Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0040325_Regional Office Historical File Pre 2018
October 10, 2018 Mr. Kent Reid, Director of Design and Construction Central Piedmont Community College P.O. Box 35009 Charlotte, NC 28235-5009 Subject: Permit No. WQ0040325 Central Piedmont Community College CPCC Merancas Phase IV Classroom Building Wastewater Collection System Extension Permit Mecklenburg County Dear Mr, Reid: In accordance with your application received October 1, 2018, we are forwarding herewith Permit No. W00040325 dated October 10, 2018, to Central Piedmont Community College (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 1.5A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules, Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215,6A through §.143-215,6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. North Oarolinr wDepartrnent f =; v r ,w nt ; aiity (E owsskon o Nat r Resources i Water Quality Regroonel Opera'tsws Mooresville Reg;c„aI OM: Avenues, Suite 3 4-663-169 ooresysile, North Carolina 28115 Ifany parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of written petition, conforming to Chapter l5O8ofNorth Carolina General Statutes' and filed with the Office of Administrative Hearings, 8714 Mail Service Center, Raleigh, N[ 27699'6714. Unless such demands are made, this permit shall befinal and binding. If you need additional information concerning this matter, please contact Barry Love at (704) 235-2143 or via e-mail at barry.love@ncdenr.gov. ��m���� [A44� f/ PU+A4 ��o��c� for byW.Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division ofWater Resources, WCDE[l cc: Lester Barnes, P.E. (c-copy) Charlotte Water (e-oopy) Tommy Rowland (e'mpy) Regional Office Files Water Resources Central Files PER[S(p-copy) 2 t. Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Central Piedmont Community College Mecklenburg County for the construction and operation of approximately 159 linear feet of 6-inch gravity sewer and 214 linear feet of 2-inch force main to serve a 997 student school and retail area as part of the CPCC Merancas Phase IV Classroom Building project, and the discharge of 10,273 gallons per day of collected domestic wastewater into the Charlotte Water existing sewerage system, pursuant to the application received October 1, 2018, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast - Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. ,—flocuSigned by: A4,14tiv HP L_—F161 FB69A2DB4A3... for byW. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Permit Number: WQ0040325 Permit Issued: October 10, 2018 3 SUPPLEMENT TO PERMIT COVER SHEET Central Piedmont Community College is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Charlotte Water McDowell Creek Wastewater Treatment Plant in accordance with Permit Number NC0036277. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDITIONS No flow in excess of the quantity permitted herein, 10,273 gallons per day, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [15A NCAC 02T.3304(b)] 2. This permit shall become voidable unless the agreement between Central Piedmont Community College and Charlotte Water for the collection and final treatment of wastewater is in full force and effect. [15A NCAC 02T.0304(h)] II. STANDARD CONDITIONS This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; GS 143-215.1(d3)] This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.41101 4 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. 1f an individual permit is not required, the following performance criteria shall be met: 115A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. 5 Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the rnap, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-S50 (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)1 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump' station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6Athrough §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 7 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required by the Division orany other Federal, State' of Local government agencies. [G.l 143' FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: PERMIT #: PROJECT: ISSUE DATE: Central Piedmont Community College WQ0040325 CPCC Merancas Phase IV Classroom Building October 10, 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION !, , as a duly registered Professional En ineer in the State of North Carolina, having been authorized to observe ([1 periodically, ❑ weekly, full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional office' 610 East Center Avenue, Suite 301 I Mooresville, l forth Carolina 28115 Dl wlslon of Water Resources State of North Carolina Department of Environrnental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number to be completed by DWR) All items ntust be completed or the application will be returned APPLICANT INFORMATION: 1. Applicant's name: Central Piedmont Community College (company, municipality, HOA, utility, etc.) 2. Applicant type: El individual 0 Corporation © General Partnership 0 Privately -Owned Public Utility 0 Federal © State/County LJ Municipal 3. Signature authority's name: Kent Reid per 15A NCAC 02T .0106(b) Title: Director of Design and Construction. 4. Applicant's mailing address: P.O. Box 35009 City: Charlotte State: North Carolina Zip: 28235-5009 5. Applicant's contact information: Phone number: (704) 330-6232 Email Address: kent.reid@cpcc.edu. Other RECEIVEDINGi PROJECT INFORMATION: I. Project name: CPCC Merancas Phase IV Classroom Building 2Application/Project status: Proposed (New Permit) 0 Existing Perm it'Project Ka modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00_ 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.39333' Longitude:-80.84083' 5. Parcel ID (if applicable): 01742107 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Lester A. Barnes License Number: 040973 Firm: Alfred Benesch & Company Mailing address: 2359 Perimeter Pointe Parkway, Suite 350 City: Charlotte State: NC Zip: 28208- Phone number: (704) 521-9880 Email Address: lbarnes a,benesch.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: McDowell Creek Wastewater Treatment Plant Permit Number: NC00036277 Owner Name: Charlotte Water V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ ystenn Wide Collection. System Penrtit?umber(s) (if applicable): WQCS Owner Name(s): Downstream (Receiving) Sewer Size: inch FOAM: FTA 04-16 Pace 1 of 5 VI. GENERAL REQi1IREMENTS 1. if the Applicant is a Privately -Owned Public lJtility, hats a Certificate of Public Convenience and Necessity been attached? El Yes ONO I'N/A 2. lfthe Applicant is a Developer of lots to be sold, has a Dcvcloper's C) erational Agreement (OOR€ DE ' been attached? © Yes N/A If the Applicant is a FEome; Property_ Owners Asti tr ti n h s anC) Brat onal AgrCe 0 Yes DNo ®N/A. 4, Origin of wastewater: (check all that apply): O Residential Owned © Retail (stores, centers, malls) O Residential Leased 0 Retail with food preparation/service School ,$` preschool day care Medical dental veterinary facilities Food and drink facilities [I Church © Businesses / offices / factories Nursing Home e of wastewater 100fl Comrnercia n,o Industrial (See 15A NCAC 2`l° .t110,3(20)) a Domestic/Commercial R been attached? 0 Car Wash U .Hotel and/or Motels C Sys=imrning Pool `Clubhouse © Swimming Pool/Filter Backwash © Other (Explain in Attachment) >ls there a Pretreatment: Program in effect? LJ Yes 6. Has a flow reduction been approved under 15 A NCAC 021 01 I41 El Yes 0 No If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.OI 14(1 School (w/ no cafeteria, gym, locker rooms) Retail w/ food prep (carry out only) 0 No Daily Design Flow a b 10 galid,aylstudent No. of Units 997 50 gal/day/100 sf 606 Flow 9,970 GPD 303 GPD Total GPD GPI) GPD GPD 0,"773 GPD a See 15A NCAC 021'.01 I41rb),(d),(1) an fvfejO2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling proposed unknown nor -residential development uses; public access facilities located near high public useareas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S,.42A-4.)• b Per 15A. NCAC 02T .01 14(c), design flow rates for establishments not identified [in table I5A NCAC 02mm1",01 14] shall be determined using available flaw data, water using fixtures, occupancy or operation patterns, and other measured data. Wastewater generated by project: 10,2'7.3 GPD (per 15ANCAC 02T 0I14) Do not incl..ude future flows or previously permitted allocations If permitted flow is zero, indicate why: O Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line © Flow has already been allocated in Permit Number: • Rehabilitation or replacement of existing E Other (Explain): ew flow expected FORM 'TA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T ,0305 & MDC ( ravity° S 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 6 159 DIP r Section II & III of the MDC for Perrrriuin.g of Gravity Sewers contains information related to design criteria Section HI contains information related to minimum slopes for gravity sewer(s) y Oversizing lines to meet minimum siope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If A.pplicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT l . Pump station number or name: 2 Approximate Coordinates (Decimal Degrees): Latitude: Longitude: -_ 3. Design flow of the purnp station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDl-l) 5. Summarize the force main to be permitted (for this Pump Station): Power reliability i;n accordance with 1.5A NCAC El Standby' power source or pump with automatic activation and telemetry - 1 5A NCAC 02I' .0305(h)(1)(f3)t Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day )io Must bepermanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: © Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or 0 Portable pumping unit with plugged emergency pump connection and telemetry - l 5A NCAC 02T .0305(h)(I)(C): It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: F FA 04-16 Page 3 of 5 ix. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(I)'): 1. Does the project comply with all separations found in 15A NCAC 02T 030S(0 &M(s) I.,. 15A NCAC 02T,0305O contains minimum separations that shallbeprovided for sewer it 'to sewers and oth at t:;r mains (vertical 'at ater mains horizontal) Setback Parameter* of listed below (vertical) over s er including in benched nches) © Yes © No stems: Separation Rewired Reclaimed waterlines (vertical - recta ittted ttwer sewer) � � e Reclaimed water lines horizontal reclaimed over server) **Any private or public water supply source, including any wells, WS 1 waters of Class l or Class II irrt ounded reservoirs used as a source of drinkin„. water **Waters classified WS (except WS-I or WS-V),13, SA, ORW, HQW„ high water (or tide elevation) and wetlands (see item IX.2) **Any other stream, take, impoundment, or ground water lowering an surface drainage ditches An building foundation SB from normal 24 inches 18 inches 10 feet 18 inches 100 feet 50 feet 10 feet 5 feet Anbasement 10 feet To sly Dralna, e s An swina� J of ankmentor uts of2 feet c more vertical height. emb_ c'� sterns and interceptor drains rota wools 10 feet 5 feet [Ina . earth grade (vertical) 36 inches I SA NCACO21 03 5 `R contains alternatives where separations in 02 1 tµ)w („t() cannot be achieved. • **Stream classifications can be identified using the Division's NC ,Surfac c._Water Clatisifieation5 wcb,Ra e If noncompliance with 02'[ 0305it)r jg see Section X of this application Does the project comply with separation requirements for wetlands? (50 feet of separation) [J Yes No N/A Y See the Division's draft separation requirements for situations where separation cannot he meet No variance is required if the alternative. design criteria specified is utilized in design and construction • As built documents should reference the location of areas effected Does the project comply with setbacks found in the river basin rules per 15A. NCAC 02B ,0200? 1J Yes 0 No • This would include Trout Buffered Streams per I5ANCAC ;2B 0202 Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? Information can be obtained from the 4()1.&. f3uffer.Perntittini_gj3rattt h Does project comply NCAC .02T, 0105(c)(6) (additional pert Per I5A NCAC 02T 0I05(c (6), directly related environmental permit been applied for, or have been obtained. Issuance of this permit is cot sedimentation control plans, stormwater management plans, etc.). D Yes N/A fications)? Yes U No ification applications are being prepared, have on issuance of dependent permits (erosion and 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per)5A NCAC 02h.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to strea.mbanks that is subject to erosion that undermines or deteriorates the sewer_ ❑ Yes ❑ No N/A If yes, include an attachment. with details for each line, including type (aerial line, size, material, and location). High priority lines shall he inspected by the per tee or its representative at (east once every six -months and inspection documented per 15A NCAC 02T.0403(a)(5) or the pernritee's individual System -Wide Collection permit. I'ORM; ETA 04-16 Page 4 of 5 X. CEf TiFICATIONS: 1, Does the submitted system comply with 1 5A ?W1_(_:'ACO21', the Minimum Desigt Criteria lOr the Permitting cal Pump Station's and l01,ce Mainsjlatest yerstgrt), and the ct avrty Stvver Minimum Design Cr' a latest version) as applicable? Yes LI No If No, complete and submit the 'Varianco/Alternative Design Request application (VADC I0-14) and support ingdocuments for review, Approval of the request is required prior to submittal of the Fast Track Application and supporting documents, ., Professional Engineer's Certification: a (Professional Engineer's name from Application item his application for has been reviewed by me and is accurate', complete and consistent with the information supplied in. the plans, specifications, engineering calculations; and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum. Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal. package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design, NOT In accordance with General Statutes 143-215.6A and 143-215,6B, any person who knowingly makes any false statement, representation, or certification in any application package shall he guilty of a Class 2 misdemeanor, which may include a fine not to exceed S I ©,tip©, as well as civil penalties up to $25,000 per violation. North Carolina :Professional Engineer's seal, signature, acid date: Applicant's Certification per 15A NCAC 02'T .0106(b):. (Sign' t .tre Authorit ame title from A!plicatiort Itett attest tha this application for has been reviewed by me and is accurate and complete to the hest of my knowledge, 1 understand that if all required parts of this application are not completed and that if all. required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non-, discharge system to surface waters or the land will result in an immediate enforcement action that tnay include civil penalties, Injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated, I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 1 43 ?15 f6A and 143-2156B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $ 0,000 as well as civil penalties up to S2S,000 per violation. Signature: Date: FORM: FTA 04-16 Page 5 of 5 CHA LOTTE W September 6, 2018 Mr. Lester A. Barnes Benesch 2359 Perimeter Pointe Pkway Suite 350 Charlotte, NC 28208 TER SUBJECT: WATER AND SEWER FLOW ACCEPTANCE CPCC MERANCAS CAMPUS -PHASE IV CLASSROOM BUILDING 11920 VERHOEFF DRIVE, HUNTERSVILLE,NC CLTWATER TRACKING# 20181164 After an analysis of the sanitary sewer associated with the proposed project 20181164, CPCC MERANCAS CAMPUS -PHASE IV CLASSROOM BUILDING, it was determined that there is currently sufficient capacity to accommodate the proposed sewer flow of 10,273 gallons per day (997 students x 10 g/student, 606 sqft x 50 gal/100 sqft) at the connection point(s) indicated on the submitted exhibit map for transmission to the McDowell Creek Wastewater Treatment Plant; NPDES permit number NC00036277, for treatment. This acceptance of flow is based on the existing capacity of the designated publicly owned treatments works. Please see the attached NCDEQ Flow Tracking form, Charlotte Water (CLTWater) agrees to furnish water to the subject project, The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. CLTWater does not expect any of the above conditions to preclude water or sewer service to the subject site. However, the applicant should understand that due to the involvement of other agencies and continuing growth of the water and sewer system, the ability to Drmvide service for future prnlects cannot be guaranteed nor reserved. Connection to the CLTWater and d sewer system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained and construction has not started within two (2) years of issuance of this flow acceptance; and payment for any service connection(s) has not been received within (2) years of the issuance of this flow acceptance, this flow acceptance approval shall be rescinded and a new flow acceptance study must be made. If you have any questions, please do not hesitate to contact me at (704) 432-5801. Sincerely, 9.4/144.4 %!.fr Guillermo Anzola Engineering Assistant Charlotte State of North Carolina Department of Environmental Quality Division of Water Resources Flow Trcking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: BENESCH Project Name for which flow is being requested: CPCC Merancas Campus-Pase IV Classroom Building More than one FTSE may he required for a single project if the owner or the IfifTPis' not responsible fir all pump stations along the route of the proposed wastewater:flow. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McDowell Creek WWTP b. WWTP Facility 'Permit #: NC0036277 c. WWII) facility's permitted flow, d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow. for this specific request g. Total actual and obligated flows to the facility. h. Percent of permitted flow used A vs are in MGD 12 00 0,49416 5.033 0 01028 5,554 46,3% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)r--(B+C) (E)-----(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm How** Current: Avg. Tributary' Flow Plus (Name or Capacity, * (Firm I pt), Daily How, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out ofservice. **Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < O. Downstream Facility Name (Sewer): UNKNOWN Downstream Permit Number: UNKNOWN Page 1 of6 1TSF. III. Certification Statement: Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. c3sca.,,—t7D,9/5/2018 Signing Official Signature Date Page 2 of 6 FTSE 04-16 benesch Transmittal Form To: NCDEQ — Water Quality Section Mooresville Regional Office Attn: Barry Love / Debbie Luckman 610 E. Center Avenue Mooresville, North Carolina 28115 Alfred 8enesch & Company 2359 Perimeter Pointe Parkway, Suite 350 Charlotte, NC 28208 www.benesch_cordn 704-521.9880 704-521.8955 Date: 10/04/2018 1 Job No. 170 Subject: CPCC Merancas Campus Phase IV Classroom Building — Private Sanitary Sewer Permit Application — 1s` Submittal UPDATE Mail Delivery Messenger WE ARE SENDING YOU: COPIES DATE Next Day Delivery A ched DESCRIPTION 09/OS/2018 Signed FTSE 04-16 THESE ARE TRANSMI 1 1 ED as checked below: For approval Approved as submitted [- For your use 1 1 Approved as noted As requested Returned for corrections [- For review and comment UPS Ground Under separate cover: L Other: Hand Resubmit. Submit Return copies for approval copies for distribution corrected prints Remarks: cc: Barry / Debbie, enclosed is the signed Flow Tracking / Acceptance for Sewer Extension application (FTSE) to accompany the previously submitted permit application package for a new classroom building at the Central Piedmont Community College (CPCC) Merancas Campus in Huntersville, NC. The previous FTSE form submitted was printed from a copied PDF that apparently removed the digital signature. Please let us know if you have questions or require additional information. Paula Gornto, PLA Project Manager Signature: Lester Barnes, PE Project Engineer PS01-0998-06 form u.a. GE01.1DGlCa. SLS WA'7 ws: 00.0.40,0 R`M1vuaai3tgn OW Topca TE L0 ATION ,72.70704.7 KANNA COAS L ES QUADRANGLE: brow.cxk cakpy A 501447K1Yi Won CQRNCUUS. NC iktAe CPCC Merancas Campus Phase IV Classroom Building Benesch Project #: 17000232 September 27, 2018 Private Sanitary Sewer Application Cover Letter This private sanitary sewer extension will serve a new classroom building at the Central Piedmont Community College (CPCC) — Merancas Campus at 12010 Verhoeff Drive in Huntersvil.le, Mecklenburg County, North Carolina (Parcel ID: 01.742107). The private extension to be permitted will consist of (1) replacement manhole, (2) new manholes, 159-LLF of new 6-inch gravity sewer, and approximately 214-LF of relocated 2-inch force main. The proposed private gravity sewer main will discharge to an existing public 6- inch gravity service line in the Verhoeff Drive right-of-way and eventually to an existing 8-inch gravity public main, which is owned and operated by Charlotte Water. The proposed system will be a modification to an existing sanitary sewer system consisting of both gravity and pressure sewer lines that currently serve the Phase III development. The existing system was constructed around 2007 and was not perrnitted. Per conversations with-NCDEQ, the portions of the existing system to remain (not modified by this phase of construction) are not required to be retro-permitted. The total flow increase as a result of this project is approximately 10,273 gallons per day (gpd). All wastewater flows from this project will be discharged to through the proposed private 6-inch gravity sewer main. The relocated 2-inch force main, which carries wastewater from the Phase III development will terminate at the most upstream (proposed) gravity manhole. It will not receive any additional flows as a result of this project. In addition to this cover letter, the following items are bei sewer extension application package: • Executed. FTA 04-16 • Flow Tracking / Acceptance Form (FTSE 04-16) • Site Map— 8.5"xl 1" USGS Topographic Map • Application Fee - $480 sub ed as part of the benesch Transmittal Form To: NCDEQ— Water Quality Section Mooresville Regional Office Attn: Barry Love / Debbie Luckman 610 E. Center Avenue Mooresville, North Carolina 28115 Mail Delivery l Messenger WE ARE SENDING YOU: COPIES DATE 09/27/2018 09 09 nia 018 2018 06/2018 n/a Alfred IBenesch & Company 2359 Perimeter Pointe Parkway, Suite 350 Charlotte, NC 28208 www.benesch.ccm 704-5.21-9880 704-521-8955 Date: 9/28/2018 1 Job No. 17©00232 Subject: CPCC Merancas Campus Phase IV Classroom Building — Private Sanitary Sewer Permit Application — 1' Submittal Next Day Delivery 7 UPS Ground Attached DESCRIPTION Cover Letter for FTA 04-16 Under separate cover: FTA Application Instructions / Checklist Check No, 2251 FTA ©4-16 Review Fee) Water and Sewer Flow Acceptance 8.5 x 11 USGS Topo Map THESE ARE TRANSMITTED as checked below: For approval f - For your use f�f As requested For review and comment r l Approved as submitted Q Approved as noted —I Returned for corrections Resubmit Submit Return FTSE 04-16 Other: Hand copies for approval copies for distribution corrected prints Remarks: Barry / Debbie, enclosed are private sanitary sewer application documents to permit approximately 159-LF of 6-inch gravity and 214-LF of relocated force main to serve a new classroom building at the Central Piedmont Community College (CPCC) Merancas Campus in Huntersville, NC. These items are being submitted for your review and/or approval, C: Please let us know if you have questions or require additional information. Paula Gornto, PIA Project Manager Signature: Lester Barnes, PE Project Engineer PS01-0998-06 form FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: Central Piedmont Community College PERMIT #: WQ0040325 PROJECT: CPCC Merancas Phase IV Classroom Building ISSUE DATE: October 10, 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's. receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations. Section at the address at the bottom, Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, The Permittee is responsible for tracking all partial certifications up until a final certification is received, A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, an. the Permittee is prepared to operate & maintain the wastewater collection system permitted herein w portions thereof. kreid kfAxo Printed Name, Title Signature Date ENGINEERS CERTIFICATION , as a du l gistered Professional En ineer in the State of North Carolina, having been authorized to observe ( periodically, weekly, full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials, North Carolina Professional Engineer"s Seal /signature & date: ri Partial (include description) Certification Comments/Qualifiers (attach if necessary): State of Nord, ( r, IiReiouurc ; Water Qu Mooresville Rmgien:, benesch To: Z Mail Delivery NCDEQ— Water Quatity Section Mooresville Regional Office Attn: Barry Love 610 E. Center Avenue Mooresville, North Carolina 28115 Messenger Next Day Delivery WE ARE SENDING YOU: COPIES DATE Attached DESCRIPTION 02/2020 Signed F Alfred benesch & Company 2359 Perimeter Pointe Parkway, Suite 350 Charlotte, NC 28208 www.benesch.com P 704-521-9880 704-521-8955 Date: 12/07/2020 Job No, 170002 Subject: CPCC Merancas Campus Phase IV Classroom Building — Private Sanitary Sewer Certification r UPS Ground El Under separate cover: Track Sewer Engineering Ce 'cation C Other: Hand THESE ARE TRANSMITTEC For approval For your use As requested For review and corn C as checked below: Approved as submitted Approved as noted Returned for corrections E ent Resubf ni Submit Return copies for approval copies for distribution corrected prints Remarks: Barry, enclosed is the Fast Track Sewer Engineering Certification (with original signatures) for the private sanitary sewer constructed to serve the new classroom building at the Central Piedmont Community College (CPCC) Merancas Campus in Huntersville, NC, A scanned version was previously submitted via email in addition to the electronic as -built survey and record drawings for your review. Please let us know if you have questions or require additional information. cc: Paula Gornto, PLA Project Manager Signature: Lester A. Barnes, PE Project Engineer P501-0998-06 form