Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0040047_Regional Office Historical File Pre 2018 (2)
�uTtkronmental Quail June 22, 2018 Mr, Joseph C. Wilson, P.E., Chief Engineer Charlotte Water 5100 Brookshire Boulevard Charlotte, NC 28216 MI-JC:HAEL S. REGAN ,Sec, re tcirr A CULPEPPER Interim L)JrF.'C"$fkr Subject; Permit No. WQ0040047 Charlotte Water Stevens Creek Lift Station, Forcemain & Gravity Sewer Wastewater Collection System Extension Permit Mecklenburg County Dear Mr, Wilson: In accordance with your application received June 5, 2018, we are forwarding herewith Permit No. WQ0040047 dated June 22, 2018, to Charlotte Water (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please note that this permit is for construction only, and a modification or new permit will be required before any flow can be made tributary to the system. Please pay particular attention to the following conditions contained within this "permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual systemwide collection system permit issued to the Perrnittee. It shall be the responsibility of the Perrnittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Nothing Compared"-....,.. ratensal Qualt, V' itter r2. sottrcra Wa,levQkia rn to '704-663- I, "' Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Barry Love at (704) 235-2143 or via e-mail at barry.love@ncdenr.gov. Sincerely, DocuSigned by: A14CC681 AF27425... by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ cc. Brian Crafford, P.E. (e-copy) Charlotte Water (e-copy) Tommy Rowland (e-copy) Regional Office Files Water Resources Central Files PERCS (e-copy) 2 PA NC Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Charlotte Water Mecklenburg County for the construction and operation of approximately 4,350 linear feet of 8-inch gravity sewer, 4,080 linear feet of 12-inch gravity sewer, 4,170 linear feet of 16-inch gravity sewer, and 222 linear feet of 24-inch gravity sewer, a 4.32 MGD pump station with triplex pumps, on -site audible and visual high water alarms, telemetry, and a permanent generator with automatic transfer switch; as well as approximately 50 linear feet of 12-inch force main and 14,560 linear feet of 20-inch force main as part of the Stevens Creek Lift Station, Forcemain & Gravity Sewer project, and the discharge of zero gallons per day of collected domestic wastewater into the Charlotte Water existing sewerage system, pursuant to the application received June 5, 2018, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast - Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. bocusigned by: 14r'C681A F274.2R, by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Permit Number: WQ0040047 Permit Issued: June 22, 2018 SUPPLEMENT TO PERMIT COVER SHEET Charlotte Water is hereby authorized to: Construct, and then operate ut on certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Charlotte Water McAlpine Creek Wastewater Treatment Plant in accordance with Permit Number NC0024970. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below, SPECIAL CONDITIONS Per 15A. NCAC 02B.0605, all portions of the gravity sewer line, lift station, and force main located within the 200-foot riparian buffer of Goose Creek and its tributaries shall meet the requirements of 15A NCAC 02T.0607(L). The Permittee shall obtain all deeds, easements and encroachment agreements necessary for installation, operation, and maintenance of the system prior to operation. [15A NCAC 02T.0305(c)1 All 401 Certifications/404 Permits shall be obtained prior to construction of the sewer lines and pump station as permitted herein. This permit shall be for the construction of the wastewater collection facilities only. No flow shall be made tributary to the subject facilities until a permit modification application is submitted (with the appropriate fee), a modified permit is issued, and the Engineer's Certification is received and approved by the Division. Only lots that can obtain a septic disposal system via the County Health Department may be developed until such time that the permit is modified and system permitted herein is placed into operation. [15A NCAC 02T.01161 4. No flow shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division, [15A NCAC 02T.0304(b)] 4 5. Each pump station shall be clearly and conspicuously posted using a weatherproof sign with a pump station identifying name/number, 24-Hour Emergency telephone number, and name of the owner/operator of the sewer system/pump station and instructions to call the number in the event of alarm activation or other emergency. Simplex pump stations or vacuum sewer pits serving a single- family residence may have a placard or sticker on the control panel in lieu of a sign. [15A NCAC 02T .0305(h)(2)] 11. STANDARD CONDITIONS 1. This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, "and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 115A NCAC 02T.0104; G.5143-215.1(d3)1 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-21.5.1C. h, A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments, The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall intrude at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i') of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc_; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency !Management at telephone number (800) 858-0368 or (919) 7.33-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part l of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not .recur, Part IM of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a.1)1 Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)) 6 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush [ow points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [1SA NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T,0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Per for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108{b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily; including the creation of nuisance conditions, the Permittee shall take Immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies. [G.S. 143- 215.1(b)] FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: Charlotte Water PERMIT #: WQ0040047 PROJECT: Stevens Creek Lift Station, Forcemain & Gravity Sewer ISSUE DATE: June 22, 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final'certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITFEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION 1, , as a duly registered Professional En Ineer in the State of North Carolina, having been authorized to observe (n periodically, ❑ weekly, L full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): State of North Carolina 1 Environmental Quality 1 Water Resources I Water Quality Regional Operations Mooresville Regional Office' 610 Fast Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 Division of Water Resources Site of North Carolina Department of Environmental Quality Division of Water Resources M. ABC 02T .0300 -- FAST TRAl 'K SEWER S'Y' ".E.N1 EXTENSION APPLICATION ETA. 04-16 & SUPPORTING DOCUMENTATION Application N`uniber: All items must be completed or the ap,p APPLICANT INFORM A.I ION: 1 a Applicant's name -itte Water (company, municipality, HOA, n will be.re Applicant type: Ell Individual [] Corporation U General Partnership © Federal [] State/County rm' unieipal Signature author' tyr's name Joseph ClVilson 1'F per ( 1 ( r' 1 ,010(0) Title: Chief Engineer 4. .Applicant's mailing address: 5100 Brookshire Blvd City: Charlotte State: NC Zip: 28216- 5. Applicant's contact information: Phone number: (704) 391-5145 Email Address: cwi1son,alchjarlotten .eov PROJECT INFORMATION: I. Project mime: Stevens Creek Lift Statiotl, I'orcemain 2. Application/Project status: If a modification, provide the existing permit number, WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WC,)00 County where project is located: Meeklenbtrr 4, Approximate Coordinates (Decimal Degrees): Latitude: 35.14230' Longitude:-8(i,64045 5. Parcel ID (if applicable): 1 [9701145 (or Parcel 11) to closest downstream sewer) ned [I Other E Proposed ('New Permit Sewer Ill. CONSULTANT INFORMATION: 1, Professional Engineer: Brian C'rafford. PE License Number: 044053„ Firm: Land Design, Mailing address: 223 'V Graham Street City: Charlotte State: NC Zip: 28202- Phone number: (704) 3. 5-03 5 Email Address: beraffard=`a`landdesir n.cem IA"`., WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1, Facility Name: McAlpine Creek V,)IF Permit Number: NC.`0024970 Owner Name: Charlotte Water ng Permit/Pr( tect RECEIVING DOWNSTREAM SEWER INFORMAT (if different than 1%"W TF): 1, Permit Number(s): Stimstem Wide Collection sue to 3 Owner Name( s): Charlotte Water Concurrent CIP project will upsize receiving sewer to 24-inch. See attached topo map Downstream (Recetvine) Sewer Size: 8 inch* atyhcrts)1jl"applie r4yl ): WQC:S00001 ned Public L DORM: 1'TA 04-16 Page 1 of 5 Has a fiovv reduction been approve! prrovideacopy of flow FVFRAL REQUIREMENTS 1 Ifthe Applicant is a Privately -Owned Public Utility, a C If the Applicant is ffthe Applicant is 4. Origin of cvas'tevaater; Residential Owned I] Residential Leased [Ti. School preschool / day care [J Food and drink facilities [] Businesses 1' offices / factories iIlea e of Public C'onv Ei Yes ON a eveloper of lots to be sold. has a ()escBe,.r ti U Yes No eck all that apply. NIA Retail (stores, centers, malts) [l Retail with food preparation/service [1 Medical / dental ./ veterinary faciiiu El Church Nursing lltame 5. Nature of wastewater ; 100 % Domestic/Commercial %Industrial 60,..1..F.5w 1_NC.A.( there a ,Pretreatment .Program in effect? ruder 1" ; C It 0 1 tt1:h4? Yes Ittetiott appruval letter 7. Summarize wastewater generated by pro Establishment Type (see 02T.01 l4 Desi nce and Necessity keen alattched? ') been attached? been attached'' © Car Wash J Hotel and/or Motels [I Swimming Pool /Clubhtatrse Swimming. Pool 'Filter Backwash © Other (Explain in Attachment) Y e s No Total CjPD See sA NCA4 02 1 01 ie#(&) tc l t)41l trxl�l f111,2J for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of"the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in ('a. ..f2.wt li. b Per 15A NCAC 02°T .01.14(c), design Clow rates for establishments not identified rin table _.°w shall be determined using available flow data, water using fixtures, occupancy or operation patterns„ and other measured data. "rtstewater generated by project: 0 GPO (per 1 \C.AC 02 f .t),i I l) Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: Puntp Station or Gravity Server where flow will he permitted in subsequent pen [ 1'Ioo has already been allocated in. Permit Nummher: Rehabilitation or replacement of existin€ elver with no news flow expected El Other (Explain). COny this line FORM: ETA 04-16 Page 2 of 5 VII. GRAM Summarize gt" R t)ESIGN CRJ I ERIA ('If Applicable) - 02T .0305 & MI„) �e permitted: aches) Length (feet) Material 8° 4.350 PVCDIP PVC,/ DIP PVC/ DIP 4,170 DIP Section f1 & 111 of the MDC for Permitting of Gravity Sewers coutains information related tag design Section 11I contains 'information related trt tmininturn slopes for gravity sewers) Owersizing lines to meet minimum shape requirement is not allowed and a violation of the MDC PUMP STATION DESIGN CRITERIA If Applicable) -- i)2"1 .0305 & MEW (Punap Statiorts�l' rce yfaia'ts` :. COMPLETE FOR I°ACII PUMP STATION INCLUDED IN THIS .PROJECT Pump station number or name: Stevens Creek Litt Station ?, Approximate Coordinates (Decimal Degrees): Latitude: 35,1423 t. Longitude; -F P,6404M , Design flow of the pump station: 4,32 millions gallons per day (firm capacity) 4. Operational points) of the pump(s): 650, 960,1300, 1600, 3000 gallons per minute at 164, 168, 174, 1.81, 6 feet total dynamic head If DH.) 5, Summarize the force main to he permitted (for this Pump Station): 6. Power reliability in accordance ww°ith V ?n .Nf., Standby power source or pump wi automatic act' tion and telemetry, - 15,A NCAC 02T .0305(h)0)( Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to facility Or if the pump station has an average daily flow less than '15,000 gallons per day: Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or Portable pumping unit with plugged emergency pump connection and telemetry - 15A \CAC 02T° ,0305(h)(l)(C): It shall he demonstrated to the .Division that the portable source is owned or contracted by the applicant (draft agreetnent) and is compatible with the station, lfthe portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station po' er outage, FORM: 1ry'IA 04-16 IX. SETBACKS & SEPARATIONS --(02B .0200 & 15A NCAC 02T .0305(0): project comply with all separations found in 15.E, Nt C t �i fi)'t4 (i� {0, NCAC O2T.0305(0 contains minimum separations thaw shall be provided rs and other nail s (vertical -ova horiz_onta Reclaitraed water litres (vertical a eclainsed water lhne (horizontal *Any private or pubi Class II in ounded re Sectbbac fisted b aster'" ing in ber ned over sew Yes sevv°er 5 s'rt;ms. Separation Recttaured 24 inches I S inches supply source, including any wells, WV S l avaters of Class l or used as a source of drinking water sWaters classified WS (except WS-I or WS-V), 13, SA, ORW, HQW, or SD from normal high water (or tide elevation) and wetlands (see item IX.2) *Any other stream, lake, ianpoundment, or ground water lowering and surface drainage ditches Any building faun An basement mbankment or a.ystents and interceptor di ning ool Final earth grade (vertical) or more w°crtic height contains altertrativ s where separations in 0;1 classifications can be identified using the Division's `t _ If noncompliance with 02, ). f) 05(I_) er (0, see Section X of this application 100 feet 10 feet 36.inches achieved„ Does the project comply asith separation requirements for vvetlands? (.50 feet of separatkm) [J Ye See the Division's draft separation requirements fbr situations where. separation cannot be meet No variance is required if the alternative design criteria specified is utilized in design and construction As built documents should reference the location of areas effected Does the prgjecl comply ssitla setbacks found in the tis This would include Trout Buffered Streams per 1p; 4. Does the project reqagelautltorizat:ion under a 404 Nationwide or individual permits or 401 Water Quality Certifications? Information can he obtained from the 40I & Buffer I° rmilt g 4I¢ ttr � 5. Does project comply with 15, „ O s,,i(() (additional pern Per ,t5A .. { W( t'l t )tl q €t , directly related environmental permits been applied for, er laas°e been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, storrns ater management plans, etc..). 6. 'Does this project de any, sewer collection lin. t are deemed 'high -priori Per 1 lit 14 0' 10) _?, "high. -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or server positioned paralle ambanks that is subject to erosion that undermines er deteriorates the sewer. ❑Yes ®No NA lf'y°es, include an attachment with details for each line, including type (aerial line, size, material, and Ioca High priority lines shall be inspected by the per z 'No es El No EJ NSA applicaticras are being prepared, have nee every six- months and inspections documented per 15A NCAC: 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FOR t FTA 04-16 X. CERTIFICATIONS: 1. Does the submitted system comply, >v and Force Mains (latestve sii tyi and the If No, coiaatriete and submi Design Request application ("v'ADC 10-14) and sup orting documents for review. Approvial of the request: is required prior to submittal of the Fast Track Application and supporting documents, 2. Prt)tcssional Engineer's Certifieattion: (Professional fngineer's name fi•ona Application a a has been rcviiew,ed by me and is accu te, earnaplete and consistent w°.it1r the infoniiation supplied in the plans, specie atrcans, engineering. calculations, and all other supporting documentation to the best of my knowledge, 1 further attest that to the best of tray knowledge the proposed design has been prepared in accordance. with the applicable regulations, Gravity'' Sewer !Minimum Design Criteria for Gravity Sewers (latest version},, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and ForceMains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design_ NOTE — In accordance with General Statutes ld 215.t>.A and 143-215.6B, any person who knowingly rnakfalse statement, representation, or certification in anv application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25.000 per violation. North C'arnlina 'Professional Engineer's seal, signature, and date: Applicant's per 5 NCAC 02T .0106(h): Sig tiattrre Attthrari ',s name title from p that this application has been rev( vsed by the and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. 1 understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, androrcriminal prosecution. twill make ncr claim against the Division of Water Resources should a condition of this permit be violated, 1 also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete, NOTE — In accordance with C."reneral Statutes and I -4 i ? 15,611, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may , include a fine not to Teed $.1 O,000 as well as eisil penalties up to $25,000 per violation, Signature: .Dat F�T 4-16 rage 5 of Rot N H t. i?vw DR Proposed Poke Main Proposed Gra ity Sewer Existing Receivin ins Gravity Sewer to be upsized to 2 4 inch. Project to be completed ahead of Lift Station Activation. CHEYA Proposed Gravi HANNAhtARA 3892 0 9 0 40' 2 35'07'3 8Q°37'30' G Map — Mecklenburg County, North Carolina Proposed Pump Station Location ,0‘41 4 Ofi3Of'' mitt, qttto"' Proposed Force Main Lawyers Road Date Printed: 1/10/2018 11 :05:25 AM s P opreparer repor oM 0nvernory 0 re. propertye enu pl anmetric maps. anc other public records and data Users of this map or repor should be consulted or verricabon, Mecklenburg C unty and its rnapprng co rg y an scompde. rom reconeee.s, pate, tax maps. surveys, are hereby notified that the aforementioned public primary nformatton sources dors assume no legal responstbiltty for the intormation contained herein. s 3G Map Mecklenburg County, North Carolina Proposed Force Main Proposed Gravity Sewer Date Printed: 1/10/2018 11106:39 AM p or pr p e e inventory o real propery wl in Tec en.urg ounty and is compireco # s ree , pats, t maps, surveys, panimetric maps, and other public records and data Users ofthis map or report are hereby notified that the aforementioned public primary information sources should be consulted for verification. Mecklenburg County and its (napping contractors assume no legal responsibility for the information contained herein, s 3 I' Iap - Mecklenburg County, North Carolina Date Printed: 1/1012018 11 :50:37 AM p or report Is prepare. fort e tnventory of rea property within der Ienburg aunty and is compife+ ram recorde+ deeds, plats, tax maps, surveys„ planimetnc maps. and other publyc records and data. Users of this map or report are hereby notified that the aforementioned public primary information sources should be consulted for verification, Mecklenburg County and its mapping contractors assume no legal responsibility for the information contained herein. Polaris 3G Map — Mecklenburg County, North Carolina This p or reportprepared for the inventory property wthin Mecklenburg Cou Users of this map or report are hereby notified that the aforementioned public primary in responsibility for the information contained herein Date Printed: 0/20 recorded deeds, plats, tax maps, surveys, planimetric maps, and other public recorbs and date d be consulted for verification. Mecklenburg County and its mapping contractors assume no legal June 5, 2018 NCDENR Division of Water Quality Mooresville Regional Office 610 E. Center Avenue Mooresville, North Carolina 28115 Subject: Fast Track Sewer System Extension Application Project: Stevens Creek Lift Station, Forcemain and Gravity Sewer LDI PN: 1016224 SEWER SYSTEM APPLICANT: Charlotte Water 5100 Brookshire Blvd Charlotte, NC 28216 ITEMS INCLUDED: Enclosed is the Fast -Track Application package for Charlotte Water's Stevens Creek Lift Station, Force Main, and Gravity Sewer Improvements project located in Mint Hill, NC. Included you will find the complete original application form, application fee, project USGS Topographic Map, and multiple street level aerial maps identifying the location of proposed sanitary sewer improvements. One additional copy of the application and supporting documentation is also provided. DESCRIPTION: The proposed sanitary sewer improvements include the installation of a regional tri-plex pump station (4.32 MGD capacity), approximately 14,610 LF of PVC/ DIP force main, and approximately I2,822 LF of PVC/ DIP gravity sewer. Flow to the proposed lift station and gravity sewer will be subsequently permitted and sent to the McAlpine Creek Wastewater Treatment Plant (NPDES permit number NC0024970). The lift station, forcemain, and gravity sewer will be constructed per Charlotte Water Standards and Specifications. Activation of the proposed Stevens Creek Lift Station, Force Main, and Trunk Sewer project is contingent upon the construction and activation of Charlotte Water's Irvins Creek Tributary Trunk sewer improvements (Charlotte Water Project No. 7030600111-17-571). N:L2016110162241DOCSIPERMITTINGLFAST TRACKIFAST TRACK PACKAGE11016224-ENGINEERS REPORT SEW ER.DOC LANDDESIGN, INC. 1016224 STEVENS CREEK LIFT STATION-FORCEMAIN & GRAVITY SEWER DESIGN 1016224 Fast Track Application -Stevens Creek Lift Station, Forcemain, & Gravity Sewer Project For your approval Trap al 6/5/2018 00037 Courier card Land Design BCraffordanddesign.conn Barry Love 610 E Center Ave #301 NCDENR - Room # 3323 Mooresville Regional barry.love@ncdenr.gov Mooresville NC 28115 Office United States 2 Mr. Love, The Fast Track Sewer System Extension Application Package for Charlotte Water's Stevens Creek Lift Station, Forcemain, & Gravity Sewer Project is attached. Please let me know if you need anything further to review our application, Thanks for your time and we look forward to hearing form you. Sincerely, BRIAN CRAFFORD, PE Senior Designer i Charlotte I '04,333,0325 Copies of Fast Track Applicaion Copies USGS Topo Maps Copies of Street level Maps Check for $480.00 (Check no. 00631909) • LandDesign PROJECT: SUBJECT: 1016224 STEVENS CREEK LIFT STATION-FORCEMAIN & GRAVITY SEWER DESIGN 1016224 Fast Track Application -Stevens Creek Lift Station, Forcemain, & Gravity Sewer Project PURPOSE: For your approval DATE: TRANSMITTAL ID: VIA: Transmittal 6/5/2018 00037 Courier FROM NAME COMPANY EMAIL PHONE Brian Crafford Land Design BCrafford@ianddesign.com TO NAME COMPANY EMAIL PHONE Barry Love 610 E Center Ave #301 Room # 3323 Mooresville NC 28115 United States NCDENR - Mooresville Regional Office barry.love@ncdenr.gov REMARKS: Mr. Love, The Fast Track Sewer System Extension Application Package for Charlotte Water's Stevens Creek Lift Station, Forcemain, & Gravity Sewer Project is attached. Please let me know if you need anything further to review our application. Thanks for your time and we look forward to hearing form you. Sincerely, BRIAN CRAFFORD, PE Senior Designer 1 Charlotte 1 704.333.0325 DESCRIPTION OF CONTENTS QTY DATED TITLE NOTES 2 -- Copies of Fast Track Applicaion 2 -- Copies USGS Topo Maps 2 -- Copies of Street level Maps 1 -- Check for $480.00 (Check no. 00631909) Page 1 of 1