HomeMy WebLinkAboutWQ0039284_Regional Office Historical File Pre 2018Water Resources
Environmental Quality
June 16, 2017
Mr. John VanMeeter, Vice President
Sterling Charlotte Apartments II, LLC
390 Edison Lakes Parkway, Suite 201
Mishawaka, IN 46545
1.1 ..�
,R' COOPER
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Director
Subject: Permit No. WQ0039284
Sterling Charlotte Apartments il, LLC
Ascent at Mallard Creek Apartments (formerly
Mallard Creek Apartments)
Wastewater Collection System Extension Permit
Mecklenburg County
Dear Mr. VanMeeter:
In accordance with your application received June 14, 2017, we are forwarding herewith Permit No.
WQ0039284 dated June 16, 2017, to Sterling Charlotte Apartments II, LLC (Permittee) for the construction
and operation upon certification of the subject wastewater collection system extension. This permit shall
be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations
as specified therein. This cover letter shall be considered a part of this permit and is therefore
incorporated therein by reference.
Please pay particular attention to the following conditions contained within this permit:
Condition 1I.1: This permit shall not be automatically transferable; a request must be made and
approved.
Condition 11.4:
Requires that the wastewater collection facilities be properly operated and maintained
in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system
permit issued to the Permittee.
It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the
appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North
Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement
wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to
the licensing board.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General
Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC
27699-6714. Unless such demands are made, this permit shall be final and binding.
`Nothing Compares..
State of North Carolina I Environmental Quality 1 Water Resources I Water Quality Regional Operations
Mooresville Regional Office 1610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
704-663-1699
if you need additional information concerning this matter, please contact Barry Love at (704) 235-2,143
or via e-mail at barry,love@ncdenr.gov.
bvVV.Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Mooresville Regional Office
Division ofWater Resources, NCQEQ
o: Matthew LMobley, P.E.
Barbara Gross (e+opy)
Tommy Rowland (e-copy)
Regional Office Files
Water Resources Central Files
�
2
P.
Environmental
Quality
WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as.
amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to
Sterling Charlotte Apartments II, LLC
Mecklenburg County
for the construction and operation of approximately 1,750 linear feet of 8-inch gravity sewer, to serve the
Ascent at Mallard Creek Apartments (formerly Mallard Creek Apartments) project, and the discharge of
35,370 gallons per day of collected domestic wastewater into the Charlotte Water and the Water and
Sewer Authority of Cabarrus County existing sewerage systems, pursuant to the application received June
14, 2017, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria
adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track
Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting
data subsequently filed and approved by the Department of Environmental Quality and considered a part
of this permit.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified
conditions and limitations contained therein.
by W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Mooresville Regional Office
Division of Water Resources, NCDEQ
Permit Number: WQ0039284
Permit Issued: June 16, 2017
3
SUPPLEMENT TO PERMIT COVER SHEET
. Sterling Charlotte Apartments 1LLLCis hereby authorized to:
Construct, and then operate upon certification the aforementioned wastewater collection extension. The
sewage and wastewater collected by this system ahe|| be treated inthe Water and Sewer Authority of
Cabarrus County Rocky River Regional Wastewater Treatment Plant in accordance with Permit Number
N[00352b9.
Permitting ofthis project does not constitute an acceptance of any part of the project that does not meet
15A N[A[ZT,the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as
applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and
Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval
is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in
the application, Itshall bethe Pemnbtee'sresponsibility toensure that the as -constructed project meetu
the appropriate design criteria and rules.
Construction and operation is contingent upon compliance with the Standard Conditions and any Special
Conditions identified below,
1. SPECIAL CONDITIONS
1. No flow in excess of the quantity permitted herein, 35,370 GPD shall be made tributary to the subject
sewer system until an application for permit modification for an increase in flow has been submitted
taand approved bythe Division. [lSANCACOZT.U304(b)]
2. This permit shall become voidable unless the agreement between Sterling Charlotte Apartments |L
LLC and Charlotte Water and Water and Sewer Authority of Cabarrus County for the collection and
final treatment of wastewater is in full force and effect. (15A NCAC 02T.0304(h))
11. STANDARD CONDITIONS
1. This permit is not transferable. In the event there is a desire for the wastewater collection facilities
to change ownership, or there is name change of the Mannittne a formal permit request shall he
submitted to the Division accompanied by documentation from the parties involved, and other
supporting materials asmay beappropriate, The approval nfthis request shall bmconsidered units
merits and may ormay not beapproved. [l5ANCACQ2T,O1Q4; G.SI43'Z19.2(d3}l
2. This permit shall become voidable unless the wastewater collection facilities are constructed in
accordance with the conditions ofthis permit; 15A N[A[2T; the Dk/ision's,Gravity Sewer Minimum
Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for
the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000,aSapplicable; and
other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110)
4
i
3. This permit shall be effective only with respect to the nature and volume of wastes described in the
application and other supporting data. [15A NCAC 02T .0110]
4. The wastewater collection facilities shall be properly maintained and operated at all times. The
Permittee shall maintain compliance with an individual system -wide collection system permit for the
operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual
permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]:
a. The sewer system shall be effectively maintained and operated at all times to prevent discharge
to land or surface waters, and to prevent any contravention of groundwater standards or surface
water standards.
b. A map of the sewer system shall be developed and shall be actively maintained.
c. An operation and maintenance plan including pump station inspection frequency, preventative
maintenance schedule, spare parts inventory and overflow response. has been developed and
implemented.
d. Pump stations that are not connected to a telemetry system shall be inspected every day (Le. 365
days per year). Pump stations that are connected to a telemetry system shall be inspected at
least once per week.
e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are
documented.
f. A general observation of the entire sewer system shall be conducted at least once per year.
g•
Overflows and bypasses shall be reported to the appropriate Division regional office in accordance
with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina
General Statute §143-215.1C.
h. A Grease Control Program is in place as follows:
1. For public owned collection systems, the Grease Control Program shall include at least
biannual distribution of educational materials for both commercial and residential users and
the legal means to require grease interceptors at existing establishments. The plan shall also
include legal means for inspections of the grease interceptors, enforcement for violators and
the legal means to control grease entering the system from other public and private satellite
sewer systems.
2. For privately owned collection systems, the Grease Control Program shall include at least bi-
annual distribution of grease education materials to users of the collection system by the
permittee or its representative.
3. Grease education materials shall be distributed more often than required in Parts (1) and (2)
of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows.
i. Right-of-ways and easements shall be maintained in the full easement width for personnel and
equipment accessibility.
Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three
years with exception of the map, which shall be maintained for the life of the system.
5. The Permittee shall report by telephone to a water resources staff member at the Mooresville
Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24
hours, following the occurrence or first knowledge of the occurrence of either of the following.
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable
of adequate wastewater transport, such as mechanical or electrical failures of pumps, line
blockage or breakage, etc.; or
b. Any SSO and/or spill over 1,000 gallons; or
c. Any SSO and/or spill, regardless of volume, that reaches surface water
Voice mail messages or faxed information is permissible, but this shall not be considered as the initial
verbal report. Overflows and spills occurring outside normal business hours may also be reported to
the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300.
Persons reporting any of the above occurrences shall file a spill report by completing and submitting
Part I of Form CS-SSO (or the most current Division approved form) within five days following first
knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to
ensure that the problem does not recur. Part. II of Form CS-SSO (or the most current Division approved
form) can also be completed to show that the SSO was beyond control. [G.5. 143-215.1C(a1)]
6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater
to the surface waters of the State, [15A NCAC 021.0108(b)]
7, Upon completion of construction and prior to operation of these permitted facilities, the completed
Engineering Certification form attached to this permit shall be submitted with the required supporting
documents to the address provided on the form. A complete certification is one where the form is
fully executed and the supporting documents are provided as applicable. Any wastewater flow made
tributary to the wastewater collection system extension prior to completion of this Engineer's
Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions.
If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles
of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately
filed with the applicable County's Register of Deeds office shall be submitted with the certification.
A complete certification is one where the form is fully executed and the supporting documents are
provided as applicable. Supporting documentation shall include the following:
a. One copy of the project construction record drawings (plan & profile views of sewer lines & force
mains) of the wastewater collection system extension. Final record drawings should be clear on
the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are
marked up or annotated with after construction information and show required buffers,
separation distances, material changes, etc.
b. One copy of the supporting applicable design calculations including pipe and pump sizing,
velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage,
surge protection, detention time in the wet well, and force main, ability to flush low points in
force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power
source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, include travel
timeframes, shall be provided.
c. Changes to the project that do not result in non-compliance with this permit, regulations, or the
Minimum Design Criteria should be clearly identified on the record drawings, on the certification
in the space provided, or in written summary form.
Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in
non-compliance with this permit (including pipe length increases of 10% or, greater, increased flow,
pump station design capacity design increases of 5% or greater, and increases in the number/type of
connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to
the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit.
Please note that variances to the Minimum Design Criteria should be requested and approved during
the permitting process prior to construction. After -construction requests are discouraged by the
Division and may not be approved, thus requiring replacement or repair prior to certification &
activation. [15A NCAC 02T .0116] •
8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's
Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until
corrected. If there is an unforeseen obstacle in the field where all viable solutions have been
examined, a slope variance can be requested from the Division with firm supporting documentation.
This shall be done through a permit modification with fee. Such variance requests will be evaluated
on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting
the construction certification. [ 15A NCAC 02T.0105(n)]
9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of
the wastewater collection facilities: [15A NCAC 02T .0116]
10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's
Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum
Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000,
as applicable; and other supporting materials may subject the Perrnittee to an enforcement action by
the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C,
construction of additional or replacement wastewater collection facilities, and/or referral of the North
Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T
.0108(b-c)]
11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate corrective action, including those
as may be required by this Division, such as the construction of additional or replacement facilities.
[15A NCAC 02T .0110; 15A NCAC 02T .0108(b)]
12. The issuance of this permit sha I I not exempt the Perm ittee from complying with any and a I I statutes,
rules, regulations, orordinances that may beimposed bythe Division any other Federal , State, or
Local 0overnnnentagencies which have jurisdiction orobtaining other perm�svvhichmaybe
required by the Division or any other Federal, State, ofLocal government agencies. [G.S. 143'
FAST TRACK SEWER ENGINEERING CERTIFICATION
PERMITTEE: Sterling Charlotte Apartments II, LLC
PERMIT #: WQ0039284
PROJECT: Ascent at Mallard Creek Apartments (formerly Mallard Creek Apartments)
ISSUE DATE: June 16, 2017
This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of
this permit until the Division has received this Certification and all required supporting documentation. It
should be submitted in a manner that documents the Division's receipt. Send the required documentation
the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom.
Any wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions. The Permittee is responsible .for tracking all partial certifications up
until a final certification is received. A Final Certification shall be a complete set of record drawings and
design calculations regardless of whether partials have been submitted.
PERMITTEE's CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant
to the applicable standards & requirements, the Professional Engineer below has provided applicable
design/construction information to the Permittee, and the Permittee is prepared to operate & maintain
the wastewater collection system permitted herein or portions thereof.
Printed Name, Title
Signature Date
ENGINEERS CERTIFICATION
1, , as a duly registered Professional Engineer in the State of North Carolina,
having been authorized to observe (n periodically, ❑ weekly, ❑ full time) the construction of the
project name and location as referenced above for the above Permittee hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the
Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12,
1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations
and Force Mains adopted June 1, 2000, as applicable; and other supporting materials.
North Carolina Professional Engineer's Seal w/signature & date:
❑ Final n Partial (include description)
Certification Comments/Qualifiers (attach if necessary):
State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations
Division of Water Resources
State of North Carolina
Department of Environmental Quality
Division of Water Resources
.0300 e FAST TRACK SE VER S'!"STE11I EXTENSION APPLICATION
E'TA 04-16 & SUPPORTING DOCUMENTATION
Application Number;
lied by 1)
.All iterns must be completed or the application will be ret(prxted
APPLICANT INFORMATION
Applicant's name: Sterling C hmunicipality. HOA, utility, etc.)
.Applicant type: lndiv'idual Corporation Oeteral Partnership Ej]sri�°atel
(l State/County ipal Other
3. Signature auth rit 's name: Johi nMeeter I� r 1 � f ((;f t)1 '0(b_)
Title: Vice President
4. Applicant's mailing address: 390 Edison Lakes Parkway, Suite 201
City. Mishawaka State: IN Zip: 46545-
5. Applicant's contact information:
Phone number: (574) 247-3234 Email Address: ipvanmeeterothesterlittg .com
Federal
PROJECT INFORMATION:
1, Project name. Ascent a 9oard Creek 1partme
Applicationr"°Proiect status;
Ka modification, provide the exi
E] Proposed (Ne
tl C'reek .l.partnaents)
[J Existing Permit/Project
permit number: WQO0a... __ and issued date:
If new construction but part of a master plan, provide the existing permit number: \\ Q00
3, County where project is located: i1feck'lenburg
4. Approximate Coordinates (Decimal Degrees); Latitude: 35.3b 1 1'
5'. Parcel II) (if applica.hle): 029-201-06
(rrr Parcel ID to closest downstream sewer)
'ONSULTANT iNFORMATION:
Professional Engineer. Matthew L. Mobley, PE
Finn: 'Design Resource Group,, PA
Mailing address: 2459 'Wilkinson Blvd, Suite 24
City: Charlotte, State: NC
28208-
Phone ntunber: (704)43-0608 Email Address:
'hew
IV. WASTEWATER TREATMENT FACIL,t [\ (WW"TF) INFORMATION:
1, Facility 'Name: Rocky River WWTP Permit "umber: NC0036269
Owner Name: Charlotte Water
itude:-80.74214`
h
RECEIVING DOWNSTREAM AM SEWER INFORMATION (if different than WWT
1. L''errnit Numher(s'): WO Downstream (Receiving) Sewer Size:
Syste \Vide CcilDection System Penult tiaat tla f( i iA1 �1 p1 (id ): WQC.'S
Owner \arne(s):
034267'
d Public Ltilit
FORM: FT, 04
Page 1 of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is aPrivately-Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ®No ❑N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
❑ Yes No ❑N/A
3. If the Applicant is a Home/Property Owners' Association. has an Operational Agreement (FORM: HOA) been attached?
❑ Yes ®No ❑N/A
4. Origin of wastewater: (check all that apply):
❑ Residential Owned
® Residential Leased
❑ School / preschool / day care
❑ Food and drink facilities
❑ Businesses / offices / factories
❑ Retail (stores, centers, malls)
❑ Retail with food preparation/service
❑ Medical / dental / veterinary facilities
❑ Church
❑ Nursing Home
5. Nature of wastewater : 100 % Domestic/Commercial % Commercial
Industrial (See I5A NCAC 02T .0103(20))
1--)-Is there a Pretreatment Program in effect?
6. Has a flow reduction been approved under 15A NCAC 02T .01 I4(f)? ❑ Yes
➢ If yes, provide a copy of Clow reduction approval letter
7. Summarize wastewater generated by project:
❑ Car Wash
❑ Hotel and/or Motels
❑ Swimming Pool /Clubhouse
❑ Swimming Pool/Filter Backwash
❑ Other (Explain in Attachment)
❑ Yes ❑ No
❑ No
Establishment Type (see 02T.0114(f))
Daily Design Flow a,6
No. of Units
Flow
Apartment Units
135 gal/day
262
35,370 GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Total
35,370 GPD
a See 15A NCAC 02T .0114(b). (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per I5A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0I 141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 35,370 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16
Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
8"
1,750 LF
PVC
➢ Section II & I11 of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: NIA
2. Approximate Coordinates (Decimal Degrees): Latitude: . ° Longitude: -
3. Design flow of the pump station: millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches)
Length (feet)
Material
6. Power reliability in accordance with 15A NCAC 02T A305(h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B):
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(1)):
1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g)
> 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems:
® Yes ❑ No
Setback Parameter*
Separation Required
24 inches
Storm sewers and other utilities not listed below (vertical)
Water mains (vertical -water over sewer including in benched trenches)
18 inches
Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
18 inches
Reclaimed water lines (horizontal - reclaimed over sewer)
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water
I00 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands (see item IX.2)
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
> 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved.
> **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
> If noncompliance with 02T.0305(f) or (g), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A
> See the Division's draft separation requirements for situations where separation cannot be meet
> No variance is required if the alternative design criteria specified is utilized in design and construction
> As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A
> This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project require coverage/authorization under a 404 Nationwide or
individual permits or 401 Water Quality Certifications?
> Information can be obtained from the 401 & Buffer Permitting Branch
❑ Yes ® No
5. Does project comply with 15A NCAC 02T,0105(c)(6) (additional permits/certifications)? ® Yes ❑ No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑Yes ®No ❑N/A
> If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 1SA NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS;
Does the submitted system comply with fiANCAC 02'l , the Minimum Desiiin Criteria for the Permitting of Pump Stations
and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
Yes j No
If No, complete and submit the Variance/Alternative Design Request application (VA DC, 10-14) and supporting documents :for
review, Approval of the request is required prior to submittal of the Fast Track Application and supporting documents.
2, Professional Engineer's Certification
Ivirr7-P5A› L. 0
(Professional EngineI's name
1,
m Application item 111.1,
attest that this application for
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications.
engineering calculations, and all other supporting documentation to the 'best of my knowledge. 1 further attest that to the best
of my, knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version), Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my, signature and seal signifies that 1 have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes I 43-215,6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed S10,000, as well as civil penalties up to $25„000 per violation.
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per I5A NCAC 02T .0 I 06(b
1. 3Oh\VckYXLkr
(Signature Authority's name & title from Application Item 1.3.)
attest that this application for
has been reviewed byme and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, andfor criminal prosecution. 1 will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 1.43-215,6B, any person who knowingly makes any .false
statement, representation, or certification in any application package shall be guilty of a Class 2 .misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Date:40
FORM: FTA 04-16
Page 5 of 5
CHARLOTTE
TER
March 20, 2017
Mr, Matthew Mobley
Design Resource Group, PA
2459 Wilkinson By
Suite 200
Charlotte, NC 28208
SUBJECT: WATER AND SEWER FLOW ACCEPTANCE
MALLARD CREEK APARTMENTS
MALLARD CREEK ROAD, CHARLOTTE NC
CLTWATER TRACKING # 2017225
After analysis of the sanitary sewer associated with the proposed design of project Mallard Creek
Apartments, it was determined that there is sufficient capacity to accommodate the proposed sewer
flow of 35,370 gallons per day (262 apartment units x 135 god/unit) at the connection point(s)
indicated on the submitted utility plan for transmission to the Rocky River Wastewater Treatment
Plant-, NPDES permit number NC0036269, located in Cabarrus County, for treatment, This
acceptance of flow is based on the existing capacity of the designated publicly owned treatments
works. Please see the attached FTSE forms,
CLTWater agrees to furnish water to the subject project. The water quality to the subject project is
regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management
Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NCDENR. However,
CLTWater cannot guarantee a constant pressure or quality of flow,
CLTWater does not expect any of the above conditions to preclude water or sewer service to the
subject site, However, the applicant should understand that due to the involvement of other agencies
and continuing growth of the water and sewer system, the ability to provide service for future
projects cannot be guaranteed nor reserved. Connection to the CLTWaterand sewer system is
accepted on a first come, first served basis,
The applicant should understand that this letter is not authorization to construct private water or
sewer systems, as the appropriate local or State permits are required prior to construction, if the
�tro�nate authorization to constructpermits are not obtained and construction has not started
within one (1) year of issuance of this flow acceptance, and payment for any service connection(s)
has not been received within one 1 ear of issuance of this flow acce tance this flow acceptance
approval shall be rescinded and a new flow acceptance request must be made, If you have any
questions, please do not hesitate to contact me at (704) 432-5801.
Sincerely,
Barbara Gross
Engineering Assistant
Charlotte Water 5100 Eitex,,ksrdre Blvd, C ha rlotte, 282. I it) chat kxlewatter ceg
Operated by the IC [ly Old rkqte
of W A TEState of North Carolina
O� Department of Environment and Natural Resources
eDivision of Water Quality
Flow Tracking/Acceptance for Sewer Extension Permit Applications
(FTSE —10/07)
(JURISDICTION USE ONLY)
Jurisdiction Requesting Flow Acceptance for Collection System:
❑City of Concord ['City of Kannapolis ❑Town of Harrisburg ❑Town of Mt. Pleasant
®Charlotte Water
Project Title, Description, and Number of Lots/Unit:
Project Title: Mallard Creek Apartments, 2017225
Description: The Mallard Creek Apartments engineering plans and specifications, as prepared and sealed by Matthew
Mobley, NCPE, with Design Resource Group, PA, for the wastewater collection system extension consistinttof 8-inch sanitary
sewer lateral connection to serve Mallard Creek Apartments located on Branscomb Road in Charlotte NC, with a wastewater
discharge of 35,370 GPD.
What is the quantity of flow that will be discharged? 35,370 GPD
Flow type:
® Domestic 100 %n ❑ Commercial °/a ❑ Industrial
Section I - List the Jurisdiction's pump stations located between the project connection point and the WSACC
Interceptor connection Doint.
Pump Station
(Name or Number)
Firm Capacity *
MGD
(A)
Design Average Daily Flow **
(Finn/pf)
MGD
(B)
Approx. Current
Average Daily Flow
MGD
(C)
Obligated, blot Yet
Tributary Daily Flow
MGD
(D) =(B+C)
Total Current Flow
Plus Obligated Flow
MGD
(E)=(A-D)
Available
Capacity*"*
MGD
•
* The Firm Capacity of any pump station is defined as the maximum pumped flow thnt can be achieved with the largest pump taken out of service.
"Design Average Daily Flow is the Firm capacity of the pump station divided by a pealdng factor not less than 25.
4"A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where Available Capacity is a O.
Section II. Jurisdiction's Certification Statement:
I, cart wit cn , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this
project has been evaluated along the route to the receiving WSACC interceptor; and the flow from this project is not
anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to
the receiving WSACC interceptor normal circumstances, given the implementation of the planned improvements identified in
the planning assessment where applicable. This analysis has been performed in accordance with local established policies and
procedures using the best available data. This certification applies to those items listed above in Section I plus all attached
planning assessment addendums for which, to the best of my knowledge, will not adversely affect the downstream sewer
capacity. Signatu. af: f this form indicates acceptance of this wastewater flow.
1/7
Jurisdiction's; ning Official Signature Dd to
Revision Date: 08/09/13
WATER. & SEWER AUTHORITY
OF CABARRUS COu TY
32. Davidson Hwy,
Concord, NC 28027
704386. i.'33 ♦ 704,795..1564 Fax
www.vwsacc org
ink Assistant
Chart ett 4 'ater
5100 Brookshire Blvd
Charlotte, NC 2821.6
Subject: Flow Acceptance Request
SanitarySewer to Serve Mallard Creek ,Apartments
Charlotte Water Tracking Number 201.7225
Dear Nis. Oross:
This is an approval of the flow acceptance request that was received by the Water and Sewer
Authority of Caharrus County (WSACC) from Charlotte Water on
2017,
WSACC has or have capacity at the Rocky River Regional Wastewaterr `"reatm,ent Pia ttt and
appropriate sewer interceptors to transport and treat the domestic wastewater from the proposed
Mallard Creek Apartments project. This project ' °ill include providing sewer service to 262
�
apartment units,. WSACC aatee to accept 5,371.t gallons per day i,gpdi total waste'kater Clow
for this project. The waste tter enerated by this pro ect will lie conveyed through Charlotte
Waters proposed and existing gravi
18-inch Christenhury Sewer inter-
ase now. that if construction of this pr iect is nr t seat°t;e l ithin two
approval, the approval is rescinded aid a second teelrrest and apprr
e notify WSACC in writinges en co tructio trt`this gr eet i initiated
nd there enter WSACC.
questions, please call nie at 1704
PE
Mark Lort€ax
Chad 4"o
Ana PE,
228,
tarn at the existis
Flow Tracking
D v ion of Water Res urces
State of North Carolina
Department of Environmental Quality
Division of Water Resources
.eptance for Sewer Extension Permit applications
iFwfStr —tfl I4
Mallard Creek .Apartments — Cha
#2917225
Name of rti' a
Muddy Creek Wastewater Treatment Faeili•ty Pemiit
tte i tlowik'vl(jL)
trihutaa i
daily" fluWry G
uest. \IUD
Total actual and obligated flows art the t edit
Percent ot pt: rmittcd tl%q4e Bused
0
r Projer
recein4a w4:tstetitittter;
Rock' River Wastewater Treatment Facility - Permit - 00 t 269
81621
0,035
n II, Pump stations along the rotate from the Jurisdiction's connection point to the WWW P.,
Pump Sution.
111.
knt o Lan- t
CaPadtar o-at`;rn1 ;mails station is, sta*%tac t rt!a
hp A pcAking r ca+ar erect ie^AA ti'
du t shuts ahe aS4Azhed tear sari'
eat: to W;;D
treatment fa il'iity, and the
or overburden can any downstream pasha
la
addendums for tent
hest of ett� tttae lei ,e
t1t"s uf this wasteGS racer
'o the r"ece
addition a
to the inter— - tY
USe any capacity kttAtt i`,t :attttaii
eatment pLint Rat rfer:sd rttir'
t1,#:i assb,sament,where appl
d procedures using glee best av;ti!.
ac plus al attached V laanu . ass.
downstream sewer capacity,
ASCENT AT MALLARD CREEK
(fRMELY.i. ALLAR L ENTS
USGO TOPO MAP
dr
DESIGN
RESOURCE
GROUP
ASCENT AT MALLARD CREEK
FORMERLY _MALLARD CREEK APARTMENTS
STREET VIEW MAP
d
DESIGN
RESOURCE
GROUP
Corporations Division Page 1 of 1
North Carolina
Elaine F. Marshall DEPARTMENT of THE
Secretary SECRETARY OF STATE
PO Box 29622 Raleigh, NC 27626-0622 (919)807-2000 Account
Login
Note: Due to electrical maintenance at the Secretary of State's building, the web site will not beCreate
fully functional on June 17th from 6:00am until 1:OOpm. We are sorry for any inconvenience. Site
Click Here To: Account
View Document Filings File an Annual Report Amend a Previous Annual Report
Print a Pre -Populated Annual Report form
Corporate Names
Legal: Sterling Charlotte Apartments II, LLC
Limited Liability Company Information
Sosld:
Status:
Annual Report Status:
Citizenship:
Date Formed:
Fiscal Month:
Registered Agent:
Corporate Addresses
1577908
Current -Active
Current
Domestic
3/1/2017
Corporation Service Company
Reg Office:
Reg Mailing:
Mailing:
Principal Office:
327 Hillsborough St.
Raleigh, NC 27603
327 Hillsborough St.
Raleigh, NC 27603
3900 Edison Lakes Parkway Suite 201
Mishawaka, IN 46545
3900 Edison Lakes Parkway Suite 201
Mishawaka, IN 46545
Company Officials
All LLCs are managed by their managers pursuant to N.C.G.S. 570-3-20.
https://www.sosne.gov/Search/profcorp/12650352
6/15/2017
DESIGN
RESOURCE
GROUP
June 13, 2017
NCDENR — Division of Water Resources
Mooresville Regional Office
610 East Center Ave., Suite 301
Mooresville, NC 28115
RE: Ascent at Mallard Creek Apartments, Charlotte, North Carolina
(formerly Mallard Creek Apartments, CLWT Tracking No, 2017225)
Fast -Track Application for Gravity Sewer Collection Systems
Dear Sir/Madam:
Enclosed, please find enclosed the Fast Track Application Package for the installation of 1,750
LF Gravity Sanitary Sewer Collection to serve the proposed 262 Units of the Ascent at Mallard
Creek Apartments community located in Charlotte, North Carolina.
The enclosed submittal package includes the following:
• Application Form (FTA 04-16) (1 original)
• Application Form (FTA 04-16) (1 copy)
• Application Fee ($480 Check)
• Flow Tracking/Acceptance Form (FTSE 10 07)
• USGS Topo Map
• Aerial Street Level Map
If any additional information is needed to process this request, please do not hesitate to contact
me at directly 704.343,0608 x318,
Since r 1y,
De ig Re u`rc GroupFA
MatthON L. Mabiey,
Principal
CORPORATE':
SEAL
C-95
C-2165
NCBELS
Central Files: APS SWP _
6/16/2017
Permit Number WQ0039284 Permit Tracking Slip
Program Category Status Project Type
Non -discharge Active New Project
Permit Type
Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions
Primary Reviewer
barry.love
Coastal SWRuIe
Permitted Flow
35,370
Facility
Version Permit Classification
too Individual
Permit Contact Affiliation
Facility Name
Ascent at Mallard Creek Apartments
Location Address
Owner
MajorlMinor Region
Minor Mooresville
County
Mecklenburg
Facility Contact Affiliation
Owner Name
Sterling Charlotte Apartments II LLC
Dates/Events
Owner Type
Non -Government
Owner Affiliation
John Vanmeeter
390 Edison Lakes Pkwy
Mishawaka IN ' 46545
Orig Issue
6/16/2017
Scheduled
App Received Draft Initiated Issuance Public Notice Issue Effective Expiration
6/14/2017 6/16/2017 6/16/2017
Regulated Activities Requested !Received Events
Apartment complex
Condominium
Wastewater collection
Outfall
Additional information requested
Additional information received
Waterbody Name Streamlndex Number Current Class Subbasin