Loading...
HomeMy WebLinkAbout20211471 Ver 1_Impacts Table_20210129ID Latitude Longitude Impact Type stream rill Purpose stream Length (ft) or Area (ac) Material Specs Resource ID Years of Impact Development Phase IMP-1 35.376781 -83.451183 (pipe) crossing 25 LF smooth plastic 18" UT-1 2008-2012 Phase IMP-2 35.378069 -83.452902 Wetland Fill (earth) Lonstr- uction access 0.07 ac Earth (fill dirt) n/a W-01 2008-2012 Phase IMP-3 35.376806 -83.451021 stream rill (pipe) stream crossing 30 LF smooth plastic 18" UT-1.1 2008-2012 Phase IMP-4 35.37556 -83.450258 stream rill (pipe) stream crossing 40 LF uorrugatea metal 36" UT-2 2012-2016 Phase II IMP-7 35.375186 -83.445461 stream rill (pipe) stream crossing 65 LF smooth plastic 24" UT-3 2017-2020 Phase III IMP-8 35.37494 -83.445279 stream rill (pipe) stream crossing 65 LF smooth plastic 24" UT-3.2 2017-2020 Phase III IMP-9 35.373556 -83.445797 stream rill (pipe) stream crossing 40 LF smooth plastic 24" UT-3.1 2017-2020 Phase III IMP-10 35.373622 -83.446162 stream rill (pipe) stream crossing 35 LF smooth plastic 24" UT-3.1 2017-2020 Phase III IMP-11 35.373052 -83.446174 stream rill (pipe) stream crossing 35 LF smooth plastic 24" UT-3.1.2 2017-2020 Phase III IMP-12 35.371888 -83.447759 stream rill (pipe) stream crossing 70 LF smooth plastic 24" UT-4 2017-2020 Phase III IMP-13 35.372668 -83.448899 stream rill (pipe) stream crossing 50 LF smooth plastic 24" UT-4 2017-2020 Phase III IMP-14 35.372205 -83.448001 stream rill (pipe) stream crossing 80 LF smooth plastic 24" UT-4 2017-2020 Phase III IMP-15 35.373331 -83.44681 stream rill (pipe) stream crossing 40 LF smooth plastic 24" UT-3.1.2 2017-2020 Phase III IMP-16 35.371416 -83.447308 stream rill (pipe) stream crossing 75 LF smooth plastic 24" UT-4 2017-2020 Phase III I650 LF Total I Impact ID Impact Type Purpose Preexisting Length (ft) Material Specs Resource ID IMP-1 35.376781 -83.451183 Fill (pipe) Stream crossing (logging road ca. 1994) 25 LF smooth plastic 18" UT-1 IMP-9 35.373556 -83.445797 Fill (pipe) Stream crossing (logging road ca. 1994) 25 LF smooth plastic 24" UT-3.1 IMP-10 35.373622 -83.446162 Fill (pipe) Stream crossing (logging road ca. 1994) 25 LF smooth plastic 24" UT-3.1 IMP-11 35.373052 -83.446174 Fill (pipe) Stream crossing (logging road ca. 1994) 25 LF smooth plastic 24" UT-3.1.2 IMP-13 35.372668 -83.448899 Fill (pipe) Stream crossing (logging road ca. 1994) 25 LF smooth plastic 24" UT-4 IMP-15 35.373331 -83.44681 Fill (pipe) Stream crossing (logging road ca. 1994) 25 LF smooth plastic 24" UT-3.1.2