Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0036753_Regional Office Historical File Pre 2018
NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder Governor Director October 9, 2013 Mr. Bryan Rushing, Construction Manager Johnston Road Apartments, LLC 301 South College Street Charlotte, NC 28202 Subject: Permit No. WQ0036753 Marvin Road Apartments Wastewater Collection System Extension Mecklenburg County Dear Mr. Rushing: ILE John E. Skvaria, ill Secretary In accordance with your application received on September 26, 2013, we are forwarding herewith Permit No. WQ0036753, dated October 9, 2013, to Johnston Road Apartments, LLC for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter and supplement shall be considered a part of this permit and are therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be responsibility of the Johnston Road Apartments, LLC to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. Mooresville Regional Office Location: 610 East Center Ave„ Suite 301 Mooresville, NC 28115 Phone: (704) 663-1699 Fax: (704) 663-60401 Customer Service:1-877-623.674B Internet www.ncwaterraualitV,orq An Eoual O000rtunily 4 Affirmative Action Emnlover North Carolina Naturally JlphnstooRoed Apartments, LLC |fyou need additional information concerning this matter, please contact S 'athaNagu|apaUyat(7O4) 235'2I43orvia e-mail atS'atha.Magu|apaUy@ncdemr.gow. for Thomas /\Reeder Division ofWater Resources byMichael Parker Mooresville Region Surface Water Protection Supervisor [c: Mooresville Regional Office, Surface Water Protection Section Matt Bramwell, P.E, Land Design (e-copy) Water Resources Central Files I ATI NCDENR STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION - DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Johnston Road Apartments, LLC Mecklenburg County for the construction and operation of approximately 1,346 linear feet of 8-inch gravity sewer and the discharge of 39,760 gallons per day of collected domestic/commercial wastewater into the McAlpine Creek WWTP existing sewerage system, pursuant to the application received September 26, 2013, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. Permit issued this the 9th day of October, 2013. for Thomas A. Reeder Division of Water Resources By Authority of The Environmental Management Commission Permit Number: WQ0036753 �UU��K������7��������0l���'��������� ~,��" . �*-v�v.~v� o n �� PERMIT " ~~���v~u" SHEET Johnston Road Apartments, LLC is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the McAlpine Creek Wastewater Treatment Facility (NCO024970) prior to being discharged into the receiving stream. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 154 NC4[ZT; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1096as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force K4o/ms adopted June 2, 2000an applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the pernnbtee's responsibility h/ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions. 1. SPECIAL CONDITIONS 1. If, at any time, the additional wastewater flow volume made tributary tothis sewer extension is believed to exceed the value permitted herein, a modification shall be requested for this permit from the Division of Water Resources to properly allocate the subject wastewater flow, 2. No Omm in excess of the quantity permitted herein, 35\760 GPD shall be made tributary to the subject sewer system until an application for permit modification for an increase in Omm has been submitted to and approved by the Division of Water Resources. 11. STANDARD CONDITIONS L This permit isnot transferable. |nthe event there isadesire for the wastewater collection facilities tochange ownership, or there is a name change of the Pormiume, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and cuha supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 2� This permit shall become voidable unless the wastewater collection facilities are constructed |naccordance with the conditions of this permit; lSA N[AC 2T/ the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Foos Mains adopted June l, 2000 as applicable; and other supporting materials unless specifically mentioned herein. 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. r 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. if an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (Le. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi-annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. Noncompliance Notification: The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number '704 663 -1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is ,permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the 55© was beyond control. 