Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0040302_Regional Office Historical File Pre 2018
FILE Water Resources ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Environmental Quality Interim Director October 4, 2018 Mr. Dave Ransenberg, President Gateway Communities NC, LLC 6701 Carmel Road, Suite 118 Charlotte, NC 28226-3983 Subject: Permit No. WQ0040302 Gateway Communities NC, LLC NoDa40 Wastewater Collection System Extension Permit Mecklenburg County Dear Mr. Ransenberg: In accordance with your application received September 24, 2018, we are forwarding herewith Permit No. WQ0040302 dated October 4, 2018, to Gateway Communities NC, LLC (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 1508 of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. nothing Compares. State of North Carolina j Environmental Quality 1 Water Resources 1 Water Quality Regional Operations Mooresville Reeional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 704-663-1699 If you need additional information concerning this matter, please contact Barry Love at (704) 235-2143 or via e-mail at barry,love@ncdenr.gov. Sincerely, Docu nned by: A' 4CC 1AF27425ae by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ cc: Brian D. Smith, R.E. (e-copy) Charlotte Water (e-copy) Tommy Rowland (e-copy) Regional Office Files Water Resources Central Files PERCS (e-copy) 2 Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Gateway Communities NC, LLC Mecklenburg County for the construction and operation of approximately 43 linear feet of 6-inch gravity sewer and 201 linear feet of 8-inch gravity sewer to serve 40 apartment units as part of the NoDa40 project, and the discharge of 5,400 gallons per day of collected domestic wastewater into the Charlotte Water existing sewerage system, pursuant to the application received September 24, 2018, and in conformity.with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. DocuSigned by: At i CC684AF27125... by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Permit Number: WQ0040302 Permit Issued: October 4, 2018 3 SUPPLEMENT TO PERMIT COVER SHEET Gateway Corn unities NC, LLC is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Charlotte Water Sugar Creek Wastewater Treatment Plant in accordance with Permit Number NC0024937. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1SA NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDITIONS No flow in excess of the quantity permitted herein, 5,400 gallons per day, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division, 11SA NCAC 02T.0304(b)) This permit shall become voidable unless the agreement between Gateway Communities NC, LLC and Charlotte Water for the collection and final treatment of wastewater is in full force and effect. [[15A NCAC 02T,0304(h)j II. STANDARD CONDITIONS This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved, [15A NCAC 02T.0104; G.S 143-215.103)) 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 115A NCAC 02T.01101 4 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: 115A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once,per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. 5 j, Documentation shall be kept for Subparagraphs (a) through (i) &this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure„ due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc,; or b, Any S50 and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part 1 of Form CS-S50 (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur, Part H of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. (G.S. 143-215.1C(a1)1 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. (15A NCAC 02T.0108(b)1 7.. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable, Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shalt be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, if the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (pl-an & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. 6 b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116) 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 7 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or local government agencies which have jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies, [G3143- 215.1(b)1 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: Gateway Communities NC, LLC PERMIT #: WQ0040302 PROJECT: NoDa40 ISSUE DATE: October 4, 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITfEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION I, , as a duly registered Professional En ineer in the State of North Carolina, having been authorized to observe (n periodically, ❑ weekly, full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 1SA NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): State of North Carolina I Environmental Quality 1 Water Resources 1 Water Quality Regional Operations Mooresville Regional O(cel 61D East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704 663 1699 State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION stc,n of Wit rResources FTA 04-U a SUPPORTING DOCUMENTATION Applicaion Number: MI ite APPLICANT INFORMA'Ti )N; io o pkhdi I' I)\V°R1 I, Applicant"s name G tr ti ni tl) rtnttl NC l l " (ccanrp ttt . tnirrtrt ipality. OA. urti its. etc.) 2 Applicant type, E] Individual [1 Corporal. ion LI General Partnership [1] Privately -Owned .Public 1 El Federal `t<itc County Municipal [l Other ?. Sig re anti on(\'s name: Tide Prcwidcnt'O w°ncr Applicant's mailing address 6701C'armel Rod, Suite 1 18 arState: NC Zip: 2 226-_iilii; City: Charlotte �pI s contact information: cr I5A_.l LAC tlYI 011160) Phone number: (704) 752_8,5() mail Address: d_ry c Yr; aatccom11c coin PROJECT INFORMATION: 1. Project name: NoDa4U Applie ation/Project status: Proposed (Ncw Permit) If a modification, provide the eistin periutit ntrrnbcr: WQU0 If new construction but part of a master plan, p County Where project is located: :Mecklenburg Approximate Coordinates (Decinual Degrees). Latitude. Parcel iD (if aipplicable): 98 t1«�31_,t (or Parcel ID to closest downstream sewer) CONSULTANT INFORMATION: t. Professional Engineer: priarn t,), Firm: Urban I7e5i.t ri:Partiicrs,,.pllc Mailing address. 1:31 Cite: Chart tte State: Phone number: (704) z 14 1 Existing Permit/Project and issued date. to existing permit nloinher; WQ1„10_ 27 Zip: 2820_5052 Email Address Brian ,c Lon f itnde 80, 17 S"I"EWATER TREATMENT FACILITY (WWTF) INFORMATION: Facility Name Sl_orr Cfcek Wyi.P Permit Number N; DLS NC0024917 Owner Name: Charrlotte Water V. 11ECEWVING DOWNSTREAM SEWER INFORMATION (if different than VWTF):. I. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch System Wide ColiccPermit Number(s) Of -applicable): W'QCS__—___ Owner Nrnc(s) FORM. FTA t)4-16 GENERA: REQUIREMENTS If the App isa Privately-Owvnett Public Utility, hit Certificate of Public Convenience and Necessity been attached? No N/A Applicant is a Developer of lots to be sold, has a Deti,u,l � �rdttt©nal Age em niffQ, 4 UE\ been attached`' Q Yes ©No N/A A ci lca1 °laps �iQ t ndtioi 1 A�;*l cta�enljFC)RM H 7A1 been Vac' [l Ycs L No N/A Applicant is a 4, Origin of wvasteww°stet: (claccl at1➢ f'', El Residential Owned El Residential Leased El School ! preschool / day care © Food auddriuk facilities 0 Businesses / offices / factories Nature o reel 0 7, Summari Residential Leased. % lndusiri apply): • R O Retail wv ith food pre O Medical / dental i vetcdna [_:] Church O Nursing Horne c Ned? © Car Wash hotel and/or Motes Swimming Pool /Cluhhouse 0 Swimming Pool/Filter Backwash El Other (Explain in Attachnrcnt) 'Domes tac Cot rarraereal "` t Commercial See 1.5A NCAC0 T ,0103L20) a Pretreatment Program in effect? 0 Yes 'ovcd under 1 �A,..,NNCAC 02T,01.14 / [11 Yes Our rct'Iraction iatataa raa'w'aal 11 atcd by project. T,914(f')) a See 1 sA NCAC ,12°T .t111 1b , dyvellinp ; proposed unknown areas„ and residential properly as defined, in Cr.WF„,42°A-,4). b Per 15A NCA( 02 .0114(c) be determined using available Daily Desi 1.35 gal, gal/ gal/ gal/ gal/ No (d,fe,�aad tel for caveats to wastewater de, asters acsidcaatixt➢ development lases public access t located south or cat of the Atlantic lnttacoastaal. \ !' desigtr now rates for cstabla flow daitaa, water using fixtures, occnpancs or operation patterns, and other measured. data. No T No. of Units Flow 40 5,400 GPD GPI) GPD GPD GPD GPD 5,400 GPD ow rates (i.e., minimum flow per Dated near high public use 9terww°er to be used as vacation rentals Wastewater generated by, protect: 51()t Do not include future flows or pre° If permitted floe is zero, indicate wwhy [l Pump Station. or Gravity Sewer where floss wvill be perm O Flow has already. been allocated iru Penult. Number. P 00e Rehabilitation cur replaacctaactat ol` • Other (Explain). i GPD (per 15A NCAC 02T ,0114) ciotas➢° permitted allocations identified tin table 15Av?CAC 021,01)41 shall ed in subsequent peen -peeled o this lin( FORM: ETA (44-1.6 Page. 2 of 5 ViL GRAVITY SEV4 ER DESIGN CRI I" ":R.IA If' Applicable) - T .0305 DC (Gravity Sewers 1, Summarize gravity sew cr to be perm Section Section ersirii . Ill oft contains lb f Graviry fated to meet minimum slope requireme cant a viola aced to dcsiaan criteria VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — tl2T .005 & M1i1C (Puma tationsfForee lMaf ra!i): COMPLETE FOR EACH PLiMP STATION INCLUDED IN THIS PROJECT 1 Pinup sun nairnbcr or name: '. Approsiniaatc Coordinates (Decimal Degrees): La _ 3. Design flow of the pump station: 4. Dperrtional point(s) of the pump(s) gallons per minute at _ :feet total dynamic Ire d. (TD 5. Summarize the 'force main to be permitted for this Pump Station): ons per da' Longitude: capacity) Povvcr reliability° in arccordaance avitla 1SANCACt T 0305L(( ;. Stauradby power source or purrap vvitla autoaaaatie activation and telemetry - 15A NCACC 1)2T 03t) (h)(1)(8),; Required for all pump stations with an <av e rargaa cl til °flow greater than or equal to 15,000 gallons per day l lust be permanent to faacilit) Or if t.hc putup station has an aavaer<age daily )1o%y k 0 [Portable power source with naaun.ial activation. .()3()5(h)(1)(C) Of e pumping u gallons per day: ion receptacle and telemetry - 1 'CAC.` t)2° plugged enaergcric» pump connection and telemct_ 15A NC'AC 02T a030y( )t shall be demonstrated to the Division that the portable source is owned or coiatracted by the applicant (draft at rcxttacaal) and is compatible with the station., I the portable power source or pump is dedicated to multiple pump f ;all the .pump s atioras' storage capacities and the rotation schedule of the portable power source or pump, including provided in the ease of a multiple station power outage, FORM. l 17A 04-1 Page .3 of 5 SETBACKS & SEPARATION Dogs the project comply vtit$t ntl I5A NC \C. 02T tl3tay(f) conlFams sewers atnd other' tat:il it R.eclauncd water gin Reclaaimed water line **.Arty priviite or public water supply. (:'lass II im pu dcd reservoirs us S _ ((12B .0200 & 15A NCAC 02T .0305(f}); separations found in 1.5A NCAC 0217 .0305t 0_ &_(I) sack Paranactct d bcto e (t crtic d over SCA ce, including -tree old **Waters classified 1h'S (except 1VS191 or t'S-\"). B. SA IR.W. • r (or tide clev a ion) and wetlands (see step IX.,2) lake, intpoundtncnt.„ or ground water ](went ditcl u'rlditaaa Poundal Co slopeMof aalafaanknaerat or eats of 2 feet or niore e Dr rru«r ste ms aattd tnlcrceptc r drains mm _ Any stt aattataittg pctola; Final e lrth grade f°eaticatl i l be pro\ aclad fo s of °la 5A NCAC 02T,0305(g contains talterttartices where separ'• Onus in 02T (1305 f ream classifications can be identified arcing the Division's NC Surface mat compliance with 22T.0305(f) or (g), see Section X of this application. tents a n Se arttian Re 24 5) fcet: 1l► feet 5 feet 10feet a inchc atr'not be achieved. :"lssiticatrctns webixage. Does the project comply wills scpaaraat rcgrairententas for wetlands? (50 I el of st.p<rrattion) See the Division's drat separation requirements for situations where separation cataartot. he meet No variance is required if the alternative design criteria specified is utilized in design and consrnaction As built documents should reference the location of areas effected Does the project comp l w ath all setbacks ,found in t This. would include l`rout Buffered Streams per A riarcr basin NC,C 2 es per 15A NCAC 028 202 .. Does the project comply with aan individuaal 404 Permit or aa'tw tll C"crtilications` Wetland -related permits shall be requested, obtained, and adhered to for projects obtained from the 49l &, puffer Perm ttg13r3nch Does project r:orrapl) w►th 15A N('ACO2l'.0L0510j o (additional per cat ion, El No No E Yes E No Finds or surface waters Yes 0 Per ,I5A 1 CAC 02 ` t1105(c)L6?.l, directly related environmental permits or certification applications are being prepared, have been applied fiar% or have been obtained, :Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control' plans, stornn atcr management plains. etc,). this project include any setter collection Lines that are deemed "high -priori Per I5A NCAC 021f,0402e •°l't posltiortcd parallel to streamix ioritt sewer ttteatts aaai ' arerial sewer. sew°eI contacting surface w'atcrs,, last is subject to erasion tlaatt trnderntines or deteriorates the sewer. El Yes ZNo include an 'attachment +pith details for each line, ,adinf type (aerial line, sire. ntr eriatl. and locaati High. Ilricarit liatcs sball be inspected by the permittee or it in pe bons documented per 15A NCAC 02T<0403(a)(5) or the perntite 's individual System FORM: FTA 04-16 ntative at least once -months and ion permit. Page 4 of 5 X. CERTIFICATIONS: Does the submitted sYstem comPIY with J.5A.,..„1.-TzVLAL:',1,:, the Mini caisgikLfc21111 4110.1pfIckLNI..„in,silitlf.„..::.tn.i.211,1, and the Ciravi SewiN tun C:riwria (Auol ersioal as aPPlieahle? No If complete and submit the Variance,Alt vative Design Request application (VADC 10-14) and supporting documents for review„Approval of the request is required prior tad submittal of the. Fast Track .Application and sttpporting documents, 2, Professional Engineer's Certificatit 1, 111ZtiVA, Tic (Professional Engineer s name from Application Rent 111, I ,) attestthat this applicatOn for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 fUrther attest that to the he of rny knowledge the proposed design has been prepared in .accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum 'Design Criteria for the Fast -Track Permitting of Purnp Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package. inclusion of these materials under rny signature and seal signifies that have reviewed this material and have judged it to he consistent with the proposed design„ 'NO'VE accordance with. General Statutes 143-2 15,6A and 143-215,6B, any person who knowingly makes any .false statement, representation, or certification in any application package shall he guilty of a Class 2 misdemeanor, whichmay include a fine not to exceed $1.0,000, as well as civil penalties up to 1;25,000 per violation, North Carolina Professional Logineer's seal., signature, and date: 3, Ap a er 1 NCAC 02T ,0106 (Signature A uth vs name & title from ,Application Item 1.3,1 0;041;10,4,i CAR° eNC" attest that thus application tbr has 'been reviewed by me and is accurate and complete to the hest of my knowledge, 1 tinder tarut that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not ifiC luded , this application package is subject to being returned as incomplete. 1 understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, andfor criminal prosecution., 1 will make no claim against the Division of Water Resources should a condition of this permit he violated, 1 also understand that if all required parts. of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete, NOTE — In accordance with General Statutes 1,13,750A and .14.3-21 otl, any person \vim knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine riot to exceed S10,000 as well as civil penalties up to S25,000 per violation, Signature: Date: FORM.: FTA 04- 6 Page 5 of DavisRon of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Urban Design Partners Project Name for which flow is being requested: NoDa40 More than one FTSE may be required for a single project if the owner of the !PUP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Irwin/Sugar/McAlpine b. WWTP Facility Permit #: NC0024945, NC0024937, NC0024970 c. WWTP facility's permitted flow All flows are in MGD 99.0 d. Estimated obligated flow not yet tributary to the WWTP 12.441 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 63.767 0.005 76.20E 77.0% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than Z.S. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Unknown Downstream Permit Number: Not applicable Page 1 of 6 FTSE 04-16 III. Certification Statement: I Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. •, (53.a,,._ 9/20/2018 Signing Official Signature Date Page 2 of 6 FTSE 04-I6 CHARLOTTE W August 7. 2t)17 lr, Josh Peeler Urban Design Partners 1318--E6 Central Ave Chnrlottc, NC 28205 TER SUBJECT: CAPACITV ASSURANCE REVIEW NODA40 2717 N 13REVARII) STREET, CHARD() CLTWATER TRACKING## 2(1171107 A capacity determined: .After an anal it was dctern E NC of the subject project has been completed and the following has been ewer associated w itlt the proposed dcsi n of project 261171 1.(17, Noda.=ltt.. pacitr to acctnntotlate the proposed average daily flow of 5,400 gallons per cl (4(1 units * l3S gpdluntit) at the connection point(s) indicated on the submitted tst.ility plan from this project for transmission to the Sugar Creek Wastewater Treatment Plant: NPDES permit number NC(l t24937,, for treatment. This acceptance of flow is based on the existing capacity of the designated publicly owned treatments works, CLTWater agrees to furnish water to the subject project.. The water duality to the su�aject projcct regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply lclanage l laty, PWS ID #F 01 0010, on file with the Public Water Supply Section of NCDENR. t o Never,. CLTWater cannot guarantee a constant pressure or quality of flow. ent CLTWater does not expect any of the above conditions to preclude water or sewer scice to the subject site. Howe v ere the applicant should u,nderstan.d that due to the involvement of other agencies and continuing growth of the water and sewer system, the ability to provide scn be guaranteed not resen cd. Connection to the (`IJTilVatti and scn ti ,Ie,°�t first served basis, The applicant should understand that t systems, as the appropriate local or State per tarthtrr r` r titrtr to c:°tt Sincerely', Gwendolyn Banner Engineering. Assistant. orization to con ,d prior to construction f you ltavTc and: fines Beam ,tt (7(14) 336-7772. Charlotte Water 5¶00 Brookshire Blvd, Charlotte„ NC 218216 teltartotteewater.or'g R operated by the City of Charlotte CONCORD 18 Mi. # INTERSTATE 8.5 4854 IV .SE (DERI TA) 518 47' 0" NoDa4 T.E North Carolina Secretary of State Search Results Page 1 of 2 • File an Annua! R€.port/Amend an Annual Report • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings • Print an Amended a Annual Report form • Print a Pre -Populated Annual Report form Limited LiabiLity Company Legal. Name Gateway Communities NC LLC Prev Legal Name Catherine 36 Apartments LLC information Sosld: 1312010 Status: Current -Active Annual Report Status: Current Citizenship: Domestic Date Formed: 4/10/2013 Fiscal Month: December Registered Agent: Ransenberg, David Addresses Mailing Principal Office Reg Office 6701 Carmel Road, Suite 118 6701 Carmel Road, Suite 118 6701 Carmel Road, Suite 118 Charlotte, NC 28226-3953 Charlotte, NC 28226-3953 Charlotte, NC 28226-3953 Reg Mailing 6701 Carmel Road, Suite 118 Charlotte, NC 28226-3953 Company Officials All LLCs are r-ian ged by their managers pursuant to N.C.G.S. 57D-3-20. https://www.sosnc.gov/online_services/search/Business_Registration_Results 6/28/2018 North Carolina Secretary of State Search Results Page 2 of 2 Managing Member Manager Doug R. Levin David Ransenbeg 6701 Carmel Road Suite 118 6701 Carmel Road, Suite 118 Charlotte NC 28226 Charlotte NC 28226 https://www.sosnc.gov/online_services/search/Business_Registration_Results 6/28/2018 Date: June 26, 2018 To: NCDEQ Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Re: NoDa 40 UDP Project No: 16-041 Charlotte Water Tracking 420171107 To Whom it May Concern, Below is a summary of items included in this application package. 13 b8-e6 central av°e. P 704,334 330'3 charlotte, nc 28205 r 704 334 3305 urbandeesl9npartners.ccrr2 PIECCRIE0iNCDE NRIate,A1. Per the documents below, we are permitting an apartment community, with a proposed average daily wastewater flow of 5,400 gallons per day. (40 units x 135 gpd/unit). A. One original and one copy of Application and Supporting Documents R. Cover Letter C. Application Fee D. Fast Track (Form FTA 04--16) Application (Completed and executed). E. Flow Tracking/Acceptance Form — N/A F. Site Maps 1. 8,5-inch x 11-inch color copy of a USGS Topographic Map, 2. Street level map showing general project area and receiving F. believe that we have addressed all the application items sufficiently. If you have any questions,. please feel free to give me a call. ?. Smith, P.E. Partner Urban Design Partners 5 ft ANE a €14$Ca Nri, , € ANNI ,r