Development 050 - Year Page 8 Subbasin : SUB-04 6 5.8 5.6 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 v 3 2.8 � 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 04 0.2 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Post -Development 050 - Year Page 9 Post -Development 050 - Year Subbasin : SUB-05 Page 10 Input Data Area(ac)------------------------------------------------------------------------ 43.54 Peak Rate Factor----------------------------------------------------------- 0.00 Weighted Curve Number----------------------------------------------- 73.00 RainGage ID----------------------------------------------------------------- Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 43.54 - 73.00 Composite Area & Weighted CN 43.54 73.00 Time of Concentration Sheet Flow Computations Manning's Roughness Flow Length (ft) Slope (%) : 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min) : Shallow Concentrated Flow Computations Flow Length (ft) Slope (%) : Surface Type : Velocity (ft/sec) Computed Flow Time (min) : Total TOC (min) ------------------ Subbasin Runoff Results Flowpath Flowpath Flowpath A B C 3 0.00 0.00 100 0.00 0.00 4 0.00 0.00 3.50 0.00 0.00 0.13 0.00 0.00 12.36 0.00 0.00 Flowpath Flowpath Flowpath A B C 2460 0.00 0.00 2.4 0.00 0.00 Unpaved Unpaved Unpaved 2.50 0.00 0.00 16.40 0.00 0.00 Total Rainfall (in)------------------------------------------------------------ 6.90 Total Runoff (in)------------------------------------------------------------- 3.85 Peak Runoff (cfs)----------------------------------------------------------- 114.94 Weighted Curve Number----------------------------------------------- 73.00 Time of Concentration (days hh:mm:ss)------------------------ 0 0028:46 Post -Development 050 - Year Page 11 Post -Development 050 - Year Page 12 Subbasin : SUB-05 6.2 6 5.8 5.6 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 v 3.2 3 2.8 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 120 115 110 106 100 95 90 85 80 75 70 65 v 60 0 55 50 45 40 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Post -Development 050 - Year Page 13 Post -Development 050 - Year Page 14 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) ( % ) (in) (in) (cfs) 1 Outlet -Pipe 89.00 567.00 7.00 566.64 -0.36 0.36 0.4000 CIRCULAR 36.000 36.000 0.0150 0.5000 0.5000 0.0000 0.00 No Post -Development 050 - Year Page 15 No. of Barrels Post -Development 050 - Year Page 16 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Outlet -Pipe 2095.0 12:35 1.94 10.81 4.52 0.33 1.87 0.62 0.00 > CAPACITY Post -Development 050 - Year Page 17 Storage Nodes Storage Node : Pond-04 Input Data Invert Elevation (ft)-------------------------------------------------------------------- 562-50 Max (Rim) Elevation (ft)------------------------------------------------------------ 573-50 Max (Rim) Offset (ft)----------------------------------------------------------------- 11-00 Initial Water Elevation (ft)---------------------------------------------------------- 567-00 Initial Water Depth (ft)--------------------------------------------------------------- 4-50 Ponded Area (ft) ----------------------------------------------------------------------- 1-00 Evaporation Loss----------------------------------------------------------------------- 0-00 Outflow Weirs SIN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-04 Trapezoidal No 572-75 1025 20-00 0-75 3-33 2 Weir-04 Rectangular No 569-00 6-50 2-00 4-00 3-33 Outflow Orifices SIN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS -RIM Bottom Rectangular No 60-00 60-00 573-00 0-63 2 WQ-Orifice-04 Side CIRCULAR No 3-00 567-00 0-61 Output Summary Results Peak Inflow (cfs)------------------------------------------------------------------------ 95-95 Peak Lateral Inflow (cfs)------------------------------------------------------------ 95-95 Peak Outflow (cfs)--------------------------------------------------------------------- 20-95 Peak Exfiltration Flow Rate (cfm)---------------------------------------------- 0-00 Max HGL Elevation Attained (ft)------------------------------------------------ 571-62 Max HGL Depth Attained (ft)----------------------------------------------------- 9-12 Average HGL Elevation Attained (ft)----------------------------------------- 569-05 Average HGL Depth Attained (ft)---------------------------------------------- 6-55 Time of Max HGL Occurrence (days hh:mm)--------------------------- 0 12-34 Total Exfiltration Volume (1000-ft3)------------------------------------------- 0-000 Total Flooded Volume (ac-in) - 0 Total Time Flooded (min) 0 Total Retention Time (sec) -------------------------------------------------------- 0-00 Post -Development 100 - Year Page 1 Project Description File Name .................................................... 27842.0003 - POST.SPF Project Options Flow Units --------------------------------------------------- CFS Elevation Type Elevation Hydrology Method . SCS TR-55 Time of Concentration (TOC) Method -------- SCS TR-55 Link Routing Method Hydrodynamic Enable Overflow Ponding at Nodes ------------ YES Skip Steady State Analysis Time Periods --- NO Analysis Options Start Analysis On . Dec 03, 2020 00:00:00 End Analysis On . Dec 04, 2020 00:00:00 Start Reporting On . Dec 03, 2020 00:00:00 Antecedent Dry Days 0 days Runoff (Dry Weather) Time Step ---------------- 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step --------------- 0 00:05:00 days hh:mm:ss Reporting Time Step ----------------------------------- 0 00:05:00 days hh:mm:ss Routing Time Step -------------------------------------- 15 seconds Number of Elements Qty Rain Gages 1 Subbasins 2 Nodes 4 Junctions 1 Outfalls 2 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 5 Channels 0 Pipes 1 Pumps 0 Orifices 2 Weirs 2 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 Time Series TS-100 Intensity inches North Carolina Union 100 7.50 SCS Type III 24-hr Post -Development 100 - Year Page 2 Subbasin Summary SN Subbasin Area Peak Rate Weighted ID Factor Curve Number Total Total Total Peak Time of Rainfall Runoff Runoff Runoff Concentration Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 SUB-04 17.91 0.00 88.62 7.50 6.15 110.18 106.00 0 00-05-00 2 SUB-05 43.54 0.00 73.00 7.50 4.37 19027 130.49 0 0028:45 Post -Development 100 - Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) 1 CONTROL -STRUCTURE Junction 567.00 573.00 0.00 0.00 1.00 23.98 569.45 0.00 8.05 0 00:00 0.00 2 Emergency-Outffall Outffall 560.00 0.00 560.00 3 Out-02 Outffall 560.00 153.43 560.00 4 Pond-04 Storage Node 562.50 573.50 567.00 1.00 105.41 571.99 0.00 Post -Development Total Time Flooded (min) 0.00 0.00 100 - Year Page 4 Post -Development 100 - Year Page 5 Link Summary SN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) ( % ) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 Outlet -Pipe Pipe Out-02 CONTROL -STRUCTURE 89.00 567.00 566.64 0.4000 36.000 0.0150 23.98 1.94 12.37 4.75 2.01 0.67 0.00 > CAPACITY 2 CS -RIM Orifice Pond-04 CONTROL -STRUCTURE 562.50 567.00 60.000 0.00 3 WQ-Orifice-04 Orifice Pond-04 CONTROL -STRUCTURE 562.50 567.00 3.000 0.39 4 Spillway-04 Weir Pond-04 Emergency-Outffall 562.50 560.00 0.00 5 Weir-04 Weir Pond-04 CONTROL -STRUCTURE 562.50 567.00 23.59 Post -Development 100 - Year Subbasin Hydrology Page 6 Subbasin : SUB-04 Input Data Area(ac)------------------------------------------------------------------------ 17-91 Peak Rate Factor----------------------------------------------------------- 0-00 Weighted Curve Number----------------------------------------------- 88-62 Rain Gage ID Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking & roofs 12.08 B 98-00 Future -Paved parking & roofs 1.29 B 98-00 > 75 % grass cover, Good 4.54 B 61-00 Composite Area & Weighted CN 17.91 88-62 Time of Concentration TOC Method : SCS TR-55 Sheet Flow Equation : Tc = (0-007 * ((n * Lf)^0-8)) / ((P^0-5) * (Sf^0-4)) Where : Tc = Time of Concentration (hr) n = Manning's roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Shallow Concentrated Flow Equation : V = 16-1345 * (Sf^0-5) (unpaved surface) V = 20-3282 * (Sf^0-5) (paved surface) V = 15-0 * (Sf^0-5) (grassed waterway surface) V = 10-0 * (Sf^0-5) (nearly bare & untilled surface) V = 9-0 * (Sf^0-5) (cultivated straight rows surface) V = 7-0 * (Sf^0-5) (short grass pasture surface) V = 5-0 * (Sf^0-5) (woodland surface) V = 2-5 * (Sf^0-5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where Tc = Time of Concentration (hr) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation: V = (1-49 * (R^(2/3)) * (Sf^0-5)) / n R =Aq/Wp Tc = (Lf / V) / (3600 sec/hr) Where : Tc = Time of Concentration (hr) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's roughness User -Defined TOC override (minutes): 5 Subbasin Runoff Results Total Rainfall (in)------------------------------------------------------------ 7-50 Total Runoff (in)------------------------------------------------------------- 6-15 Peak Runoff (cfs)----------------------------------------------------------- 106-00 Weighted Curve Number----------------------------------------------- 88-62 Time of Concentration (days hh:mm:ss)------------------------ 0 00-05-00 Post -Development 100 - Year Page 7 Post -Development 100 - Year Page 8 Subbasin : SUB-04 6.5 6 5.5 5 4.5 4 E 3.5 3 2.5 2 1.5 0.5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 115 110 105 100 95 90 85 80 75 70 n 65 -- 60 0 55 50 45 40 35 30 25 20 15 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Post -Development 100 - Year Page 9 Post -Development 100 - Year Subbasin : SUB-05 Page 10 Input Data Area(ac)------------------------------------------------------------------------ 43.54 Peak Rate Factor----------------------------------------------------------- 0.00 Weighted Curve Number----------------------------------------------- 73.00 RainGage ID----------------------------------------------------------------- Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 43.54 - 73.00 Composite Area & Weighted CN 43.54 73.00 Time of Concentration Sheet Flow Computations Manning's Roughness Flow Length (ft) Slope (%) : 2 yr, 24 hr Rainfall (in) Velocity (ft/sec) : Computed Flow Time (min) : Shallow Concentrated Flow Computations Flow Length (ft) Slope (%) : Surface Type : Velocity (ft/sec) Computed Flow Time (min) : Total TOC (min) ------------------ Subbasin Runoff Results Flowpath Flowpath Flowpath A B C 3 0.00 0.00 100 0.00 0.00 4 0.00 0.00 3.50 0.00 0.00 0.13 0.00 0.00 12.36 0.00 0.00 Flowpath Flowpath Flowpath A B C 2460 0.00 0.00 2.4 0.00 0.00 Unpaved Unpaved Unpaved 2.50 0.00 0.00 16.40 0.00 0.00 Total Rainfall (in)------------------------------------------------------------ 7.50 Total Runoff (in)------------------------------------------------------------- 4.37 Peak Runoff (cfs)----------------------------------------------------------- 130.49 Weighted Curve Number----------------------------------------------- 73.00 Time of Concentration (days hh:mm:ss)------------------------ 0 0028:46 Post -Development 100 - Year Page 11 Post -Development 100 - Year Page 12 Subbasin : SUB-05 7 6.6 6 5.5 5 4.5 4 3.5 3 2.6 2 1.5 0.5 140 135 130 125 120 116 110 105 100 95 90 85 80 75 v 70 0 65 60 55 50 45 40 35 30 25 20 15 10 5 Rainfall Intensity Graph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Runoff Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time [hrs] Post -Development 100 - Year Page 13 Post -Development 100 - Year Page 14 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) ( % ) (in) (in) (cfs) 1 Outlet -Pipe 89.00 567.00 7.00 566.64 -0.36 0.36 0.4000 CIRCULAR 36.000 36.000 0.0150 0.5000 0.5000 0.0000 0.00 No Post -Development 100 - Year Page 15 No. of Barrels Post -Development 100 - Year Page 16 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Outlet -Pipe 23.98 0 12:34 1.94 12.37 4.75 0.31 2.01 0.67 0.00 > CAPACITY Post -Development 100 - Year Page 17 Storage Nodes Storage Node : Pond-04 Input Data Invert Elevation (ft)-------------------------------------------------------------------- 562-50 Max (Rim) Elevation (ft)------------------------------------------------------------ 573-50 Max (Rim) Offset (ft)----------------------------------------------------------------- 11-00 Initial Water Elevation (ft)---------------------------------------------------------- 567-00 Initial Water Depth (ft)--------------------------------------------------------------- 4-50 Ponded Area (ft) ----------------------------------------------------------------------- 1-00 Evaporation Loss----------------------------------------------------------------------- 0-00 Outflow Weirs SIN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-04 Trapezoidal No 572-75 1025 20-00 0-75 3-33 2 Weir-04 Rectangular No 569-00 6-50 2-00 4-00 3-33 Outflow Orifices SIN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 CS -RIM Bottom Rectangular No 60-00 60-00 573-00 0-63 2 WQ-Orifice-04 Side CIRCULAR No 3-00 567-00 0-61 Output Summary Results Peak Inflow (cfs)------------------------------------------------------------------------ 105-41 Peak Lateral Inflow (cfs)------------------------------------------------------------ 105-41 Peak Outflow (cfs)--------------------------------------------------------------------- 23-98 Peak Exfiltration Flow Rate (cfm)---------------------------------------------- 0-00 Max HGL Elevation Attained (ft)------------------------------------------------ 571-99 Max HGL Depth Attained (ft)----------------------------------------------------- 9-49 Average HGL Elevation Attained (ft)----------------------------------------- 569-18 Average HGL Depth Attained (ft)---------------------------------------------- 6-68 Time of Max HGL Occurrence (days hh:mm)--------------------------- 0 12-34 Total Exfiltration Volume (1000-ft3)------------------------------------------- 0-000 Total Flooded Volume (ac-in) - 0 Total Time Flooded (min) 0 Total Retention Time (sec) -------------------------------------------------------- 0-00 25-YR CAPACITY H EC-22 Energy Grade Line Computations Struct. Q EGLo HGLo Total Pipe EGLi HGLi Ea EGLa Surface Elev. ID (cfs) (ft) (ft) Loss (ft) (ft) (ft) (ft) (ft) (ft) 3 570.22 570.22 1 568.66 1 49.2 570.46 570.221 0.14 570.60 570.36 5.9 570.73 584.43 12 38.0 570.83 570.59 0.21 571.04 570.80 5.6 571.15 584.99 13 32.7 571.23 571.05 0.03 571.26 571.08 5.7 571.41 585.35 187 7.0 573.47 572.96 1.19 574.65 574.14 2.1 574.94 578.35 188 3.1 574.98 574.88 0.25 575.23 575.131 1.3 575.321 579.80 14 26.01 571.50 571.29 0.19 571.69 571.48 5.4 571.76 582.76 31 1.1 571.76 571.75 571.76 571.75 4.9 571.77 582.76 14 20.1 571.81 571.68 0.13 571.94 571.81 4.9 571.97 579.82 15 18.8 572.06 571.83 0.44 572.50 572.27 4.5 572.64 576.04 18 7.2 572.67 572.59 0.16 572.83 572.75 3.9 572.85 580.44 19 7.1 575.10 574.46 575.37 574.74 2.0 575.86 582.00 19 6.51 575.95 575.741 0.18 576.12 575.91 2.0 576.26 581.65 21 5.3 576.32 576.18 0.31 576.62 576.48 2.1 577.59 580.25 22 3.6 577.62 577.55 0.04 577.66 577.59 1.8 577.69 580.30 38 7.0 572.73 572.49 0.67 573.40 573.16 4.0 573.51 574.47 38 1.3 573.51 573.50 0.02 573.53 573.52 3.0 573.54 577.96 17 3.6 572.66 572.60 0.03 572.70 572.631 4.3 572.741 576.04 35 1.21 571.97 571.971 571.98 571.97 4.3 571.98 579.82 34 5.0 571.80 571.68 0.06 571.87 571.75 5.0 571.94 581.11 32 4.9 571.99 571.87 0.22 572.20 572.08 4.4 572.32 579.38 32 2.5 572.33 572.30 0.02 572.35 572.32 4.1 572.38 579.38 27 4.2 576.93 576.47 578.53 578.07 1.1 578.53 587.95 28 4.0 578.59 578.45 579.23 578.751 1.2 579.261 587.09 29 3.91 579.31 579.201 580.21 579.74 1.1 580.25 586.01 30 1.4 580.26 580.24 580.26 579.99 0.9 580.26 586.01 2 10.5 570.74 570.72 0.01 570.75 570.74 4.9 570.76 581.91 3 9.9 570.77 570.74 0.03 570.80 570.77 3.6 570.81 578.90 4 8.8 570.82 570.80 0.02 570.84 570.81 2.9 570.85 577.01 5 8.9 570.87 570.82 0.03 570.90 570.851 2.3 570.921 575.91 6 6.21 570.93 570.90 570.93 570.40 1.7 570.93 577.97 7 5.5 570.95 570.91 571.34 570.84 1.1 571.34 577.32 8 5.6 571.38 571.27 572.82 572.32 1.1 572.82 578.76 9 4.6 572.86 572.76 574.29 573.82 1.1 574.29 579.95 10 3.4 574.33 574.23 575.11 574.70 1.0 575.12 578.93 11 1.1 575.12 575.11 575.73 575.51 0.6 575.73 579.97 39 556.64 556.64 571.30 124 23.4 568.92 567.79 570.65 569.52 2.3 570.65 582.99 125 16.6 570.69 570.59 570.69 569.76 2.0 570.69 582.93 130 14.9 570.74 570.61 571.31 570.41 1.9 571.31 579.55 43 10.4 571.38 571.21 572.49 571.761 1.5 572.491 580.79 44 6.41 573.20 572.62 575.03 574.46 1.2 575.03 582.60 143 3.2 575.65 575.27 577.46 577.08 0.9 577.46 584.50 50 2.1 575.53 575.20 577.29 576.95 0.8 577.29 585.17 49 5.8 575.25 574.89 576.06 575.70 1.0 576.06 584.36 207 3.5 576.08 576.03 576.26 575.98 0.8 576.26 585.07 47 2.3 576.28 576.24 576.89 576.67 0.7 576.89 586.43 147 0.91 576.90 576.89 576.90 576.77 0.5 576.90 586.45 153 1.8 576.61 576.30 576.97 576.66 0.7 576.97 584.64 159 11.8 568.33 567.34 569.05 568.07 1.7 569.05 580.64 52 9.1 569.07 569.02 570.44 569.59 1.5 570.44 581.51 53 5.9 570.46 570.41 572.30 571.60 1.3 572.30 584.28 165 3.5 572.31 572.28 574.06 573.551 0.9 574.061 590.70 55 0.51 574.06 574.06 575.56 575.39 0.4 575.56 597.77 56 0.2 575.56 575.56 576.38 576.28 0.2 576.38 599.60 177 0.1 576.38 576.38 576.87 576.80 0.2 576.87 599.73 10 22.0 583.40 583.07 583.80 583.46 0.8 583.80 591.55 105 1.5 576.28 576.00 576.73 576.44 0.7 576.73 585.15 103 2.0 575.171 574.84 1 575.531 575.201 0.81 575.531 581.52 F4 THOMAS s HUTTON Z: 127842127842.00031 Engineering I Calculations and Reports IStorm Waterl HEC-22127842.0003 - HEC-22 Reporting H EC-22 Energy Grade Line Computations Struct. ID Q (cfs) EGLo (ft) HGLo (ft) Total Pipe Loss (ft) EGLi (ft) HGLi (ft) Ea (ft) EGLa (ft) Surface Elev. (ft) 159 1.0 574.39 574.16 574.75 574.521 0.61 574.75 580.64 109 573.04 573.04 569.91 112 67.6 573.32 573.04 0.09 573.41 573.13 8.4 573.65 589.42 114 67.4 573.76 573.48 0.18 573.94 573.66 8.2 574.18 588.84 134 1.6 579.63 579.15 583.43 582.95 0.8 583.43 587.04 115 66.41 574.36 573.92 0.32 574.67 574.241 8.3 575.04 589.64 137 1.1 579.62 579.22 582.22 581.82 0.7 582.22 590.83 138 0.5 582.22 582.22 582.65 582.43 0.4 582.65 590.84 115 64.6 575.20 574.79 0.21 575.42 575.01 8.3 575.65 588.64 118 31.8 575.69 575.59 0.11 575.81 575.71 7.4 575.84 586.44 119 27.0 575.89 575.771 0.08 575.97 575.85 7.0 576.02 585.34 121 21.31 576.05 575.97 0.04 576.09 576.01 6.6 576.12 584.46 69 15.2 576.18 576.03 0.16 576.35 576.20 3.6 576.42 583.34 126 10.3 576.45 576.38 0.11 576.56 576.49 2.1 576.59 581.75 127 8.7 576.63 576.51 577.55 576.86 1.6 577.59 580.64 128 0.7 577.59 577.59 577.59 577.49 0.5 577.59 582.38 133 0.2 577.59 577.59 0.18 577.77 577.73 0.6 577.81 582.38 186 4.91 577.64 577.52 0.08 577.72 577.60 1.6 577.79 580.64 182 4.0 576.43 576.40 0.01 576.44 576.42 3.4 576.45 583.34 103 3.7 576.46 576.44 0.04 576.50 576.48 2.7 576.51 583.08 103 0.6 576.51 576.51 576.51 576.51 2.4 576.52 581.12 103 2.5 576.52 576.51 0.02 576.54 576.53 2.0 576.54 579.83 105 1.0 576.54 576.541 576.54 576.421 1.4 576.54 581.39 108 6.61 576.13 576.10 0.04 576.17 576.14 5.9 576.20 583.71 109 6.7 576.21 576.18 0.03 576.24 576.21 5.3 576.25 582.89 208 5.9 576.28 576.22 0.08 576.35 576.30 4.9 576.38 581.12 110 6.0 576.40 576.34 0.08 576.48 576.42 4.4 576.50 580.13 209 4.5 576.51 576.48 0.05 576.56 576.53 3.9 576.57 578.77 111 4.5 576.58 576.551 0.04 576.62 576.591 3.4 576.63 577.72 112 2.51 576.64 576.61 0.07 576.71 576.68 2.9 576.73 579.77 113 1.6 576.74 576.71 0.131 576.87 576.84 2.1 576.89 581.81 176 6.0 576.04 575.98 0.03 576.06 576.01 6.7 576.10 585.34 174 5.4 576.16 576.02 0.09 576.26 576.11 6.6 576.35 584.42 174 5.2 576.41 576.27 0.22 576.63 576.49 6.0 576.69 583.34 178 1.1 576.70 576.69 0.01 576.71 576.691 1.1 576.72 583.33 100 1 3.41 576.72 576.66 0.21 576.93 576.87 4.3 576.98 580.93 100 1.6 576.98 576.97 0.01 576.99 576.98 3.9 577.00 581.29 171 4.3 575.92 575.73 0.16 576.08 575.89 1.6 576.17 586.43 172 3.6 576.23 576.09 578.95 578.34 1.2 578.95 581.32 144 34.3 575.98 575.17 577.03 575.63 3.1 577.22 588.64 144 32.1 577.35 577.03 0.06 577.42 577.101 3.2 577.59 588.48 142 31.71 577.71 577.40 0.06 577.77 577.46 3.4 578.04 588.48 140 30.5 578.28 577.68 0.98 579.25 578.65 4.0 580.39 590.65 146 14.5 580.44 580.31 0.20 580.64 580.51 2.7 580.75 588.50 82 13.3 580.80 580.68 0.03 580.83 580.71 2.4 580.89 588.50 84 13.2 581.00 580.72 0.09 581.09 580.82 2.4 581.26 589.05 155 11.8 581.35 581.13 0.08 581.42 581.20 2.4 581.61 589.05 156 10.61 581.68 581.50 0.21 581.89 581.71 1.9 582.05 590.22 87 9.4 582.23 581.79 1.10 583.33 582.89 2.5 583.58 591.73 88 6.3 583.66 583.46 584.58 583.83 1.6 584.65 593.44 160 3.6 584.68 584.61 585.62 585.17 1.1 585.62 595.15 163 0.8 585.62 585.62 586.55 586.35 0.5 586.55 596.86 91 0.4 586.56 586.55 586.68 586.55 0.3 586.68 596.84 168 1.41 585.63 585.61 585.63 585.36 0.8 585.63 595.13 167 1.4 584.66 584.65 0.01 584.66 584.65 1.3 584.67 593.42 92 1.9 583.59 583.57 0.01 583.60 583.58 2.3 583.62 591.60 201 16.6 580.56 580.13 0.21 580.77 580.34 3.8 581.00 590.44 202 16.4 581.17 580.75 0.41 581.59 581.17 3.21 .80 588.31 203 11.8 581.88 581.66 584.56 583.24 2.2 584.56 590.26 F4 THOMAS s HUTTON Z: 127842127842.00031 Engineering I Calculations and Reports IStorm Waterl HEC-22127842.0003 - HEC-22 Reporting H EC-22 Energy Grade Line Computations Struct. ID Q (cfs) EGLo (ft) HGLo (ft) Total Pipe Loss (ft) EGLi (ft) HGLi (ft) Ea (ft) EGLa (ft) Surface Elev. (ft) 204 9.0 584.61 584.48 587.19 586.05 1.9 587.19 591.96 205 1 6.11 587.26 587.08 589.77 588.82 1.61 589.77 593.68 206 1 3.21 589.81 589.70 592.161 591.47 1.21 592.16 595.39 F4 THOMAS s HUTTON Z: 127842127842.00031 Engineering I Calculations and Reports IStorm Waterl HEC-22127842.0003 - HEC-22 Reporting H EC-22 Storm Drain Computations Z�� Length (ft) Drainage Area (ac) Runoff Coeff "C" Tc (min) I Manning's n Rain "I" (in/hr) Runoff "Q.. (cfs) Total Q (cfs) Pipe Dia. (in) Velocity Design (ft/s) Invert Elevation Slope I U/S D/S 1 3 1 122 0.44 0.55 5 0.013 7.48 49.2 49.2 48 8.0 564.85 564.24 0.50% 12 1 146 0.32 0.55 5 0.013 7.69 38.0 38.0 42 7.5 565.58 564.85 0.50% 13 12 33 0.09 0.55 5 0.013 7.71 32.7 32.7 42 7.2 565.75 565.58 0.50% 187 13 119 0.88 0.55 5 0.013 8.17 7.0 7.0 15 5.7 572.89 571.71 1.00% 188 187 111 0.67 0.55 5 0.013 8.25 3.1 3.1 15 5.2 574.00 572.89 1.00% 14 13 127 0.07 0.55 5 0.013 7.781 26.0 26.0 36 6.8 566.38 565.75 0.50% 31 14 24 0.24 0.55 5 0.013 8.25 1.1 1.1 18 3.8 566.91 566.67 1.00% 15 14 145 0.10 0.55 5 0.013 7.86 20.1 20.1 36 6.4 567.10 566.38 0.50% 17 15 207 0.30 0.55 5 0.013 7.99 18.8 18.8 30 6.3 568.14 567.10 0.50% 18 17 158 0.03 0.55 5 0.013 8.11 7.2 7.2 24 5.0 568.93 568.14 0.50% 19 18 28 0.14 0.55 5 0.013 8.13 7.1 7.1 18 6.4 573.84 573.56 1.00% 20 19 46 0.27 0.55 5 0.013 8.15 6.5 6.5 18 6.3 574.30 573.84 1.00% 21 20 120 0.37 0.55 5 0.013 8.23 5.3 5.3 18 6.0 575.50 574.30 1.00% 22 21 35 0.79 0.55 5 0.013 8.25 3.6 3.6 18 5.4 575.85 575.50 1.00% 38 17 152 1.27 0.55 5 0.013 8.09 7.0 7.0 18 5.5 569.50 568.44 0.70% 37 38 155 0.28 0.55 5 0.013 8.25 1.3 1.3 18 3.6 570.58 569.50 0.70% 36 17 28 0.80 0.55 5 0.013 8.25 3.6 3.6 18 5.4 568.42 568.14 1.00% 35 15 28 0.26 0.55 5 0.013 8.25 1.2 1.2 18 3.9 567.68 567.40 1.00% 34 14 29 0.03 0.55 5 0.013 8.17 5.0 5.0 18 5.9 566.96 566.67 1.00% 32 34 101 0.53 0.55 5 0.013 8.23 4.9 4.9 18 5.8 567.96 566.96 1.00% 33 32 28 0.54 0.55 5 0.013 8.25 2.5 2.5 18 4.9 568.24 567.96 1.00% 27 12 160 0.04 0.55 5 0.013 8.12 4.2 4.2 24 5.5 577.49 575.89 1.00% 28 27 62 0.03 0.55 5 0.013 8.16 4.0 4.0 18 5.5 578.11 577.49 1.00% 29 28 100 0.55 0.55 5 0.013 8.23 3.9 3.9 18 5.5 579.11 578.11 1.00% 30 29 28 0.30 0.55 5 0.013 8.25 1.4 1.4 15 4.2 579.39 579.11 1.00% 2 1 111 0.19 0.55 5 0.013 7.54 10.5 10.5 42 6.5 565.86 564.86 0.91% 3 2 148 0.25 0.55 5 0.013 7.63 9.9 9.9 36 6.5 567.20 565.86 0.91% 4 3 88 5 0.013 7.68 8.8 8.8 36 6.3 568.00 567.20 0.91% 5 4 70 0.63 0.55 5 0.013 7.72 8.9 8.9 30 6.4 568.63 568.00 0.91% 6 5 70 0.17 0.55 5 0.013 7.77 6.2 6.2 30 5.8 569.27 568.63 0.91% 7 6 104 5 0.013 7.83 5.5 5.5 30 5.6 570.21 569.27 0.91% 8 7 163 0.24 0.55 5 0.013 7.94 5.6 5.6 30 5.7 571.68 570.21 0.91% 9 8 167 0.29 0.55 5 0.013 8.06 4.6 4.6 24 5.5 573.19 571.68 0.91% 10 9 100 0.51 0.55 5 0.013 8.13 3.4 3.4 18 5.1 574.10 573.19 0.91% 11 10 118 0.24 0.55 5 0.013 8.25 1.1 1.1 18 3.7 575.17 574.10 0.91% 124 39 173 0.27 0.55 5 0.013 7.89 23.4 23.4 42 8.5 568.37 566.64 1.00% 125 124 29 0.38 0.55 5 0.013 7.91 16.6 16.6 42 7.7 568.66 568.37 1.00% 130 125 78 0.60 0.55 5 0.013 7.95 14.9 14.9 36 7.6 569.44 568.66 1.00% 43 130 102 0.92 0.55 5 0.013 8.00 10.4 10.4 36 6.9 570.961 569.94 1.00% 44 43 184 0.72 0.55 5 0.013 8.12 6.4 6.4 30 6.1 573.80 571.96 1.00% 143 44 182 0.69 0.55 5 0.013 8.25 3.2 3.2 30 5.0 576.61 574.80 1.00% 50 130 176 0.46 0.55 5 0.013 8.25 2.1 2.1 18 4.6 576.50 574.74 1.00% 49 124 136 0.12 0.55 5 0.013 8.02 5.8 5.8 36 4.8 575.02 574.21 0.60% 207 49 67 0.27 0.55 5 0.013 8.08 3.5 3.5 30 4.3 575.42 575.02 0.60% 47 207 132 0.32 0.55 5 0.013 8.22 2.3 2.3 30 3.8 576.21 575.42 0.60% 147 47 28 0.19 0.55 5 0.013 8.25 0.9 0.9 30 2.8 576.38 576.21 0.60% 153 49 36 0.40 0.55 5 0.013 8.25 1.8 1.8 18 4.5 576.24 575.88 1.00% 159 39 48 0.42 0.55 5 0.013 7.71 11.8 11.8 48 8.0 567.36 566.64 1.50% 52 159 107 0.34 0.55 5 0.013 7.77 9.1 9.1 48 7.4 568.97 567.36 1.50% 53 52 139 0.24 0.55 5 0.013 7.85 5.9 5.9 36 6.7 571.05 568.97 1.50% 165 53 139 0.24 0.55 5 0.013 7.94 3.5 3.5 36 5.7 573.13 571.05 1.50% 55 165 139 0.06 0.55 5 0.013 8.10 0.5 0.5 30 3.3 575.22 573.13 1.50% 56 55 63 0.03 0.55 5 0.013 8.19 0.2 0.2 30 2.6 576.15 575.22 1.50% 177 56 37 0.03 0.55 5 0.013 8.25 0.1 0.1 24 2.2 576.71 576.15 1.50% 107 165 40 0.44 0.55 5 0.013 8.25 2.0 2.0 15 4.6 582.99 582.59 1.00% 105 53 45 0.33 0.55 5 0.013 8.25 1.5 1.5 15 4.3 576.03 575.58 1.00% 103 52 36 0.43 0.55 5 0.013 8.25 2.0 2.0 15 4.6 574.73 574.37 1.00% 101 159 36 0.23 0.55 5 0.013 8.25 1.0 1.0 15 3.9 574.18 573.82 1.00% 112 109 771 0.241 0.551 51 0.013 6.89 67.6 67.6 54 8.7 565.25 564.87 0.50% 114 112 1561 0.081 0.551 51 0.013 6.96 67.4 67.4 54 8.7 566.03 565.25 0.50% 4 THOMAS 6 HUTTON Z: �27842 �27842.0003 �Engineering� Calculations and Reports�Storm Water�HEC-22�27842.0003 - HEC-22 Reporting H EC-22 Storm Drain Computations Structure ID Length (ft) Drainage Area (ac) Runoff Coeff "C" Tc (min) I Manning's n Rain "I" (in/hr) Runoff "Q.. (cfs) Total Q (cfs) Pipe Dia. (in) Velocity Design (ft/s) Invert Elevation Slope From To I U/S D/S 134 114 190 0.34 0.551 51 0.013 8.25 1.6 1.6 15 5.6 582.60 578.80 2.00% 115 114 150 0.30 0.55 5 0.013 7.02 66.4 66.4 48 8.6 566.78 566.03 0.50% 137 115 130 0.15 0.55 5 0.013 8.22 1.1 1.1 15 5.1 581.52 578.93 2.00% 138 137 36 0.10 0.55 5 0.013 8.25 0.5 0.5 18 3.8 582.25 581.52 2.00% 118 115 106 0.26 0.55 5 0.013 7.07 64.6 64.6 48 8.6 567.31 566.78 0.50% 119 118 234 0.32 0.55 5 0.013 7.191 31.8 31.8 48 7.21 568.48 567.31 0.50% 121 119 116 0.10 0.55 5 0.013 7.26 27.0 27.0 42 6.9 569.06 568.48 0.50% 69 121 94 0.08 0.55 5 0.013 7.31 21.3 21.3 42 6.5 569.53 569.06 0.50% 126 69 119 0.27 0.55 5 0.013 7.69 15.2 15.2 30 11.2 572.83 569.53 2.78% 127 126 175 0.38 0.55 5 0.013 7.79 10.3 10.3 30 6.9 574.53 572.83 0.97% 128 127 150 0.77 0.55 5 0.013 7.88 8.7 8.7 24 6.7 575.99 574.53 0.97% 131 128 213 0.12 0.55 5 0.013 8.19 0.7 0.7 24 2.6 577.05 575.99 0.50% 133 131 36 0.04 0.55 5 0.013 8.25 0.2 0.2 18 1.8 577.23 577.05 0.50% 186 128 36 1.06 0.55 5 0.013 8.25 4.9 4.9 18 4.5 576.17 575.99 0.50% 182 126 36 0.09 0.55 5 0.013 7.81 4.0 4.0 24 4.2 573.01 572.83 0.50% 103 182 155 0.13 0.55 5 0.013 7.95 3.7 3.7 24 4.1 573.79 573.01 0.50% 104 103 64 0.14 0.55 5 0.013 8.25 0.6 0.6 18 2.6 574.11 573.79 0.50% 105 103 159 0.35 0.55 5 0.013 8.11 2.5 2.5 24 3.7 574.58 573.79 0.50% 106 105 107 0.21 0.55 5 0.013 8.25 1.0 1.0 24 2.8 575.12 574.58 0.50% 108 69 149 0.00 0.55 5 0.013 7.43 6.6 6.6 30 4.8 570.28 569.53 0.50% 109 108 130 0.21 0.55 5 0.013 7.53 6.7 6.7 30 4.8 570.93 570.28 0.50% 208 109 115 5 0.013 7.62 5.9 5.9 24 4.7 571.50 570.93 0.50% 110 208 115 0.37 0.55 5 0.013 7.71 6.0 6.0 24 4.7 572.08 571.50 0.50% 209 110 119 1 5 0.013 7.82 4.5 4.5 24 4.4 572.68 572.08 0.50% 111 209 105 0.47 0.55 5 0.013 7.91 4.5 4.5 24 4.4 573.20 572.68 0.50% 112 111 122 0.21 0.55 5 0.013 8.03 2.5 2.5 18 3.8 573.81 573.20 0.50% 113 112 204 0.35 0.55 5 0.013 8.25 1.6 1.6 15 3.4 574.83 573.81 0.50% 176 121 36 0.14 0.55 5 0.013 8.00 6.0 6.0 24 6.1 569.44 569.08 1.00% 174 176 36 0.04 0.55 5 0.013 8.02 5.4 5.4 18 6.0 569.80 569.44 1.00% 178 174 89 0.18 0.55 5 0.013 8.08 5.2 5.2 18 5.9 570.69 569.80 1.00% 102 178 28 0.24 0.55 5 0.013 8.25 1.1 1.1 15 3.9 575.63 575.35 1.00% 100 178 198 0.41 0.55 5 0.013 8.22 3.4 3.4 18 5.3 572.67 570.69 1.00% 181 100 41 0.34 0.55 5 0.013 8.25 1.6 1.6 18 4.3 573.08 572.67 1.00% 171 119 36 0.18 0.55 5 0.013 8.13 4.3 4.3 15 6.6 574.63 574.09 1.50% 172 171 208 0.78 0.55 5 0.013 8.25 3.6 3.6 15 6.3 577.75 574.63 1.50% 144 118 36 0.54 0.55 5 0.013 7.51 34.3 34.3 36 9.5 574.10 573.74 1.00% 142 144 28 0.12 0.55 5 0.013 7.52 32.1 32.1 36 9.3 574.38 574.10 1.00% 140 142 28 0.36 0.55 5 0.013 7.53 31.7 31.7 36 9.3 574.66 574.38 1.00% 146 140 177 0.06 0.55 5 0.013 7.60 30.5 30.5 30 9.2 576.43 574.66 1.00% 150 146 161 0.28 0.55 5 0.013 7.68 14.5 14.5 30 7.6 578.04 576.43 1.00% 82 150 28 0.02 0.55 5 0.013 7.70 13.3 13.3 30 8.6 578.46 578.04 1.50% 84 82 28 0.33 0.55 5 0.013 7.71 13.2 13.2 24 8.7 578.87 578.46 1.50% 155 84 28 0.30 0.55 5 0.013 7.72 11.8 11.8 24 7.9 579.22 578.87 1.25% 156 155 95 0.31 0.55 5 0.013 7.77 10.6 10.6 24 7.1 580.18 579.22 1.00% 87 156 138 0.31 0.55 5 0.013 7.87 9.4 9.4 18 5.3 581.08 580.18 0.66% 88 87 150 0.31 0.55 5 0.013 7.95 6.3 6.3 18 6.9 583.07 581.08 1.32% 160 88 150 0.31 0.55 5 0.013 8.06 3.6 3.6 18 5.4 584.57 583.07 1.00% 163 160 150 0.10 0.55 5 0.013 8.22 0.8 0.8 18 3.6 586.07 584.57 1.00% 91 163 28 0.09 0.55 5 0.013 8.25 0.4 0.4 18 2.9 586.35 586.07 1.00% 168 160 28 0.31 0.55 5 0.013 8.25 1.4 1.4 18 4.1 584.85 584.57 1.00% 167 88 28 0.31 0.55 5 0.013 8.25 1.4 1.4 18 4.2 583.35 583.07 1.00% 92 87 29 0.41 0.55 5 0.013 8.25 1.9 1.9 18 4.4 581.36 581.08 0.95% 201 146 39 0.05 0.55 5 0.013 7.92 16.6 16.6 24 10.0 577.16 576.43 1.88% 202 201 79 1.06 0.55 5 0.013 7.95 16.4 16.4 24 10.0 578.64 577.16 1.88% 203 202 199 0.66 0.55 5 0.013 8.03 11.8 11.8 24 9.2 582.38 578.64 1.88% 204 203 157 0.65 0.55 5 0.013 8.10 9.0 9.0 24 8.5 585.32 582.38 1.88. 