Loading...
HomeMy WebLinkAboutNCC200575_NOT Closeout Documents_20211117J \ r ROY COOPER v ; a, �IICHAEL 5. REGAL! ]94 ivrarti .�M� ZfW.l+�� BRIAN WRENN \IoRTH c.aRocINA ?irarror EnOrortmental Quaiiry SEDIMENT AND EROSION CONTROL & CONSTRUCT10+N STORMWATER INSPECTION REPORT Dear Sir or Madam: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDE5 Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, ,-. James B. Edwards Environmental Senior Specialist (252) 946-6481 Enclosure: Sediment/Construction S}ormwater inspection Report D- E Q u?lrewn• �-gym,. N]ui}� .. '•I'�I w_ __ �1• •'.1 S'• _ tiL.• Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Martin Project: Line 204 Gas Line Relocation Project Person financially responsible: Piedmont Natural Gas - Kelsey Pace, Project Project #: Manager Address: 4720 Piedmont Row Drive, Charlotte, NC 28210 1. Project Location: U.S. Hwy 17, Williamston Pictures: No 2. Weather and soil conditions: sunny, cool, dry River basin: Roanoke MARTI-2020-001 Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No if Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one. Inspection report: Sent Report Title: Date given/sent: November 10, 2021 Yes 9. Corrective act' n needed• � ermanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspect ions are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction 10. Comments: Activities (NCGOI) must be requested by the permitter via a Notice of Termination (NOT). The NOT is available at: htt s://edoes.de .ne. ov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: James Edwards Others present: Date of inspection: November 09, 2021 Time arriving on site: 9:35 AM Time leaving site: 9:50 AM