HomeMy WebLinkAbout20211682 Ver 1_Site Plan_20211118of rc jp C VY,nne15
Full Pond/
Normal —Water Level
Shore .ne
Croo Channel 41 G-C-ovt) C'lx�nnel
i oo ` -X 30' Sv X
Lake,
(At Pull Pond/NO ai Ovate. eve[} 3'—CUA a' CL*
31Cu-�-
`Io .
_ yo'
'�'Ao +-CeeS remo v -d
f ,ni cnoA16ks4U'C6atne-e,
�O 6-T t '
Please approximately sketch the following information on this plan, leash of shoreline
(provide dimensions for each item, such as 10 ft x 100 ft)*:
I. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Foil Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ normal Water Level elevation
6. Location of construction access corridors
V1ro�� Ch�r\r�1 #-1
wais
Gifou`� Ch�r,ne1 a5����
1 �y
-i
wG S
FORM: SSGP 10-2013 Page 3 of 3