HomeMy WebLinkAboutNCC213787_NOT Closeout Documents_20211117North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200
County: Wake Project: AT&T Zebulon, NC (A0212J7) River basin: Neuse
Person financially responsible: Bellsouth Telecommunications, LLC - Kevin Project #: WAKE-2021-086
Hogsed, Manager
Address: 10610 Metromont Pkwy, Ste 206, Charlotte, NC 28269
1. Project Location: Shepherd School Road & others, Zebulon
Pictures: No
2. Weather and soil conditions: sunny, dry, workable Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): no one on site Title:
Inspection report: Sent Report Date given/sent: November 16, 2021
9. Corrective action needed:
Yes
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Kimberly Summers Others present: Joe Dupree
Date of inspection: November 16, 2021 Time arriving on site: 12:00 PM Time leaving site: 12:10 PM
cc: