Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0039487_Regional Office Historical File Pre 2018
Water Resources Environmental Quality September 22, 2017 Mr. Andrew Rouzer, Vice President of Land Acquisitions Century Communities Southeast, LLC 7400 Carmel. Executive Park Drive, Suite 205 Charlotte, NC 28226 Dear Mr. Rouzer: COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director Subject: Permit No. WQ0039487 Century Communities Southeast, LLC Arrowood Station AKA Hadley Wastewater Collection System Extension Permit Mecklenburg County In accordance with your application received September 13, 2017, we are forwarding herewith Permit No. WQ0039487 dated September 22, 2017, to Century Communities Southeast, LLC (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and'/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. '°'""`Nothing Compares w� State of North Carolina I Environmental Quality I Water Resources Water Quality Regional Operations Mooresville Regional Office 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 704-663-1699 If you need additional information concerning this matter, please contact Barry Love at(704)235-2143 or via e-mail at barry.love@ncdenr.gov. bvVV.Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division ofWater Resources, NCDEO cc: Frank McMahan, P.E. c-uv\ Barbara Gross (e-copy) Tommy Rowland (e'cmpv Regional Office Files Water Resources Central Files 2 Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Century Communities Southeast, LLC Mecklenburg County for the construction and operation of approximately 54 linear feet of 8-inch gravity sewer, to serve the Arrowood Station AKA Hadley project, and the discharge of 760 gallons per day of collected domestic wastewater into the Charlotte Water existing sewerage system, pursuant to the application received September 13, 2017, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the •Fast - Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. p. by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Permit Number: WQ0039487 Permit Issued: September 22, 2017 3 SUPPLEMENT TO PERMIT COVER SHEET Century Communities Southeast, LLC is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension, The sewage and wastewater collected by this system shall be treated in the Charlotte Water McAlpine Creek Wastewater Treatment Plant in accordance with Permit Number NC0024970. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDITIONS No flow in excess of the quantity permitted herein, 760 GPD, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [15A NCAC 02T.0304(b)1 2. This permit shall become voidable unless the agreement between Century Communities Southeast, LLC and Charlotte Water for the collection and final treatment of wastewater is in full force and effect. [15A NCAC 02T,0304(h)] The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and shall be a condition of this permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by North Carolina General Statutes §143-215.6A to §143-215.6C for violation of or failure to act in accordance with the terms and conditions of this permit. [15A NCAC 02T.0115] II, STANDARD CONDITIONS 1. This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum 4 Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (Le. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h.• A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and .the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the for is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on 6 the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One -copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each•on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greaterthan ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined,.a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification: [ 15A NCAC 02T 0105(n)] 9. A copy of the construction record drawings shall.be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 12.The issuance ofthis permit shall not exempt the Pernittemfrom complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required bvthe Division orany other Federal, State, ofLocal government agencies. [G.S.143- 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: PERMIT #: PROJECT: ISSUE DATE: Century Communities Southeast, LLC • WQ0039487 Arrowood Station AKA Hadley September 22, 2017 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEERS CERTIFICATION I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (n periodically, ❑ weekly, ❑ full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the b'est of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): State of North Carolina 1 Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Reeional Office) 610 East Center Avenue, Suite 301 I Mooresville. North Camlina 28115 . STATE OF NORTH CAROLINA COUNTY OF Mecklenburg Permit No. WQCA-51 4E 7 DEVELOPERS OPERATIONAL AGREEMENT �nThis AGREEMENT made pursuant to G.S. 143-215.1 (di) and entered into this i day of { 9 ek 0901 f , by and between the North Carolina Environmental Management Commission, an agency of the o A.Vi,t OM1YVLI, , business in the WITNES SETH: te oSit Caro ' a hereinafter known as the COMMISSION; and 14 L co oLLC— ration/general partnership registered/licensed to do to of North Carolina, hereinafter known as the DEVELOPER. 1. The DEVELOPER is the owner of the certain lands lying in Mecklenburg County, upon which it is erecting and will erect dwelling units and other improvements, said development to be known as Arrowood Station AKA Hadley (hereinafter the Development). 2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve the Development on said lands. 3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143- 215.1 to construct, maintain, and operate the Disposal System. 4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter 47C or 47F of the North Carolina General Statutes. 5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the Declaration, the Century Communities Southeast, LLC (hereinafter Association), a non-profit corporation organized and existing under and by the virtue of the Iaws of the State of North Carolina, for the purpose, among others, of handling the property, affairs and business of the Development; of operating, maintaining, re -constructing and repairing the common elements of the lands and improvements subject to unit ownership, including the Disposal System; and of collecting dues and assessments to provide funds for such operation, maintenance, re -construction and repair. 6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance with law and permit provisions in order to protect the quality of the waters of the State and the public interest therein. NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows: 1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions and law. 2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association until construction has been completed in accordance with the permit and approved plans, and the staff of the Division of Water Resources has inspected and approved of the facilities. In order to change the name of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The request must include a copy of the Association Bylaws and Declaration. 3. The DEVELOPER shall not transfer, convey, assign or .otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's successor. FORM: DEV 08- I 3 Page 1 of 2 4. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and appurtenances thereto are part of the common elements and shall thereafter be properly maintained and operated in conformity with law and the provisions of the permit for construction, operation, repair, and maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater treatment, collection and disposal system as a common element which will receive the highest priority for expenditures by the Association except for Federal, State, and local taxes and insurance. 5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will be maintained out of the common expenses. In order to assure that there shall be funds readily available to repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses, the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses. Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part of the yearly budget. 6. In the event the common expense allocation and separate fund are not adequate for the construction, repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any time. 7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city, town, village, county, water and sewer authorities, or other unit of government shall hereinafter become available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the existing and future wastewater of the Development to be accepted and discharged into said governmental system, and shall convey or transfer as much of the Disposal System and such necessary easements as the governmental unit may require as condition of accepting the Development's wastewater. 8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for the Association to enter into voluntary dissolution without having made adequate provision for the continued proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the Association Bylaws that the Association shall not enter into voluntary dissolution without first having transferred its said system and facilities to some person, corporation or other entity acceptable to and approved by the COMMISSION by the issuance of a permit. 9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and operation of the Disposal System. 10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the Association. IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized representative of the parties hereto on the day and year written as indicated by each of the parties named below: FOR THE ENVIRONMENTAL ca ._ S. Jay Zimmerman, P.G. Director, Division of Water Resources n (Date) Century Communities Southeast, LLC Name of DEYLOP ER By: (Signature) Andrew Rouzer, VP of Land Acquisitions Print Name and Title 446 19lif)117 (Date) FORM: DEV 08-13 Page 2 of 2 State of North. Caro ina. Department of Environmental Quality Division of Water Resources iSA NCAC 02T .0300 — FAST T"RAC.K SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Number: 0') d by t rrt➢ All items rnust be completed or the application willlwe returned APPLICANT IN. OR'MATION: L Applicants name, Century Commit 2, Applicant type: ( Individual s Sou a: ation © Federal 0 State/County 0 Municipal 3. Signature authority's name: Andrew Rouzcr per l5A NC. ,f t 02T .01.06 Title: Vice President of Land Acquisitions 4. Applicant's mailing address: '7400 Carmel Executive Park Drive Suite 205 City: Charlotte State: NC Zip: 28226- .5. Applicant's contact information: Phone number: (704) 912-1374 Email Address: Andrew.Roux_ert� centut corrarttun (i s.cotta PROJECT INFORMATION: I. Project name: Arrowood Station AKA Hadley Application/I tus: Proposed (New Permit) ❑ .Existing Permit/P npany, man is ipality. 110A, utility, etc.) General Partnership ® Privately -Owned Public Utility Other If a modificatittra, provide the existing permit number: WQ00 and issued date: -� If new construction but part of a master plan, provide the existing permit number: WQ00, 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.13 `°`longitude: 80.878` 5. Parcel ID (if applicable): 20517302. (or Parcel ID to closest downstream sewer) CONSULTANT INFORMATION: 1 _ Professional Engineer: Frank McMahan License Number Firth: LandDesigg Inc Mailing address: 223 N Graham St City: Charlotte State: NC Zip: 28202-__ Phone number: (704) 333-0325 Email Address: fmcmaha.n(t'landdesign.com 37773 IV. WASTEWATER TREATMENT FACILITY (VVVWTF) INFORMATION: 1, Facility Name: Mcfl.lpine Creek Wastewater Owner Name: Charlotte Water Permit Number: NC0024970 V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Perrnit Number(s) WO System Wtci C,CI ,(a?rc : steawl Permi(, umber,( (i( applicahl j: WQCS Owner Name(s)': Downstream (Receiving) Sewer Size: FORM: FTA 04-16 Page I of 5 VI, t. 2. .3. 4. GENERAL REQUIREMENTS If the Applicant is a Privately -Owned Public Utility, has a Certificate ofPublic Convenience and Necessity been attached? 0 Yes LJNo N/A If the Applicant is a Developer of lots to he sold, has a Developer's Operational Agreeme FORM: DEV) been attached? Yes 0No • N/A If the Applicant is a Home/Property Owners' ssociatioh, has an Operational A )reen M.: 1iQj been attached? El Yes LINo NIA Origin of wastewater: (check all that apply): Residential Owned 0 Residential Leased. fl School / preschool / day care 0 Food and drink facilities I1.Businesses / offices factories L Retail (stores, centers, malls) LI Retail withfood preparation/service 0 Medical / dental / veterinary facilities Church Nursing Home 5. Nature of wastewater 1.00 % Domestic/Commercial % Cornmercia % Industrial (See I 5A NCAQ0217 '24)) 'Pretreatment Program in effect? Has a flow reduction been approved under 15.A. NCAC 02 .01. 1.4(f)? 0 Yes If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a`h. No E] Car Wash 0 Hotel and/or Motels 0 Swimming Pool /Clubhouse Swimming Pool/Filter Backwash E] Other (Explain in Attachment) No. of Units Flow Residential Dwelling 'Units 190 gal/day 4 760 GPD gal/ GPI) GPI) gal/ gal/ GPD GPD gal/ GPD Total 760 GPD a See ISA N(AC. 02T 01.14(bi, te)(1) and (e).(2±_) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located ,south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in (i.S. 42„.A4), b Per I 5.A NCAC 02T ,0 1 .14(c),. design flow rates for establishments not identified Lin table 15A NCAC 0.2,71,0111.1 shall be determined: using available flow data, water using fixtures, occupancy or operation patterns, and other measured data, 8„ Wastewater generated by project 680 GPD (per 15A NC (121 .0 I 1.1) Do not include future flows or previously permitted allocations If permi.tted flow is zero, indicate why: El Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Flow has already been allocated in Permit Number: 0 Rehabilitation or replacement of existing sewer with no new flow expected Other (Explain) FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SL,WsF R HESIGN CRITERIA (If Applicable) - 02T _0305 & MDC (Gravit er e; Summarize gravity sewer to be ,permitted:: Size (inches) Length (feet) 54 PVC Section If III of the IvIDC for Permitting of Gravity Sewers contains information related to design crit Section III contains information related to minimum slopes for gravity sewer(s) Oversizi ng lines to meet minimum slope requirement is not allowed and a violation of the MDC PUMP STATION DESIGN CRITERIA (If Applicable).— 02T.0305 & MDC (Pump Stations/Force Man COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2, ApproximateCoordinates(Decimal. I. 3. Design flow attic pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TTIH) 5. Summarize the force main to be permitted (for this Pump Statio b. Power reliability in accordance El Standby power source or pump with autonta Longitude: - n and telemetry - 15A NCAC 02T .0305(h)(1)(13) Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to facility f)r ifthe pump station has an average daily flow less than 15,000 gallons per day: © Portable power source with manual activation, quick -connection receptacle and telemetry - I SA NCAC 02T .03050)(1)(C) or I''orlabie pumping unit with plugged emergency pump connection and telemetry I5A NCAC 02T .0305(h)(I)(C): " It shall be demonstrated to the Division that the portable source is owned or contracted by theapplicant (draft agreement) and is compatible with the station. If the portable power source or pump is dedicated to multiple pump stations, att evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including 'travel tirneframes, shall be provided in the case of a multiple station power outage. FORM. VIA. 04-16 Page SETBACKS & SEPARATIONS — (0 B .0200 & 1SA NCAC 02T .0305(f)); Does the project comply with all separations found in ,I 5 A NC"Af 02. l .0305i°0 t 15A NCAC 0271-®0305(1) contains minimum separations that shall be provided for sewer ystemsa Setback Parameter* Storm sewers and other utilities not listed below (vertical) Water mains (vertical -water ov Water mains (horizontal) tiding in benched tr Reclaimed water lines (vertical - reclaimed over sewer) Reclaittted water° litre flsoriz **Any private or public Class 11 im ounded rese ed over se Separation Required 24 inches apply source, ittclud'ing any wells, sed as a source of drinking water aters of Class 1 or 11 inches feet 2 feet 100 feet. **Waters classified WS (except WS-1 or WS-V), B, SA, ©RWFIQW, or SB from normal high water (or tide elevation) and wetlands (ce item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches Any building foundation Any basement Top siopc of embartktnettt car cu Drainage systems an Any swimming pools Finalearth grade (vertical) 10 feet 15A NCAC2 02'I'.0305(Qg) contains alternatives where sepa classifications can be idenlifted using the Division's NC mpliance with 02`[w',O305 see Section X of this applica 5 feet 10 feet 10 feet 5 feet 10 feet 36 inches No Does the project comply with separation requirements for wetlands? (50 feet ofseparation') © Yes ©No N/A • See the Division's draft separation requirements for situations where separation cannot be meet • No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference t'hc location ofareas eftec-tc.d Does the project comply with setbacks found in the ri basin rules per 15A NCAC 02B .0200? 0 Yes d No 'N/A This would 'include Trout Buffered Streams per 15 cif A( 2E3 020"2 4. Does the project require coverage/authori:zation under a 404 Nationwide or individual perm, 401 Water Quality Certifications'? • Information can be obtained from the 401 & Buffer 1' El Yes Does pro.(eet comply with. 15A NC„ ,At`w fl2T.0I O51c1p) (additional permits/certifications)? Yes © No Per I5A NCAC 02-1 Ol05t')(6), directly related. environmental permits or certification.applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). b. Does this project include any sewer collection lines that are deemed "high -priority" Per 15A'NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer, © Yes (l No N/A • If yes., include an attachment with details for each line, including type (`aerial line, size, material, and toeation). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per ISA NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FTA 0446 Page 4 of 5 X. CERTIFICATIONS: Does the submitted system comply with JAA„Ngc„,,ozT, the Minimum Des n Criteria for 1wperriiittiog_citeem,5tatinas antihrc MIn\(tatr*Nlerstort),,. and the .Ortivity,:e Wer, Minimum Deign Critqlita, Oa Or as [Applicable? Yes DNo If No,. complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of therequest is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification. 147 (Protessional Engmecr's om Application attest that tivs npnlic has been reviewed by me and is accurate, complete and consistent with the inteneration supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the bast of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design en wrist for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting or Pump Stations and Force Mains (latest version). ,Although other prolessionak may have developed certain portions of tits submittal pack , e, inclusion, of these materials under my 'signature and seal signifies thnt I have reviewed this material and have judged it to be consistent with the proposed design. NOTE In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be p why of a Class 2 misdemeanor, which may include a fine not to exceed 510,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Appli ant's Certification per 15A NCAC 02T .0106(b): ANDREW gPlit‘ie V,aPreJakil (Signature Authority's name & title from Apphotion Ite 037773 • . LI 07' r TOL' tqit„S,att 7 this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts or this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any dischargeof wastewater from trios non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. 3 also understand that 11811 required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE In accordance with General Statutes141„!,.;',„1 c,,nA and 14:3:. uifip., any person who know ly makes any false statement, representation, or certification in any applicaion package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penal a es up to $25,000 per violation. Signature-. FORK fiTA 04-16 Page 5 of 5 CHARLOTTE W May 26, 2017 Mr. Frank McMahan LandDesign, Inc. 223 N Graham St Charlotte, NC 28202 TER SUBJECT: WATER AND SEWER FLOW ACCEPTANCE YARDS AT ARROWOOD'TOWNHOMES ENGLAND STREET, CHARLOTTE NC CLTWATER TRACKING# 2017736 After an analysis of the sanitary sewer associated with the proposed design of project, Arrowood Station Townhomes, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 760gallons per day (4 townhome units x 190 gpolunit) at the connection point(s) indicated on the submitted utility plan for transmission to the McAlpine Creek Wastewater Treatment Plant, NPDES permit number NC0024970, for treatment. This acceptance of flow is based upon the existing capacity of the designated publicly owned treatments works. Please see attached NC DEQ FTSE form. Charlotte Water (CLTWater) agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. The applicant should understand that due to the involvement of other agencies and continuing growth of the water system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CL71Naterstrstem isacceoted on a first erne, first served basis. The applicant should understand that this letter is not authorization to construct or extend private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization toconstructpermits are not obtained construction has not started within one (1) year of issuance of this flow acceptance, and payment for any service connections have not been received within f ar of issuance of this flow acce terrce letter. this flow e fence a royal shall be rescinded' and a new fl w ac tan e r u rnu t made. If you have any questions, please do not hesitate to contact me at (704) 432-580 Sincerely, Barbara Gross Engineering Assistant Chard©tte Ply Char€otrr,NC282`Ira c tiot water.org r t� by the City of Ch, r luitte t'l;izsott afi Vil ; r Ete €lifir: State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: LandEesign, Inc. Project Name for which flow is being requested: yards at Arrowood Townhomes . More than one FTSE may be required for a single project if the owner of the WYYTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit #: NC0024970, NC0024945 , NC0024937 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 99.0 11.788 62.895 0.0007 74.684 75.4 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the Iargest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not Less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility -Name (Sewer): Icings Branch Outfall to England Street (1989) Downstream Permit Number: WQ0006313 Page 1 of 6 FTSE 04-16 III. Certification Statement: I J. Carl Wilson certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this/form indicates acceptance of this wastewater flow. Signing Official ignature Page 2 of 6 D 0f7 D to FTSE 04- L 6 USGS TOPOGRAPHIC MAP CHARLOTTE, NC 2016 NITS, PIER PEESEl: I0; 1016386 ARROWO©D TOWNHOME SUBDIVISION REVISIONS & PERMITTING 1016386 Yards at Arrowood Sewer For your use Nikki Curley 223 N Graham St Charlotte NC 28202 United States NAME Barry Love 610 E Center Ave #301 Room # 3323 Mooresville NC 28115 United States 7043330325 9/12/2017 00026 Courier Land Design ncurley@landdesign.com NCDENR- Mooresville Regional Office barryiove@ncdenr.gov Please find enclosed the Fast Track Application, a check for $480.00, the Developers agreement, the Charlotte Water sewer flow acceptance, and a map. Please let us know if you need any additional information. Thank you, Nikki Curley, El urban design planning civil engineering branding landscape architecture September 12, 2017 Mooresville Regional Office Water Quality Section 610 E. Center Ave. Mooresville, NC 28301 RE: Arrowood Station AKA Hadley LandDesign RN: 1016386 Dear Sir/Madam, Century Communities Southeast LLC, is in the process of developing and constructing 4 residential townhome units. It will be served by 54 LF of 8" PVC. We are estimating 760 gallons per day of gravity sewage. Attached is a letter from Charlotte Water agreeing to accept our flow to the McAlpine Creek WWTP, Also attached are our FTA 04-16 application and a check for $480. We respectfully request your review and welcome any questions or comments. Thank you for your assistance with this project. Please feel free to contact me directly via telephone at 704.333.0325 or email at abreit@landdesign.com should you have any questions and/or comments. Respectfully Submitted, Nikki Curley, El LandDesign, Inc. PO Sax 36959 Charlotte, NC 28236.6959 223 Nnnh Graham Street Charlotte„ NC 28202 is 704.333,0325 F 704.376.t12 N:A 20hf) 101638fivDocs\Fennitt'ing` ermit Forms\Scwer\NCDENR Last Track Lettcr.doc Central Files: APS SWP _ 9/22/2017 Permit Number WQ0039487 Permit Tracking Slip Program Category Status Protect Type Non -discharge Active New Project Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer barry.love Coastal SWRuIe Permitted Flow 760 Facility Version Permit Classification 1.00 Individual Permit Contact Affiliation Facility Name Arrowood Station AKA Hadley Location Address 7400 Carmel Executive Park Dr Ste 205 Charlotte NC 28226 Owner Major/Minor Region Minor Mooresville County Mecklenburg Facility Contact Affiliation Owner Name Century Communities Southeast LLC Dates/Events Owner Type Non -Government Owner Affiliation Andrew Rouzer Acquisitions Land VP 7400 Carmel Executive Park Dr Charlotte NC 28226 Orig Issue 9/22/2017 App Received Draft Initiated 9/15/2017 Scheduled issuance Public Notice Issue Effective 9/22/2017 9/22/2017 Regulated Activities Requested /Received Events Subdivision Wastewater collection Outfall Expiration Additional information requested Additional information received Waterbody Name Streamlndex Number Current Class Subbasin