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State, 7, Per 15A NCAC 2T.0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following:. a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be dear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc„ b. One copy of the supporting pump station design calculations (selected pumps, system curve, operating point, buoyancy calculations, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project. I c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non- compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. 8. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 9. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. 10. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 11. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. FAST TRACK ENGINEERING CERTIFICATION Permittee:. Johnston Road Apartments, LLC Permit No. WQ0036753 Project: Marvin Road Apartments Issue Date: 10/09/2013 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views and detail drawings of sewer lines) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) in pdf format. Record drawings should indicate the design and the marked up changes during construction. * Supporting design calculations (selected pumps,, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. Modifications should be submitted prior to certification. This project shall not be considered complete nor allowed to operate until the Division has received this Engineer's Certification and all required supporting documentation, Therefore, it is highly recommended that this certification be sent in a mariner that provides proof of receipt by the Division. PERMITTECS CERTIFICATION , the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof, Printed Name, Title Signature Date ENGINEERS CERTIFICATION 0 Partial Q Final i, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe ([ periodically, weekly, [1] full time) the construction of the subject project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS SURFACE WATER PROTECTION SUPERVISOR MOORESVILLE REGIONAL OFFICE 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE, NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. DWR Use on Flow from rli tritbutary tc 1F NORTH CAROLINA TY OF MECKLENBURG Permit No. DEVELOPER'S OPERATIONAL AGREEMENT This AGREEMENT made pursuant to CS. 143-215.1 (di) and entered into this TWENTIETH day of SEPTEMBER 2013, by and between the North Carolina Environmental Management Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and JOHNSTON ROAD APARTMENTS LLC;, a corporation/general partnership registered/licensed to do business in the State of North Carolina, hereinafter known as the DEVELOPER. WITNESSETH: tA/(k)UUN53 . The DEVELOPER is the owner of the certain lands lying in MECKLENBURG . County, upon which it is erecting and will erect dwelling units and other improvements, said development to be known as MARVIN ROAD APARTMENTS . (Hereinafter the Development). 2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve the Development on said lands. 3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143-215.1 to construct, maintain, and operate the Disposal System. 4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter 47C or 47F of the North Carolina General Statutes. 5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the Declaration, the (Enter Proposed Unit Owners' Association) (hereinafter Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State of North Carolina, for the purpose, among others, of handling the property, affairs and business of the Development; of operating, maintaining, re -constructing and repairing the common elements of the lands and improvements subject to unit ownership, including the Disposal System; and of collecting dues and assessments to provide funds for such operation, maintenance, re -construction and repair. 6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance with law and permit pi ovisions in order to protect the quality of the waters of the State and the public interest therein. NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows: 1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions and law. 2. The DEVELOPER shall no: transfer ownership and/or control of the Disposal System to the Association until construction has been completed in accordance with the permit and approved plans, and the staff of the Division. of Water Quality has FTA 12/07 inspected and approvcd of the facilities. in order to change the name of the permit holder, the. DEVELOPER Must request prr that the, permit be i eissued to the Association. The request must include a copy of the Association Bylaws and Declaration. i. The DEVELOPER shall not•transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System antil a permit has been reissued to the DEVELOPER's successor. it The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and appurtenances thereto are part of the common elements and shall •thereafter be -properly maintained and operated in conformity with law and the provisions of the permit for construction, operation, repair, and maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater treatment, collection and disposal system as a common element which will receive the highest priority for expenditures by the Association except for Federal, State, and local taxes and insurance. 5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will be maintained -out of the common expenses. In order to assure that there shall be funds readily available to repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses, the Declaration and.Association Bylaws shall provide that a fund be created out of the common expenses. Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part of the yearly budget. 6. In the event the common expense allocation and separate fund are not adequate for the construction, repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any time. 7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city, town, village, county, water and sewer authorities, or other unit of government shall hereinafter become available to serve the Development; the DEVELOPER shall take such action as is necessary to cause the existing and future wastewater of the Development to, be accepted and discharged into said governmental system; and shall convey or transfer as much of the Disposal System and such necessary easements as the governmental unit may require as condition of accepting the Development's wastewater. 8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for the Association to enter into voluntary dissolution without having made adequate provision for the continued proper maintenance, 'repair and operation of its Disposal System, the DEVELOPER shall provide in the Association Bylaws that the Association shall not enter into voluntary dissolution without first having transferred its said system and facilities to some person, corporation or other entity acceptable to and approved by the COMMISSION by the issuance of a permit. 9. The agreements set forth in numbered paragraphs I,"2, 3, 4, 5, 6. 7, and 8 above shall be conditions of any permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and operation of the Disposal System. 10. A copy of this agreement.shall be filed at the Register of Deeds in the County(ies) where the Declaration is fled and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the Association. •FTA•12/iI7 • WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized representative of the parties hereto on the day and year written as indicated by each of the parties named below: FOR THE ENVIRONMENTAL 'oh r3 o,n 1404Lot+ 4, Yne.m 4.s LL C AGEMENT COMMISSION Nance of DEVELOP-Mt. ,Director 'r Division of Water Quatity !o%2-a/ (Date) By:, (Signature) '( %)..$)% Cons 64.04}c, LkMine Print Name and Title (Date) CHAt.LtTTE-MECKLENBU RG UTILITY DEPARTMENT March 18, 2013 Mr. Matt Bramwell LandDesign 223 N Graham Street Charlotte, NC 28202 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE MARVIN ROAD MULTIFAMILY TAX PARCEL# 223-531-05, -06 C-MU TRACKING# 600-13-525 A flow acceptance study of the subject site has been completed and the following has been determined: Charlotte -Mecklenburg Utility Department agrees to accept the gravity sewage flow of 39,760 gallons per day (276 apartment units with 4-inch pool drain line x 135 gpd/unit; 5,000 ft2 amenity center x 50 gpd/100 ft2) from this project for transmission to the McAlpine Creek Wastewater Treatment Plant; NPDES permit number NC0024970, for treatment. This acceptance of flow is based on the existing capacity of the designated publicly owned treatments works. Please see attached FTSE form, Charlotte -Mecklenburg Utility Department agrees to furnish water to the subject project. The water quality to the subject project Is regulated by the State Drinking Water Act Amendments of 1986, and The Water Supply Management Plan, dated October 2005, (WSMP # 05-01702 & PWS ID # 0160010), on file with the Public Water Supply Section of NCDENR, However, Charlotte -Mecklenburg Utility Department cannot guarantee a constant pressure or quality of flow. Due to the involvement of other agencies and continuing growth of the water and sewer system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the Charlotte -Mecklenburg Utility Department system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct private water or sewer systems, as the appropriate local or State permits are required prior to construction. !f the appropriate ar th©rizatirsn to construct raerrnits ire not obtained and construction has not started within one (1) year of and atrrnent for nw rvice connection ° ha not 6 en racewe Sincerely, Barbara Gross Engineering Assistant CHARLOTTE-MECKI,ENBURG UTILITY, DEPARTMENT Engineering Division • Installation & Development Services f you have any questions, www,mu ctlllties.com T00 North Tryon Street Charlotte, NC 28202 Ph: 704/432-5801 Fax: 704/432-5804 State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow TrackinglAcceptaflCe for Sewer E nsio Permit Applications (FTSE —10/07) Project Applicant Narne Project Name for which flow is being requested; More than one FTSE-10/07 may he required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek Irwin Creek, Sugar Creek WWTP b. WWTP Facility Permit #: NC0024970, NC0024945, NC0024937 All flows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 66.8 0.0397 73.71 4 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD Clems Branch PS 1.05 0.309 III. Crtification Statement: I, cLjJc , certify that, to the best of my knowledge, the addition of the volume of watewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptance of this apewatar flow, Signing Offltia1 Signature North Carolina Secretary of State Page 1 of 1 Account Login Register North Carolina Elaine F. Marshall DEPARTMENT UF'THE Secretary SECRETARY OF STATE PO Box 29622 Raleigh, NC 27626-0622 (919)807-2000 Date: 9/26/2013 Click here to: View Document Filings I File an Annual Report j JPrint a Pre -populated Annual Report Fillable PDF Form I Amend A Previous Annual Report Corporation Names Name NC JOHNSTON ROAD APARTMENTS, LLC Limited Liability Company Information Name Type LEGAL SOSID: Status: Effective Date: Citizenship: Duration: Annual Report Status: Registered Agent 1320264 Current -Active 5/29/2013 DOMESTIC PERPETUAL CURRENT Agent Name: Office Address: Mailing Address: Principal Office JOHNSON, CYRUS 301 S. COLLEGE STREET, SUITE 3500 CHARLOTTE NC 28202 301 S. COLLEGE STREET, SUITE 3500 CHARLOTTE NC 28202 Office Address: Mailing Address: Officers NO ADDRESS 301 S. COLLEGE STREET, SUITE 2800 CHARLOTTE NC 28202 This website is provided to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: 1630 http://www.secretary.state.nc. us/corporations/Corp. aspx?P itemId=10260003 9/26/2013 SUBJECT: 1011302 MARVIN ROAD MULTI- FAMILY 1011302 Marvin Road Apartments PURP OS Ei For your approval FROM Mooresville Regional Office - NCDENR. 610 E. Center Avenue Mooresville, North Carolina 28115 REMARK : 1 DATE TRANSMIT TAL ID. VIA, mbramwell Trans 9/24/2013 00032 Overnight anddesign.com mooresvilleoftice@ncdenr.co m Attached is our sanitary sewer fast track submittal for Marvin Road Apartments. Please feel free to contact me at anytime if you need anything additional. Thank you, Matt. Bramwell 704-376-7777 Signed Fast Track Application CMUD flow acceptance USGS map Operation Agreements ertification GNric-K Permit Number WQ0036753 Pir Central Files: APS, SWP^ 10/09/13 Permit Tracking Slip Program Category Non -discharge Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer sujatha.nagulapally Coastal SW Rule Permitted Flow 39760 Facility Fast Track Facility Name Marvin Road Apartments, LLC Location Address Owner Status Active Project Type New Project Version Permit Classification 1.00 Individual Permit Contact Affiliation Major/Minor Minor Region Mooresville County Mecklenburg Facility Contact Affiliation Owner Name Johnston Road Apartments LLC Dates/Events Owner Type Non -Government Owner Affiliation Bryan Rushing 301 S College St Charlotte NC 28202 Orig Issue 10/09/13 App Received 09/26/13 Regulated Activities Apartment complex Condominium Wastewater collection _ Outfall NULL Draft Initiated Scheduled Issuance Public Notice Issue Effective 10/09/13 10/09/13 RequestedlReceived Events Additional information requested Additional information received Expiration Waterbody Name Stream Index Number Current Class Subbasin Water Resources ENVIRONMENTAL QUALITY April 21, 2016 Mt Bryan Rushing, Construction Manager Johnston Road Apartments, LLC 301 South College Street Charlotte, NC 28202 SUBJECT: Final Engineering Certification Acknowledgement Project: Marvin Road Apartments Permit No. WQ0036753 Permittee: Johnston Road Apartments,, LLC County: Mecklenburg Dear Mr. Rushing: PAT MCCRORY. Governor D14NAL . VAN -DER VAART Secretary S. JAY ZIMMERMAN Director The Division of Water Resource's Mooresville Regional Office received the final engineering certification with record drawings for the subject sewer extension project: on 04/20/2016. Enclosed is a certification page for your records. A full review of the certification materials may or may not be conducted. It is assumedthat receipt of this certification indicates compliance with all regulations, design criteria and the permit. However, if a full technical review is conducted, you will be notified of any items ofnon-compliance. Please be reminded that the Permittee is responsible for keeping a copy of the final record drawings for the life of the project. If you have not received such copy from your consultant,. please contact them immediately to obtain a copy. Lastly, you are receiving this -letter because the Division has you listed as the responsible party. If this permitted system is no longer owned.byyou or your company, please complete Form PNOCF since the permit is not automatically transferable. Form PNOCF can be downloaded from http://portal.ncdenr.org/web/wq/swp/ps/es/pnoc from the Collection Systems Applications page. Should you have any questions, please do not hesitate to contact me at (704) 235-2143. Sincerely, Barry Love Environmental Specialist cc: Mr. Eric Lemieux, (LandDesign, 223 N. Graham St., Charlotte, NC 28202) Central Files MRO State of North Carolina I Environmental Quality I WaterResonrces 610 E. Center Avenue, Suite 301, Mooresville, NC28115 Phone: 704-663-1699 \ Internet myw.ncdenr.gov Deer r an tr'u provided appal maintain the wastewater Printed Name, Title FAST" TRACK ENGINEERING CERTIFICATION Permlttee: Johnston Road Apartments, LLC Permit No. WQ0030753 Project; Mervin Road Apartments Issue Date: 10/0912013 Complete end submit Us form to the permit Issuing regional office with the following: • One copy of the project record drawings (plan & profile views and detail drawl ge of sewer lines) of the wastewater co leclion system extension. Final record drawings should be clear on the piano or on digital media (CO or DVO disk) In pdf format: Record crawinga should indicate the design and the marked up changes during construction. • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) ar storage greater than longest pest three year outage reliability option selected) for eny pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings ar in written summery formm. Frail( meSiincetlons rravlrsd far Prfy ctliF19“ rqu tie, m nen-cgrpollspce i tills Dorptll. fEW1 IS+1i! or minimum *mien criteria. Modlilcetfof+i, should tiobiritIO prior to coortlikatim This project shall not be conskfered ccsrnpteto nor allowed to operate until the Division has received this Engineer's Certification end at required supporting documentation. Therefore.Jt Is Malay recommended that this csrtiftcstion De sent in a manner that provides proof 9! regttlot I:v the MASON _, the undere applicable standsProfessional Engineer below has clion Information to ties Perm s, and thus Posrmitlee prepared to operate & system permitted herein or portions thereo tate that thls project has Signature ENGINEWE CERTIFICATION 0 Partial Frnal as s duly r istensci Professional Engineer in the State of North Carolina, periodically weekly, © full time) the construction of the subject project by state that, to tite best of my abilities, due care and diligence was used in the observation ion such that the rnstaction was observed to be built within substantial compliance of this NCAC 02T; the Diviaics^d"e Gravity Sewer Minimum Design Criteria adopted February 12, 1996 es Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force ns adopted June 1, 2000 as applicable; and other supporting materials. h Casroiins Professlosnal Engineer's nd date: 4 SEND THIS FORM& SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS SURFACE WATER PROTECTION SUPERVISOR MOORESVILLE REGIONAL OFFICE 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE, NC 28115 nstble for tracking all par9aN cettiflea llens up until a final certification is received. My utary to the wastewater collection system extension prior to completion of this be consider.,' a violation of the permit end shall subject the Perrnittee to appropriate DWI floc Only: Flow from this project is tributary to: Sanitary Sewer Testing Report Project Name: Marvin Road Multi Date: July 23, 2015 Signed: William Morris Manhole Location SSMH-5 to SSMH-6A SSMH-6A to SSMH-6 SSMH-6 to SSMH-7 SSMH-7 to SSMH-8 SSMH-8 to SSMH-9 SSMH-9 to SSMH-10 SSMH-11 to SSMH-12 SSMH-12 to SSMH-13 SSMH-13 to SSMH-13A SSMH-13A to SSMH-14A SSMH-14A to 'SSMH-14 Pipe Size 8 inch 8 inch. 8 inch 8 inch 8 Inch 8 Inch 8 Inch 8 Inch 8 Inch 8 Inch 8lnch Pipe Length 11.84ft 36,64 ft 218,84 ft 177.5 ft 197.51 ft 184.42 ft 9©,26 ft 93,36 ft 89,53 ft 16.95'ft 228,92 ft Mandrel Test Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Passed Project #: 1011302 Present at Site: William Low Pressure Air Test Time(Minutes) 4 Minutes 4 minutes 4 minutes Cot ants 4 minutes 4 minutes 4 minutes 4 minutes 4 minutes 11chfiles\projects\_201111©11302\Construchen Admin\Field Reports\Marvin 9:05 AM 4/1912016