Loading...
HomeMy WebLinkAboutWQ0040108_Regional Office Historical File Pre 2018iv1 ICH A E L purees LINIDA C° June 26, 2018 Mr. Panchali Sau, Developer Coltrane Development Company, LLC 1233 The Plaza, Unit 5492 Charlotte, NC 28299 Subject: Permit No, WQ0040108 Coltrane Development Company, LLC The Cottages at Sardis Lane Wastewater Collection System Extension Perr Mecklenburg County Dear Mr. Sau: in accordance with your application received June 25, 2018, we are forwarding herewith Permit No, WQ0040108 dated June 26, 2018, to Coltrane Development Company, LLC (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference, Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved, Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules, Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215:6A through §143-215.6C„ construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board, If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing, upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding, e�aa, Swaete 301 •l 7(4r66,3.. i 69'9 OPER gx�r°rsrz� REGAN SeCre toy PEPPER If you need additional information concerning this matter, please contact Barry Love at (704) 235-2143 or via e-mail at barry.love@ncdenr.,gove Sincerely, DocuSigned by: A14CC681AF27425... by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ cc: Brian Smith, P.E. (e-copy) Charlotte Water (e-copy) Tommy Rowland (e-copy) Regional Office Files Water Resources Central File PERCS (e-copy) 2 I 1110 Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Coltrane Development Company, LLC Mecklenburg County for the construction and operation of approximately 313 linear feet of 8-inch gravity sewer as part of the The Cottages at Sardis Lane project, and the discharge of 1,330 gallons per day of collected domestic wastewater into the Charlotte Water existing sewerage system, pursuant to the application received June 25, 2018, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. p DoeuSigued by: --AldrrAR1AF97475 by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Permit Number: WQ0040108 Permit Issued: June 26, 2018 SUPPLEMENT TO PERMIT COVER SHEET Coltrane Development Company, LLC is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Charlotte Water McAlpine Creek Wastewater Treatment Pant in accordance with Permit Number NC0024970. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T, the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable, and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina licensed Professional Engineer in the application, It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDITIONS No flow in excess of the quantity permitted herein, 1,330 gallons per day, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [15A NCAC 02T.0304(b)] This permit shall become voidable unless the agreement between Coltrane Development Company, ILC and Charlotte Water for the collection and final treatment of wastewater is in full force and effect. [15A NCAC 02T.0304(h)] The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and shall be a condition of this permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by North Carolina General Statutes §143-215.6A to §143--215.6C for violation of or failure to act in accordance with the terms and conditions of this permit. [15A NCAC 02.T.0115] II. STANDARD CONDITIONS This permit is not transferable, In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved,, and other 4 I supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first. knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current, Division approved form) can also be completed to show that the SSO was beyond control. [G.S. '143-215.1C(a1)) Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. 6 I A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. 'Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. • Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 1,2, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer o the licensing board. [15A NCAC 02T .01 ; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)I 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies. [G.S. 143- 215.1(b)] I FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: PERMIT #: PROJECT: ISSUE DATE: Coltrane Development Company, LLC WQ0040108 The Cottages at Sardis Lane June 26, 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION I, , as a dui registered Professional En ineer in the State of North Carolina, having been authorized to observe (periodically, n weekly, full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final n Partial (include description) Certification Comments/Qualifiers (attach if necessary): State ofNarth Carolina I Environmental Quality I Water Resources ) Water Quality Regional Operations Mooresville Regional Office! 610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704 663 1699 r E OF NORTH CAROLINA TYOF Mecklenburg Permit No. Q ce f .d DEVELOPER'S OPERATIONAL AGREEMENT This AGREEMENT made pursuant to G.S. 143-215.1 (dl) and entered into this 2 L day of June 2018 , by and between the North Carolina Environmental Management Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and Coltrane Development LLC , a corporation/general partnership registered/licensed to do business in the State of North Carolina, hereinafter known as theDEVELOPER. WITNESSETH: 1. The DEVELOPER is the owner of the certain lands lying in Mecklenburg County, upon which it is erecting and will erect dwelling units and other improvements, said development to be known as • The Cottages at Sardis Lane (hereinafter the Development). 