Loading...
HomeMy WebLinkAboutWQ0038039_Regional Office Historical File Pre 2018pir Pat McCrory Governor North Carolina Department of Environmental Quality November 19, 2015 Joseph C. Wilson, PE -- Chief Engineer Charlotte Water 5100 Brookshire Boulevard Charlotte, NC 28216 Donald R. van der Vaart Secretary WOROS MOORESVILLE REGIONAL OFFICE Subject: Permit No. WQ0038039 Charlotte Water Courtyards at Nantz Road Low Pressure Sewer System (LPSS) Mains Wastewater Collection System Extension Permit Mecklenburg County Dear Mr. Wilson In accordance with your application received September 17, 2015, and additional information received on November 18, 2015 we are forwarding herewith Permit No, WQ0038039, dated November 19, 2015, to Charlotte Water (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter and supplement shall be considered a part of this permit and are therefore incorporated therein by reference, Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Cond on 4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215,6C, construction of additional or replacement. wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. if any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding, 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919-807-6300\ Internet: ww�w,ncwaterqualltyoLg An Equal Opportunity \ Affirmative Action Employer —Made in by recycled paper Charlotte Water Permit No. VVQO038839 If you need additional information concerning this matter, please contact MichaelLeggett a1(919)8O7- G313mrvia e-mail atnnicbaei|eXgett@mcdenr.gou Sincerely, for S.Jay Zimmerman, P.G. Director, Division of Water Resources bvDeborah Gore, Supervisor Pretreatment, Emergency Response, Collection System Unit CC' Wesley Smith,PE—EMH&T (wsmith@emht.mm) Mooresville Regional Office, Water Quality Section Regional Operations Water Resources Central Files: VVQ0U38O39 PFRCS(electronic copy) Page 2 of 7 Environmental Quality STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT in accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Charlotte Water for the construction and operation of approximately 2,700 linear feet of 2-inch low pressure sewer, approximately 225 linear feet of 3-inch low pressure sewer as part of the Courtyards at Nantz Road LPSS project, and the discharge of 13,870 gallons per day (gpd) of domestic wastewater into Charlotte Water's existing sewerage system, pursuant to the application received September 17, 2015, and additional information received on November 18, 2015 and in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. Individual simplex pumps and service laterals are permitted under Permit No. WQ0038145 This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. for S. Jay Zimmerman, P.G. Director, Division of Water Resources By Authority of The Environmental Management Commission Permit Number: WQ0038039 Permit Issued: November 19, 2015 Treatment Facility: McDowell Creek WWTF (NC0036227) Page 3 of 7 SUPPLEMENT __-.._.-. TO PERMIT COVER SHEET The Pe[O0itt2e is hereby authorized to: Construct, and then operate uP_gncertification the aforementioned wastewater collection extension. Permitting ofthis project doesnotconstitmteanacccptanceofanypaMoftheprojec\thatdoesvotmeet 15A N[AC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1.996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Purnp Stations and Force Mains adopted June 1,28QQasapplicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions identified below. 1. STANDARD CONDITIONS 1. This permit shall not be transferable. in the event there /s a desire for the wastewater collection facilities to change ownership, or there is a name change of the Penniitee, a formal permit request shall besubmitted tothe Division accompanied by docunnentatinnfrom the parties involved, and other supporting materials asmay beappropriate. The approval o[this request shall beconsidered omits merits and may ormay not beapproved. [I5ANCACO2T.0104;Gl143'2152/d3>] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the condition: of this permit; 15A NC4C JT; the Division's Gravity Sewer K4inimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting ofPump Stations and Force Mains adopted June 1, 2000as applicable; and other supporting materials unless specifically mentioned herein. [I54NCACO2T.0110] S. This permit shall be effective only with respect to the nature and VOlUrTle of wastes described in the application and other supporting data. [25AN[A[02T.01I0] 4. The wastewater collection facilities shall be properly maintained and operated atall times. The Permittee shall maintain compliance with an individual systern-wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T.0403 and WQCSOOOO1. / The Penwittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (7O4)6G3-1699,assoon aspossible, but ionncase more than 24 hours, following the occurrence orfirst knowledge nf the occurrence mfeither nfthe following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport such as mechanical or electrical failures of pumps, line blockage nrbreakage, etc.;or h. Any SSOand/or spill over 1,00]gallons; or c. Any 3SUand/or spill, regardless nfvolume, that reaches surface water / Page 4 of 7 I Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part 1 of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)1 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design -Criteria will be reviewed on -a -case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T.01161 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated Page 5 of 7 onacae-by-rasebasis, Reou|otionofsuch request shaUheevident prior tncompleting and submitting the construction certification. [15ANCACO2T.U1OS(n)] Q. Ampy ofthe construction record drawings shall bemaintained nmfile by thePemittee for the life of lO. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T;the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting ofPump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Penmittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143'215.6Atboougb §143'215.6 . construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer (othe licensing board. [15ANDlCO2T.0I04;15AN[AI02T 11. In the event that the wastewater collection facilities fail to perform skivbctorUy, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15AN[AC82T.0108(b)] I2.The issuance ofthis permit shall not exempt the Penmittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division orany other Federal, State, ofLocal government agencies. [G.S.I43'215.1(b)] Page 6 of 7 I ENGINEERING CERTIFICATION Permit No: WQ0038039 Project: Courtyards at Nantz Road Low Pressure Sewer System (LPSS) Mains Issue Date: November 19, 2015 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation, which includes: • One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital _ media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. - Permit modifications are required for any changes resulting in non-compliance with this permit. A detailed description for partial certifications should be attached to this form along with any certification comments. Certification should be submitted in a manner that documents the Division's receipt. The Permittee is responsible for tracking all partial certifications up until a final certification is received. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, D full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the'observationof the following construction: construction and operation of approximately 2,700 linear feet of 2-inch low pressure sewer, approximately 225 linear feet of 3-inch low pressure sewer as part of the Courtyards at Nantz Road LPSS project, and in conformity with the project plans, specifications, supporting documents, and design criteria subsequently filed and approved. i certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. - North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Send the Completed Form & Supporting Documentation to the Following Address: NCDEQ/DWR WATER QUALITY PERMITTING SECTION WASTEWATER BRANCH — PERCS UNIT 1617 Mail Service Center Raleigh, NC 27699