Loading...
HomeMy WebLinkAboutWQ0037158_Regional Office Historical File Pre 2018AY; ;At 'Aga& ladaftit North Carolina Department of Environ ent and Natural Resources Pat McCrory John E. Skvarla, 111 Governor Secretary December 1, 2014 Dr. Fredrick Grosse, President Elon Homes and Schools for Children 171.7 Sharon Road Charlotte, N.C. 28210 Subject: Permit No, WQ0037158 Modification Kennedy Charter School Wastewater Collection System Extension .Meeklen.burg County Dear Dr. Grosse: In accordance with your application received on November 18, 2014, we are forwarding herewith Permit No. WQ00371.58, dated December 1, 2014, to the Elon Homes and Schools for Children for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance .until rescinded, shall replace Permit. No. WQ00371.58 issued June 13, 201.4, and shall be subject to the conditions and limitations as specified therein. This cover letter and supplement shall be considered a part of this permit and are therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11,4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T ,0403 or any individual system -wide collection systein. permit issued to the Permittee. It shall be responsibility of the Elon. Homes and Schools for Children to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection 'facilities, andlor referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must. be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-671.4, Unless such demands are made, this permit shall be final and binding. Mooresville Regional Office, 610 East Center Avenue, Mooresville, North Carolina 28155 Phone: 704-663-1699\ internet: www,ncdenr,gov An Equal Opportunity l; Affirmative Act& Etnployer - Made ln part by recycled paper I NCDENR STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Elon Homes and Schools for Children for the construction and operation of approximately 475 linear feet of 6-inch gravity sewer for the Kennedy Charter School project and the discharge of 2,610 gallons per day of collected domestic wastewater into the Irwin Creek Wastewater Treatment Facility existing sewerage system, pursuant to the application received November 18, 2014, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. ermit issued this 1st day of December, 2014. for Thomas A. Reeder Division of Water Resources By Authority of The Environmental Management Commission Permit Number: WQ0037158 SUPPLEMENT TO PERMIT COVER SHEET Elon Hot and Schools for Children is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall. be treated in the Irwin Creek Wastewater Treatment Facility prior to being discharged into the receiving stream. Permitting of this project does riot constitute an acceptance of any part of th.e project that does not meet 1.5A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteriaadopted 'February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with th I. SPECIAL CONDITIONS 0 wing Conditions. No flow in excess of the quantity permitted herein, 2,610 GPD, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division of Water Resources. H. STANDARD C,0 TIONS This permit. is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. This permit shall become voidable anless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual systemwide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .0403: I f. A general observation of the entire sewer system shall be conducted at least once per year. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute § 143-215.1 C. A Grease Control Program is in place as follows: 1. a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. g. h. For public owned collection systems, the Grease Control Programshall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. Noncompliance Notification: The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number 704 663 -1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known Of unknown reasons, that renders the facility incapable of adequate wastewater transport, such as m.echanical or electrical failures of pumps, line blockage or breakage, etc,; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless. of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report, Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a. spill report by completing and submitting, Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to. ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed. to show that the SSO was beyond control., 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. Per 15A NCAC 2T.0116, upon completion of construction, and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, if the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted. with the certification. A complete certification is one Where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a, One copy of the project constniction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting pump station design calculations (selected pumps, system curve, operating point, buoyancy calculations, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. I Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. 8. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 9. Failure to abide by. the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through § 143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. 10. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 11. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 12. The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. FAST TRACK ENGINEERING CERTIFICATION Permittee: Elon Homes and Schools for Children Project: Kennedy Charter School - Mecklenburg County Permit No. WQ0037158 Modification Issue Date: 12/1/2014 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views and detail drawings of sewer lines) of the wastewater collection system extension, Final record drawings should be clear on the plans or on digital media (CD or DVD disk) in pdf format, Record drawings should indicate the design and the marked up changes during construction, • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. Modifications should be submitted prior to certification. This project shall not be considered complete nor allowed to operate until the Division has received this Engineer's Certification and all required supporting documentation, Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. PERMITTEF'S CERTIFICATION .1, , the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the .Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature ENGINEER'S CERTIFICATION Date ri Partial E Final 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe ([11 periodically, Elweekly, full time) the construction of the subject project for the Permittee hereby state that, to the best, of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this peintit; 15A NCAC 02T; the Division's Gravity Sewer Minimum. Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum. Design Criteria for the Fast -Track Permitting ofPump Stations and Force Mains adopted June 1,. 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING- ADDRESS DIVISION OF WATER RESOURCES WATER QUALITY REGIONAL OPERATIONS SECTION MOORESVILLE REGIONAL OFFICE 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE, NC 28115 DWR Use Only: Row from. this projec USE THE TAB KEY TO MOVE FROM FIELD TO FIELD Application Number: (to be completed by DWR) Owner/Permittee: 1 a. Elan Homes & Schools for Children Full Legal Name (company, municipality, HOA, utility, etc.) 0 1b. Dr. Fredrick Grosse, President Signing Official Name and Title (Please review 15A NCAC 2T .0106 (b) lc. The legal entity who will own this system is: 0 Individual 0 Federal 0 Municipality 0 State/County 0 Private Partnership 0 Co 0 1d. W z 1717 Sharon Road Mailing Address North Carolina State 704-369-2505 1 i. 704-688-2960 Telephone Facsimile Proiect (Facility) Information: a. Kennedy Charter School Q. Brief Project Name (permit will Contact Person: a. David S. Klausman 3b. his name) le. Charlotte City 28210 Zip Code Fred,Grosse c kenned E-mail uthorized signing official _Z oration 0 Other (specify): 2b. Mecklenburg County Where Project is Located Name and Affiliation of Someone Who Can Answer Questions About this Application 803-513-4734 Phone Number Project is 0 New 3c. dklausman@bloc-nc.com E-mail odificatton (of an existing permit)If Modification, 31 �_ dification, Permit No.: W00037158 Owner is ❑ Public (skip to Item B(3)) Private (go to Item 2(a)) 2a, If private, applicant will be: Retaining Ownership (i.e. store, church, single office, etc.) 0 Leasing units (lots, townhomes, etc, - skip to item B(3)) [ Selling units (lots, townhomes, etc. - go to Item B(2b)) 2b. If sold, facilities owned by a (must choose one) 0 Public Utility (Instruction D) 0 Homeowner Assoc./Developer (instruction E) Charlotte -Mecklenburg Utility Department Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 4a. Irwin Creek WWTP 4b. NC0024945 Name of WWTF WWTF Permit No, Charlotte -Mecklenburg I5b. $ Gravity c. Unknown Owner of Downstream Sewer Receiving Sewer Size 0 Force Main The origin of this wastewater is (check all that apply): 0 Residential Subdivision 0 Apartments/Condominiums 0 Mobile Home Park School 0 Restaurant 0 Office Permit # of Downstream Sewer 0 Retail (Stores, shopping centers) 0 Institution ❑ Hospital ❑ Church 0 Nursing Home 0 Other (specify): Volume of wastewater to be allocated or permitted for this particular project: 2,610 100% Domestic/Commercial % Industrial (Attach Description) % Other (Attach Description) "'Do not include future flows or previously permitted allocations If the permitted flow is zero, indicate why: 0 Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent pe 0 Flow has already been allocated in Permit No. 0 Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) gallons per day hat connect to this line FTA 08-13 APPLICATION Page 4 of 6 B. PERMIT INFORMATION (CONTINUED) 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) New Gravity or Additional Force Main 6 475 New Gravity 11. Summary of Pump Stations wl associated Force Mains to be Permitted (attach additional sheets as necessary) Pump Station Location ID: (self chosen - as shown on planslmap for reference) Longitude: Latitude: Design Flow (MGD) Operational Point GPM @TDH Power Reliability Option 1 - permanent generatorwlATS; 2 - portable generator w!MTS Force Main Size Force Main Length Pump Station Location ID: (self chosen - as shown on plans/map for reference) Longitude: Latitude: Design Flow (MGD) Operational Point GPM @TDH Power Reliability Option 1 - permanent generatorwlATS; 2 - portable generator w/MTS Force Main Size Force Main Length 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? • Yes ❑ No If Yes, permit number of 2nd treatment facility : (RO — if "yes° to B,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? Yes • No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA 08-13 APPLICATION Page 5 of 6 14. Have the following permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings - General Permit or 401Certification? Sedimentation and Erosion Control Plan? Trout Buffer Waiver? Stormwater? ❑ Yes ❑ No ® Yes ❑ No ❑ Yes ❑ No ® Yes ❑ No ® NIA ❑ N/A ® N/A ❑ NIA 15. Does this project include any high priority lines (15A NCAC 02T .0402 (2)) involve aerial lines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months Check if Yes: ❑ and provide details: Z 0 H Ei_ cc U CU 1. Owner/Perrnittee's Certification: (Signature of Signing Official and Project Name) 1, Dr. Fredrick Grosse , attest that this application for Kennedy Charter School has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being retumed as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B. any person who knowingly makes any false statement representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil jw_ penalties up to $25,000 per violet: �1 a. Signing Official Signature ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC. REFER TO 15A NCAC 02T .0305 2. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) 1 !, David S. Klausman. PE ,attest that this application for Kennedy Charter School has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that l have reviewed this material and have judged it to be consistent with the proposed design- Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B. any person who knowingly makes any false statement, representation, or certification in any application shall be gulty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 perviolation. 2a_ David S. Klausman, PE Professional Engineer Name 2b. Bloc Design, PLLC Engineering Firm 2c. 1310 South Tryon Street, Suite 111 Mailing Address 2d. Charlotte City- 2g. 803-513-4734 2h. N/A Telephone Facsimile 2e. NC 2f. 28203 State ! Zip 2i. dklausman@bloc-nc.com E-mail °- SEAL pr 35711 ; 1,46 �yGI���S�P=`� *10 S.I NC PE Seal, Signature 8 Date CHARLOTTE. CHARLOTTE-MECKLENBURG UTILITY DEPARTMENT March 14, 2014 Dr. Frederick Grosse Elon Homes & Schools for Children 1717 Sharon Road West Charlotte, NC 28210 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE KENNEDY CHARTER SCHOOL TAX PARCEL# 078-201-07 C-MU TRACKING# 600-14-520 A flow acceptance study of the subject site has been completed and the following has been determined; Charlotte -Mecklenburg Utility Department agrees to accept the gravity sewage flow of 2,610 gallons per day (261 student school x 10 gpd/student) from this project for transmission to the Irwin Creek Wastewater Treatment Plant; NPDES permit number NC0024945, for treatment, This acceptance of flow is based on the existing capacity of the designated publicly owned treatment works. Please see attached FTSE form, Charlotte -Mecklenburg Utility Department agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986, and The Water Supply Management Plan, PWS ID # 0160010, on file with the Public Water Supply Section of NCDENR. However, C-MUD cannot guarantee a constant pressure or quality of flow. Charlotte -Mecklenburg Utility Department does not expect any of the above conditions to preclude water or sewer service to the subject site. However, the applicant should understand that due to the involvement of other agencies and continuing growth of the water and sewer system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the Charlotte -Mecklenburg Utility Department system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct private water and sewer systems, as the appropriate local or State permits are required prior to construction. if the appropriate authorization to construct permits are not obtained and construction has not started within one (1) year of issuance of this flow acceptance letter, and payment for any service connection(s) has not been received within (1) year of issuance of this flow acceptance letter, this flow acceptance approval shall be rescinded and a new flow acceptance study must be made. If you have any questions, you may contact me at (704) 432-5801. Sincerely, Barbara Gross Engineering Assistant CHARLOTTE-MECKLENBURG UTILITY DEPARTMENT Engineering Division • Installation & Development Services www.crrrutilities.com 700 North Tryon Street Charlotte, NC 28202 Ph: 704/432-5801 Fax: 704/432-5804 `"Division of Water Resources State of North Carolina Department of Environment and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 08-13) Project Applicant Name: &lon Homes & Schools for Children Project Name for which flow is being requested: Kennedy Charter school More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit #: NC0024970, NC0024945, NC0024937 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 99.0 9.711 66.0 0.00261 76.495 77.3% 1I. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the projectconnection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity,* (Firm / pt), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Page 1 of b FTSE 08-13 III. Certification Statement: p r ry 5 kcor. k certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. 3//t./ty 2,1 Signing O j ar ignature. Date Page 2 of 6 FTSE 08-13 tin Bloc Design 1 3 1 ©South Sryon Sheer-SUMe I l l Charlotte. NC 28203 phone. 704, 4 5 3.1 d d b www.blec+nccun IMv'A'tt f pi mit, 1 chimp s-whg PROJECT NAME: Kenndy Charter School East Site OWNER/CLIENT: Eton Homes & Schools for Children NOTES: SITE DISCHARGES INTO IRWIN CREEK OF SUGAR CREEK. TOPOGRAPHICAL INFORMATION TAKEN FROM UNITED STATES GEOLOGICAL SURVEY - CHARLOTTE EAST, NC, 7.5 MINUTE SERIES QUADRANGLE, DATED 2013. SHEET TITLE: USGS TOPOGRAPHIC QUAD MAP SHEET: USGS-1 JOB NO.: DiCI1O9J DATE: 11/16/14 SCALE 1" = 1000' sv" *a1,a1 sM.,3 =7xena A.w e„r r,uz.wwriu®-v ,n,;1854, Corporations Division Page 1 of 1 North Carolina El aine F. marshal/ ..7EPA RTM EN] wl � of 'rl --S./ecretety .)ECREMI ARY OF i TE Po iris. 2fn 22 R.aiek, 't, NC 2762134.4122 (9190,07-2C 1a Click Here To: Account Login Register View Document Filings Corporate Names Prev Legal: Legal: Prev Legal: Prev Legal: Prev Legal: Prev Legal: Elon Home for Children Elon Homes and Schools for Children, Inc. Elon Homes for Children The Christian Orphanage The Congregational Christian Home for Children The Elon Home for Children Non -Profit Corporation Information Sosld: Status: Annual Report Status: Citizenship; Date Formed: Fiscal Month: State of Incorporation: Registered Agent: Corporate Addresses 0047152 Current -Active Not Applicable Domestic 2/27/1905 December NC Grosse, Frederick G Principal Office: Reg Office: Mailing: Reg Mailing: 103 S Antioch Ave Elon College, NC 27244 2579 Eric Lane Suite J Bulrlington, NC 27215 PO Box 157 Elon College, NC 27244 PO Box 157 Elon College, NC 27244 http://www.secretary.state.nc.us/Searclilprofcorp/5068510 11/19/2014 November 17, 2014 North Carolina Department of Environment and Natural Resources Division of Water Resources 610 East Center Avenue Suite 301 Mooresville, North Carolina 28115 Re: 00109.01 — Kennedy Charter School East Site To Whom it May Concern, The referenced ro`ect was reviousl ii sued authorization to construct on Jun 13 2014 under ermit number WQ 0037158. Subsequent to this approval, the project underwent a significant site plan redesign requiring revisions to the original onsite (private) sanitary sewer, We are hereby requesting a revision to the approved application, and have enclosed applicable information for your review and approval. The following description is taken from the original application dated May 23, 2014 and is still applicable: The referenced project seeks to situate two (2) mobile units on property located at 631 North Summit Avenue in Charlotte, North Carolina, for the purpose of charter school offices and classrooms, Development of the aforementioned property will include associated parking, drives, landscaping, storm water detention measures, a private water distribution, and private sanitary sewer systems. The proposed private sanitary sewer system will be owned and maintained by the client, Elon Homes & Schools for Children, and will tie to the existing Charlotte - Mecklenburg Utilities public main located in North Summit Avenue, Upon your review of the enclosed information, please feel free to contact me for further discussion. Regards, Bloc Design, PLLC David Sr Ktausman, PE, CMGSI wIl cc: Mr, W. Larry Lockhart, „ PE, CMCSI - BD Mr, C. Collin Brock, RLA -- BD Ms, Emily S. Buehrer, MBA - BD Elon Homes & Schools for Children 00109,01 - Kennedy Charter School East Site Charlotte, North Carolina hoc Design 1tr1 South Tryon Street Suite '1 11 Charlotte, North Carolina 28203 704,458.164ber�r nweflm. TRANSMITTAL Date: November 17, 2014 Reference: 00109,01 - Kennedy Charter School East Site - Private Sanitary Sewer Submittal RTAP Attention: Company: North Carolina Department of Environment and Natural Resources Division of Water Resources 610 East Center Avenue Suite 301 Mooresville, North Carolina 28115 Transmitting: 1. Cover Letter 2. Fast -Track Application 3. Application Fee - $480 4. Flow Acceptance Letter 5. Site Map Transmitted Hand Delivery Via: Comments: Please contact us with any questions. Thank you. By: David S. Klausman, PE, CMCSI Bloc Design, PLLC CC: Mr. W. Larry Lockhart, Jr. PE, CMCSI - BD Mr. C. Collin Brock, RLA - BD Ms, Emily S. Buehrer, MBA - BD Bloc Design 1310 South Tryon Street - Suite 111 Charlotte, North Carolina 28203 Central Files: APS SWP _ 12/1/2014 Permit Number WQ0037158 Permit Tracking Slip Program Category Status Project Type Non -discharge Active Major modification Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer barry.love Coastal SWRuIe Permitted Flow 2,610 Facility Version Permit Classification 1.10 Individual Permit Contact Affiliation Facility Name Major/Minor Region Kennedy Charter School Minor Mooresville Location Address County Mecklenburg Facility Contact Affiliation Owner Owner Name Elon Homes & Schools for Children Dates/Events Owner Type Non-Govemment Owner Affiliation Frederick Grosse 1717 Sharon Rd Charlotte NC 28210 Orig Issue 6/13/2014 App Received 11/18/2014 Draft Initiated Scheduled Issuance Public Notice Issue Effective 12/1/2014 12/1/2014 Regulated Activities Requested /Received Events School Wastewater collection OutfalI Expiration Additional information requested Additional information received Waterbody Name Streamindex Number Current Class Subbasin