2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment works, andlor disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve the Development on said lands. 3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143- 215.1 to construct, maintain, and operate the Disposal System. 4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter 47C or 47F of the North Carolina General Statutes. 5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the Declaration, the (Unit Owners' Association) (hereinafter Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State of North Carolina, for the purpose, among others, of handling the property, affairs and business of the Development; of operating, maintaining, re -constructing and repairing the common elements of the lands and improvements subject to unit ownership, including the Disposal System; and of collecting dues and assessments to provide funds for such operation, maintenance, re -construction andrepair. 6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance with law and permit provisions in order to protect the quality of the waters of the State and the public interest therein. NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows: 1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions andlaw. 2. The DEVELOPER shall not transfer ownership andlor control of the Disposal System to the Association until construction has been completed in accordance with the permit and approved plans, and the staff of the Division of Water Resources has inspected and approved of the facilities. In order to change the name of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The request must include a copy of the Association Bylaws andDeclaration. 3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's successor. I appurtenances thereto are part of the common elements and shall thereafter be properly maintained and operated in conformity with law and the provisions of the permit for construction, operation, repair, and maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater treatment, collection and disposal system as a common element which will receive the highest priority for expenditures by the Association except for Federal, State, and local taxes andinsurance. 5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will be maintained out of the common expenses. In order to assure that there shall be funds readily available to repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses, the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses. Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part of the yearlybudget. 6. In the event the common expense allocation and separate fund are not adequate for the construction, repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any time. 7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city, town, village, county, water and sewer authorities, or other unit of government shall hereinafter become available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the existing and future wastewater of the Development to be accepted and discharged into said governmental system, and shall convey or transfer as much of the Disposal System and such necessary easements as the governmental unit mayrequire as condition of accepting the Development's wastewater. 8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for the Association to enter into voluntary dissolution without having made adequate provision for the continued proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the Association Bylaws that the Association shall not enter into voluntary dissolution without fast having transferred its said system and facilities to some person, corporation or other entity acceptable to and approved by the COMIVIISSION by the issuance of apermit. 9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and operation of the Disposal System. 10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the Association. IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized representative of the parties hereto on the day and year written as indicated by each of the parties named below: FOR THE ENVIRONMENTAL MANAGEMENT COMMISSION "coda Culpepper Interim Director, Division of Water Resources (Da‘) Coltrane Development LLC Name of VELOPER By: (Signa n print Name and Title 6o/a0Ji e (Date) DIvlslon of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: Wa 0 0 017 / 0' (to be completed by DWR) AlI items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Coltrane Development Company, LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County . ❑ Municipal ❑ Other 3. Signature authority's name: Panchali Sau per 15A NCAC 02T .0106(b) Title: Developer 4. Applicant's mailing address: 1233 The Plaza Unit 5492 City: Charlotte State: NC Zip: 28299- 5. Applicant's contact information: Phone number: (704) 649-5628 Email Address: panchaliAcanopvc1t.com H. PROJECT INFORMATION: 1. Project name: The Cottages at Sardis Lane 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.140799° Longitude: -80.775815° 5. Parcel ID (if applicable): 18718128 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Brian Smith License Number: 27890 Firm: Urban Design Partner Mailing address: 1318 Central Ave # E6 City: Charlotte State: NC Zip: 28205- Phone number: (704) 334-3303 Email Address: brian@urbandesi.ennartnerscom IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: McAlpine Creek Wastewater Treatment Plant Permit Number: NPDES HC0024970 Owner Name: Charlotte Water V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ NIA Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS NIA Owner Name(s): Charlotte Water FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ENo ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ® Yes ❑No ❑N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ❑N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Residential Leased ❑ School / preschool / day care ❑ Food and drink facilities ❑ Businesses / offices / factories El Retail (stores, centers, malls) El Retail with food preparation/service ❑ Medical / dental / veterinary facilities ❑ Church ❑ Nursing Home 5. Nature of wastewater : 100 % Domestic/Commercial % Commercial Industrial (See 15A NCAC 02T .0103(20)) >Is there a Pretreatment Program in effect? 6. Has a flow reduction been approved under 1SA NCAC 02T .0114(fl? LI Yes > if yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: ❑ Car Wash ['Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) ❑ Yes ❑ No ❑ No Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow Dwelling Unit 190 gal/day 7 1,330 GPD gall GPD gal/ GPD gal/ GPD . gal/ _ GPD gal/ GPD Total 1,330 GPD a See 15A NCAC 02T .01 14(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed'unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per I5A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01 14] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 1,330 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line El Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 GRAVITY SEWER DESIGN CRITERIA (If Applicable) 02T .0305 & h1DC: ('Gravity Sew 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) 313 Material PVC r Section 11 & [ll oftl e MDC for Permitting ofGravity Sewers contains information related. to design criteria Section 111' contains information related to minimum slopes for gravity sewer(s) Oversizing tines to meet minimum slope requirement is not allowed and a violation of the MDC PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1..Pump station number or name: NLA 2. Approximate Coordinates (Decimal Degrees): Latitude: t.:ongitudc; -, 3. Design flow of the pump station: millions gallons per day (firm capacity) 4, Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5, Summarize the force main to be permitted (for this Pump Station): Siz nches) Length (feet) Material Power reliability in accordance NCAC 02T .0305(h}(1): E Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(la)(l)(fi)_ Required for all. pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to facility Or if th.e pump station has an average daily flow less than 15,000 gallons per day: © Portable power source with manual activation, quick -connection receptacle and telemetry - 1 5 A NCAC 02T ,0305(h)(1)(C) or 0 Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305C): It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station, If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-1 fi Page 3 of 5 SETBACKS & SEPARATIONS —(0213 .0200 & 15A NCAC 02T .0305(0): Does the project comply with all separations found in 5 N 'AC 02T 5A NCAC' 02T 0105f coniamsminimum separations that s Setback Parameter* Stormse T..- and otherothcr utilitics not hstcd below (vertical) natns(vertical- later over sewer including in benche eclaimed water te ical reclai 'er scwcr Reckunicd water lines tag- -claimed over sewe & provtded for severer systems: *Any private or public water supply source, including any ‘vells, WS-1 waters of Class" or C'lass 11 impoundcd reservoirsrcscrvoirs nsed as a source .of drinking( w.at.er raters classified WS (except WS-I or WS-V), B. SA, ORW, 'HOW,or SB from normal water to. ('de eleva it and wedands'ee 'ern **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches E Yes E No -quired 24 inches in les 'riches 2 fet eet f -t 10 feet. Anv lMnLdingfoundat. Any base c 5 feet eet Top slope of embankment or cuts of 2 feet or more vertical height Dramagc systems and interce - drains r" 10 feet 5 feet feet Final earth, grade,(yertical), 36 inches • I5A NCAC 02T,0305(g) contains alternatives where separations in (121„0305(f) cannot. be achieved,. **Stream classifications can bc identified using the Division's NC Surface 'Water Classifications wet -Tags Ilnoncornpliance .with 02T,030.5(1) ni (g), see Section .X of this application Does thc project comply with separation requirements for wetlands'? (50 feet of separation) E yes Ell No El NIA • See the Division's draft separation requirements for situations where separation cannot be meet No variance is required if the alternative design criteria specified is utilized. in design and construction • As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per I 5A NQA.C, 0213 .0200? Ves No IJ N/A • This would include Trout Buffered Streams per I 5A 'NCAC 2B„0202 4, Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? Information can be obtained. from the 401 & Buffer Pe nuttng Branch. LI Yes 4 No Does project comply with 15A 'N(TAC 02'1,0105(0th) (additional permits/certifications)? E Yes fl No Per I5A N ,A 7.0.2T 01.051.; '6. , directly related environmental permits or certification applications arc being prepared, ha.vc been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent. permits (erosion and sedimentation control plans, stormwater management, plans, etc.), 6 Does this project: include any sewer collection lines that arc deemed "high -priority?" Per '15A NCA.0 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positionedparallel to streambanks that is subject to erosion that undermines or deteriorates the SeWar El Yes No LJrA If yes, include an altachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15.A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum. Design Criteria for the Permitting of Pump Stations si n Criteria (latest version) as applicable? and Force Mains (latest version); and the Gravity Sewer Yes LINo If No, complete and submit the Variance/Alternative Design Request application (VADC lt} 14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. Professional Engineer's Certifica 1, (Professional Engineer's name from Application ite attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specitacations, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $1.0,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: Appl" an 's Certifica tic per l5 -. a -AC 02T .01 this application for (Signature Authority's name title from Applicatio has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that Wall required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-?15.6A. and 143-21.5.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: NORTH CAROLINA Department of the Secretary of State To all whom these presents shall come, Greetings: 1, Elaine F. Marshall, Secretary of State of the State of North Carolina, do hereby certify the following and hereto attached to be a true copy of ARTICLES OF ORGANIZATION OF COLTRANE DEVELOPMENT COMPANY, LLC the original of which was filed in this office on the 24th day of July, 2014. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal at the City of Raleigh, this 24th day of July, 2014. 110; e Scan to verify online. Certification# C201420500267-1 Reference# C201420500267-1 Page: 1 of 3 Verify this certificate online at www.secretary.state.nc.nslverification Secretary of State State of North Carolina Department of the Secretary of State Limited Liability Company ARTICLES OF ORGANIZATION SOSID: 1392030 Date Filed: 7/24/2014 1:18:00 PM Elaine F. Marshall North Carolina Secretary of State C2014 205 00267 Pursuant to §57D-2-20 of the General Statutes of North Carolina, the undersigned does hereby submit these Articles of Organization for the purpose of forming a limited liability company. 1. The name of the limited liability company is: COLTRANE DEVELOPMENT COMPANY, LLC (See Ilan lef the (astruelivhs for eppropmmetui y designalionl 2. The name and address of each person executing these articles of organization is as follows: (State whether each person is executing these articles of organization in the capacity of a member, organizer or both. Note: This document must be signed by all persons listed.) KEVIN W. TYDINGS (organizer onlyi, 831 EAST MOREHEAD STREET, SUITE 255, CHARLOI"I'h, NC 28202 3. The name of the initial registered agent is: KEVIN W. TYDINGS 4. The street address and county of the initial registered agent office of the limited liability company is: Number and Street 831 EAST MOREHEAD STREET. SUITE 255 City: CHARLOTTE State: NC Zip Code: 28202 County: MECKLENBURG 5. The mailing address, if different from the street address, of the initial registered agent office is: Number and Street City State: Zip Code: County: 6. Principal office information: (Select either a or b.) a. ❑ The Limited liability company has a principal office. The principal office telephone number: The street address and county of the principal office of the Iimited Iiability company is: Number and Street City State: Zip Code: County: The mailing address, if different from, the street address, of the principal office of the company is: Number and Street City State: Zip Code: County: b. CKI The limited Iiability company does not have a principal office. CORPORATIONS DIVISION (Revised January 2014) P.O. Box 29622 RALEIGH, NC 27626-0622 1 (Form L-0I) • 7. Any other provisions which the limited liability company elects to include (e.g., the purpose of the entity) are attached. 8. (Optional): Please provide a business e-mail addre The Secretary of State's Office will e-mail the business automatically at the address provided above at no cost when a document is filed. The e-mail provided will not be viewable on the website. For more information on why this service is offered, please see the instructions for this document: Privacy Redaction 9. These articles will be effective upon filing, unless a future date is specified: This is the A J day of July, 2014. . COLTRANE D VELOPMENT COMPANY, LLC Signature KEVIN W. TYDINGS (organizer only) Type or Print Name and Title 714d117-1.nnieles.dne NOTES: 1. Filing fee is $125. This document must be filed with the Secretary of State. CORPORATIONS DIVISION (Revised January 2014) P.O. Box 29622 2 RALEIGH, NC 27626.0622 (Form L-01) CHARLOTTE WLTER June 8, 2018 Mr, Panchali Sau Coltrane Development Company 1233 The Plaza, Unit 5492 Charlotte, NC 28205 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE THE COTTAGES AT SARDIS LANE. 412 SARDIS LANE, CHARLOTTE NC CLTWATER TRACKING# 2018793 After an analysis of the sanitary sewer associated with the proposed design of project 2018793, The Cottages at Sardis Lane, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 1,330 gallons per day (7 ots x 190 gpd/lot) at the connection point(s) indicated on the submitted utility plan for transmission to the McAlpine Creek Wastewater Treatment Plant NPDES permit number NC0024970, for treatment. This acceptance of flow is based upon the existing capacity of the designated publicly owned treatments works. Please see the attached NC DEQ FTSE form, Charlotte Water (CLTWater) agrees to furnish water to the subject project, The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. The applicant should understand that due to the involvement of other agencies and continuing growth of the water system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater system is accepted on a first come, first served basis The applicant should understand that this letter is not authorization to construct or extend private water or sewer systems, as the appropriate local or State permits are required prior to construction, if the aropriate authorization to construct permits are not obtained construction has not started within (2) years of issuance of this flow acceptance, and payment for any service connections have not been received within 2 ears of issuance of this flow acce tance letter this flow acce tance pval shall be rescinded and _a new flow acceptance request must be made. If you have any questions, please do not hesitate to contact me at (704) 336-1006. Sincerely, 9.64,..i5"asx Gwendolyn Banner Engineering Assistant Charlotte Water 5100 Brookshire Blvd, Charlotte, NC 2821E charlottewater.org by the City of Charlotte Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Coltrane Development Company Project Name for which flow is being requested: The Cottages at Sardis Lane More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit #: NC0024970, NC0024945, NC0024937 All flaws are in MGD c. WWTP facility's permitted flow 99.0 d. Estimated obligated flow not yet tributary to the WWTP 11.488 e. WWTP facility's actual avg. flow 65.008 f. Total flow for this specific request 0.001 g. Total actual and obligated flows to the facility 76.497 h. Percent of permitted flow used 77.3% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)-(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current. Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < O. Downstream Facility Name (Sewer): Lansdowne Sub. Downstream Permit Number: Unknown Page 1 of 6 FTSE 04-16 1II. Certification Statement: Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. 4SC .--� 6/7/2018 Signing Official Signature Date Page 2 of 6 FTSE 04-16 Polaris 3G Map — Mecklenburg County, North Carolina The Cottages at Sardis Lane Date Printed: 6 4/2018 .36 AM This map or report is prepared for the inventory of real property within Mecklenburg County and is compiled from recorded deeds, plats, tax maps, aarveys, planimetric maps, and other public records and data. Users of this map or report are hereby notified that the aforementioned public primary information sources should be consulted for verification. Mecklenburg County and its mapping contractors assume no legal responsibility for the information contained herein: Polaris 3G Map - Mecklenburg County, North Carolina The Cottages at Sardis Lane Streets Map © Q3751,©75 S,0.15 Mile l fl l 1 t f 4 J b This map or report i prepared for the inventory of real property within Mecklenburg County and is cd from recorded deeds plats, Users of this map or report are hereby notified that the aforementioned public primary information sources should be consulted for verificati responsibility for the information contained herein. y p ecklenbu date Printed: 6114/2018 "10:25:45 A ric neaps, and other public records and data, unty and its mapping contractorsasime no legal 1318-e6 central ave. PI 704,334,3303 charlotte, roc 28205 F 704334.3305 urbandesignpart.ners.corm Date: June 18, 2018 To: NCDEQ Attn: Fast Track Sewer Permitting 610 East Center Ave, Suite 301 Mooresville, NC 28115 Re: The Cottages at Sardis Lane UDP Project #: 17-043 To whom it may concern, The attached Fast Track application is being submitted for a proposed residential development, referred to as The Cottages at Sardis Lane, The site is located near the intersection of Sardis Lane & Valleybrook Road in Lansdowne, Mecklenburg County, North Carolina. The proposed private gravity sewer lines related to this application will serve 7 single-family homes. The flow allocation for this development is 190 GPD per dwelling unit, for a total of 1,330 GPD. The following items are included within the submittal package: • Application fee amount ($480.00) • Completed FTA 04-16 application (Original & Copy) • Documentation of registration with the NC Sect. of Stat • FTSE 04-16 Flow Tracking/Acceptance Form • USGS Topo Map • Street Map • Capacity Assurance Flow Acceptance Letter • Developers Operational Agreement (DEV 11-17) • Set of Utility Plans Please feel free to contact me via email (bran ixbanclesignpartners,cQm) or by phone at (704) 334-3303x102 with questions pertaining to The Cottages at Sardis Lane. Thank you, Brian D. Smith, P.E. Partner Urban Design Partners TRANSMITTAL URBAN DESIGN PARTNERS To: Fast Track Sewer Permitting Date: NCDEQ 610 East Center Ave. Suite 301 Mooresville, NC 28115 Phone: Fax: 1318 e-6 central avenue P 704.334.3303 charlotte, nc 28205 F 704.334,3305 Fr' ENEDNCDENRIDWR WO uO S MOORES tL' .E REGIONAL OFFICE 6/22/2018 Project Name: The Cottages at Sardis Lane Project No: 17-043 Transmitted Via: ❑ Overnight UPS Ground ❑ Hand ❑ Mail El Fax Action: For Approval ❑ For Your Use ❑ As Requested ❑ For Review & Comment 0 For Signature Number Date Description 2 6.18.2018 Cover Letter 2 2 2 Check for Application Fee ($480) Completed FTA 04-16 application (Original & Copy Documentation of registration with the NC Sect. of State FTSE 04-16 Flow Tracking/Acceptance Letter USGS Topo Map 2 Street Map 2 Comments See cover letter Cc: Capacity Assurance Flow Acceptance Lette Developers Operational Agreement (DEV 11-17 Set of Utility Plans