Loading...
HomeMy WebLinkAboutWQ0039844_Regional Office Historical File Pre 2018L Water Resources Environmental Quality March 6, 2018 Mr. David Helfrich, Principal, Campus Works & CW Construction CampusWorks Development, LLC 200 Unionville -Indian Trail Road W Indian Trail, NC 28079 f L— OY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director Subject: Permit No. WQ0039844 CampusWorks Development, LLC Old Providence Road Townhomes Wastewater Collection System Extension Permit Mecklenburg County Dear Mr. Helfrich: In accordance with your application received March 2, 2018, we are forwarding herewith Permit No. WQ0039844 dated March 6, 2018, to CampusWorks Development, LLC (Permittee) for the construction and operation upon certification of the subject wastewater collectionsystem extension. This permit shall be effective from the, date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. - Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall .be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. �" Notlttiing Compares-. State of [forth Carolina I Environmental Quality 1 Water Resources 1 Water Quality Regional Operations Mooresville Regional Office 1610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28l 15 704.663-1699 If you need additional information concerning this matter, please contact Barry Love at (704) 235-2143 or via e-mail at barry.love@ncdenr.gov. Since by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ cc: Robert Reddick, P.E. (e-copy) Barbara Gross (e-copy) Tommy Rowland (e-copy) Regional Office Files Water Resources Central Files. PERCS (e-copy) Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to CampusWorks Development, LLC Mecklenburg County for the construction and operation of approximately 653 linear feet of 8-inch gravity sewer to serve the Old Providence Road Townhomes project, and the discharge of 3,800 gallons per day of collected domestic wastewater into the Charlotte Water existing sewerage system, pursuant to the -application received March 2, 2018, and in conformity with 1SA NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Permit Number: WQ0039844 Permit Issued: March 6, 2018 SUPPLEMENT TO PERMIT COVER SHEET Ca00pusWorks Development, LLCiShereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension, The sewage and wastewater collected by this system shall be treated in the Charlotte Water McAlpine Creek Wastewater Treatment Plant in accordance with Permit Number NCO024970:. Permitting ofthis project does not constitute anacceP1anceofanypar1nftheprnecttha¢doesnotmeet 15A WCAC lT; the Division's Gravity Sewer Minimum Design Criteria adopted February lZ, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, ZOOU,asapplicable, unless specifically mentioned herein. Division approve� is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. it shall be the Perm|t1ec's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. |. SPE[&ALCON0HTKONS 1. No flow in excess of the quantity permitted herein, 3,800 gallons per day, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division, [15A NCAC 02T.0304(b)] 2. This permit shall bmcornevoi6ub|e unless the agreement 'between CampusVVorks Development, LL[ and Charlotte Water for the collection and fjna� treatment of wastewater is in full force and effect. [ISAN[A[O2T.O3O4(h)] 11. STANDARD CONDITIONS L This permit is not transferable, In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change ofthe Pennittee, a formal permit request shah be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials asmay beappropriate. The approval ofthis request shall beconsidered onits merits and may ormay not beapproved. [lSAN[A[O2TD104; G.SI4]'2l5.I(d])] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; I5A NCAC ZT; the Division's Gravity Sewer Minimum Design Criteria adopted February lZ, 19S6,asapplicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T ,0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For • privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i) ofthis Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following:. a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 ,gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur, Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)1 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T,0108(b)] 7, Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a, One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. ]15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies. [G.S. 143- 215.1(b)1 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: PERMIT #: PROJECT: ISSUE DATE: CampusWorks Development, LLC WQ0039844 Old Providence Road Townhomes March 6, 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION 1, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION I, , as a dul registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, n weekly, I full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 1SA NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations DWR D(vIslon of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources L5A, NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION ETA. 04-1.6 & SUPPORTING DOCUMENTATION Application Number: (to he completed by DWR) All(items utust,he completed or the application will be retuned 1. APPLICANT INFORMATION: 1, Applicant's name: CW Developmei -ornpany, municipality, I-10A, utility, etc„) 2. Applicant type: 0 Individual Corporation Ei General Partnership Privately -Owned Public Utility Federal 0 State/County 0 Municipal 0 Other 3. Signature authority's name: David"- elfirich per 1,5,A NtL,‘„C,N,„1,1_„„ill,00(11:i Title: Principal, CampusWorks & CW Construction 4, Applicant's mailing address: 2000 Urnomville-Indian Trail Road W City: Indian Trail State: NC Zip: 28079- 5, Applicant's contact information: Phone number: (704) 821-5599 Email Address: dhelfrich,(ajcwonsite.coart H. PROJECT INFORMATION: L Project name: Old Providence d wnhomes 2. Application/Project status: 0 Proposed (New Permit) 0 Existing PermirProject If a modification, provide the existing permit number WON and issued date: If new construction but part of a master plan, provide the existing permit number WOO(), 3. County where project is located: M ck enburi4 4, Approximate Coordinates (Decimal. Degrees): Latitude: 35,133055' Longitude: -80,785688 5, Parcel ID (if applicable>: 8727 L30 (or Parcel iD to closest downstream. sewer) 111 CONSULTANT INFORMATION: I, Professional Engineer Robe,ReddkPE k Firm: McAdams Mailing address: 3436 Toringdon 0 City: Charlotte State: NC Zip: Phone number (704) .527-0800 Email .Address: reddickAmcdamsco,com License Number 35747 111/. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: I. Facility Name: Sugar creek , Permit Number: Nc00',349n, Owner Name: Charlotte Water V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch t„:011,;A:tv,tt ['dram Nu1bev"(-0 6140111)::c,ibl•,:r. WQCS Owner Narne,(s): FORM: ETA )4-16 Page of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .11305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 652.6 PVC D Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .11305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02'1' .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - I5A NCAC 02T .0305(h)(l)(B): D Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day D Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(l)(C): D It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. D If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 VI. GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes No ❑N/A 2. lithe Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 1 If the Applicant is a If Owners' Association, has an Operational Aarcemcnt (FORM: F 1OA) been attached? ❑ Yes No ❑N/A. 4. Origin of wastewater: (check all that apply): Residential Owned ❑ Residential Leased ❑ School / preschool / day care ❑ Food and drink facilities ❑ Businesses / offices / factories ❑ Retail (stores, centers, malls) ❑ Retail with food preparation/service ❑ Medical / dental / veterinary facilities ❑ Church ❑ Nursing Home ❑ Car Wash D Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 % Domestic/Commercial % Commercial Industrial (See 15A NCAC 02T 0103(20)) �Ts there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under ISA NCAC 02T .0114(f)? ❑ Yes ❑ No lives, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.O1 l4(1)) Daily Design Flow a.b No. of Units Flow Residential, Townhome 190 gal/day/unit 20 3,800 GPD gall GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 3,800 GPD a See 15r\ NCAC 02T .0l 14(h), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.ti. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02'1'.01 14] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 3,800 GPD (per 15A NCAC 112T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line O Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2of5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC'02T .0305(f)): I. Does the project comply with all separations found in 15A NCAC 02'1' .0305(fl & (g) ➢ 15A NCAC 02T.0305(f1 contains minimum separations that shall be provided for sewer systems: ❑ Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-1 waters of Class 1 or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches D 15A NCAC 02T.0305(g) contains alternatives where separations in 02'F.0305(f) cannot be achieved. D **Stream classifications can be identified using the Division's NC Surface Water CIa,sifications webpage D If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A D See the Division's draft separation requirements for situations where separation cannot be meet D No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 0213 .0200? ® Yes ❑ No ❑ NIA D This would include Trout Buffered Streams per 15A NCAC'213.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? > Information can be obtained from the 4(11 & Buffer Permitting Branch ® Yes ❑ No 5. Does project comply with 15A NCAC 02T.0I 05(c)(6) (additional permits/certifications)? ❑ Yes ® No Per I5A NCAC 02'I.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15.1. NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ®No ❑ NIA ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 1SA NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: I.. Does the submitted system comply with 15A CAC 02T, the Minimum Design Criteria for the Permitting of PumpStations artdb:trCCMilitiAil*S1Yer;AOP.I., and the Ora qtY, Sewtr l nmwu DesigP Oiler va5i0.9) as applicable? Yes El No If No, complete and submit the Variance/AIternative Design Request application. (VADC 10-14) and supporting documents for review, .Aparoval of the request is required prior to submittal of the,Fast Track Application and supporting. do c ments. Professional Engineer's Certification: •CA , 'RA CV— 'Tr. (Professional Engineer's name from Application Item attest thatLhat this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast-'t rack Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-.215,6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty- of a Class 2 misdemeanor, which may include a tine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A. NCAC 02'1 .0106(b): 1, TA am . & title •frm Application Item (..3.) attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge„ I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. 1 understand that any discharge of wastewater from this non - discharge system to surface waters or the and will result •in an immediate enforcement action that may include civil penalties. injunctive relief, andlor criminal prosecution, I will make no claim against the Division of Water Resources should a condition of this permit he violated, 1 also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 14,3-215..6;A and 1'4 .4,j 5, K., any person who knowingly makes any false statement, repr t on, or certification in any application packs c shall he guilty of a Class 2 misdemeanor, which may include a fit not to xed $10,000 as well as civil penalties up 5,000 per violation. Signature: Date: FORM: FTA 04-16 Page 5 of CHARLOTTE TER June 28, 2017 Mr, Dan Koebel CW Development 200 Unionville -Indian Trail Road W Indian Trail, NC 28079 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE OLD PROVIDENCE ROAD TOWNHOMES 5912 OLD PROVIDENCE ROAD, CHARLOTTE NC CLTWATER TRACKING# 2017875 After an analysis of the sanitary sewer associated with the proposed design of project, Old Providence Road Townhomes, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 3,800 gallons per day (20 townhome units x 190 god/unit) at the connection point(s) indicated on the submitted utility plan for transmission to the McAlpine Creek Wastewater Treatment Plant; NPDES permit number NC0024970, for treatment. This acceptance of flow is based upon the existing capacity of the designated publicly owned treatments works. Please see attached NC DEQ FTSE form. Charlotte Water (CLTWater) agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. The applicant should understand that due to the involvement of other agencies and continuing growth of the water system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater system is accepted on a first come, first served basis, The applicant should understand that this letter is not authorization to construct or extend private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained construction has not started within one 1) vear of issuance of this flow acceptance,and payment for any service connections of have not been w acceptance approval shall be rescinded and a new flow acceptance request must be made If you have any questions, please do not hesitate to contact me at (704) 432-5801. Sincerely. Barbara Gross Engineering Assistant Charlotte Water 5100 Brookshire Blvd., Charlotte, NC 2,8216 charlottevvaterJ)rg Operated by the City of Charlotte Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting AIlocation: cw Development Project Name for which flow is being requested: Old Providence Road Townhomes More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit #f: NC0024970, NC0024945, NC0024937 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 99.0 12.231 62.895 0.004 75.130 75.9s II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)—(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Trunk 2X, 1974 Annexation Downstream Permit Number: 3 517 Page 1 of 6 FTSE 04-16 III. Certification Statement: Carl Wilson certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature this form indicates acceptance of this wastewater flow. wi` Signin. 0 O[%7/ cial Signature Date Page 2 of 6 FTSE 04-16 VICINITY MAP NTS viciNrry MAP 0 1,000 2,000 OLD PROVIDENCE USGS TOPO MAP 4,000 PROJECT #: CPW-15010 Feet inch = z,000 Teti CHARLOT 1 E, NORTH CAROLI NA March l , 201 8 NCC)EQ Mooresville Regional Office Water Quality Section 610 E. Center Avenue Mooresville, North Carolina 2S115 te: Fast -Track Application (FTA t)4-l6) For Sewer Old Providence Road Townhomes Charlotte, North Carolina CPW-15010 Water Resources Department: find enclosed with this application the following attachments: Application 1°orm (FTA 04-16) Application Fee Flow Tracking/Acceptance for Sewer Extension ['c nnit 1°ornt (FT S 08-13) 4. Site Maps -LUGS Topographic Map -Street Level Map The proposed water distribution system provides water service for domestic and irrigation applications to serve a single-family attached development that include 20 residential units. The system ecattsists ofapl roximately '788 if of 2- pri °ate domestic lin e ne and two 2- reduced pressure principle backflow preventers at each domestic connection. to the public lines. The system will be connected to Charlotte Water and connections will be made to the existing. 20°' '`water main located within Old Providence Road. and to the existing 20-" water man located within Old Providence Lane The proposed sanitary sewer system will provide sanitary sewer service for each residential unit. The system will include 8 manholes and approximately 653 If of 8" PVC private sanitary sewer. The private service will he tied into the existing ti"" s< nitary sewer located within Old Providence Lane. The John R. McAdams Company, Inc. Sincerely Raleigh / Durham, NC 79135 Meridian Parkway Durham, North Carokna 27713 I9,191301,50Q4 charlotte, NC 3436 Tordngdon Way 5,Jae '110 ChaFlcttn. North Carolina 2827 (7041 527-0800 THE JOHN . j77OMPANY, INC. R'ddiek, -t Manager McAdamfCo.com Desr r ,�'l i to r' arrow's fnfr°astructure & Cemmun,. North Carolina Secretary of State Search Results Page 1 of 1 • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings • File an Annual Report/Amend an Annual Report • Print an Amended a Annual Report form Limited Liability Company Legal Name CampusWorks Development, LLC Information Sosld: 1232893 Status: Current -Active Annual Report Status: Current Citizenship: Domestic Date Formed: 12/6/2011 Fiscal Month: December Registered Agent: Helfrich, David J. Addresses • Print a Pre -Populated Annual Report form Mailing Principal. Office Reg Office 200 Unionville Indian Trail Rd W 200 Unionville Indian Trail Rd W 200 Unionville Indian Trail Rd W Indian Trail, NC 28079 Indian Trail, NC 28079 Indian Trail, NC 28079 Reg Mailing 200 Unionville Indian Trail Rd W Indian Trail, NC 28079 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Manager David J Helfrich 200 Unionville Indian Trail Rd W Indian Trail NC 28079 https://www.sosnc.gov/online services/search/Business Registration_Results 3/5/2018 Date: March 2, 2018 To: NCDEQ Water.�..__ ...�� Quality Section 610 E. Center Avenue ETTER OF AND LIVElit Re: Old Providence Townhomes Mooresville, North Carolina 28115 Job #: I am sending you the following items: ❑ Drawings © Specifications ❑ Plans At Transmitted as checked below:. © For approval El For your use As requested ❑ Letter El Submittal ❑ Prints NS AL LI Statement of Qualifications Other er and Sewer Flow Acceptance Vicinity Map USGS Topo Map etter re: Fast Track Application for Sewer Copy of the Fast Track Application for your reference ❑ For review + comment ❑ Other ❑ Other Remarks: Please note the original signed/stamped Fast Track Application was sent with the original Copy to: submittal, Thank you. Signature: Robert M. Reddick Jr,, Director, Charlotte Region ugh experience 3436 Toringdon Way, Suite 110, Charlotte, NC 28277 / 704. 527. 0800 Central Files: APS ^ SWP 3/6/2018 Permit Number WQ0039844 Permit Tracking Slip Program Category Status Project Type Non -discharge Active New Project Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer barry.iove Coastal SWRuie Permitted Flow 3,800 Facility Version 1.00 Permit Classification Individual Permit Contact Affiliation Facility Name Old Providence Road Townhomes Location Address Owner Major/Minor Region Minor Mooresville County Mecklenburg Facility Contact Affiliation Owner Name Campus Works Development LLC Dates/Events Owner Type Non -Government Owner Affiliation David Helfrich 2000 Unionville- Indian Trail Rd W Indian Trail NC 28079 Orig Issue App Received Draft Initiated 3/6/2018 3/2/2018 Scheduled Issuance public Notice Issue Effective Expiration 3/6/2018 3/6/2018 Regulated Activities Requested /Received Events Subdivision Additional information requested Wastewater collection Outfall Additional information received Waterhody Name Streamlndex Number Current Class Subbasin