Loading...
HomeMy WebLinkAboutWQ0039088_Regional Office Historical File Pre 2018Water Resources Environmental Quality March 29, 2017 Bart Hopper, President Hopper Communities, Inc. 229 East Kingston Avenue Charlotte, NC 28203-8700 'ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director Subject: Permit No. WQ0039088 Hopper Communities, Inc. 200 Wesley Heights Way Wastewater Collection System Extension Permit Mecklenburg County Dear Mr. Hopper: In accordance with your application received March 9, 2017, and additional information received March 22, 2017, we are forwarding herewith Permit No. WQ0039088 dated March 29, 2017, to Hopper Communities, Inc. (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11 4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215,6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. ---":----Nothing ComparesT. State ot'North Carolina I Environmental Quality 1 Water Resources I Water Quality Regional Operations Mooresville Regional ©[Tice 1610 East Center Avenue, Suite 301 i Mooresville, North Carolina 28115 704-663-1699 If you need additional information concerning this or via e-mail at barryiove@ncdenr.gov. Sincerely, by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ cc: Mark R. McAuley, P.E. (e-copy) Barbara Gross (e-copy) Tommy Rowland (e-copy) Regional Office Files Water Resources Central Files PERCS (e-copy) atte please contact Barry Love at (704) 235-2143 2 Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Hopper Communities, Inc. Mecklenburg. County for the construction and operation of approximately 1,413 linear feet of 6-inch gravity sewer to serve the 200 Wesley Heights Way project, and the discharge of 14,060 gallons per day of collected domestic wastewater into the Charlotte Water existing sewerage system, pursuant to the application received March 9, 2017, and additional information received March 22, 2017 , and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. by W. Corey Basinger, Regional Supervisor Water Quality Regional. Operations Section Mooresville Regional. Office Division of Water Resources, NCDEQ Permit Number: WQ0039088 Permit Issued: March 29, 2017 SUPPLEMENT TO PERMIT COVERSHEET Hopper Co imn^ unities, Inc. is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Charlotte Water Irwin Creek Wastewater Treatment Plant in accordance with Permit Number NC0024945.. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation i contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDITi©NS 1. No flow in excess of the quantity permitted herein, 14,060 GPD shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [15A NCAC 02T.0304(b)] 2. This permit shall become voidable unless the agreement between Hopper Communities, Inc. and Charlotte Water for the collection and final treatment of wastewater is in full force and effect. [15A NCAC 02T.0304(h)) The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and shall be a condition of this permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by North Carolina General Statutes §143-215 6A to §143-215.6C for violation of or failure to act in accordance with the terms and conditions of this permit. [15A NCAC 02T.0115] II. STANDARD CONDITIONS 1. This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit,; 15A NCAC 2T; the Division's Gravity Sewer Minimum 4 --------Design-Criteria adopted February 12, 1996, as applicable; the Division`sMinimum Design.Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 115A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24,, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur.. Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control, [G.S. 143-215,1C(a1)] Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on - -~ thre-p1a!ls-or on digital media (CD or DVD disk) and are defined as the -design" drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, .such as the construction of additional or replacement facilities. [15A NCAC 02T ,0110; 15A NCAC 02T ,0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies. [G,S. 143- 215.1(b)] FAST TRACK SEWER -ENGINEERING CERTIFICATION PERMITTEE: PERMIT #: PROJECT: ISSUE DATE: Hopper Communities, Inc. WQ0039088 200 Wesley Heights Way March 29, 2017 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION 1, , as a dul registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, ❑ weekly, ❑ full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; ISA NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): State of North Carolina I Environmental Quality 1 Water Resources I Water Quality Regional Operations E OF NORTH CAROLINA COUNTY OF Mecklenburg Permit No. 14./OCO39M8 DEVELOPER'S OPERATIONAL AGREEMENT This AGREEMENT made pursuant to G.S. 143-215.1 (dl) and entered into this seventh day of March, 2017 , by and between the North Carolina Environmental Management Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and Hopper Communities , a corporation/general partnership registered/licensed to do business in the State of North Carolina, hereinafter known as the DEVELOPER. WITNESSETH: 1. The DEVELOPER is the owner of the certain lands lying in Mecklenburg County, upon which it is erecting and will erect dwelling units and other improvements, said development to be known as 200 Wesley Heights Way (hereinafter the Development). 2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve the Development on said lands. 3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143- 215.1 to construct, maintain, and operate the Disposal System. 4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter 47C or 47F of the North Carolina General Statutes. 5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the Declaration, the (Unit Owners' Association) (hereinafter Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State of North Carolina, for the purpose, among others, of handling the property, affairs and business of the Development; of operating, maintaining, re -constructing and repairing the common elements of the lands and improvements subject to unit ownership, including the Disposal System; and of collecting dues and assessments to provide funds for such operation, maintenance, re -construction and repair. 6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance with law and permit provisions in order to protect the quality of the waters of the State and the public interest therein. NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows: 1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions and law. 2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association until construction has been completed in accordance with the permit and approved plans, and the staff of the Division of Water Resources has inspected and approved of the facilities. In order to change the name of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The request must include a copy of the Association Bylaws and Declaration. 3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's successor. FORM: DEV 08-13 Page 1 of 2 BUSINESS CORPORATION ANNUAL REPORT NAME OF BUSINESS CORPORATION: Hopper Communities, Inc. SECRETARY OF STATE ID NUMBER: 0991890 REPORT FOR THE FISCAL YEAR END: 12/31/2015 SECTION A: REGISTERED AGENT'S INFORMATION 1. NAME OF REGISTERED AGENT: Hopper, J. Bart STATE OF FORMATION: NC Faing Office Use Only E-Fled Annual Report 0991890 CA201617505063 6123/2016 03:53 EI Changes 2. SIGNATURE OF THE NEW REGISTERED AGENT: SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 3. REGISTERED OFFICE STREET ADDRESS & COUNTY 4. REGISTERED OFFICE MAILING ADDRESS 229 E. Kingston Ave. 229 E. Kingston Ave. Charlotte, NC 28203-4743 Mecklenburg County Charlotte, NC 28203-4743 SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: Real Estate Management & Consulting 2. PRINCIPAL OFFICE PHONE NUMBER: (704) 805-4805 4. PRINCIPAL OFFICE STREET ADDRESS & COUNTY 229 E. Kingston Ave. Charlotte, NC 28203-4743 SECTION C: OFFICERS (Enter additional officers in Section E.) 3. PRINCIPAL OFFICE EMAIL: Privacy Redaction 5. PRINCIPAL OFFICE MAILING ADDRESS 229 E. Kingston Ave. Charlotte, NC 28203-4743 NAME: J Bart Hopper NAME: NAME: TITLE: President TITLE: TITLE: ADDRESS: ADDRESS: ADDRESS: 229 E. Kingston Ave. Charlotte, NC 28203 SECTION D: CERTIFICATION OF ANNUAL REPORT. Section D must be completed in its entirety by a person/business entity. J Bart Hopper 6/23/2016 SIGNATURE DATE Form must be signed by an officer listed under Section C of this form. J Bart Hopper President Print or Type Name of Officer Print or Type Title of Officer This Annual Report has been filed electronically. MAIL TO: Secretary of State, Corporations Division, Post Office Box 29525, Raleigh, NC 27626.0525 CHARLOTTE WTER January 27, 2017 Mr. Tom Platt Colejenest & Stone 200 S. Tryon St. Ste. 1400 Charlotte, NC 28202 SUBJECT: CAPACITY ASSURANCE REVIEW 200 WESLEY HEIGHTS WAY 200 WESLEY HEIGHTS WAY., CHARLOTTE NC CLTWATER TRACKING# 20161560 After an analysis of the sanitary sewer associated with the proposed project, it was determined that there is sufficient capacity to accommodate the average daily flow of 14,060 gallons per day (74 residential, single family) from this project for transmission to the Irwin Creek Wastewater Treatment Plant; NPDES permit number NC0024945, for treatment. This acceptance of flow is based on the existing capacity of the designated publicly owned treatment works. CLTWater agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986, and The Water Supply Management Plan, PWS ID # 0160010, on file with the Public Water Supply Section of NCDENR. However, CLTWater cannot guarantee a constant pressure or quality of flow. CLTWater does not expect any of the above conditions to preclude water or sewer service to the subject site. However, the applicant should understand that due to the involvement of other agencies and continuing growth of the water and sewer system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater and sewer system is accepted on a first come first served basis. The applicant should understand that this letter is not authorization to construct private water and sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained and construction has not started within one (1) year of issuance of this capacity assurance letter; or payment for any service connection(s) has not been received within (1) year of issuance of this capacity assurance letter, this capacity assurance approval shall be rescinded and a new capacity assurance review must be made. If you have any questions, you may contact me at (704) 391-5138 or Alan Gaines at (704) 391-4689. Sincerely, Gwendolyn Banner Engineering Assistant Charlotte Water 5100 Brookshire Blvd, Charlotte, NC 28216 charlottewater.org ctm operated by the City of Charlotte • nu urrn. ID: Customer Name: Submittal Date: Reviewer: Project Name: Service Address: Service City: Service State: Service ZIP: Tax Parcel Number: Capacity Assurance Program Application Flow Analysis 20161560 Tom Platt 12/22/2016 Alan H. Gaines 200 Wesley Heights Way 200 Wesley Heights Way Charlotte NC 28208 0710171 Q,20,08 Approval Type: Flow Tracking Status: Connection Type: Certification Date: Explicit Active Minor 1/24/2017 Project Type:: Non Exempt Basin:: Irwin Creek Requested Average Daily Flow (gpd): 14,060 Peaking Factor. 2.5 Percent of Flow Applied: 100 Surcharges or Downstream SSO's: No Nodes and Flows Affected by this Application (Values shown for flow/capacity are in gallons per day) Node_Name Requested_Flow_ Baseline_Commit Available_Commit NA NA1 12+41 35,150 31,400,000 25,945,595 N/A N/A 39 + 40 35,150 37,000,000 31,398,988 N/A N/A Irwin Creek 16,310 4,700,000 1,649,466 N/A N/A Requested peak flow and available capacities for pumping stations and flow monitors are reported as peak flow. Requested peak flow and available capacities for WWTPs are reported as maximum month flow. The available capacities presented for WWTPs are approximate and for informational purposes only; consult Technical Memorandum 15 — Guidelines for Evaluating Treatment Capacity for more information. Comments: After an analysis of the sanitary sewer system associated with proposed design of project 20161560, 200 Wesley Way, it was determined that there is currently sufficient capacity to accommodate the proposed average daily flow of 14,060 gallons per day at the connection point(s) indicated on the submitted utility plan. Division sion of W.iter Res State of North Carolina. Department of Environmental Quality Division of Water Resources rres Flow Tracking/Acceptartee for Sewer Extension Applica Entity Requesting Allocation: colejenest & Stone Project Name for which flow is being requested: 200 ey Heights Way WCOS More than one F7SE may be required fir a single project if the owner of the WN7TP is not responsible for` call pump stations along the route of the proposed wastewater Zow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b, WWTP Facility Permit #f: NCOQ24970, NC0024945, N00024937 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTPP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD - 99.0 72.026 70.717 0,014©6 84.235 Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the W (A) (B) (C) (D)=(B+C) (B)={A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Mow** Current Avg. Tributary Flow plus (Name or Capacity, * (Firrn / pi), Daily. Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the Largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < U. Downstream. Facility Name (Sewer): Zruckwarth Ave Downstream Permit Number: Unknown Page 1 of 6 FTSE O4-16 Carl Wilson certify to the best ofrny knowledge that the volume of wastewater to be permitted in this project has been evaluated a ong the route to t receiving wast a ent facility and that the flow from this project is not anticipated to cause any capacity, related s nitary serer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal ircurns ce , given the implementati the planned improvements identified in the planning assessment where applicable. This nalysis has been performed in accordance with local established policies and procedures using he best available data, This certification applies to those items listed above in Sections I and ll plus all attached planning assessment addendums ft r which l am the responsible party: Signature of this form indicates acceptance of this wastewater flow CHARLOTTE WATER 1 ¢$ S b\ ^ i ...�xN An'Wn'ggN , l�k�.q �..�P� .i.. a t`.'j3`n `� , .eW x.. Date 7125l2€116 e 1 inch = 1 CO ft Created By Lauren Johnson Project: Wesley Heights Way �E R1.t.JT�I F \VATI-R GINE'RING DIVISION p ,0 BROOKtit tER1 81 \ D lip\RLt11 0 '*"_ »1216 Map Number 1 A-1 Page 1 of 1 Duckworth Avenue 200 Wesley Heights Way Project Site Earth feet 500 meters; 100 Corporations Division Page 1 of 1 North Carolina Elaine F. Marshall DEPARTMENT OF THE Secretary SECRETARYOi~ STATE PO Box 29622 Raleigh, NC 27626-0622 (919)807-2000 Click Here To: View Document Filings File an Annual Report Amend a Previous Annual Report Print a Pre -Populated Annual Report form Corporate Names Account Login Create Site Account Legal: Hopper Communities, Inc. Business Corporation Information Sosld: Status: Annual Report Status: Citizenship: Date Formed: Fiscal Month: Registered Agent: Corporate Addresses 0991890 Curre nt-Active Current Domestic 7/24/2007 December Hopper, J. Bart Mailing: Principal Office: Reg Office: Reg Mailing: Officers 229 E. Kingston Ave. Charlotte, NC 28203-4743 229 E. Kingston Ave. Charlotte, NC 28203-4743 229 E. Kingston Ave. Charlotte, NC 28203-4743 229 E. Kingston Ave. Charlotte, NC 28203-4743 President: J Bart Hopper 229 E. Kingston Ave. Charlotte NC 28203 Stock Class: Common Shares: 1000 Par Value: 0.01 https://www.sosnc.gov/S earch/profcorp/82 66722 3/10/2017 Date: Reference: Attention: Company: We Are Transmitting: Transmitted Via: Remarks: By: cc: Cheotte TR. hITTAL March 8, 2017 4384.00 — 200 Wesley Heights — NCDEQ Private Sanitary Sewer Submittal Mooresville Regional Office Water Quality Section NC Department of Environmental Quality Mooresville Regional Office Water Quality Section 610 East Center Avenue Mooresville, North Carolina 28115 Copies 2 2 Ea Dated 03/06/17 03/01/17 03/07/17 03/07/17 06/2 /16 01/27/17 07/25/16 E Herewith Project Cover Sheet Tel: 704-663-1699 a Under Separate Cover Descrttation Fast Track Sewer Application Certified check 2753 for $480 00 8.5"x11" Topographic Map ational Agreement Business Corporation Annual Report Flow Tracking/Acceptance Forrn and Associated Documents Developer's Oper Asbuilts provided by Charlotte Water Site Map Aerial ail ❑ Overnight Courier 0 Hand Delivery [Q Pick -Up For Approval 0 For Your Use ❑ As Requested For Review Please find the attached documents for the 200 Wesley Heights Way private sanitary sewer review. Should you need any additional information, please contact our offices. Thank you. Tom A. Platt, El sac Mr. Mark R. McAuley, PE, LEED AP BD+C Mr. Casey P. Werner, PE P:SS©SKPR©J44384 Crarres#rrand2Cat7\Trans\O30Pt_NC Z©© Wesley Heights Way Townhomes Project The proposed 200 Wesley Heights Way Townhomes project is located on a ±5 acre site at the intersection of Wesley Heights Way and Duckworth Ave, in Charlotte, NC. The site is currently undeveloped. The proposed private sanitary sewer includes development of seventy-four (74) single-family residential townhomes which will generate a design wastewater flow of 14,060 GPD. A proposed private 6" sanitary sewer collection system is to be constructed within the new property and will outfall via an existing 8" public sanitary sewer located east of the project site at two locations. The proposed private sanitary sewer system, to be permitted with the enclosed application, will be owned and maintained by the Hopper Communities, Inc. Attached Items: 1. Fast Track Application 2. Application Fee of $480 00 3. Site Map 4, Street Aerial Map 5. Flow Tracking/Acceptance Form P S105KPROJW31344_Correspandences120175Lettersl0206 - Comment Response Letter10307 - NCDENR Cover Letett-200WHW Project Description dnc Permit Number WQ0039088 Central Files: APS _ SWP _ 3/29/2017 Permit Tracking Slip Program Category Non -discharge Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer barry.love Coastal SWRule Permitted Flow 14,060 Facility Status Active Project Type New Project Version Permit Classification 1.00 Individual Permit Contact Affiliation Facility Name 200 Wesley Heights Way Location Address, Owner Major/!Minor Minor Facility Contact Affiliation Region Mooresville County Mecklenburg Owner Name Hopper Communities Inc Dates/Events Owner Type Non-Govemment Owner Affiliation Bart Hopper 229 E Kingston Ave Charlotte NC 28208 Orig Issue 3/29/2017 App Received 3/9/2017 Regulated Activities Draft Initiated Scheduled Issuance Subdivision Wastewater collection Outfall Public Notice Issue Effective Expiration 3/29/2017 3/29/2017 Requested !Received Events Additional Information requested 3/20/17 Additional information received 3/22/17 Waterbody Name Streamlndex Number Current Class Subbasin