Loading...
HomeMy WebLinkAboutSW4210901_O&M Agreement/Plan_20211117The SCM(s) on this project include (check all that apply & co Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: User Defined SCM Present: Low Density Present: ndi ►7 0&M sheets will be added automaticall : Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s).- Location(s): Location(s): Location(s): Location(s): Type: Ve etated swales/roadside ditches I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Gerringer Mill Road, LLC Kevin D. Sasser, Managing Member 7237 Pace Drive Whitsett, NC 27377 336-449-1144 kevin2@sassercompanies.com Signature: j Date: 1, 1 J L-16 AJ a Notary Public for the State of County of do hereby certify that �, �� �j� personally appeared before me this day of P�L11 , and acknowledge the due execution of the gperations and Main ena ce Agreement . Witness my hanq�and1afrf4)PI seal, _ Q Notary Public = Randolph County Ex TH C ARQ . Seat "" My commission expires STORM-EZ 11 /12/2021 Version 1.5 O&M Agreement Page 1 of 4 Low Dons ity Maintenance Reg uirements Important maintenance procedures: The drainage area to the vegetated conveyance or vegetated receiving area will be carefully managed to reduce the sediment load to the vegetated conveyance or vegetated receiving area. After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizer will not be applied to the vegetated receiving areas. The vegetated conveyance or vegetated receiving area will be inspected quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Vegetation is too short or Maintain grassed vegetation such that the Swale or vegetated Vegetation too long. area does not erode during the peak flow from the 10-year storm Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re - Vegetated receiving erosive gullies have sod (or plant with other appropriate species) and water until formed. established. Provide lime and a one-time fertilizer application. areas Trees and/or other woody Remove the trees and woody vegetation from the Swale, vegetation are present in regrade the Swale if necessary and re-establish grass as shown the Swale. on the approved plans. Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re - erosive gullies have sod (or plant with other appropriate species) and water until formed. established. Provide lime and a one-time fertilizer application. Sediment covers the grass Remove sediment and dispose in an area that will not impact Vegetated conveyances / at the bottom of the Swale. streams or SCMs. Re -sod if necessary. swales / roadside ditches (other than curb The side slope is steeper Regrade the slopes to the permitted configuration per the outlet swales) than the approved approved plan and reestablish vegetation. If as -built or existing configuration. conditions do not allow the slopes to be regraded, contact the applicable permitting agency. Determine the source of the problem: soils, hydrology, disease, Grass is dead, diseased or etc. Remedy the problem and replace plants. Provide a one - dying. time fertilizer application to establish the ground cover if necessary. Trees and/or other woody vegetation are present in Remove the trees and woody vegetation from the vegetated the vegetated conveyance, regrade the vegetated conveyance if necessary and re-establish grass as shown on the approved plans. conveyance. Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device (if applicable) The outlet device is damaged Repair or replace the outlet device. Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the site are causing erosion or sedimentation in the Contact the local NCDEQ Regional Office. receiving water.