Loading...
HomeMy WebLinkAboutNCC201400_NOT Closeout Documents_20211118North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: Carteret Project: PNG Line 243 Receiver Person financially responsible: PIEDMONT NATURAL GAS COMPANY INC -SANU ODUGBESAN Address: 4720 PIEDMONT ROW DR, CHARLOTTE, NC 1. Project Location: Arendal Street/Highway 70, New Port Pictures: No River basin: White Oak Project #: CARTE-2020-018 2. Weather and soil conditions: sunny and workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: October 28, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at degnc.gov/NCGO1. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Creighton Brown Others present: Date of inspection: October 27, 2021 Time arriving on site: 11:25 PM Time leaving site: 11:30 PM cc: