Loading...
HomeMy WebLinkAboutSW5200701_Design Calculations_20211026Famous Chicken,*n Biscuits at Spring Hope, NC Owner/Developer: It's Farm Time, LLC Contact: Brad Mercer brad. mercer(cD-becaiun.com 252.208.2233 ,``��eeeererrrrr�a,, "MEOW SEAL. ENGINEERING _ %84 i 801 EAST WASHINGTON STREET P.O. BOX 1108 • • • NASHVILLE, N.C. 27856 PHONE: (252) 459-8196 �i V .• WWW.STOCKSENGINEERING.COM •••• •• • EENGINEERING Wet Pond Design Project: Bojangles Spring Hope Location: Spring Hope, NC Date: 19-Aug-20 Basin ID: 1 Drainage Area (A) 8.08 Acres Impervious Area 3.47 Acres % Impervious (1) 42.95% Water Qualitv Volume Calculate Rv: Rv = 0.05+.9 X I Rv =1 0.44 WQV= 3630XRDXRvXA R. = 1.00 Inch WQV = 12,803 ICF Surface Area Orifice Sizing Average Depth = 3.00 SA/DA Ratio = 1.60 (Choose SA/DA Ration from the NC BMP Maunual Table 1 or 2) Surface Area = (SA/DA Ratio / 100) X Area (Ac.) / 43,560 (SF/Ac.) 5,631 SF Design Orifice Q= CDAO 2gHo CD = 0.6 g= 32.2 FT/S2 Ho = H/3= 0.67 FT H= 2 FT Ao = 0.01 FEET Design Pipe = 1.3 INCH Design Orifice Q = 0.04 CFS Days to Drain =1 4.1 Wetland Plants - Vegetative Shelf Vegetative Shelf SurfaceArea = 1919 SF # of Wetland Plants = 480 FOREBAY/POND VOLUME COMPARISON 8/24/2020 WET DETENTION FOREBAY VOLUME COMPARISON FOREBAY VOLUME ELEVATION SURFACE AREA INCREMENTAL VOLUME 0.0 0.0 0.0 241 0 74.5 242 149 239.5 243.0 330.0 446.0 244.0 562.0 705.0 245.0 848.0 1,015.0 246.0 1,182.0 703.0 246.5 1,630.0 SUM = 3,183.0 Forebay is 117.27,of Pond. Pond Average Depth: 1 3.4 lFeet POND VOLUME ELEVATION SURFACE AREA INCREMENTAL VOLUME 0.0 0.0 0.0 238 0 0.0 239 0 593.0 2401 1186 1,327.5 241 1469 1,624.5 242 1780 1,949.5 243.0 2,119.0 2,301.0 244.0 2,483.0 2,679.0 245.0 2,875.0 3,083.5 246.0 3,292.0 1,797.8 246.5 3,899.0 SUM = 15,355.8 • RE-NGINEERING Curve Numbers Project: Bojangles At Spring Hope Location: Spring Hope, NC Date: 15-Oct-21 Pre Development Curve Number Pre Dev. 1 49.66 Post Development Curve Number Post Dev. 1 64.34 Post Dev. Bypass 39.00 l r ENGERING Curve Numbers Project: Bojangles At Spring Hope Location: Spring Hope, NC Date: 15-Oct-21 Basin ID: Pre Dev. Area 1 Drainage Area (A) 1 8.95 Acres Runoff Curve Numbers Cover Description Cover Type and Hydrologic Condition I A I Area (ac)J B I Area (ac)J C I Area (ac)J D I Area (ac) Cultivated Land Without Conservation Treatment 72 81 88 91 With Conservation Treatment 62 71 78 81 Wood of Forest Land Poor Cover (Thin) 45 66 77 83 Good Cover 25 55 70 77 Open Spance (lawns, parks, cemeteries, etc) Poor Condition (grass cover <50%) 68 79 86 89 Fair Condition (grass cover 50%-75%) 49 8.83 69 79 84 Good Condition (grass cover >75%) 39 61 74 80 Impervious Area Parking Lots, Roofs, Drives, etc. 1 98 1 0.12 1 98 1 1 98 1 1 98 Soil Area per Hydrologic Group 1 1 8.95 1 1 0 1 1 0 1 1 0 Drainage Area = Area Total Weighted Curve Number CN = [(CNi*Ai)+ (CNn*An)]/Atot TRUE F 8.95 Pre Development Area 1 Curve Number 49.66 l r ENGERING Curve Numbers Project: Bojangles At Spring Hope Location: Spring Hope, NC Date: 15-Oct-21 Basin ID: Post Dev. To SCM Drainage Area (A) 1 8.08 Acres Runoff Curve Numbers Cover Description Cover Type and Hydrologic Condition I A I Area (ac)J B I Area (ac)J C I Area (ac)J D I Area (ac) Cultivated Land Without Conservation Treatment 72 81 88 91 With Conservation Treatment 62 71 78 81 Wood of Forest Land Poor Cover (Thin) 45 66 77 83 Good Cover 25 55 70 77 Open Spance (lawns, parks, cemeteries, etc) Poor Condition (grass cover <50%) 68 79 86 89 Fair Condition (grass cover 50%-75%) 49 69 79 84 Good Condition (grass cover >75%) 39 4.61 61 74 80 Impervious Area Parking Lots, Roofs, Drives, etc. 1 98 1 3.47 1 98 98 98 Soil Area per Hydrologic Group 1 1 8.08 1 1 0 0 1 0 Drainage Area = Area Total Weighted Curve Number CN = [(CNi*Ai)+ (CNn*An)]/Atot TRUE F 8.08 Post Development Area 1 Curve Number 64.34 l r ENGERING Curve Numbers Project: Bojangles At Spring Hope Location: Spring Hope, NC Date: 15-Oct-21 Basin ID: Post Dev. Bypass Drainage Area (A) 1 1.08 Acres Runoff Curve Numbers Cover Description Cover Type and Hydrologic Condition I A I Area (ac)J B I Area (ac)J C I Area (ac)J D I Area (ac) Cultivated Land Without Conservation Treatment 72 81 88 91 With Conservation Treatment 62 71 78 81 Wood of Forest Land Poor Cover (Thin) 45 66 77 83 Good Cover 25 55 70 77 Open Spance (lawns, parks, cemeteries, etc) Poor Condition (grass cover <50%) 68 79 86 89 Fair Condition (grass cover 50%-75%) 49 69 79 84 Good Condition (grass cover >75%) 39 1.08 61 74 80 Impervious Area Parking Lots, Roofs, Drives, etc. 1 98 1 1 98 98 98 Soil Area per Hydrologic Group 1 1 1.08 1 1 0 0 0 Drainage Area = Area Total Weighted Curve Number CN = [(CNi*Ai)+ (CNn*An)]/Atot TRUE 1.08 Post Development Area 2 Curve Number 39.00 Runoff Curve Numbers Cover Description Cover Type and Hydrologic Condition A B C D Cultivated Land Without Conservation Treatment 72 81 88 91 With Conservation Treatment 62 71 78 81 Wood of Forest Land Poor Cover (Thin) 45 66 77 83 Good Cover 25 55 70 77 Open Spance (lawns, parks, cemeteries, etc) Poor Condition (grass cover <50%) 68 79 86 89 Fair Condition (grass cover 50%-75%) 49 69 79 84 Good Condition (grass cover >75%) 39 61 74 80 Impervious Areas Parking Lots, Roofs, Driveways, etc. 98 98 98 98 Watershed Model Schematic 1 Hydraflow Hydrographs by Intelisolve v9.22 1 - Pre Area 1 2 - Post to SCM 3 - Post Dev. Bypass r■l 4 - Post into SCM ® Total Post Development Leaend Hvd• Origin Description 1 SCS Runoff Pre Area 1 2 SCS Runoff Post to SCM 3 SCS Runoff Post Dev. Bypass 4 Reservoir Post into SCM 5 Combine Total Post Development Project: Wetland #1.gpw Monday, Oct 18, 2021 Hydrograph Return Period Recap HydraflowHydrographsbylntelisolvev9.22 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------- 0.058 ------- ------- ------- 4.657 ------- ------- ------- Pre Area 1 2 SCS Runoff ------- 2.433 ------- ------- ------- 14.05 ------- ------- ------- Post to SCM 3 SCS Runoff ------- 0.000 ------- ------- ------- 0.051 ------- ------- ------- Post Dev. Bypass 4 Reservoir 2 0.053 ------- ------- ------- 2.352 ------- ------- ------- Post into SCM 5 Combine 3,4 0.054 ------- ------- ------- 2.597 ------- ------- ------- Total Post Development Proj. file: Wetland #1.gpw Monday, Oct 18, 2021 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 0.058 1 902 2,008 ---- ------ ------ Pre Area 1 2 SCS Runoff 2.433 2 730 12,510 ---- ------ ------ Post to SCM 3 SCS Runoff 0.000 2 n/a 0 ---- ------ ------ Post Dev. Bypass 4 Reservoir 0.053 2 1456 11,063 2 247.98 10,041 Post into SCM 5 Combine 0.054 2 1456 11,418 3,4 ------ ------ Total Post Development Wetland #1.gpw Return Period: 1 Year Monday, Oct 18, 2021 I Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Oct 18, 2021 Hyd. No. 1 Pre Area 1 Hydrograph type = SCS Runoff Peak discharge = 0.058 cfs Storm frequency = 1 yrs Time to peak = 902 min Time interval = 1 min Hyd. volume = 2,008 cuft Drainage area = 8.950 ac Curve number = 49.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 22.50 min Total precip. = 2.86 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Area 1 Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 5 Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 2 Post to SCM Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 8.080 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.86 in Storm duration = 24 hrs Monday, Oct 18, 2021 Peak discharge = 2.433 cfs Time to peak = 730 min Hyd. volume = 12,510 cuft Curve number = 64.3 Hydraulic length = 0 ft Time of conc. (Tc) = 22.10 min Distribution = Type II Shape factor = 484 Post to SCM Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Oct 18, 2021 Hyd. No. 3 Post Dev. Bypass Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 1.080 ac Curve number = 39 Basin Slope = 3.0 % Hydraulic length = 3050 ft Tc method = KIRPICH Time of conc. (Tc) = 14.50 min Total precip. = 2.86 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev. Bypass Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.02 0.03 0.02 0.01 0.01 0.00 - 0.00 0 20 40 60 80 100 120 — Hyd No. 3 Time (min) Hydrograph Report 7 Hydraflow Hydrographs by Intelisolve v9.22 Monday, Oct 18, 2021 Hyd. No. 4 Post into SCM Hydrograph type = Reservoir Peak discharge = 0.053 cfs Storm frequency = 1 yrs Time to peak = 1456 min Time interval = 2 min Hyd. volume = 11,063 cuft Inflow hyd. No. = 2 - Post to SCM Max. Elevation = 247.98 ft Reservoir name = SCM #1 Max. Storage = 10,041 cuft Storage Indication method used Q (cfs) 3.00 1.00 Post into SCM Hyd. No. 4 -- 1 Year Q (cfs) 3.00 2.00 1.00 I 'I I I 10.00 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 4 Hyd No. 2 Total storage used = 10,041 cuft Pond Report $ Hydraflow Hydrographs by Intelisolve v9.22 Monday, Oct 18, 2021 Pond No. 1 - SCM #1 Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 246.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 246.50 5,529 0 0 0.50 247.00 6,535 3,016 3,016 1.50 248.00 7,793 7,164 10,180 2.50 249.00 9,408 8,601 18,781 3.50 250.00 11,854 10,631 29,412 4.00 250.50 13,987 6,460 35,872 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 1.30 0.00 0.00 Crest Len (ft) = 10.00 15.00 0.00 0.00 Span (in) = 15.00 1.30 0.00 0.00 Crest El. (ft) = 249.25 250.10 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 246.30 246.50 0.00 0.00 Weir Type = Rect Broad --- --- Length (ft) = 46.00 0.50 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 7.17 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 4.00 3.00 2.00 1.00 0.00 r 1 0.00 2.00 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 4.00 6.00 Stage / Discharge Elev (ft) 250.50 249.50 248.50 247.50 246.50 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 Discharge (cfs) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Oct 18, 2021 Hyd. No. 5 Total Post Development Hydrograph type = Combine Peak discharge = 0.054 cfs Storm frequency = 1 yrs Time to peak = 1456 min Time interval = 2 min Hyd. volume = 11,418 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 1.080 ac Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 ' ' 0 600 Hyd No. 5 Total Post Development Hyd. No. 5 -- 1 Year 1200 1800 2400 Hyd No. 3 3000 3600 Hyd No. 4 4200 4800 5400 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 1 0.00 6000 Time (min) Hydrograph Summary Report 10 Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 4.657 1 730 23,834 ---- ------ ------ Pre Area 1 2 SCS Runoff 14.05 2 728 51,188 ---- ------ ------ Post to SCM 3 SCS Runoff 0.051 2 738 900 ---- ------ ------ Post Dev. Bypass 4 Reservoir 2.352 2 764 44,100 2 249.42 23,199 Post into SCM 5 Combine 2.597 2 760 45,448 3,4 ------ ------ Total Post Development Wetland #1.gpw Return Period: 10 Year Monday, Oct 18, 2021 Hydrograph Report 11 Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 1 Pre Area 1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 8.950 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.17 in Storm duration = 24 hrs Monday, Oct 18, 2021 Peak discharge = 4.657 cfs Time to peak = 730 min Hyd. volume = 23,834 cuft Curve number = 49.6 Hydraulic length = 0 ft Time of conc. (Tc) = 22.50 min Distribution = Type II Shape factor = 484 Pre Area 1 Q (cfs) Q (cfs) Hyd. No. 1 -- 10 Year 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 12 Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 2 Post to SCM Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 8.080 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.17 in Storm duration = 24 hrs Monday, Oct 18, 2021 Peak discharge = 14.05 cfs Time to peak = 728 min Hyd. volume = 51,188 cuft Curve number = 64.3 Hydraulic length = 0 ft Time of conc. (Tc) = 22.10 min Distribution = Type II Shape factor = 484 Post to SCM Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 13 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Oct 18, 2021 Hyd. No. 3 Post Dev. Bypass Hydrograph type = SCS Runoff Peak discharge = 0.051 cfs Storm frequency = 10 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 900 cuft Drainage area = 1.080 ac Curve number = 39 Basin Slope = 3.0 % Hydraulic length = 3050 ft Tc method = KIRPICH Time of conc. (Tc) = 14.50 min Total precip. = 5.17 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev. Bypass Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 14 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Oct 18, 2021 Hyd. No. 4 Post into SCM Hydrograph type = Reservoir Peak discharge = 2.352 cfs Storm frequency = 10 yrs Time to peak = 764 min Time interval = 2 min Hyd. volume = 44,100 cuft Inflow hyd. No. = 2 - Post to SCM Max. Elevation = 249.42 ft Reservoir name = SCM #1 Max. Storage = 23,199 cuft Storage Indication method used. Q (cfs) 15.00 12.00 OR 1H ME M 600 1200 Hyd No. 4 Post into SCM Hyd. No. 4 -- 10 Year Q (cfs) 15.00 12.00 3.00 0.00 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) - Hyd No. 2 Total storage used = 23,199 cuft Hydrograph Report 15 Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 5 Total Post Development Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 2 min Inflow hyds. = 3, 4 Q (cfs) 3.00 1.00 e Monday, Oct 18, 2021 Peak discharge = 2.597 cfs Time to peak = 760 min Hyd. volume = 45,448 cuft Contrib. drain. area = 1.080 ac Total Post Development Hyd. No. 5 -- 10 Year Q (cfs) 3.00 2.00 1.00 0.00 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 5 Hyd No. 3 Hyd No. 4