205 204 150 0.65 0.55 5 0.013 8.17 6.11 6.1 18 7.8 588.131 585.321 1.88% 206 205 150 0.71 0.55 5 0.013 8,251 3.21 3.2 15 6.71 590.951 588.13 3 88% 1 THOMAS 6 HUTTON Z: �27842 �27842.0003 �Engineering� Calculations and Reports�Storm Water�HEC-22�27842.0003 - HEC-22 Reporting 4 IN/HR INLET SPREAD H EC-22 Inlet Capacity Results Structure Q=CIA/Kc (cfs) Known Q (cfs) Longitudinal Slope SL (ft/ft) Cross Slope Sx (ft/ft) Cross Slope SW (ft/ft) Prev. Bypass Flow (cfs) Total Gutter Flow (cfs) Depth d (ft) Gutter Width (ft) Spread T (ft) Inlet Type Grate Length (in) Grate Width (in) Curb Opening Length (in) Curb Opening Height (in) Intercept Flow Qi (cfs) Bypass Flow Qb (cfs) Bypass Structure Remark 37 0.6 0.07 0.33 0.51 0.6 3.4 0.2 0.0 0.7 Grate inlet 23.8 23.8 0.1 0.5 38 38 2.9 -1.00 0.33 0.7 0.0 2.0 Grate inlet 23.8 23.8 3.4 188 1.5 0.01 0.33 1.5 0.4 0.0 1.3 Grate inlet 23.8 23.8 0.5 1.0 187 187 2.0 -1.00 0.33 1.0 2.9 0.6 0.0 1.8 Grate inlet 23.8 23.8 2.9 13 0.2 0.02 0.02 0.04 0.2 0.1 2.0 2.2 Combination 35.5 23.6 35.5 4.2 0.2 14 12 0.7 0.021 0.02 0.04 0.7 0.1 2.0 4.4 Combination 35.5 23.61 35.5 4.2 0.6 0.1 31 11 0.5 0.01 0.33 0.5 0.3 0.0 0.9 Grate inlet 23.8 23.8 0.3 0.3 10 10 1.1 -1.00 0.33 0.7 1.81 0.4 0.0 1.3 Grate inlet 23.8 23.8 1.8 9 0.7 0.02 0.33 0.7 0.3 0.0 0.9 Grate inlet 23.8 23.8 0.3 0.4 10 8 0.5 -1.00 0.33 0.5 0.2 0.0 0.6 Grate inlet 23.8 23.8 0.5 22 1.8 -1.00 0.02 0.04 1.8 0.2 2.0 5.5 Combination 71.0 23.6 71.01 4.2 1.8 21 1 0.8 -1.001 0.02 0.041 0.1 0.9 0.1 2.01 2.9 Combination 71.01 23.6 71.0 4.2 0.9 20 0.6 0.01 0.02 0.04 0.6 0.1 2.0 4.6 Combination 35.5 23.6 35.5 4.2 0.5 0.1 21 33 1.2 -1.00 0.02 0.04 1.21 0.1 2.0 3.9 Combination 71.0 23.6 71.0 4.2 1.2 34 0.1 0.04 0.02 0.04 0.1 0.1 2.0 1.2 Combination 35.5 23.6 35.5 4.2 0.1 32 15 0.2 0.02 0.02 0.04 0.2 0.1 2.0 2.4 Combination 35.5 23.6 35.5 4.2 0.21 0.0 17 36 1.8 -1.00 0.02 0.04 0.1 1.9 0.2 2.0 5.7 Combination 71.0 23.6 71.01 4.2 1.9 29 1 1.2 -1.00 0.02 0.041 1.2 0.1 2.0 4.0 Combination 71.0 23.6 71.0 4.2 1.2 28 0.1 0.02 0.02 0.04 0.1 0.1 2.0 1.5 Combination 35.5 23.6 35.5 4.2 0.1 29 27 0.1 0.01 0.02 0.04 0.11 0.1 2.0 1.9 Combination 35.5 23.6 35.5 4.2 0.1 12 30 0.7 -1.00 0.02 0.04 0.7 0.1 2.0 2.0 Combination 71.0 23.6 71.0 4.2 0.7 32 1.2 -1.00 0.02 0.04 1.2 0.1 2.0 3.8 Combination 71.0 23.6 71.0 4.21 1.2 35 0.6 0.021 0.02 0.04 0.1 0.6 0.1 2.01 4.2 Combination 35.51 23.6 35.5 4.2 0.6 0.1 36 31 1 0.5 0.02 0.02 0.041 0.1 0.6 0.1 2.0 4.1 Combination 35.5 23.6 35.5 4.2 0.6 0.1 35 14 0.2 0.02 0.02 0.04 0.2 0.1 2.0 1.9 Combination 35.5 23.6 35.5 4.2 0.2 34 19 0.3 0.01 0.02 0.04 0.31 0.1 2.0 3.3 Combination 35.5 23.6 35.5 4.2 0.3 0.0 18 18 0.1 0.04 0.02 0.04 0.0 0.1 0.1 2.0 1.3 Combination 35.5 23.6 35.51 4.2 0.11 17 17 0.7 -1.00 0.02 0.04 0.0 0.7 0.1 2.0 2.0 Combination 71.0 23.6 71.0 4.2 0.7 207 1 0.6 0.01 0.02 0.041 0.6 0.1 2.0 4.8 Combination 35.5 23.6 35.5 4.2 0.5 0.1 49 143 1.6 0.01 0.33 1.6 0.5 0.0 1.4 Grate inlet 23.8 23.8 0.6 1.0 44 44 1.6 0.01 0.33 1.0 2.61 0.5 0.0 1.7 Grate inlet 23.8 23.8 0.8 1.8 43 43 2.1 -1.00 0.33 1.8 3.8 0.7 0.0 2.2 Grate inlet 23.8 23.8 3.8 130 1.3 -1.00 0.33 0.9 2.2 0.5 0.0 1.5 Grate inlet 23.8 23.8 2.2 125 0.9 0.011 0.02 0.04 0.2 1.0 0.2 2.0 6.1 Combination 35.5 23.6 35.5 4.2 0.8 0.2 159 124 1 0.61 0.01 0.02 0.041 0.0 0.6 0.1 2.0 4.9 Combination 35.51 23.6 35.5 4.2 0.6 0.1 50 1.0 0.09 0.33 1.0 0.3 0.0 0.8 Grate inlet 23.8 23.8 0.2 0.9 130 49 0.3 0.01 0.02 0.04 0.2 0.5 0.1 2.0 4.3 Combination 35.5 23.6 35.5 4.2 0.4 0.0 124 47 0.7 0.01 0.02 0.041 1 0.71 0.2 2.0 5.2 Combination 35.51 23.6 35.5 4.2 0.6 0.1149 F4 THOMAS 6 HUTTON Z:127842127842.00031 EngineeringlCalculations and ReportslStorm WaterIHEC-22127842.0003 - HEC-22 Reporting H EC-22 Inlet Capacity Results Structure Q=CIA/Kc (cfs) Known Q (cfs) Longitudinal Slope SL (ft/ft) Cross Slope Sx (ft/ft) Cross Slope SW (ft/ft) Prev. Bypass Flow (cfs) Total Gutter Flow (cfs) Depth d (ft) Gutter Width (ft) Spread T (ft) Inlet Type Grate Length (in) Grate Width (in) Curb Opening Length (in) Curb Opening Height (in) Intercept Flow Qi (cfs) Bypass Flow Qb (cfs) Bypass Structure Remark 153 0.9 0.01 0.02 0.04 0.0 0.9 0.04 0.4 0.041 1 0.1 0.2 2.0 5.8 Combination 35.5 23.6 35.5 4.2 0.7 0.2 125 147 0.4 0.01 0.02 0.11 2.0 4.0 Combination 35.5 23.6 35.5 4.2 0.4 0.0 153 177 0.1 0.02 0.02 0.1 2.0 1.3 Combination 35.5 23.6 35.5 4.2 0.1 107 56 0.1 0.02 0.02 0.04 0.1 0.1 2.0 1.3 Combination 35.5 23.6 35.5 4.2 0.1 55 0.1 0.04 0.02 0.04 0.1 0.1 2.0 1.6 Combination 35.5 23.6 35.5 4.2 0.1 165 165 0.5 0.051 0.02 0.04 0.5 0.1 2.0 3.0 Combination 35.5 23.61 35.5 4.2 0.5 0.0 53 53 0.5 0.04 0.02 0.04 0.0 0.5 0.1 2.0 3.3 Combination 35.5 23.6 35.5 4.2 0.5 0.0 52 52 0.8 0.02 0.02 0.04 0.0 0.8 0.1 2.0 4.9 Combination 35.5 23.6 35.5 4.2 0.7 0.1 159 159 0.9 -1.00 0.02 0.041 0.3 1.3 0.2 2.0 5.6 Combination 35.5 23.6 35.5 4.2 1.3 101 0.5 -1.00 0.02 0.04 0.2 0.7 0.1 2.0 3.3 Combination 35.5 23.6 35.5 4.2 0.7 103 1.0 0.01 0.02 0.04 0.1 1.0 0.2 2.0 5.7 Combination 35.51 23.6 35.51 4.2 0.8 0.2 101 105 1 0.7 0.041 0.02 0.04 0.7 0.1 2.01 3.9 Combination 35.5 23.6 35.5 4.2 0.7 0.1 103 107 1.0 0.05 0.02 0.04 1 1.0 0.1 2.0 4.1 Combination 35.5 23.6 35.5 4.2 0.9 0.1 104 0.3 0.01 0.33 1 0.1 0.5 0.3 0.0 0.8 Grate inlet 23.8 23.8 0.2 0.2 133 0.1 0.01 0.02 0.04 0.1 0.1 2.0 1.8 Combination 35.5 23.6 35.5 4.2 0.1 186 105 0.8 -1.00 0.33 0.3 1.0 0.3 0.0 0.9 Grate inlet 23.81 23.8 1.0 106 1 0.5 0.011 0.33 0.51 0.3 0.01 0.8 Grate inlet 23.8 23.8 0.2 0.31105 172 1.7 0.01 0.33 1.7 0.5 0.0 1.4 Grate inlet 23.8 23.8 0.6 1.2 134 0.8 0.01 0.33 0.1 0.8 0.4 0.0 1.1 Grate inlet 23.8 23.8 0.4 0.5 114 0.2 0.01 0.33 0.2 0.2 0.0 0.6 Grate inlet 23.8 23.8 0.1 0.1 134 112 0.5 -1.00 0.33 0.4 1.0 0.3 0.0 0.9 Grate inlet 23.8 23.8 1.0 131 0.3 0.01 0.02 0.04 0.3 0.1 2.0 3.3 Combination 35.51 23.6 35.5 4.2 0.3 0.0 128 138 1 0.2 0.011 0.02 0.04 0.21 0.1 2.01 3.0 Combination 35.5 23.6 35.5 4.2 0.2 0.0 144 137 0.3 0.01 0.02 0.04 0.3 0.1 2.0 3.7 Combination 35.5 23.6 35.5 4.2 0.3 0.0 115 118 0.6 0.01 0.02 0.04 0.1 0.7 0.2 2.0 5.1 Combination 35.5 23.6 35.5 4.2 0.6 0.1 119 121 0.2 0.01 0.02 0.041 0.2 0.4 0.1 2.0 3.9 Combination 35.5 23.6 35.5 4.2 0.3 0.0 69 69 0.2 0.01 0.02 0.04 0.0 0.2 0.1 2.0 2.7 Combination 35.5 23.6 35.5 4.2 0.21 0.0 126 126 0.6 0.01 0.02 0.04 0.0 0.6 0.1 2.0 4.9 Combination 35.51 23.6 35.5 4.2 0.5 0.1 127 127 1 0.9 0.01 0.02 0.04 0.1 0.9 0.21 2.0 6.0 Combination 35.5 23.6 35.5 4.2 0.7 0.2 128 128 1.7 -1.00 0.02 0.04 0.2 1.9 0.2 2.0 5.9 Combination 71.0 23.6 71.0 4.2 1.9 186 2.4 -1.00 0.02 0.04 0.0 2.4 0.2 2.0 7.1 Combination 71.0 23.6 71.0 4.2 2.4 182 0.2 0.01 0.02 0.04 0.2 0.1 2.0 2.8 Combination 35.5 23.6 35.5 4.2 0.2 0.01186 176 0.3 0.01 0.02 0.04 0.1 0.4 0.1 2.0 3.9 Combination 35.5 23.6 35.5 4.2 0.3 0.0 174 144 1.2 0.011 0.02 0.04 0.0 1.21 0.2 2.01 6.5 Combination 35.51 23.6 35.5 4.2 0.9 0.3 142 102 1 0.51 0.01 0.02 0.041 0.5 0.1 2.0 4.3 Combination 35.5 23.6 35.5 4.2 0.5 0.1 181 181 0.8 0.01 0.02 0.041 0.1 0.8 0.2 2.0 5.2 Combination 35.5 23.6 35.5 4.2 0.7 0.1 142 0.3 -1.00 0.02 0.04 0.3 0.6 0.1 2.0 2.6 Combination 35.5 23.6 35.5 4.2 0.6 140 0.8 0.02 0.02 0.04 0.0 0.8 0.1 2.0 4.7 Combination 35.5 23.6 35.5 4.2 0.7 0.11171 F4 THOMAS 6 HUTTON Z:127842127842.00031 EngineeringlCalculations and ReportslStorm WaterIHEC-22127842.0003 - HEC-22 Reporting H EC-22 Inlet Capacity Results Structure Q=CIA/Kc (cfs) Known Q (cfs) Longitudinal Slope SL (ft/ft) Cross Slope Sx (ft/ft) Cross Slope SW (ft/ft) Prev. Bypass Flow (cfs) Total Gutter Flow (cfs) Depth d (ft) Gutter Width (ft) Spread T (ft) Inlet Type Grate Length (in) Grate Width (in) Curb Opening Length (in) Curb Opening Height (in) Intercept Flow Qi (cfs) Bypass Flow Qb (cfs) Bypass Structure Remark 146 0.1 0.01 0.02 0.04 0.1 0.04 0.6 0.041 1 0.2 0.1 2.0 2.5 Combination 35.5 23.6 35.5 4.2 0.1 0.0 140 150 0.6 0.02 0.02 0.11 2.0 4.3 Combination 35.5 23.6 35.5 4.2 0.6 0.1 91 0.2 0.01 0.02 0.1 2.0 2.6 Combination 35.5 23.6 35.5 4.2 0.2 0.0 168 163 0.2 0.01 0.02 0.04 0.2 0.1 2.0 2.8 Combination 35.5 23.6 35.5 4.2 0.2 0.0 160 160 0.7 0.01 0.02 0.04 0.0 0.7 0.1 2.0 5.0 Combination 35.5 23.6 35.5 4.2 0.6 0.1 88 88 0.7 0.01 0.02 0.04 0.1 0.8 0.2 2.0 5.2 Combination 35.5 23.61 35.5 4.2 0.7 0.1 87 87 0.7 0.01 0.02 0.04 0.1 0.8 0.2 2.0 5.4 Combination 35.5 23.6 35.5 4.2 0.7 0.1 156 155 0.7 -1.00 0.02 0.04 0.1 0.8 0.1 2.0 3.7 Combination 35.5 23.6 35.5 4.2 0.8 84 0.7 0.01 0.02 0.041 0.2 1.0 0.2 2.0 5.8 Combination 35.5 23.6 35.5 4.2 0.8 0.2 82 82 0.1 0.02 0.02 0.04 0.2 0.3 0.1 2.0 2.6 Combination 35.5 23.6 35.5 4.2 0.3 0.0 156 0.7 0.01 0.02 0.04 0.1 0.8 0.2 2.0 5.4 Combination 35.51 23.6 35.51 4.2 0.7 0.1 155 167 1 0.7 0.011 0.02 0.04 0.1 0.8 0.2 2.01 5.3 Combination 35.5 23.6 35.5 4.2 0.7 0.1 92 168 0.7 0.01 0.02 0.04 0.01 0.7 0.1 2.0 5.0 Combination 35.5 23.6 35.5 4.2 0.6 0.1 167 113 0.8 0.01 0.33 0.8 0.4 0.0 1.1 Grate inlet 23.8 23.8 0.4 0.4 112 112 0.5 0.02 0.33 1 0.5 0.3 0.0 0.8 Grate inlet 23.8 23.8 0.2 0.3 111 111 1.1 -1.00 0.33 0.9 1.9 0.4 0.0 1.4 Grate inlet 23.8 23.8 1.9 110 0.8 0.01 0.33 0.2 1.1 0.4 0.0 1.2 Grate inlet 23.81 23.8 0.4 0.6 111 109 1 0.5 0.011 0.33 0.0 0.51 0.3 0.01 0.9 Grate inlet 23.8 23.8 0.2 0.2 110 108 0.0 0.01 0.33 0.0 0.1 0.0 0.2 Grate inlet 23.8 23.8 0.0 0.0 109 92 0.9 0.01 0.02 0.04 0.1 1.1 0.2 2.0 6.0 Combination 35.5 23.6 35.5 4.2 0.8 0.2 84 178 0.4 0.01 0.02 0.041 0.4 0.1 2.0 3.8 Combination 35.5 23.6 35.5 4.2 0.4 0.0 100 100 0.9 0.01 0.02 0.04 0.0 1.0 0.2 2.0 5.7 Combination 35.5 23.6 35.5 4.21 0.8 0.2 115 0.7 0.01 0.02 0.04 0.0 0.7 0.2 2.0 5.1 Combination 35.51 23.6 35.5 4.2 0.6 0.1 118 174 1 0.1 0.011 0.02 0.04 0.0 0.1 0.1 2.0 1.8 Combination 35.5 23.6 35.5 4.2 0.1 178 171 0.4 0.01 0.02 0.04 0.1 0.5 0.1 2.0 4.5 Combination 35.5 23.6 35.5 4.2 0.5 0.1 176 119 0.7 0.01 0.02 0.04 0.1 0.8 0.2 2.0 5.5 Combination 35.5 23.6 35.5 4.2 0.71 0.2 121 103 0.3 0.01 0.33 0.3 0.2 0.01 0.7 Grate inlet 23.8 23.8 0.2 0.1 104 206 1.6 0.01 0.33 1.6 0.4 0.0 1.3 Grate inlet 23.8 23.8 0.6 1.0 205 1.5 0.01 0.33 1.5 0.4 0.0 1.3 Grate inlet 23.81 23.8 0.5 0.9 204 204 1 1.5 0.01 0.33 0.9 2.4 0.5 0.0 1.5 Grate inlet 23.8 23.8 0.7 1.6 203 203 1.51 0.01 0.33 1.61 3.11 0.6 0.0 1.8 Grate inlet 23.8 23.8 1.0 2.2 202 202 2.4 -1.00 0.33 2.21 4.61 0.8 0.0 2.4 Grate inlet 23.8 23.8 1 4.6 201 0.11 0.01 0.331 1 1 0.11 0.2 0.0 0.5 Combination 35.5 23.6 35.5 4.21 0.11 0.01142 F4 THOMAS 6 HUTTON Z:127842127842.00031 EngineeringlCalculations and ReportslStorm WaterIHEC-22127842.0003 - HEC-22 Reporting APPENDIX I ITEM 6 STORM DRAIN PIPE MAXIMUM CAPACITY TABLE (1) PIPE SIZE (2) MAXIMUM CAPACITY 12" 6 15" 9 18" 13 24" 25 30" 43 36" 4 42" 90 48" 120 54" 160 60" 200 66" 250 (1) CONCRETE PIPE (2) CAPACITY (c.f...) BASED ON INLET CONTROL FOR MAXIMUM DEPTH IN STANDARD CATCH BASIN 6/90 STORMWATER MANAGEMENT REPORT CRESSWIND WESLEY CHAPEL - PHASE 03 APPENDIX F WATER QUALITY CALCULATIONS 27842.0003 Fq THOMAS Sc HUTTON Water Quality Calculations Cresswind - Wesley Chapel Project No. 27842.0003 WET POND 04 Project/Drainage Area: Acres Required Water Quality Volume: 46,929 Cubic Feet Impervious Area: Acres "74.7% (Project Area (Acres) X 43,560 SF X 1"/12 = Required Cubic Feet Volume) Percent Impervious Runoff Coeifficient: R-05+0.9 (1) = 0.72 (Required Collection of First 1" of Rainfall from the Project Site and Release over a Minimum 48 Hour (Maximum 120 Hours) in Cubic Feet Per Second) Min. 48-Hour Release Rate: 0.272 CPS Required Orifice Size: 3.00 Drawdown Time (Hours): 63.22 Water Quality Elevation Orifice Flow Calculation Elev. Area Storage Q-C,A*sgrt(2gh) (ft) (sf) (cu. ft) C,= 0.62 (Sharp Orifice) NWL 567.00 24,979.00 0.00 A= 0.049 sf TOP OF BERM 573.50 40,748.00 213,612.75 g= 32.174 ft/sz Elevation Pond Depth Storage h =J 1.43 Ift (ft) (ft) (cu. ft) Q= 0.206 cfs 567.00 0.00 0.00 568.43 1.43 46,928.64 573.50 6.50 213,612.75 Average Depth Calculation Vpp Designed @ Elevation 567.00 74,522.00 Permanent Pool SA Designed @ Elev 567.00 19,948.00 Area of wet pond at the bottom of the shelf 18,357.00 Dmax over shelf 0.50 Pedmeter of Permanent Pool 666.00 Width of submerged part of shelf 3.00 Volume over the shelf only 499.50 Average Depth 4.03 SA/DA Method Drainage Area 17.90 acres Table value 2.25 Surface Area Required 1 17,543.79 Isquarefeet VPP-Vrhel f AbOttOtlrOf.h1 if wmra: o..,, - n.erhse aeo�h roes VW = Tda1'-- paimenmi root llea'1 v— - -L, o erineenem oay lreeial-ee•neiow we.a—weaxinehaim,aene:nwrni ve,.,= as•DWhm.,.,..e..•vwimear.".,„,•vnanW.,,..,..,."„,... wne<e: o...._.., = o�inawem. e�maaaBa eiaemma ehercen rmi ireai .neu (reeti wain -a -.=.tea... w�am ha„me oeac eiaemme ory uoeame Tablea:Piedmont—Mountains—Table f—'--On. —p Stage Storage Calculations Cresswind - Wesley Chapel Project No. 27842.0002 WET POND 04 FOREBAY 01 VOLUME CONTOUR CONTOUR INC. VOL. CUM. VOL. AVG. ELEV AREA (SF) DEPTH (FT) AVG. END END (CU. FT.) 562.5 2,099 N/A N/A 0 563.5 2,488 1 2,293 2,293 564.5 2,907 1 2,697 4,990 565.5 3,358 1 3,132 8,122 566.5 3,840 1 3,599 11,721 567 4,540 0.5 2,095 13,816 TOTAL FOREBAY VOLUME: I13,816 CU.FT PERCENTAGE OF PERMANENT POOL VOLUME: 1 19% PERMANENT POOL VOLUME CONTOUR CONTOUR INC. VOL. CUM. VOL. AVG. DEPTH (FT) ELEV AREA (SF) AVG. END END (CU. FT.) 562.5 14,190 N/A N/A 0 563.5 15,191 1 14,690 14,690 564.5 16,219 1 15,702 30,392 565.5 17,275 1 16,744 47,136 566.5 18,357 1 17,813 64,949 567 19,948 0.5 9,573 74,522 PERMANENT POOL VOLUME: I 74,522 CU.FT TEMPORARY PONDING ZONE CONTOUR CONTOUR INC. VOL. CUM. VOL. AVG. DEPTH (FT) ELEV AREA (SF) AVG. END END (CU. FT.) 567 24,979 N/A N/A 0 567.5 27,062 0.5 13,010 13,010 568.5 29,202 1 28,132 41,142 569.5 31,398 1 30,300 71,442 570.5 33,651 1 32,525 103,967 571.5 35,960 1 34,806 138,773 572.5 38,326 1 37,143 175,916 573.5 40,748 1 39,538 215,454 TEMPORARY PONDING ZONE VOLUME: 215,454 CU. FT. Cresswind Wesley Chapel - Phase 04 Job: J-27842.0003 T KH Wesley Chapel, LLC Date: 2/18/21 c H Thomas & Hutton Engineering Co. Revised: 9/9/21 Anti -Flotation Design Considerations By: MSK ANTI -FLOTATION DESIGN CONSIDERATIONS FOR: Wet Pond 02 CONTROL STUCTURE ELEVATIONS Top Structure Elevation: 573.00 Bottom Structure Elevation: 562.50 CONTROL STRUCTURE FLOTATION Buovant Force Calculate submerged volume: Vs = (Acs x Hcs) Where: VS = Submerged volume (cf) Les = Length of control structure (ft) = 10.50 ft Wes = Width of Control structure (ft) = 5.00 ft Aes- Cross -sectional area of control structure (ft) = 52.50 ft Hes = Height of control structure (ft) = 10.50 ft Solve equation for Vs: VS = (Aes x H. = 551.25 cf Calculate buoyant force: Fb = Vs x ywater Where: Fb = buoyant force (lbf) ywater = Specific weight of water = 62.40 lbf/cf Fb = 34,398 lbf Z:\27842\27842.0003\Engineering\Calculations and Reports\Storm Water\Anti Flotation\27842.0003 - Wet Pond 04 - Anti Flotation Design Calculations Page 1 of 3 Cresswind Wesley Chapel - Phase 04 Job: J-27842.0003 T KH Wesley Chapel, LLC Date: 2/18/21 c H Thomas & Hutton Engineering Co. Revised: 9/9/21 Anti -Flotation Design Considerations By: MSK Downward Force Calculate Downward Force of Control Structure Fdcs — (Ves — Vweir — Vorifiej X yconcrete Where: WteS = Weight of control structure (lbs) Yconcrete = Specific weight of concrete = 140.00 lbf/cf Ac, = Cross -sectional area of control structure (ft) = 52.50 ft Hcs = Height of control structure (ft) = 10.50 ft TCS = Wall thickness of control structure (ft) = 0.50 ft VCS = Volume of control structure (cf) = 152.25 cf Wweir = Width of weir (ft) = 2.00 ft Hweir = Height of weir opening (ft) = 4.00 ft Aweir = Area of weir opening(ft) = 8.00 sf Vweir = Volume of weir = 4.00 cf DIAorif,ce = Diameter of orifice opening (in) = 3.00 in Aoriace = Area of orifice opening (sf) = 0.049 sf Vorifee = Volume of orifice opening (sf) = 0.025 cf FdeS = 20,752 lbf Size Anti -Flotation Footing to Resist Bouyant Force FdeS + Fdft > Fb Fdft = (Lb X Wb X Db) X Yco=&r Where: FdeS = downward force of control structure (lbf) = 20752 lbf Fb = buoyant force (lbf) = 34398 lbf Yconcrete = Specific weight of concrete = 77.60 lbf/cf Lb = Length of Concrete Block = 14.00 ft Wb = Width of Concrete Block = 14.00 ft Db = Depth of Concrete Block = 12.00 in Fdft = downward force of anti -flotation footing (lbf) = 15210 lbf Z:\27842\27842.0003\Engineering\Calculations and Reports\Storm Water\Anti Flotation\27842.0003 - Wet Pond 04 - Anti Flotation Design Calculations Page 2 of 3 Cresswind Wesley Chapel - Phase 04 Job: J-27842.0003 T KH Wesley Chapel, LLC Date: 2/18/21 c H Thomas & Hutton Engineering Co. Revised: 9/9/21 Anti -Flotation Design Considerations By: MSK Fd,s + Fdit = 35961 IV > Fb = 34398 lbf Factor of Safety Confirm anti -flotation block is sized for minimum factor of safety (Fj of 1.10. Fs = (Fd. + Fdft)/]Fb 1.05 > 1.10 Too SMALL Z:\27842\27842.0003\Engineering\Calculations and Reports\Storm Water\Anti Flotation\27842.0003 - Wet Pond 04 - Anti Flotation Design Calculations Page 3 of 3