HomeMy WebLinkAboutNC0005363_Lab Evalulation Results_20051209November 22, 2005
5057 -
Mr. Steve Davis
Progress Energy Carolinas Weatherspoon Steam Electric Plant
491 Power Plant Road
Lumberton, NC 28358-
SUBJECT: Performance Evaluation Results
Dear. Mr. Davis:
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
DENR-FRO
NOV 2 8 2005
®INO
One of the requirements of your North Carolina laboratory certification is analysis of a Performance Evaluation
(PE) sample obtained from an accredited vendor. To date we have not received any PE results for your
facility. You are reminded that an acceptable performance evaluation result must be obtained for all certified
parameters which are available from the accredited vendors. Failure to submit a .passing PE result by December
31, 2005. will be considered a first miss. Failure to analyze and submit an acceptable follow up sample result
within 60 days after a failed PE or producing a second successive unacceptable result may result in decertification
for that parameter.
Please contact us at 919-733-3908 if you have questions or need additional information.
Sincerely,
*104 Z/41f
Norman L. Good
Laboratory Section
cc: James W. Meyer
Fayetteville Regional Office
Laboratory Section
1623 Mail Service Center; Raleigh, NC 27699-1623
4405 Reedy Creek Road; Raleigh, NC 27607
Phone (919) 733-3908 / FAX (919) 733-6241 / Internet: www.dwglab.org
NorthCarolina
JVaturally
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper
December 9, 2005
5057
Mr. Steve Davis
Progress Energy Carolinas - Weatherspoon Steam Electric Plant
491 Power Plant Road
Lumberton, NC 28358-
SUBJECT: Performance Evaluation Results
Dear Mr. Davis:
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
DENR-FR
DEC 1 2 2005
OWQ
Alan W. Klimek, P.E. Director
Division of Water Quality
The performance evaluation (PE) results submitted by your laboratory from the ERA DMR-QA Performance Evaluation
Study have been received and evaluated. The attached table represents the status for each of your certified parameters
and methods to date. A "Pass" entry indicates your lab has satisfied the annual performance evaluation requirement.
Other information in this column indicates vendor and Study identification. An N/A entry represents parameter exemption
from the performance evaluation requirement. If a follow up analysis is required a date will be indicated to the right.
Pararx eter/1111ethodl ,, rb
PE;fStatuS :" ' „j
sFollow UpmDue
RESIDUAL CHLORINE, Std Method 4500 CI G
Pass ERA DMR-QA 25
pH, Std Method 4500 H B
Pass ERA DMR-QA 25
TEMPERATURE, Std Method 2550B
NA
Your NC PE requirement for 2005 has been satisfied for all of your certified parameters and methods.. You
are not required to submit additional results to this office for the calendar year 2005. Should a PE provider notify
us of a failure on one of your certified parameters, you will be required to analyze add submit a follow up blind PE
result. Failure to analyze and submit an acceptable follow up sample result within 60 days or producing a second
successive unacceptable result will result in decertification for that parameter.
Please contact us at 919-733-3908 if you have questions or need additional information.
Sincerely,
&ropt
Norman L. Good
Laboratory Section
cc: James W. Meyer
Fayetteville Regional Office
Laboratory Section
1623 Mail Service Center; Raleigh, NC 27699-1623
4405 Reedy Creek Road; Raleigh, NC 27607
Phone (919) 733-3908 / FAX (919) 733-6241 / Internet www.dwglab.org
NorthCarolina
hatura!!y
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper