Loading...
HomeMy WebLinkAboutNC0005363_Inspection_20140523ATA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary May 23, 2014 Mr. Issa J Zarzar Duke Energy Progress Inc Weatherspoon Plant 491 Power Plant Road Lumberton, NC 28358 SUBJECT: May 22, 2014 Compliance Evaluation Inspection Duke Energy Progress Inc Weatherspoon Steam Electric Plant Permit No: NC0005363 Robeson County Dear Mr. Zarzar: Enclosed please find a copy of the Compliance Evaluation Inspection form from the inspection conducted on May 22, 2014. The Compliance Evaluation Inspection was conducted by Mark Brantley, Environmental Senior Specialist, of the Fayetteville Regional Office. The facility was found to be in Compliance with permit NC0005363. As a reminder, preservation of the Waters of the State can only be achieved through consistent NPDES Permit compliance. Comments Demolition activities are ongoing and is scheduled to be completed in the fall of 2014. There was no discharge at outfall 001 at the time of the inspection. Also there was no discharge at the coal ash pond outfall at the time of the inspection. Please refer to the enclosed inspection report for additional observations and comments. If you or your staff have any questions, please call me at 910-433-3327. Sincerely, 1 yy Mark Brantley Environmental Senior Specialist Division of Water Resources DENR cc: Kent Tyndall, Environmental Professional Central Files Fayettev___,..il F esJ Fayetteville Regional Office 225 Green Street, Suite 714, Fayetteville, North Carolina 28301-5095 Main Phone: 910-433-3300 1 Internet: http://www.ncdenr.gov An Fnual Onnnrtnniiv 1 Affirmative Action Emolover— Made in Dart by Recycled Paoer United States Environmental Protection Agency EOMB PA Washington, D.C. 20460 1 Water Compliance Inspection Report Form Approved. No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection 1 INI 2 15 I 31 NC0005363 111 121 14/05/22 117 Type Inspector Fac Type 18I C I 19I S I 20III IIII I I I I III66 Remarks 21IIII IIII I I I I I 1 I I 1 I I I IIII IIII III•IIIII Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved-------------- 67I 169 7° III 71 I N I 72 I N I 731 1 174 751 1 1 1 1 I 1 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Weatherspoon Steam Electric Plant 491 Power Plant Rd Lumberton NC 28358 Entry Time/Date 09:30 AM 14/05/22 Permit Effective Date 10/01/01 Exit Time/Date 11:30 AM 14/05/22 Permit Expiration Date 14/07/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Anthony Lin Locklear/ORC/910-270-7001/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted J Mark Frederick,PO Box 1551 Raleigh NC 276021551//919-368-3580/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Waters as necessary) li Permit Records/Reports : ' Facility Site Review ' Effluent/Receiving Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Mark Brantley FRO WQ//910-433-3300 Ext.727/ , n-te1w7-ei`— S^ -.23 -/y i. Signature o Mana ement Q eviewer Agency/Office/Phone and Fax Numbers Date / . l . e 6:9a.) 3 / Ldi EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page # 1 NPDES yr/mo/day Inspection Type NC0005363 111 12 I 14/05/22 117 18 1 C 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Comments Demolition activities are ongoing and is scheduled to be completed in the fall of 2014. There was no discharge at outfall 001 at the time of the inspection. Also there was no discharge at the coal ash pond outfall at the time of the inspection. Page # 2 Permit: NC0005363 Owner - Facility: Weatherspoon Steam Electric Plant Inspection Date: 05/22/2014 Inspection Type: Compliance Evaluation Permit (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: Coal fired facility and associated equipment (excluding Ash Pond) has been shut done and removed. Demolition crews are removing concrete and and final grading and reseeding is scheduled to be complete by October 2014. Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Comment: Facility has not had a discharge event since 1999. Yes No NA NE ®nnn n n®n W HEW ®nnn ® nnn Yes No NA NE ®nnn ®nnn n n n Page # 3