Loading...
HomeMy WebLinkAboutWQ0036662_Regional Office Historical File Pre 2018NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder Governor Director August 12, 2013 Richard Jersey, Development Manager P&L Coliseum LP 3225 Cumberland Road, Suite 400 Atlanta, GA, 30339 Subject: Permit No. W00036662 City Park Retail Wastewater Collection System Extension Mecklenburg County Dear Mr. Jersey: John E. Skvarla, III Secretary In accordance with your application received July 29, 2013, we are forwarding herewith Permit No. WQ036662, dated August 12, 2013 to P&L Coliseum LP for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein, This cover letter and supplement shall be considered a part of this permit and are therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be responsibility of the P&L Coliseum LP to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board, If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 671,4 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. Mooresville Regional Office Location: 610 East Center Ave., Suite 361 Mooresville, NC 28815 Phone; (704) 663.16991 FAX; (704) 663-60401Custorner'Service: i-877-623-6748 Internet: www.hcwaterguviity.orq An Equal Opportunity \ Affirmative Action Employer One NorthCuirolina Vaturay rP. &L Coliseum LP WQ0036662 Page 2 If you need additional information concerning this matter, please contact Sujatha Nagulapaily at (704) 235-2143 or via e-mail at Sujatha.Nagulapally@ncdenr.gov. Sincerely, for Thomas A. Reeder Division of Water Resources by Michael L. Parker Mooresville Region Surface Water Protection Supervisor enclosure: Operational Agreement_ cc: . Mooresville Regional Office file Water Resources Central Files PERCS (electronic copy) k. ATA NCDENR STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the P&L Coliseum LP Mecklenburg County for the construction and operation of approximately 325 linear feet of 8 inch gravity sewer as part of the City Park Retail project, and the discharge of 1,747 gallons per day of collected domestic wastewater into the Charlotte Mecklenburg Utilities existing sewerage system, pursuant to the application received July 29, 2013, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast - Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. Permit issued this the 12th day of the August, 2013. ?4) for Thomas A. Reeder Division of Water Resources By Authority of The Environmental Management Commission Permit Number: WQ0036662 SUPPLEMENT EMENlF TO PERMIT COVER SHEET P &L Coliseum LP is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension, The sewage and wastewater collected by this system shall be treated in the McAlpine Creek Wastewater Treatment Facility (NCOQ2497U)prior tobeing discharged into the receiving stream. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A N[4[2T|the Division's Gravity Sewer Minimum Design Criteria adopted February 12, I996as applicable,- and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina-|icensed Professional Engineer in the application, it shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions. 1. STANDARD CONDITIONS I This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permnit1ee, a formal permit request shall besubmdted10 the Division accompanied by documentation from the parties involved, and othersupporting materials as may be appropriate. The approval of this request shall be considered on in merits and may or may not he approved. ]L This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 13A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 1Z'I996asapplicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of' Pump Stations and Force Mains adopted June l' 2000 as applicable- and other supporting materials unless specifically mentioned herein, I This permit shall be effective only with respect to the nature and mdumc of wastes described in the application and other supporting data. o, The wastewater collection facilities shall be properly maintained and operated atall times. The Permittce shall maintain omrnphamce with an individual system -wide collection system permit for the operation and maintenance of these facHties as required by 15A N[A[ 2T .0401 If an individual permit is not required, the following performance criteria shall be met as provided in 15AN[AC 2T.0403� a. The sewer system shall be effectively maintained and operated atall times toprevent discharge to land or surface waters, and to prevent any contravent�on of groundwater standards or surface water standards. b, A map of thesewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented, d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation -of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi-annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. 1. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (I) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. Noncompliance Notification:. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part l of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. 6„ Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 7, Per 15A NCAC 27,0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable, Any wastewater flow made tributary to the wastewater collection syste„rn extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions„ If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc„ b„ One copy of the supporting pump station design calculations (selected pumps, system curve, operating point, buoyancy calculations, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project„ Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non- compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria, Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit, Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation„ 8, A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities, 9. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 21; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215,6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board, Fr. 10. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 11. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. FAST TRACK ENGINEERING FICA1 ION Permittee: P&L Coliseum LP Permit No. W00036662 Project: City Park Retail Issue Date: 08/12/13 Complete and submit this form to the permit issuing regional office with the following. One copy of the project record drawings (plan & profile views and detail drawings of sewer lines) of the wastewater collection system extension Final record drawings should be clear on the plans or on digital media (CD or DVD disk) in pdf format, Record drawings should indicate the design and the marked up changes during construction, Supporting design calculations (selected pumps: system curve, operating point available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. Modifications should be submitted prior to certification. This project shall not be considered complete nor allowed to operate until the Division has received this Engineer's Certification and all required supporting documentation. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. PERMITTEE'S CERTIFICATION the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEERS CERTIFICATION 11 Partial [11 Final as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe Li periodically, El weekly, r] full time) the construction of the subject project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T, the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable, the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineers Seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS SURFACE WATER PROTECTION SUPERVISOR MOORESVILLE REGIONAL OFFICE 610 E CENTER AVE, SUITE 301 MOORESVILLE NC, 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received, Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions„ DV) Lis.eOrik Flo Crom his pi*ct is tribttuir:\ to: STATE OF NORTH CAROLINA COUNTY OF l°� Permit No. l V 4)U` (7 ff tr 0" DEVEL PER'S OPERATIONAL AGREEMENT This AGREEMENT made pursuant to G.S. 143-215.1 (di) and entered into this ZZ day of J V 2 3, by and between the North Carolina Environmental Management Commission, agency of the State of North Carolina, hereinafter known as the COMMISSION; and ?4 L ec)useito. L1� , a corporation/general partnership registered/licensed to do business in the State of North Carolina, hereinafter known as the DEVELOPER. WITNESSETH: 1. The DEVELOPER is the owner of the certain lands lying in Mecklenburg County, upon which it is erecting and will erect dwelling units and other improvements, said development to be known as City Park Retail (hereinafter the Development). 2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve the Development on said lands. 3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143- 215.1 to construct, maintain, and operate the Disposal System. 4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements and lands through filing, of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter 47C or 47F of the North Carolina General Statutes. 5. The DEVELOPER has caused to be formed or will cause to be formed at the time of fling of the Declaration, the (Unit Owners' Association) (hereinafter Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State of North Carolina, for the purpose, among others, of handling the property, affairs and business of the Development; of operating, maintaining, re -constructing and repairing the common elements of the Lands and improvements subject to unit ownership, including the Disposal System; and of collecting dues and assessments to provide funds for such operation, maintenance, re -construction and repair. 6: The COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance withlaw and permit provisions in order to protect the quality of the waters of the State and the public interest therein. NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows: 1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shalt thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions and law. 2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association until construction has been completed in accordance with the permit and approved plans, and the staff of the Division of Water Quality has inspected and approved of the facilities. In order to change the name of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The request must include a copy of the Association Bylaws and Declaration. 3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's successor. FORM: DEV 12/12 Page 1 of 2 4. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and appurtenances thereto are part of the common elements and shall thereafter be properly maintained and operated in conformity with law and the provisions of the permit for construction, operation, repair, and maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater treatment, collection and disposal system as a common element which will receive the highest priority for expenditures by the Association except for Federal, State, and local taxes and insurance. 5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will be maintained out of the common expenses. In order to assure that there shall be funds readily available to repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses, the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses. Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part of the yearly budget. 6. In the event the common expense allocation and separate fund are not adequate for the construction, repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any time. 7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city, town, village, county, water and sewer authorities, or other unit of government shall hereinafter become available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the existing and future wastewater of the Development to be accepted and discharged into said governmental system, and shall convey or transfer as much of the Disposal System and such necessary easements as the governmental unit may require as condition of accepting the Development's wastewater. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for the Association to enter into voluntary dissolution without having made adequate provision for the continued proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the Association Bylaws that the Association shall not enter into voluntary dissolution without first having transferred its said system and facilities to some person, corporation or other entity acceptable to and approved by the COMMISSION by the issuance of a permit. 9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and operation of the Disposal System. 10, A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the Association. IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized representative of the parties hereto on the day and year written as indicated by each of the parties named below': FOR THE ENVIRONMENTAL Division of Water ettsfity P_CSOUECES (Date) L b \)c-C Name of DEVELOPER. Bv: (Sig] a k,ctkatJ Tecs- Print Name and Title 2- it- 13 (Pate) FORM: DEV 12/12 Page 2 of 2 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Owner/Permittee: la. P & L Coliseum LP Full Legal Name (company, municipality, HOA, util 0 1 b. Richard Jerse i '. V t" ft) °;1 ✓T) earyi Signing Official Name and Title (Please review 15A NCAC 2T etc.) Application Number: (to be completed by DWQ) l c. CLr 0 1 d. 1 f. z 0 1h. Q 2. J 2a. 0 d 6 (b or authorized signing officials!) The legal entity who will own this system is: ❑ Individual ❑ Federal ❑ Municipality ❑ State/County ❑ Private Partnership 3225 Cumberland Blvd. Suite 400 Mailing Address GA State 770 980 0808 Telephone Project (Facility) Information: City Park Retail 770 984 8630 Facsimile Brief Project Name (permit will refer to this name) Contact Person: 3a. Richard Jersey 1 g, 1j. 2b, Name and Affiliation of Someone Who Can Answer Questions Abou 3b. 770 980 080 Phone Number Atlanta City 30339 Zip Code rjersey@popeandland.com E- Mecklenburg County Where Project is Located this Application c. rjersey@popeandland@com E-mail Project is ►I' New ❑ Modification (of an existing permit) If Modification, Permit No.: 2. Owner is 0 Public (skip to Item B(3)) 2a. If private, applicant will be: 4a Private (go to Item 2(a)) 2b. If sold, facilitie ned by a (must choose o Retaining Ownership (i.e. store, church, single office, etc.) or ❑ Public Utility (Instruction C) 0 Leasing units (lots, townhomes, etc, - skip to item B(3)) 0 Selling units (lots, townhomes, etc. - go to item B(2b)) CMUD ❑ Homeowner Assoc./Developer (Instruction D) Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project pine Creek Name of WWTF CMUD I5b 8" Owner of Downstream Sewer Receiving Sewer Size The origin of this wastewater is (check all that apply): El Residential Subdivision Apartments/Condominiums ❑ Mobile Home Park El School ❑ Restaurant ❑ Office 4b. NC0024970 WWTF Permit No. ® Gravity i5c 100-08-509 0 Force Main Permit # of Downstream Sewer (Instruction E) Retail (Stores, shopping centers) 0 Institution 0 Hospital ❑ Church ❑ Nursing Home ❑ Other (specify): 100 % Domestic/Commercial % Industrial (attach description.) (RO: contact your Regional Office Pretreatment staff) % Other (specify): 7. Volume of wastewater to be allocated or permitted for this particular project: 1,747 gallons per day *Do not include future flows or previously permitted allocations 8. If the permitted flow is zero, indicate why: Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line 0 Flow has already been allocated in Permit No. 0 Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 M. 13,436 sf / 1,000 sf =13.436 13.436 x 130 gpd = 1,747 gpd 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) New Gravity or Additional Force Main 8" 324.67 Gravity 11. Summary of Pump Stations wl associated Force Mains to be Permitted (attach additional sheets as necessary) W Pump Station Location ID (self chosen - as shown on plans/map for reference) ATION (CONTIN Design Flow (MGD) Operational PointPower GPM @TDH Reliability Option 1 - permanent generator MATS; 2 - portable generator w!MTS Force Main Size Force Main Length Pump Station Location ID (self chosen - as shown on planslmap for reference) RMIT INFORM Design Flow (MGD) Operational Point GPM @TDH Power Reliability Option 1 - permanent generator w/ATS; 2 - portable generator wIMTS Force Main Size Force Main Length Pump Station Location ID (self chosen - as shown on plans/map for reference) _ Ll.l 0. Di Design Flow (MGD) Operational Point GPM @TDH Power ReliabilityOption 1 - permanent generator wIATS; 2 - portable generator wIMTS Force Main Size Force Main Length 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? ® Yes ■ No If Yes, permit number of 2"s treatment facility ^Irwin Creek (RO — if "yes" to B,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? ® Yes 0 No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION 14. Have the following permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings - General Permit or 401 Certification? Sedimentation and Erosion Control Plan? Stormwater? []Yes LINO ®Yes No Yes ©No ® N/A [] N/A E N/A 15. Does this project include any high priority lines, [see 15A NCAC 02T .0402 (2)] involve aerial lines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months Check if Yes: EJ and provide details 1a. ©wnerfPermittee's Certification: (Signature of Signing Official and Project Name) a, Richard Jersey , attest that this application for City Park Retail has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil -Wallies up to $25,000 per violation, igning ©ffi+' al Signatu 7;-13 Date ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMI l I AL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY! u) TO OTHER UTILITIES, DESIGN CALCULATIONS. ETC. REFER TO 15A NCAC 02T .0305 z 0 I— 2, Professional Engineer's Certification. (Signature of Design Engineer and Project Name) !, Bryan C. Metzler attest that this application for City Park Retail has been reviewed by me and ILL is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting }�. documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $1 0, 000 as well as civil penalties up to $25, 000 per violation. 2a. Bryan Metzler Professional Engineer Name 2b. Merrick & Compan Engineering Firm 2c. 1001 Morehead Square DR. STE 530 Mailing Address 2d. Charlotte City 2g. 704 529 6500 2h. 704 522 0882 Telephone Facsimile 2e. NC 2f. 28203 State Zip 2i. bryan.metzler@merrick.com E-mail NC PE Seal, Signature & Date Signing Official Signature GF WA7 ,,9 State of North Carolina QC. Department of Environment and Natural Resources j. r Division of Water Quality --; -<• Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Merrick & Company Project Name for which flow is being requested: City Park Retail. More than one FTSE-10/07 may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek WWTP b. WWTP Facility Permit #: NC0024970, NC0024945, NC0024937 All flows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 99.0 10.902 66.8 0.0017 74.325 75.1% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD III. Certification Statement: I, 4a eryy . tt e_r ' frt. , certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am the responsible party. Signature of this form indicates acceptance of this ' a water flow. //2/f3 Date CHARLOTTE. CHARLOTTE-MECKLENBURG UTILITY EPARTMENT June 24, 2013 Mr, Joshua Motes Merrick & Company 1001 Morehead Square Drive Charlotte, NC 28203 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE CITY PARK RETAIL TAX PARCEL# 143-131-09 C-MU TRACKING# 600-13-566 A flow acceptance study of the subject site has been completed and the following has been determined: Charlotte -Mecklenburg Utility Department agrees to accept the gravity sewage flow of 1,747 gallons per day (13,436 ft2 retail space with food prep x 130 gpd/1,000 ft2) from this project for transmission to the McAlpine Creek Wastewater Treatment Plant, NPDES permit number NC0024970, for treatment, This acceptance of flow is based on the existing capacity of the designated publicly owned treatments works. Please see attached FTSE form. Charlotte -Mecklenburg Utility Department agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986, and The Water Supply Management Plan, dated October 2005, (WSMP # 05-01702 & PWS ID # 0160010), on file with the Public Water Supply Section of NCDENR. However, Charlotte -Mecklenburg Utility Department cannot guarantee a constant pressure or quality of flow. Due to the involvement of other agencies and continuing growth of the water and sewer system, the ability to provide service for future projects cannot be guaranteed nor reserved, Connection to the Charlotte -Mecklenburg Utility Department system is accepted on a first come, first served basis, The applicant should understand that this letter is not authorization to construct private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained and construction has not started within one (1) year of issuance of this flow acceptance letter. and payment for any service connection s has not been received within (1) year of the issuance of this flow acceptance letter this flow acceptance approval shall be rescinded and a new flowacceptance study must be made. If you have any questions, you may contact me at (704) 432-5801, Sincerely, Barbara Gross Engineering Assistant CHARLOTTE-MECKLENBURG UTILITY DEPARTMENT Engineering Division • Installation & Development Services www. cm util ities.com 700 North Tryon Street Charlotte, NC 28202 Ph: 704/432-5801 Fax: 704/432-5804 Go Address W Tyvola Rd Charlotte, NC Oxford -City Park North Carolina Secretary of State Page 1 of 1 Account Login Register North Carolina Elaine F Marshall DEPARTMENT OF THE Secretary SECRETARY OFSTATE PO Sox 29622 Raleigz, NC 27626-0622 (919)807,2000 Date: 7/29/2013 Click here to: View Document Filings 1 PC, PLLC, LP and Non -Profit entities are not required to file annual reports. Corporation Names Name NC P&L COLISEUM, L.P. Limited Partnerships Information Name Type LEGAL SOSID: Status: Effective Date: Dissolution Date: Citizenship: State of Inc.: Duration: Registered Agent 0836829 Current -Active 3/27/2006 FOREIGN GA .12/31 /2026 Agent Name: Office Address: Mailing Address: Principal Office RADINGER, PATRICK L 214 NORTH TRYON STREET, 47TH FLOOR CHARLOTTE NC 28201 214 NORTH TRYON STREET, 47TH FLOOR CHARLOTTE NC 28201 Office Address: Mailing Address: Officers 3225 CUMBERLAND BOULEVARD, SUITE 400 ATLANTA GA 30339 3225 CUMBERLAND BOULEVARD, SUITE 400 ATLANTA GA 30339 This website is provided to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: 1107 • http ://www.secretary.state.nc.uslcorporati ons/Corp.aspx?Piternl d=7943962 7/29/2013 ME" I To: Dee Browder NCDENR 610 E. Center Avenue Mooresville, NC 28115 TRANSMITTAL Date: 7/25/2013 Document: Fast Track Appl cation Ref.: City Park Retail Job #: 65117846 Sent Via: Fed Ex The following material has been transmitted to you this date: Quantity Description 1 Original Fast Track Application 1 Copy of Fast Track Application # Check for $480.00 1 Original Operational Agreement 2 Copies of Operational Agreement. 1 Water and Sewer Flow Acceptance 1 Form FTSE-10/07 1 USGS Map and Street View Map Remarks Dee, Enclosed is the Fast -Track Application for the Oxford - City Park apartments, located within the City Park Development in Charlotte, NC. Please let me know if you have any questions or need additional information. Respectfully submitted, Merrick & Company By: Joshua Mote Project Manager_', errick Received by Date. Time: 0e1CHAlFrojedI51784.6.0O-City Park Retail' Pl.lC rrespondencrPTransmittaisiNC[1F lRVDFi Browder. D. FTA-dec°x 7125113 2:1 `,I PM Permit Number WQ0036662 Central Files: APS SWP 08/09/13 Permit Tracking Slip Program Category Status Project Type Non -discharge Active New Project Permit Type Fast Track Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer 1.00 Individual Extensions Primary Reviewer Permit Contact Affiliation sujatha.nagulapally Coastal SW Rule Permitted Flow 1747 Facility Facility Name Major/Minor Region City Park Retail Minor Mooresville Location Address Owner County Mecklenburg Facility Contact Affiliation Owner Name Owner Type P&L Coliseum LP Non -Government Dates/Events Owner Affiliation Richard Jersey Dev Manager 3225 Cumberland Blvd Atlanta GA 30339 Orig Issue App Received 08/09/13 07/29/13 Draft Initiated Scheduled Issuance Public Notice Issue Effective Expiration 08/09/13 08/09/13 Regulated Activities Re•uested/Received Events Retail Additional information requested Wastewater collection Additional information received Outfall NULL Waterbody Name Stream Index Number Current Class Subbasin