Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW5210603_Design Calculations_20211111
Project: Location: Date: Basin ID: • MENGINEERING Wet Pond Design Treatment volume requirement for offsite SCM Spring Hope, NC 11-Nov-21 Drainage Area (A) 0.25 Acres Impervious Area 0.05 Acres % Impervious (1) 20.00% Water Qualitv Volume Calculate Rv: Rv = 0.05+.9 X I Rv =1 0.23 WQV = 3630 X RD X Rv X A Ro = 1.00 Inch WQV = 209 ICF